Key Benefits:
Field of Water Resources c. Part 3: The Job Unit Price Analysis Guidelines (AHSP)
Field of Bina Marga d. Part 4: The Job Unit Price Analysis Guidelines (AHSP)
Copyright Works
(2) The Unit Price Analysis Manual of Units as referred to in paragraph (1) is listed on the appendix which is an integral part of the Regulation. This Minister.
BAB II
ANALYSIS OF THE BUSINESS UNIT JOB GENERAL EMPLOYMENT
Article 5 (1) The unit price of the job consists of:
a. Direct cost b. Indirect charges
(2) Direct charge components consist of: a. Labor b. It's a c. The tool
(3) The AHSP General field discussed in this guideline includes all work applicable to the employment activities of Water Resources, Bina Marga and Copyright Works among others: a. Dirt work b. Couple's Work
www.djpp.kemenkumham.go.id
2013, No. 1374 6
c. D-reinforced concrete work. The work of Steel e. The Design Work Of The F. (Water drying) g. Use of the Workforce
(4) AHSP the Water Resources discussed in this guideline includes: a. The work of the Water Door and the Hydromechanical Equipment b. It's cloudy c. Network Irrigation d. River E safety. Dam and Embung f. Beach safety g. Sink control of the river h. Swamp infrastructure i. Baku Fatherland and Water Infrastructure
(5) AHSP the field of Bina Marga discussed in this guideline includes: a. General specification
1. Division 1-General 2. Division 2-drainage 3. Division 3-Land Work 4. Division 4-Redistribution of Perkerasan and Bahu Road 5. Division 5-Grain Concrete and cement Concrete Cement 6. Division 6-Aspal 7. Division 7-Structure 8. Division 8-Minor Condition and Minor Work 9. Division 9-Daily Job 10. Division 10-Rutin ' s Maintenance Job
b. Special specifications 1. Concrete tailings 2. Rumput vetiver 3. Grouting under the concrete road crunch
www.djpp.kemenkumham.go.id
2013, No. 1374 7
4. Layer of asphalt sand ponties 5. Soft ground handling with additional stockpile load
while (surcharge) 6. Maintenance with asphalt seal coat 7. Shortcrete 8. Concrete kerb for the 9th Street. Concrete fast track 10. High-salt concrete, 11. Cold mix recycling by foam bitumen base 12. Cement treaded recycling base and cement treated recycling
subbase 13. Geotextile 14. The Macadam Asbuton Penetration Layer (LPMA Asbuton) 15. A hot-asphalt mixture with Asbuton Lawele 16. Installation of kerb pracetak 17. Slurry seal 18. Cold mixture of asbuton emulsion 19. A warm mixture of asbuton 20. Hot mix of asbuton 21. A hot-asphalt mixture with Asbuton Lawele 22. Expand the concrete road concrete road previews
(6) AHSP Copyright Works discussed in this guideline include: a. Division 1 Design development b. Division 2 Sitework c. Division 3 structural jobs d. Division 4 architecture e. Division 5 mechanical work f. Division 6 electrically g. Division 7 exterior facility building h. Division 8 Miscellaneous work
Article 6 (1) AHSP is part of the unit price contract document and
must be included with the details as an inseparable attachment as well as a tool to assess the natural offer.
www.djpp.kemenkumham.go.id
2013, No. 1374 8
(2) The total value of HSP is open and non-confidential as well as used to set the highest value of the valid bid.
(3) The unit price contract is a job contract that is the contract value of the contract is based on a definite HSP and is binding upon each type of work each.
(4) The value of the contract is the amount of the HSP Unit Price units with the volume of each type of work corresponding to the list of quantity and price (Bill of quantity, BOQ) contained in the offer document.
BAB III
terms TRANSITION Section 7
The Job Unit Price Analysis Guidelines that have existed before the enactment of this Minister Regulation, remain in effect and in the most prolonged period 6 (six) months must conform to the Regulation of this Minister.
CHAPTER IV PROVISIONS CLOSING
Article 8
(1) National Standard of Indonesia (SNI) about Tata Cara Calculations Unit Price for Building Construction Building and Housing is declared to be in effect as long as it does not conflict with the Minister of Public Works.
(2) With the Ordinance of this Minister, Letter Edaran Public Works Minister Number 02/SE/M/2013 on the Guidelines for Analysis Analysis of the Work Unit of Public Works and the Circular Letter of Public Works Minister Number 07 /SE/M/2008 on the Instruction of Standards, Guidelines, Job Unit Price Manual Construction of Building and Housing Building, revoked and declared no longer in effect.
Article 9 of the Minister ' s Regulation is beginning to apply to the date of the undrased.
www.djpp.kemenkumham.go.id
2013, No. 1374 9
For everyone to know, ordering the Minister of the Union Regulation with its discoverer in the News of the Republic of Indonesia.
Specified in Jakarta on 4 November 2013 MINISTER GENERAL WORK OF THE REPUBLIC OF INDONESIA, DJOKO KIRMANTO
Was promulred in Jakarta on 20 November 2013 MINISTER OF LAW AND HUMAN RIGHTS REPUBLIC OF INDONESIA,
AMIR SYAMSUDIN
www.djpp.kemenkumham.go.id
12. List of quantities and prices or Bill of Quantity (BOQ) is a list of details of the work material needs to be systematically compiled according to the group/part of the work, with details regarding the volume and unit of each type of work, the eyes money, the unit price, the result of the volume with the unit price of each job type and the sum of the entire job results as the total job price.
13. The Minister is the Minister who organizes the affairs of public works government.
Article 2
(1) The AHSP Guidelines for Public Works is intended as a reference in calculating development costs for the government/regulator as The completion of the government's goods/services is related to construction and construction work as well as for the construction of construction services (consultants/contractors).
(2) The AHSP Guidelines Public Works aims to realize transparency, efficiency, effectiveness and accountability in the process of procurement of government goods/services for the construction activities of public works.
(3) AHSP Guidelines The field of Public Works as referred to in paragraph (1) and (2) is used as a basis in compiling the calculations HPS or owner's estimate (OE) and HPPor engineering's estimate (EE) for the handling of job field work generic.
Section 3 (1) The scope of this AHSP Guidelines includes handling work
preserves or maintenance and construction or increased performance capacity of public employment, consisting of the general field, the field of Water Resources, the field of Bina Marga, the Copyright Works.
www.djpp.kemenkumham.go.id
2013, No. 1374 5
(2) The calculation of the index or coefficients in the work referred to in paragraph (1), is done through:
a. The HSD power measure is the power of a b. The HSD is a matter of c. The HSD tool's calculation step. The HSP calculation step
Section 4 (1) The Job Unit Price Analysis Guidelines are divided in 4 (four)
sections, consisting of: a. Part 1: The Job Unit Price Analysis Guidelines (AHSP)
Genera