ial, with low pancar power, range of range

is limited, as well as to serve its community interests.

10. The next subscription of the Broadcasting Agency

abbreviated as LPB is the Indonesian legal entity's

commercial agency, whose field

its business only organizes broadcasting services

subscriptions.

11. A subsequent review of the hearings abbreviated as EDP

is the process of identifying, clarification and verification that

is implemented by the Indonesian Broadcasting Commission.

12. The eligibility recommendations for the hosting of the broadcast

subsequently abbreviated as RKPP are the decision letters

provided by the Indonesian Broadcasting Commission.

13. The next Joint Meeting Forum (FRB)

is a coordination platform between the Broadcasting Commission

Indonesia and the Government at the center level

authorities decide to accept or refuse

applications and The extension of the event

Broadcasting.

14. The applicant is an Indonesian legal entity that

applied for a broadcast for the hosting permit.

15. Selection is screening the frequency spectrum user

radio for hosting broadcasting.

16. The next broadcasting principle permit

called Principals is the approval given

by the Minister to the Broadcasting Institute to perform

broadcast test.

www.peraturan.go.id

2016, No. 1661

-6-

17. The next broadcast permit is abbreviated

IPP is the rights granted by the state to

The Broadcasting Agency for hosting the broadcaster.

18. The subsequent Payment Order Letter is abbreviated

SPP is the invoice of Princip and IPP

billing fees issued by the Director.

19. Transmitter Station is the site of a device for the device

broadcasting transmission that serves to

baiting a radio or television broadcast.

20. Broadcast Service Area is the broadcast service area

in accordance with the permission granted.

21. Radio Frequency Channel is part of the frequency band

radio set for a radio station.

22. The next Radio Station permit is abbreviated to ISR

permission for use in the form of radio frequency channel

based on a specific requirement.

23. The subsequent evaluation of the Broadcast Test (EUCS

) is an evaluation of the broadcast test run

to obtain the IPP.

24. Work Day is Monday to Friday except

a national holiday and a day off-day holiday.

25. The Minister is the Minister who organizes affairs

governments in the field of communication and informatics.

26. The Ministry is the Ministry that organizes

government affairs in the field of communication and

informatics.

27. The next Indonesian Broadcasting Commission is abbreviated

KPI is an independent state institution that

exists in the center and in the area, as a role as well as

society in the field of broadcasting.

28. The Director-General is the Director General of the task

and its functions in the area of broadcasting.

29. The General Directorate is the General Directorate

The Postal Service and Informatics.

30. The Director is the Director whose task and function in the

area of broadcasting.

www.peraturan.go.id

2016, No. 1661

-7-

Article 2

The scope of the Regulation of the Minister set about

the requirements and layout of the licensing of the

broadcasting covering:

a. Principle Permission;

b. IPP; and

c. IPP extension.

BAB II

TYPE OF BROADCAST HOSTING PERMIT

Article 3

Broadcasting agencies prior to hosting broadcasting

are required to obtain IPP.

Article 4

IPP as referred to in Section 3 is made up of:

a. IPP LPP Radio Republik Indonesia;

b. IPP LPP Television Republik Indonesia;

c. IPP LPP Local Service Radio Broadcasting Service;

d. IPP LPP Local Service Broadcasting Service;

e. IPP LPS Broadcasting Services Radio;

f. IPP LPS Services Broadcasting Service;

g. IPP LPK Broadcasting Services Radio;

h. IPP LPK Broadcasting Services Television;

i. IPP LPB Services Broadcasting Radio; and

j. IPP LPB Television Broadcasting Service.

Article 5

Broadcasting Agencies before acquiring IPP as

referred to in Section 4 of the letter c up to the letter j should

get the Princip's Permission first.

Article 6

IPP as referred to in Article 4 for services

radio broadcasting applies 5 (five) years and for services

www.peraturan.go.id

2016, No. 1661

-8-

The television broadcaster applies 10 (ten) years as well as it can be

extended.

BAB III

ESTABLISHING AND LICENSING REQUIREMENTS

Section Parts

Establishment Requirements

Paragraph 1

The Standing Requirements of the LPP

Section 7

(1) The LPP consists of:

a. LPP Radio Republik Indonesia;

b. LPP Television Republik Indonesia; and

c. Local LPP.

(2) Local LPP as referred to in paragraph (1) letter c

consists of:

a. LPP Local Service Radio Broadcasting Service; and

b. LPP Local Service Broadcasting Television.

Article 8

LPP Radio Republik Indonesia and LPP Television Republic

Indonesia is a broadcasting institution that has stood

and is designated as LPP as referred to in the

Act No. 32 of 2002 on Broadcasting

and its implementation rules.

Article 9

(1) The establishment of Local LPP must meet the requirements

as follows:

a. the form of a legal entity established by

The Local Government through the Regional Regulation

with the approval of the People's Representative Council

Regions on the public proposal;

www.peraturan.go.id

2016, No. 1661

-9-

b. no Republican Radio broadcasting station

Indonesia and/or Television Republik Indonesia at

the region of the broadcast service;

c. The radio frequency channel is in accordance with

broadcasting frequency master plan as

is set up in the provisions of the perinvite rule-

invitation;

d. the availability of professional human resources

and other resources so that the Locaing radio broadcasting activities or

broadcasting television, is independent, neutral, non-

commercial and serves to provide services to

the interests of the public whose broadcast is network

with Indonesian Radio of the Republic for radio and television

Republic of Indonesia for television.

www.peraturan.go.id

2016, No. 1661

-5-

8. The next private broadcasting agency abbreviated as LPS

is an Indonesian legal agency, which is the form of Indonesian legal entity, whose field

its efforts only host radio broadcasting services

or television.

9. The next: LPK is a radio or television Broadcasting Institute that

shaped Indonesian legal entities, founded by

a particular community, is independent, and not

commercion of the broadcast program is composed of:

1. broadcast time description, event eye material source

broadcast, target audience, and saing power; and

www.peraturan.go.id

2016, No. 1661

-14-

2. eye percentage of the overall broadcast event and

music broadcast details, as well as the daily broadcast show pattern

and weekly;

d. Technical data complete:

1. The list inventory of the means and infrastructure that will be

is used, including studio equipment and

transmitters, numbers and types of studios as well as

calculations for the investment costs;

2. image of the studio layout and location map of the station

broadcasting, the layout image of the transmitter station and

map the location of the transmitter station, as well as a map image

region of broadcast range and service area

its broadcasts;

3. Engineering specifications and equipment systems that would

be used with the system block diagrams

configuration; and

4. the proposed radio frequency channel and contour diagram

which is desirable.

PARAGRAPH 3

THE LICENSING REQUIREMENTS OF LPK

SECTION 16

THE LPK IPP REQUEST MUST ATTACH THE REQUIREMENTS

COVERING:

a. letter of request;

b. Administrative completeness consisting of:

1. setting intent and purpose

lists the name, vision, mission, and broadcast format

that will be held;

2. photocopy of the establishment and its changes as well as

the enactment of the legal entity or has been registered in

the authority of the authorized instance;

3. alignment and name of the organizers

broadcasting;

4. the feasibility study and work plan;

5. description of the application aspect;

www.peraturan.go.id

2016, No. 1661

-15-

6. description of the organizational structure ranging from the unit

highest work until the lowest working unit, including

the layout description attached to each working unit;

7. office address, narahubung (contact person), address

email (email), mobile phone number, and

any other valid identity that can be used

as a means of communication;

8. photocopy KTP administrator;

9. NPWP photocopies; and

10. photocopy of the Domisili Letter of Attraction;

c. the completion of the broadcast program is composed of:

1. broadcast time description, event eye material source

broadcast, target audience; and

2. eye percentage of the overall broadcast event and details

music broadcasts, as well as the daily broadcast show patterns and

weekly;

d. Technical data complete:

1. The list inventory of the means and infrastructure that will be

is used, including studio equipment and transmitters,

the number and type of the studio as well as the cost calculations

its investment;

2. image of the studio layout and location map of the station

broadcasting, the layout image of the transmitter station and

map the location of the transmitter station, as well as a map image

region of broadcast range and service area

its broadcasts;

3. Engineering specifications and equipment systems that would

be used with a diagram of the configuration system block;

and

4. the proposed frequency channel and contour of the diagram that

desired.

www.peraturan.go.id

2016, No. 1661

-16-

Paragraf 4

The LPB Licensing Requirements

Article 17

The IPP IPP plea must attach the requirements

includes:

a. letter of request;

b. Administrative completeness consisting of:

1. setting intent and purpose

lists the name, vision, and mission of the Institution

The subscription broadcaster will be held;

2. photocopies of the company's founding certificate and its changes

with the passage of the legal entity or have been registered

on the authority of the authorized instance;

3. alignment and name of the organizer manager

broadcasting;

4. the feasibility study and work plan;

5. description of the application aspect;

6. description of revenue projections (revenue) of

subscriptions and other authorized businesses and

are related to the hosting;

7. list of print media, Private Broadcasting Agency services

radio broadcasting, and/or the Private Broadcasting Institute

the television broadcasting services already owned by

The applicant;

8. description of the organizational structure ranging from the unit

the highest work up to the lowest working unit,

including the layout description attached to any

work unit;

9. office address, narahubung (contact person), address

email (email), mobile phone number, and

any other valid identity that can be used

as a means of communication;

10. photocopy KTP administrator;

11. NPWP photocopies; and

12. photocopy of Domisili Attraction;

www.peraturan.go.id

2016, No. 1661

-17-

c. The completion of the broadcast program is made up:

1. Channel format description, event material source, audience

target and saing power (competition);

2. number of channels/programs, program names and contents

programs that will be routed; and

3. a daily and weekly broadcast event pattern;

d. the technical data completeness consisting of:

1. list inventory of the means and infrastructure that will

be used as well as the calculation of its investment costs;

2. image map location and broadcast service area map

as well as operational space layout, control room and space

transmitter;

3. Engineering specifications and equipment systems that would

be used with a diagram of the configuration system block;

and

4. Special for LPB via terrestrial, conveyway

proposed radio frequency channel and contour diagram

the desired pancar.

Third Section

The Broadcasting Institute for Special Purity

Article 18

(1) The Minister may priorite the establishment of the Institution

Broadcasting for special purposes.

(2) Specific needs as referred to in paragraph (1)

include the field:

a. education;

b. public health; and/or

c. hate.

Article 19

(1) The Broadcasting Institute established for the purposes

specifically as referred to in Section 18 of the paragraph (1)

can be shaped:

a. Local LPP that meets the establishment requirements

as refe>email address, mobile phone number, and

Other valid IDs that can

be used as a means of communication;

10. The statement of the statement paid off the fee

the licensing of the broadcast;

11. a statement of the statement of misrepresentation fulfilling its commitment

hosting the broadcaster in accordance with the provisions

the laws of the negotiations;

12. photocopy KTP administrator;

13. NPWP photocopies; and

14. photocopy of the Domisili Letter of Attraction;

c. the completquirements

in the timeframe as referred to in the paragraph

(3), the applicant is deemed to cancel its request

and/or resigned.

(5) In terms of the plea to be declared meet

the completeness administration and broadcasting engineering data,

The minister notified in writing to KPI

Regions and exhales to the Central KPI in time

at least 2 (two) business days.

www.peraturan.go.id

2016, No. 1661

-23-

Paragraf 4

Evaluating hearings

Article 28

(1) EDP is exercised by KPI in the slowest time 6

(six) the working day after the applicant meets

The completeness and requirements of the broadcast program

as referred to in Section 26 and meet

the completeness and requirements of the administration and data

broadcasting techniques as referred to in Section 27.

(2) The Regional KPI notify in writing to

Minister and be exhaled to the Central KPI concerning

The specified applicant is not eligible to host

the broadcaster by attaching the reason of the internation

at least 3 (three) business days since being lactated

EDP.

(3) The Regional KPI publishes the RKPP against the application

which is stated to be eligible to host broadcasting and

relayed to the Minister via the Central KPIs the most

slow 6 (six) business days since the EDP's performance.

(4) The RKPP as referred to in the least paragraph (3) at least

contains:

a. broadcasting agency name;

b. air name names;

c. type of service hosting services;

d. the proposed use of radio frequency spectrum for LPP

Local, LPS, LPK, or LPB via terrestrial as appropriate

with the radio frequency spectrum master plan;

e. broadcast service area;

f. broadcast format;

g. office address;

h. studio address;

i. transmitter station address; and

j. coordinate address of the transmitter station.

(5) More provisions on the implementation of the EDP

as referred to in paragraph (1) and more provisions

www.peraturan.go.id

2016, No. 1661

-24-

further regarding the broadcast format as intended

in paragraph (4) the letter f is governed by the KPI Regulation.

Article 29

(1) The RKPP Publishing for LPS and/or LPB through

the terrestrial must correspond to the announcement of opportunities

hosting the broadcaster.

(2) KPI is required to reject an application that is not appropriate to

(3) KPIs only accept LPS and/or LPB applications

via terrestrial after announcement of opportunity announcements

hosting.

(4) RKPP for LPS and/or LPB via terrestrial which

does not match the announcement of opportunities

hosting the broadcaster no further processed.

BAB V

MEETING FORUM TOGETHER

Part Parts

General

Article 30

The minister holds FRB along with KPI at the center level

slow 15 (fifteen) a working day since the receipt of the RKPP from

KPI Center as defined as in

Section 28 and Section 29.

Section 31

(1) The FRB participant as referred to in Section 30

consists of the element Ministry and KPI.

(2) In terms of required, the Minister may invite

related agencies to present in FRB.

www.peraturan.go.id

2016, No. 1661

-25-

Second Part

FRB Decision

Article 32

(1) FRB as referred to in Section 30 is led

by the Minister or the designated official.

(2) Decisions The FRB is either an agreement or a rejection

against the IPP application and/or the extension of the IPP.

(3) FRB may decide on approval against

the IPP LPK request by requiring

a broadcast time sharing agreement between the LPK with

another LPK and/or Community in terms of

limitations radio frequency channel.

(4) The decision of the FRB as referred to in paragraph (2)

is poured in the news of the event signed by

FRB leaders and representatives of the Central KPI.

(5) The FRB decision as intended on verse (2)

is the basis for the Minister to publish:

a. Principle Permission;

b. renunciation of IPP;

c. extension of IPP; or

d. The rejection of the IPP extension.

Article 33

In terms of 1 (one) broadcast service regions, the amount

applications that have obtained RKPP exceeds the amount

the radio frequency channel specified in the opportunity

hosting the broadcaster, FRB decided that

is implemented a selection.

www.peraturan.go.id

2016, No. 1661

-26-

Third Section

Selections

Paragraf 1

General

Article 34

(1) Selection as referred to in Section 33,

is executed by the Selection Team which is set up by

Minister.

(2) Selections as referred to in paragraph (1) can

be implemented with:

a. Comparative evaluation method; or

b. the auction of radio frequency usage.

(3) Selection with comparative evaluation method as

referred to in paragraph (2) the letter a is exercised in

the longest term of 14 (fourteen) business days

since the FRB decision as intended in

Article 33.

(4) The use of radio frequency usage as

is referred to in paragraph (2) the letter b is set by the Minister.

Article 35

(1) The comparative evaluation method as referred to

in Section 34 of the paragraph (2) the letter a performed by the Team

The Selections are composed of element:

a. KPI is most 4 (four) people composed of elements

Central KPI and Regional KPI elements; and

b. Ministry of the most 5 (five) people.

(2) The Selection Team as referred to in paragraph (1)

has a task:

a. Set up a selection schedule;

b. prepare a selection document;

c. conduct the evaluation and assessment of the selection document;

d. set the selection of the selection results; and

e. created a selection of the results of the selection for the

FRB.

www.peraturan.go.id

2016, No. 1661

-27-

(3) The Selection Team in carrying out tasks as

is referred to in paragraph (2) assisted by the secretariat.

Paragraph 2

Comparative Evaluation Materials

Article 36

(1) Evaluation as referred to in Article 34 of the paragraph (2)

letter a performed on aspect:

a. business; data

broadcasting techniques, the Minister in the slowest time 2

(two) the work day notified in writing to

The applicant to meet the completeness and

requirements.

(3) The applicant must fulfill the completeness and requirements

the administration and broadcast engineering data as

referred to in paragraph (2) the slowest 15 (fifteen) days

work since the receipt of the notice.

(4) If the applicant does not meet the completeness and

the administration and broadcast engineering data rep>community service; and

c. leaping costs regarding the cost

hosting.

(2) The violation of the provisions as intended

on verse (1) is subject to sanction in accordance with the provisions

laws.

BAB VII

RADIO STATION PERMIT AND LABUH RIGHTS

Article 45

(1) The applicant is submitting an ISR application in writing

to the Minister.

(2) The ISR invocation is done in accordance with the provisions

laws regarding the spectrum

radio frequency.

(3) In terms of the Broadcasting Institute committing a violation

use of the radio frequency spectrum and/or region

the specified broadcast range that resulting

www.peraturan.go.id

2016, No. 1661

-32-

revocation of ISR, IPP Broadcasting Agency

concerned is revoked.

(4) In terms of the Broadcasting Society committing a breach

the hosting of the broadcast resulted

IPP revocation, the ISR Broadcasting Agency which

is concerned is revoked.

Article 46

(1) The hosting of broadcasters using satellites

foreigners are required to obtain labuh rights.

(2) The invocation of the rights is performed accordingly. with

the provisions of the laws.

BAB VIII

TEST BROADCAST

Part Kesatu

General

Article 47

After obtaining the Principle Permit, the Licensee's Authorized Authorized holder

conduct the broadcast test in the term of the License Agreement.

The principle as referred to in Section 42.

Section 48

During the broadcast trial period, the holder of the Principles Authorized

is hosting a broadcast according to the proposed broadcast program and

broadcast engineering data for the duration of at least 5 (five)

hours every day for the radio broadcasting services and at least

2 (two) clocks every day for television broadcasting services.

Article 49

(1) The Princiholders of the Principles apply a written request

to the Minister to do EUCS with

a gust to the Director General, the Director General

Resources and Postal Devices and Informatics, Chairman

KPI Center, Local KPI Chairman, and Unit Head

www.peraturan.go.id

2016, No. 1661

-33-

Technical Executing of the radio frequency spectrum

local.

(2) The eUCS request as specified in paragraph (1)

is received by the slowest Minister 1 (one) of the month

prior to the expiration of the term of the Principle Permit.

(3) The Principle Permit that does not apply

EUCS request within the deadline as

referred to in paragraph (2) is considered to resign.

(4) In the case of the Principle Permit Licensee is considered

resigning as referred to in paragraph (3),

The authorization of the Principals expires at the end of the term

applies to the Principle Permit Intended, and is performed

revocation ISR.

section 50

The EUCS plea as referred to in Article 49

paragraph (1) is submitted by attaching the requirements as

following:

a. Administration includes:

1. A copy of the Cloud Service is not available for use with the Cloud Service. photocopy rights of the syllas for the LPB;

3. data changes other than stock ownership if any;

and

4. Data and non-commercial correctness letters;

b. broadcast program included:

1. for the Radio Broadcasting Service Broadcasting Service that

consists of:

a) viewer segmentation;

b) broadcast format;

c) broadcast composition;

d) broadcast materials; and

e) the form of broadcast material;

2. for the Television Broadcasting Service Board which

consists of:

a) broadcast format;

b) The percentage of broadcast (local and foreign);

c) the broadcast event's eye group; and

www.peraturan.go.id

2016, No. 1661

-34-

d) broadcast material source;

c. broadcast engineering data included:

1. The ISR photocopy still applies;

2. photocopy of device certification;

3. system configuration (including studio up to

radio station) built;

4. the layout image of each broadcast studio; and

5. the spatial image of each radio station.

The Second Section

Implementation of EUCS

Team EUCS

Article 51

(1) The minister forms an EUCS Team consisting of the element:

a. Directorate General for the evaluation of aspects

administration;

b. Directorate General of Resources and Postal Devices

and Informatics for the evaluation of the engineering data aspects

broadcasting; and

c. KPI for the evaluation of the program aspect of broadcast.

(2) The director is ex officio to be the chairman of Team EUCS

as it is referred to in paragraph (1).

(3) Members of Team EUCS are required to sign a pact

integrity containing about statements for not

conduct corruption, collusion, nepotism, and manipulation.

(4) the Director delivered an execution notice

EUCS to Team EUCS to conduct evaluations

aspects of administration, broadcasting engineering data aspects, and

aspect of broadcast program most slowly 2 (two) business days

after receiving the EUCS application.

www.peraturan.go.id

2016, No. 1661

-35-

Paragraf 2

Graduation of Graduation

Article 52

(1) The EUCS team as referred to in Article 51 of the paragraph

(1) performs a graduation assessment of fulfillment

the requirements and completeness as intended

in Section 50, and evaluate the feasibility

operational in accordance with the respective authority

at most 20 (twenty) business days since the receipt

notice EUCS implementation of the Director.

(2) The graduation assessment as intended on verse (1)

may be performed by each Team element

EUCS separately.

(3) In case the EUCS Team rate the applicant does not meet

graduation requirements while there is still the remainder of the time

at least 30 (three The calendar days before

expiration of the Terms of Princip, the applicant

given the opportunity to meet the requirements and

the EUCS graduation completeness at least 20 (two

days prior to expiration of the term). term

Princible.

(4) If the applicant may meet the requirements and

graduation completeness in the timeframe as

referred to in paragraph (3), Team EUCS will do

highest graduation assessment of 7 (seven) workdays since

The completion of the requirements.

Paragraph 3

Plenary EUwill use

the radio frequency spectrum;

c. The Labuh Rights management for the applicant will

use a foreign satellite;

d. the execution of the broadcast test; and

e.

Section 44

(1) During the term of the effective Principle Permit, the Institute

The Broadcasting Service is prohibited:

a. conduct a share of the stock ownership, except

shareholder ownership changes

due to legacy transfer due to inheritance;

b. hosted an advertisement, except for the ad broadcast

<s; page-break-after:always">

2016, No. 1661

-40-

(5) The IPP extension for LPP and/or Local LPP

is done directly by the Minister after getting

reports from the Local LPP and/or LPP.

(6) The report as contemplated on the paragraph (5) must

be delivered before the IPP term expires.

Article 58

(1) The Broadcasting Institute did not apply

the IPP extension in the slowest term of 12

(twelve) months before the end of the IPP as

referred to in Article 57 of the paragraph (1) is given a reprimand

at most 2 (two) times in a row with

quarter of the alert time of 7 (seven) days

calendar.

(2) If after the end of the warning term

the second is referred to in paragraph (1),

The Broadcasting Institute does not apply

IPP extension, the Broadcasting Institute

is concerned An administrative sanction is not

given the extension of the IPP.

Article 59

(1) The Director publishes SPP of the IPP extension fee

to the applicant whose application is approved in

FRB, most slowly 3 (three) business days since the decision

FRB.

(2) The applicant is required to pay the fee of an extension of the IPP

and deliver the payment proof to the Director

at least 15 (fifteen) business days since

published in the SPP.

(3) The IPP extension charge as referred to in

paragraph (2) is paid to the state coffers through the account

Treasurer of the General Directorate General on the bank

The government has been determined.

(4) If in the term 15 (fifteen) business days

as referred to in paragraph (2), the applicant is not

meeting the renewal fee obligation

www.peraturan.go.id

2016, No. 1661

-41-

IPP, the Director publishes a written reprimand to

The applicant.

(5) The written notice as referred to in paragraph (4)

is given the most 3 (three) times in a row

with a commemoration time of 30

(thirty) calendar days.

(6) If the applicant is not to pay off its obligations in

a term of 30 (thirty) calendar days.

since the third written warning as intended

on the paragraph (5) is published, the applicant is considered

resigned and the decision FRB against

The applicant is null by law.

Article 60

(1) Minister publish the slowest IPP extension 7

(seven) working days since the obligation

payment fee extension of the IPP and delivery

payment proof as referred to in Article

59 paragraph (2).

(2) The Minister relayed the IPP extension that has been

published as referred to in paragraph (1)

to the Central KPI slowest 2 (two) business days.

(3) The IPP extension is delivered by the Central KPI to

KPI Regional slowest 2 (two) business days since

received from the Minister as referred to in paragraph

(2).

(4) The IPP extension is delivered by the Regional KPI to

the slowest 2 (two) business days since being accepted

of the Central KPI as referred to in paragraph (3).

BAB X

PAYMENT FEE IPP

Article 61

(1) The IPP charge consists of:

a. Principle Permission Fee;

b. IPP cost; and

www.peraturan.go.id

2016, No. 1661

-42-

c. fee extension of the IPP.

(2) The Principle Permit charge as referred to in paragraph (1)

letter a paid 1 (one) times.

(3) The IPP charge and extension charge of the IPP as

are referred to in paragraph (1) letter b and the letter c is paid

any The year during the term of the IPP applies.

(4) Investigative Agencies that do not pay IPP and

extension fees for the IPP for the second year and

onwards are given the most written warning 3

(three) times in a row with the time timeout

alerts each 30 (thirty) calendar days.

(5) The delay in fulfillment of the cost of payment obligations

IPP as referred to paragraph (1) is subject to the sanction

administrative fines in accordance with the provisions

laws.

(6) If the Broadcasting Institute referred to

the paragraph (4) does not pay off its obligations in the term

time 30 (thirty) calendar days since

the third written warning is published, the Broadcasting Institute

in question are subject to the IPP revocation sanctions.

(7) The charge of the IPP charge as referred to in paragraph (1)

in accordance with the provisions of the Government Regulation on

The State Revenue is Not Tax (PNBP) in the environment

Ministry of Communications and Informatics.

BAB XI

BROADCASTING HOSTING

Article 62

(1) The institution of the Broadcasting Service is required to deliver a report

annual operating performance of the broadcast

to the Minister at least 30 June of the year

next.

(2) Reports as referred to in paragraph (1) the most

little loading:

a. application (last change status) consisting of

from:

www.peraturan.go.id

2016, No. 1661

-43-

1) capital;

2) the composition of the shareholders; and

3) the centralization and cross ownership.

b. financial report;

c. the number of customers for LPB;

d. the development of a broadcast program consisting of:

1) broadcast time description, event eye material source

broadcast, target audience, and competeability; and

2) the overall percentage of broadcast events and

daily broadcast events patterns and weekly;

e. development of the means and infrastructure consisting of:

1) a list inventory of the means and infrastructure that

is used, including studio equipment and

transmitters, numbers and types of studio; and

2) the location map of the broadcasting station, the layout image

transmitter station and station location map

transmitter, as well as the range region map image

broadcast and its broadcast service area;

f. The fulfillment of the hosting commitments

in accordance with the proposed business plan/proposals

at the time of the IPP application and extension; and

g. Legal compliance with intellectual property and

fulfillment of copyright royalty payment obligations

and related rights in accordance with regulatory provisions

laws.

(3) The report as referred to in paragraph (2) letter a

number 2) and number 3) does not apply to the LPP and LPK.

(4) Reports as referred to in paragraph (1) may

be delivered electronically.

BAB XII

SUPERVISION, CONTROL, MONITORING, AND

EVALUATION

Section 63

Oversight and control of the implementation

This Minister ' s Regulation is carried out by the Director General. e station

broadcasting, image of the transmitter station layout

and the location map of the transmitter station, map image

region of broadcast range and service area

broadcasts including the contour The diagram has

approved for the permission obtained.

(4) The provisions as referred to in Section 24

up to Section 32 apply mutatis mutandis

in the extension process of the IPP, except for LPP and

Local LPP.

www.peraturan.go.id

2016, No. 1661

-44-

Article 64

The Director General can form an evaluation team for

performing monitoring and evaluation of

hosting.

BAB XIII

OTHER CONDITIONS

PART OF THE SECTION

COMMUNICATION MEANS

SECTION 65

(1) DELIVERY OF CORRESPONDENCE, LICENSING DOCUMENTS

BROADCASTING, AND/OR STAGING REPORTING

THE BROADCAST IS DONE electronically among others through

email (email), fax, and/or number phones

cellular.

(2) The correspondence and/or documents as

referred to the paragraph (1) includes:

a. notification of the completeness of the requirements

request to the applicant;

b. delivery of the completeness of the requirements

the request from the applicant;

c. the delivery of the execution and results of EUCS;

d. SPP delivery of the SPP cost of Princip Principles;

SPP delivery of IPP charges;

f. SPP delivery fee for IPP extension cost;

g. the delivery of proof of pay of the Principles of Principles;

h. the delivery of proof of pay of IPP costs;

i. the delivery of proof of pay of IPP extensions;

and/or

j. Annual report of the implementation of implementation operations

broadcasting.

(3) Letters and/or documents from the applicant

to the Minister must be delivered via the mail address

electronic (email), fax number, and/or phone number

www.peraturan.go.id

2016, No. 1661

-45-

cellular which is the official identity specified

by the Director and announced to the public.

(4) Letter-correspondence and/or documents from the applicant

to KPI and KPID must be delivered through the address

email (email), fax number, and/or number

cell phone which is the official identity

set by KPI and KPID and announced to

the public.

(5) Letters and/or documents to the applicant

delivered via email address (email),

fax number, and/or mobile phone number

is a valid identity delivered in

official by the applicant to the Minister and/or KPI/KPI

Regions.

(6) In terms of correspondence and/or documents

as referred to in paragraph (2) of the letter

the statement signed above the seal, then

must be delivered the original document.

Section 66

In terms of the delivery of the correspondence and/or documents

the broadcasting permissions as referred to in Section 65

paragraph (2) cannot be performed electronically,

The delivery is performed physically and/or by post.

Article 67

Change of office address, narahubung (contact person),

email address (email), fax, cell phone number,

as well as the other identity of the applicant must be delivered

in writing to the Minister and KPI.

www.peraturan.go.id

2016, No. 1661

-46-

Second Section

The authorization of the Licensing Process and

Format Licensing

Section 68

The Minister may provide the mandate to the Officials

The Government in lower in the licensing process

hosting the broadcaster.

Article 69

The format of the application in the submission of the Local IPP, IPP LPS,

IPP LPK, IPP LPB and IPP extension requests are set

with Regulation Rekur General.

BAB XIV

PROVISIONS

Article 70

At the time the Minister ' s Ordinance came into effect:

a. Rules of Minister for Communications and Informatics Number:

17 /P/M. KOMINFO/6/ 2006 on Tata Cara

Adjustment Permit Broadcasting For

Private Broadcasting Agency which Has Had Permission

The Radio Station of the Directorate General of Post and

Telecommunications and/or National Broadcast Permission for

Television of the Department of Information and for the Institution

Subscription Broadcaster which Has Had Permission

The Host Of Television Services Pay from the Directorate

General of Post and Telecommunications and/or Permission

Subscribe of Television Broadcast Subscriptions of

The Department of Information;

b. Rules of Minister for Communications and Informatics Numbers:

08 /P/M. KOMINFO/3/ 2007 about Licensing

and the hosting of the broadcasting agency broadcasting

Private;

www.peraturan.go.id

2016, No. 1661

-47-

c. Rules of Minister for Communications and Informatics Number:

28 /P/M. KOMINFO/09/ 2008 on Tata Cara and

The Licensing Requirements for Broadcasting; and

d. Rules of Minister for Communications and Informatics Numbers:

18 /P/M. KOMINFO/03/ 2009 on Tata Cara and

The Licensing Process of Hosting Broadcasting by

Provincial Regional Government and Local Government

Kabupaten/ City,

revoked and declared not in effect.

Article 71

The rules of the Minister are in effect 3 (three) months since

the date is promulred.

www.peraturan.go.id

2016, No. 1661

-48-

So that everyone knows it, ordering

the invitation of this Minister's Rule with

its placement in the Republic of Indonesia News.

Specified in Jakarta

on October 31, 2016

MINISTER OF COMMUNICATIONS AND INFORMATICS

REPUBLIC OF INDONESIA,

ttd

RUAMID

DiundPour in Jakarta

on 5 November 2016

DIRECTOR GENERAL

REGULATION OF

THE MINISTRY OF LAW AND HUMAN RIGHTS

REPUBLIC OF INDONESIA,

ttd

WIDODO EKATJAHJANA

www.peraturan.go.id