ment is a part of the national development system which is implemented by all the components of the community and government according to the regional initiative within the framework of the Indonesian Republic of Indonesia

-4-

12. Planning is the process for determining the right future actions, through the order of choice, by taking into account the available resources.

13. The Regional Development Planning System (SPPD) is a unit of planning development planning to generate development plans in the long, medium-term, and annual development plan. elements of organizer of local government and society.

14. The Regional Long-Term Development Plan, which was later shortened to RPJPD, was a planning document for a period of 20 (twenty) years containing the vision, mission and direction of development of the area referring to the National RPJP.

15. The Regional Long-Term Development Plan (RPJMD) is a planning document for a period of 5 (five) years that is the definition of vision, mission and regional head program that contains the direction of financial policy, development strategy. region, general policy and program of area device workunits, cross-unit work area devices and regional programs are accompanied by a work plan within the regulatory framework and the indicative funding framework.

16. Regional Government Work Plan called RKPD, is a Regional planning document for a period of 1 (one) year that contains the design of the regional economic framework, the priority of regional development, the work plan and its funding is well executed. by the local government and its place by encouraging community participation.

17. The Regional Development Plan of the Regional Device Workspace, which is subsequently called the Renstra-SKPD, is a SKPD planning document for a period of 5 (five) years from the area of the area device work that contains the vision, mission, purpose, strategy, policy, program and development activities that are compiled in accordance with the task and function of the area device work unit with guideline on the indicative RPJMD.

18. The Annual Development Plan of the Regional Device Workforce, which is next called the Renja-SKPD-abbreviated Regional Device Workspace Plan, is a Regional Device Workspace planning document for a period of 1 (1) year period The policy, program and development activities are either directly implemented by the local government and the ones that are taking place by encouraging community participation.

19.Musyawarah Development Planning which is next abbreviated as Musrenbang is The forum between the perpetrators of development in order to build up The area and the National Development Plan.

20. The RKA-SKPD is a planning and budgeting document that contains revenue plans, program shopping plans and SKPD activities as well as financing plans as a basis for the drafting of APBD.

21. Vision is a common formulation of the desired state at the end of the planning period.

22. The mission is a common formulation of the efforts to be implemented to realize the vision.

23. Strategy is the steps of a program-a program of indicative programs to realize the vision and mission.

-5-

24. Policy is the direction or action taken by the local government to achieve the goal.

25. A Program is a policy instrument that contains one or more activities performed by the local government/agency to achieve objectives and objectives and obtain a budget allocation or community activities coordinated by the Government. Area.

26. The Regional Device Workspace Program is one or more activities of a Regional Device Working Unit in the Regional Government.

27. The Regional Workspace Program is a policy instrument that contains one or more activities of multiple State Device Workunits within the Regional Government.

28. The Regional and Cross-Area Program is a policy instrument that contains one or more integrated regional activities between the Regional Device Workspace of the Local Government.

29. Activities are part of a program performed by one or more work units, as part of the achievement of the measured goals on a program and consists of a set of resource deployment actions, both of which are personnel (SDM), Capital goods including equipment and technology, funds, or any combination of some or all types of resources are input (input) to generate output in the form of goods and services.

30. A function is the embodiment of government duties in a particular field that is exercised in order to achieve the national or Regional development goals.

31. Government affairs are the functions of the government which are the rights and obligations of every level and/or order of government to govern and take care of such functions as their authority in order to protect, serve, and to protect the functions of the government. empowering, and welfare for society.

32. Control is a series of management activities that are intended to ensure that a program/activities are implemented according to the plan specified.

33. Monitoring is the activity of observing the development of development plans, identifying and anticipating the problems that arise and/or will arise for action as early as possible.

34. Evaluation is a series of activities comparing the realization of input (input), output (output), and basil (outcome) to the established plans and standards.

35. Efficiency is the degree of relationship between the goods/services generated through a program/activities and the resources required to produce such goods/services that are measured at the cost per unit output (output).

36. Effectiveness is a measure that shows how far the program/activities achieve basil and the expected benefit.

37. The target (target) is the expected basil of an expected program or output of an activity.

38. Input is a resource-in-person (SDM), capital goods including equipment and technology, funds, and time or a combination of some or all of the types of resources needed to carry out activities.

39. Output is the goods or services generated by the activities implemented to support the achievement of the goals and objectives of the program and policy.

-6-

40. Outcome is everything that reflects the functioning of the output of the activities in a single program.

BAB II

ASAS AND PURPOSE

Article 2

(1) Regional Development is organized under a democracy with the principles of concurrent, justice, continuous, environmental insight as well as independence by maintaining the balance and progress of the area.

(2) The development planning of the area is organized systement's organizer.

4. Bupati is the regent of Poso. 5. The Regional People's Representative Council, later abbreviated to DPRD

is the Regional People's Representative Council of Poso Regency. 6. The Poso Regency Regional Development Planning Board

subsequently called Bappeda is the Working Unit responsible for the execution of the task and development planning function in Poso Regency.

7. The Regional Revenue and Shopping Budget, which is next abbreviated as APBD is an annual financial plan of local government established with regional regulations.

8. The next version of the ToolPD is a unit of work that is in the Poso Regency Government Environment.

9. A system is a one-way unit and a process to produce something.

10. The National Development is an effort implemented by all the components of the nation in order to achieve a state goal.

11. The Regional Developy. (2) Musrenbang Village/Kelurahan regard development program

middle-term village as well as input from source and participant describing the real problems facing the community and the village.

-10-

(3) The Village Musrenbang/Kelurahan participants are at least comprised of the elements of the Village Government, the Institute of Public Affairs, the social organization/social organization, the religious organization and the local public figures, who are accompanied by the Local Government apparatus by engaging roles as well as women.

(4) The Musrenbang Village/Kelurahan result is an annual development plan document that is poured in the news of the event: a. a priority list of activities that can be implemented alone by

Village/Kelurahan concerned; b. list of activities that can be implemented through the Budget

Revenue and Shopping Village and the public swadaya; c. list of priority activities proposed to Musrenbang Subdistrict; d. list of names of the village delegation to follow Musrenbang District.

(5) The village chief/Lurah obliged to deliver the results of Musrenbang Village/Kelurahan to Camat.

Article 20

(1) Musrenbang District is held no later than the month February.

(2) Musrenbang Subdistrict aims to combine proposed development plan from SKPD in the district of the district concerned.

(3) Musrenbang Subdistrict as the synchronization stage of the participation planning results from Village/Kelurahan that is accommodated in Musrenbang Village/Kelurahan.

(4) Neighbourhood Musicians at least comprise the elements of SKPD, Subdistrict, Village Government, Village Corrections, Social Organization/community organization, religious organization and member of the DPRD in an election area concerned, by involving the role as well as the female.

(5) The result of Musrenbang Subdistrict is a document of development plans poured in the news of the event: a. list of priority activities proposed to Musrenbang Regency; b. list the names of the subdistricts to follow the SKPD Forum and

Musrenbang District. (6) Camat is required to convey the result of Musrenbang Subdistrict to the Regent

via Head of Bappeda.

Article 21

(1) Bappeda organizes the SKPD Forum. (2) The SKPD Forum as referred to in paragraph (1) is the slowest

in the second week of March. (3) The SKPD Forum is implemented after Musrenbang Subdistrict. (4) The SKPD Forum is followed by all SKPD and related agencies

Regional development as well as sub-district representatives by engaging roles as well as women.

(5) The SKPD Forum is organized to report the Renja SKPD Design with Musrenbang Subdistrict Results.

(6) The results of the SKPD Forum are the final draft of Renja SKPD are the RKPD Design Drafting guidelines.

Article 22

(1) Bappeda compiled an initial RKPD design as a Musrenbang County material.

-11-

(2) The Musrenbang Regency is held by no later than the month

March. (3) Concourse of Musrenbang County at least composed of elements

Local government, DPRD and community, by engaging roles as well as women.

(4) Bappeda is required to convey the result of Musrenbang Regency to the Regent through County Secretary.

Article 23

(1) Based on the results of Musrenbang Regency, Bappeda composed

RKPD final design. (2) The result of Musrenbang Regency must go through the Technical Review

by the Integrated Team by engaging the elements DPRD, Colleges and Related SKPD.

(3) RKPD is set with the Bupati Regulation. (4) Based on the RKPD as referred to in paragraph (2) the SKPD Chief

compiling the final design of Renja-SKPD. (5) Renja-SKPD is set with the SKPD Chief Regulation.

Article 24

(1) Musrenbang Village/Kelurahan is financed with the Revenue Budget and

Village Shopping each/APBD. (2) Musrenbang Subdistrict, Forum SKPD and Musrenbang Regency in

finance APBD.

The Fifth Part of the Responsibility and Duty of the Musrenbang Implementation

Article 25

(1) The Head of the Village (Lurah) is responsible for hosting the Musrenbang

Village/Kelurahan. (2) Camat is responsible for hosting Musrenbang Subdistrict. (3) Bappeda is responsible for hosting the Term Musrenbang

Area length, Regional Medium Term Musrenbang and SKPD Forum and District Musrenbang.

Article 26

Further provisions on the layout of the implementation The Regional Long-Term Musrenbang, Regional Mid-Term Musrenbang and Regional Annual Musrenbang are governed by the Regent Regulation.

BAB VI

CONTROL OF THE IMPLEMENTATION PLANNING OF THE AREA

Article 27

The construction of the construction planning implementation is intended to guarantee the goal of the goal. and the development goals are labled in the plan, carried out through monitoring and surveillance activities.

-12-

Article 28

(1) Controlled by the regent, in implementation it is performed by Bappeda for the overall development planning of the area and by the Head of SKPD for the program and/or activities In accordance with the principal task and function

(2) Bappeda exercised the synchronization and coordination of the implementation of development plans, whether sourced from APBD or APBN, by assembing and analyzing the bending basil Head of the SKPD's planned development plan.

(3) SKPD performs implementation of development plans, whether sourced from APBD or APBN in accordance with their respective duties and authority.

Section 29

(1) SKPD performs implementation monitoring of Renja-SKPD which includes

program labeling and activities in accordance with its duties and authority, both sourced from APBD and APBN.

(2) Bappeda performs the monitoring of the implementation plan, whether sourced from APBD or APBN in accordance with its duties and its authority.

(3) Monitoring the execution of programs and activities as referred to in paragraph (1) and verse (2) is conducted against the development of the absorption realization of funds, the realizations of the output of the output (output), and the constraints encountered.

(4) The monitoring results as referred to in paragraph (1) and the verse (2) are arranged in laopran form Periodic and single-level.

BAB VII EVALUATION OF PLAN EXECUTION DEVELOPMENT

Section 30

(1) The evaluation is conducted against the implementation of Renja-SKPD and RKPD for

assessing the performance success of a program/activities based on the indicators and performance objectives set forth in Renstra-SKPD and RPJMD.

(2) Evaluation conducted against the execution of Renstra-SKPD and RPJMD to assess the efficiency, effectiveness, benefit, impact and sustainability of a program.

(3) Evaluation as referred to in paragraph (1) and paragraph (2) is performed based on the resource used as well: a. indicators and perform

has been established with the Bupati Regulation. (2) SKPD sets Renja-SKPD Final Design into Renja-SKPD

with the SKPD Chief Decision. (3) Renja-SKPD into the RKA-SKPD drafting guidelines.

Fourth Section

Tata Ways Implementation Of The Annual Musrenbang

Article 18

The Regional Annual Musrenbang consists of: a. Musrenbang Village/Kelurahan; b. "Muslow". c. SKPD/Combined SKPD d forum. Musrenbang Regency.

Article 19

(1) Musrenbang Village/Kelurahan is held at the slow pace of the month

Januar plan ready for a set of 4 (four) steps. The first step is the preparation of a technocratic, thorough, and measurable design plan. The second step, each of the government's inctance, prepares the design of a plan of work with guidelines on the design plan that has been prepared. The next step is to involve the public (stakeholders) and the government through the Consulteration of Development Planning. The fourth step is the construction of the final design plan. The next phase is the designation of a plan into a legal product so that it binds all parties to implement it. According to these Regional Regulations, the area 's long-term development plan is set to be area regulations, the area' s medium-term development plan is set as area regulations, and the area ' s annual development plan is set as The Regent's Rules.

The implementation of the development plan is intended to guarantee the goal and objectives of the development that are stated in the plan through the course of correction and regret during the execution of the plan. by the Head of the Regional Device Workforce. Furthermore, Bappeda set up and analyzed the basil monitoring of the implementation of the development plans of each of the head of the regional Device's Workforce in accordance with its duties and authority. Evaluation of the implementation of the plan is part of a development planning activity that systematically collects and analyzes data and data information and information for the assessment of the achievement of means, objectives and performance of development. This evaluation is conducted based on the indicators and performance objectives listed in the development plan document. Performance indicators and objectives include input (Input), output (Output) and basil (Outcome). In order for development planning, every Working Unit

The area of the area is obligated to carry out the evaluation of the development performance that is and or is associated with its function and responsibility. In implementing the development performance evaluation, the Regional Device Works Unit, follows the guidelines and instructions for performance evaluation performance to guarantee the uniformity of the methods, materials and sizes suitable for each term of a plan.

4. Systematics of the Regulation of the Regions is structured with systematics as follows: general provisions, azas and objectives, scope of planning of regional development, stage planning stages, drafting and determination of plan, control implementation of the development plan, evaluation of execution of development plans, data and information, institutional, and closing provisions.

II. SECTION BY SECTION

Article 1 is fairly clear

Article 2 of the paragraph (1)

Quite clearly paragraph (2)

Quite clearly paragraph (3)

The "General Asas of the State" is included: 1. Asas "legal certainty" i.e. asas in a legal country that priorses

the cornerstone of legislation, wrineness, and fairness in any State Organizing policy;

2. The principle of "order of state" is the principle that is the cornerstone of the rules, the centenary, and the balance in the control of the State;

3. Asas "common interests" are principles that precede common welfare in an aspirational, acomodative, and selective manner;

4. Asas "openness" is the principle that opens up against the right of the people to obtain the correct, honest and undiscriminatory information about hosting the country with regard to the protection of personal rights, groups, and State Secret;

5. The principle of "proportionality" is the principle that priorities the balance between the rights and obligations of the State Organizing;

6. Asas "professionalism" is an asas that priorates the expertise in code of ethics and the provisions of the laws of law; and

7. "Accountability" of "accountability" which determines that any activity and end result of the State Organizing activities must be accountable to the people or the people as the highest sovereign state holder of the country in accordance with the terms of the IBM International Program. Laws.

paragraph (4) The letter a

referred to as "The Builder" is the government (Central, Province, County and city), the business world, and the community. The coordination of the development perpetrators in the government also includes the execution of development planning.

The letter b referred to as "Regions" is the boundary of an area that is administratively limited to a particular boundary. The meaning of "space" is a platform that includes land, ocean, and air as a place of territory where humans and other beings live and perform activities nurturing a survival. The "time" is a period of long-term, medium, and long-term development. This goal demanded that the construction plan be prepared by the principle of building that

is continuously consistent from one development period to the next priode.

The c c Is Pretty Clear

The d-letter

referred to by "optimizing" is the best possible way in achieving desired results. "society" is all parties of both citizens and residents as individuals, groups of people including indigenous legal societies or legal entities that are concerned with the activities and outcomes of good development as well as the "people". Charges, perpetrators, recipients, or recipients of both direct or indirect risk. The "participation of the public" is the participation of the public to accommodate their interests in the process of drafting development plans.

The letter e

Quite clearly Article 3

paragraph (1) referred to as the "macro planning" is a planning that is on the grammar of the county policy. The "field of life" among other religions, idelogi, political, economic, social, cultural, legal, defence and security.

paragraph (2) Is quite clear

Article 4 of the paragraph (1)

The direction of regional development is a strategy for achieving Area's long-term development goals.

paragraph (2) Understanding the region refers to a space that is a geographical entity with all the associated elements, whose limits and systems are determined by functional aspects. The "indication" is that the information, both about the necessary resources and the output and the impact set forth in this plan document, is only a forecast to be achieved and not rigid. The Poso Regency Mid-Term Development Plan in this Section is the Regional Strategic Plan (Renstrada) of Poso Regency.

paragraph (3) It is fairly clear

Article 5 of the paragraph (1)

Clearly a paragraph (2)

Quite Clearly Article 6

The four stages of this planning are implemented in a continuous way so as a whole to form a whole cycle.

Article 7 of the paragraph (1)

Pretty Clear The paragraph (2)

Quite Clearly Article 8

paragraph (1) Is Clear Enough

paragraph (2) Is Clear Enough

Section 9 paragraph (1)

Quite clearly verse (2)

Quite clearly paragraph (3)

Clearly Article 10

paragraph (1) Iied out according to the government. Plans for the top-down and lower-upper process are aligned through deliberations that are performed well at the National, Provincial, Kabupaten/ City, District and Village levels.

3. Development Planning consists of four (four) stages: (1) Plan Drafting; (2) Plan Assignment; (3) The execution of plan execution; and (4) Evaluation of the execution of the plan. The four stages are organized continuously so that overall form one whole planning cycle. The process of planning is implemented to produce a complete design of as Clear Enough

paragraph (2) Is Clear Enough

paragraph (3) Is Clear Enough

Article 11 paragraph (1)

Quite clearly verse (2)

Quite clearly paragraph (3)

Quite Clearly Article 12

paragraph (1) Is Clear Enough

paragraph (2) Is Clear Enough

paragraph (3) Quite Clearly

paragraph (4) Is Clear Enough Article 13

paragraph (1) Is Clear Enough

paragraph (2) Clear Enough

Section 14 paragraph (1)

Quite Clearly paragraph (2)

Quite clearly paragraph (3)

Quite clearly paragraph (4)

Quite Clearly Section 15

paragraph (1) Is Clear Enough

paragraph (2) Is Clear Enough

Verse (3) The composition of the Musrenbang in order to assemble the RKPD other than followed by the elements of the Government also include the include and/or absorbing the aspirations of the related community, among other Professorites, College, Community Swadaya Society, Indigenous People, and Religious Affairs, as well as the World Kalangan.

paragraph (4) Is Pretty Clear

Article 16 paragraph (1)

Quite clearly verse (2)

Pretty Clear Article 17

paragraph (1) Is quite clear

paragraph (2) Pretty clear

paragraph (3) Pretty clear

Article 18 Is Pretty Clear

Article 19 paragraph (1)

Clear enough verse (2)

Pretty Clear paragraph (3)

Pretty Clear paragraph (4)

Quite Clear paragraph (5)

Quite Clearly Section 20

paragraph (1) Is Clear Enough

paragraph (2) Is Clear Enough

paragraph (3) Is Clear Enough

paragraph (4) Is Quite Clear

paragraph (5) Is Quite Clear

paragraph (6) Is Clear Enough

Article 21 paragraph (1)

Quite clearly verse (2)

Quite clearly verse (3)

Quite clearly verse (4)

Quite clearly paragraph (5)

Clear enough

paragraph (6) Is Clear Enough

Section 22 paragraph (1)

Quite clearly paragraph (2)

Quite clearly paragraph (3)

Quite clearly paragraph (4)

Quite Clearly Article 23

paragraph (1) Is Clear Enough

paragraph (2)

Clear enough verse (3)

Quite Clear paragraph (4)

Quite Clear paragraph (5)

Quite Clearly Section 24

paragraph (1) Is Clear Enough

paragraph (2) Is Clear Enough

Section 25 paragraph (1)

Quite clearly paragraph (2)

Enough Clear paragraph (3)

Clearly Article 26

Quite Clearly Article 27

Quite Clearly Article 28

paragraph (1) Is Clear Enough

paragraph (2) Pretty Clear

paragraph (3) Pretty Clear

Article 29 paragraph (1)

Quite clearly verse (2)

Quite Clear paragraph (3)

Quite Clear paragraph (4)

Quite Clearly Section 30

paragraph (1)

Pretty Clear The paragraph (2)

Pretty Clear The paragraph (3)

Pretty Clear The paragraph (4)

Pretty Clear The paragraph (5)

Pretty Clear Article 31

paragraph (1) Is Clear Enough

paragraph (2) Is Clear Enough

paragraph (3) Quite Clear

paragraph (4) Is Quite Clear

paragraph (5) Clear Enough

Section 32 paragraph (1)

Quite clearly verse (2)

Quite clearly verse (3)

Quite clearly paragraph (4)

Quite clearly paragraph (5)

Quite clearly Article 33 Quite clearly Article 34

referred to by "Data" is an objective description of a good fact in the form Quantitative, qualitative, and visual (images) images obtained either by direct observation or from those collected in print or other storage devices. Whereas "information" is a processed data that is used to obtain an interpretation of a fact.

Article 35 Is Clear Enough Article 36

paragraph (1) Is Clear Enough

paragraph (2) Is Clear Enough

paragraph (3) Is Clear Enough

Article 37 Is Clear Enough