Regulation About The Profession Of The Master Craftsman's Examination And The Examination Requirements In Parts I And Ii Of The Master Craftsman In The Electrical Mechanical Engineering Trade

Original Language Title: Verordnung über das Meisterprüfungsberufsbild und über die Prüfungsanforderungen in den Teilen I und II der Meisterprüfung im Elektromaschinenbauer-Handwerk

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$20 per month, or Get a Day Pass for only USD$4.99.

Regulation on the Master Examination profession and the examination requirements in Parts I and II of the Master Examination in the electrical machinery manufacturer-Handwerk (Elektromaschinenbauermeisterverordnung-ElektroMbMstrV)

unofficial table of contents

ElektroMbMstrV

date of delivery: 17.06.2002

full quote:

" electric machine builder decree of 17. June 2002 (BGBl. 2325), by Article 10 of the Regulation of 17 December 2008. November 2011 (BGBl. I p. 2234) "

:as amended by Art. 10 V v. 17.11.2011 I 2234

For details, see Notes

Footnote

(+ + + Text evidence from: 1.10.2002 + + +)
(+ + + For application). cf. § 8 + + +)

Explanatory notes to the Master Examination Ordinance in the electrical engineering industry are published in the Federal Gazette (Bundesanzeiger). Non-official table of contents

Inbox formula

Based on § 45 of the Craft Code, as amended by the 24. September 1998 (BGBl. 3074), which is Article 135 (3) of the Regulation of 29 June 2008. October 2001 (BGBl. 2785), the Federal Ministry of Economics and Technology, in agreement with the Federal Ministry of Education and Research, is ordering: href="index.html#BJNR232500002BJNE000100000"> unofficial table of contents

§ 1 outline and content of the master examination

The master test in the electrical engineering industry includes the following independent testing parts:
1.
Review of the masterful execution of the usual work (Part I),
2.
checking the required subject-theoretical knowledge (Part II),
3.
checking the required business, commercial and legal knowledge (Part III) and
4.
Examination of the necessary vocational and occupational pedagogical knowledge (Part III) IV).
Non-official table of contents

§ 2 Master examination professional image

(1) By the master examination in the electrical engineering industry, the craft industry will be noted that the examinee is competent to carry out a craft business independently, to perform managerial tasks in the fields of technology, business management, personnel management and development, to carry out the training and to carry out its professional activities in the field of To independently implement action competence and to adapt it to new requirements in these areas.(2) The following activities, knowledge and skills are attributed to the electrical machinery manufacturer's craft as integral qualifications for the purposes of the master's examination:
1.
Identify customer requests, advise customers, calculate services, and create offerings, Execute order negotiations and set order targets,
2.
Tasks of technical and commercial management, operational organization, personnel planning, and , in particular taking into account in-company training and further training, quality management, liability and occupational safety, safety, data protection and environmental protection; Use information systems,
3.
Perform orders taking into account manufacturing techniques, maintenance alternatives, occupational laws, standards, rules and regulations, staffing requirements and training, order processing and order processing, planning and monitoring,
4.
Equipment for equipment and equipment Developing, planning, manufacturing, programming, control and control technology, as well as the control, distribution, welding and process engineering, taking into account safety and health-relevant precautionary measures and erect,
5.
Function of energy consumption devices as well as electrical and electronic equipment, assemblies and their Power supply devices, mastering, considering and applying techniques for the rational use of energy,
6.
Digital, data and network technology mastering, Analyze Interfaces,
7.
Consider Material Properties in Planning, Design, and Execution
8.
Rotating and stationary electrical machines and devices calculate, assemble, repair, test, operate and maintain; use measurement and test tools and
9.
documentations, in particular winding representations and schematics, also using computer-based systems,
10.
Functions of mechanics, hydraulics and pneumatics, taking into account the physical laws,
11.
Design Contracts; develop and maintain standard contracts, especially service contracts,
12.
Error- Perform troubleshooting, control measures to eliminate errors and malfunctions, evaluate and document results,
13.
decrease performance, and Log, submit to the customer, calculate and post-costing.
Non-official table of contents

§ 3 outline, duration of examination and Consist of Part I

(1) Part I of the Master Examination comprises as examination area a master examination project and an expert discussion related to it.(2) The completion of the Master Test Project shall not take longer than five working days, the expert discussion shall not last longer than 30 minutes.(3) The Master examination project and the expert discussion will be evaluated separately. The examination achievements in the Master examination project and in the expert discussion are weighted in the ratio 3: 1. This will form an overall evaluation.(4) Minimum requirement for the existence of Part I of the Master examination is a sufficient overall examination performance, whereby the examination must not have been assessed either in the Master examination project or in the expert discussion with less than 30 points. Non-official table of contents

§ 4 Master Audit Project

(1) The test item has a master audit project that has a customer order. . The specific task is to be carried out by the Master Examination Committee. The proposals of the test item are to be taken into consideration. Prior to carrying out the Master's examination project, the examinee shall submit the draft, including a scheduling, to the Master Examination Committee for approval.(2) The following task is to be carried out as a master inspection project:
An installation or a part of the drive technology, taking into account the measuring, control and control technology, or set it in place.(3) The Master Test Project referred to in paragraph 2 shall consist of:
1.
Draft, calculation, planning and Calculation documents,
2.
Installation or repair of the asset or part,
3.
Audit log.
The design, calculation, planning and calculation documents will be 30 of the hundred, the production or repair of the asset or the part with 50 of the hundred and the test protocol with 20 of the hundred weighted. Non-official table of contents

§ 5 expert discussion

A technical discussion is conducted on the basis of the examination achievements in the Master Examination Project. In doing so, the examinee is to show that he can show the technical connections that are based on the master test project, that he establish the course of the master test project and that he/she is connected with the master audit project. problems and their solutions, and is in a position to take new developments into account. Non-official table of contents

§ 6 outline, duration and passing of part II

(1) The test in Part II is intended to be performed by the test by Demonstrate that technological, technical, technical, technical, mathematical and economic knowledge is linked to technical, safety, flow and process engineering, that it will analyse and assess problems and demonstrate appropriate solutions and document.(2) Audits are:
1.
Drive and Security Technology,
2.
Order fulfillment,
3.
Operations Management and Operational Organization.
(3) In each of the Checkboxes must be edited at least one task, which must be case-oriented.
1.
Drive and Safety technology The test piece is to prove that it is capable of carrying out tasks and problems of drive technology in an electrical engineering company with due regard to technical, safety-related, economic and ecological aspects. Edit. It is intended to assess and describe technical issues. The task is to associate more than one of the following qualifications:
a)
Analyze customer requirements,
b)
Construction, mode and function of drive technology systems, in particular, describe and assess measurement, control and control technology,
c)
describe methods of diagnosis, maintenance, repair and measurement technology, and assess,
d)
evaluate technical data and associate it with usage,
e)
Types, Assessing the properties and processing of materials and material compounds and assigning them for use,
f)
Technical solutions, in particular: Develop, assess and correct safety and health-related precautionary measures
2.
Order unwinding The test item demonstrate that it is in a position to initiate and complete customer-oriented measures in order to ensure the technical and economic success of an electrical engineering company in order to complete the contract. The task is to associate more than one of the following qualifications:
a)
Evaluate order documents and schedule order fulfillment processes,
b)
Methods and procedures of the Evaluate work planning and organisation, taking into account the manufacturing and repair methods and the use of equipment, equipment and personnel, while presenting quality assurance aspects,
c)
Technical work plans, in particular sketches, technical drawings, winding representations and circuit diagrams, are developed, evaluated and corrected, including by using electronic Data processing systems,
d)
Analyze and evaluate approval requirements analysis
e)
Subcontracting and controlling,
f)
Collect and evaluate data, and audit results document,
g)
Perform pre-and post-calculation;
3.
Operating and Company organisation The test piece is to prove that it is able to carry out tasks of the company management and organization in an electrical machine construction company. The task is to associate more than one of the following qualifications:
a)
summarize work items on offer packages; and Calculate prices,
b)
Hours accounting records based on a given cost structure calculate,
c)
Identify and use operational measures based on given schemas
d)
based on technical development and the market, planning business field development,
e)
Design and implement human resources development and management concepts,
f)
Operational quality management plan and represent,
g)
instruct and train employees in tasks,
h)
Develop customer care marketing and create new customers,
i)
Information and Describe and assess communication systems in relation to their operational applications,
k)
Professional laws, standards, rules and regulations
l)
assessing liability in manufacturing, maintenance, and services,
m)
The requirements of occupational safety, health protection, data protection and environmental protection; assess hazards and measures to protect the environment
n)
Planning and presenting operational, storage and construction site equipment and logistics.
(4) The examination in Part II is written on the market. It should last no longer than nine hours. It is not allowed to exceed a duration of six hours per day.(5) Where at most two of the examination subjects referred to in paragraph 2 have been reached at least 30 and less than 50 points, an oral supplementary examination may be carried out in one of those subjects if they are to pass the existence of Part II of the master's examination.(6) Minimum requirement for the existence of Part II of the Master examination is a sufficient overall examination performance. The Examination Committee shall issue a certificate to the examinee on the basis of the outcome of the examination in the examination subject referred to in point 1 of the second paragraph of paragraph 2, after having passed Part II of the Master Examination. The Part II validation is not passed if
1.
is a test subject with less than 30 points has been evaluated or
2.
after the additional examination has been carried out, two examination subjects were evaluated with fewer than 50 points

Footnote

(+ + + § 6 Abs. 5 u. 6: For use, see: § 8 + + +) Non-official table of contents

§ 7 General examination and procedural regulations, further regulations for the master examination.

(1) The provisions of the Regulations of the Master Examination Regulations of 17. December 2001 (BGBl. 4154) in the current version remain unaffected.(2) The examination in parts III and IV of the Master Examination is determined in accordance with the General Master Examination Regulations of 26. October 2011 (BGBl. 2149), as amended. Non-official table of contents

§ 8 Transitional provision

The provisions of § 6 (5) and (6) do not apply to the up to the 31. The audit procedure started in December 2011. These will be brought to an end in accordance with the previous regulations. Non-official table of contents

§ 9 Entry into force, override

This regulation occurs on the 1. October 2002, in force.