Regulation Concerning Vocational Training For The Roofer / To The Student

Original Language Title: Verordnung über die Berufsausbildung zum Dachdecker/zur Dachdeckerin

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$20 per month, or Get a Day Pass for only USD$4.99.

Regulation on vocational training as a roofer/roofing cover

Non-official table of contents

DachdAusbV 1998

Date of issue: 13.05.1998

Full quote:

" Regulation on vocational training Dachdecker/roofer of the 13th May 1998 (BGBl. 918) "

This decree is a training order in the Sinnedes § 25 of the Craft Regulations. The training regulations and the coordinated framework curriculum for the vocational school, agreed by the Standing Conference of the Ministers of Education and Cultural Affairs of the Länder in the Federal Republic of Germany, will soon become a supplement to the Federal Gazette (Bundesanzeiger)

Footnote

(+ + + Text evidence from: 1.8.1998 + + +) unofficial table of contents

Inbox formula

Based on § 25 (1) in Connection with paragraph 2, first sentence, of the Craft Regulations, as amended by the 28. December 1965 (BGBl. 1), which was last amended by Article 1 (9) of the Law of 25. March 1998 (BGBl. 596), the Federal Ministry of Economics, in agreement with the Federal Ministry of Education, Science, Research and Technology, is ordering: href="index.html#BJNR091800998BJNE000200310"> A non-official table of contents

§ 1 State Recognition of the Professional Training profession

The training profession roofer/roofer will be used for the training for the trade number 4, roofer, the Craft order state-approved. Non-official table of contents

§ 2 Training period

(1) The training lasts three years. For the third year of training, between the fields of expertise
1.
roof, wall and sealing technology and
2.
Reetdachtechnik
.(2) apprentices who are to be regarded as the first year of vocational training in accordance with a legal regulation in accordance with Article 27a (1) of the Craft Code, according to which a visit to a school-based vocational training year introduced under national law is to be expected. begin the company training in the second year of training. Non-official table of contents

§ 3 Basic Vocational Training and Vocational Training Objective

(1) The training in the first year of training provides a basic vocational training course if the company training in accordance with this Regulation and the training in the vocational school are carried out in accordance with the provisions of the national law on the vocational training year.(2) The skills and knowledge referred to in this Regulation shall be communicated in such a way as to enable the trainee to pursue a qualified professional activity within the meaning of Article 1 (2) of the Vocational Training Act, which shall, in particular: Self-planning, carrying out and controlling. This qualification must also be proven in the examinations according to § § 9 and 10. Non-official table of contents

§ 4 Training professional image

(1) The subject of vocational training shall be at least the following skills and knowledge:
1.
Vocational Training, Work and Taric Law,
2.
Construction and organization of the training company,
3.
Safety and Health at the Work,
4.
Environmental protection,
5.
Order failover, performance collection, job plan, and Flow plan,
6.
Setting up, saving, and spaces of construction sites,
7.
Check, store, and Selecting construction and building materials,
8.
Reading and applying drawings and plans, drawing up sketches, performing measurements,
9.
Production of masonry, plaster and concrete,
10.
Processing of wood and manufacture of wood Wood components,
11.
Processing of plastics and bituminous materials
12.
Making thermal insulation, performing additional measures on roof coverings,
13.
Processing Slate, roof tiles and shingles,
14.
Processing roof tiles and roof tiles,
15.
Processing metals,
16.
Monting and Build-in Parts
17.
Producing substructures for exterior wall coverings,
18.
Installing devices to Derivation of surface water,
19.
Processing of corrugated plates,
20.
Build-up of Energy collectors and energy converters.
(2) The subject-matter of vocational training in the fields of expertise is at least the following skills and knowledge:
1.
in the field of roof, wall and sealing technology:
a)
Blankets of roof and wall surfaces with slate, roof tiles, shingles, corrugated panels, roof tiles and roofing tiles,
b)
Sealing with plastics and bituminous materials,
c)
Performing covers with plastics and bituminous materials Bleach,
d)
Clothing of exterior walls,
e)
Erector of lightning protection systems for the outer lightning protection,
f)
Repair of roof and wall surfaces as well as of wooden structures,
g)
Reporting, Thickness, Quality-securing measures;
2.
in the specialization Reetdachtechnik:
a)
Prepare coverings with Reet,
b)
Blankets of flat roof surfaces with Reet,
c)
Connecting and connecting Seals,
d)
Blankets of curved and curly roof surfaces with reet,
e)
of lightning protection systems for external lightning protection,
f)
Repair of roof surfaces and of wooden structures,
g)
Reporting, Thickness, Quality-assurance measures.
Non-official Table of contents

§ 5 Training framework plan

The skills and knowledge referred to in § 4 are to be applied in accordance with the guidance provided in the Appendix for basic vocational education and training and for vocational training in the field of material and the chronological breakdown of vocational training (training framework plan). An outline of the training content, which deviates from the training framework within the basic vocational training and within the vocational training course, is particularly permissible, insofar as the specific operating conditions are that require the deviation. Non-official table of contents

§ 6 Training plan

The trainee has a training plan for the trainee on the basis of the training framework plan. Create a training plan. Non-official table of contents

§ 7 Vocational training in inhouse training centres

Vocational training will be carried out in appropriate facilities outside the training centre. The Chamber of Crafts (Chamber of Crafts) regulates the implementation of the over-company training on the basis of the training framework plan (annex, section IV). Non-official table of contents

§ 8 Report Sheft

The trainee has a report booklet in the form of a training certificate. It is the opportunity to give him the opportunity to carry out the report during the training period. The training course has to be reviewed regularly by the report booklet. Non-official table of contents

§ 9 Intermediate examination

(1) An intermediate examination is to be carried out to determine the level of training. It is to take place before the end of the second year of training.(2) The intermediate examination shall cover the skills and knowledge listed in Section I for the first year of training and in Section II for the third half-year of training, as well as the skills and knowledge required in the course of the vocational education and training courses. Teaching material to be used in the framework curriculum, insofar as it is essential for vocational training.(3) In the practical part of the examination, the examinee shall carry out three practical tasks in the course of a maximum of six hours. For this purpose, in particular, the following areas are eligible:
1.
Blankets of a partial area of a roof-or Wall surface with slate, roofing panels or shingles,
2.
ceilings of a roof area with roof tiles or roofing tiles,
3.
Production of a partial area of a roof sealing with plastics or bituminous materials.
(4) The test specimen is to be in the written part of the test in total at most Solve 180 minutes of tasks that are related to practice-related cases from the following areas:
1.
Health and Safety at the building site,
2.
Environmental protection, nature conservation buildings,
3.
sketches, drawings, and laying plans,
4.
rulebook of the Roofing craft,
5.
Construction and construction aids, machinery, equipment and tools,
6.
Insulating Materials and Insulation Technology,
7.
Roof, Wall and Sealing Technology,
8.
job-related calculations.
unofficial table of contents

§ 10 

(1) The journeyman's examination extends to the skills and knowledge listed in the Appendix and to the teaching material taught in the vocational education and training course, insofar as it is essential for vocational training.(2) In the practical part of the examination, the examinee shall carry out four practical tasks in the course of a maximum of twelve hours. For this purpose, in particular, one of the following four areas is eligible for one of the following tasks:
1.
in the field of roof, wall and sealing technology:
a)
Schiefer-, Dachplatten-, Schindel-und WellplattenCover:
aa)
Blankets of roof surfaces with slate, roof tiles or shingles including eaves and grat,
bb)
Blankets of roof surfaces with corrugated boards, including inserts of shaped parts or
cc)
Manufactution of Connectors or terminations;
b)
roofing tiles and roofing tiles:
aa)
Blankets of roof surfaces including eaves and grat or village and first,
bb)
Manufacch of Connectors or terminations,
cc)
Building parts of a lightning protection system or
dd)
Monting and installation of fittings;
c)
Sealing:
aa)
The sealing of a roof surface including the creation of a connector or closure with Plastics, bituminous materials or metals,
bb)
Manufactures of building seals on horizontal and vertical surfaces, or
cc)
Making and sealing motion joints;
d)
External wall coverings:
aa)
Clothing in particular with roof tiles, roofing tiles, slate, fiber cement, metals or plastics,
bb)
Connect or
cc)
Connect from covers;
2.
in the Reetdachtechnik specialty:
a)
ReetdachCoverage:
aa)
Levels of layers Roof surfaces including eaves and grat, or grat,
bb)
ceilings of curved or curly roof surfaces,
cc)
Manufactution and installation of parts of a lightning protection system or
dd)
Manufacch of a flash protection system Connectors;
b)
roof tile and roof tile cover:
aa)
ceilings of a roof area including eaves, location, and first,
bb)
Manufactution of Connectors or terminations or
cc)
Monting and mounting of installation parts;
c)
Sealing: Sealing a roof surface including making a connector or closure with plastics, bituminous materials or metals;
d)
Outside wall coverings:
aa)
Run
bb)
Manufactutions or
cc)
Making covers.
set up a construction site, safety and health, environmental protection, and quality-assurance Measures shall be taken into account.(3) The examinee shall be examined in the written part of the examination in the examination areas of roof coverings, seals, external wall coverings as well as economic and social studies. In the examination areas of roof coverings, seals and exterior wall coverings, the test specimen is intended to show that it is possible to find solutions in particular by linking information, technological, mathematical and graphic questions. Work processes and measures can be applied to safety, health protection and environmental protection. Tasks related to practice-related cases, in particular from the following areas, are eligible:
1.
in the roofing review area:
a)
Rules of the rooftop craft,
b)
roof structures, deck documents,
c)
Heat protection,
d)
Materials,
e)
deck types, fastening techniques,
f)
ports and degrees,
g)
Surface Water Discharge,
h)
Energy collectors and power converters,
i)
Lightning protection systems for outer lightning protection;
2.
in the exam area Sealing:
a)
rooftop handbook rule set,
b)
Cover records,
c)
Heat protection,
d)
Materials for the sealing of buildings,
e)
The structure and layer sequence of roofs with Seals,
f)
Structure and layer sequence of roof justifications,
g)
Sealing of surfaces against soil moisture and against non-pressing water,
h)
Ports and closures;
3.
in the exterior wall coverings:
a)
rooftop handset rule set,
b)
outer wall coverings substructures,
c)
Heat protection,
d)
Materials, fastening techniques,
e)
ports and degrees, covers;
4.
in the Economic and Social Examination area Social studies: general economic and social interrelations of the working and working world.
(4) The written part of the examination must be based on the following time limits:
1in the roof panel review area150 minutes,
2. in the Seals Examination Area90 minutes,
3.in the Outside wall coverings60 minutes,
4.in the Auditing area Economic and Social studies60 minutes.
(5) The written part of the examination is oral examination at the request of the test item or at the discretion of the examination board in individual areas. , if it can give a rash for the passing of the examination. The written part of the examination shall have twice the weight of the oral test.(6) Within the written part of the examination, the examination areas shall be weighted as follows:
1.Examination area Roof coverings30 of the hundred,
2.Sealing area seals 25 from the Hundred,
3.External Wall Clothing Audit Area25 of One hundred,
4.Economic and social science examination area20 of the hundred.
(7) Examination has been passed if in both the practical and in the written part of the examination as well as within the written part of the examination in at least two of the examination areas roof coverings, seals and outer wall coverings at least have been provided with sufficient performance. If the examination results are rated "insufficient" in one of the four practical tasks or in one of the four examination areas, the examination has not been passed. Non-official table of contents

§ 11 Transitional rules

On vocational training conditions that exist at the time of entry into force of this Regulation, the , unless the Contracting Parties agree to the application of the provisions of this Regulation. Non-official table of contents

§ 12 Entry into force, override

This regulation occurs on the 1. This is due to be in force. Non-official table of contents

Asset (to § 4)
Training Framework for Vocational Education and Training for the Dachdecker/Dachdecker

(Fundstelle: BGBl. I 1998, 922-931)
I. Basic vocational training
Lfd. No. Part of the training professional image skills and knowledge to be mediated Time guide values in weeks in the year of training
1 2 3
1 2 3 4
1 Vocational training, labor and collective bargaining
(§ 4 para. 1 no. 1)
a)
The importance of the training contract, in particular completion, duration and termination,
b)
Mutual rights and obligations arising from the training contract call
c)
opportunities for continuing vocational training
d)
essential parts of the employment contract
e)
essential provisions of the collective agreements applicable to the training of the company
throughout the training
2 Construction and organization of the training company
(§ 4 para. 1 no. 2)
a)
explain the structure and tasks of the forming enterprise
b)
explain the basic functions of the forming enterprise such as offer, procurement, manufacturing and administration
c)
Relations of the training company and its employees on economic organisations, professional representatives and trade unions
d)
The basic principles, tasks and functioning of the institutions ' constitutional or personnel-representative bodies of the forming
3 Safety and health protection at work
(§ 4 para. 1 no. 3)
a)
endangerment of health and safety at work Identify and take action to avoid
b)
Apply occupational health and accident prevention regulations
c)
Describe behaviour in the event of an accident and take first steps
d)
Apply preventative fire protection regulations; describe behaviors in fires and take fire-fighting
4 Environmental protection
(§ 4 para. 1 no. 4)
to Avoidance of operational environmental pressures in the occupational impact field, in particular
a)
Possible environmental pressures due to the training establishment and its contribution to environmental protection by examples explain
b)
apply environmental protection rules applicable to the training establishment
c)
Use the possibilities of economic and environmental energy and material use
d)
Avoid waste, Fabrics and materials for environmentally friendly
5 Order failover, performance collection, job plan, and expiration plan
(§ 4 para. 1 no. 5)
a)
Target of the work order
b)
Schedule work items, work equipment, and backup measures
c)
Set construction and construction aids
d)
Set devices, tools, and tools
e)
work performed on the basis of Check preferences
f)
Create Work
6 *)
6 Setting up, saving, and spaces of construction sites
(§ 4 para. 1 no. 6)
workplace at construction site:
a)
Setting up, maintaining and clearing work place, taking ergonomic aspects into account
b)
Securing the workplace
Protective scaffolds:
c)
Build, maintain and remove work and protective scaffolders according to specifications
d)
assist in the testing of operational safety of scaffolders
Tools, devices, and Machines:
e)
Deliver tools, devices, and machines
f)
detect and report failures on devices and machines
g)
Tools, devices, and machines
h)
Devices and machines
Operating machines, melting, welding and soldering equipment under
7 Checking, storing and selecting construction and construction materials
(§ 4 para. 1 no. 7)
a)
Construction and Check construction aids and installation parts for usability
b)
Retrieve construction and building aids as well as installation parts according to specifications, transport and store them on
8 reading and applying drawings and plans, making sketches, performing measurements
(§ 4 1 no. 8)
sketches, drawings and plans:
a)
Read and apply sketches of views and sections
b)
Construction drawings and Read the laying plans
c)
Sketch ready measurements:
d)
Perform measurements with tape measure and link scale
e)
Transfer heights with a spirit level and a hose scale
f)
Strap Fluous
g)
Apply and save measurement points
h)
Apply and check right
9 Production of masonry, plaster and concrete
(§ 4 para. 1 no. 9)
a)
distinguish mortar groups by intended use
b)
Select binders and aggregates for mortar and concrete
c)
create wall, plaster and mortar mortars, and in its consistency assess
d)
Connect bricks from stones
e)
Connect chimneys from stones and molded parts
f)
create single-layer wall plaster
g)
Brettschalungen
h)
cut concrete steel mats
i)
Install reinforcements with spacers
k)
Connect concrete, insert, compress, and post-
4
10 Processing of wood and manufacture of wooden components
(§ 4 para. 1 no. 10)
a)
Wood and wood-based materials according to the intended use distinguish
b)
Perform preventive wood protection measures, in particular with respect to plant and animal pests
c)
distinguish sorting and cutting tholt classes
d)
wood and Store wood materials
e)
Edit wood, in particular by tearing, stalking, sawing, planing and drilling
f)
Select nails and screws according to the norm
g)
Wood connections and wooden fixtures
11 Processing plastics and bituminous materials
(§ 4 para. 1 no. 11)
a)
surfaces of the cover sheet on their suitability for sealing Check
b)
distinguish thermoplastics, thermosets and elastomers by their properties
c)
deform thermoplastics and elastomers
d)
Cutting, drilling and bonding thermosets
e)
Plastic and plastic materials and elastomers
Distinguish, cut, nail and fix bitumen webs by designation and intended use
f)
distinguish and process adhesive, paint and sealant
g)
plastic and bitumen webs and welding
8
12 Making thermal insulation, performing additional measures on roof coverings
(§ 4 para. 1 no. 12)
thermal insulation materials according to properties and after distinguish and install 24
13 Processing slate, roofing tiles and shingles
(§ 4 para. 1 no. 13)
a)
shapes of slate, roof tiles and shingles
b)
shale and roofing
c)
sort slate
d)
shingles and
14 Processing roof tiles and roofing tiles
(§ 4 paragraph 1 no. 14)
a)
distinguish and edit roof tiles and roofing tiles, in particular behauen, tearing, cropping, cutting, sharing and drilling
b)
Types of covers, partial areas of roof surfaces according to the specification
15 Processing of metals
(§ 4 1 n ° 15)
a)
distinguish properties of steel and non-ferrous metals
b)
Edit the sheets and profiles, in particular tearing them up, Cutting, folding, folding, rounding, flanging, sawing, drilling, filing, riveting and soldering
c)
Select and apply fixing means for sheet metal
d)
Perform corrosion protection
6
16 Monting and Installation of installation parts
(§ 4 para. 1 no. 16)
distinguish and replace installation parts for roofs and walls according to the intended use 4
*)
To mediate in connection with other training contents.
II. Vocational training
Lfd. No. Part of the training professional image skills and knowledge to be mediated Time guide values in weeks in the year of training
1 2 3
1 2 3 4
1 Order failover, performance collection, job plan, and expiration plan
(§ 4 paragraph 1 no. 5)
Order failover, performance collection:
a)
Check work order in terms of preferences
b)
Technical rules, in particular the rules of the rooftop craft, Construction regulations and general technical terms and conditions for works and work instructions, apply
c)
Performance of other trades under review Check the job plan and schedule:
d)
Time and personnel Estimating support
e)
Set the work items and coordinate them according to preferences, and take action to ensure the workflow
f)
The weather conditions for performing work taking into account
4 *)
2 Setting up, securing and rooms of construction sites
(§ 4 para. 1 no. 6)
Setting up, safety and health at construction site:
a)
assessing the suitability of transport routes and using measures to use
b)
create and maintain light sources and barriers
c)
apply ergonomic working methods
d)
detect hazardous materials and estimate possible hazards
e)
Storage of Ensure
f)
Endanger overhead lines and operating machines on the site
g)
Ensure ventilation of work spaces
h)
Use protective equipment , as well as measures to protect people on construction sites
i)
Take immediate action in the event of accidents at work to supply injured persons, secure the accident site
Work and protective scaffolders:
k)
Work-related work and safety scaffolders.
l)
assess the operational reliability of scaffolders
Devices and machines:
m)
Select, request, transport, store, and use equipment for the workflow. prepare
n)
Use transport and transport equipment, use load-bearing and stop means
Environmental protection:
o)
Separate waste at the construction site in a clean way and for the transport of goods preparing
p)
Causing hazardous substances to be disposed of
q)
Measures of nature conservation in roofs and exterior wall coverings, especially for birds and bats
Spaces:
r)
Construction materials, Preparing devices and machines for removal
s)
Submit
3 Checking, storing and selecting construction and construction materials
(§ 4 para. 1 no. 7)
a)
Construction and Determining, requesting and deploying construction aids as well as installation parts
b)
Checking construction and building aids for dimensional accuracy and shape accuracy
4 reading and applying drawings and plans, drawing up sketches, performing measurements
(§ 4 para. 1 no. 8)
a)
Check drawings for compliance with the conditions on site
b)
Apply installation plans
c)
Sketches for Build dimensions
d)
Measure and check components with measurement
5 Processing wood and manufacture of wooden components
(§ 4 para. 1 no. 10)
a)
Wood and wood-based materials select
b)
Wood constructions, especially for roof chairs and timbered walls,
c)
Top and wall panels and shells
d)
Bring up front panels on formwork
8
6 Processing of plastics and bituminous materials
(§ 4 para. 1 no. 11)
a)
Take up smelting and welding equipment and bituminous cookers, observe safety rules
b)
Construction of ventilated and non-ventilated roofs with seals, layer sequence As well as constructive and physical differences in building physics
c)
Connect connections and seals to roof
  7
7 Making Thermal insulation, performing additional measures on roof coverings
(§ 4 para. 1 no. 12)
a)
Thermal insulation in ventilated and non-ventilated " (b)
Perform additional measures, in particular under-roofs, undercovers and undervoltages.
b)
c)
Connect ports and
11
8 Processing slate, roofing panels and shingles
(§ 4 para. 1 no. 13)
partial areas of roof and wall surfaces with slate, roofing panels and shingles in different types of cover covering
9 Processing roof tiles and roofing tiles
(§ 4 para. 1 no. 14)
a)
Areas of roof tiles with roofing tiles and roofing tiles in different types of covers, molded parts
b)
Connect connectors and connectors
c)
Top brick and first bricks in mortar and with dry
10 Processing of metals
(§ 4 para. 1 no. 15)
a)
Take soldering devices into operation, observe safety rules
b)
Top and wall surfaces with metal sheets in different types of cover
c)
covers manufacturing
d)
6
11 Manufactution of substructures of the clothing type for exterior wall coverings
(§ 4 para. 1 no. 17)
a)
appropriately set the structure of the substructure
b)
Check the subsurface, in particular with regard to the anchorage of Substructures
c)
Select anchoring means
d)
align and mount substructures
5
12 Build-up Devices for the derivation of surface water
(§ 4 para. 1 no. 18)
a)
Rins and throat made of metals and plastics
b)
Install the roof gullys
c)
Connect outside dewatering
d)
connect the interior dewatering
4
13 Processing corrugated panels
(§ 4 para. 1 no. 19)
a)
Cutting corrugated sheets made of different materials, and drilling
b)
Areas of roof and wall surfaces covered with corrugated panels, installation of molded
3
14 Building energy collectors and Energy converters
(§ 4 para. 1 no. 20)
a)
Energy collector and energy converter, in particular solar panels and photovoltaic elements, in roof and wall panels
b)
Connect to roof coverings, roof seals, and outer wall
4
*)
To mediate in connection with other training contents.
III. Vocational training in the subject areas
a)
in the field of roof, wall and sealing
Lfd. No. Part of the training professional image skills and knowledge to be mediated Time guide values in weeks in the year of training
1 2 3
1 2 3 4
1 Blankets of roof and wall surfaces with slate, roof panels, shingles, corrugated panels, roof tiles and roof tiles
(§ 4 Paragraph 2 (1) (a)
a)
cover roof and wall surfaces
b)
Connections and terminations when covers with slate, roofing panels, Make shingles and corrugated boards
c)
Use mortar and gratstones in mortars and with dry elements
d)
Run joint smear, cross-stroke, and inner smear
21
2 Poems with plastics and bituminous materials
(§ 4 para. 2 no. 1 letter b)
a)
Surfaces against soil moisture and against non-pressing water sealing
b)
Connect connections and degrees
c)
Connect and seal movement joints
d)
Surface protection of roof seals, in particular by flotation, gravel shaking, and panel coverings, manufacturing
e)
Construction and layer sequence of extensive and intense roof justifications
12
3 Run coverings with sheet metal
(§ 4 paragraph 2 no. 1 letter c)
a)
cover roof and wall surfaces
b)
manufacture and install expansion compensators
c)
connect
6
4 Clothing of outer walls Blechen
(§ 4 para. 2 no. 1 letter d)
a)
Connect with open and rear joints
b)
Connections and connectors
4
5 Erect lightning protection systems for the outer lightning protection
(§ 4 para. 2 no. 1 letter e)
a)
Grounding resistance of determine the usual forms of the earth, set and document dimensions of surface and low-earths
b)
bring in cables and pipes laid out in the earth with respect to the ground
c)
Potential equalization manufacture, connect potential-compensating rail, connect existing earth lines
d)
erect lightning protection systems for external lightning protection in accordance with technical rules, in particular the arrangement of fishing gears and discharges at Determining and documenting proximity to electrical equipment
e)
Measuring, assessing and documenting resistors of earth and lightning protection
4
6 Repairs of roof and wall surfaces as well as wood constructions
(§ 4 para. 2 no. 1 letter f)
a)
detect damage, determine causes
b)
first action to limit damage grab
c)
Perform
3
7 Reporting, Thickness, quality assurance measures
(§ 4 para. 2 no. 1 letter g)
a)
check executed work on error-free execution, perform final control
b)
document executed work, in particular create daily report and make up
2 *)
b)
in the subject direction Reetdachtechnik
Lfd. No. Part of the training professional image skills and knowledge to be mediated Time guide values in weeks in the year of training
1 2 3
1 2 3 4
1 Preparing coverings with Reet
(§ 4 para. 2 No. 2 letter a)
a)
Review reet for usability and sort by scope
b)
Set attachment technique
c)
select the attachment
6
2 Blankets of levels Roof surfaces with Reet
(§ 4 para. 2 no. 2 letter b)
a)
Check and make a cover layer of flat roof surfaces
b)
flat roof surfaces in various fastening techniques, in particular binding, sewing and screwing,
12
3 Making connections and connections
(§ 4 paragraph 2 no. 2 letter c)
a)
distinguish cover techniques for connectors and degrees, set cover technology
b)
c)
Location covers
d)
Fabricates
e)
Connect Grat and Throat Covers
f)
Connect to built-in parts, especially to chimneys
12
4 Blankets of Curved and curly roof surfaces with Reet
(§ 4 para. 2 No. 2 letter d)
a)
Please check the vaulted and curly roof underlay and manufacturing
b)
curved and curly roofing surfaces in different fastening techniques, in particular binding, sewing and screwing,
c)
Transitions in curved and curly roofing surfaces
12
5 Erect lightning protection systems for the outer lightning protection
(§ 4 para. 2 no. 2 letter e)
a)
Grounding resistance of determine the usual forms of the earth, set and document dimensions of surface and low-earths
b)
bring in cables and pipes laid out in the earth with respect to the ground
c)
Potential equalization manufacture, connect potential-compensating rail, connect existing earth lines
d)
erect lightning protection systems for external lightning protection in accordance with technical rules, in particular the arrangement of fishing gears and discharges at Determining and documenting proximity to electrical equipment
e)
Measuring, assessing and documenting resistors of earth and lightning protection
4
6 Repairing roof surfaces and wooden constructions
(§ 4 2 (2) (f)
a)
detect damage, determine causes
b)
first measures to Damage limitation
c)
Perform
4
7 Reporting, Thickness, quality assurance measures
(§ 4 para. 2 no. 2 letter g)
a)
check executed work on error-free execution, perform final control
b)
document executed work, in particular create daily report and make up
2 *)
*)
To mediate in connection with other training contents.

IV. Training in in-company training centres
The skills and knowledge listed in Sections I-III are intended to provide the basic or deepening knowledge in suitable, in-company training centres:
1.
in the first year of training for at least eight weeks, in particular those in serial number 9 and 10, the skills and knowledge referred to in point 11 (a) to (e), (12), (13) and (14) and the current number 15 (b),
2.
in the second Year of training for three weeks, in particular the number 5 (a)-c, current number 8, the current number 9 (a) and (c), the current number (10) (a) and (b), the current number (12) (a) and (c), and the serial number (s) of 14 (a) skills and knowledge,
3.
in the third year of training for three weeks
a)
in the field of roof, wall and sealing technology, especially those in serial number 1 letters b and d, the current number 2 (a) to (c) and (e) and the current number 5 (a), (c) and (e),
(b)
in the field of Reetdachtechnik, in particular those in skills and knowledge listed in section 2 (b), current number 3 (a), (b), (d) and (e), serial number 4 (c) and current number 5 (a), (c) and (e

The Chamber of Craftwork shall be available for: Application of the exceptions to be made if the skills and knowledge referred to in the first sentence can be mediated in the same way in the training establishment.