Advanced Search

Presidential Decree Number 49 In 1990

Original Language Title: Keputusan Presiden Nomor 49 Tahun 1990

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.

The text is not in the original format.
Back


image
SHEET COUNTRY
REPUBLIC OF INDONESIA

PRESIDENT OF THE REPUBLIC OF INDONESIA
NUMBER 49 YEAR 1990
ABOUT
HIGHWAY DESIGNATION IS A FREEWAY AND THE ADDITION OF A DUKUH RAMP TO THE JAGORAWI TOLL ROAD AND THE DESIGNATION OF MOTOR VEHICLE TYPE AND THE MAGNITUDE OF THE TOLL FARE.

PRESIDENT OF THE REPUBLIC OF INDONESIA,

Weigh: a.  that by having completed the construction of the freeway Cikunir Cakung is seen needing to set the freeway as a highway;
B. that by having completed the construction of the entrance from Jakarta's outer ring road to the Jagorawi Expressway which is the node on the Taman Mini toll gate, it needs to open a new ramp in Dukuh;
c. that in accordance with the provisions of Law Number 13 of the Year 1980 on the Road of Jalan designation ruas road as a motorway, the type of motor vehicle and large toll fare is set with the Presidential Decree;

Remembering: 1. Article 4 of the paragraph (1) of the Basic Law of 1945;
2. Law No. 13 of 1980 on the Road (State Sheet of 1980 Number 83 Additional State Sheet Number 3186);
3. Government Regulation No. 4 Year 1978 on the inclusion of the State Capital of Indonesia in the Establishment of the Company of Perseroan (PERSERO) in the Field of Maintenance and Acquisition of the Expressway Network, as well as the provisions of its efforts (State Sheet of 1978 Number 4);
4. Government Regulation Number 26 of 1985 on the Road (1985 State Sheet Number 37, Additional State Sheet Number 3293);
5. Government Regulation Number 8 of 1990 on the Expressway (1990 State Sheet Number 12, Extra State Sheet Number 3405);
6. Presidential Decree Number 25 of 1988 on the Determination Of The Toll Tolls and the Toll Subscription on several Expressway and the Toll Bridge;
7. Presidential Decree No. 16 of 1988 on the Designation Of Motor Vehicle Type And The Magnitude Of Toll Fares For The Jakarta-Cikampek Toll Road as amended by Presidential Decree No. 18 of 1989;

DECIDED:

SET: THE DECISION OF THE PRESIDENT OF THE REPUBLIC OF INDONESIA ON THE DESIGNATION OF FREE ROAD BARRIERS OF CIKUNIR CLAWS AS A MOTORWAY AND THE ADDITION OF A DUKUH RAMP ON THE JAGORAWI TOLL ROAD AND THE DESIGNATION OF MOTOR VEHICLE TYPES AND THE MAGNITUDE OF TOLL FARES.

FIRST: The 8.8 km-long Cakung Cikunir freeway is designated as the expressway of the Cikunir Cakung Expressway.
Second: The addition of a Dukuh ramp to the Jagorawi Expressway is designated as the entrance of Jakarta's outer ring road to the Jagorawi Toll Road through the Dukuh Toll Gate.
Third: The Cikunir Cakung Expressway as intended in the first FIRST ditum is restricted:
a. north by the Cakung Toll Gate and its way of entry;
B. South side by the Jakarta Expressway Cikampek;
FOURTH: The Cikunir Cakung Expressway in its operation to become one unit with the Jakarta Expressway Cikampek and the operation of the entrance from Jakarta's outer ring road through Ramp Dukuh into a single unit with the Expressway Jagorawi.
KELIMA: The Cikunir Cakung Expressway and the entrance of the DKI's outer ring road through the Ramp Dukuh are reserved for road users who use a 4 (four) or more-wheeled motor vehicle.
SIXTH: Large toll rates for the Cikunir Cakung toll road are as set forth in this Presidential Decree annex.
SEVENTH: The toll tarif for the entrance of Jakarta's outer ring road to the Jagorawi Expressway on the Ramp Dukuh for the motor vehicles of the group I and II is Rp. 300.00 (three hundred rupiah).
EIGHTH: Implementation of the provisions as intended in the FOURTH dictum is further regulated by the Minister of Public Works.
NINTH: The President ' s decision comes into effect on the set date.

Set in Jakarta
on October 9, 1990
PRESIDENT OF THE REPUBLIC OF INDONESIA

SUHARTO



ATTACHMENT
PRESIDENT OF THE REPUBLIC OF INDONESIA
NUMBER 49 YEAR 1990
October 9, 1990

TOLL FARE FOR THE TOLL ROAD OF CIKUNIR CLAWS


FROM THE DESTINATION OF THE TOLL FARE (RP)
GROUP I-GROUP II



Cikampek Claws 4,800,00-7.500.00
Eastern Karawang 3.500,00-5,800,00
Western Karawang 3.000,00-4,800,00
Cikarang 2.000.00-3.200,00
Cibitung 1,500,00-2,500,00
Eastern Becation 1,000.00-1,500,00
Western Becation 800,00-1.200,00
Bintara 300,00-500,00
Jakarta 1.200,00-1.8000.00

Bintara Cikampek 4.500,00-7.300,00
East Karawang 3.300,00-5.500.00
Western Karawang 2,800,00-4.500,00
Cikarang 1.800.00-3.000.00
Cibitung 1.300,00-2.000.00
Eastern Becation 800,00-1,300,00
Western Becation 500,00-800,00
Jakarta 1,000 .00-1,500.00


Motor Vehicle Group

Group I: The four-wheeled vehicle weighs up to 2.5 (two and a half) tons.

Group II: A four or more wheeled vehicle weighing more than 2.5 (two and a half) tons.


PRESIDENT OF THE REPUBLIC OF INDONESIA

SUHARTO