BUPATI MAGELANG

REGULATION OF MAGELANG COUNTY NUMBER 12 IN 2010

ABOUT

VILLAGE DEVELOPMENT PLANNING GUIDELINES

WITH THE GRACE OF THE ALMIGHTY GOD

MAGELANG REGENT,

A draw: a. that in order to host village governance it needs to be drafted

planning the development of the village as a single unit within the county regional development planning system;

b. that under the provisions of Article 66 of the Government Regulation No. 72 of 2005 concerning the Village, the guidelines on the stage, order of drafting, control, and evaluation of the implementation of the village development plan are governed by the Rule of the Regions;

c. that based on considerations as intended on the letter a and the letter b need to form the Regional Regulation on the Village Building Planning Guidelines;

Given: 1. Law No. 13 of 1950 On the Establishment of the County-District in the Central Java Propinsion Environment;

2. Law Number 10 of the Year 2004 on the Establishment of the Legislation Invitation (sheet Of State Of The Republic Of Indonesia In 2004 Number 53, Additional Gazette Of The Republic Of Indonesia Number 4389);

3. Law No. 25 of 2004 on the National Development Planning System (2004 Indonesian State Sheet Number 104, Additional Gazette of the Republic of Indonesia No. 4421);

4. Law No. 32 of the Year 2004 on Local Government (Indonesian Republic Year 2004 Number 125, Additional Gazette Republic of Indonesia Number 4437) as amended last several times with Act No. 12 2008 About The Second Change Of The Law Number 32 Of 2004 On The Local Government (sheet Of State Of The Republic Of Indonesia 2008 Number 59, Additional Gazette Of The Republic Of Indonesia Number 4844);

5. Government Regulation No. 21 Year 1982 on the Beauty of the Capital Region Level II of Magelang County and the area of Magelang II Regional District to the District of Mungkid in the area of Magelang II Region (State Sheet of the Year 1982) Number 36);

6. The Government of the Republic of Indonesia No. 72 Year 2005 on the Village (Indonesian Republic of Indonesia Year 2006 Number 158 Additional Gazette Republic of Indonesia Number 4587);

http://www.bphn.go.id/

2

7. Government Regulation No. 40 of 2006 on the Way of Drafting The National Development Plan (sheet Of State Of The Republic Of Indonesia In 2006 Number 97, Additional Gazette Of The Republic Of Indonesia Number 4664);

8. Government Regulation No. 8 Year 2008 on Stage, How To Assemble, Control And Evaluate The Implementation Of Regional Development Plans (sheet Of State Of The Republic Of Indonesia 2008 Number 21, Additional Gazette Of The Republic Of Indonesia Number Of Indonesia) 4817);

9. The Presidential Decree No. 1 of 2007 on Unrest, Invitation and the Replacement of the Act of Law;

10. Rules of the District of Magelang District Number 10 of 2004 on the Public Consultation Mechanism (leaf of the Regency of Magelang Regency Year 2004, Number 17 Serie E Number 9);

11. Rules of the District of Magelang Number 2 of 2006 on the Tata Cara Formation of the Regional Regulation (Sheet Area Magelang District 2006 Number 11 Series E Number 7);

12. Rules of the District of Magelang District No. 1 of 2009 on Stages, Drafting Methods, Controlling and Evaluation of the Implementation of the Regency of Magelang County (2009) Building Plan Number 1);

With Joint Agreement

MAGELANG COUNTY COUNTY PEOPLE ' S REPRESENTATIVE COUNCIL

and BUPATI MAGELANG

DECIDE

SET FORTH: REGIONAL REGULATIONS ON DRAFTING GUIDELINES

VILLAGE DEVELOPMENT PLANNING.

CHAPTER I OF THE GENERAL PROVISION

Article 1

In this Region Regulation referred to:

1. The area is Magelang County.

2. The Regional Government is the Regent and the Regional Device as an element of the regional government's organizer.

3. The subdistrict is a seagull working area as a County-area device.

4. Camat is the leader of a subdistrict device whose work region includes the villages in question.

5. The village is a unity of the legal society that has the boundaries of the region which is authorized to organize and take care of the interests of the local community, based on the origins and customs of the local recognized and respected government systems United States of the Republic of Indonesia.

6. Village Government is the holding of government affairs by the village government and the Consultative Body of the Village in arranging and taking care of the interests of the local community, based on the origins and customs of the local recognized and respected communities in the The government system of the Republic of Indonesia.

http://www.bphn.go.id/

3

7. Village Government is the head of village and village device as an element of the village government organizer.

8. The next governing body of the village called the BPD is an institution that is the embodiment of democracy in the holding of village government as an element of the governing village.

9. Village Law is the laws created by the BPD with the Head of the Village.

10. The decision of the Head of the Village is a decision made and issued by the head of the village to carry out higher laws or hold new wisdom and is of designation.

11. The village society is an institution created by the public according to the needs and is a partner of the village government in village development and community empowerment of the village.

12. Planning is a process for determining the right future actions, through the order of choice, by taking into account the available resources.

13. Village Development is an attempt to process the social change of the village in a better direction and is implemented by all the components of the village community in order to improve the welfare and life of the village community.

14. The next development planning process called Musrenbang was a forum between perpetrators and development stakeholders in order to structure the regional development plan.

15. The village's next planning consultation called Musrenbangdesa is a development planning forum at the village level organized by the Village Government and involves the participation of the community with a spirit of deliberation for the assemblies.

16. The Village Development Planning System is a unit of planning for the development of the village to produce a medium and annual development plan of the village that is organized in a particular manner by the village government in accordance with its authority.

17. The perpetrators of development are local government, community and world of business, College, NGOs, Political Organizations and the Organization of the Time.

18. The Village Intermediate-Term Development Plan, later called RPJMVillage is a village planning document for a period of 5 (five) years.

19. The Village Development Works Plan (RKP Village) is the Penjabaran of RPJM Village for a period of 1 Year set by the Head of the Village.

20. The Village Revenue and Shopping Budget (APBVillage) is the annual financial plan of the village government discussed and agreed jointly by the Government of the Village and the BPD, which is set with the Village Regulation.

BAB II

RUANG SCOPE OF VILLAGE DEVELOPMENT PLANNING

Article 2

(1) In order to host village governance, compulsory planning

village development as one unity in the regional development planning system.

(2) The planning of the Village Building is as follows: a. Village Medium Term Development Plan; b. Village Development Work Plan.

http://www.bphn.go.id/

4

(3) In compiling a village development planning as referred to a paragraph (1) is required to involve the village community community and community leaders individually.

Article 3

(1) The Country-Term Development Plan As referred to as section 2 paragraph

(2) the letter a, it is the document of the village development plan for a term of 5 (five) years.

(2) The RPJM-Village contains the vision, mission, purpose, strategy, policy, program and activities of the village building with guidelines on the Regional RPJM.

(3) RPJM-Village as referred to in paragraph (1) set with Village Regulation.

Article 4

(1) The village Development Work Plan as referred to section 2 of the paragraph (2) letter b, is the definition of RPJM-Village for a term of 1 (one) year.

(2) The RKP-Village contains the framework program, village development priority, activity plan and its funding to be performed directly by the Village Government or the one which is taken by encouraging community participation.

(3) The RKP Village as referred to in paragraph (1) is set with the Village Chief Decision.

BAB III

DRAFTING OF CONSTRUCTION PLANNING DESA

Part Parts Asas and Purpose

Section 5

(1) The Village Development Planning is implemented with the Planning system

The Partisipative Development of the Village Society based on the common asas of the holding of the country, and (2) The purpose of creating village development planning is: a. Systematic, guided, integrated, unified,

village planning documents are thorough and respond to changes. B. ensuring the creation of Integration, Sync and Synergy in drafting

development planning between villages, subdistricts and districts. c. guarantee the connection and consistency between planning, budgeing,

execution, control and supervision of development. D. optimizing the role as well as the village government, society and the business world

in the planning of the village building.

The Second Part Drafting The Village Development Planning

Section 6

(1) Drafting the development planning The village was composed through Musrenbangdesa.

(2) The village of Musrenbangdesa is made up of medium-term rural musrenbangers, and the annual musrenbangvillage.

(3) The medium-term Musrenbangvillage is held at least 1 (one) times in the order of drafting the village medium term development plan (RPJM Village) for a term of 5 (five) years.

http://www.bphn.go.id/

5

(4) The annual Musrenbangvillage is organized in order to compose the RKP Village for a term of 1 (one) year.

Article 7

(1) The Village Chief is responsible for composing the Village RPJM for a term of 5 (five)

Year and Next, assemble the RKP Village for a term of 1 (one) Year.

(2) The slowest headmaster 1 (one) of the year after being sworn in must have already composed RPJMVillage on Vision and Mission while nominating the Head of the Village.

(3) Drafting RPJM Village is done through the order of activities: a. Village RPJM design; b. Middle-term development planning process; c. designation of RPJM Village by the Head of the Village Joint BPD.

(4) The composition of the Village RKP is carried out through the order of activities: a. RKP Village Design (RPJM) based on RPJM Village; b. hosted a hamlet-level musrenbang; c. organized a village-level musrenbang; d. Village RKP designation by Village Head.

Third Section

Term Musrenbangvillage

Article 8

(1) The village's middle-term Musrenbangvillage was taken at the slowest of the year before the end of the term Village RPJM period.

(2) The village's annual Musrenbangvillage is held at least 1 (one) months before the end of the RKP Village period.

(3) In terms of the village has yet to have RPJM Village and RKP Village then the drafting of RPJM Village and RKP The village begins with the creation of the Regional Rule of Planning Drafting Guidelines. Village Development.

Fourth section

The substance planning of the Village Building

Article 9 (1) RPJM Village contains the vision, mission and direction of village development by referring to

RPJM County, Propinsi and National.

(2) RPJM Village is outlined in an annual work plan called RKP Village.

The Fifth Part of the Musrenbangvillage Results

Article 10

(1) The Musrenbangvillage result is made up:

a. A priority list of activities to be implemented by the village using the Village APB;

b. List of priority activities proposed to the Subdistrict level to be financed by APBD County, Province, APBN as well as other funding sources;

c. List of messenger names who will discuss the results of Musrenbangdesa on the musrenbang forum.

(2) The results of Musrenbangdesa as referred to in verse (1) are poured in the news of the Musrenbangdesa event.

http://www.bphn.go.id/

6

Section Six of the Musrenbangvillage Participant

Article 11

The Musrenbangvillage participant is the organizer of the village government and emissaries of the village's community institutions.

The Seventh Part of the Financing

Article 12

Financing the implementation of village development planning until the completion of the Musrenbangdesa result from the APB of the Village is adapted to the financial capabilities of the village.

CHAPTER IV OF PLANNING CONTROL VILLAGE DEVELOPMENT

Article 13

(1) Control of the establishment of planning Village development is implemented

by Regent.

(2) The Count in Control as referred to in paragraph (1) may form the monitoring and evaluation team and/or bestow it to the Technical Work Unit.

(3) the execution of The control is referred to in verse (1) including: a. granting guidelines and standards in the implementation of planning

village development; b. Supervision and consulting of the planning

village development; c. planning, research, development, monitoring and evaluation of

implementation of village development planning.

CHAPTER V EVALUATION OF PLANNING FOR VILLAGE DEVELOPMENT PLANNING

Section 14

Control results as referred to In Article 13 used as the next Regent's evaluation material by the village government can be used as a material for planning the development of the village.

CHAPTER VI SANCTIONS

Article 15

(1) For the village that does not compose village development planning and/or

implementation of village development do not match Planning for the development of the village as set up in the Regulation of the Regions, sanctioned the assistance of APBD assistance.

(2) The provisions of the awarding of the sanctions as referred to in paragraph (1) are set further by the Rules of the Count.

http://www.bphn.go.id/

7

BAB VII TRANSITION

Article 16

(1) The provisions set about Village Development Planning

still remain in effect as long as it does not conflict with this Regional Regulation.

(2) Village regulations on Village Development Planning are set at most 1 (one) year since the Regional Regulation is set.

(3) For the village before the enactment of the regulations this area has established the Village Regulation on RPJMVillage, it is still remain in effect for the duration of the expiring term.

BAB VIII

provisions Closing

Section 17

Things that have not been set up in this Area Regulation as long as the technical implementation is further set up with the Regent's rules.

Article 18

This Regional Regulation begins to apply on the date It's an invitation. In order for everyone to know, ordered the invitational of this Area's Regulation with its placement in the section of the District of Magelang Regency.

Set in the City of Mungkid on 11 October 2010 REGENT MAGELANG, SINGGIH SANYOTO

Invundated in Mungkid City on 11 October 2010 SECRETARY OF THE COUNTY DISTRICT OF MAGELANG,

UTOYO

SHEET AREA OF THE COUNTY OF MAGELANG 2010 NUMBER 12

http://www.bphn.go.id/

8

EXPLANATION OF

THE DISTRICT RULES OF THE MAGELANG DISTRICT NUMBER 12 OF 2010

ABOUT

THE GUIDING GUIDELINES OF THE VILLAGE DEVELOPMENT PLANNING

I. UMUM

The village government in organizing village development affairs needs

basing on a systematic, guided, integrated, thorough and percepting village development plan for change. It is intended that the implementation of village development can be effectively, efficiently and precisely targeted in order to improve the life and well-being of the village community. It is therefore necessary for a village development planning system which is a unit of planning for the development of the village to produce a Country-term (RPJM Village) development plan for a term of 5 (5) years and Village Development Work Plan (RKP Village) for a term of 1 (one) year.

The system of drafting the village development planning document using the Partisipative planning approach of the Village Community Development is the planning system of planning which is implemented by engaging all parties of interest to Village building. The repentance of the parties is in order to gain aspiration and to create a sense of having and responsibility together in the implementation of development plans for the advancement of his village.

The village development planning system consists of 4 (four) the stage is: 1. The drafting of the plan; 2. The termination of the plan; 3. The control of the execution of the plan; and 4. Evaluation of the execution of the plan.

The four stages are organized continuously so as a whole form a whole planning cycle.

II. ARTICLE BY SECTION

Article 1

Clearly Is Quite Clear. Section 2

Clearly. Section 3

Clearly. Article 4

Is Pretty Clear. Article 5

Verse (1) In question "common asas of the country" is: 1. The principle of legal certainty is that the principle that priorses the foundation

legislation, the propriety and fairness of any state organizer policy;

2. Order of the Order which is the cornerstone of the rules, the greed and balance in the control of the State;

http://www.bphn.go.id/

9

3. Common interests include the principle that precede the common keejahetherness in an aspirational, acomodative and selective manner;

4. The Principle of openness is the principle that opens itself against the right of the people to obtain the correct, honest and undiscriminatory information about hosting the State with regard to the protection of personal, class, and personal rights. State Secret;

5. Asas Proportionality is the principle that priorities the balance between the rights and obligations of the State of the Nation;

6. The principle of professionalism is the principle that priorities the expertise in code of ethics and the provisions of the laws of law;

7. Accountability Asas that determine that any activities and end results of the State organizer ' s activities must be liable to the public in accordance with the applicable laws.

Verse (2) Enough Clearly.

Verse (3) Is Pretty Clear.

Article 6 Is Pretty Clear.

Article 7 Is Pretty Clear.

Article 8 Verse (1)

Is Pretty Clear. Verse (2)

Is Pretty Clear. Verse (3)

In terms of the village composing RPJMdesa is made with systematics: a. Preliminations include: Background, Mean and Purpose,

Runway Law, RPJM Village Relationship with Other Planning Documents, Village RPJM Writing Systematics;

b. Overview of the Village Conditions: Geography, Village Economy, Social Culture, Prasarana and Sarana Village, General Governance;

c. Vision and Mission Loading: Philosophical Cornerstone Building, Vision, Mission;

d. Village Development Strategy; e. Village Finance Policy Direction: Management Direction

Village Revenue, Village Shopping Management Direction, Financing Management Direction, Budget General Policy;

f. Village Development Program; g. Closing.

Article 10 Is Pretty Clear.

Article 11 referred to the institution of the ministry consists of public figures, RT/RW envoys, LPMD or other desigcountries, the PKK, the Taruna Reef, the public figures and the social organization of the existing society.

Article 12 Is Pretty Clear.

Section 13 referred to a technical work unit is a work unit that guides the planning issues that are performed with other work units in coordination so resulting in comprehensive planning.

http://www.bphn.go.id/

10

Article 14 Is Pretty Clear.

Article 15 Is Pretty Clear.

Article 16 Is Pretty Clear.

Article 17 Is Pretty Clear.

Article 18 Is Quite Clear.