Regulation on fees and charges for official acts of the Federal Railway Authority (Bundeseisenbahntoll Regulation-BEGebV)

Non-official table of contents

BEGebV

Date of delivery: 27.03.2008

Full quote:

" Bundeseisenbahntoll ordinance of 27. March 2008 (BGBl. 546), as last amended by Article 1 of the Regulation of 11 June 2008. July 2014 (BGBl. I p. 1047, 1599) "

V deg. by Article 4 (121) of the G v. 7.8.2013 I 3154 mWv 14.8.2018
The V replaces the V 930-9-8 v. 5.4.2001 I 562 mWv 1.5.2008
Stand:Last modified by Art. 1 V v. 11.7.2014 I 1047, 1599
Note:Mediable change by Art. 1b G v. 24.5.2014 I 538 is

For details, see Notes

Footnote

(+ + + Text evidence: 1.5.2008 + + +)

unofficial table of contents

input formula

pursuant to section 26 (1) sentence 1, no. 9, also in conjunction with sentence 2, and in conjunction with Paragraph 3, sentence 5 of the General Railway Act of 27. December 1993 (BGBl. 2378, 2396), of which Article 26 (1), first sentence, point (9) was last amended by Article 1 (4) (a) (cc) of the Law of 13. December 2006 (BGBl. 2919), Article 26 (1), second sentence, by Article 1 (4) of the Law of 8. November 2007 (BGBl. 2566) as well as Article 26 (3) sentence 5 by Article 1 (12) (b) of the Law of 27. April 2005 (BGBl. 1138), and by Article 1 (9) of the Law of 9. December 2006 (BGBl. 2833), in conjunction with the 2. Section of the Administrative Costing Act of 23. June 1970 (BGBl. 821), the Federal Ministry of Transport, Building and Urban Development, in agreement with the Federal Ministry of Finance and the Federal Ministry for Economic Affairs and Technology: href="index.html#BJNR054600008BJNE000201305"> unofficial table of contents

§ 1 Scope

The Federal Railway Authority and the Federal Network Agency for Electricity, Gas, Telecommunications, Post and Railways (Regulatory Authority) Fees and outlays under this Regulation shall be levied for their individually attributable public services in accordance with the General Railway Act and in accordance with the Federal Railway Traffic Management Act. Non-official table of contents

§ 2 Fees

(1) Chargeable individual public services and fees are charged. from the list of fees (Appendix 1). (2) Insofar as the fee is fixed according to the amount of time spent, the hourly rate is EUR 100, for each quarter of an hour 25 euros. The hourly rate for individually attributable public services in accordance with Annex 1, Part I and III, shall be EUR 120, for each quarter of an hour 30 EUR.(3) A lump-sum fee may be fixed at the request of the same fee debtor for the payment of multiple, individually, individually attributable public services for the same charge debtor. It shall be fixed in advance for a period of one year on the basis of a calculated average fee, taking into account the lower level of the administrative effort.(4) The fee debtor has to provide the evidence required for the payment of the fee, in the case of an individually attributable public service on request already with the position of the fee debtor. Non-official table of contents

§ 3 Fee exemption

For a decision by the regulatory authority pursuant to Section 14f (2) of the General Railway Act as well as for the investigation of dangerous events in the railway operation, no charges are levied. Non-official table of contents

§ 4 contradiction

For the complete or partial rejection of an appeal, a fee is charged up to the amount of the does not apply to the contested administrative act; this does not apply if the objection is not successful only because the infringement of a procedural or procedural requirement under Section 45 of the Administrative Procedure Act is incontetable. In the event of an unsuccessful appeal, which shall be directed exclusively against a fixing of fees, the fee shall not exceed 10 per cent of the sum in question. If an appeal is withdrawn after the commencement of its factual processing, but before its termination, the fee shall not exceed 75 per cent of the opposition fee. Unofficial table of contents

§ 5 Revocation, withdrawal, rejection, and withdrawal of requests

For the revocation or withdrawal of an application Administrative action, the rejection of an application for an individually attributable public service, and in the event of withdrawal of an application for the acceptance of an individually attributable public service, fees shall be subject to the following: § 23 (5) sentence 1 and 2 of the Federal Fee Act. Non-official table of contents

§ 6 Deposits

(1) In addition to the fees, the fee debtor is subject to expositions in accordance with § 10 (1) (4) and (5) of the Administrative Cost Law of 23. June 1970 (BGBl. I p. 821) in the The current version of the Directive is hereby established separately.(2) In addition to the fees and expenses referred to in paragraph 1, expenses for remuneration of natural or legal persons who are involved in the performance of the duties of the Federal Railways Office shall be levied on the charge debtor's fees. § 7h (2) of the General Railways Act must be observed. Non-official table of contents

§ 7 Alt-Facts

(1) For matters that are from the 1. May 2001 and until the end of the 13. § 2 (1), with the proviso that the chargeable, individually attributable public services and the fees are the result of the fee list of the Appendix 2.(2) For matters which are to be found in the 14. June 2005 and up to the end of the 10th § 2 (1), with the proviso that the fee-based, individually attributable public services and the fees are derived from the fee list of Appendix 3.(3) For matters relating to the 11. July 2007 and until the end of the 13. § 2 (1), with the proviso that the fee-based, individually attributable public services and the fees are derived from the fee list of Appendix 4.(4) For matters which are to be found in the 14. July 2007 and until the end of the 21. § 2 (1), provided that the chargeable, individually attributable public services and the fees are derived from the list of fees of Appendix 5, applies in January 2008.(5) For matters which are to be found in the 22. January 2008 and up to the end of the 30. § 2 (1) shall apply on the condition that the chargeable, individually attributable public services and the fees are derived from the fee list of the facility 6.(6) In the cases referred to in paragraphs 1 and 2, section 2 (2) must be applied with the proviso that the hourly rate is EUR 81.80, for each quarter of an hour it is 20.45 euros.(7) § 6 (2) and Annex 1 (1) (1) (1) (1.18) and (1.19) shall apply before the 24. In the case of official acts and individually attributable public services in accordance with Section 7g (1) to (3) of the General Railway Act, July 2014 shall only be subject to the following facts. Non-official table of contents

§ 8 Entry into force, expiry

This regulation occurs on the 1. May 2008 enter into force. Non-official table of contents

Final formula

The Bundesrat has agreed. Non-official table of contents

Appendix 1 (to § 2 para. 1)
Fees Directory

(Fundstelle: BGBl. I 2008, 548-564;
of the individual amendments, cf. Footnote)

Part IFees for individually attributable public services of the Railways-BundesamtesSection 1Individually attributable public services according to the AEG

Nr.CounterstandLegal base fee
1.1Baufreidoses, approvals, exams, approvals, approvals, and monitors for Erection, modification, maintenance and operation of the operating systems and for rail vehicles § 6 para. 3 PflSchG i. V. m. § 4 para. 2 AEG,
§ 4 BImSchG i. V. m. § 4 para. 2 AEG,
§ 8 BImSchG i. V. m. § 4 (2) AEG,
§ 8a BImSchG i. V. m. § 4 para. 2 AEG,
§ 9 BImSchG i. V. m. § 4 para. 2 AEG,
§ 16 BImSchG i. V. m. § 4 para. 2 AEG,
§ 17 BImSchG i. V. m. § 4 para. 2 AEG,
§ 20 BImSchG i. V. m. § 4 para. 2 AEG,
§ 21 BImSchG i. V. m. § 4 para. 2 AEG,
§ 24 BImSchG i. V. m. § 4 para. 2 AEG,
§ 25 BImSchG i. V. m. § 4 para. 2 AEG,
§ 26 BImSchG i. V. m. § 4 para. 2 AEG,
§ 29 BImSchG i. V. m. § 4 (2) AEG,
§ 29a BImSchG i. V. m. § 4 para. 2 AEG,
§ 31 BImSchG i. V. m. § 4 (2) AEG,
§ 52 BImSchG i. V. m. § 4 (2) AEG,
§ 53 BImSchG i. V. m. § 4 (2) AEG,
§ 58a BImSchG i. V. m. § 4 para. 2 AEG,
§ 20 BImSchV 1 i. V. m. § 4 para. 2 AEG,
§ 1 BImSchV 5 i. V. m. § 4 para. 2 AEG,
§ 2 BImSchV 5 i. V. m. § 4 para. 2 AEG,
§ 4 BImSchV 5 i. V. m. § 4 para. 2 AEG,
§ 5 BImSchV 5 i. V. m. § 4 para. 2 AEG,
§ 6 BImSchV 5 i. V. m. § 4 para. 2 AEG,
§ 8 BImSchV 5 i. V. m. § 4 para. 2 AEG,
§ 9 BImSchV 5 i. V. m. § 4 para. 2 AEG,
§ 6 BImSchV 7 i. V. m. § 4 para. 2 AEG,
§ 6 BImSchV 11 i. V. m. § 4 para. 2 AEG,
§ 1 BImSchV 12 i. V. m. § 4 para. 2 AEG,
§ 6 BImSchV 12 i. V. m. § 4 para. 2 AEG,
§ 9 BImSchV 12 i. V. m. § 4 para. 2 AEG,
§ 16 BImSchV 12 i. V. m. § 4 para. 2 AEG,
§ 19 BImSchV 12 i. V. m. § 4 para. 2 AEG,
§ 26 BImSchV 13 i. V. m. § 4 para. 2 AEG,
§ 24 BImSchV 17 i. V. m. § 4 para. 2 AEG,
§ 8 BImSchV 26 i. V. m. § 4 para. 2 AEG,
§ 11 BImSchV 31 i. V. m. § 4 para. 2 AEG,
§ 3 BImSchV 34 i. V. m. § 4 para. 2 AEG,
§ 9 para. 2 BBodSchG
i. V. m. § 4 para. 2 AEG,
§ 10 para. 1 BBodSchG
i. V. m. § 4 para. 2 AEG,
§ 13 BBodSchG i. V. m. § 4 para. 2 AEG,
§ 14 sentence 1 BBodSchG
i. V. m. § 4 para. 2 AEG,
§ 15 para. 2 BBodSchG
i. V. m. § 4 para. 2 AEG,
§ 16 para. 1 BBodSchG
i. V. m. § 4 para. 2 AEG
based on time
1.2 Monitoring of railways within the framework of the railway supervision to comply with the regulations referred to in § 5 para. 1 AEG on suspicion of a complaint or for the purpose of a sample, if the suspicion or the complaint is caused by the person concerned or if a breach of a piece of legislation has been found § 5a para. 2 AEG after effort from
300 to 1 000 Euro
1.3 Measures to eliminate detected violations and to prevent future violations of railway law regulations, unless otherwise specified. § 5a para. 2 AEG based on time
1.4 Examination of new construction products and designs as well as railway-specific construction products and construction types and issuing of a corresponding certificate with responsibility caused or justified suspicion or on request § 5a para. 2 AEG by time
1.5 Examination of a type approval for railway-specific constructional facilities and issuing of a corresponding certificate with responsible or reasonable suspicion or on request § 5a para. 2 AEG by time
1.6 Examination of a new or modified form or -type (type approval) of signal, telecommunication and electrical equipment and issuing of a corresponding certificate in case of suspected or justified suspicion or on request § 5a para. 2 AEG by time
1.7 Protocol-based audit Certain components or construction work and issuing of a corresponding certificate in case of suspected or justified suspicion or on request § 5a para. 2 AEG based on time
1.8 Approval of a rail transport company, holder, or railway infrastructure company § 6 AEG 5 000 Euro
1.9 Change of approval of a Rail transport company, holder or railway infrastructure company § 6 AEG 2 500 Euro
1.10 Issue or extension of a security certificate § 7a para. 2 and 7 AEG by time, at least 600, and at most 75 000 euros
1.11 Erding a national certificate § 7a para. 4 AEG based on time
1.12 Grant or extension of a security permit § 7c para. 2 and 4 AEG by time, at least 600, and at most 100 000 euros
1.13 (omitted)
1.14 Decision on permission to hold the operation § 7f AEG by time
1.15 Decision on the delivery and decommissioning of Railway infrastructure facilities § 11 AEG 3 000 Euro
1.16 Freistellen von BahnoperationPurpose § 23 para. 1 AEG 1 450 Euro
1.17 Transfer of the tasks of a notified body within the scope of the trans-European high-speed rail system § 25b Par. 1 AEG based on time
1.18 Issue of a maintenance station certificate § 7g para. 1 and 2 AEG by time, at least 1 200, and at most 140 000 euros
1.19 Granting of a certificate of maintenance functions § 7g para. 3 AEGby time, at least 1 000 and at most 100 000


Section 2Individual public services according to the AEG i. V. m. VwVfG

Nr.CounterstandLegal Base Charge
2.1 Plan fix:
-Construction of new operating systems
-Modification of existing operating systems
§ 18 AEG i. V. m. Section 74 (1) VwVfG after panel 1
of the attachment
2.2 Plan Approval § 18 AEG i. V. m. Section 74 (6) VwVfG 50% of the fee according to No. 2.1
2.3 Decision on the determination of the plan setting and planning permission § 18 AEG i. V. m. Section 74 (7) VwVfG 25% of the fee according to No. 2.1
2.4 Repeal of the planning approval decision or the planning permission after construction start § 77 VwVfG i. V. m. Section 75 para. 1a VwVfG after time spent up to 75% of the fee according to No. 2.1 or No. 2.2
2.5 Building technical examination of the building templates § 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG 500 Euro
up to 1 500 000 euro
2.6 Approval of execution planning including construction supervision and acceptance for civil engineering § 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG according to panel 2 of the attachment
2.7 Approval of execution planning including construction supervision and acceptance for superstructure § 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG according to panel 3 of the attachment
2.8 Approval of execution planning including construction supervision and acceptance for building construction § 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG according to panel 4 of the attachment
2.9 Review of modified building templates during planning changes with a volume of more than 1/20 of the original design in the engineer, Upper or high-end construction § 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG according to No. 2.6, 2.7 or No. 2.8, multiply with the ratio of the scope of the change planning to the scope of the original planning
2.10 Approval of the Execution planning including construction supervision and removal of conversions of an existing plant with essential interventions in constructions or stock in engineering, upper or high-end construction § 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG according to No. 2.6, 2.7 or No. 2.8, plus a supplement of 20 to 50%
depending on the difficulty level; the
costs for the
Canceling construction parts are attributed to the construction costs
2.11 Approval of execution planning for the demolition or removal of assets, including construction supervision and acceptance in the engineering, upper or high-end construction § 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG based on time
2.12 Approval of execution planning for signal, telecommunication and electrical equipment § 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG based on time
2.13 Construction inspection of a signal, telecommunication and electrical engineering plant including construction supervision during construction § 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG based on time
2.14 Extension of the validity of the plan determination decision or the planning permission § 18c AEG by time, at least 600, and at most 3 600 euros
2.15 New plan change by new Plan determination method § 18 AEG i. V. m § 76 Abs. 1 VwVfG according to panel 1 of the attachment
2.16 Plan change due to new plan approval process § 74 paragraph 6 VwVfG i. V. m. § 18b No. 1 and 2 AEG i. V. m § 76 Abs. 1 VwVfG 50% of the fee according to No. 2.15
2.17 Plan change in cases of insignificant importance § 18 AEG i. V. m § 76 Abs. 2 VwVfG 3 600 Euro
2.18 Planning change in cases of insignificant importance by simplified plan setting procedure § 18 AEG i. V. m § 76 para. 3 VwVfG6 000 Euro


Section 3Individually attributable public services according to the EBV, EBPV

No.CounterstandLegal base fee
3.1 Confirmation of the order of an operating manager or a deputy § 2 EBV 300 Euro
3.2 Decision on approval for audit as operations manager § 9 EBPV 330 Euro
3.3 performing an operational ladder check § § 13, 14, 20, 21, 22 EBPV 1 850 Euro
3.4 Run the replay check
a)
three audit subjects repeat-checking
b)
Two Audit Subjects
c)
Repeating Review with a Check
§ 23 EBPV
a)
1 730 Euro
b)
1 610 Euro
c)
1 490 Euro


Section 4Individually attributable public services after EBO, ESBO, and ESO 1959

Nr.CounterstandLegal base fee
4.1 Exceptions to EBO/ESBO § 3 para. 1 no. 2 letter a EBO or ESBO 1 800 Euro
4.2 Approvals to EBO/ESBO § 3 para. 2 No. 1 EBO
or ESBO
by time, at least 700, and at most 12 000 Euro
4.3 Decrease of a vehicle within the scope of the EBO § 32 para. 1 EBO by time, at least 2 000 and at most 300 000 Euro
4.4Need for monitoring: checking a new or changed design; testing before commissioning; scheduled checks; exceptions and outposts of a corresponding Certificate § 33 para. 4 i. V. m. Par. 1 EBO by time
4.5 Approval of non-ESO signals with transient effectivity Section A, letter a, paragraph 4 ESO 1959 by time, at least 700 and at most 6 000


Section 5 Individual attributable public services after the EIBV

No.CounterstandLegal base fee
5.1 Consent for levying charges in case of lack of driveway capacity § 18 para. 4 EIBV by time
5.2 Exception approval pursuant to § 14 para. 4 AEG § 22 para. 1 No. 1 EIBVby time


Section 6Individually attributable public services after the TEIV

No.CounterstandLegal base fee
6.1 Admission of exceptions to the application of certain TSIs within the scope of the trans-European Railroad systems § 5 para. 1 TEIV after Time required
6.2 Approval of the commissioning of a structural subsystem in the field of engineering within the scope of the trans-European rail system § 6 para. 3 TEIV according to panel 2 of the attachment
6.3 Approval of the commissioning of a structural subsystem in the superstructure within the scope of the trans-European Railroad systems § 6 para. 3 TEIV after panel 3 of Attachment
6.4 Approval of the commissioning of a structural sub-system in building construction within the scope of the trans-European rail system § 6 para. 3 TEIV according to panel 4 of the attachment
6.5 Approval of commissioning within the scope of the trans-European rail system, except as provided in points 6.2 up to 6.4 recorded § 6 para. 3 TEIV after Time required
6.6 Approval for the commissioning of a structural sub-system in the engineering sector for which there is no TSI, within the scope of the trans-European rail system § 6 para. 4 TEIV according to panel 2 of the attachment
6.7 Approval for the commissioning of a structural subsystem in the superstructure, for which no TSI is , in the field of application of the trans-European rail system § 6 para. 4 TEIV according to panel 3 of the attachment
6.8 Approval for the commissioning of a structural subsystem in high-construction, for which no TSI is available, within the scope of the trans-European rail system § 6 para. 4 TEIV according to panel 4 of the attachment
6.9 Approval for the commissioning of a structural Subsystem, for which there is no TSI, within the scope of the trans-European rail system, unless it is covered by points 6.6 to 6.8 § 6 para. 4 TEIV based on time
6.10 Approval for test drives within the scope of the trans-European rail system § 6 para. 7 TEIV by time
6.11 Serial approval § 7 para. 2 TEIV based on time
6.12 Admission for a vehicle variant § 7a para. 1 sentence 2 and 3 TEIV by time
6.13 Series approval for a vehicle variant § 7a para. 2 sentence 2 TEIV by time
6.14 General approval of Vehicle types § 7b para. 1, 2 and 3 TEIV after Time required
6.15 Approval for other vehicles of an approved vehicle type § 7b para. 4 TEIV based on time
6.16 Simplified approval for entry into service for foreign vehicles within the scope of the trans-European rail system § 8 para. 1 TEIV based on time
6.17 Approval for the commissioning of a large-scale or renewed structural subsystem in the Civil engineering in the field of application of the trans-European rail system § 9 para. 1 TEIV according to panel 2 of the attachment
6.18 Approval for the commissioning of a large-scale or renewed structural subsystem in the superstructure within the scope of the trans-European rail system § 9 para. 1 TEIV according to panel 3 of the attachment
6.19 Approval for the Commissioning of a large-scale or renewed structural sub-system in the field of construction within the scope of the trans-European rail system § 9 para. 1 TEIV according to panel 4 of the attachment
6.20 Approval for the commissioning of a large-scale or renewed structural subsystem in the the scope of the trans-European rail system or the approval requirement for the entry into service of an upgraded or renewed structural subsystem within the scope of the trans-European rail system, to the extent that: not covered by the numbers 6.15 to 6.17 § 9 para. 1 TEIV By Time
6.21 Monitoring the conformity and suitability for use of interoperability constituents within the scope of the trans-European rail system on the basis of a suspicion, complaint or sample, if the suspicion or complaint is caused by the person concerned or if a breach of a piece of legislation has been found § 5a paragraph 2 AEG i. V. m. § 11 TEIV based on time
6.22 Setting a vehicle in the vehicle entry register § 20 para. 2 TEIV 50 Euro
6.23 Setting up to 10 vehicles of the same type in the vehicle registration register § 20 para. 2 TEIV 35 Euro
per vehicle
6.24 Setting 11 up to 100 Vehicles of the same construction type in the vehicle registration register § 20 para. 2 TEIV 30 Euro
per vehicle
6.25 Setting more than 100 vehicles of the same type into the vehicle registration register § 20 para. 2 TEIV 25 Euro
per vehicle
6.26 Electronic transfer of the data of vehicles from the vehicle registers of railways to the vehicle registration register (NVR), to the extent that Vehicles are not already granted vehicle numbers from the NVR as part of a commissioning approval § 20 para. 3 TEIV 8 Euro per vehicle
6.27 Modification and completion of data in the NVR outside a standardized application process § 20 para. 4 TEIV by time
6.28 Change and supplement data in the NVR using a standardized application procedure for similar vehicles in any number of times § 20 para. 4 TEIV10 Euro per vehicle, no more than 5 000 euros per


Section 7Individual eligible public services after the KonVEIV (omitted)

Section 8Individually attributable public performance after the ArbSchG

Nr.CounterstandLegal fee
8.1 Arrangement of measures for work protection § 22 para. 3 ArbSchGafter Time


Section 9Individually attributable public performance after the IfSG

Nr.CounterstandLegal fee
9.1 Checking the water supply systems in the
rail vehicles
§ 39 IfSG, § § 18, 19, 20 TrinkwV 400 Euro
9.2 Check the fixed installations for the exclusive filling of rail vehicles;
up to 10 hydrants
§ 39 IfSG, § § 18, 19, 20 TrinkwV 800 Euro
9.3 Verify fixed assets For the exclusive filling of rail vehicles;
11 to 50 hydrants
§ 39 IfSG, § § 18, 19, 20 TrinkwV 1 000 Euro
9.4 Check the stationary equipment for the exclusive filling of rail vehicles;
51 to 100 hydrants
§ 39 IfSG, § § 18, 19, 20 TrinkwV 1 350 Euro
9.5 Check the fixed installations for the exclusive filling of rail vehicles;
101 to 200 Hydrants
§ 39 IfSG, § § 18, 19, 20 TrinkwV 1 500 Euro
9.6 Check the stationary systems for the exclusive filling of rail vehicles;
over 200 hydrants
§ 39 IfSG, § § 18, 19, 20 TrinkwV 2 000 Euro
9.7 Decision on measures in the event of non-compliance with limit values and requirements § 39 IfSG; § 9 TrinkwV by time
9.8 Infection hygiene monitoring of the waste water disposal systems in the rail vehicles as well as in the fixed installations for the exclusive use of the Disposal of rail vehicles § 41 IfSG400


Section 10Individually attributable public services according to the TfV

Nr.CounterstandLegal fee
10.1 Exhibition of a provisional driving licence and issue of a new, amended or extended driver's license or a replacement licence § 8 Paragraph 1 i. V. m. Paragraph 2 and 3 TfV 175 Euro
10.2 Issuing a new, changed or extended driver's license or a replacement driving licence § 8 Paragraph 1 i. V. m
Paragraph 3 TfV
150 Euro
10.3 Granting of information about the driver's license plate § 10 Paragraph 3 TfV 50 Euro
10.4 Recognition as trainers § 14 Paragraph 1 and 6 TfV 850 Euro
10.5 Recognition as reviewer § 15 Paragraph 1 TfV 850 Euro
10.6 Recognition as a doctor or psychologist to carry out digevity examinations § 16 Paragraph 1 TfV 850 Euro


Section 11Other individually attributable public services

Nr.CounterstandLegal fee
11.1 Changing, extending, and extending the validity of the administrative actionafter Time spent, up to half of the administrative act


Part IICharges for individually attributable public services of the regulatory authority

No.CounterstandLegal base fee
1 Approval of the term of a framework contract on the use of train paths § 14a para. 2 AEG by time
2 Monitoring of access to the railway infrastructure due to a Suspicion, a complaint or for the purpose of a sample, if the suspicion or the complaint is caused by the person concerned or a breach of a piece of law has been established § 14c para. 1 AEG by time
3 Measures in case of violation of rules on access to the Railway infrastructure § 14c para. 1 AEG after Time required
4 Examination of the intended decisions to be notified in advance, in so far as the intended decisions do not comply with the provisions of the railway law on access to the railway infrastructure and do not contradicts the provisions of Section 14e (1) AEG occurs § 14e para. 1 AEG after Time required
5 contradiction against pre-participating intended decisions according to § 14d AEG § 14e para. 1 AEG based on time
6 Monitoring access to the railway infrastructure on the basis of suspicion, complaint, or sample, if the suspicion or complaint of the Concerned, or a violation of a piece of legislation was found § 14f para. 1 AEG based on time
7 Measures in violation of rules on access to railway infrastructure § 14f 1 sentence 2 or 3 i. V. m. Par. 2 AEG based on time
8 Decision on access authorization in international passenger traffic § 14g para. 3 AEG 200 Euro to
600 Euro
9 Approval of the extension of a framework contract on the use of train paths § 38 para. 8 AEG1 500 Euro to
3 500 Euro.


Part IIIFees for individually attributable public services of the notified bodies

No.CounterstandLegal Base Charge
1 Assessment of the conformity and usability of a Interoperability constituent and issuing an appropriate certificate within the scope of the trans-European rail system § 15 para. 1 sentence 1 No. 1 TEIV by time
2 EC verification of a subsystem and issuing of a corresponding certificate within the scope of the trans-European rail system § 15 para. 1 sentence 1 no. 2 or sentence 2 or 3 TEIVby time


appendix to the fee-dictionary application of the charge panels
1.
The fee measurement for points 2.1 to 2.4 and 2.6 to 2.10 is based on the construction costs and The rating features classified according to levels of difficulty in charge zones.
2.
The cost of:
a)
the acquisition, the freeming, the building, and the development of the plot,
b)
Winterbauschutzvorconversions,
c)
surveying and marketing,
d)
Compensation and Damage Services,
e)
Baunflat Cost,
f)
Artworks and artistically designed components, as far as they are not essential parts of the object.
3.
The cost of signal, telecommunications and electrical equipment is not included in the cost of measurement according to the tables 2 and 4.
4.
For panels 1 and 3, the operating assets will be attributed to the following charge zones:
a)
Zone 1: Objects with very low planning requirements, for example: B. Operating systems without switches and crossings, unless mentioned in zones 2 to 5, simple traffic areas;
b)
Zone 2: Objects with low planning requirements, For example: B. Operating systems of the free route without any special compulsion points, operating facilities of the free route in the little moving terrain, operating facilities of the stations with simple track plans;
c)
Zone 3: Objects with average planning requirements, for example: Internal operating facilities, unless mentioned in Zone 4, operating systems of the free route with special forced points, operating systems of the free route in the moving terrain, operating systems of the stations with difficult Track plans;
d)
Zone 4: Objects with above-average planning requirements, for example, (b) difficult internal facilities, operating installations of the free route with a large number of specific compultrating points, operating installations of the free route in the heavily moved terrain, operating facilities of the stations with very difficult track plans, Transport space for combined transport freight transport;
e)
Zone 5: Objects with very high planning requirements, e.g. B. very difficult domestic facilities.
5.
For Table 2, the engineering structures are charged with the following charge zones:
a)
Zone 1: Objects with very low planning requirements, for example:
b)
Zone 2: Objects with low planning requirements, e. g. for the use of the Municipal Waste Water (BGN), the Municipal Waste Water (NWI), the Municipal Waste Water (HGN), B. Dammbauts, as far as not mentioned in Zone 3 or 4, straight single-field bridges of simple design, support structures with traffic load, simple noise protection systems, lines for water and waste water with small links and few ZwangPoints;
c)
Zone 3: Objects with average planning requirements, for example: B. difficult dams, single-field bridges, as far as not mentioned in Zone 2 or 4, simple multi-field and arched bridges, support structures with anchorage, simple tunnel and trough structures, simple underground stations, lines for water or waste water with numerous links and numerous coercion points;
d)
Zone 4: Objects with above-average planning requirements, e.g. Particularly difficult dams, difficult fields of single-field, multi-field and arched bridges, noise protection systems in difficult urban planning situations, difficult tunnel and trough structures, difficult underground stations, if not in Zone 5 ;
e)
Zone 5: Objects with very high planning requirements, for example: Particularly difficult bridges, particularly difficult tunnel and trogling structures, underground crossing stations.
6.
The charge zone of the panel 4 is used for high-rise buildings Based on the following rating characteristics:
a)
Zone 1: Building with very low Planning requirements, that is, with
-
very low requirements for integration into the Environment,
-
a functional area,
-
very small design Requirements,
-
simplest constructions,
-
none or more technical Equipment,
-
No or one removal;
b)
Zone 2: Building with low Planning requirements, that is, with
-
low requirements for integration into the Environment,
-
few functional areas,
-
small design requirements,
-
simple constructions,
-
less technical Equipment,
-
low expansion;
c)
Zone 3: Buildings with average Planning requirements, that is,
-
Average requirements for inclusion in the Environment,
-
Multiple Simple Functional Areas,
-
Average Design requirements,
-
normal or common constructions,
-
average technical equipment,
-
normal build-up;
d)
zone 4: Buildings with above-average planning requirements, that is, with
-
above-average Requirements for inclusion in the environment,
-
multiple functional areas with multiple relationships,
-
above-average design requirements,
-
above-average constructive requirements,
-
above-average technical equipment,
-
above-average Expansion;
e)
Zone 5: Building with very high planning requirements, that is, with
-
very high requirements for integration into the environment,
-
a wide variety of functional areas with comprehensive relationships,
-
very high design Requirements,
-
very high constructive requirements,
-
a diverse technical Equipment with high technical requirements,
-
high-quality expansion.


1Plan setting intermediate values are linear to interpolate.Construction costs in EuroZone 1
EuroZone 2
EuroZone 3
EuroZone 4
EuroZone 5
Euro
25 000 420 540 660 750 870
30 000 500 630 750 870 990
35 000 560 700 840 980 1 100
40 000 630 780 930 1 080 1 230
45 000 690 920 1 040 1 190 1 370
50 000 750 1 000 1 110 1 290 1 470
75 000 1 040 1 280 1 520 1 760 2 000
100 000 1 290 1 590 1 890 2 180 2 480
150 000 1 790 2 180 2 550 2 940 3 330
200 000 2 240 2 700 3 180 3 650 4 110
250 000 2 630 3 180 3 750 4 290 4 830
300 000 3 030 3 650 4 280 4 890 5 500
350 000 3 400 4 080 4 770 5 460 6 150
400 000 3 750 4 500 5 250 5 990 6 740
450 000 4 080 4 890 5 700 6 510 7 300
500 000 4 410 5 270 6 140 6 990 7 850
750 000 5 840 6 910 8 010 9 100 10 200
1 000 000 6 990 8 270 9 540 10 800 12 040
1 500 000 9 700 11 390 13 030 14 790 16 500
2 000 000 12 270 14 340 16 350 18 450 20 550
2 500 000 14 670 17 100 19 500 21 900 24 300
3 000 000 17 000 19 700 22 500 25 200 27 900
3 500 000 19 200 22 200 25 400 28 400 31 500
4 000 000 21 500 24 800 28 000 31 500 34 700
4 500 000 23 600 27 200 30 800 34 400 38 000
5 000 000 25 700 29 600 33 500 37 400 41 100
7 500 000 35 600 40 800 45 900 51 000 56 100
10 000 000 44 900 51 200 57 500 63 800 69 900
15 000 000 65 000 70 400 78 800 87 000 95 400
20 000 000 78 500 88 500 98 600 108 600 118 800
25 000 000 93 900 105 600 117 500 129 200 140 900
30 000 000 105 600 118 500 131 100 144 000 157 000
35 000 000 119 400 133 500 148 500 162 200 176 600
40 000 000 133 200 148 500 164 100 179 700 195 600
45 000 000 146 400 162 900 179 900 196 800 213 900
50 000 000 159 300 177 000 195 200 213 500 231 900
55 000 000 172 000 191 000 210 000 229 800 249 300
60 000 000 184 700 204 600 224 900 237 200 266 600
65 000 000 197 000 218 000 240 000 261 300 283 400
70 000 000 209 100 231 000 253 700 276 600 299 700
75 000 000 221 000 243 900 267 600 291 600 315 900
80 000 000 232 800 256 800 281 600 306 500 332 000
85 000 000 244 400 270 000 295 000 321 200 347 600
90 000 000 256 000 281 900 308 600 335 600 363 200
95 000 000 267 500 294 200 321 800 349 800 378 500
100 000 000 278 700 306 500 335 000 364 000 393 600
112 500 000 306 500 336 300 367 200 399 000 430 500
125 000 000 333 600 365 600 399 000 432 200 466 700
137 500 000 360 000 394 000 429 000 465 200 501 800
150 000 000 386 400 422 100 459 300 497 400 536 300
200 000 000 498 300 530 000 574 800 620 700 658 000
250 000 000 594 300 632 300 684 000 737 100 781 400
375 000 000 819 000 871 400 938 100 1 007 400 1 067 900
500 000 000 1 028 300 1 094 000 1 173 800 1 257 300 1 332 800
625 000 000 1 226 600 1 305 000 1 396 700 1 493 300 1 582 700
750 000 000 1 416 900 1 507 400 1 609 800 1 718 100 1 821 200
1 000 000 000 1 778 900 1 892 400 2 014 400 2 144 100 2 272 800
1 250 000 000 2 122 200 2 257 700 2 397 000 2 546 300 2 699 000
1 500 000 000 2 451 300 2 607 800 2 762 900 2 930 100 3 105 900
1 750 000 000 2 769 200 2 945 900 3 115 400 3 299 400 3 497 400
2 000 000 000 3 077 600 3 273 900 3 457 000 3 656 900 3 876 200


Blackboard 2engineering intermediate values are linear to interpolate. Construction costs in EuroZone 1
EuroZone 2
EuroZone 3
EuroZone 4
EuroZone 5
Euro
25 000 300 370 450 530 600
30 000 350 430 520 610 700
35 000 390 490 590 690 780
40 000 430 540 650 760 860
45 000 480 590 710 830 950
50 000 520 640 770 900 1 020
75 000 720 890 1 060 1 230 1 400
100 000 910 1 110 1 320 1 530 1 730
150 000 1 260 1 540 1 820 2 090 2 360
200 000 1 590 1 930 2 270 2 610 2 950
250 000 1 910 2 300 2 700 3 090 3 490
300 000 2 210 2 660 3 110 3 560 4 010
350 000 2 500 3 000 3 510 4 010 4 510
400 000 2 790 3 340 3 890 4 440 5 000
450 000 3 060 3 660 4 260 4 860 5 470
500 000 3 330 3 980 4 630 5 270 5 920
750 000 4 620 5 480 6 350 7 200 8 070
1 000 000 5 830 6 880 7 940 8 990 10 000
1 500 000 8 080 9 480 10 900 12 300 13 700
2 000 000 10 200 11 900 13 600 15 300 17 000
2 500 000 12 200 14 200 16 200 18 200 20 200
3 000 000 14 100 16 400 18 700 21 000 23 200
3 500 000 16 000 18 500 21 100 23 600 26 100
4 000 000 17 800 20 600 23 400 26 200 28 900
4 500 000 19 600 22 600 25 600 28 600 31 700
5 000 000 21 300 24 600 27 800 29 900 34 300
7 500 000 29 600 33 900 38 200 42 500 46 800
10 000 000 37 300 42 500 47 800 53 000 58 200
15 000 000 51 700 58 600 65 600 72 500 79 400
20 000 000 65 300 73 700 82 100 90 500 98 900
25 000 000 78 100 87 900 97 700 107 500 117 200
30 000 000 85 400 95 600 106 000 116 500 127 000
35 000 000 96 700 108 000 119 600 131 200 142 900
40 000 000 107 700 120 100 132 700 145 400 158 200
45 000 000 118 400 131 800 145 400 159 200 173 100
50 000 000 128 900 143 200 157 900 172 600 187 500
55 000 000 139 200 154 400 170 000 185 800 201 700
60 000 000 149 300 165 400 181 900 198 700 215 500
65 000 000 159 200 176 300 193 700 211 300 229 100
70 000 000 169 100 186 900 205 200 223 700 242 400
75 000 000 178 700 197 400 216 500 235 900 255 500
80 000 000 188 300 207 700 227 700 247 900 268 400
85 000 000 197 700 217 900 238 700 259 800 281 200
90 000 000 207 000 228 000 249 600 271 500 293 700
95 000 000 216 300 237 900 260 300 283 000 306 100
100 000 000 225 400 247 800 270 900 294 400 318 300
112 500 000 247 900 272 000 296 900 322 400 348 200
125 000 000 269 800 295 600 322 300 349 600 377 400
137 500 000 291 400 318 700 347 200 376 200 405 800
150 000 000 312 600 341 500 371 600 402 300433 700


Table 3OberbauInterim values are linear to Interpolate.Construction costs in EuroZone 1
EuroZone 2
EuroZone 3
EuroZone 4
EuroZone 5
Euro
25 000 330 410 500 580 660
30 000 380 480 570 660 760
35 000 430 540 640 750 850
40 000 480 590 710 830 950
45 000 520 650 780 900 1 030
50 000 570 710 840 980 1 120
75 000 780 970 1 150 1 330 1 520
100 000 990 1 210 1 430 1 660 1 880
150 000 1 350 1 650 1 950 2 240 2 540
200 000 1 690 2 060 2 410 2 780 3 130
250 000 2 010 2 430 2 850 3 260 3 680
300 000 2 310 2 780 3 250 3 720 4 190
350 000 2 590 3 110 3 630 4 150 4 670
400 000 2 860 3 430 3 990 4 560 5 130
450 000 3 110 3 730 4 340 4 950 5 560
500 000 3 360 4 010 4 660 5 320 5 970
750 000 4 440 5 270 6 090 6 920 7 750
1 000 000 5 330 6 290 7 260 8 220 9 180
1 500 000 7 390 8 670 9 950 11 200 12 500
2 000 000 9 320 10 900 12 400 14 000 15 600
2 500 000 11 200 13 000 14 800 16 600 18 500
3 000 000 12 900 15 000 17 100 19 200 21 200
3 500 000 14 600 16 900 19 300 21 600 23 900
4 000 000 16 300 18 800 21 400 23 900 26 500
4 500 000 17 900 20 700 23 400 26 200 28 900
5 000 000 19 500 22 500 25 400 28 400 31 400
7 500 000 27 100 31 000 34 900 38 800 42 700
10 000 000 34 100 38 900 43 700 48 500 53 200
15 000 000 47 300 53 600 59 900 66 200 72 600
20 000 000 59 700 67 300 75 000 82 700 90 400
25 000 000 71 400 80 400 89 300 98 200 107 200
30 000 000 80 300 90 000 99 800 109 600 119 500
35 000 000 91 000 101 600 112 500 123 400 134 400
40 000 000 101 300 113 000 124 800 136 800 148 800
45 000 000 111 400 124 000 136 800 149 800 162 800
50 000 000 121 300 134 800 148 500 162 400 176 500
55 000 000 131 000 145 300 160 000 174 800 189 800
60 000 000 140 500 155 700 171 200 180 500 202 800
65 000 000 149 800 165 800 182 200 198 800 215 600
70 000 000 159 100 175 800 193 000 210 500 228 100
75 000 000 168 200 185 700 203 700 222 000 240 400
80 000 000 177 200 195 400 214 200 233 300 252 600
85 000 000 186 000 205 000 224 600 244 400 264 500
90 000 000 194 800 214 500 234 800 255 400 276 300
95 000 000 203 500 223 900 244 900 266 300 288 000
100 000 000 212 100 233 100 254 900 277 000 299 500
112 500 000 233 200 255 900 279 400 303 300 327 600
125 000 000 253 900 278 100 303 300 329 000 355 100
137 500 000 274 200 299 900 326 700 354 000 381 800
150 000 000 294 100 321 300 349 600 378 500 408 000
200 000 000 379 200 403 400 437 400 472 400 500 800
250 000 000 452 300 481 200 520 500 561 000 594 700
375 000 000 623 300 663 100 713 900 766 700 812 700
500 000 000 782 500 832 500 893 300 956 800 1 014 200
625 000 000 933 500 993 100 1 062 900 1 136 200 1 204 400
750 000 000 1 078 300 1 147 100 1 225 200 1 307 500 1 385 900
1 000 000 000 1 353 800 1 440 200 1 533 000 1 631 800 1 729 700
1 250 000 000 1 615 000 1 718 100 1 824 100 1 937 800 2 054 000
1 500 000 000 1 865 500 1 984 600 2 102 600 2 229 900 2 363 700
1 750 000 000 2 107 400 2 241 900 2 370 900 2 511 000 2 661 600
2 000 000 000 2 342 100 2 491 600 2 630 900 2 783 000 2 949 900


Table 4 High-building intermediate values are linear to interpolate. Construction costs in EuroZone 1
EuroZone 2
EuroZone 3
EuroZone 4
Euro
25 000 250 300 370 480
30 000 300 360 440 570
35 000 350 420 520 670
40 000 400 480 590 760
45 000 440 540 670 860
50 000 500 600 740 950
100 000 990 1 190 1 450 1 840
150 000 1 490 1 760 2 120 2 660
200 000 1 980 2 320 2 760 3 420
250 000 2 480 2 860 3 360 4 130
300 000 2 860 3 310 3 900 4 800
350 000 3 180 3 700 4 400 5 440
400 000 3 460 4 050 4 850 6 030
450 000 3 690 4 360 5 250 6 590
500 000 3 880 4 620 5 610 7 100
1 000 000 7 050 8 360 10 100 12 700
1 500 000 10 200 12 100 14 600 18 300
2 000 000 13 400 15 800 19 100 23 900
2 500 000 16 600 19 600 23 600 29 500
3 000 000 19 900 23 300 27 700 34 500
3 500 000 23 200 27 000 31 900 39 400
4 000 000 26 500 30 600 36 100 44 400
4 500 000 29 800 34 300 40 300 49 300
5 000 000 33 200 38 000 44 500 54 200
10 000 000 66 300 75 400 87 500 105 600
15 000 000 99 500 112 100 128 800 154 000
20 000 000 132 600 148 100 168 600 199 500
25 000 000 165 800 184 300 208 800 245 700
30 000 000 186 500 206 100 232 900 273 100
35 000 000 215 400 237 300 267 300 312 400
40 000 000 243 000 267 100 300 200 350 100
45 000 000 269 600 295 600 331 600 386 000
50 000 000 295 300 323 200 361 800 420 700
55 000 000 320 100 349 900 391 300 454 100
60 000 000 344 400 375 500 419 600 486 600
65 000 000 368 100 400 900 447 500 518 000
70 000 000 391 200 425 500 474 500 549 000
75 000 000 414 000 449 800 501 200 579 500
80 000 000 436 100 473 300 527 100 609 100
85 000 000 457 900 496 600 552 600 638 200
90 000 000 479 500 519 500 577 800 666 900
95 000 000 500 900 542 200 602 600 695 300
100 000 000 522 100 564 700 627 200 723 300
112 500 000 574 100 619 800 687 500 791 900
125 000 000 625 000 673 700 746 300 858 900
137 500 000 674 900 726 400 803 800 924 300
150 000 000 724 000 778 100 860 200988 400
Non-official table of contents

Appendix 2 (to § 2 para. 1 i. V. m. § 7 para. 1)

(Fundstelle: BGBl. I 2008, 565-578)

Fee directory Section 1General Charges

Nr.CounterstandLegal fee
101 Monitoring in the area of railway operation on the basis of a suspicion, complaint or sample, if the suspicion or complaint is caused by the person concerned or a breach of a Rule of law was found § 3 paragraph 2 no. 2 BEVVG 500 DM
102 Monitoring in the area of operating facilities and
vehicles on suspicion, complaint or sample, if the suspicion or complaint is caused by the person concerned or a breach has been found against a piece of legislation
1 500 DM
103 Instruction for operational security reasons § 2 para. 4 EBO based on time
104 Opinion on deviations from the recognized rules of technology § 2 para. 2 EBO based on time
105 Approval of signals that are different from ESO
, with temporary Validity
Section A letter a
para. 4 ESO
after Time required
106 Exception to EBO/ESBO § 3 para. 1 no. 2 letter a
EBO or ESBO
based on time
107 Approval by EBO/ESBO § 3 para. 2 No. 1 EBO
or ESBO
based on time
108 Confirmation of an operational manager § 2 para. 2 Railway Management Regulation based on time
109 Arrangement of measures of the occupational health and safety authority § 22 ArbSchG i. V. m. § 1 para. 1 Railway-Occupation-Safety Regulation based on time
110 Recognition of a named location § 2 No. 5 EIV based on time
111 Assessment and Certificate of Conformity
of an Interoperability Component
§ 3 para. 1 no. 1 EIV by time
112 Certificate of EC verification of a partial system § 3 para. 1 no. 2 EIVby time


Section 2Approvals after the AEG

Nr.CounterstandLegal base fee
201 Approval of a rail transport company or a Railway infrastructure company § 6 AEG 2 500 DM
202 Decision on decommissioning
Railway infrastructure facilities
§ 11 AEG1 500 DM


Section 3Planfestation

No.CounterstandLegal Base Charge
301 Schedule fix
-Construction of new operating assets
-Change Existing operating systems
§ 18 para. 1 AEG by board 1
of the attachment
302 Plan Approval § 18 para. 2 AEG 50% of the Fee according to No. 301
303 Decision on the maintenance of the plan-set-
position and planning permission
§ 18 para. 3 AEG 25% of the fee according to No. 301
304 Plan change of insignificant importance before
Completion of the project
§ 76 para. 2 VwVfG based on time
305 Duldung Arrangement § 17 AEG based on time
306 Pre-reserved decision after
scheduling or plan approval completion
§ 74 para. 3 VwVfG by time
307 Plan Supplements Not the foreseeable effects of the project after the unquestionability of the plan § 75 paragraph 2 sentence 3 VwVfG based on time
308 Waiver of the plan determination decision or
the plan approval after construction start
§ 77 VwVfG by time, up to 75% of the fee according to No. 301 or 302
309 Entwidmung § 18 AEG by time


Section 4Railway supervision in civil engineering, superstructure, superstructure

Nr.CounterstandLegal fee
401 Approval of and consent in individual cases to new construction products and construction types as well as railway-specific construction products and construction types § 3 paragraph 2 no. 2 BEVVG by time
402 granting type approval for railway-specific construction assets based on time
403 Approval of execution planning including construction supervision and acceptance for engineering structures § 3 para. 2 No. 2 BEVVG; § 18 AEG i. V. m. Section 74 (2) VwVfG after panel 2
of the attachment
404 für Oberbau after panel 3
of the Attachment
405 for Hochbauten according to panel 4
of the attachment
406 Checking changed building templates for planning
changes with a volume of more than
1/20 of the Origin planning
§ 3 para. 2 no. 2 BEVVG;
§ 18 AEG i. V. m.
§ 74 paragraph 3 VwVfG
nach Nr. 403,
404 or 405,
multiplied by the extent of the change planning to the extent of Origin planning
407 Approval of execution planning, including construction supervision and removal of conversions of an existing
system, with substantial interventions in design or inventory
§ 3 para. 2 Nr. 2 BEVVG;
§ 18 AEG i. V. m.
§ 74 paragraph 3 VwVfG
nach Nr. 403,
404 or 405,
plus a
20 to 50% strike, depending on the level of difficulty; the
costs for
canceling construction parts will be attributed to construction costs
408 Approval of
execution planning approval or removal of assets
including construction oversight and acceptance
by time
409 Building technical examination of the building templates § 3 para. 2 no. 2 BEVVG 1 000 DM to
3 000 000 DM
410 Protocol-based interim removal of certain components or construction work after Time required
411 Approval for commissioning of a subsystem § 2 Nr. 1 EIVby time


Building supervision of signal, telecommunication and electrical engineering Assets

No.CounterstandLegal Base Fee
421 Approval of the Execution planning § 3 para. 2 no. 2 BEVVG;
§ 18 AEG i. V. m.
§ 74 paragraph 3 VwVfG
based on time
422 Construction inspection of an installation including construction supervision during construction work § 3 paragraph 2 no. 2 BEVVG by time
423 Approval of a new or modified type
-Type approval-
by time
424 Approval for commissioning of a subsystem § 2 Nr. 1 EIV by time


Technical oversight of rail vehicles

Nr.CounterstandLegal fee
441 Decrease of the first vehicle of a series § 32 para. 1 EBO based on time
442 Decrease of the first converted vehicle after Time required
443 Checking a vehicle not coming from the scope of the
EBO, including a notice of acceptance
by time
444 Admission of a Component based on time
445 Admission of the first modified component of a series after Time required
446 Decrease based on the compliance
certificate
by time
447 Approval for commissioning of a subsystem § 2 No. 1 EIVby time


Assets that require monitoring and approval

Nr.CounterstandLegal base fee
460 Type approval, audit before commissioning,
exception approval
§ 33 para. 1 EBO based on time
461 Planmoderate recurring testing of
steam boilers, pressure vessels, and other
monitoring systems in need of surveillance
based on time
462 Recognition of § 33 para. 5 EBO 1 000 DM
463 Checking the drinking water systems of rails-
vehicles and the installations for filling
rail vehicles; Checking the drinking water systems of a railway vehicle
§ 79 Bund-Seuchen-
gesetz; § § 19, 20 TrinkwV
500 DM
464 Check the assets for filling
rail vehicles; up to 10 hydrants
800 DM
465 Check the Installations for filling
rail vehicles; 11 to 50 hydrants
1 000 DM
466 Checking assets for filling
rail vehicles; 51 to 100 hydrants
1 300 DM
467 Checking assets for filling
rail vehicles; 101 to 200 Hydrants
1 500 DM
468 Check the Installations for filling
rail vehicles; over 200 hydrants
2 000 DM
469 Definition of measures in the case of limit and
target overruns of microbiological, chemical and physico-chemical parameters
about measures in case of overruns
§ 11 paragraph 4 Federal-
Disease Act;
§ § § § § § § § § § § § § § § § § § § 1, 2, 3 TrinkwV
80 DM
470 About action on limit-
overruns
80 DM


Section 5Other public benefits attributable to individual

No.CounterstandLegal Base Charge
501 Individually attributable public services according to § 4 Par. 2 AEG § 4 paragraph 2 AEG i. V. m.
to the respective law
based on time
502 Monitoring of compliance and serviceability of interoperability constituents § 2 No. 2 EIV by time
503 Monitoring compliance with the TSI § 2 No. 3 EIV by time
504 Permit of exceptions to the application
TSI
§ 2 No. 4 EIV by time
505 Change, extension, and Extension
the validity of an administrative action
by time, up to half the fee for the administrative act
506 Other non-mentioned individually attributable public servicesas comparable eligible public services, otherwise by time


Charge table appendix to charge
1.
The fee measurement for the numbers 301 to 303, 308 and 403 to 407 depends on the construction costs and on the levels of difficulty in charge zones Rating properties.
2.
The cost of the fee is not included in the cost of the fee for:
a)
the acquisition, the freeming, the building, and the development of the plot,
b)
Winterbauschutzvorconversions,
c)
surveying and marketing,
d)
Compensation and Damage Services,
e)
Baunflat Cost,
f)
Artworks and artistically designed components, as far as they are not essential parts of the object.
3.
The cost of signal, telecommunications and electrical equipment is not included in the cost of measurement according to the tables 2 and 4.
4.
For panels 1 and 3, the operating assets will be attributed to the following charge zones:
a)
Zone 1: Objects with very low planning requirements, for example: B. Operating systems without switches and crossings, unless mentioned in zones 2 to 5, simple traffic areas;
b)
Zone 2: Objects with low planning requirements, For example: B. Operating systems of the free route without any special compulsion points, operating facilities of the free route in the little moving terrain, operating facilities of the stations with simple track plans;
c)
Zone 3: Objects with average planning requirements, for example: Internal operating facilities, unless mentioned in Zone 4, operating systems of the free route with special forced points, operating systems of the free route in the moving terrain, operating systems of the stations with difficult Track plans;
d)
Zone 4: Objects with above-average planning requirements, for example, (b) difficult internal facilities, operating installations of the free route with a large number of specific compultrating points, operating installations of the free route in the heavily moved terrain, operating facilities of the stations with very difficult track plans, Transport space for combined transport freight transport;
e)
Zone 5: Objects with very high planning requirements, e.g. B. very difficult domestic facilities.
5.
For Table 2, the engineering structures are charged with the following charge zones:
a)
Zone 1: Objects with very low planning requirements, for example:
b)
Zone 2: Objects with low planning requirements, e. g. for the use of the Municipal Waste Water (BGN), the Municipal Waste Water (NWI), the Municipal Waste Water (HGN), B. Dammbauts, as far as not mentioned in Zone 3 or 4, straight single-field bridges of simple design, support structures with traffic load, simple noise protection systems, lines for water and waste water with small links and few ZwangPoints;
c)
Zone 3: Objects with average planning requirements, for example: B. difficult dams, single-field bridges, as far as not mentioned in Zone 2 or 4, simple multi-field and arched bridges, support structures with anchorage, simple tunnel and trough structures, simple underground stations, lines for water or waste water with numerous links and numerous coercion points;
d)
Zone 4: Objects with above-average planning requirements, e.g. Particularly difficult dams, difficult fields of single-field, multi-field and arched bridges, noise protection systems in difficult urban planning situations, difficult tunnel and trough structures, difficult underground stations, if not in Zone 5 ;
e)
Zone 5: Objects with very high planning requirements, for example: Particularly difficult bridges, particularly difficult tunnel and trogling structures, underground crossing stations.
6.
The charge zone of the panel 4 is used for high-rise buildings Based on the following rating characteristics:
a)
Zone 1: Building with very low Planning requirements, that is, with
-
very low requirements for integration into the Environment,
-
a functional area,
-
very small design Requirements,
-
simplest constructions,
-
none or more technical Equipment,
-
No or one removal;
b)
Zone 2: Building with low Planning requirements, that is, with
-
low requirements for integration into the Environment,
-
few functional areas,
-
small design requirements,
-
simple constructions,
-
less technical Equipment,
-
low expansion;
c)
Zone 3: Buildings with average Planning requirements, that is,
-
Average requirements for inclusion in the Environment,
-
Multiple Simple Functional Areas,
-
Average Design requirements,
-
normal or common constructions,
-
average technical equipment,
-
normal build-up;
d)
zone 4: Buildings with above-average planning requirements, that is, with
-
above-average Requirements for inclusion in the environment,
-
multiple functional areas with multiple relationships,
-
above-average design requirements,
-
above-average constructive requirements,
-
above-average technical equipment,
-
above-average Expansion;
e)
Zone 5: Building with very high planning requirements, that is, with
-
very high requirements for integration into the environment,
-
a wide variety of functional areas with comprehensive relationships,
-
very high design Requirements,
-
very high constructive requirements,
-
a diverse technical Equipment with high technical requirements,
-
high-quality expansion.
Table 1Planting intermediate values are linearly to interpolate.Construction costs in DMZone 1
DMZone 2
DMZone 3
DMZone 4
DMZone 5
DM
50 000 460 580 700 810 930
60 000 530 670 800 940 1 070
70 000 600 750 900 1 050 1 200
80 000 670 830 1 000 1 160 1 330
90 000 740 920 1 100 1 270 1 450
100 000 800 990 1 190 1 380 1 570
150 000 1 100 1 360 1 620 1 880 2 130
200 000 1 390 1 700 2 020 2 330 2 650
300 000 1 910 2 330 2 740 3 160 3 570
400 000 2 390 2 890 3 400 3 910 4 410
500 000 2 830 3 420 4 010 4 600 5 180
600 000 3 250 3 910 4 580 5 240 5 900
700 000 3 650 4 380 5 110 5 850 6 580
800 000 4 020 4 820 5 620 6 420 7 220
900 000 4 380 5 250 6 110 6 970 7 830
1 000 000 4 730 5 650 6 570 7 490 8 410
1 500 000 6 250 7 420 8 590 9 750 10 920
2 000 000 7 500 8 860 10 220 11 580 12 930
3 000 000 10 400 12 210 14 010 15 820 17 620
4 000 000 13 120 15 330 17 530 19 740 21 950
5 000 000 15 710 18 290 20 870 23 450 26 020
6 000 000 18 190 21 120 24 050 26 980 29 910
7 000 000 20 600 23 860 27 120 30 380 33 640
8 000 000 22 950 26 520 30 100 33 680 37 250
9 000 000 25 230 29 110 32 990 36 870 40 760
10 000 000 27 470 31 640 35 820 39 990 44 170
15 000 000 38 090 43 620 49 140 54 670 60 190
20 000 000 48 040 54 770 61 510 68 240 74 980
30 000 000 66 610 75 510 84 400 93 290 102 180
40 000 000 84 010 94 830 105 640 116 460 127 280
50 000 000 100 570 113 160 125 750 138 340 150 940
60 000 000 113 110 126 710 140 470 154 330 168 280
70 000 000 128 080 143 130 158 400 173 790 189 290
80 000 000 142 640 159 080 175 770 192 610 209 590
90 000 000 156 860 174 600 192 670 210 900 229 300
100 000 000 170 770 189 770 209 150 228 730 248 490
110 000 000 184 410 204 630 225 270 246 150 267 240
120 000 000 197 810 219 210 241 080 254 210 285 580
130 000 000 211 000 233 530 256 590 279 950 303 570
140 000 000 224 000 247 630 271 850 296 390 321 230
150 000 000 236 810 261 510 286 860 312 560 338 590
160 000 000 249 460 275 200 301 650 328 490 355 680
170 000 000 261 960 288 720 316 240 344 200 372 520
180 000 000 274 310 302 070 330 650 359 690 389 130
190 000 000 286 540 315 260 344 870 374 980 405 520
200 000 000 298 640 328 310 358 940 390 090 421 700
225 000 000 328 400 360 360 393 440 427 130 461 360
250 000 000 447 520 391 680 427 100 463 230 499 980
275 000 000 386 090 422 340 460 030 498 520 537 700
300 000 000 414 150 452 420 492 300 533 070 574 610
400 000 000 533 930 568 010 616 000 665 280 705 200
500 000 000 636 950 677 610 732 970 790 030 837 430
750 000 000 877 730 933 750 1 005 300 1 079 600 1 144 370
1 000 000 000 1 101 940 1 172 280 1 257 910 1 347 370 1 428 210
1 250 000 000 1 314 610 1 398 520 1 496 790 1 600 010 1 696 010
1 500 000 000 1 518 490 1 615 420 1 725 270 1 841 220 1 951 690
2 000 000 000 1 906 400 2 028 080 2 158 780 2 297 880 2 435 760
2 500 000 000 2 274 310 2 419 480 2 568 730 2 728 760 2 892 480
3 000 000 000 2 627 030 2 794 720 2 960 850 3 140 130 3 328 540
3 500 000 000 2 967 610 3 157 030 3 338 720 3 535 960 3 748 120
4 000 000 000 3 298 120 3 508 640 3 704 820 3 918 960 4 154 100


Blackboard 2Engineer intermediate values are linear to interpolate. Construction costs in DMZone 1
DMZone 2
DMZone 3
DMZone 4
DMZone 5
DM
50 000 580 730 880 1 030 1 180
60 000 680 850 1 020 1 190 1 360
70 000 760 950 1 150 1 340 1 530
80 000 850 1 060 1 270 1 480 1 690
90 000 930 1 160 1 390 1 620 1 850
100 000 1 020 1 260 1 510 1 760 2 000
150 000 1 410 1 740 2 070 2 400 2 730
200 000 1 780 2 180 2 590 2 990 3 390
300 000 2 470 3 010 3 550 4 090 4 620
400 000 3 110 3 780 4 440 5 100 5 760
500 000 3 730 4 500 5 280 6 050 6 830
600 000 4 320 5 200 6 080 6 960 7 840
700 000 4 890 5 870 6 860 7 840 8 820
800 000 5 450 6 530 7 610 8 690 9 770
900 000 5 990 7 160 8 340 9 510 10 690
1 000 000 6 520 7 780 9 050 10 310 11 580
1 500 000 9 040 10 720 12 410 14 090 15 780
2 000 000 11 400 13 460 15 520 17 590 19 650
3 000 000 15 810 18 550 21 290 24 030 26 770
4 000 000 19 930 23 290 26 640 29 990 33 340
5 000 000 23 860 27 780 31 700 35 620 39 530
6 000 000 27 640 32 090 36 540 40 990 45 440
7 000 000 31 300 36 250 41 200 46 150 51 110
8 000 000 34 860 40 290 45 720 51 160 56 590
9 000 000 38 330 44 230 50 120 56 020 61 910
10 000 000 41 730 48 070 54 410 58 510 67 100
15 000 000 57 860 66 260 74 650 83 050 91 440
20 000 000 72 970 83 200 93 440 103 670 113 900
30 000 000 101 190 114 700 128 210 141 720 155 230
40 000 000 127 620 144 050 160 490 176 920 193 360
50 000 000 152 780 171 900 191 030 210 160 229 290
60 000 000 166 960 187 040 207 360 227 820 248 400
70 000 000 189 060 211 280 233 820 256 530 279 410
80 000 000 210 560 234 810 259 460 284 320 309 380
90 000 000 231 540 257 740 284 400 311 320 338 470
100 000 000 252 070 280 130 308 730 337 630 366 810
110 000 000 272 210 302 060 332 530 363 350 394 480
120 000 000 292 000 323 580 355 860 388 530 421 560
130 000 000 311 460 344 720 378 760 413 240 448 100
140 000 000 330 650 365 530 401 280 437 510 474 170
150 000 000 349 560 386 020 423 440 461 380 499 800
160 000 000 368 240 406 240 445 280 484 900 525 030
170 000 000 386 690 426 190 466 820 508 070 549 890
180 000 000 404 930 445 890 488 080 530 940 574 400
190 000 000 422 970 465 370 509 080 553 520 598 600
200 000 000 440 840 484 630 529 840 575 820 622 490
225 000 000 484 760 531 940 580 760 630 500 681 020
250 000 000 527 750 578 160 630 450 683 790 738 040
275 000 000 569 910 623 420 679 060 735 870 793 710
300 000 000 611 340 667 830 726 690 786 870848 190


Table 3OberbauInterim values are linear Interpolate.Construction costs in DMZone 1
DMZone 2
DMZone 3
DMZone 4
DMZone 5
DM
50 000 640 800 970 1 130 1 300
60 000 740 930 1 110 1 300 1 490
70 000 840 1 050 1 250 1 460 1 670
80 000 930 1 160 1 390 1 620 1 850
90 000 1 020 1 270 1 520 1 770 2 020
100 000 1 110 1 380 1 650 1 920 2 190
150 000 1 530 1 890 2 250 2 610 2 970
200 000 1 930 2 370 2 800 3 240 3 680
300 000 2 650 3 230 3 810 4 390 4 970
400 000 3 310 4 020 4 720 5 430 6 130
500 000 3 930 4 750 5 570 6 380 7 200
600 000 4 510 5 440 6 360 7 280 8 200
700 000 5 070 6 090 7 100 8 120 9 140
800 000 5 590 6 700 7 810 8 920 10 030
900 000 6 090 7 290 8 480 9 680 10 870
1 000 000 6 570 7 850 9 120 10 400 11 670
1 500 000 8 690 10 310 11 920 13 540 15 160
2 000 000 10 420 12 310 14 190 16 080 17 960
3 000 000 14 450 16 960 19 460 21 970 24 480
4 000 000 18 220 21 290 24 350 27 420 30 490
5 000 000 21 820 25 400 28 980 32 560 36 150
6 000 000 25 270 29 340 33 410 37 470 41 540
7 000 000 28 620 33 140 37 670 42 200 46 730
8 000 000 31 870 36 840 41 810 46 770 51 740
9 000 000 35 040 40 430 45 830 51 220 56 610
10 000 000 38 150 43 950 49 750 55 550 61 350
15 000 000 52 910 60 580 68 250 75 930 83 600
20 000 000 66 720 76 070 85 430 94 780 104 130
30 000 000 92 520 104 870 117 220 129 570 141 920
40 000 000 116 680 131 700 146 730 161 760 176 780
50 000 000 139 680 157 170 174 660 192 150 209 630
60 000 000 157 100 175 980 195 100 214 350 233 720
70 000 000 177 890 198 800 220 000 241 370 262 900
80 000 000 198 120 220 940 244 130 267 520 291 100
90 000 000 217 860 242 510 267 590 292 920 318 470
100 000 000 237 180 263 580 290 490 317 680 345 130
110 000 000 256 120 284 210 312 880 341 880 371 160
120 000 000 274 740 304 450 334 830 353 070 396 640
130 000 000 293 060 324 350 356 380 388 820 421 620
140 000 000 311 110 343 920 377 560 411 650 446 150
150 000 000 328 910 363 210 398 420 434 120 470 270
160 000 000 346 480 382 230 418 960 456 240 494 010
170 000 000 363 840 401 000 439 230 478 050 517 390
180 000 000 380 980 419 540 459 230 499 560 540 460
190 000 000 397 980 437 870 478 990 520 800 563 220
200 000 000 414 780 455 990 498 520 541 790 585 700
225 000 000 456 110 500 510 546 440 593 240 640 780
250 000 000 496 560 543 990 593 200 643 380 694 420
275 000 000 536 230 586 580 638 930 692 380 746 800
300 000 000 575 210 628 360 683 750 740 370 798 070
400 000 000 741 570 788 900 855 550 924 000 979 440
500 000 000 884 660 941 120 1 018 020 1 097 260 1 163 100
750 000 000 1 219 060 1 296 880 1 396 260 1 499 440 1 589 410
1 000 000 000 1 530 480 1 628 170 1 747 090 1 871 340 1 983 620
1 250 000 000 1 825 840 1 942 390 2 078 870 2 222 230 2 355 570
1 500 000 000 2 109 020 2 243 630 2 396 210 2 557 250 2 710 680
2 000 000 000 2 647 770 2 816 780 2 998 300 3 191 510 3 383 000
2 500 000 000 3 158 760 3 360 380 3 567 680 3 789 940 4 017 340
3 000 000 000 3 648 660 3 881 550 4 112 290 4 361 290 4 622 970
3 500 000 000 4 121 680 4 384 760 4 637 110 4 911 060 5 205 720
4 000 000 000 4 580 720 4 873 110 5 145 580 5 443 000 5 769 580


Blackboard 4HochbautenInterim values are linear to interpolate. Construction costs in DMZone 1
DMZone 2
DMZone 3
DMZone 4
DMZone 5
DM
50 000 490 590 730 940 1 080
60 000 580 710 870 1 120 1 290
70 000 680 830 1 020 1 310 1 500
80 000 780 940 1 160 1 490 1 710
90 000 870 1 060 1 310 1 680 1 920
100 000 970 1 170 1 440 1 850 2 120
200 000 1 940 2 320 2 830 3 590 4 100
300 000 2 910 3 440 4 140 5 200 5 900
400 000 3 880 4 530 5 390 6 680 7 540
500 000 4 850 5 590 6 580 8 070 9 060
600 000 5 600 6 470 7 630 9 380 10 540
700 000 6 220 7 240 8 600 10 630 11 990
800 000 6 760 7 930 9 480 11 800 13 350
900 000 7 220 8 530 10 270 12 890 14 640
1 000 000 7 580 9 030 10 970 13 880 15 820
2 000 000 13 790 16 350 19 750 24 860 28 260
3 000 000 20 010 23 660 28 530 35 830 40 700
4 000 000 26 220 30 970 37 300 46 800 53 130
5 000 000 32 430 38 280 46 080 57 770 65 570
6 000 000 38 920 45 500 54 270 67 430 76 210
7 000 000 45 400 52 710 62 470 77 090 86 840
8 000 000 51 890 59 930 70 660 86 750 97 480
9 000 000 58 370 67 150 78 850 96 410 108 110
10 000 000 64 860 74 370 87 050 106 070 118 750
20 000 000 129 720 147 430 171 040 206 460 230 070
30 000 000 194 580 219 170 251 970 301 160 333 950
40 000 000 259 440 289 610 329 830 390 170 430 400
50 000 000 324 290 360 370 408 470 480 610 528 710
60 000 000 364 690 403 150 455 420 534 090 586 040
70 000 000 421 220 464 070 522 790 611 040 669 080
80 000 000 475 210 522 460 587 080 684 680 748 250
90 000 000 527 260 578 050 648 650 754 940 824 340
100 000 000 577 460 632 050 707 680 822 840 896 030
110 000 000 626 090 684 250 765 280 888 170 965 550
120 000 000 673 610 734 450 820 600 951 630 1 032 860
130 000 000 719 960 784 010 875 160 1 013 150 1 099 010
140 000 000 765 060 832 160 928 110 1 073 730 1 164 110
150 000 000 809 650 879 700 980 350 1 133 460 1 228 260
160 000 000 852 900 925 760 1 030 900 1 191 230 1 290 260
170 000 000 895 630 971 230 1 080 770 1 248 170 1 351 350
180 000 000 937 880 1 016 130 1 129 990 1 304 340 1 411 590
190 000 000 979 680 1 060 520 1 178 620 1 359 800 1 471 040
200 000 000 1 021 050 1 104 420 1 226 680 1 414 590 1 529 760
225 000 000 1 122 790 1 212 240 1 344 580 1 548 910 1 673 610
250 000 000 1 222 350 1 317 560 1 459 620 1 679 840 1 813 710
275 000 000 1 320 010 1 420 710 1 572 150 1 807 790 1 950 530
300 000 000 1 415 960 1 521 900 1 682 440 1 933 0802 084 420
Non-Official Table of Contents

Appendix 3 (to § 2 para. 1 i. V. m. § 7 para. 2)
fee list

(Fundstelle: BGBl. I 2008, 579-593)

Section 1General Fees

Nr.CounterstandLegal fee
101 Monitoring in the area of railway operation on the basis of a suspicion, complaint or sample, if the suspicion or complaint is caused by the person concerned or a breach of a Rule of law was found § 3 paragraph 2 no. 2 BEVVG 500 DM
102 Monitoring in the area of operating equipment and vehicles on the basis of suspicion, complaint or sample, if the suspicion or complaint is caused by the person concerned or a breach of a piece of legislation was found 1 500 DM
103 Instruction for operational security reasons § 2 para. 4 EBO based on time
104 Opinion on deviations from the recognized rules of technology § 2 para. 2 EBO based on time
105 Approval of signals that are different from ESO
, with temporary Validity
Section A letter a
para. 4 ESO
after Time required
106 Exception to EBO/ESBO § 3 para. 1 no. 2 letter a
EBO or ESBO
based on time
107 Approval by EBO/ESBO § 3 para. 2 No. 1 EBO or ESBO based on time
108 Confirmation of an operational manager § 2 para. 2 Railway Management Regulation based on time
109 Arrangement of measures of the occupational health and safety authority § 22 ArbSchG i. V. m. § 1 para. 1 Railway-Occupation-Safety-
Regulation
based on time
110 Recognition of a named location § 2 No. 5 EIV based on time
111 Evaluation and certification of compliance of an interoperability constituent § 3 para. 1 no. 1 EIV by time
112 Certificate of the EC verification of a partial system § 3 para. 1 no. 2 EIV after Time required
113 Consent for the collection of charges for
lack of driveway capacity
§ 18 para. 4 EIBV by time
114 Exception Approval to § 14 para. 4 AEG § 22 para. 1 no. 1 and 2 EIBVby time


Section 2Approvals after the AEG

Nr.CounterstandLegal fee
201 Approval of a rail transport company or a railway infrastructure company § 6 AEG 2 500 DM
202 Decision on the decommissioning of railway-
infrastructure facilities
§ 11 AEG 1 500 DM
203 Parts of a security certificate § 14 para. 7 AEGafter Time


Section 3Planning


Nr.CounterstandLegal fee
301 Plan fix
-Construction of new operating assets
-Change of existing operating assets
§ 18 paragraph 1 AEG according to panel 1 of the attachment
302 Plan Approval § 18 para. 2 AEG 50% of the fee according to No. 301
303 Decision on the maintenance of the
plan setting and planning permission
§ 18 para. 3 AEG 25% of the fee according to No. 301
304 Planning change of insignificant importance before
Completion of project
§ 76 para. 2 VwVfG by time
305 Duldung Arrangement § 17 AEG by time
306 Pre-ordered decision after completion of
Plan setting or planning permission
§ 74 para. 3 VwVfG By Time
307 Plan supplement for non-predictable effects
of the project after the inability of the plan
§ 75 para. 2 set 3 VwVfG based on time
308 Waiver of the plan determination decision or
the planning permission after construction start
§ 77 VwVfG by time, up to 75% of the fee according to No. 301 or 302
309 Entwidmung § 18 AEG by time


Section 4Railway supervisor in civil engineering, superstructure, superstructure

Nr.CounterstandLegal base fee
401 Approval of and consent in individual cases to
new construction products and construction types as well as railway-specific construction products and construction types
§ 3 paragraph 2 no. 2 BEVVG after Time required
402 Granting of a type approval for railway-specific constructional facilities based on time
403 Approval of execution planning including construction supervision and acceptance for Engineering structures § 3 para. 2 No. 2 BEVVG;
§ 18 AEG i. V. m. Section 74 (2) VwVfG
according to panel 2 of the attachment
404 für Oberbau after panel 3 of Attachment
405 for Hochbauten according to panel 4 of the attachment
406 Checking changed building templates for planning
changes with a scope of more than
1/20 of origin planning
§ 3 para. 2 no. 2 BEVVG;
§ 18 AEG i. V. m. Section 74 (3) VwVfG
nach Nr. 403, 404 resp. 405, multiply with the ratio of the scope of change planning to the scope of origin planning
407 Approval of the Execution planning including construction supervision and removal of conversions of a
existing facility with substantial operations in design or inventory
§ 3 para. 2 no. 2 BEVVG;
§ 18 AEG i. V. m. Section 74 (3) VwVfG
nach Nr. 403, 404 resp. 405, plus a supplement of 20 to 50% depending on the degree of difficulty; the cost of canceling of construction parts shall be: The construction costs are calculated
408 Approval of execution scheduling of abortion or removal of assets, including
construction supervision and acceptance
after Time required
409 Building technical examination of the building templates § 3 paragraph 2 no. 2 BEVVG 1 000 DM
to 3 000 000 DM
410 Protocol-based interim acceptance of certain
components or construction work
by time
411 Approval for commissioning a partial system § 2 Nr. 1 EIVby time


Building supervision of signal, telecommunications and electrical assets

Nr.CounterstandLegal base fee
421 Approval of execution planning § 3 paragraph 2 no. 2 BEVVG; § 18 AEG i. V. m. Section 74 (3) VwVfG based on time
422 Construction inspection of an installation including construction supervision during construction work § 3 paragraph 2 no. 2 BEVVG by time
423 Approval of a new or modified form
type approval -
by time
424 Approval for commissioning of a subsystem § 2 Nr. 1 EIVafter Time


Technical oversight of rail vehicles

No.CounterstandLegal Base Charge
441 Decrease of the first vehicle of a series § 32 para. 1 EBO based on time
442 Decrease of the first converted vehicle by time
443 Checking a not from the scope of the EBO Coming vehicle including a notice about the acceptance based on time
444 Approval of a component By Time
445 Admission of the first modified component
of a series
by time
446 Decrease based on the compliance
detection
by time
447 Approval for commissioning of a subsystem § 2 Nr. 1 EIVafter Time expended


Monitoring and Approve Assets

No.CounterstandLegal Base Fee
460 Type approval, check before commissioning, exception approval § 33 para. 1 EBO based on time
461 Planmoderate recurrent testing of steam-
boilers, pressure vessels, and other equipment requiring monitoring
based on time
462 Recognition of § 33 para. 5 EBO 1 000 DM
463 Checking the drinking water systems of rails-
vehicles and the installations for filling
rail vehicles; testing the drinking water systems of a rail vehicle
§ 79 Bund-Seuchengesetz; § § 19, 20 TrinkwV 500 DM
464 Check the facilities for filling from rails-
vehicles; up to 10 hydrants
800 DM
465 Checking assets to fill rails-
vehicles; 11 to 50 hydrants
1 000 DM
466 Checking assets for filling rails-
vehicles; 51 to 100 hydrants
1 300 DM
467 Check the facilities for filling from rails-
vehicles; 101 to 200 hydrants
1 500 DM
468 Checking equipment for filling rails-
vehicles; over 200 hydrants
2 000 DM
469 Definition of measures in the case of cross-border and guide value overruns of microbiological, chemical and physico-chemical parameters Direction Overruns § 11 paragraph 4 Federal-
Disease Act; § § 1, 2, 3 TrinkwV
80 DM
470 Information about measures at limit value-
80 DM


Section 5Other individually attributable public services

Nr.CounterstandLegal base fee
501 Individually attributable public services according to § 4 paragraph 2 AEG § 4 paragraph 2 AEG i. V. m. of the respective law based on time
502 Monitoring of compliance and use-
suitability of interoperability constituents
§ 2 No. 2 EIV by time
503 Monitoring compliance with the TSI § 2 No. 3 EIV by time
504 Permit of exceptions to the application
TSI
§ 2 No. 4 EIV by time
505 Change, extension, and Extension of the
effectivity of an administrative act
by time, up to half of the fee for the
administrative act
506 Other non-mentioned individually attributable public servicesas comparable eligible public services, otherwise by time


Section 6Individually attributable public services of the regulatory authority

Nr.CounterstandLegal base fee
601 Monitoring access to the railway infrastructure on the basis of suspicion, complaint or sample if: the suspicion or the complaint is caused by the person concerned, or a breach of a piece of legislation has been established § 14c para. 1 AEG based on time
602 Instruction to comply with the rules on
access to the railway infrastructure
§ 14c para. 1 AEG by time
603 objection to results and decisions pursuant to § 14d AEG § 14e para. 1 AEG by time
604 Monitoring access to Railway infrastructure on the basis of a suspicion, complaint or sample, if the suspected or the complaint is caused by the person concerned, or a breach of a piece of law has been established § 14f para. 1 AEG by time
605 Instruction on omission of the Impairment
of the right to access to the railway infrastructure
§ 14f para. 1 and 3 AEG by time
606 Approval of the Duration of a framework contract on the allocation of train paths § 14a para. 2 AEGby time


Charge table charging attachment appendix
1.
The charge measurement for the Numbers 301 to 303, 308 and 403 to 407 depend on the construction costs and the rating characteristics classified according to levels of difficulty in charge zones.
2.
Not applicable the cost of construction in the sense of the fee measurement includes the cost of:
a)
the acquisition, the exemption, the Setting up and developing the plot,
b)
Winterbauschutzvorconversions,
c)
Vermessung und markung,
d)
Compensation and Damage Services,
e)
Baunebenkosten,
f)
Artworks and artistically designed components, as far as they are not essential components of the object.
3.
The cost of the signal is not the same as the construction costs in the sense of the fee measurement in accordance with the tables 2 and 4. Telecommunications and electrical installations.
4.
For tables 1 and 3, the operating systems are charged with the following charge zones:
a)
Zone 1: Objects with very low planning requirements, for example: B. Operating systems without switches and crossings, unless mentioned in zones 2 to 5, simple traffic areas;
b)
Zone 2: Objects with low planning requirements, For example: B. Operating systems of the free route without any special compulsion points, operating facilities of the free route in the little moving terrain, operating facilities of the stations with simple track plans;
c)
Zone 3: Objects with average planning requirements, for example: Internal operating facilities, unless mentioned in Zone 4, operating systems of the free route with special forced points, operating systems of the free route in the moving terrain, operating systems of the stations with difficult Track plans;
d)
Zone 4: Objects with above-average planning requirements, for example, (b) difficult internal facilities, operating installations of the free route with a large number of specific compultrating points, operating installations of the free route in the heavily moved terrain, operating facilities of the stations with very difficult track plans, Transport space for combined transport freight transport;
e)
Zone 5: Objects with very high planning requirements, e.g. B. very difficult domestic facilities.
5.
For Table 2, the engineering structures are charged with the following charge zones:
a)
Zone 1: Objects with very low planning requirements, for example:
b)
Zone 2: Objects with low planning requirements, e. g. for the use of the Municipal Waste Water (BGN), the Municipal Waste Water (NWI), the Municipal Waste Water (HGN), B. Dammbauts, as far as not mentioned in Zone 3 or 4, straight single-field bridges of simple design, support structures with traffic load, simple noise protection systems, lines for water and waste water with small links and few ZwangPoints;
c)
Zone 3: Objects with average planning requirements, for example: B. difficult dams, single-field bridges, as far as not mentioned in Zone 2 or 4, simple multi-field and arched bridges, support structures with anchorage, simple tunnel and trough structures, simple underground stations, lines for water or waste water with numerous links and numerous coercion points;
d)
Zone 4: Objects with above-average planning requirements, e.g. Particularly difficult dams, difficult fields of single-field, multi-field and arched bridges, noise protection systems in difficult urban planning situations, difficult tunnel and trough structures, difficult underground stations, if not in Zone 5 ;
e)
Zone 5: Objects with very high planning requirements, for example: Particularly difficult bridges, particularly difficult tunnel and trogling structures, underground crossing stations.
6.
The charge zone of the panel 4 is used for high-rise buildings Based on the following rating characteristics:
a)
Zone 1: Building with very low Planning requirements, that is, with
-
very low requirements for integration into the Environment,
-
a functional area,
-
very small design Requirements,
-
simplest constructions,
-
none or more technical Equipment,
-
No or one removal;
b)
Zone 2: Building with low Planning requirements, that is, with
-
low requirements for integration into the Environment,
-
few functional areas,
-
small design requirements,
-
simple constructions,
-
less technical Equipment,
-
low expansion;
c)
Zone 3: Buildings with average Planning requirements, that is,
-
Average requirements for inclusion in the Environment,
-
Multiple Simple Functional Areas,
-
Average Design requirements,
-
normal or common constructions,
-
average technical equipment,
-
normal build-up;
d)
zone 4: Buildings with above-average planning requirements, that is, with
-
above-average Requirements for inclusion in the environment,
-
multiple functional areas with multiple relationships,
-
above-average design requirements,
-
above-average constructive requirements,
-
above-average technical equipment,
-
above-average Expansion;
e)
Zone 5: Building with very high planning requirements, that is, with
-
very high requirements for integration into the environment,
-
a wide variety of functional areas with comprehensive relationships,
-
very high design Requirements,
-
very high constructive requirements,
-
a diverse technical Equipment with high technical requirements,
-
high-quality expansion.
Table 1Planting intermediate values are linearly to interpolate.Construction costs in DMZone 1
DMZone 2
DMZone 3
DMZone 4
DMZone 5
DM
50 000 460 580 700 810 930
60 000 530 670 800 940 1 070
70 000 600 750 900 1 050 1 200
80 000 670 830 1 000 1 160 1 330
90 000 740 920 1 100 1 270 1 450
100 000 800 990 1 190 1 380 1 570
150 000 1 100 1 360 1 620 1 880 2 130
200 000 1 390 1 700 2 020 2 330 2 650
300 000 1 910 2 330 2 740 3 160 3 570
400 000 2 390 2 890 3 400 3 910 4 410
500 000 2 830 3 420 4 010 4 600 5 180
600 000 3 250 3 910 4 580 5 240 5 900
700 000 3 650 4 380 5 110 5 850 6 580
800 000 4 020 4 820 5 620 6 420 7 220
900 000 4 380 5 250 6 110 6 970 7 830
1 000 000 4 730 5 650 6 570 7 490 8 410
1 500 000 6 250 7 420 8 590 9 750 10 920
2 000 000 7 500 8 860 10 220 11 580 12 930
3 000 000 10 400 12 210 14 010 15 820 17 620
4 000 000 13 120 15 330 17 530 19 740 21 950
5 000 000 15 710 18 290 20 870 23 450 26 020
6 000 000 18 190 21 120 24 050 26 980 29 910
7 000 000 20 600 23 860 27 120 30 380 33 640
8 000 000 22 950 26 520 30 100 33 680 37 250
9 000 000 25 230 29 110 32 990 36 870 40 760
10 000 000 27 470 31 640 35 820 39 990 44 170
15 000 000 38 090 43 620 49 140 54 670 60 190
20 000 000 48 040 54 770 61 510 68 240 74 980
30 000 000 66 610 75 510 84 400 93 290 102 180
40 000 000 84 010 94 830 105 640 116 460 127 280
50 000 000 100 570 113 160 125 750 138 340 150 940
60 000 000 113 110 126 710 140 470 154 330 168 280
70 000 000 128 080 143 130 158 400 173 790 189 290
80 000 000 142 640 159 080 175 770 192 610 209 590
90 000 000 156 860 174 600 192 670 210 900 229 300
100 000 000 170 770 189 770 209 150 228 730 248 490
110 000 000 184 410 204 630 225 270 246 150 267 240
120 000 000 197 810 219 210 241 080 254 210 285 580
130 000 000 211 000 233 530 256 590 279 950 303 570
140 000 000 224 000 247 630 271 850 296 390 321 230
150 000 000 236 810 261 510 286 860 312 560 338 590
160 000 000 249 460 275 200 301 650 328 490 355 680
170 000 000 261 960 288 720 316 240 344 200 372 520
180 000 000 274 310 302 070 330 650 359 690 389 130
190 000 000 286 540 315 260 344 870 374 980 405 520
200 000 000 298 640 328 310 358 940 390 090 421 700
225 000 000 328 400 360 360 393 440 427 130 461 360
250 000 000 447 520 391 680 427 100 463 230 499 980
275 000 000 386 090 422 340 460 030 498 520 537 700
300 000 000 414 150 452 420 492 300 533 070 574 610
400 000 000 533 930 568 010 616 000 665 280 705 200
500 000 000 636 950 677 610 732 970 790 030 837 430
750 000 000 877 730 933 750 1 005 300 1 079 600 1 144 370
1 000 000 000 1 101 940 1 172 280 1 257 910 1 347 370 1 428 210
1 250 000 000 1 314 610 1 398 520 1 496 790 1 600 010 1 696 010
1 500 000 000 1 518 490 1 615 420 1 725 270 1 841 220 1 951 690
2 000 000 000 1 906 400 2 028 080 2 158 780 2 297 880 2 435 760
2 500 000 000 2 274 310 2 419 480 2 568 730 2 728 760 2 892 480
3 000 000 000 2 627 030 2 794 720 2 960 850 3 140 130 3 328 540
3 500 000 000 2 967 610 3 157 030 3 338 720 3 535 960 3 748 120
4 000 000 000 3 298 120 3 508 640 3 704 820 3 918 960 4 154 100


Blackboard 2engineering intermediate values are linear to interpolate. Construction costs in DMZone 1
DMZone 2
DMZone 3
DMZone 4
DMZone 5
DM
50 000 580 730 880 1 030 1 180
60 000 680 850 1 020 1 190 1 360
70 000 760 950 1 150 1 340 1 530
80 000 850 1 060 1 270 1 480 1 690
90 000 930 1 160 1 390 1 620 1 850
100 000 1 020 1 260 1 510 1 760 2 000
150 000 1 410 1 740 2 070 2 400 2 730
200 000 1 780 2 180 2 590 2 990 3 390
300 000 2 470 3 010 3 550 4 090 4 620
400 000 3 110 3 780 4 440 5 100 5 760
500 000 3 730 4 500 5 280 6 050 6 830
600 000 4 320 5 200 6 080 6 960 7 840
700 000 4 890 5 870 6 860 7 840 8 820
800 000 5 450 6 530 7 610 8 690 9 770
900 000 5 990 7 160 8 340 9 510 10 690
1 000 000 6 520 7 780 9 050 10 310 11 580
1 500 000 9 040 10 720 12 410 14 090 15 780
2 000 000 11 400 13 460 15 520 17 590 19 650
3 000 000 15 810 18 550 21 290 24 030 26 770
4 000 000 19 930 23 290 26 640 29 990 33 340
5 000 000 23 860 27 780 31 700 35 620 39 530
6 000 000 27 640 32 090 36 540 40 990 45 440
7 000 000 31 300 36 250 41 200 46 150 51 110
8 000 000 34 860 40 290 45 720 51 160 56 590
9 000 000 38 330 44 230 50 120 56 020 61 910
10 000 000 41 730 48 070 54 410 58 510 67 100
15 000 000 57 860 66 260 74 650 83 050 91 440
20 000 000 72 970 83 200 93 440 103 670 113 900
30 000 000 101 190 114 700 128 210 141 720 155 230
40 000 000 127 620 144 050 160 490 176 920 193 360
50 000 000 152 780 171 900 191 030 210 160 229 290
60 000 000 166 960 187 040 207 360 227 820 248 400
70 000 000 189 060 211 280 233 820 256 530 279 410
80 000 000 210 560 234 810 259 460 284 320 309 380
90 000 000 231 540 257 740 284 400 311 320 338 470
100 000 000 252 070 280 130 308 730 337 630 366 810
110 000 000 272 210 302 060 332 530 363 350 394 480
120 000 000 292 000 323 580 355 860 388 530 421 560
130 000 000 311 460 344 720 378 760 413 240 448 100
140 000 000 330 650 365 530 401 280 437 510 474 170
150 000 000 349 560 386 020 423 440 461 380 499 800
160 000 000 368 240 406 240 445 280 484 900 525 030
170 000 000 386 690 426 190 466 820 508 070 549 890
180 000 000 404 930 445 890 488 080 530 940 574 400
190 000 000 422 970 465 370 509 080 553 520 598 600
200 000 000 440 840 484 630 529 840 575 820 622 490
225 000 000 484 760 531 940 580 760 630 500 681 020
250 000 000 527 750 578 160 630 450 683 790 738 040
275 000 000 569 910 623 420 679 060 735 870 793 710
300 000 000 611 340 667 830 726 690 786 870848 190


panel 3Oberbaumediate values are linear to interpolate.Construction costs in DMZone 1
DMZone 2
DMZone 3
DMZone 4
DMZone 5
DM
50 000 640 800 970 1 130 1 300
60 000 740 930 1 110 1 300 1 490
70 000 840 1 050 1 250 1 460 1 670
80 000 930 1 160 1 390 1 620 1 850
90 000 1 020 1 270 1 520 1 770 2 020
100 000 1 110 1 380 1 650 1 920 2 190
150 000 1 530 1 890 2 250 2 610 2 970
200 000 1 930 2 370 2 800 3 240 3 680
300 000 2 650 3 230 3 810 4 390 4 970
400 000 3 310 4 020 4 720 5 430 6 130
500 000 3 930 4 750 5 570 6 380 7 200
600 000 4 510 5 440 6 360 7 280 8 200
700 000 5 070 6 090 7 100 8 120 9 140
800 000 5 590 6 700 7 810 8 920 10 030
900 000 6 090 7 290 8 480 9 680 10 870
1 000 000 6 570 7 850 9 120 10 400 11 670
1 500 000 8 690 10 310 11 920 13 540 15 160
2 000 000 10 420 12 310 14 190 16 080 17 960
3 000 000 14 450 16 960 19 460 21 970 24 480
4 000 000 18 220 21 290 24 350 27 420 30 490
5 000 000 21 820 25 400 28 980 32 560 36 150
6 000 000 25 270 29 340 33 410 37 470 41 540
7 000 000 28 620 33 140 37 670 42 200 46 730
8 000 000 31 870 36 840 41 810 46 770 51 740
9 000 000 35 040 40 430 45 830 51 220 56 610
10 000 000 38 150 43 950 49 750 55 550 61 350
15 000 000 52 910 60 580 68 250 75 930 83 600
20 000 000 66 720 76 070 85 430 94 780 104 130
30 000 000 92 520 104 870 117 220 129 570 141 920
40 000 000 116 680 131 700 146 730 161 760 176 780
50 000 000 139 680 157 170 174 660 192 150 209 630
60 000 000 157 100 175 980 195 100 214 350 233 720
70 000 000 177 890 198 800 220 000 241 370 262 900
80 000 000 198 120 220 940 244 130 267 520 291 100
90 000 000 217 860 242 510 267 590 292 920 318 470
100 000 000 237 180 263 580 290 490 317 680 345 130
110 000 000 256 120 284 210 312 880 341 880 371 160
120 000 000 274 740 304 450 334 830 353 070 396 640
130 000 000 293 060 324 350 356 380 388 820 421 620
140 000 000 311 110 343 920 377 560 411 650 446 150
150 000 000 328 910 363 210 398 420 434 120 470 270
160 000 000 346 480 382 230 418 960 456 240 494 010
170 000 000 363 840 401 000 439 230 478 050 517 390
180 000 000 380 980 419 540 459 230 499 560 540 460
190 000 000 397 980 437 870 478 990 520 800 563 220
200 000 000 414 780 455 990 498 520 541 790 585 700
225 000 000 456 110 500 510 546 440 593 240 640 780
250 000 000 496 560 543 990 593 200 643 380 694 420
275 000 000 536 230 586 580 638 930 692 380 746 800
300 000 000 575 210 628 360 683 750 740 370 798 070
400 000 000 741 570 788 900 855 550 924 000 979 440
500 000 000 884 660 941 120 1 018 020 1 097 260 1 163 100
750 000 000 1 219 060 1 296 880 1 396 260 1 499 440 1 589 410
1 000 000 000 1 530 480 1 628 170 1 747 090 1 871 340 1 983 620
1 250 000 000 1 825 840 1 942 390 2 078 870 2 222 230 2 355 570
1 500 000 000 2 109 020 2 243 630 2 396 210 2 557 250 2 710 680
2 000 000 000 2 647 770 2 816 780 2 998 300 3 191 510 3 383 000
2 500 000 000 3 158 760 3 360 380 3 567 680 3 789 940 4 017 340
3 000 000 000 3 648 660 3 881 550 4 112 290 4 361 290 4 622 970
3 500 000 000 4 121 680 4 384 760 4 637 110 4 911 060 5 205 720
4 000 000 000 4 580 720 4 873 110 5 145 580 5 443 000 5 769 580


Blackboard 4HochbautenInterim values are linear to interpolate. Construction costs in DMZone 1
DMZone 2
DMZone 3
DMZone 4
DMZone 5
DM
50 000 490 590 730 940 1 080
60 000 580 710 870 1 120 1 290
70 000 680 830 1 020 1 310 1 500
80 000 780 940 1 160 1 490 1 710
90 000 870 1 060 1 310 1 680 1 920
100 000 970 1 170 1 440 1 850 2 120
200 000 1 940 2 320 2 830 3 590 4 100
300 000 2 910 3 440 4 140 5 200 5 900
400 000 3 880 4 530 5 390 6 680 7 540
500 000 4 850 5 590 6 580 8 070 9 060
600 000 5 600 6 470 7 630 9 380 10 540
700 000 6 220 7 240 8 600 10 630 11 990
800 000 6 760 7 930 9 480 11 800 13 350
900 000 7 220 8 530 10 270 12 890 14 640
1 000 000 7 580 9 030 10 970 13 880 15 820
2 000 000 13 790 16 350 19 750 24 860 28 260
3 000 000 20 010 23 660 28 530 35 830 40 700
4 000 000 26 220 30 970 37 300 46 800 53 130
5 000 000 32 430 38 280 46 080 57 770 65 570
6 000 000 38 920 45 500 54 270 67 430 76 210
7 000 000 45 400 52 710 62 470 77 090 86 840
8 000 000 51 890 59 930 70 660 86 750 97 480
9 000 000 58 370 67 150 78 850 96 410 108 110
10 000 000 64 860 74 370 87 050 106 070 118 750
20 000 000 129 720 147 430 171 040 206 460 230 070
30 000 000 194 580 219 170 251 970 301 160 333 950
40 000 000 259 440 289 610 329 830 390 170 430 400
50 000 000 324 290 360 370 408 470 480 610 528 710
60 000 000 364 690 403 150 455 420 534 090 586 040
70 000 000 421 220 464 070 522 790 611 040 669 080
80 000 000 475 210 522 460 587 080 684 680 748 250
90 000 000 527 260 578 050 648 650 754 940 824 340
100 000 000 577 460 632 050 707 680 822 840 896 030
110 000 000 626 090 684 250 765 280 888 170 965 550
120 000 000 673 610 734 450 820 600 951 630 1 032 860
130 000 000 719 960 784 010 875 160 1 013 150 1 099 010
140 000 000 765 060 832 160 928 110 1 073 730 1 164 110
150 000 000 809 650 879 700 980 350 1 133 460 1 228 260
160 000 000 852 900 925 760 1 030 900 1 191 230 1 290 260
170 000 000 895 630 971 230 1 080 770 1 248 170 1 351 350
180 000 000 937 880 1 016 130 1 129 990 1 304 340 1 411 590
190 000 000 979 680 1 060 520 1 178 620 1 359 800 1 471 040
200 000 000 1 021 050 1 104 420 1 226 680 1 414 590 1 529 760
225 000 000 1 122 790 1 212 240 1 344 580 1 548 910 1 673 610
250 000 000 1 222 350 1 317 560 1 459 620 1 679 840 1 813 710
275 000 000 1 320 010 1 420 710 1 572 150 1 807 790 1 950 530
300 000 000 1 415 960 1 521 900 1 682 440 1 933 0802 084 420
Non-Official Table of Contents

Appendix 4 (to § 2 para. 1 i. V. m. § 7 para. 3)
fee list

(Fundstelle: BGBl. I 2008, 594-610)

Part IFees for individually attributable public services of the Railways-BundesamtesSection 1Individually attributable public services according to the AEG

No.CounterstandLegal base fee
border-right: 0.5pt solid; border-bottom: 0.5pt solid; "
1.1Baufreigifts, Abassumptions, Tests, Approvals, Approvals and Monitors for Construction, Change, Maintenance and operation of the operating facilities and for rail vehicles § 6 para. 3 PflSchG i. V. m. § 4 para. 2 AEG,
§ 4 BImSchG i. V. m. § 4 para. 2 AEG,
§ 8 BImSchG i. V. m. § 4 (2) AEG,
§ 8a BImSchG i. V. m. § 4 para. 2 AEG,
§ 9 BImSchG i. V. m. § 4 para. 2 AEG,
§ 16 BImSchG i. V. m. § 4 para. 2 AEG,
§ 17 BImSchG i. V. m. § 4 para. 2 AEG,
§ 20 BImSchG i. V. m. § 4 para. 2 AEG,
§ 21 BImSchG i. V. m. § 4 para. 2 AEG,
§ 24 BImSchG i. V. m. § 4 para. 2 AEG,
§ 25 BImSchG i. V. m. § 4 para. 2 AEG,
§ 26 BImSchG i. V. m. § 4 para. 2 AEG,
§ 29 BImSchG i. V. m. § 4 (2) AEG,
§ 29a BImSchG i. V. m. § 4 para. 2 AEG,
§ 31 BImSchG i. V. m. § 4 (2) AEG,
§ 52 BImSchG i. V. m. § 4 (2) AEG,
§ 53 BImSchG i. V. m. § 4 (2) AEG,
§ 58a BImSchG i. V. m. § 4 para. 2 AEG,
§ 20 BImSchV 1 i. V. m. § 4 para. 2 AEG,
§ 1 BImSchV 5 i. V. m. § 4 para. 2 AEG,
§ 2 BImSchV 5 i. V. m. § 4 para. 2 AEG,
§ 4 BImSchV 5 i. V. m. § 4 para. 2 AEG,
§ 5 BImSchV 5 i. V. m. § 4 para. 2 AEG,
§ 6 BImSchV 5 i. V. m. § 4 para. 2 AEG,
§ 8 BImSchV 5 i. V. m. § 4 para. 2 AEG,
§ 9 BImSchV 5 i. V. m. § 4 para. 2 AEG,
§ 6 BImSchV 7 i. V. m. § 4 para. 2 AEG,
§ 6 BImSchV 11 i. V. m. § 4 para. 2 AEG,
§ 1 BImSchV 12 i. V. m. § 4 para. 2 AEG,
§ 6 BImSchV 12 i. V. m. § 4 para. 2 AEG,
§ 9 BImSchV 12 i. V. m. § 4 para. 2 AEG,
§ 16 BImSchV 12 i. V. m. § 4 para. 2 AEG,
§ 19 BImSchV 12 i. V. m. § 4 para. 2 AEG,
§ 26 BImSchV 13 i. V. m. § 4 para. 2 AEG,
§ 24 BImSchV 17 i. V. m. § 4 para. 2 AEG,
§ 8 BImSchV 26 i. V. m. § 4 para. 2 AEG,
§ 11 BImSchV 31 i. V. m. § 4 para. 2 AEG,
§ 3 BImSchV 34 i. V. m. § 4 para. 2 AEG,
§ 9 para. 2 BBodSchG
i. V. m. § 4 para. 2 AEG,
§ 10 para. 1 BBodSchG
i. V. m. § 4 para. 2 AEG,
§ 13 BBodSchG i. V. m. § 4 para. 2 AEG,
§ 14 sentence 1 BBodSchG
i. V. m. § 4 para. 2 AEG,
§ 15 para. 2 BBodSchG
i. V. m. § 4 para. 2 AEG,
§ 16 para. 1 BBodSchG
i. V. m. § 4 para. 2 AEG
based on time
1.2 Monitoring of railways within the framework of the railway supervision to comply with the regulations referred to in § 5 para. 1 AEG on suspicion of a complaint or for the purpose of a sample, if the suspicion or the complaint is caused by the person concerned or if a breach of a piece of legislation has been found § 5a para. 2 AEG after effort of 300 to 1 000 euros
1.3 Measures to eliminate detected violations and to prevent future violations of railway law regulations, unless otherwise specified. § 5a para. 2 AEG based on time
1.4 Examination of new construction products and designs as well as railway-specific construction products and construction types and issuing of a corresponding certificate with responsibility caused or justified suspicion or on request § 5a para. 2 AEG by time
1.5 Examination of a type approval for railway-specific constructional facilities and issuing of a corresponding certificate with responsible or reasonable suspicion or on request § 5a para. 2 AEG by time
1.6 Examination of a new or modified form or -type (type approval) of signal, telecommunication and electrical equipment and issuing of a corresponding certificate in case of suspected or justified suspicion or on request § 5a para. 2 AEG by time
1.7 Protocol-based audit of certain components or construction work and issuing a corresponding
certificate in case of suspected or
justified suspicion, or on request
§ 5a para. 2 AEG based on time
1.8 Approval of a rail transport company, holder, or railway infrastructure company § 6 AEG 5 000 Euro
1.9 Change permission for a railroad-
§ 6 AEG 2 500 Euro
1.10 Decision on permission to hold
of the operation
§ 7a AEG based on time
1.11 Decision on delivery and decommissioning
of railway infrastructure facilities
§ 11 AEG 3 000 Euro
1.12 Parts of a security certificate § 14 para. 7 AEG by time
1.13 Freistellen von BahnoperationPurpose § 23 para. 1 AEG by time


Section 2Individually attributable public services according to the AEG i. V. m. VwVfG

Nr.CounterstandLegal Base Charge
2.1 Plan fix:
-Construction of new Operating assets
-Change existing operating assets
§ 18 para. 1 AEG i. V. m. Section 74 (1) VwVfG according to panel 1 of the attachment
2.2 Plan Approval § 18 para. 2 AEG i. V. m. § 74 VwVfG 50% of the fee according to No. 2.1
2.3 Decision on the determination of the plan setting and planning permission § 18 para. 3 i. V. m. Par. 1 AEG 25% of the fee according to No. 2.1
2.4 Repeal of the planning approval decision or the planning permission after construction start § 20 para. 7 AEG i. V. m. § 77 VwVfG after time spent up to 75% of the fee according to No. 2.1 or No. 2.2
2.5 Building technical examination of the building templates § 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG 500 Euro to
1 500 000 Euro
2.6 Approval of execution planning including construction supervision and acceptance for civil engineering § 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG after panel 2
of the attachment
2.7 Approval of execution planning including construction supervision and acceptance for superstructure § 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG according to panel 3
of the attachment
2.8 Approval of execution planning including construction supervision and acceptance for building construction § 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG according to panel 4
of the attachment
2.9 Checking changed building templates for planning walls-
rungen with a volume of more than 1/20 of the original planning in the Engineer, superstructure or superstructure
§ 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG according to No. 2.6, 2.7 or No. 2.8, multiply with the ratio of the scope of the change planning to the scope of the original planning
2.10 Approval of the Execution planning including construction supervision and removal of conversions of a
existing installation with essential interventions in constructions or stock in the engineering, upper
or building construction
§ 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG nach Nr. 2.6,
2.7 or Nr. 2.8, plus a supplement of
20 to 50% depending on the difficulty level; the cost of canceling the construction costs are attributed to the construction costs
2.11 Approval of execution planning for the demolition or removal of assets, including construction supervision and acceptance in the engineering, upper or high-end construction § 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG based on time
2.12 Approval of execution planning for signal, telecommunication and electrical equipment § 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG by time
2.13 Construction inspection of a signal, telecommunication and electrical engineering system including construction supervision during construction work § 18 AEG i. V. m. § 74 para. 2 sentence 2 VwVfGby time


Section 3Individually attributable public services according to the EBV, EBPV

No.CounterstandLegal base fee
3.1 Confirmation of the order of an operating manager
or a deputy
§ 2 EBV 150 Euro
3.2 Decision on approval for audit as operations manager § 9 EBPV 330 Euro
3.3 performing an operational ladder check § § 13, 14, 20, 21, 22 EBPV 1 850 Euro
3.4 Run the replay check
a)
three audit subjects repeat-checking
b)
Two Audit Subjects
c)
Repeating Review with a Check
§ 23 EBPV
a)
1 730 Euro
b)
1 610 Euro
c)
1 490 Euro


Section 4Individually attributable public services after EBO, ESBO, and ESO 1959

Nr.CounterstandLegal base fee
4.1 Exceptions to EBO/ESBO § 3 para. 1 no. 2 letter a EBO or ESBO by time
4.2 Approvals to EBO/ESBO § 3 para. 2 No. 1 EBO
or ESBO
by time
4.3 Accepting a vehicle in scope
of the EBO
§ 32 para. 1 EBO by time
4.4Apportionable assets: Testing of a new or modified design; testing before commissioning; periodic tests; exceptions and issuing of a corresponding certificate § 33 para. 4 i. V. m. Paragraph 1
EBO
by time
4.5 Approval of deviations from the
railroad signal order
Section A, letter a, paragraph 4 ESO 1959 by time


Section 5 Individual attributable public services after the EIBV

Nr.CounterstandLegal base fee
5.1 Consent to collection of charges for
lack of travel capacity
§ 18 para. 4 EIBV by time
5.2 Exception approval pursuant to § 14 para. 4 AEG § 22 para. 1 no. 1 EIBVby time


Section 6Individually attributable public services after the EIV

Nr.CounterstandLegal base fee
6.1 Approval for the commissioning of a structural subsystem within the scope of the trans-European High-speed rail system § 2 No. 1 EIV after Time required
6.2 Monitoring the conformity and suitability for use of interoperability constituents within the scope of the trans-European high-speed rail system on the basis of a suspicion, a complaint or a sample; if the suspicion or complaint is caused by the person concerned or if a breach of a piece of legislation has been found § 5a paragraph 2 AEG i. V. m. § 2 No. 2 EIV based on time
6.3 Monitoring the application and compliance of the
TSI within the scope of the trans-European high-speed rail system due to a Suspected, a complaint or for the purpose of a sample, if the suspicion or the complaint was caused by the person concerned or a violation of a piece of law was found
§ 5a paragraph 2 AEG i. V. m. § 2 No. 3 letter a EIV based on time
6.4 Admission of exceptions to the application of certain TSIs within the scope of the trans-European High-speed rail system § 2 No. 4 EIV after Time required
6.5 Recognition of a notified body within the scope of the trans-European high-speed rail system § 3 para. 3 to 6 EIV i. V. m. § 2 No. 5 EIV based on time
6.6 Evaluation of the conformity and suitability for use-
of an interoperability constituent and issuing a corresponding certificate in the Scope of the trans-European high-speed rail system
§ 3 para. 1 no. 1 EIV by time
6.7 EC verification of a Subsystem and issuing of a corresponding certificate in the field of application of the trans-European high-speed rail system § 3 para. 1 no. 2 EIV by time


Section 7Individually attributable public services after the KonVEIV

Nr.CounterstandLegal base fee
7.1 Approval for the commissioning of a structural subsystem within the scope of the conventional trans-European Railroad systems § 4 para. 3 KonVEIV also
i. V. m. § 5 para. 1 KonVEIV
based on time
7.2 Approval of a structural subsystem, for
that is not TSI, within the scope of the conventional trans-European Railroad systems
§ 4 para. 4 KonVEIV after Time required
7.3 Approval for sample and transfer journeys
within the scope of the conventional
trans-European rail system
§ 4 para. 6 KonVEIV based on time
7.4 Admission of exceptions to the application of certain TSIs within the scope of the conventional
Railroad systems
§ 5 para. 2 KonVEIV after Time required
7.5 Start-up of a significantly upgraded
structural subsystem within the scope of the trans-European conventional rail system
§ 8 para. 1 KonVEIV based on time
7.6 Approval of exceptions to the permit requirement for significantly modified structural
Sub-systems within the scope of the trans-European conventional rail system
§ 8 para. 2 KonVEIV based on time
7.7 Evaluation of the conformity and suitability for use of an interoperability constituent and issuing
of a corresponding certificate within the scope of the conventional trans-European rail systems
§ 10 para. 1 no. 1 KonVEIV by time
7.8 EG-Review of a subsystem and display a certificate of conformity within the scope of the conventional trans-European rail system § 10 para. 1 no. 2 KonVEIV By


Section 8Individually attributable public performance after the ArbSchG

Nr.CounterstandLegal fee
8.1 Arrangement of measures for work protection § 22 para. 3 ArbSchGafter Time


Section 9Individually attributable public services after the IfSG

Nr.CounterstandLegal fee
9.1 Checking the water supply systems in the
rail vehicles
§ 39 IfSG, § § 18, 19, 20 TrinkwV 400 Euro
9.2 Verify fixed assets for
exclusive filling of rail vehicles;
up to 10 hydrants
§ 39 IfSG, § § 18, 19, 20 TrinkwV 800 Euro
9.3 Verify fixed assets on
exclusive filling of rail vehicles;
11 to 50 hydrants
§ 39 IfSG, § § 18, 19, 20 TrinkwV 1 000 Euro
9.4 Checking fixed assets for
exclusive filling of rail vehicles;
51 to 100 Hydrants
§ 39 IfSG, § § 18, 19, 20 TrinkwV 1 350 Euro
9.5 Check the fixed assets for
exclusive filling of Rail vehicles;
101 to 200 Hydrants
§ 39 IfSG, § § 18, 19, 20 TrinkwV 1 500 Euro
9.6 Check the fixed installations for the
exclusive filling of rail vehicles; more than 200 hydrants
§ 39 IfSG, § § 18, 19, 20 TrinkwV 2 000 Euro
9.7 Decision on measures in the event of non-compliance with limit values and requirements § 39 IfSG, § 9 TrinkwV by time
9.8 Infection hygiene monitoring of the
waste water disposal systems in the rail vehicles and in the fixed installations for the exclusive disposal of rail vehicles
§ 41 IfSG400


Section 10Other individually attributable public services

Nr.CounterstandLegal fee
10.1 Changing, extending, and extending the Validity
of the management act
by time, up to half of the fee for the
Administrative


Part IICharges for individually attributable public services of the Federal Network Agency
for Electricity, Gas, Telecommunications, Post and Railways

Nr.CounterstandLegal base fee
1 Approval of the term of a framework contract on the use of train paths § 14a para. 2 AEG by time
2 Monitoring access to the Railway infrastructure based on a suspicion, a complaint or for the purpose of a sample, if the suspected or the complaint is caused by the person concerned or if a breach of a piece of law has been established § 14c para. 1 AEG by time
3 Measures in violation of Rules on access to railway infrastructure: § 14c para. 1 AEG by time
4 Examination of the intended decisions to be notified in advance, in so far as the intended decisions do not comply with the rules of the railway law on access to the railway infrastructure and do not conflict with § 14e para. 1 AEG occurs § 14e para. 1 AEG after Time required
5 contradiction against pre-participating intended decisions according to § 14d AEG § 14e para. 1 AEG based on time
6 Monitoring access to the railway infrastructure due to a suspicion, a complaint, or for the purpose of a sample, if the suspicion or complaint of the Concerned, or a violation of a piece of legislation was found § 14f para. 1 AEG by time
7 Measures in the case of infringements of rules on access to railway infrastructure, § 14f para. 1 sentence 2 or para. 3 i. V. m. Par. 2 AEGby time


Attachment to the fee list Part IApplication of the charge panels
1.
The fee measurement for the numbers 2.1 to 2.4 and 2.6 to 2.10 depends on the construction costs and on the level of difficulty in charge zones. Rating properties.
2.
The cost of the fee is not included in the cost of the fee for:
a)
the acquisition, the freeming, the building, and the development of the plot,
b)
Winterbauschutzvorconversions,
c)
surveying and marketing,
d)
Compensation and Damage Services,
e)
Baunflat Cost,
f)
Artworks and artistically designed components, as far as they are not essential parts of the object.
3.
The cost of signal, telecommunications and electrical equipment is not included in the cost of measurement according to the tables 2 and 4.
4.
For panels 1 and 3, the operating assets will be attributed to the following charge zones:
a)
Zone 1: Objects with very low planning requirements, for example: B. Operating systems without switches and crossings, unless mentioned in zones 2 to 5, simple traffic areas;
b)
Zone 2: Objects with low planning requirements, For example: B. Operating systems of the free route without any special compulsion points, operating facilities of the free route in the little moving terrain, operating facilities of the stations with simple track plans;
c)
Zone 3: Objects with average planning requirements, for example: Internal operating facilities, unless mentioned in Zone 4, operating systems of the free route with special forced points, operating systems of the free route in the moving terrain, operating systems of the stations with difficult Track plans;
d)
Zone 4: Objects with above-average planning requirements, for example, (b) difficult internal facilities, operating installations of the free route with a large number of specific compultrating points, operating installations of the free route in the heavily moved terrain, operating facilities of the stations with very difficult track plans, Transport space for combined transport freight transport;
e)
Zone 5: Objects with very high planning requirements, e.g. B. very difficult domestic facilities.
5.
For Table 2, the engineering structures are charged with the following charge zones:
a)
Zone 1: Objects with very low planning requirements, for example:
b)
Zone 2: Objects with low planning requirements, e. g. for the use of the Municipal Waste Water (BGN), the Municipal Waste Water (NWI), the Municipal Waste Water (HGN), B. Dammbauts, as far as not mentioned in Zone 3 or 4, straight single-field bridges of simple design, support structures with traffic load, simple noise protection systems, lines for water and waste water with small links and few ZwangPoints;
c)
Zone 3: Objects with average planning requirements, for example: B. difficult dams, single-field bridges, as far as not mentioned in Zone 2 or 4, simple multi-field and arched bridges, support structures with anchorage, simple tunnel and trough structures, simple underground stations, lines for water or waste water with numerous links and numerous coercion points;
d)
Zone 4: Objects with above-average planning requirements, e.g. Particularly difficult dams, difficult fields of single-field, multi-field and arched bridges, noise protection systems in difficult urban planning situations, difficult tunnel and trough structures, difficult underground stations, if not in Zone 5 ;
e)
Zone 5: Objects with very high planning requirements, for example: Particularly difficult bridges, particularly difficult tunnel and trogling structures, underground crossing stations.
6.
The charge zone of the panel 4 is used for high-rise buildings Based on the following rating characteristics:
a)
Zone 1: Building with very low Planning requirements, that is, with
-
very low requirements for integration into the Environment,
-
a functional area,
-
very small design Requirements,
-
simplest constructions,
-
none or more technical Equipment,
-
No or one removal;
b)
Zone 2: Building with low Planning requirements, that is, with
-
low requirements for integration into the Environment,
-
few functional areas,
-
small design requirements,
-
simple constructions,
-
less technical Equipment,
-
low expansion;
c)
Zone 3: Buildings with average Planning requirements, that is,
-
Average requirements for inclusion in the Environment,
-
Multiple Simple Functional Areas,
-
Average Design requirements,
-
normal or common constructions,
-
average technical equipment,
-
normal build-up;
d)
zone 4: Buildings with above-average planning requirements, that is, with
-
above-average Requirements for inclusion in the environment,
-
multiple functional areas with multiple relationships,
-
above-average design requirements,
-
above-average constructive requirements,
-
above-average technical equipment,
-
above-average Expansion;
e)
Zone 5: Building with very high planning requirements, that is, with
-
very high requirements for integration into the environment,
-
a wide variety of functional areas with comprehensive relationships,
-
very high design Requirements,
-
very high constructive requirements,
-
a diverse technical Equipment with high technical requirements,
-
high-quality expansion.
Table 1Planting intermediate values are linearly to interpolate.Construction costs in EuroZone 1
EuroZone 2
EuroZone 3
EuroZone 4
EuroZone 5
Euro
25 000 280 360 440 500 580
30 000 330 420 500 580 660
35 000 370 470 560 650 740
40 000 420 520 620 720 820
45 000 460 670 690 790 910
50 000 500 610 740 860 980
75 000 690 850 1 010 1 170 1 330
100 000 860 1 060 1 260 1 450 1 650
150 000 1 190 1 450 1 700 1 960 2 220
200 000 1 490 1 800 2 120 2 430 2 740
250 000 1 750 2 120 2 500 2 860 3 220
300 000 2 020 2 430 2 850 3 260 3 670
350 000 2 270 2 720 3 180 3 640 4 100
400 000 2 500 3 000 3 500 3 990 4 490
450 000 2 720 3 260 3 800 4 340 4 870
500 000 2 940 3 510 4 090 4 660 5 230
750 000 3 890 4 610 5 340 6 070 6 800
1 000 000 4 660 5 510 6 360 7 210 8 030
1 500 000 6 470 7 590 8 690 9 860 11 000
2 000 000 8 180 9 560 10 900 12 300 13 700
2 500 000 9 780 11 400 13 000 14 600 16 200
3 000 000 11 300 13 100 15 000 16 800 18 600
3 500 000 12 800 14 800 16 900 18 900 21 000
4 000 000 14 300 16 500 18 700 21 000 23 100
4 500 000 15 700 18 100 20 500 22 900 25 300
5 000 000 17 100 19 700 22 300 24 900 27 400
7 500 000 23 700 27 200 30 600 34 000 37 400
10 000 000 29 900 34 100 38 300 42 500 46 600
15 000 000 43 300 46 900 52 500 58 000 63 600
20 000 000 52 300 59 000 65 700 72 400 79 200
25 000 000 62 600 70 400 78 300 86 100 93 900
30 000 000 70 400 79 000 87 400 96 000 104 700
35 000 000 79 600 89 000 99 000 108 100 117 700
40 000 000 88 800 99 000 109 400 119 800 130 400
45 000 000 97 600 108 600 119 900 131 200 142 600
50 000 000 106 200 118 000 130 100 142 300 154 600
55 000 000 114 700 127 300 140 000 153 200 166 200
60 000 000 123 100 136 400 149 900 158 100 177 700
65 000 000 131 300 145 000 159 700 174 200 188 900
70 000 000 139 400 154 000 169 100 184 400 199 800
75 000 000 147 300 162 600 178 400 194 400 210 600
80 000 000 155 200 171 200 187 700 204 300 221 300
85 000 000 162 900 180 000 196 700 214 100 231 700
90 000 000 170 700 187 900 205 700 223 700 242 100
95 000 000 178 300 196 100 214 500 233 200 252 300
100 000 000 185 800 204 300 223 300 242 700 262 400
112 500 000 204 300 224 200 244 800 266 000 287 000
125 000 000 222 400 243 700 266 000 288 100 311 100
137 500 000 240 000 262 700 286 000 310 100 334 500
150 000 000 257 600 281 400 306 200 331 600 357 500
200 000 000 332 200 353 300 383 200 413 800 438 700
250 000 000 396 200 421 500 456 000 491 400 520 900
375 000 000 546 000 580 900 625 400 671 600 711 900
500 000 000 685 500 729 300 782 500 838 200 888 500
625 000 000 817 700 870 000 931 100 995 500 1 055 100
750 000 000 944 600 1 004 900 1 073 200 1 145 400 1 214 100
1 000 000 000 1 185 900 1 261 600 1 342 900 1 429 400 1 515 200
1 250 000 000 1 414 800 1 505 100 1 598 000 1 697 500 1 799 300
1 500 000 000 1 634 200 1 738 500 1 841 900 1 953 400 2 070 600
1 750 000 000 1 846 100 1 963 900 2 076 900 2 199 600 2 331 600
2 000 000 000 2 051 700 2 182 600 2 304 700 2 437 9002 584 100


Table 2engineering intermediate values are linear to interpolate. Construction Cost in EuroZone 1
EuroZone 2
EuroZone 3
EuroZone 4
EuroZone 5
Euro
25 000 300 370 450 530 600
30 000 350 430 520 610 700
35 000 390 490 590 690 780
40 000 430 540 650 760 860
45 000 480 590 710 830 950
50 000 520 640 770 900 1 020
75 000 720 890 1 060 1 230 1 400
100 000 910 1 110 1 320 1 530 1 730
150 000 1 260 1 540 1 820 2 090 2 360
200 000 1 590 1 930 2 270 2 610 2 950
250 000 1 910 2 300 2 700 3 090 3 490
300 000 2 210 2 660 3 110 3 560 4 010
350 000 2 500 3 000 3 510 4 010 4 510
400 000 2 790 3 340 3 890 4 440 5 000
450 000 3 060 3 660 4 260 4 860 5 470
500 000 3 330 3 980 4 630 5 270 5 920
750 000 4 620 5 480 6 350 7 200 8 070
1 000 000 5 830 6 880 7 940 8 990 10 000
1 500 000 8 080 9 480 10 900 12 300 13 700
2 000 000 10 200 11 900 13 600 15 300 17 000
2 500 000 12 200 14 200 16 200 18 200 20 200
3 000 000 14 100 16 400 18 700 21 000 23 200
3 500 000 16 000 18 500 21 100 23 600 26 100
4 000 000 17 800 20 600 23 400 26 200 28 900
4 500 000 19 600 22 600 25 600 28 600 31 700
5 000 000 21 300 24 600 27 800 29 900 34 300
7 500 000 29 600 33 900 38 200 42 500 46 800
10 000 000 37 300 42 500 47 800 53 000 58 200
15 000 000 51 700 58 600 65 600 72 500 79 400
20 000 000 65 300 73 700 82 100 90 500 98 900
25 000 000 78 100 87 900 97 700 107 500 117 200
30 000 000 85 400 95 600 106 000 116 500 127 000
35 000 000 96 700 108 000 119 600 131 200 142 900
40 000 000 107 700 120 100 132 700 145 400 158 200
45 000 000 118 400 131 800 145 400 159 200 173 100
50 000 000 128 900 143 200 157 900 172 600 187 500
55 000 000 139 200 154 400 170 000 185 800 201 700
60 000 000 149 300 165 400 181 900 198 700 215 500
65 000 000 159 200 176 300 193 700 211 300 229 100
70 000 000 169 100 186 900 205 200 223 700 242 400
75 000 000 178 700 197 400 216 500 235 900 255 500
80 000 000 188 300 207 700 227 700 247 900 268 400
85 000 000 197 700 217 900 238 700 259 800 281 200
90 000 000 207 000 228 000 249 600 271 500 293 700
95 000 000 216 300 237 900 260 300 283 000 306 100
100 000 000 225 400 247 800 270 900 294 400 318 300
112 500 000 247 900 272 000 296 900 322 400 348 200
125 000 000 269 800 295 600 322 300 349 600 377 400
137 500 000 291 400 318 700 347 200 376 200 405 800
150 000 000 312 600 341 500 371 600 402 300433 700


panel 3Upper building intermediate values are linear to interpolate. Construction costs in EuroZone 1
EuroZone 2
EuroZone 3
EuroZone 4
EuroZone 5
Euro
25 000 330 410 500 580 660
30 000 380 480 570 660 760
35 000 430 540 640 750 850
40 000 480 590 710 830 950
45 000 520 650 780 900 1 030
50 000 570 710 840 980 1 120
75 000 780 970 1 150 1 330 1 520
100 000 990 1 210 1 430 1 660 1 880
150 000 1 350 1 650 1 950 2 240 2 540
200 000 1 690 2 060 2 410 2 780 3 130
250 000 2 010 2 430 2 850 3 260 3 680
300 000 2 310 2 780 3 250 3 720 4 190
350 000 2 590 3 110 3 630 4 150 4 670
400 000 2 860 3 430 3 990 4 560 5 130
450 000 3 110 3 730 4 340 4 950 5 560
500 000 3 360 4 010 4 660 5 320 5 970
750 000 4 440 5 270 6 090 6 920 7 750
1 000 000 5 330 6 290 7 260 8 220 9 180
1 500 000 7 390 8 670 9 950 11 200 12 500
2 000 000 9 320 10 900 12 400 14 000 15 600
2 500 000 11 200 13 000 14 800 16 600 18 500
3 000 000 12 900 15 000 17 100 19 200 21 200
3 500 000 14 600 16 900 19 300 21 600 23 900
4 000 000 16 300 18 800 21 400 23 900 26 500
4 500 000 17 900 20 700 23 400 26 200 28 900
5 000 000 19 500 22 500 25 400 28 400 31 400
7 500 000 27 100 31 000 34 900 38 800 42 700
10 000 000 34 100 38 900 43 700 48 500 53 200
15 000 000 47 300 53 600 59 900 66 200 72 600
20 000 000 59 700 67 300 75 000 82 700 90 400
25 000 000 71 400 80 400 89 300 98 200 107 200
30 000 000 80 300 90 000 99 800 109 600 119 500
35 000 000 91 000 101 600 112 500 123 400 134 400
40 000 000 101 300 113 000 124 800 136 800 148 800
45 000 000 111 400 124 000 136 800 149 800 162 800
50 000 000 121 300 134 800 148 500 162 400 176 500
55 000 000 131 000 145 300 160 000 174 800 189 800
60 000 000 140 500 155 700 171 200 180 500 202 800
65 000 000 149 800 165 800 182 200 198 800 215 600
70 000 000 159 100 175 800 193 000 210 500 228 100
75 000 000 168 200 185 700 203 700 222 000 240 400
80 000 000 177 200 195 400 214 200 233 300 252 600
85 000 000 186 000 205 000 224 600 244 400 264 500
90 000 000 194 800 214 500 234 800 255 400 276 300
95 000 000 203 500 223 900 244 900 266 300 288 000
100 000 000 212 100 233 100 254 900 277 000 299 500
112 500 000 233 200 255 900 279 400 303 300 327 600
125 000 000 253 900 278 100 303 300 329 000 355 100
137 500 000 274 200 299 900 326 700 354 000 381 800
150 000 000 294 100 321 300 349 600 378 500 408 000
200 000 000 379 200 403 400 437 400 472 400 500 800
250 000 000 452 300 481 200 520 500 561 000 594 700
375 000 000 623 300 663 100 713 900 766 700 812 700
500 000 000 782 500 832 500 893 300 956 800 1 014 200
625 000 000 933 500 993 100 1 062 900 1 136 200 1 204 400
750 000 000 1 078 300 1 147 100 1 225 200 1 307 500 1 385 900
1 000 000 000 1 353 800 1 440 200 1 533 000 1 631 800 1 729 700
1 250 000 000 1 615 000 1 718 100 1 824 100 1 937 800 2 054 000
1 500 000 000 1 865 500 1 984 600 2 102 600 2 229 900 2 363 700
1 750 000 000 2 107 400 2 241 900 2 370 900 2 511 000 2 661 600
2 000 000 000 2 342 100 2 491 600 2 630 900 2 783 0002 949 900


Table 4High-building intermediate values are linearly to interpolate.Construction costs in EuroZone 1
EuroZone 2
EuroZone 3
EuroZone 4
Euro
25 000 250 300 370 480
30 000 300 360 440 570
35 000 350 420 520 670
40 000 400 480 590 760
45 000 440 540 670 860
50 000 500 600 740 950
100 000 990 1 190 1 450 1 840
150 000 1 490 1 760 2 120 2 660
200 000 1 980 2 320 2 760 3 420
250 000 2 480 2 860 3 360 4 130
300 000 2 860 3 310 3 900 4 800
350 000 3 180 3 700 4 400 5 440
400 000 3 460 4 050 4 850 6 030
450 000 3 690 4 360 5 250 6 590
500 000 3 880 4 620 5 610 7 100
1 000 000 7 050 8 360 10 100 12 700
1 500 000 10 200 12 100 14 600 18 300
2 000 000 13 400 15 800 19 100 23 900
2 500 000 16 600 19 600 23 600 29 500
3 000 000 19 900 23 300 27 700 34 500
3 500 000 23 200 27 000 31 900 39 400
4 000 000 26 500 30 600 36 100 44 400
4 500 000 29 800 34 300 40 300 49 300
5 000 000 33 200 38 000 44 500 54 200
10 000 000 66 300 75 400 87 500 105 600
15 000 000 99 500 112 100 128 800 154 000
20 000 000 132 600 148 100 168 600 199 500
25 000 000 165 800 184 300 208 800 245 700
30 000 000 186 500 206 100 232 900 273 100
35 000 000 215 400 237 300 267 300 312 400
40 000 000 243 000 267 100 300 200 350 100
45 000 000 269 600 295 600 331 600 386 000
50 000 000 295 300 323 200 361 800 420 700
55 000 000 320 100 349 900 391 300 454 100
60 000 000 344 400 375 500 419 600 486 600
65 000 000 368 100 400 900 447 500 518 000
70 000 000 391 200 425 500 474 500 549 000
75 000 000 414 000 449 800 501 200 579 500
80 000 000 436 100 473 300 527 100 609 100
85 000 000 457 900 496 600 552 600 638 200
90 000 000 479 500 519 500 577 800 666 900
95 000 000 500 900 542 200 602 600 695 300
100 000 000 522 100 564 700 627 200 723 300
112 500 000 574 100 619 800 687 500 791 900
125 000 000 625 000 673 700 746 300 858 900
137 500 000 674 900 726 400 803 800 924 300
150 000 000 724 000 778 100 860 200988 400
Non-official table of contents

Appendix 5 (to § 2 para. 1 i. V. m. § 7 para. 4)
fee list

(Fundstelle: BGBl. I 2008, 611-627)

Part IFees for individually attributable public services of the Railways-BundesamtesSection 1Individually attributable public services according to the AEG

No.CounterstandLegal base fee
1.1Baufreigifts, Abassumptions, Tests, Approvals, Approvals and Monitors for Construction, Change, Maintenance and operation of the operating facilities and for rail vehicles § 6 para. 3 PflSchG i. V. m. § 4 para. 2 AEG,
§ 4 BImSchG i. V. m. § 4 para. 2 AEG,
§ 8 BImSchG i. V. m. § 4 (2) AEG,
§ 8a BImSchG i. V. m. § 4 para. 2 AEG,
§ 9 BImSchG i. V. m. § 4 para. 2 AEG,
§ 16 BImSchG i. V. m. § 4 para. 2 AEG,
§ 17 BImSchG i. V. m. § 4 para. 2 AEG,
§ 20 BImSchG i. V. m. § 4 para. 2 AEG,
§ 21 BImSchG i. V. m. § 4 para. 2 AEG,
§ 24 BImSchG i. V. m. § 4 para. 2 AEG,
§ 25 BImSchG i. V. m. § 4 para. 2 AEG,
§ 26 BImSchG i. V. m. § 4 para. 2 AEG,
§ 29 BImSchG i. V. m. § 4 (2) AEG,
§ 29a BImSchG i. V. m. § 4 para. 2 AEG,
§ 31 BImSchG i. V. m. § 4 (2) AEG,
§ 52 BImSchG i. V. m. § 4 (2) AEG,
§ 53 BImSchG i. V. m. § 4 (2) AEG,
§ 58a BImSchG i. V. m. § 4 para. 2 AEG,
§ 20 BImSchV 1 i. V. m. § 4 para. 2 AEG,
§ 1 BImSchV 5 i. V. m. § 4 para. 2 AEG,
§ 2 BImSchV 5 i. V. m. § 4 para. 2 AEG,
§ 4 BImSchV 5 i. V. m. § 4 para. 2 AEG,
§ 5 BImSchV 5 i. V. m. § 4 para. 2 AEG,
§ 6 BImSchV 5 i. V. m. § 4 para. 2 AEG,
§ 8 BImSchV 5 i. V. m. § 4 para. 2 AEG,
§ 9 BImSchV 5 i. V. m. § 4 para. 2 AEG,
§ 6 BImSchV 7 i. V. m. § 4 para. 2 AEG,
§ 6 BImSchV 11 i. V. m. § 4 para. 2 AEG,
§ 1 BImSchV 12 i. V. m. § 4 para. 2 AEG,
§ 6 BImSchV 12 i. V. m. § 4 para. 2 AEG,
§ 9 BImSchV 12 i. V. m. § 4 para. 2 AEG,
§ 16 BImSchV 12 i. V. m. § 4 para. 2 AEG,
§ 19 BImSchV 12 i. V. m. § 4 para. 2 AEG,
§ 26 BImSchV 13 i. V. m. § 4 para. 2 AEG,
§ 24 BImSchV 17 i. V. m. § 4 para. 2 AEG,
§ 8 BImSchV 26 i. V. m. § 4 para. 2 AEG,
§ 11 BImSchV 31 i. V. m. § 4 para. 2 AEG,
§ 3 BImSchV 34 i. V. m. § 4 para. 2 AEG,
§ 9 para. 2 BBodSchG
i. V. m. § 4 para. 2 AEG,
§ 10 para. 1 BBodSchG
i. V. m. § 4 para. 2 AEG,
§ 13 BBodSchG i. V. m. § 4 para. 2 AEG,
§ 14 sentence 1 BBodSchG
i. V. m. § 4 para. 2 AEG,
§ 15 para. 2 BBodSchG
i. V. m. § 4 para. 2 AEG,
§ 16 para. 1 BBodSchG
i. V. m. § 4 para. 2 AEG
based on time
1.2 Monitoring of railways within the framework of the railway supervision to comply with the regulations referred to in § 5 para. 1 AEG on suspicion of a complaint or for the purpose of a sample, if the suspicion or the complaint is caused by the person concerned or if a breach of a piece of legislation has been found § 5a para. 2 AEG after effort of 300 to 1 000 euros
1.3 Measures to eliminate detected violations and to prevent future violations of railway law regulations, unless otherwise specified. § 5a para. 2 AEG based on time
1.4 Examination of new construction products and designs as well as railway-specific construction products and construction types and issuing of a corresponding certificate with responsibility caused or justified suspicion or on request § 5a para. 2 AEG by time
1.5 Examination of a type approval for railway-specific constructional facilities and issuing of a corresponding certificate with responsible or reasonable suspicion or on request § 5a para. 2 AEG by time
1.6 Examination of a new or modified form or -type (type approval) of signal, telecommunication and electrical equipment and issuing of a corresponding certificate in case of suspected or justified suspicion or on request § 5a para. 2 AEG by time
1.7 Protocol-based audit of certain components
or construction work and issuing of a corresponding
certificate in case of suspected or
responsible suspicion or on request
§ 5a para. 2 AEG based on time
1.8 Approval of a rail transport company, holder or rail infrastructure under-
accepting
§ 6 AEG 5 000 Euro
1.9 Change of approval of a Rail-
transport company, Halters or an iron
railway infrastructure company
§ 6 AEG 2 500 Euro
1.10 Parts of a security certificate § 7a para. 2 AEG based on time
1.11 Erding a national certificate § 7a para. 4 AEG based on time
1.12 Parts of a security permit § 7c para. 2 AEG based on time
1.13 Approval of training facilities § 7d para. 2 AEG based on time
1.14 Decision on permission to hold the operation § 7e AEG based on time
1.15 Decision on the delivery and decommissioning of railway infrastructure facilities § 11 AEG 3 000 Euro
1.16 Freistellen von BahnoperationPurpose § 23 para. 1 AEG by time
1.17 Transfer of the tasks of a notified body
within the scope of the Trans-European high-speed
system
§ 25b para. 1 AEGby time


Section 2Individually attributable public services according to the AEG i. V. m. VwVfG

Nr.CounterstandLegal Base Charge
2.1 Plan fix:
-Construction of new operating systems
-Modification of existing operating systems
§ 18 para. 1 AEG i. V. m.
§ 74 para. 1 VwVfG
after panel 1
of the attachment
2.2 Plan Approval § 18 para. 2 AEG i. V. m. § 74 VwVfG 50% of the fee
according to no. 2.1
2.3 Decision on the determination of the plan setting and planning permission § 18 para. 3 i. V. m. Par. 1 AEG 25% of the fee according to No. 2.1
2.4 Waiver of the plan determination decision or
of the planning permission after construction start
§ 20 para. 7 AEG i. V. m.
§ 77 VwVfG
after time spent up to 75% of the fee according to No. 2.1 or No. 2.2
2.5 Building technical examination of the building templates § 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG 500 Euro to
1 500 000 Euro
2.6 Approval of execution planning including construction supervision and acceptance for civil engineering § 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG after panel 2
of the attachment
2.7 Approval of execution planning including construction supervision and acceptance for superstructure § 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG according to panel 3
of the attachment
2.8 Approval of execution planning including construction supervision and acceptance for building construction § 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG according to panel 4
of the attachment
2.9 Checking changed building templates for planning
changes with a scope of more than
1/20 of origin planning in the Engineer, top
, or building
§ 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG according to No. 2.6, 2.7 or No. 2.8, multiply with the ratio of the scope of the change planning to the scope of the original planning
2.10 Approval of the Execution planning including construction supervision and removal of conversions of an existing plant with essential interventions in constructions or stock in engineering, upper or high-end construction § 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG nach Nr. 2.6, 2.7 or Nr. 2.8, plus a supplement of 20 to 50% depending on the difficulty level; the cost of canceling Construction parts are attributed to the construction costs
2.11 Approval of execution planning for the demolition or removal of assets, including construction supervision and acceptance in the engineering, upper or high-end construction § 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG based on time
2.12 Approval of execution planning for signal, telecommunication and electrical equipment § 18 AEG i. V. m. Section 74 para. 2 sentence 2 VwVfG by time
2.13 Construction inspection of a signal, telecom-
communication and electrical system including construction supervision during construction
§ 18 AEG i. V. m. § 74 para. 2 sentence 2 VwVfGby time


Section 3Individually attributable public services according to the EBV, EBPV

No.CounterstandLegal base fee
3.1 Confirmation of the order of an operating manager
or a deputy
§ 2 EBV 150 Euro
3.2 Decision on approval for audit as operations manager § 9 EBPV 330 Euro
3.3 performing an operational ladder check § § 13, 14, 20, 21, 22 EBPV 1 850 Euro
3.4 Run the replay check
a)
three audit subjects repeat-checking
b)
Two Audit Subjects
c)
Repeating Review with a Check
§ 23 EBPV
a)
1 730 Euro
b)
1 610 Euro
c)
1 490 Euro


Section 4Individually attributable public services after EBO, ESBO, and ESO 1959

Nr.CounterstandLegal base fee
4.1 Exceptions to EBO/ESBO § 3 para. 1 no. 2 letter a EBO or ESBO by time
4.2 Approvals to EBO/ESBO § 3 para. 2 No. 1 EBO or ESBO by time
4.3 Accepting a vehicle in scope
of the EBO
§ 32 para. 1 EBO by time
4.4Apportionable assets: Testing of a new or modified design; testing before commissioning; periodic tests; exceptions and issuing of a corresponding certificate § 33 para. 4 i. V. m. Par. 1 EBO by time
4.5 Approval of deviations from the
railroad signal order
Section A point a para. 4 ESO 1959 by time


Section 5 Individual attributable public services after the EIBV

Nr.CounterstandLegal base fee
5.1 Consent to collection of charges for
lack of travel capacity
§ 18 para. 4 EIBV by time
5.2 Exception approval pursuant to § 14 para. 4 AEG § 22 para. 1 no. 1 EIBVby time


Section 6Individually attributable public services after the TEIV

Nr.CounterstandLegal base fee
6.1 Approval of exceptions to the application of certain TSIs within the scope of the trans-European rail system § 5 para. 1 TEIV by time
6.2 Approval of commissioning a structural sub-system within the scope of the trans-European rail system § 6 para. 3 TEIV based on time
6.3 Approval for the commissioning of a struc-
part-system for which no TSI is available, within the scope of the trans-European rail system
§ 6 para. 4 TEIV by time
6.4 Approval for test drives in the Scope of the trans-European rail system § 6 para. 7 TEIV by time
6.5 General approval of vehicle construction series (type approval) within the scope of the trans-European rail system § 7 para. 2 TEIV based on time
6.6 Simplified approval for commissioning
for vehicles of an approved type within the scope of the trans-European rail systems
§ 7 para. 4 TEIV after Time required
6.7 Simplified approval for commissioning
for foreign vehicles within the scope of the trans-European rail system
§ 8 para. 1 TEIV based on time
6.8 Approval for the commissioning of a large-scale or renewed structural
subsystem in the Scope of the transeuro-
railway system or failure of the
approval requirement for the commissioning of an upgraded or renewed structural
subsystem within the scope of the transeuro-
european rail system
§ 9 para. 1 TEIV after Time required
6.9 Monitoring the conformity and suitability for use of interoperability constituents within the scope of the trans-European rail system on the basis of a suspicion, a complaint or for the purpose of a sample, if the Suspicion or the complaint was caused by the person concerned or a violation of a piece of law was found § 5a 2 AEG i. V. m. § 11 TEIV based on time
6.10 Setting a vehicle in the vehicle entry register § 20 para. 2 and 3 TEIV 50 Euro
6.11 Setting up to 10 vehicles of the same type in the vehicle registration register § 20 para. 2 and 3 TEIV 35 Euro
Vehicle
6.12 Setting 11 up to 100 vehicles of the same type in the vehicle registration register § 20 para. 2 and 3 TEIV 30 Euro
per vehicle
6.13 Setting more than 100 vehicles of the same type of design
to the vehicle registration register
§ 20 para. 2 and 3 TEIV 25 Euro
per vehicle
6.14 Change/complement data in the vehicle-
setting-up register
§ 20 para. 4 TEIV10 Euro
per vehicle


Section 7 (omitted)

Section 8Individually attributable public performance after the ArbSchG

No.CounterstandLegal Base Charge
8.1 Arrangement of measures for work protection § 22 para. 3 ArbSchGby time


Section 9Individual attributable public services after the IfSG

Nr.CounterstandLegal base fee
9.1 Checking the water supply systems in the
Rail vehicles
§ 39 IfSG, § § 18, 19, 20 TrinkwV 400 Euro
9.2 Check the stationary systems for the exclusive filling of rail vehicles;
up to 10 hydrants
§ 39 IfSG, § § 18, 19, 20 TrinkwV 800 Euro
9.3 Check the stationary equipment for the exclusive filling of rail vehicles;
11 to 50 hydrants
§ 39 IfSG, § § 18, 19, 20 TrinkwV 1 000 Euro
9.4 Check the fixed installations for the exclusive filling of rail vehicles;
51 to 100 Hydrants
§ 39 IfSG, § § 18, 19, 20 TrinkwV 1 350 Euro
9.5 Check the stationary systems for the exclusive filling of rail vehicles;
101 to 200 hydrants
§ 39 IfSG, § § 18, 19, 20 Drinking wV 1 500 Euro
9.6 Check the fixed installations for the exclusive filling of rail vehicles;
more than 200 hydrants
§ 39 IfSG, § § 18, 19, 20 TrinkwV 2 000 Euro
9.7 Decision on measures in the event of non-compliance of limit values and requirements § 39 IfSG, § 9 TrinkwV by time
9.8 Infection hygiene monitoring of the Waste water
disposal systems in the rail vehicles
as well as in the fixed installations for the exclusive disposal of rail vehicles
§ 41 IfSG400


Section 10Other individually attributable public services

Nr.CounterstandLegal fee
10.1 Changing, extending, and extending the validity of the administrative action by time, up to half of the administrative act


Part IIFees for individually attributable public services of the Federal Network Agency
for electricity, gas, telecommunications, mail and Railways

No.CounterstandLegal Base Fee
1 Approval of the runtime of a Framework agreement on the use of train paths § 14a para. 2 AEG By Time
2 Monitoring access to the railway infrastructure on the basis of a suspicion, complaint or sample, if the suspicion or complaint is caused by the person concerned, or if there is a breach of Rule of law was found § 14c para. 1 AEG By Time
3 Measures in violation of rules on
access to railway infrastructure
§ 14c para. 1 AEG based on time
4 Examination of the intended decisions to be notified in advance, in so far as the intended decisions do not comply with the provisions of the railway law on access to the Railway infrastructure and no contradiction according to § 14e (1) AEG shall be made § 14e para. 1 AEG based on time
5 contradiction against pre-participating intended decisions in accordance with § 14d AEG § 14e Par. 1 AEG based on time
6 Monitoring access to the railway infrastructure due to a suspicion, a complaint, or for the purpose of a sample, if the suspicion is or the complaint has been caused by the person concerned or a violation of a piece of legislation has been established § 14f para. 1 AEG by time
7 Measures in case of violation of rules on
access to railway infrastructure
§ 14f para. 1 sentence 2 or para. 3 i. V. m. Section 2 AEGby time


Part IIIFees for individually attributable public services of the named agency

No.CounterstandLegal base fee
1 Assessment of the compliance and usability of an interoperability constituent and issue
of a Corresponding certificate within the scope of the trans-European rail system
§ 15 para. 1 no. 1 TEIV by time
2 EC verification of a subsystem and issuing of a corresponding certificate within the scope of the trans-European rail system § 15 para. 1 no. 2 TEIVby time


Attachment Fee directory Part IApplication of charge panels
1.
The fee measurement for the numbers 2.1 to 2.4 and 2.6 to 2.10 depends on the construction costs and on the level of difficulty in charge zones. Rating properties.
2.
The cost of the fee is not included in the cost of the fee for:
a)
the acquisition, the freeming, the building, and the development of the plot,
b)
Winterbauschutzvorconversions,
c)
surveying and marketing,
d)
Compensation and Damage Services,
e)
Baunflat Cost,
f)
Artworks and artistically designed components, as far as they are not essential parts of the object.
3.
The cost of signal, telecommunications and electrical equipment is not included in the cost of measurement according to the tables 2 and 4.
4.
For panels 1 and 3, the operating assets will be attributed to the following charge zones:
a)
Zone 1: Objects with very low planning requirements, for example: B. Operating systems without switches and crossings, unless mentioned in zones 2 to 5, simple traffic areas;
b)
Zone 2: Objects with low planning requirements, For example: B. Operating systems of the free route without any special compulsion points, operating facilities of the free route in the little moving terrain, operating facilities of the stations with simple track plans;
c)
Zone 3: Objects with average planning requirements, for example: Internal operating facilities, unless mentioned in Zone 4, operating systems of the free route with special forced points, operating systems of the free route in the moving terrain, operating systems of the stations with difficult Track plans;
d)
Zone 4: Objects with above-average planning requirements, for example, (b) difficult internal facilities, operating installations of the free route with a large number of specific compultrating points, operating installations of the free route in the heavily moved terrain, operating facilities of the stations with very difficult track plans, Transport space for combined transport freight transport;
e)
Zone 5: Objects with very high planning requirements, e.g. B. very difficult domestic facilities.
5.
For Table 2, the engineering structures are charged with the following charge zones:
a)
Zone 1: Objects with very low planning requirements, for example:
b)
Zone 2: Objects with low planning requirements, e. g. for the use of the Municipal Waste Water (BGN), the Municipal Waste Water (NWI), the Municipal Waste Water (HGN), B. Dammbauts, as far as not mentioned in Zone 3 or 4, straight single-field bridges of simple design, support structures with traffic load, simple noise protection systems, lines for water and waste water with small links and few ZwangPoints;
c)
Zone 3: Objects with average planning requirements, for example: B. difficult dams, single-field bridges, as far as not mentioned in Zone 2 or 4, simple multi-field and arched bridges, support structures with anchorage, simple tunnel and trough structures, simple underground stations, lines for water or waste water with numerous links and numerous coercion points;
d)
Zone 4: Objects with above-average planning requirements, e.g. Particularly difficult dams, difficult fields of single-field, multi-field and arched bridges, noise protection systems in difficult urban planning situations, difficult tunnel and trough structures, difficult underground stations, if not in Zone 5 ;
e)
Zone 5: Objects with very high planning requirements, for example: Particularly difficult bridges, particularly difficult tunnel and trogling structures, underground crossing stations.
6.
The charge zone of the panel 4 is used for high-rise buildings Based on the following rating characteristics:
a)
Zone 1: Building with very low Planning requirements, that is, with
-
very low requirements for integration into the Environment,
-
a functional area,
-
very small design Requirements,
-
simplest constructions,
-
none or more technical Equipment,
-
No or one removal;
b)
Zone 2: Building with low Planning requirements, that is, with
-
low requirements for integration into the Environment,
-
few functional areas,
-
small design requirements,
-
simple constructions,
-
less technical Equipment,
-
low expansion;
c)
Zone 3: Buildings with average Planning requirements, that is,
-
Average requirements for inclusion in the Environment,
-
Multiple Simple Functional Areas,
-
Average Design requirements,
-
normal or common constructions,
-
average technical equipment,
-
normal build-up;
d)
zone 4: Buildings with above-average planning requirements, that is, with
-
above-average Requirements for inclusion in the environment,
-
multiple functional areas with multiple relationships,
-
above-average design requirements,
-
above-average constructive requirements,
-
above-average technical equipment,
-
above-average Expansion;
e)
Zone 5: Building with very high planning requirements, that is, with
-
very high requirements for integration into the environment,
-
a wide variety of functional areas with comprehensive relationships,
-
very high design Requirements,
-
very high constructive requirements,
-
a diverse technical Equipment with high technical requirements,
-
high-quality expansion.
Table 1Planting intermediate values are linearly to interpolate.Construction costs in EuroZone 1
EuroZone 2
EuroZone 3
EuroZone 4
EuroZone 5
Euro
25 000 280 360 440 500 580
30 000 330 420 500 580 660
35 000 370 470 560 650 740
40 000 420 520 620 720 820
45 000 460 670 690 790 910
50 000 500 610 740 860 980
75 000 690 850 1 010 1 170 1 330
100 000 860 1 060 1 260 1 450 1 650
150 000 1 190 1 450 1 700 1 960 2 220
200 000 1 490 1 800 2 120 2 430 2 740
250 000 1 750 2 120 2 500 2 860 3 220
300 000 2 020 2 430 2 850 3 260 3 670
350 000 2 270 2 720 3 180 3 640 4 100
400 000 2 500 3 000 3 500 3 990 4 490
450 000 2 720 3 260 3 800 4 340 4 870
500 000 2 940 3 510 4 090 4 660 5 230
750 000 3 890 4 610 5 340 6 070 6 800
1 000 000 4 660 5 510 6 360 7 210 8 030
1 500 000 6 470 7 590 8 690 9 860 11 000
2 000 000 8 180 9 560 10 900 12 300 13 700
2 500 000 9 780 11 400 13 000 14 600 16 200
3 000 000 11 300 13 100 15 000 16 800 18 600
3 500 000 12 800 14 800 16 900 18 900 21 000
4 000 000 14 300 16 500 18 700 21 000 23 100
4 500 000 15 700 18 100 20 500 22 900 25 300
5 000 000 17 100 19 700 22 300 24 900 27 400
7 500 000 23 700 27 200 30 600 34 000 37 400
10 000 000 29 900 34 100 38 300 42 500 46 600
15 000 000 43 300 46 900 52 500 58 000 63 600
20 000 000 52 300 59 000 65 700 72 400 79 200
25 000 000 62 600 70 400 78 300 86 100 93 900
30 000 000 70 400 79 000 87 400 96 000 104 700
35 000 000 79 600 89 000 99 000 108 100 117 700
40 000 000 88 800 99 000 109 400 119 800 130 400
45 000 000 97 600 108 600 119 900 131 200 142 600
50 000 000 106 200 118 000 130 100 142 300 154 600
55 000 000 114 700 127 300 140 000 153 200 166 200
60 000 000 123 100 136 400 149 900 158 100 177 700
65 000 000 131 300 145 000 159 700 174 200 188 900
70 000 000 139 400 154 000 169 100 184 400 199 800
75 000 000 147 300 162 600 178 400 194 400 210 600
80 000 000 155 200 171 200 187 700 204 300 221 300
85 000 000 162 900 180 000 196 700 214 100 231 700
90 000 000 170 700 187 900 205 700 223 700 242 100
95 000 000 178 300 196 100 214 500 233 200 252 300
100 000 000 185 800 204 300 223 300 242 700 262 400
112 500 000 204 300 224 200 244 800 266 000 287 000
125 000 000 222 400 243 700 266 000 288 100 311 100
137 500 000 240 000 262 700 286 000 310 100 334 500
150 000 000 257 600 281 400 306 200 331 600 357 500
200 000 000 332 200 353 300 383 200 413 800 438 700
250 000 000 396 200 421 500 456 000 491 400 520 900
375 000 000 546 000 580 900 625 400 671 600 711 900
500 000 000 685 500 729 300 782 500 838 200 888 500
625 000 000 817 700 870 000 931 100 995 500 1 055 100
750 000 000 944 600 1 004 900 1 073 200 1 145 400 1 214 100
1 000 000 000 1 185 900 1 261 600 1 342 900 1 429 400 1 515 200
1 250 000 000 1 414 800 1 505 100 1 598 000 1 697 500 1 799 300
1 500 000 000 1 634 200 1 738 500 1 841 900 1 953 400 2 070 600
1 750 000 000 1 846 100 1 963 900 2 076 900 2 199 600 2 331 600
2 000 000 000 2 051 700 2 182 600 2 304 700 2 437 9002 584 100


Table 2engineering intermediate values are linear to interpolate. Construction Cost in EuroZone 1
EuroZone 2
EuroZone 3
EuroZone 4
EuroZone 5
Euro
25 000 300 370 450 530 600
30 000 350 430 520 610 700
35 000 390 490 590 690 780
40 000 430 540 650 760 860
45 000 480 590 710 830 950
50 000 520 640 770 900 1 020
75 000 720 890 1 060 1 230 1 400
100 000 910 1 110 1 320 1 530 1 730
150 000 1 260 1 540 1 820 2 090 2 360
200 000 1 590 1 930 2 270 2 610 2 950
250 000 1 910 2 300 2 700 3 090 3 490
300 000 2 210 2 660 3 110 3 560 4 010
350 000 2 500 3 000 3 510 4 010 4 510
400 000 2 790 3 340 3 890 4 440 5 000
450 000 3 060 3 660 4 260 4 860 5 470
500 000 3 330 3 980 4 630 5 270 5 920
750 000 4 620 5 480 6 350 7 200 8 070
1 000 000 5 830 6 880 7 940 8 990 10 000
1 500 000 8 080 9 480 10 900 12 300 13 700
2 000 000 10 200 11 900 13 600 15 300 17 000
2 500 000 12 200 14 200 16 200 18 200 20 200
3 000 000 14 100 16 400 18 700 21 000 23 200
3 500 000 16 000 18 500 21 100 23 600 26 100
4 000 000 17 800 20 600 23 400 26 200 28 900
4 500 000 19 600 22 600 25 600 28 600 31 700
5 000 000 21 300 24 600 27 800 29 900 34 300
7 500 000 29 600 33 900 38 200 42 500 46 800
10 000 000 37 300 42 500 47 800 53 000 58 200
15 000 000 51 700 58 600 65 600 72 500 79 400
20 000 000 65 300 73 700 82 100 90 500 98 900
25 000 000 78 100 87 900 97 700 107 500 117 200
30 000 000 85 400 95 600 106 000 116 500 127 000
35 000 000 96 700 108 000 119 600 131 200 142 900
40 000 000 107 700 120 100 132 700 145 400 158 200
45 000 000 118 400 131 800 145 400 159 200 173 100
50 000 000 128 900 143 200 157 900 172 600 187 500
55 000 000 139 200 154 400 170 000 185 800 201 700
60 000 000 149 300 165 400 181 900 198 700 215 500
65 000 000 159 200 176 300 193 700 211 300 229 100
70 000 000 169 100 186 900 205 200 223 700 242 400
75 000 000 178 700 197 400 216 500 235 900 255 500
80 000 000 188 300 207 700 227 700 247 900 268 400
85 000 000 197 700 217 900 238 700 259 800 281 200
90 000 000 207 000 228 000 249 600 271 500 293 700
95 000 000 216 300 237 900 260 300 283 000 306 100
100 000 000 225 400 247 800 270 900 294 400 318 300
112 500 000 247 900 272 000 296 900 322 400 348 200
125 000 000 269 800 295 600 322 300 349 600 377 400
137 500 000 291 400 318 700 347 200 376 200 405 800
150 000 000 312 600 341 500 371 600 402 300433 700


panel 3Upper building intermediate values are linear to interpolate. Construction costs in EuroZone 1
EuroZone 2
EuroZone 3
EuroZone 4
EuroZone 5
Euro
25 000 330 410 500 580 660
30 000 380 480 570 660 760
35 000 430 540 640 750 850
40 000 480 590 710 830 950
45 000 520 650 780 900 1 030
50 000 570 710 840 980 1 120
75 000 780 970 1 150 1 330 1 520
100 000 990 1 210 1 430 1 660 1 880
150 000 1 350 1 650 1 950 2 240 2 540
200 000 1 690 2 060 2 410 2 780 3 130
250 000 2 010 2 430 2 850 3 260 3 680
300 000 2 310 2 780 3 250 3 720 4 190
350 000 2 590 3 110 3 630 4 150 4 670
400 000 2 860 3 430 3 990 4 560 5 130
450 000 3 110 3 730 4 340 4 950 5 560
500 000 3 360 4 010 4 660 5 320 5 970
750 000 4 440 5 270 6 090 6 920 7 750
1 000 000 5 330 6 290 7 260 8 220 9 180
1 500 000 7 390 8 670 9 950 11 200 12 500
2 000 000 9 320 10 900 12 400 14 000 15 600
2 500 000 11 200 13 000 14 800 16 600 18 500
3 000 000 12 900 15 000 17 100 19 200 21 200
3 500 000 14 600 16 900 19 300 21 600 23 900
4 000 000 16 300 18 800 21 400 23 900 26 500
4 500 000 17 900 20 700 23 400 26 200 28 900
5 000 000 19 500 22 500 25 400 28 400 31 400
7 500 000 27 100 31 000 34 900 38 800 42 700
10 000 000 34 100 38 900 43 700 48 500 53 200
15 000 000 47 300 53 600 59 900 66 200 72 600
20 000 000 59 700 67 300 75 000 82 700 90 400
25 000 000 71 400 80 400 89 300 98 200 107 200
30 000 000 80 300 90 000 99 800 109 600 119 500
35 000 000 91 000 101 600 112 500 123 400 134 400
40 000 000 101 300 113 000 124 800 136 800 148 800
45 000 000 111 400 124 000 136 800 149 800 162 800
50 000 000 121 300 134 800 148 500 162 400 176 500
55 000 000 131 000 145 300 160 000 174 800 189 800
60 000 000 140 500 155 700 171 200 180 500 202 800
65 000 000 149 800 165 800 182 200 198 800 215 600
70 000 000 159 100 175 800 193 000 210 500 228 100
75 000 000 168 200 185 700 203 700 222 000 240 400
80 000 000 177 200 195 400 214 200 233 300 252 600
85 000 000 186 000 205 000 224 600 244 400 264 500
90 000 000 194 800 214 500 234 800 255 400 276 300
95 000 000 203 500 223 900 244 900 266 300 288 000
100 000 000 212 100 233 100 254 900 277 000 299 500
112 500 000 233 200 255 900 279 400 303 300 327 600
125 000 000 253 900 278 100 303 300 329 000 355 100
137 500 000 274 200 299 900 326 700 354 000 381 800
150 000 000 294 100 321 300 349 600 378 500 408 000
200 000 000 379 200 403 400 437 400 472 400 500 800
250 000 000 452 300 481 200 520 500 561 000 594 700
375 000 000 623 300 663 100 713 900 766 700 812 700
500 000 000 782 500 832 500 893 300 956 800 1 014 200
625 000 000 933 500 993 100 1 062 900 1 136 200 1 204 400
750 000 000 1 078 300 1 147 100 1 225 200 1 307 500 1 385 900
1 000 000 000 1 353 800 1 440 200 1 533 000 1 631 800 1 729 700
1 250 000 000 1 615 000 1 718 100 1 824 100 1 937 800 2 054 000
1 500 000 000 1 865 500 1 984 600 2 102 600 2 229 900 2 363 700
1 750 000 000 2 107 400 2 241 900 2 370 900 2 511 000 2 661 600
2 000 000 000 2 342 100 2 491 600 2 630 900 2 783 0002 949 900


Table 4High-building intermediate values are linearly to interpolate.Construction costs in EuroZone 1
EuroZone 2
EuroZone 3
EuroZone 4
Euro
25 000 250 300 370 480
30 000 300 360 440 570
35 000 350 420 520 670
40 000 400 480 590 760
45 000 440 540 670 860
50 000 500 600 740 950
100 000 990 1 190 1 450 1 840
150 000 1 490 1 760 2 120 2 660
200 000 1 980 2 320 2 760 3 420
250 000 2 480 2 860 3 360 4 130
300 000 2 860 3 310 3 900 4 800
350 000 3 180 3 700 4 400 5 440
400 000 3 460 4 050 4 850 6 030
450 000 3 690 4 360 5 250 6 590
500 000 3 880 4 620 5 610 7 100
1 000 000 7 050 8 360 10 100 12 700
1 500 000 10 200 12 100 14 600 18 300
2 000 000 13 400 15 800 19 100 23 900
2 500 000 16 600 19 600 23 600 29 500
3 000 000 19 900 23 300 27 700 34 500
3 500 000 23 200 27 000 31 900 39 400
4 000 000 26 500 30 600 36 100 44 400
4 500 000 29 800 34 300 40 300 49 300
5 000 000 33 200