Key Benefits:
PRESIDENT OF THE REPUBLIC OF INDONESIA
DECISION OF THE PRESIDENT OF THE REPUBLIC OF INDONESIA
NUMBER 57 IN 1998
ABOUT
THE ASSIGNMENT OF FREEWAYS ROADBLOCKS AS
THE HIGHWAY AND THE DESIGNATION OF VEHICLE TYPE
MOTOR FARE
PRESIDENT OF THE REPUBLIC OF INDONESIA,
DRAWS: A. that the construction of the End Pandang roadblock is already
completed, so it is seen as necessary to establish a free road route
the impediment becomes a Toll Road;
b. that in line with technological advances in the field of transport tools
the highway that causes increasingly diverse, shapes and
sizes, is seen as necessary to establish the type of type
motor vehicle for road space as intended as a;
c. that in accordance with the provisions of Act Number 13 of the Year
1980 on the Road, the designation of the motor vehicle type and
the magnitude of the toll fare needs to be established by the Presidential Decree.
Given: 1. Article 4 of the paragraph (1) of the Basic Law of 1945;
2. Law Number 13 Of 1980 On The Road (Sheet
Country Of 1980 Number 83, Extra State Sheet Number
3186);
3. Government Regulation No. 4 Year 1978 on the Inclusion
Capital of the Republic of Indonesia in the Establishment of the Company of Perseroan
(PERSERO) in the Field of Management, Maintenance and Procurement
Toll Road Network, as well as provisions Her Organization
(state Sheet Of 1978 Number 4);
4. Rules ...
PRESIDENT OF THE REPUBLIC OF INDONESIA
-2-
4. Government Regulation No. 26 of 1985 on Road
(State Sheet 1985 Number 37, Extra Sheet
State Number 3293);
5. Government Regulation No. 8 of 1990 on Toll Road
(State Sheet of 1990 Number 12, Extra Sheet
State Number 3405);
6. President's decision No. 36 of 1992 on Road Redemption
Free of the Roads of Erang-Peacock as Toll Road, Addition
The Mabar Toll Gate on the Beopposed Expressway-Medan-Tanjung
Morawa and the Designation Of The Type Of Vehicle Type Motorized,
Highlight Toll and Toll Subscription on multiple Toll Roads and
Toll Bridge.
DECIDED:
SET: THE PRESIDENT ' S DECISION ON FREEWAYS
OBSTACLES TO THE POINT OF VIEW AS TOLL ROAD AND
DESIGNATION OF MOTOR VEHICLE TYPE AS WELL AS
MAGNITUDE OF TOLL FARES.
FIRST: The 11.95 Km Upper End roadblock includes
the controlled connecting road is set to be the Toll Road.
SECOND: Set up the Old Tallo Toll Bridge as part of the Expressway
End View by adjusting the tols rate.
THIRD: ...
PRESIDENT OF THE REPUBLIC OF INDONESIA
-3-
THIRD: Setting the type of motor vehicle for the Expressway
as referred to in the first FIRST dictum as follows:
Golongan I: Sedan, Jip, Pick Up, Small Bus, Small Truck (3/ 4)
and Bus Is.
Golongan II-A: Large Truck and Large Bus with 2 (two) gandar.
Golongan II-B: Large truck and Big Bus, with 3 (three) gandar
or more.
FOURTH: Setting the Type of Motor Vehicle and Magnitude Rates
Toll for the Toll Road as the first QUESTION is
as set forth in this Presidential Decree.
KELIMA: Specialized for motor vehicles The second wheel can pass the Bridge
The Old Tallo toll is not charged with tolls.
SIXTH: The top of the Toll Subscription for the Toll Road as intended in
The first ditum is set at 90% (ninety-one hundred)
of the Toll Tarif as referred to in the FOURTH dictum.
SEVENTH: ...
PRESIDENT OF THE REPUBLIC OF INDONESIA
-4-
SEVENTH: This President's decision came into effect on the set date.
Specified in Jakarta
on 13 April 1998
PRESIDENT OF THE REPUBLIC OF INDONESIA
ttd.
SUHARTO
PRESIDENT OF THE REPUBLIC OF INDONESIA
ATTACHMENT
THE DECISION OF THE PRESIDENT OF THE REPUBLIC OF INDONESIA
NUMBER: 57 1998
DATE: APRIL 13, 1998
MAGNITUDE OF TOLL FARE ON THE TIP TOLLS OF THE POINT OF VIEW
MAGNITUDE OF TOLL FARE
(Rp.) TOLL ROAD
GOL. I GOL.II-A GOL.II-B
End Of View 1,000 1,500 1,500
Ramp Tallo West 500 800 800
President Of The Republic Of Indonesia
ttd.
SUHARTO