Regulation Concerning Vocational Training For The Roofer / To The Student

Original Language Title: Verordnung über die Berufsausbildung zum Dachdecker/zur Dachdeckerin

Read the untranslated law here: http://www.gesetze-im-internet.de/dachdausbv_1998/BJNR091800998.html

Regulation concerning vocational training for the roofer / to the student DachdAusbV 1998 copy date: 13.05.1998 full quotation: "regulation of vocational training to the roofer / to the student of 13 May 1998 (BGBl. I p. 918)" this Decree is a training regulations within the meaning of section 25 of the handicrafts Regulation Act. Aligned the training regulations and derdamit, by the Standing Conference derKultusminister of the countries in the Federal Republic of Deutschlandbeschlossene framework curriculum for vocational school werdendemnächst releasing as a supplement to the Federal Gazette.
Footnote (+++ text detection from: 1.8.1998 +++) input formula on the basis of § 25 para 1 in conjunction with § 2 sentence 1 of the handicrafts Regulation Act as amended by the notice of December 28, 1965 (BGBl. 1966 I p. 1), last by article 1 No. 9 of the law of 25 March 1998 (BGBl. I p. 596) is changed, decreed the Federal Ministry of economy in agreement with the Federal Ministry of education , Science, research and technology: section 1 State recognition of the education profession who is training professional roofing/engineering of training for the commercial number 4, roofers, the trade and crafts code State-recognized.

Section 2 (1) duration training takes three years. 1. roof, wall and sealing technology and 2. thatched roof technology can be selected for the third year of training between the disciplines.
(2) trainees, the visit is which one according to national regulations of introduced school-based basic vocational education year after a legal regulation in accordance with § 27a, paragraph 1, of the trade and crafts code than to be first year of vocational training, start the company-based training in the second year of training.

§ 3 professional field width basic education and objective of vocational training (1) training in the first year of training provides a professional field broad basic education, if company training according to this regulation and the education in vocational school under the national rules on the basic vocational training year.
(2) the knowledge and skills referred to in this regulation to be acquired so that the trainees to engage a qualified professional activity within the meaning of § 1 para 2 of the vocational training Act is empowered, includes in particular independent planning, performing, and controlling. This qualification is to prove in the tests after the articles 9 and 10.

§ 4 education profession at least the following skills and knowledge are (1) the subject of the vocational training: 1. vocational education and training, work and collective bargaining law, 2. construction and organization of the training company, 3. safety and health protection at work, 4. environmental protection, 5. order acceptance, service entry, work plan and schedule, 6 setting up, securing and spaces by construction sites, 7 test, camps and select construction and materials help, 8 read and apply drawings and plans , Making sketches, taking measurements, 9 manufacture of masonry, plaster and concrete, 10 processing of wood and manufacture of wooden parts, 11 processing of plastics and bituminous materials, 12 manufacture of thermal insulation, perform additional measures in case of roof coverings, 13 processing of slate, roof tiles and shingles, 14 processing of roof tiles and roof tiles, 15 processing of metals, 16 assembling and installing parts, 17 manufacture of support structures for external wall cladding , 18 incorporate devices for the derivation of surface water, 19 processing of corrugated sheets, 20 building up energy collectors and energy converters.
(2) at least the following skills and knowledge are the vocational training in the disciplines subject to: 1 in the specialty roofing, wall and sealing technology: a) ceiling of roof and wall surfaces with slate, roof tiles, shingles, corrugated sheets, roof tiles and roof tiles, b) sealing with plastics and bituminous materials, c) execute coverings with sheets, d) dressing by exterior walls, e) building lightning protection system for external lightning protection , f) repair of roof and walls and wooden structures, g) measurement, reporting, quality assurance measures;
2. specializing in thatched roof technology: a) preparing shelters with Reed, b) ceiling of flat roof surfaces with Reed, c) manufacture of connections and statements, d) ceilings of arched and curved roof surfaces with Reed, e) build of lightning protection systems for outer lightning protection, f) repair of roofs and wooden structures, g) measurement, reporting, quality assurance measures.

§ 5 training curriculum the knowledge and skills referred to in section 4 shall after the contained instructions for the factual and temporal structure of vocational training (training curriculum) are taught in the system for basic training and specialist training. One of the training curriculum within the vocational education and training and different within vocational education and technical training material and temporal outline of training content is specifically allowed, as far as practical operating characteristics require the deviation.

Article 6 education plan the training employer has to create a training plan on the basis of the education masterplan for the trainees.

§ 7 vocational training at inter-company training centres the vocational training is supplemented in suitable facilities outside the training facility. The Chamber regulates the implementation of inter-company vocational training on the basis of the education Masterplan (annex, section IV).

§ 8 report issue the trainee has to do a report portfolio in the form of a training certificate. He is to give opportunity to lead the record book during the training period. The trainers has regularly look through the record book.

§ 9 midterm (1) to determine of the level of training is making a midterm. It should take place before the end of the second year of training.
(2) the intermediate covers that in the appendix in section I for the first year of training and skills listed in section II for the third six months of training and knowledge, as well as on the material to be conveyed in the vocational education according to the curriculum, unless it is essential for the training.
(3) the candidate to perform practical tasks in the practical part of the exam in no more than six hours three. For this purpose come in particular the following areas into consideration: 1 ceiling of a part of area of a roof or wall surface with slate, tiles or shingles, 2. ceiling a part of area of a roof with roof tiles or roof tiles, 3 establish of a division of a waterproofing with plastics or bituminous materials.
(4) the test specimen to solve tasks that you want to relate to real-world cases, in the written part of the examination in no more than 180 minutes from the following areas: 1 safety and health on the construction site, 2. environmental protection, nature conservation buildings, 3 sketches, drawings and laying, 4. rulebook of the roofing trade, 5. construction and building materials, machines, devices and tools, 6 insulation materials and insulation technology, 7 roof , Wall and sealing technology, 8 work-related calculations.

Article 10 examination (1) examination stretches on the knowledge and skills listed in the annex, as well as on the curriculum taught in the vocational school, as far as it is essential for the training.
(2) the candidate to perform practical tasks in the practical part of the exam in no more than twelve hours. This comes in particular from the following four areas of each one of the specified tasks to consider: 1 in the specialty roofing, wall and sealing technology: a) slate, roof tiles, shingle and wave plates coverings: aa) covering roofs with slate, tiles or shingles including eaves and verge or Ridge, bb) cover of roofs with corrugated sheets including installing moldings or cc) making connections or statements;
b) roof tiles and Dachstein coverings: aa) ceiling roof surfaces including eaves and ridge or verge and first, bb) manufacture of connections or financial statements cc) installing parts of a lightning protection system or dd) mounting and installation of parts;
c) seals: aa) caulk a roof surface including making a connection or financial statements with plastics, bituminous materials or metals, bb) manufacture of building waterproofing on horizontal and vertical surfaces or cc) manufacture and sealing of expansion joints;
d) exterior wall claddings: aa) run by clothing in particular with roof tiles, roof tiles, slates, fibre cement, metals or plastics, bb) manufacture of connections or qualifications or cc) manufacture of covers;
2. in the field of thatched roof technology: a) thatched roof cover: aa) ceiling of flat roof surfaces including eaves and verge or Ridge, bb) cover of arched or curved roof surfaces, cc) manufacture of first covers and installing parts of a lightning protection system or dd) manufacture of ports;
b) roof tiles and Dachstein cover: aa) ceiling of a division of a roof surface including eaves, verge and first, bb) manufacture of connections or qualifications or cc) mounting and installation of parts;
(c) seals: Seal a roof surface including establishing a connection or financial statements with plastics, bituminous materials or metals;
d) exterior wall claddings: aa)
(Run by clothing with small plates, bb) making statements or cc) manufacture of covers.
This set up a construction site, the safety, health protection, environmental protection and quality assurance measures should be included.
(3) the candidate shall be checked in the written part of the test in the test areas of roofing, waterproofing, exterior wall cladding and economic and social studies. The candidate shall demonstrate in test areas roofing, waterproofing and exterior wall cladding that he can represent technological, mathematical and graphic issues solutions and workflows in particular through link information, and apply measures to the safety, health and environmental protection. Tasks, which should relate to real-world cases, in particular from the following areas considered are: 1 in the test range of roof coverings: a) rules and regulations of the roofing trade, b) roofing, deck materials, c) heat protection, d) materials, e) deck types, mounting techniques, f) connections and terminations, g) derive from surface water, h) energy collectors and energy converters, i) lightning protection system for outer lightning protection;
2. in terms of examination of seals: a) rules and regulations of the roofing trade, b) deck documentation, c) heat protection, d) materials for the sealing of buildings, e) structure and layers of roofs with sealing, f) structure and layers of roofs, g) sealing surfaces against moisture and water not under pressure, h) connections and terminations;
3. in the audit area external wall cladding: a) rules and regulations of the roofing trade, b) support structures for external wall cladding, c) heat protection, d) materials, fastening techniques, e) connections and terminations, covers;
4. in the test area of economic and social studies: general economic and social contexts of professional and working world.
(4) for the written portion of which is testing to go out following time limits: 1. in the audit area roofing 150 minutes, 2nd in the testing area seals 90 minutes, 3rd in the testing area of exterior wall cladding 60 minutes, 4th in the testing area of economic and social studies 60 minutes.
(5) the written part of the examination is to complement, if this can be decisive for the existence of testing at the request of the DUT or discretion of the Audit Committee in individual areas by an oral examination. The written part of the examination has the double weight to the oral exam.
(6) within the written part of the exam, the exam areas are as follows to weight: 1 inspection area roofing 30 per cent, 2. test area seals 25 per cent, 3. test area external wall coverings 25 per cent, 4. test area of economic and social studies 20 per cent.
(7) the examination is considered passed if each in the practical and the written part of the examination within the written part of the examination at least sufficient services are provided in at least two of the test areas of roofing, waterproofing and exterior wall cladding. Are the audit services in one of the four practical tasks or rated in one of the four test areas with "insufficient", so the exam is not passed.

§ 11 the existing regulations continue to apply transitional vocational training relationships that exist in the entry into force of this regulation, are, unless the parties agree on the application of the provisions of this regulation.

Article 12 entry into force, expiry this regulation enters into force on 1 August 1998.

Plant (to 4) training curriculum for vocational training to the roofer / to the student (site: BGBl. I 1998, 922-931) I. basic training item No. No. part of the education profession to negotiating skills and knowledge of temporal values in weeks in the year 1 2 3 1 2 3 4 1 vocational training, labour and collective bargaining law (§ 4 para 1 No. 1) a) meaning of the training contract, in particular conclusion, duration and termination , b explain) mutual rights and obligations arising from the contract call c) possibilities of vocational training call d) essential parts of the contract call e) essential provisions of the collective agreements applicable to the training operation call during the whole training to teach 2 structure and organisation of the training company (§ 4 para 1 No. 2) a) structure and tasks of the training operation explain b) training operation as offering basic functions , Procurement, manufacturing and Administration explain c) relationships of the training operation and its employees to business organisations, professional organisations and trade unions call d) principles, tasks and functioning of betriebsverfassungs - or staff-legal bodies of formed operation describe 3 safety and health at work (article 4, paragraph 1 No. 3) a) determine risk to health and safety at the workplace and take measures to avoid b) occupational health and safety and accident prevention regulations apply c) describe behaviour in accidents and initiate the first measures d) Regulations of fire prevention apply; Describe Verhaltensweisen in fires and fire-fighting measures 4 environmental protection (§ 4 para 1 No. 4) in particular: a contribute to the prevention of operational pollution within the professional sphere of influence,) possible environmental impacts by the training company and his contribution to the environmental protection examples explain b) for the training operation, applicable regulations of environmental protection apply c) ways the economic and environmentally-friendly energy and material use to use d) avoid waste , Materials and environmentally friendly waste disposal lead to 5 order acquisition, output registration, work plan and schedule (article 4, paragraph 1 No. 5) a) b identify target the work order) steps, work equipment and precautionary measures plan c) construction and materials help set d) equipment and tools set e) work carried out on the basis of specifications check f) work reports 6 *) 6 set up, secure and spaces by construction sites (§ 4 para 1 No. 6) work on the construction site : a) Workstation set up, entertain and clean, ergonomic aspects into account b) protective scaffolds to secure work place: c) protective scaffolds according to build, maintain and remove d) tools, equipment and machinery involved in assessing the reliability of work and safety substructures: e) deploy tools, devices and machines get f) errors of devices and machines detect and report g) tools, devices and machines waiting for h) devices and machines in operation take , Aufschmelz-, welding and soldering equipment in operation under supervision take 7 inspection, bearings and selection of construction and materials help (§ 4 para 1 No. 7) a) construction, construction materials and components for availability check b) retrieve building and construction materials and components according to specifications, carry on the construction site and store 8 read and apply drawings and plans, making sketches, taking measurements (§ 4 para. 1 No. 8) sketches , Drawings and plans: a) sketches of views and sections read and apply b) c read architectural drawings and laying) sketches make measurements: d) measurements with a measuring tape and folding rule perform e) heights with spirit level and tube balance transfer f) straight lines align g) measuring points and secure h) right angles and check 9 manufacture of masonry, plaster and concrete (§ 4 para 1 No. 9) a) mortar groups according to purpose are different b) c select binders and aggregates for mortar and concrete) wall , Cleaning and shipping line mortar manufacture and assess its consistency d) masonry parts of stones produce e) manufacture chimneys made of rocks and form parts f) produce single-layer wall plaster g) Board formwork manufacture h) welded steel mesh cut out i) rebar with spacers install k) establish concrete, introduce, summarize and treat 4 10 processing of wood and manufacture of wooden parts (§ 4 para 1 No. 10) a) wood and wood-based materials distinguish b according to the intended use) carry out preventative wood protection measures , in particular in terms of plant and animal pests c) sorting and sawn timber classes distinguish d) wood and wood-based materials store e) wood f edit, in particular through marking, mortising, sawing, planing and drilling) nails and screws according to the standard select g) wood joinery and wood fixtures produce 11 processing of plastics and bituminous materials (§ 4 para 1 No. 11) a) b check surfaces of the deck surface on their suitability for sealing) thermoplastics , Thermosets and elastomers according to their characteristics differ c) thermoplastics and elastomers deform d) Duromers cut, drill, and glue the e) plastic and bitumen sheets after designation and purpose are different, cut, nail and fix f) adhesive, paints and sealants distinguish and handle g) plastic and bitumen sheets sticking and welding 8 12 manufacture of thermal insulation, perform additional measures in case of roof coverings (§ 4 para 1 No. 12) insulation properties and the purpose of use distinguish and incorporate 24 13 processing of slate , Roof tiles and shingles (§ 4 ABS. 1 Nr. 13) a) forms by Schiefer, roof tiles and shingles are different b)
Slate and roof plates cut and punch c) slate sort d) shingles cut and cut e) different deck types, sections of roof and wall surfaces according to specifications cover 14 processing of roof tiles and roof tiles (§ 4 para. 1 No. 14) a) roof tiles and roof tiles differ and edit, in particular cut, tear, pinch, cut, share and drill b) different deck types, sections of roof areas according to the requirements cover 15 processing of metals (§ 4 para 1 No. 15) a) properties of steel and non-ferrous metals are different b) sheets and profiles (edit, in particular tear, cutting, bending, folding, round, beading, cutting, drilling, filing, rivets and solder c) fasteners for panels select and apply d) corrosion protection measures perform 6 16 mounting and installation of parts (§ 4 para. 1 No. 16) parts for roofs and walls different purpose and build a 4 *) In connection with other training content to convey.
 
II. skills conveyed to specialist training item No. No. part of the education profession and knowledge time values in weeks in the year 1 2 3 1 2 3 4 1 order acquisition, output registration, work plan and schedule (article 4, paragraph 1 No. 5) order acquisition, performance tracking: a) work order with respect to the requirements check b) technical rules and regulations, in particular regulations of the roofing trade, building regulations and general technical terms and conditions for construction services, as well as work instructions , apply c) inputs of other trades in the run test task list and schedule: d) e estimate time and support staff) steps set and vote, as well as measures to ensure the course of the work according to specifications f) weather conditions for the execution of work take into account 4 *) 2 set up, secure and spaces by construction sites (§ 4 para 1 No. 6) set up, safety and health on the construction site: a) assess suitability of the roads and measures to use cause b) light sources and barriers set up and maintain c) apply ergonomic working methods
(d) hazardous materials identify and assess potential hazards e) f ensure storage of hazardous materials) risk through overhead lines and into operation any machines on the construction site note g) ventilation of workplaces make sure h) i use protective equipment as well as measures for the protection of persons at construction sites) for accidents at work, take emergency measures for the care of injured persons, protective scaffolds secure crash site: k) work and working scaffolds and dismantle l) equipment assess safety substructures : m) equipment and machinery for the workflow select, request, transport, store and prepare for use n) conveyor and transport systems serve as well as lifting and slinging use environmental protection: o) sorted waste on site and prepare for the evacuation p) q arrange disposal of hazardous substances) take measures for nature protection of roof and exterior wall cladding, especially for birds and bats rooms: r) building materials , Prepare s devices and machines for transporting) 3 check, camps and select construction and materials help pass construction site (§ 4 para 1 No. 7) a) construction and construction of auxiliary materials and components to determine request and provide b) construction and construction AIDS for dimensional and form accuracy check 4 read and apply drawings and plans, making sketches, taking measurements (§ 4 para 1 No. 8) a) drawings for compliance with the conditions on site check b) laying apply c) sketches for measurements make d) components with measuring devices measure and check 5 processing of wood and manufacture of wooden parts (§ 4 para 1 No. 10) a) wood and wood-based materials select b) wooden structures, particularly for roof truss and timber-framed walls, make c) roof and wall surfaces slats and shells d) foredeck railways formwork to raise 8 6 processing of plastics and bituminous materials (§ 4 para 1 No. 11) a) bitumen cookers, Aufschmelz - and welding equipment include in operating , B observe safety regulations) establish construction of ventilated and non-ventilated roofs with sealing, layers, as well as constructive and structural differences note c) make 7 connections and terminations in roof waterproofing 7 manufacture of thermal insulation, perform additional measures in case of roof coverings (§ 4 para 1 No. 12) a) produce thermal insulations in ventilated and non-ventilated sloping roofs and exterior wall cladding, constructive and structural differences note b) perform additional measures , in particular under roofs, underfunding and under stress produce c) make 11 connections and accounts 8 processing of slate, roof tiles and shingles (§ 4 para 1 No. 13) sections of roof and wall surfaces with slate, roof tiles and shingles in different types of deck cover 9 processing of roof tiles and roof tiles (§ 4 para 1 No. 14) a) cover portions of roofs with roof tiles and roof tiles in different deck types , Mouldings build a b) make connections and degrees c) lay Ridge tiles and first stones in mortar and with Trockenelementen 10 processing of metals (§ 4 para 1 No. 15) a) take soldering equipment in operation, observe the safety regulations b) sections of roof and walls with sheets in different types of deck cover c) covers manufacture d) statements produce 6 11 manufacture of substructures of the clothing type for external wall cladding (article 4, paragraph 1 No. 17) a) construction of substructure according to set b) background check , in particular with regard to the anchoring of substructures c) fastener select d) substructures align and fasten 5 12 installing devices to the drainage of surface water (§ 4 para 1 No. 18) a) trays and throats from metals and plastics install b) roof drains insert c) external drainage systems produce d) Interior drain plug 4 13 processing of corrugated sheets (§ 4 para 1 No. 19) a) corrugated sheets of different materials cut and drill b) cover portions of the roof and walls with corrugated sheets , Fittings install 3 14 installing energy collectors and energy converters (§ 4 para. 1 No. 20) a) energy collectors and energy converters, in particular solar panels and photovoltaic elements, roof and walls incorporate into b) connect roof coverings, roof waterproofing and exterior wall cladding 4 *) In connection with other training content to convey.
 
III. professional training in the disciplines of a) skills to conveyed roof, wall and sealing technology item No. No. part of the education profession in the field of and knowledge time values in weeks in the year 1 2 3 1 2 3 4 1 ceiling of roof and wall surfaces with slate, roof tiles, shingles, corrugated sheets, roof tiles and roof tiles (§ 4 paragraph 2 No. 1 letter a) a) roof and wall surfaces cover b) connections and terminations for covers with slate , Roof tiles, shingles and corrugated sheets to make c) Ridge tile and Ridge stones in mortar and with Trockenelementen lay d) joints reverse stroke, transverse tunnel and internal shipping line run 21 2 sealing with plastics and bituminous materials (§ 4 para. 2 No. 1 letter b) a) surfaces against moisture and water not under pressure seal b) make connections and degrees c) expansion joints to connect and seal d) surface protection of roof waterproofing, particularly through split do Begen , Pours gravel and concrete slabs put, produce e) structure and layers of extensive and intensive roofs produce 12 3 execute coverings with sheets (§ 4 paragraph 2 No. 1 letter c) a) roof and wall surfaces cover b) expansion bellows to connect and build a c) connect 6 4 dressing of walls sheet (§ 4 paragraph 2 No. 1 letter d) a) clothing with open and deposited joints produce b) connections and accounts to establish 4 5 building lightning protection system for outer lightning protection (§ 4 para. 2 No.) 1 letter e) a) grounding resistance of commonly used forms of Earth er set dimensions of surface and Tiefenerdern, determine and document b) grounding conductors in accordance with in the ground laid cables and pipes bring c) establish potential equalisation, equipotential bonding bar mount, existing underground lines connect d) lightning protection system for outer lightning protection according to technical rules set up, set in particular arrangement of fishing facilities and discharges in compliance with approximations to electrical systems and document e) measure resistance of earthing and lightning protection systems , assess and document 4 6 repair of roof and walls and wooden constructions (§ 4 para. 2 No. 1 letter f) a) determine damage causes determine b) c take first steps to limit the damage) perform repair 3 7 reporting, measurement, quality assurance measures (§ 4 paragraph 2 No. 1 letter g) a) check work carried out on flawless execution, b carry out final inspection) document work carried out, in particular daily report and 2 make allowance *) b) skills specializing in thatched roof technology item No. No. part of the education profession to conveyed and knowledge of temporal values in weeks in training year 1 2 3 1 2 3 4 1 preparation of coverage with Reed
(§ 4 ABS. 2 Nr. 2 Buchstabe a) a) Reed on availability check and sort by application b) fastening set c) fasteners select 6 2 blankets by flat roofs thatched (§ 4 para. 2 No. 2 letter b) a) deck surface of flat roof surfaces check and b) flat roof surfaces in different mounting techniques, in particular binding, sewing and screws, cover 12 3 manufacture of connections and accounts (§ 4 para. 2 No. 2 letter c) a) deck techniques for connections and accounts differ , Deck equipment set b) make the gutter covers in accordance with the knee point c) place course covers manufacture d) first covers of different kind manufacture e) Ridge and Kehl coverings manufacture f) connect installation parts, especially at chimneys, 12 4 ceilings of arched and curved roofs thatched (§ 4 para. 2 No. 2 letter d) a) deck surface of convex and brace roof surfaces check and b) arched and curved roof surfaces in different mounting techniques , in particular binding, sewing and screws, cover c) transitions with arched and curved roof shape 12 5 building lightning protection system for external lightning protection (§ 4 para. 2 No. 2 letter e) a) grounding resistance of commonly used forms of Earth er set dimensions of surface and Tiefenerdern, determine and document b) earthing in accordance with in the ground laid cables and pipes bring c) establish potential equalisation, equipotential bonding bar mount, existing underground lines connect d) lightning protection system for outer lightning protection according to technical rules build , in particular arrangement of fishing facilities and discharges in compliance with approximations to electrical systems define and document e) resistance of earthing and lightning protection systems measure, evaluate, and document 4 6 repair roofs and wooden constructions take (§ 4 para. 2 No. 2 letter f) a) determine damage causes determine b) first measures to limit the damage of c) perform repair 4 7 reporting, measurement, quality assurance measures (§ 4 paragraph 2 No. 2 letter g) a) work carried out on flawless execution check , Performing final inspection b) document work carried out, in particular daily report and 2 make allowance *) *) in connection with other training content.
IV. to training at inter-company training centres to the Foundation or deepening of the skills listed in the sections I - III and to be taught skills in appropriate inter-company training centres: 1. in the first year of training during at least eight weeks in number 9 and 10, in particular, the ongoing number 11 letters a - e, running number 12, 13 and 14, as well as number 15 letter of b listed skills and knowledge , 2nd in the second year during three weeks in number 5 letters a - c, number 8, running number 9 letters a and c, number 10 letters a and b, current number 12 letters a and c, as well as number 14 letter of a listed skills and knowledge, 3. in the third year of training during three weeks a) specializing in roofing , Wall and sealing technology in number 1 letters b and d, current number 2 letters a to c and the letter e, as well as number 5 letters a, c, and e, b) specializing in thatched roof technology in particular that in number 2 letter b, number 3 letters a, b, d and e, running number 4 letter c and number 5 letter a , c and e listed skills and knowledge.
The craft Chamber allows exceptions at the request of trainers, if the knowledge and skills referred to in sentence 1 can be arranged in the same way in the training operation.