Advanced Search

Regulation Of The Minister Of Energy And Mineral Resources By 2015 Number 03

Original Language Title: Peraturan Menteri Energi Dan Sumber Daya Mineral Nomor 03 Tahun 2015

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.

REPUBLIC OF INDONESIA STATE NEWS

No. 49, 2015 KEMEN-ESDM. Direct designation. Electric Power Purchase. The price of the benchmark. PLTU. PLTA. PLTG. PLTMG. Procedure. Revocation.

REGULATION OF MINISTER OF ENERGY AND MINERAL RESOURCES

REPUBLIC OF INDONESIA 03 YEAR 2015

ON THE PROCEDURE OF PURCHASING POWER AND THE BENCHMARK PRICE

THE ELECTRIC POWER PURCHASE FROM THE MINE MOUTH PLTU, THE " PLTU COAL, PLTG/PLTMG, AND PLTA BY PT COMPANY

ELECTRICITY OF STATE (PERSERO) THROUGH DIRECT ELECTION AND DIRECT DESIGNATION

WITH THE GRACE OF GOD ALMIGHTY

THE ENERGY MINISTER AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

Weigh: that in order to accelerate the development of the power plant by PT of the State Electricity Company (Persero) and to implement the provisions of Article 39 paragraph (2) of Government Regulation No. 14 of 2012 on the Activities of the Power Supply Service as amended with the Government Regulation No. 23 Year 2014, it needs to establish the Regulation of the Minister of Energy and Mineral Resources on the Electrical Power Purchase Procedure and the Purchase Price of Electric Power Purchase From the Mine PLTU, PLTU Coal, PLTG/PLTMG, and PLTA By PT Corporate Electricity Company (Persero) Through Direct and Direct Appointment;

www.peraturan.go.id

2015, No. 49 2

Given: 1. Law No. 22 of 2001 on Oil and Earth Gas (State of the Republic of Indonesia in 2001 Number 136, Additional Gazette of the Republic of Indonesia Number 4152);

2. Law Number 19 of 2003 on the State-owned Enterprises (Indonesian Republic of Indonesia Year 2003 Number 70, Additional Gazette of the Republic of Indonesia No. 4297);

3. Law No. 30 Year 2007 on Energy (State Sheet Indonesia Year 2007 Number 96, Additional Gazette Republic of Indonesia Number 4746);

4. Law No. 4 of 2009 on Mineral Mining and Coal (sheet of State of the Republic of Indonesia in 2009 No. 4, Additional Gazette of the Republic of Indonesia Number 4959);

5. Law No. 30 Year 2009 on Fame (leaf of State of the Republic of Indonesia Year 2009 Number 133, Additional Gazette of the Republic of Indonesia No. 5052);

6. Government Regulation No. 14 Year 2012 on the Activities of the Provision Of Electric Power (state Gazette Indonesia Year 2012 Number 28, Additional Gazette Republic of Indonesia Number 5281) as amended by Regulation Government Number 23 Of 2014 (sheet Of State Of The Republic Of Indonesia In 2014 Number 75, Additional Gazette Of The Republic Of Indonesia Number 5530);

7. President's decision number 121 /P of 2014 dated 27 October 2014;

8. Regulation of the Minister of Energy and Mineral Resources Number 001 in 2006 dated January 2, 2006 on the Electrical Power Purchase Procedure and/or Lease Lease The Network In The Business Of Providing Electricity To The General Interest as amended with the Regulation of the Minister of Energy and Mineral Resources Number 004 of 2007 dated May 11, 2007;

www.peraturan.go.id

2015, No. 49 3

9. Regulation of the Minister of Energy and Mineral Resources No. 18 of 2010 on the Organization and the Working System of the Ministry of Energy and Mineral Resources (State News of Indonesia 2010 Number 552) as it has been twice amended with the Regulation of the Minister of Energy and Mineral Resources No. 30 of 2014 (State News of the Republic of Indonesia 2014 Number 1725);

10. Regulation of the Minister of Energy and Mineral Resources No. 04 of 2012 on the Price of Electric Power Purchase by PT PLN (Persero) of the Power Plant Using Small and Medium Scale Renewable Energy or Electrical Power (State News of the Republic of Indonesia 2012 Number 128);

DECIDED:

Establits: REGULATION OF ENERGY MINISTER AND MINERAL RESOURCES ON THE PROCEDURE OF PURCHASING POWER POWER AND THE BENCHMARK PRICE OF ELECTRIC POWER PURCHASE FROM PLTU MINE MOUTH, PLTU COAL, PLTG/PLTMG, AND PLTA BY PT STATE POWER COMPANY (PERSERO) THROUGH DIRECT SELECTION AND DIRECT APPOINTMENT.

Article 1

(1) The State Electric Company (Persero) is obliged to meet the needs of electricity in its area of effort.

(2) In meeting the needs of the electricity power as it is referred to the paragraph (1) PT Corporate Electricity (Persero) can carry out electric power purchases from PLTU Mulut Mine, PLTU Batubara, PLTG/PLTMG, and PLTA.

(3) The purchase of electric power by the State Electric Company (Persero) as referred to in paragraph (2) with the permit holder of other power supply efforts to be carried out on the basis of an electric power supply plan.

(4) Electric power purchase of PLTU Mulut Mine, PLTU Batubara, PLTG/PLTMG, and PLTA as referred to in verse (2) can be done through direct election and direct appointment throughout meeting the criteria.

(5) the election Criteria directly as the verse (4) is:

www.peraturan.go.id

2015, No. 49 4

a. Diversification of energy for power generation to non-fuel oil; and/or

b. the addition of a power generation center generation capacity that has been operating at a different location on the local system, between the business entity's business permit enterprise or a new business entity set up by the developer. interested.

(6) The direct appointment Criteria as referred to in paragraph (4) is:

a. Electric power purchase done from PLTU Mulut Mine, marginal PLTG and PLTA;

b. purchase of excess electric power from PLTU Mulut Mine, PLTU Batubara, PLTG/PLTMG, and PLTA;

c. electric power purchase of PLTU Mulut Mine, PLTU Batubara, PLTG/PLTMG, and PLTA if the local electrical power system is in crisis condition or an emergency provision of electrical power; and/or

d. the electric power purchase of PLTU Mulut Mine, PLTU Batubara, PLTG/PLTMG, and PLTA in order to add generation capacity to the power plant center that has been operating at the same location.

(7) In terms of more of 1 (one) interested developers submitting an electric power purchase offering through direct designation as referred to in paragraph (6), the purchase of power is made by direct election.

Section 2

(1) PT Companies The State Electricity (Persero) is required to announce an electric power purchase plan as referred to in Section 1 in accordance with an electrical power supply plan.

(2) The purchase of an electric power as referred to in Section 1 is implemented through electronic procurement.

(3) In terms of procuring An electronic or electronic system is not accessible to the Cloud Service, and is not accessible to the electronic or electronic system.

Article 3 (1) of the Board of Directors of the State Electricity Company (Persero) set further

provisions concerning the procedure of purchasing power power through direct election and direct appointment as referred to in Section 1, with exclude provisions in

www.peraturan.go.id

2015, No. 49 5

The Ordinance of the Minister of Energy and Mineral Resources Number 001 in 2006 on the Electrical Power Purchase Procedure and/or Lease Lease The Network In The Effort Of Providing Electricity To The General Interest as it has been was amended by the Regulation of the Minister of Energy and Mineral Resources No. 004 of 2007.

(2) Direct election process as referred to in paragraph (1), preceded by a tuntas test of the technical and financial capabilities that a procurement agent may perform designated by the State Electric Company PT (Persero) and up to the signing of an electric power purchase agreement, at most 45 (forty-five) days.

(3) The direct appointment process as referred to in paragraph (1), preceded by a tuntas test of the technical and financial capabilities may be performed by the procurement agent party designated by the Company PT. State Electricity (Persero) and up to the signing of an electric power purchase agreement, at most 30 (thirty) days.

Section 4

Guna speeds up the process of purchasing electricity power as referred to in Section 1, PT Company The State Electricity (Persero) is required to compose:

a. the standard of the power generation procurement document; and b. the standard electric power buy agreement for each type

plant. Article 5

The purchase of electric power must meet the technical requirements that refer to the Indonesian National Standard (SNI) in the field of calm, international standards or other countries ' standards that do not conflict with ISO standards. (International Organization for Standardization) or IEC (International Electrotechnical Commission), and paying attention to regulations regarding the Internal Level of Internal Affairs (TKDN).

Article 6

(1) The highest benchmark price of purchasing power from PLTU Mulut Mine, PLTU Batubara, PLTG/PLTMG, and PLTA by PT Corporate Electricity Negara (Persero) as referred to in Section 1 is as set forth in The attachment that is an inseparable part of this Minister ' s Regulation.

www.peraturan.go.id

2015, No. 49 6

(2) The highest benchmark price of the purchase of electric power as referred to in paragraph (1), is based on the following: a. the highest benchmark price is the levellized base at

busbar plant; and b. The highest benchmark price is the price at the time

the plant was declared a commercial operation (Commercial Operation Date).

(3) Purchase of electric power for PLTU Mulut Mine, coal PLTU, PLTG/PLTMG, and PLTA implemented based on the highest benchmark price as referred to in paragraph (1) is not required for the approval of the sale of the electric power from Minister.

Article 7 By referring to the benchmark price as referred to in Article 6, the purchase price of an electric power can be made adjustments as determined in the electricity purchasing agreement.

Article 8 For the area In particular, the State Electric Company (Persero) can make an electric power purchase From a power plant at the price of the highest price, as referred to in Article 6, it is based on the estimated price of the State Electric Company (Persero), and is required to obtain the approval of the sale price of electricity from the U.S. Minister.

Section 9 Cooperation of the State Electric Company (Persero) with a permit holder of a power supply venture that has an area of venture for the purchase of electric power from the PLTU Mulut Mine, PLTU Coal, PLTG/PLTMG, and PLTA using the highest benchmark price of the purchase of electric power as intended in Article 6 and not required the consent of the Minister.

Article 10 At the time the Minister ' s Ordinance came into effect, the process of selling electric power through direct elections and direct designation of PLTU Mulut Mine, PLTU Batubara, PLTG/PLTMG, and PLTA above 10 MW which are currently running and are not yet undertaken/designation of candidates for developers or developers are exercised under this Minister's Regulation.

Article 11 At the time the Minister's Ordinance comes into effect: 1. The provisions of Article 16 paragraph (1), paragraph (6) and paragraph (7), and Section 19A paragraph

(3) and paragraph (4), the Regulation of the Minister of Energy and Mineral Resources

www.peraturan.go.id

2015, No. 49 7

Number 001 of 2006 dated January 2, 2006 on the Electrical Power Purchase Procedure and/or Lease Lease The Network In The Effort Of Providing Electrical Power To The General Interest as amended by the Regulation Minister of Energy and Mineral Resources No. 004 of 2007 dated 11 May 2007; and

2. The terms of the purchase price of excess power (excess power) as referred to in Article 2 of the Regulation of the Minister of Energy and Mineral Resources No. 04 of 2012 on the Price of the Purchase of Electric Power By PT PLN (Persero) of the Plant Electric Power Using Small and Medium Scale Renewable Energy or Electric Power, related to the purchase price of electric excess power (excess power) derived from PLTU Mulut Mine, PLTU Batubara, PLTG/PLTMG, and PLTA,

revoked and declared not to apply.

Article 12 of the Regulation The minister entered into force from the date of the promulcity.

For everyone to know it, ordered the invitational of the Minister's Regulation with its discoverer in the Republic of Indonesia News.

Set in Jakarta on the 12th. January 2015 MINISTER OF ENERGY AND MINERAL RESOURCES REPUBLIC OF INDONESIA, SUDIRMAN SAID

UNDRASED in Jakarta on January 13, 2015 MINISTER OF LAW AND HUMAN RIGHTS REPUBLIC OF INDONESIA YASONNA H. LAOLY

www.peraturan.go.id

2015, No. 49 8

ATTACHMENT REGULATION MINISTER ENERGY AND MINERAL RESOURCES REPUBLIC OF INDONESIA NUMBER 03 OF 2015 ON THE PROCEDURE OF PURCHASING POWER POWER AND THE BENCHMARK PRICE OF PURCHASING POWER POWER FROM PLTU MOUTH MINES, PLTU COAL, PLTG/PLTMG, AND PLTA BY PT PLN (PERSERO)

THE HIGHEST BENCHMARK PRICE OF PURCHASING POWER POWER

1. PLTU Mouth Mine

Netto Unit Capacity Class (MW) 100 150 600 600 Price (cent USD/kWh) 8.2089 7.6520 7.1862 6,9012 Asumption: Availability Factor (AF) 80% Contracted Month 30 Heat rate Kcal/kwh 3200 3000 2900 2700 Calorific Value (gar) Kcal/kg 3000 USD/ton Coal Price (CIF) 30

2. Non-Mouth Coal Power Plant

Unit Capacity Unit Netto (MW) Objective 10 15 25 50 100 150 600 1000

Price (cent USD/KWh) 11.82 10.61 10.60 9.11 8.43 7.84 7.25 6.96 6.96 6.31

Aconsumption: Availability Factor (AF) 80%

25-year Contracted Month Heat Rate Kcal/kwh 4160 3500 3450 3200 3000 2800 2600 2450 2290

Calorific Value (gar) Kcal/kg 5000

USD/ton Coal Price (CIF) 60

For the Price of Batubara using the principle Passthrough.

3. PLTG/PLTMG

Capacity Unit Netto (MW) 40-60 100 Price (cent USD/kWh) 8.64 7.31 Assumption: Availability Factor (AF) 85% 20-year Term Heat Rate BTU/kwh 9083 8000 Gas Price USD/MMBTU 6.00

www.peraturan.go.id

2015, No. 49 9

With provisions:

a. if it functions as s unit, then the price calculation takes up availability;

b. for PLTMG heat rate calculated based on the data heat rate Pabrikan; and

c. The price of gas is done by the passthrough principle.

4. PLTA

Total Capacity of Netto (MW) > 10-< 50 50-100 > 100 Price (cent USD/kWh) 9.00 8.50 8.00 Assumption: Availability Factor (AF) 60% Contracted Month 30