REGULATION OF THE CITY AREA
JULY 20, 2012 NUMBER: 12 2012 ABOUT: CONSTRUCTION SERVICES VENTURE PERMIT
The Regional Secretariat Of The City Of Sukabumi The Legal Section
2012
LEAF CITY AREA
NUMBER 12 2012
MUNICIPAL REGULATION OF THE CITY
NUMBER 12 YEAR 2012
ABOUT:
THE CONSTRUCTION SERVICES PERMIT
WITH THE GRACE OF THE GOD ALMIGHTY
THE SUKABUMI MAYOR,
DRAWS: A. that under Section 14 of the paragraph (1) of the Government Regulation No. 28 of 2000 on
The Construction and Role of the Construction Services Society
and to further optimize the coaching,
setting and service, the activities of the service effort
construction, then City Regional Regulation
Sukabumi Number 4 of 2002 on Construction Services Permit Permit to be adjusted
return;
b. that based on considerations as
referred to the letter a as well as for legal certainty, then it needs to form
back the Regional Rule of Business License
Construction Services;
Given: 1. Article 18 of the paragraph (6) of the Basic Law
Republic of Indonesia in 1945; 2. Act ...
-2-
2. Law No. 17 of 1950 on the Establishment of the Small City Regions in
East Java Propinsi Environment, Central Java,
and West Java (Republic of Indonesia State News
dated 14 August 1950) as it has
amended with Act Number 13 of the Year
1954 on Rechange Act Number 16 and 17 of 1950 Republican Gazette
Indonesia in 1954 No. 40, additional
sheet of state of Republic of Indonesia No. 551);
3. Law Number 18 of 1999 on Construction Services (Republican Gazette
Indonesia In 1999 No. 54, Supplement
sheet of state of the Republic of Indonesia Number
3833);
4. Law No. 28 of 1999 on the Clean and Free State of the Year
Corruption, Colusion, and Nepotism (State Sheet
The Republic Of Indonesia In 1999 Number 75,
Extra Sheet Of State Of The Republic Of Indonesia
Number 3581);
5. Law No. 28 of 2002 on
Building Building (Republican Gazette
Indonesia In 2002 Number 134, Supplement
sheet of State of Indonesia Number
4247);
6. Law No. 32 Year 2004 on
Local Government (Republican Gazette
Indonesia Year 2004 Number 125, Supplement
sheet of State of the Republic of Indonesia Number 4437) as has been several times amended last
with Act Number 12 of 2008
about the Second Amendment to the Act
Number 32 Year 2004 on Governance
Regions (State Sheet of the Republic of Indonesia
Year 2008 Number 59, Extra Sheet Republic of Indonesia No. 4844);
7. Act ...
-3-
7. Law Number 12 Year 2011 on Formation of the Laws
(sheet of state of the Republic of Indonesia in 2011
number 82, Additional Gazette Republic of State
Indonesia Number 5234);
8. Government Regulation No. 28 Year 2000 on the Effort and Role of Community Services
Construction (State Sheet of the Republic of Indonesia
Year 2000 Number 63, Additional Sheet Country
Republic of Indonesia Number 3955), as it has been
Last modified with Government Regulation No. 92 of 2010 on the Second Amendment
On Government Regulation No. 28 of 2000
on the Effort and Role of Community Services
Construction (Republican Gazette) Indonesia
2010 No. 157);
9. Government Regulation No. 29 Year 2000
on the Hosting Of Construction Services (Sheet
The State Of The Republic Of Indonesia 2000 Number 64,
Additional State Sheet 3956)
as amended by Regulation Government Number 59 of 2010 on
Changes to Government Regulation No. 29
Year 2000 on Hosting Of Services
Construction (Sheet Country Republic Of Indonesia
Year 2010 Number 95);
10. Government Regulation Number 30 Year 2000
on Hosting Of Services
Construction (State Sheet Of The Republic Of Indonesia
Year 2000 Number 65, Additional State Sheet
Republic Indonesia Number 3957);
11. Government Regulation Number 36 Year 2005
on Law Enforcement Act
No. 28 Year 2002 on Building Building
(sheet State of the Republic of Indonesia in 2005
No. 83, Additional Sheet of State Republic of Indonesia No. 4532);
12. Rules ...
-4-
12. Government Regulation Number 79 of 2005
on the Coaching And Supervision Guidelines
of the Regional Government Smuggling
(Indonesian Republic of Indonesia Year
2005 Number 165, Extra State Sheet
Republic of Indonesia Number 4593);
13. President's Law No. 54 of 2010
on the Acquisition of Government Goods/Services
as amended by Regulation
President Number 35 of 2011 on Change of Presidential Regulation No. 54
TAhun 2010 about the Acquisition of Goods/Services
Government;
14. City Regional Rule Number 3
In 2005 About Investigations Of Local Civil Servers (city Area Sheet
Sukabumi Year 2005 Number 2 Series E-1);
15. City Regional Rule Number 2
In 2008 on the Government Affairs of the City of Sukabumi (City Area Sheet
Sukabumi Year 2008 Number 2);
16. The City of Sukabumi Regulation No. 6
In 2008 about the Establishment and
The organization of the organization of the device organization of the city of Sukabumi (a sheet of Sukabumi City Area
Year 2008 Number 6);
17. City Regional Rule Number 9
In 2012 About Building A Building (Sukabumi Town Area Year
2012 Number 32);
With .......
-5-
With A Joint Agreement
THE CITY REGIONAL PEOPLE ' S REPRESENTATIVE COUNCIL
SUFFRAGAN
and
SUKABUMI MAYOR
DECIDED:
SET: COUNTY REGULATION ABOUT THE PERMIT FOR THE CONSTRUCTION SERVICES.
BAB I
provisions of UMUM
Article 1
In this Region Regulation referred to:
1. Area is the City of Sukabumi.
2. The Regional Government is hosting
government affairs by the Local Government
and the DPRD according to the principle of autonomy and duties
governs with the principle of autonomy as broad as-
breadth in the system and principles of the State of Unity Republic of Indonesia as
referred to in the Country Basic Law
Republic of Indonesia 1945.
3. The Local Government is the Mayor and the Regional Device as an Organizing element
Local Government.
4. The Regional Chief is the Mayor of Sukabumi.
5. Service ...
-6-
5. The next General Employment Service is called the City Public Works Department
Sukabumi or Regional Device Working Unit
(SKPD) that has led to construction services.
6. The Office is the Office of Cultivation Capital and
Integrated Service of the City of Sukabumi or SKPD that is drugging Perizinan.
7. Head of the Office is the Head of the Planting Office
Capital and Integrated Services City of Sukabumi
or the SKPD Chief who is combating Perizinan.
8. The Entity is the Entity ID in the form
Limited liability (PT), Koperative, or not
The Legal Agency among others Cv, Firm.
9. Construction services are a consulting services for construction work planning, service services
implementation of construction work, and services
construction job surveillance consulting services.
10. A Construction Services effort is an effort in the service planning consultancy services
construction, job implementation services service
construction, and consulting services services
surveillance of construction work.
11. BUJK is a business entity that
moves its efforts in the field of services
Construction.
12. The next Concurrent Construction Services license (IUJK) is the required permit for
a private person or BUJK that organizes
a construction service effort across the region
The Republic of Indonesia provided by
Local Government or Officials designated in
place domicilinya.
13. Work ...
-7-
13. Construction work is the overall or part of the series of activities
planning and/or execution and/or execution and
supervision that includes work
architecture, civil, mechanical, electrical, and
environment each and
its agility, to realize a building or another physical form.
14. A Construction planner is a service provider
an individual person or BUJK that
is declared an expert and professional in the field of planning a capable construction service
embodied work in the form
planning document building or form
another physical.
15. Construction Managing is an individual or BUJK person services provider that
is declared an expert and professional in the field
performing capable construction services
organizes its activities for
realizing a result planning to be another building or physical shape.
16. Construction Supervisor is a service provider
person or BUJK stated
ahli/professional in the service supervision field
constructs capable of carrying out surveillance work since inception
execution of construction work until
finished and was handed over.
17. A service user is a person or entity as a taskholder or owner
job/project that requires services
construction services.
18. A service provider is an individual person
or a body whose business activities provide construction services services.
19. Domicile ...
-8-
19. Domicile is the place of establishment and/or position/address of a fixed enterprise body
in performing the activities of the Services
Construction.
20. The certificate is:
a. A proof of recognition in the designation of classification and qualification of competence
and the business capabilities of the services
construction, either person-shaped
individual or business entity;
b. Proof of recognition or competency and skill profession skills
work and workmanship persons
individuals in the field of construction services
according to the disciplines of scientists and/or
certain skills and/or
certain funccability and/or specific expertise;
c. Enterprise certificate, next
SBU;
d. Certificate of expertise, which is next
called SKA; e. Skills certificate, which is next
called SKT.
21. Classification is a part of the registration activities
to set the business group
in the field of construction services according to the field and sub field of job construction services or
skill profession group and
expertise Individual work in the field
construction services according to the scientific discipline
and/or certain skills and/or specific functicians and/or expertise
respectively.
22. Qualifications .......
-9-
22. Qualification is a part of the registration activities
to set the business group
in the field of construction services according to
level/depth competencies and
business skills, or professions of the profession
skills and Individual work skills are in the field of construction services
according to competency level/depth and
profession skills and expertise.
23. Coaching is an activity setting, enablement, and oversight that
is a Local Government for Providers
Services and Services Users.
24. The institution is the Service Development Institute
construction in accordance with the mandate of the laws.
BAB II
ASAS, INTENT, AND PURPOSE
Article 2
The granting of IUJK is based on honesty principles
and fairness, benefits, uniformity, balance, independence, openness, partnership, security,
and safety in the interests of the community,
nation, and country.
Section 3
IUJK grant means permission
to the individual person or BUJK who
organizes Construction Services Effort in
Regions.
Article 4 ........
-10-
Article 4
The IUJK grant objective is:
a. ensuring the regularity of the settings and
coaching the Construction Services Effort;
b. Improve the business climate that
is healthier;
c. the reliability of the company's reliability;
d. protect community interests and
coaching in the Construction Services field.
e. Supports increased efficiency and
effectiveness of resource use in construction of means and physical infrastructure.
BAB III
CONSTRUCTION SERVICES VENTURE
Section 5
(1) Services Effort Construction includes:
a. business type;
b. effort form; and
c. field of construction effort.
(2) The type of construction services is made up of efforts
construction planning, implementation efforts
construction, and the construction of each construction surveillance exercised by
construction planners, construction executors,
and construction supervisors.
(3) The planning services, execution services, and construction surveillance services as
referred to the paragraph (2) can be performed
integrally.
(4) Forms .......
-11-
(4) The form of the Construction Services Act as referred to in paragraph (1) letter b includes
an individual person and BUJK business effort.
(5) The field of construction services efforts include
architectural and/or civil work
and/or mechanical and/or electrical and/or environmental, respectively
and its agility.
Section 6
(1) To be able to execute the work
construction of the Construction Planning, Executable
Construction, and Construction Supervisor which
shaped the Agency is required to have IUJK.
(2) IUJK as referred to in paragraph (1) must list the Classification and
Qualification of the Construction Services.
(3) The Classification and Qualification of the Services
Construction as intended on the paragraph (2) must conform to the listed
in the BUJK Certificate.
BAB IV
CONSTRUCTION SERVICES VENTURE PERMIT
Part Kesatu
General Principles of IUJK Publishing
Article 7
The principle of implementation of IUJK publishing:
a. Depaning the prime service;
b. reflect professionalism;
c. is a means of coaching Effort Services
Construction.
Article 8 .......
-12-
Article 8
(1) Regional Head through Office Head
publishes IUJK to BUJK which has
meets the requirements.
(2) IUJK is published to BUJK which is domiciled in the Regions.
(3) IUJK is published in the form of the Certificate.
(4) The office is required to submit IUJK responses periodically at any
3 (three) months to the Head of the Regions.
(5) IUJK as referred to in paragraph (2)
applies to carrying out the activities of the Business
Construction Services in the The entire territory of the Republic of Indonesia.
Article 9
(1) The office in publishing IUJK as referred to in Section 8 of the paragraph (1) is based on
recommendations of the Chairman of the Pembina Team or that
appointed by the Chairman Team of Services
Construction.
(2) The Pembina team as referred to in paragraph (1) is set by the Regional Chief.
Article 10
(1) The recommendation as referred to in Article 9 of the paragraph (1) may be provided to BUJK
the most bit to meet the criteria:
a. The Entity ID (SBU), Certificate
Skills (SKA), and/or Certificate
The BUJK-owned Skills (SKT)
is published in accordance with the provisions of the laws of the law;
b. Location .......
-13-
b. The location of the BUJK office corresponds to the letter
the domicile description;
c. The BUJK is not currently
hit by sanctions; and
d. The concerned BUJK is not currently
entry into the blacklist.
(2) In giving a recommendation, the Service
The Local Public Works can do field verification first if
is required.
The Second Part
IUJK Service Request
Article 11
(1) The office provides IUJK publishing services
based on the application in writing from BUJK.
(2) The type of application as referred to in
paragraph (1) includes:
a. new IUJK appeals;
b. extension IUJK;
c. data changes; and/or
d. IUJK closure.
(3) IUJK publishing process is performed at least 10
(ten) business days after the document
requirements are declared complete.
Part .......
-14-
Third Section
Requirements
Paragraf 1
BUJK Requirements
Article 12
(1) BUJK that applied for IUJK
is mandatory for the Engineering Respond
Entity ID (PJT-BU).
(2) PJT-BU as referred to in paragraph (1) mandatory SKA and/or SKT in accordance with
Classification and workforce qualification
construction.
(3) PJT-BU as referred to in paragraph (1)
is required to have an engineering charge card provided by the Office.
(4) the engineering and/or power power that
maintains a fixed power status on a The enterprise entity,
is prohibited as a fixed force on individual persons or business entities
others in the same construction services field
(5) Further provisions on the terms
IUJK appeals and The charge card
the technique as referred to in 11 and Section 12 paragraph (1) is specified with or
based on the Regional Chief Regulations.
Article 13
(1) BUJK with the status of a branch or representative
operating in the Region is required to have
Classification and Qualification of appropriate efforts
with Classification and Qualification of the effort
is owned by the BUJK headquarters.
(2) BUJK ........
-15-
(2) BUJK with branch or representative status
must have IUJK records that have been
legalized by the IUJK Agencies in
the BUJK region parent is domiciled.
Paragraph 2
Individual Requirements
Section 14
(1) Compulsory Individual persons are required to have SKA/SKT, Corporate List Sign (TDP)
and are listed on the Office.
(2) People's efforts Individuals as
referred to paragraph (1) are given the Card
The list of people's efforts individual.
(3) The Card Request Requirements
Sign of the Individual Person Business List
as referred to in paragraph (2)
specified with or based on the Daearah Chief Regulation.
Fourth Section
The validity of the Documents
Article 15
(1) The office in the IUJK publishing process
does a check on the document
native BUJK pleas.
(2) The office can conduct field verification
to ensure the validity of the document
BUJK appeals as intended
in paragraph (1).
Part .......
-16-
Fifth section
IUJK Applicable Terms
Article 16
(1) IUJK has a period of 3
(three) years and may be extended for any expiration time.
(2) The extension in question
in paragraph (1) cannot be performed
if the BUJK is concerned over the duration of IUJK not
once following the procurement process
barang/merit.
BAB V
RIGHT AND LIABILITY
Article 17
IUJK holders have the right:
a. follow the service procurement process
construction;
b. getting coaching from the Government
Regions.
Section 18
(1) IUJK holders are required to meet
provisions about:
a. purified that includes general safety requirements, construction
buildings, and equipment quality accordingly
by applicable standard;
b. security .......
-17-
b. security, safety, and workplace health in accordance with the regulations
legislation;
c. Social security of the workforce in
execution of construction work in
with the laws of the law;
d. local environmental and environmental management appropriate
with the laws.
(2) IUJK holders are required to execute
exact construction work, quality, and time.
(3) IUJK holders with business fields
Construction and Supervising Executing
Conscription producing the product
construction according to specifications and design in the contract as well as referring to the provisions
perseverance.
(4) IUJK holders with the field of venture
The Construction Planning Event is required to produce a contract design that matches the contract
and refers to the persistence provision.
(5) IUJK holders are required to meet provisions
administration as follows:
a. Reports in the event of a BUJK data change and an individual person in
at the longest time 14 (fourteen) days
work after the data change;
b. delivered a year-end report delivered to the Office of the slowest
in December of the running year;
c. install the company's name sign
listing the IUJK number in place
BUJK berdomicile. BAB VI ........
-18-
BAB VI
EMPOWERMENT AND SUPERVISION
Article 19
Regional Head through the Regional Secretary and
The Head of Office performs Empowerment and
Supervision against IUJK grants with
way:
a. provide counseling on construction services laws;
b. provide information on the provisions
purified, security, safety, and
work health as well as the local environment;
c. conducting training on experts
and the skilled power of construction services;
d. disseminate the perijinan provisions
development; and
e. performing supervision for
being kept in order and
orderly utilization of construction services.
Section 20
(1) Empowerment and Supervision
as referred to in Section 19
is done through the periodic monitoring and evaluation of reports from
the BUJK leadership or data from the source
others are concerned.
(2) The order of empowerment as referred to in Article 19 is set by
Regional Head.
Article 21 .......
-19-
Article 21
(1) The Regional Head through the Head of the Office has
the authority to carry out the supervision
IUJK issuer and its use at any
construction work.
(2) In supervision execution, Head of Area
via Head Office makes a guideline
as a reference to conduct surveillance.
(3) The Head of the Regions through the Head of Office can conduct the evaluation of the data correctness
is shown in the SBU given by LPJK
by referring to the LPJK norm.
(4) If the results of checks or checks
conclude that the SBU submitted by the company turns out to be untrue, then IUJK-
is frozen to fix.
(5) The Head of the Regions via Office Head can
conduct an overall inspection of the construction job construction that is being implemented
to ensure that IUJK grants are not
abused as well as product quality
job results.
Section 22
(1) BUJK is required to report performance and/or
activities Construction Services efforts to the Office
for monitoring.
(2) Quality and quality monitoring provisions
the company follows the regulatory norms
applicable laws.
(3) Term reporting as
referred to paragraph (1) is determined by the Head of Office.
BAB VII .......
-20-
BAB VII
INFORMATION SYSTEMS
Article 23
The office can perform IUJK service data input into the Construction Services Information System.
BAB VIII
SANCTION ADMINISTRATION
Article 24
(1) The violation of the Regulation provisions
The area is sanctioned in the form of:
a. written warning, a reprimand that
does not stop and negate the right
attempting to the Entity ID;
b. freezing IUJK, which would
cause the company to not be allowed to carry out the work
construction for a while; or
c. IUJK revocation would negate
the Agency for the Effort.
(2) The introduction of the sanction against BUJK as referred to in paragraph (1) must
be announced to the general public
of which through the services information system
construction and/or notice board
at the Office.
Section 25
Offense against the requirements
determined to be sanctioned A warning
written.
Article .......
-21-
Article 26
BUJK will be subjected to IUJK freeze sanctions
if:
a. ignoring a written warning
as set in Section 25
as much as 3 (three) times with a timeout of 1 (one) month, but
not meeting its obligations and not
heeding the warning
delivered;
b. In violation of the provisions of Article 6 (3), Section 12 (1) and paragraph (4), and Article 18 of the paragraph (1)
letter a up to the letter c and verse (2)
up to paragraph (4); or
c. enter the blacklist.
Section 27
IUJK freezing mechanism as
referred to in Article 26 as follows:
a. IUJK certificate of BUJK dropped
sanction freeze is withdrawn by Office; and
b. The office published the caption letter
freezing of IUJK.
Article 28
BUJK will be subject to IUJK revocation sanctions if:
a. has been exposed to IUJK freeze sanctions
as much as 2 (two) times;
b. are getting freezing sanctions
IUJK as referred to in Article 26 but still carrying out the work; or
c. has proven to cause failure
construction and/or building failure.
Article .......
-22-
Article 29
(1) For the individual person's efforts
commits a breach of the provisions
Section 14 of the paragraph (1) is charged with fine
at most Rp 5,000.00 (five million
RUPIAH).
(2) Denda as referred to in paragraph (1)
is the Regional acceptance.
The frozen
IUJK may be enacted
returns when it has met the criteria as
following:
A. The Entity has heeded the warning and executed
its obligations in accordance with the provisions
apply;
b. The Agency is declared to be unproven to be committing an economic criminal appropriate
with a judicial body decision that
has had a fixed legal force.
Article 31
IUJK reenaccation mechanism
as referred to in Article 30 is
as follows:
a. The entity is applying for the IUJK reinstatement in writing
with the proof of fulfilment of liability
required to the Office;
b. The office checks the application of the application and
does field verification if
is perceived to be;
c. If ...
-23-
c. If the application file and the proof of the fulfilment of the obligation are declared feasible,
The office may provide a letter
IUJK's reinstatement;
d. The Office may provide the Certificate
IUJK to BUJK the applicant; and
e. The office announces to the public
the general is through the information system
Construction services and/or boards
announcements on the Office.
BAB IX
provisions TRANSITION
Article 32
(1) IUJK given before
promulred this Regional Regulation
is stated to remain in effect until the expiration date of the permit.
(2) In terms of SKA, SKT, and/or Mail
Adorance PJT-BU enablement is not yet
adequate in the Area, usable:
a. Education and Training Certificate
with construction management materials
issued by the institutions
at the longest applicable
2 (two) years; or
b. Provisional Letter letter
issued by Head of the PU Service that
declares the concerned
competent as PJT-BU with a period
applies the longest 2 (two) years.
(3) On ......
-24-
(3) At the time the Regional Regulation is starting
in effect, the governing provisions regarding
Construction services are declared to remain in effect
as long as not contradictory and/or
not to be replaced by Regulation
This area.
BAB X
provisions CLOSING
Article 33
Regulation of the Act of Regional Regulations
this is set at most shortly 1 (one) years
counting since the Rule of this Area
promulred.
Article 34
At the time the Regional Regulation came into effect,
The Regional Rule of the City of Sukabumi Number 4 of 2002 on Construction Services Permit Construction
(Sheet Area Of The City Of Earth 2002
Number 5 Series B-2) revoked and declared not
in effect.
Article 35
The rules of this section begin to apply to the date
promulred.
So that everyone knows it, ordering the Rules inviters
This area with its discoverer
The Sukabumi City Area Sheet.
Set ...
-25-
Specified in Sukabumi
On July 20, 2012
SUKABUMI MAYOR,
cap.ttd.
MOKH. MUSLIKH ABDUSGRATITUDE
Reundraed at Sukabumi
On July 20, 2012
SECRETARY OF THE CITY OF SUKABUMI REGION,
cap. ttd.
H. M. N. HANAFIE ZAIN
THE YOUNG PRINCIPAL TAMPER
NIP. 19580518 198503 1 009
LEAF OF THE CITY OF SUKABUMI AREA 2012 NUMBER 12