REPUBLIC OF INDONESIA STATE NEWS

No. 1131, 2014 KEMEN ESDM. A purchase. Power. PLTA. PT PLN (Persero). Change.

REGULATION OF THE MINERAL RESOURCE ENERGY MINISTER

REPUBLIC OF INDONESIA

NUMBER 22 IN 2014

ABOUT

CHANGES TO THE ENERGY MINISTER ' S REGULATIONS AND

MINERAL RESOURCES NUMBER 12 OF 2014 ABOUT

ELECTRIC POWER PURCHASE FROM THE HYDROELECTRIC POWER PLANT

BY PT STATE ELECTRICITY COMPANY (PERSERO)

WITH THE GRACE OF GOD ALMIGHTY

MINISTER OF ENERGY RESOURCES OF THE MINERAL REPUBLIC OF INDONESIA,

DRAWS: A. That in order to maximize the potential utilization of hydropower from reservoirs and/or irrigation channels, it is multipurpose for the Hydroelectric Power Plant and to maintain the sustainable operation of the Power Power Plant. Water is up to 10 MW which is already in operation, needing to fine-tune the arrangement regarding the purchase of electric power from the Air Power Plant by the State Electric Power Company (Persero) as referred to in the Minister of Energy and Resources Regulation. Mineral Power Number 12 Year 2014;

b. that under consideration as intended in the letter a, it is necessary to establish the Regulation of the Minister of Energy and Mineral Resources on the Changes to the Minister of Energy and Source Regulations

www.peraturan.go.id

2014, No. 1131 2

Mineral Power Number 12 Year 2014 About The Purchase Of Electric Power From The Hydroelectric Power Plant By The State Electricity Company PT (Persero);

Given: 1. Law No. 19 of 2003 on the State Owned Entity (Indonesian Republic of Indonesia Year 2003 Number 70, Additional Gazette of the Republic of Indonesia No. 4297);

2. Law No. 30 Year 2007 on Energy (State Sheet Indonesia Year 2007 Number 96, Additional Gazette Republic of Indonesia Number 4746);

3. Law No. 30 Year 2009 on Fame (leaf of State of the Republic of Indonesia Year 2009 Number 133, Additional Gazette of the Republic of Indonesia No. 5052);

4. Government Regulation Number 23 Of 1994 On The Diversion Of The State (perum) State Electricity Company Into The Perseroan Company (persero) (state Gazette Of The Republic Of Indonesia In 1994 Number 34);

5. Government Regulation No. 14 of 2012 on the Activities of the Provision Of Electrical Power (sheet Of State Of The Republic Of Indonesia In 2012 Number 28, Additional Gazette Of The Republic Of Indonesia Number 5281);

6. President's decision No. 59 /P of 2011 dated October 18, 2011;

7. Regulation of the Minister of Energy and Mineral Resources No. 18 of 2010 on the Organization and the Working Governance of the Ministry of Energy and Mineral Resources (2010 Republic of Indonesia News No. 552) as amended by the Regulation of the Minister of Energy and Mineral Resources (2010). Energy and Mineral Resources No. 22 of 2013 (State News of the Republic of Indonesia 2013 Number 1022);

8. Regulation of the Minister of Energy and Mineral Resources Number 12 of 2014 on the Purchase of Electric Power From the Air Power Plant by PT Corporate Electric Company (Persero) (State News of the Republic of Indonesia 2014 No. 594);

www.peraturan.go.id

2014, No. 11313

DECIDED:

Establishing: REGULATION OF ENERGY MINISTER AND MINERAL RESOURCES ON CHANGES TO THE REGULATION OF ENERGY MINISTER AND MINERAL RESOURCES NUMBER 12 OF 2014 ABOUT THE PURCHASE OF ELECTRIC POWER FROM THE HYDROELECTRIC POWER PLANT BY THE STATE ELECTRIC COMPANY (PERSERO).

Article I

Some provisions in the Regulation of the Minister of Energy and Mineral Resources Number 12 of 2014 on the Purchase of Electric Power From the Hydroelectric Power Plant By PT Corporate Electric Company (Persero) (State News The Republic of Indonesia in 2014 No. 594) was changed as follows:

1. The provisions of Article 3 of the paragraph (1) are amended so that Article 3 reads as follows:

Article 3

(1) With the Regulation of this Minister, the Minister assigned PT PLN (Persero) to purchase an electric power from:

a. The PLTA with a capacity of up to 10 MW (ten megawatts) is managed by the venture body as referred to in Article 2 which has already had IUPTL;

b. PLTA utilised hydropower from reservoir/dam and/or irrigation channels whose construction is multipurpose with a capacity of up to 10 MW (ten megawatts) managed by the venture body as referred to in Article 2 that have been Have the IUPTL.

(2) The Assignment as referred to in paragraph (1) applies as:

a. immediate appointment agreement for the purchase of electric power by PT PLN (Persero); and

b. the approval of the purchase price of electric power by PT PLN (Persero).

2. The provisions of Article 4 paragraph (1) are amended so that Section 4 reads as follows:

Section 4

(1) The purchase price of electricity from the PLTA with capacity up to 10 MW (ten megawatts) as referred to in Article 3 is specified with regard to the electrical grid voltage of PT PLN (Persero), and the plant location/region (factor F) with

www.peraturan.go.id

2014, No. 1131 4

magnitude as set forth in Appendix to the IA and IB Annex which is an inseparable part of this Minister's Regulation.

(2) The purchase price of an electric power as referred to by paragraph (1) is already Including the entire cost of procuring a network of splicing from a plant to the PT PLN (Persero) power grid and is the price used in the PJBL without any price negotiation and without any escalation.

3. The provisions of Article 6 of the paragraph (1) letter b are amended so that Article 6 reads as follows:

Article 6

(1) PT PLN (Persero) may purchase an electric power from:

a. PLTA with a capacity above 10 MW (ten megawatts); or

b. PLTA uses hydropower from a reservoir/dam and/or irrigation channel whose construction is multipurpose with a capacity above 10 MW (ten megawatts).

(2) The purchase price of an electric power from the PLTA as referred to in paragraph (1) is based on a deal between PT PLN (Persero) with the business entity.

(3) The purchase price as referred to in paragraph (2) is mandatory for approval. Minister.

4. The provisions of Article 18 paragraph (1), paragraph (2), and paragraph (4) are amended so that Article 18 reads as follows:

Article 18

(1) At the time the Regulation of the Minister comes into effect, the purchase price of electricity from the PLTA with capacity up to 10 MW (ten megawatts) of the entity that has obtained a designation as a PLTA developer of PT PLN (Persero) and the price is specified under the terms before the Regulation of this Minister applies, stated to remain in effect.

(2) Price the purchase of an electric power as referred to the paragraph (1) may be adjusted, with provision:

a. The business entity, as referred to in verse (1), should first be designated as the hydropower manager for the power plant by the General General EBTKE;

b. to be designated as the water power manager as referred to in the letter a, the business entity is required to deliver a request to Dirjen EBTKE by attaching a copy of the entire development related document

www.peraturan.go.id

2014, No. 11315

The plant-owned PLTA, and for the entity whose generation has been operating must attach a report to the plant's operations.

(3) The value adjustment of the purchase of electric power as referred to in the verse (2) is based on a deal between PT PLN (Persero) with the business entity, provided the terms:

a. the weighted average price as set forth in Annex III which is an inseparable part of the Regulation of the Minister is used as the highest benchmark price in the negotiation process;

b. The price of the purchase of electric power proceeds of the deal is fixed and directly poured in the PJBL and the expiring term until the end of the PJBL.

(4) The purchase price adjustment process as referred to in paragraph (3) must be completed within the slowest term of 90 (ninety) business days since the establishment of an entity as the water power manager for the power plant in accordance with the terms of the applicable law. with the applicable mechanisms and procedures regarding the adjustment of the purchase price of an electric power.

(5) The purchase price as referred to in paragraph (3) the letter b must get the Minister ' s approval.

(6) In terms of the price adjustment process cannot be completed within 90 (90) days of work. In a verse (4), then PT PLN (Persero) must report a reason for the uncut of the deal to the General General of EBTKE.

(7) Following the signing of the PJBL as referred to in paragraph (3) letter b, the provisions apply:

a. against the uninitiated body of the PLTA physical development is required to achieve the financial close fulfillment of (financial close) and begin the slowest nuclear power plant development activities in the term 6 (six) months since signing PJBL;

b. against the entity that has not been able to complete the physical development of the PLTA is required to begin continuing the physical development of the PLTA within the slowest term 3 (three) months since the signing of the PJBL;

c. in terms of the time limit as In the case of a failed attempt to fulfill its obligations, then the power plant for the power plant is revoked by the General Agent EBTKE and to the business agency

www.peraturan.go.id

2014, No. 1131 6

it imposed a ban on same-sex requests for a term of 2 (two) consecutive years from the date of the revocation.

Article II

The Ordinance of the Minister of inimulai is valid on the date of promulgance.

For everyone to know, order the Minister of the Ordinance with its placement in the News of the Republic of Indonesia.

Specified in Jakarta

on August 13, 2014

MINISTER OF ENERGY AND SOURCES DAYA

THE MINERAL REPUBLIC OF INDONESIA,

JERO WACIK

UNDRASED in Jakarta

on August 13, 2014

MINISTER FOR LAW AND HUMAN RIGHTS

REPUBLIC OF INDONESIA,

AMIR SYAMSUDIN

www.peraturan.go.id

2014, No. 11317

ATTACHMENT HE

REGULATIONS MINISTER OF ENERGY AND MINERAL RESOURCES REPUBLIC OF INDONESIA

NUMBER 22 IN 2014

ABOUT

CHANGES TO THE REGULATION OF THE MINISTER OF ENERGY AND MINERAL RESOURCES NUMBER 12 IN 2014 ABOUT THE POWER PURCHASE OF A HYDROELECTRIC POWER PLANT BY THE STATE POWER COMPANY (PERSERO)

THE ELECTRIC POWER PURCHASE PRICE

FROM THE HYDROELECTRIC POWER PLANT

WITH A CAPACITY OF UP TO 10 MW.

No.

Power Network Stretch

(Plant Capacity)

Location/Region

Purchase Price (Rp ./Kwh)

Factor

FYear 1st s.d. Year

8th

9th Year s.d. 20th Year

1.

Intermediate Range

(s.d. 10 MW)

Java, Bali, and Madura

1,075.0 x F 750.0 x F 1.00

2. Sumatra 1,075.0 x F 750.0 x F 1.10

3. Borneo and Sulawesi

1,075.0 x F 750.0 x F 1.20

4. West Nusa Tenggara and East Nusa Tenggara

1,075.0 x F 750.0 x F 1.25

5. Maluku and North Maluku

1,075.0 x F 750.0 x F 1.30

6. Papua and West Papua

1,075.0 x F 750.0 x F 1.60

www.peraturan.go.id

2014, No. 1131 8

7.

Low Volt

(s.d. 250 kW)

Java, Bali, and Madura

1.270.0 x F 770.0 x F 1.00

8. Sumatra 1.270,0 x F 770.0 x F 1.10

9. Borneo and Sulawesi

1.270,0 x F 770.0 x F 1.20

10. West Nusa Tenggara and East Nusa Tenggara

1.270.0 x F 770.0 x F 1.25

11. Maluku and North Maluku

1.270.0 x F 770.0 x F 1.30

12. Papua and West Papua

1.270.0 x F 770.0 x F 1.60

MINISTER OF ENERGY AND MINERAL RESOURCES

REPUBLIC OF INDONESIA,

JERO WACIK

www.peraturan.go.id

2014, No. 11319

ANNEX IB

REGULATIONS MINISTER OF ENERGY AND MINERAL RESOURCES REPUBLIC OF INDONESIA

NUMBER 22 IN 2014

ABOUT

CHANGES TO THE REGULATION OF THE MINISTER OF ENERGY AND MINERAL RESOURCES NUMBER 12 IN 2014 ABOUT THE POWER PURCHASE OF A HYDROELECTRIC POWER PLANT BY THE STATE POWER COMPANY (PERSERO)

THE ELECTRIC POWER PURCHASE PRICE

FROM THE PLTA UTILIZING THE WADUK/DAM AND/OR IRRIGATION CHANNEL CONSTRUCTION IS MULTIPURPOSE

WITH CAPACITY UP TO 10 MW

No.

Power Network Stretching

(Plant Capacity)

Location/Region

Purchase Price (Rp ./Kwh)

Factor

FYear 1 s.d. Tahun

8th

9th Year s.d. Year

20th

1.

Intermediate Range

(s.d. 10 MW)

Java, Bali, and Madura

967.50 x F 675.0 x F 1.00

2. Sumatra 967.50 x F 675.0 x F 1.10

3. Borneo and Sulawesi

967.50 x F 675.0 x F 1.20

4. West Nusa Tenggara and East Nusa Tenggara

967.50 x F 675.0 x F 1.25

5. Maluku and North Maluku

967.50 x F 675.0 x F 1.30

6. Papua and West Papua

967.50 x F 675.0 x F 1.60

www.peraturan.go.id

2014, No. 1131 10

7.

Lower stretch

(s.d. 250 kW)

Java, Bali, and Madura

1.143.0 x F 693.0 x F 1.00

8. Sumatra 1.143.0 x F 693.0 x F 1.10

9. Borneo and Sulawesi

1.143.0 x F 693.0 x F 1.20

10. West Nusa Tenggara and East Nusa Tenggara

1.143.0 x F 693.0 x F 1.25

11. Maluku and North Maluku

1.143.0 x F 693.0 x F 1.30

12. Papua and West Papua

1.143.0 x F 693.0 x F 1.60