Key Benefits:
BEGebV
Date of completion: 27.03.2008
Full quote:
" Federal Railway Fee Ordinance of 27 March 2008 (BGBl. 546), as last amended by Article 1 of the Regulation of 11 July 2014 (BGBl I). 1047, 1599).
V up. By Article 4 (121) G v. 7.8.2013 I 3154 mWv 14.8.2018 | |
The V replaces the V 930-9-8 v. 5.4.2001 I 562 mWv 1.5.2008 | |
Status: | Last amended by Art. 1 V v. 11.7.2014 I 1047, 1599 |
Note: | Indirect change by Art. 1b G v. 24.5.2014 I 538 is considered |
(+ + + Proof of text: 1.5.2008 + + +)Unofficial table of contents
1.1 | Areas under construction, taking-off, testing, authorisations, authorisations and monitoring for the establishment, modification, maintenance and operation of the operating facilities and for rail vehicles | § 6 para. 3 PflSchG i. V. m. Section 4 (2) AEG, § 4 BImSchG i. V. m. Section 4 (2) AEG, § 8 BImSchG i. V. m. Section 4 (2) AEG, § 8a BImSchG i. V. m. Section 4 (2) AEG, § 9 BImSchG i. V. m. Section 4 (2) AEG, § 16 BImSchG i. V. m. Section 4 (2) AEG, § 17 BImSchG i. V. m. Section 4 (2) AEG, § 20 BImSchG i. V. m. Section 4 (2) AEG, § 21 BImSchG i. V. m. Section 4 (2) AEG, § 24 BImSchG i. V. m. Section 4 (2) AEG, § 25 BImSchG i. V. m. Section 4 (2) AEG, § 26 BImSchG i. V. m. Section 4 (2) AEG, § 29 BImSchG i. V. m. Section 4 (2) AEG, § 29a BImSchG i. V. m. Section 4 (2) AEG, § 31 BImSchG i. V. m. Section 4 (2) AEG, § 52 BImSchG i. V. m. Section 4 (2) AEG, § 53 BImSchG i. V. m. Section 4 (2) AEG, § 58a BImSchG i. V. m. Section 4 (2) AEG, § 20 BImSchV 1 i. V. m. Section 4 (2) AEG, § 1 BImSchV 5 i. V. m. Section 4 (2) AEG, § 2 BImSchV 5 i. V. m. Section 4 (2) AEG, § 4 BImSchV 5 i. V. m. Section 4 (2) AEG, § 5 BImSchV 5 i. V. m. Section 4 (2) AEG, § 6 BImSchV 5 i. V. m. Section 4 (2) AEG, § 8 BImSchV 5 i. V. m. Section 4 (2) AEG, § 9 BImSchV 5 i. V. m. Section 4 (2) AEG, § 6 BImSchV 7 i. V. m. Section 4 (2) AEG, § 6 BImSchV 11 i. V. m. Section 4 (2) AEG, § 1 BImSchV 12 i. V. m. Section 4 (2) AEG, § 6 BImSchV 12 i. V. m. Section 4 (2) AEG, § 9 BImSchV 12 i. V. m. Section 4 (2) AEG, § 16 BImSchV 12 i. V. m. Section 4 (2) AEG, § 19 BImSchV 12 i. V. m. Section 4 (2) AEG, § 26 BImSchV 13 i. V. m. Section 4 (2) AEG, § 24 BImSchV 17 i. V. m. Section 4 (2) AEG, § 8 BImSchV 26 i. V. m. Section 4 (2) AEG, § 11 BImSchV 31 i. V. m. Section 4 (2) AEG, § 3 BImSchV 34 i. V. m. Section 4 (2) AEG, Section 9 (2) BBodSchG i. v. m. Section 4 (2) AEG, Section 10 (1) BBodSchG i. v. m. Section 4 (2) AEG, § 13 BBodSchG i. V. m. Section 4 (2) AEG, § 14 sentence 1 BBodSchG i. v. m. Section 4 (2) AEG, Section 15 (2) BBodSchG i. v. m. Section 4 (2) AEG, Section 16 (1) BBodSchG i. v. m. Section 4 (2) AEG |
by time |
1.2 | Monitoring of railways under the supervision of the railway system in order to comply with the provisions of Section 5 (1) of the AEG on the basis of suspicion, complaint or sample, if the suspicion or complaint of the person concerned is has been held responsible or a breach of a piece of legislation has been established | Section 5a (2) AEC | by the cost of 300 to 1 000 Euro |
1.3 | Measures to eliminate established infringements and to prevent future infringements of railway law provisions, unless otherwise specified | Section 5a (2) AEC | by time |
1.4 | Testing of new construction products and designs as well as railway-specific construction products and construction types and issuing of a corresponding certificate in case of a responsible or reasonable suspicion or on request | Section 5a (2) AEC | by time |
1.5 | Examination of a type-approval for railway-specific construction equipment and issuing of a corresponding certificate in case of suspected or justified suspicion or on request | Section 5a (2) AEC | by time |
1.6 | Examination of a new or modified form of construction or -type (type approval) of signal, telecommunication and electrical engineering equipment and issuing of a corresponding certificate in case of suspected or substantiated suspicion or on request | Section 5a (2) AEC | by time |
1.7 | Inspection of certain components or construction work and issuing of a corresponding certificate in case of suspected or justified suspicion or on request | Section 5a (2) AEC | by time |
1.8 | Approval of a railway undertaking, a holder or a railway infrastructure undertaking | § 6 AEG | EUR 5 000 |
1.9 | Modification of a licence for a railway undertaking, a holder or a railway infrastructure undertaking | § 6 AEG | EUR 2 500 |
1.10 | Issue or renewal of a safety certificate | § 7a (2) and (7) AEG | by time, at least 600 and not more than EUR 75 000 |
1.11 | Issuing a national certificate | Section 7a (4) AEG | by time |
1.12 | Granting or renewal of a safety authorisation | Section 7c (2) and (4) AEG | by time, at least 600 and not more than EUR 100 000 |
1.13 | (dropped) | ||
1.14 | Decision on permission to take up the holding | § 7f AEG | by time |
1.15 | Decision on the supply and decommissioning of railway infrastructure | § 11 AEG | EUR 3 000 |
1.16 | Exemption from railway operations | Section 23 (1) AEG | 1 450 Euro |
1.17 | Transfer of tasks to a notified body within the scope of the trans-European high-speed rail system | Section 25b (1) AEC | by time |
1.18 | Issue of a maintenance certificate | Section 7g (1) and (2) AEG | by time, at least 1 200 and not more than 140 000 Euro |
1.19 | Issue of a certificate of maintenance functions | Section 7g (3) AEG | by time, at least 1 000 and not more than EUR 100 000 |
2.1 | Plan determination: -construction of new plants -modification of existing plants |
§ 18 AEG i. V. m. Section 74 (1) VwVfG | by Table 1 of the Annex |
2.2 | Plan Approval | § 18 AEG i. V. m. Section 74 (6) VwVfG | 50% of the fee according to item 2.1 |
2.3 | Decision on the decision to decide on plan approval and planning permission | § 18 AEG i. V. m. Section 74 (7) VwVfG | 25% of the fee according to point 2.1 |
2.4 | Cancellation of the planning approval decision or the planning permission after the start of construction | § 77 VwVfG i. V. m. Section 75 (1a) VwVfG | up to 75% of the fee referred to in point 2.1 or point 2.2 |
2.5 | Construction-technical examination of the building templates | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | 500 euro up to 1 500 000 Euro |
2.6 | Approval of the execution planning including construction supervision and acceptance for civil engineering | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by table 2 of the Annex |
2.7 | Approval of the execution planning including construction supervision and acceptance for superstructure | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by table 3 of the Annex |
2.8 | Approval of the execution planning including construction supervision and acceptance for building construction | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by table 4 of the Annex |
2.9 | Review of modified building templates during planning changes with a volume of more than 1/20 of the original planning in the engineering, upper or high-construction sector | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | according to No. 2.6, 2.7 or No. 2.8, multiplied by the ratio of the scope of the change planning to the extent of the original planning |
2.10 | Approval of the implementation planning including construction supervision and acceptance of conversions of an existing installation with essential interventions in constructions or stock in the engineering, upper or high-end construction | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | pursuant to No 2.6, 2.7 or 2.8, plus a supplement of 20% to 50% depending on the degree of difficulty, the Costs for the Cancelation of construction parts is attributed to the construction costs |
2.11 | Approval of the execution planning for the demolition or removal of equipment, including construction supervision and acceptance in the engineering, upper or high-building construction | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by time |
2.12 | Approval of the execution planning for signal, telecommunication and electrical equipment | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by time |
2.13 | Construction inspection of a signal, telecommunication and electrical engineering system including supervision during construction | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by time |
2.14 | Extension of the validity of the plan approval decision or the planning approval | § 18c AEG | by time, at least 600 euros and at most € 3 600 |
2.15 | Plan change through new planning procedures | § 18 AEG i. V. m § 76 para. 1 VwVfG | by table 1 of the Annex |
2.16 | Change of plan due to new planning approval procedure | Section 74 (6) VwVfG i. V. m. § 18b No. 1 and 2 AEG i. V. m § 76 para. 1 VwVfG | 50% of the fee according to No. 2.15 |
2.17 | Change of plan in cases of insignificant importance | § 18 AEG i. V. m § 76 para. 2 VwVfG | EUR 3 600 |
2.18 | Change of plan in cases of insignificant importance by simplified plan setting procedure | § 18 AEG i. V. m § 76 para. 3 VwVfG | EUR 6 000 |
3.1 | Confirmation of the appointment of a manager or a deputy | § 2 EBV | EUR 300 |
3.2 | Decision on admission to the examination as an operating manager | § 9 EBPV | 330 Euro |
3.3 | Carrying out an operational management test | § § 13, 14, 20, 21, 22 EBPV | EUR 1 850 |
3.4 | Performance of the repeat examination
|
§ 23 EBPV |
|
4.1 | Exceptions to EBO/ESBO | § 3 (1) (2) (a) EBO or ESBO | EUR 1 800 |
4.2 | Approvals according to EBO/ESBO | § 3 para. 2 No. 1 EBO or ESBO |
by time, at least 700 and not more than 12 000 Euro |
4.3 | Acceptance of a vehicle within the scope of the EBO | Section 32 (1) of the EBO | by time, at least 2 000 and not more than EUR 300 000 |
4.4 | Installations in need of surveillance: testing of a new or modified design; testing before commissioning; periodic tests; exceptions and issuing of a corresponding certificate | Section 33 (4) (i). V. m. Paragraph 1 EBO | by time |
4.5 | Approval of non-ESO signals with temporary validity | Section A, point (a) (4) ESO 1959 | by time, at least 700 and at most 6 000 Euro |
5.1 | Consent to the collection of charges in the event of a lack of infrastructure capacity | Section 18 (4) of the EIBV | by time |
5.2 | Exemption pursuant to § 14 (4) AEG | Section 22 (1) (1) EIBV | by time |
6.1 | Authorisation of derogations for the application of certain TSIs within the scope of the trans-European rail system | § 5 (1) TEIV | by time |
6.2 | Approval of the commissioning of a structural subsystem in the field of civil engineering within the scope of the trans-European rail system | Section 6 (3) TEIV | by table 2 of the Annex |
6.3 | Approval of the commissioning of a structural subsystem in the superstructure within the scope of the trans-European rail system | Section 6 (3) TEIV | by table 3 of the Annex |
6.4 | Approval of the commissioning of a structural subsystem in the field of construction within the scope of the trans-European rail system | Section 6 (3) TEIV | by table 4 of the Annex |
6.5 | Authorisation of entry into service within the scope of the trans-European rail system, unless it is covered by points 6.2 to 6.4 | Section 6 (3) TEIV | by time |
6.6 | Approval for the putting into service of a structural subsystem in the engineering sector for which there is no TSI, within the scope of the trans-European rail system | Section 6 (4) TEIV | by table 2 of the Annex |
6.7 | Approval for the commissioning of a structural subsystem in the superstructure for which there is no TSI, within the scope of the trans-European rail system | Section 6 (4) TEIV | by table 3 of the Annex |
6.8 | Authorisation for the entry into service of a structural subsystem in the high-rise for which there is no TSI, within the scope of the trans-European rail system | Section 6 (4) TEIV | by table 4 of the Annex |
6.9 | Approval for the entry into service of a structural subsystem for which there is no TSI, within the scope of the trans-European rail system, to the extent that it is not covered by points 6.6 to 6.8. | Section 6 (4) TEIV | by time |
6.10 | Authorisation for test drives within the scope of the trans-European rail system | Section 6 (7) TEIV | by time |
6.11 | Serial approval | Section 7 (2) TEIV | by time |
6.12 | Approval for a vehicle variant | § 7a (1) sentence 2 and 3 TEIV | by time |
6.13 | Standard approval for a vehicle variant | § 7a para. 2 sentence 2 TEIV | by time |
6.14 | General approval of vehicle types | Section 7b (1), (2) and (3) TEIV | by time |
6.15 | Approval of other vehicles of an approved vehicle type | Section 7b (4) TEIV | by time |
6.16 | Simplified authorisation for entry into service of foreign vehicles within the scope of the trans-European rail system | Section 8 (1) TEIV | by time |
6.17 | Authorisation for the commissioning of an extensive or renewed structural subsystem in the field of civil engineering within the scope of the trans-European rail system | Section 9 (1) TEIV | by table 2 of the Annex |
6.18 | Authorisation for the commissioning of an extensive or renewed structural subsystem in the field of superstructure within the scope of the trans-European rail system | Section 9 (1) TEIV | by table 3 of the Annex |
6.19 | Authorisation for the commissioning of a large-scale or renewed structural subsystem in the field of construction within the scope of the trans-European rail system | Section 9 (1) TEIV | by table 4 of the Annex |
6.20 | Authorisation for the entry into service of an extensive or renewed structural subsystem within the scope of the trans-European rail system or a failure to approve the approval requirement for the commissioning of a reequipped or a renewed structural subsystem within the scope of the trans-European rail system, to the extent that it does not fall within the scope of points 6.15 to 6.17 | Section 9 (1) TEIV | by time |
6.21 | To monitor the conformity and suitability for use of interoperability constituents within the scope of the trans-European rail system on the basis of a suspicion, complaint or sample, if the suspicion or the A complaint has been caused by the person concerned or a breach of a piece of legislation has been established | § 5a (2) AEG i. V. m. § 11 TEIV | by time |
6.22 | Setting of a vehicle into the vehicle registration register | Section 20 (2) TEIV | 50 Euro |
6.23 | Adjustment of up to 10 vehicles of the same type to the vehicle registration register | Section 20 (2) TEIV | 35 Euro per vehicle |
6.24 | Adjustment of 11 up to 100 vehicles of the same type in the register of vehicles | Section 20 (2) TEIV | 30 Euro per vehicle |
6.25 | Adjustment of more than 100 vehicles of the same type to the vehicle registration register | Section 20 (2) TEIV | 25 Euro per vehicle |
6.26 | Electronic transfer of the data of vehicles from the vehicle registers of railways to the vehicle registration register (NVR), to the extent that vehicle numbers have not already been issued by the NVR for the vehicles as part of a commissioning permit are | Section 20 (3) TEIV | 8 Euro per vehicle |
6.27 | Modification and addition of data in the NVR outside of a standardized application procedure | Section 20 (4) TEIV | by time |
6.28 | Modification and completion of data in the NVR by means of a standardised application procedure for similar vehicles in any number of cases | Section 20 (4) TEIV | EUR 10 per vehicle, no more than EUR 5 000 per application |
8.1 | Arrangement of measures for occupational safety and health | Section 22 (3) ArbSchG | by time |
9.1 | Checking the water supply systems in the Rail vehicles |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | 400 Euro |
9.2 | Check the fixed installations for the exclusive filling of rail vehicles; up to 10 hydrants |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | 800 euro |
9.3 | Check the fixed installations for the exclusive filling of rail vehicles; 11 to 50 Hydrants |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | EUR 1 000 |
9.4 | Check the fixed installations for the exclusive filling of rail vehicles; 51 to 100 Hydrants |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | EUR 1 350 |
9.5 | Check the fixed installations for the exclusive filling of rail vehicles; 101 to 200 Hydrants |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | EUR 1 500 |
9.6 | Check the fixed installations for the exclusive filling of rail vehicles; more than 200 Hydrants |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | EUR 2 000 |
9.7 | Decision on measures in the event of non-compliance with limit values and requirements | § 39 IfSG; § 9 TrinkwV | by time |
9.8 | Anti-infective monitoring of waste water disposal systems in rail vehicles and in fixed installations for the exclusive disposal of rail vehicles | § 41 IfSG | 400 Euro |
10.1 | Issuing of a provisional driving licence and issuing of a new, amended or extended driving licence or a replacement licence | § 8 (1) (i). V. m. Paragraph 2 and 3 TfV | 175 Euro |
10.2 | Granting of a new, amended or extended driving licence or a replacement driving licence | § 8 (1) (i). V. m Paragraph 3 TfV |
150 Euro |
10.3 | To obtain information on the driver's licence | Section 10 (3) of the TfV | 50 Euro |
10.4 | Recognition as trainers | Section 14 (1) and 6 (TfV) | 850 Euro |
10.5 | Recognition as auditor | Section 15 (1) of the TfV | 850 Euro |
10.6 | Recognition as a doctor or psychologist for carrying out a digevity examination | Section 16 (1) of the TfV | 850 Euro |
11.1 | Change, extend and renew the validity of the administrative act | by time, up to half the fee for the administrative act |
1 | Approval of the term of a framework contract on the use of train paths | Section 14a (2) AEG | by time |
2 | Monitoring of access to the railway infrastructure on the basis of suspicion, complaint or sample, if the suspected or the complaint is caused by the person concerned, or if there is a breach of a law has been identified | Section 14c (1) AEC | by time |
3 | Measures to be taken in the event of infringements of rules on access to railway infrastructure | Section 14c (1) AEC | by time |
4 | Examination of the intended decisions to be notified in advance, in so far as the proposed decisions do not comply with the provisions of the railway law relating to access to the railway infrastructure and do not conflict with Article 14e (1) AEC | Section 14e (1) AEG | by time |
5 | Objection to intended decisions to be notified in advance pursuant to Section 14d AEG | Section 14e (1) AEG | by time |
6 | Monitoring of access to the railway infrastructure on the basis of suspicion, complaint or sample, if the suspicion or complaint is caused by the person concerned or if there is a breach of a law has been | Section 14f (1) AEG | by time |
7 | Measures to be taken in the event of infringements of rules on access to railway infrastructure | § 14f (1) sentence 2 or (3) (i). V. m. Paragraph 2 AEG | by time |
8 | Decision on access rights in international passenger transport | Section 14g (3) AEG | 200 Euro to 600 Euro |
9 | Approval of the extension of a framework agreement on the use of train paths | Section 38 (8) AEG | EUR 1 500 to EUR 3 500. |
1 | Assessment of the conformity and suitability for use of an interoperability constituent and the issuing of a corresponding certificate within the scope of the trans-European rail system | Section 15 (1) sentence 1 no. 1 TEIV | by time |
2 | EC verification of a subsystem and issuing of a corresponding certificate within the scope of the trans-European rail system | Section 15 (1) sentence 1 no. 2 or sentence 2 or 3 TEIV | by time |
25 000 | 420 | 540 | 660 | 750 | 870 |
30 000 | 500 | 630 | 750 | 870 | 990 |
35 000 | 560 | 700 | 840 | 980 | 1 100 |
40 000 | 630 | 780 | 930 | 1 080 | 1 230 |
45 000 | 690 | 920 | 1 040 | 1 190 | 1 370 |
50 000 | 750 | 1 000 | 1 110 | 1 290 | 1 470 |
75 000 | 1 040 | 1 280 | 1 520 | 1 760 | 2 000 |
100 000 | 1 290 | 1 590 | 1 890 | 2 180 | 2 480 |
150 000 | 1 790 | 2 180 | 2 550 | 2 940 | 3 330 |
200 000 | 2 240 | 2 700 | 3 180 | 3 650 | 4 110 |
250 000 | 2 630 | 3 180 | 3 750 | 4 290 | 4 830 |
300 000 | 3 030 | 3 650 | 4 280 | 4 890 | 5 500 |
350 000 | 3 400 | 4 080 | 4 770 | 5 460 | 6 150 |
400 000 | 3 750 | 4 500 | 5 250 | 5 990 | 6 740 |
450 000 | 4 080 | 4 890 | 5 700 | 6 510 | 7 300 |
500 000 | 4 410 | 5 270 | 6 140 | 6 990 | 7 850 |
750 000 | 5 840 | 6 910 | 8 010 | 9 100 | 10 200 |
1 000 000 | 6 990 | 8 270 | 9 540 | 10 800 | 12 040 |
1 500 000 | 9 700 | 11 390 | 13 030 | 14 790 | 16 500 |
2 000 000 | 12 270 | 14 340 | 16 350 | 18 450 | 20 550 |
2 500 000 | 14 670 | 17 100 | 19 500 | 21 900 | 24 300 |
3 000 000 | 17 000 | 19 700 | 22 500 | 25 200 | 27 900 |
3 500 000 | 19 200 | 22 200 | 25 400 | 28 400 | 31 500 |
4 000 000 | 21 500 | 24 800 | 28 000 | 31 500 | 34 700 |
4 500 000 | 23 600 | 27 200 | 30 800 | 34 400 | 38 000 |
5 000 000 | 25 700 | 29 600 | 33 500 | 37 400 | 41 100 |
7 500 000 | 35 600 | 40 800 | 45 900 | 51 000 | 56 100 |
10 000 000 | 44 900 | 51 200 | 57 500 | 63 800 | 69 900 |
15 000 000 | 65 000 | 70 400 | 78 800 | 87 000 | 95 400 |
20 000 000 | 78 500 | 88 500 | 98 600 | 108 600 | 118 800 |
25 000 000 | 93 900 | 105 600 | 117 500 | 129 200 | 140 900 |
30 000 000 | 105 600 | 118 500 | 131 100 | 144 000 | 157 000 |
35 000 000 | 119 400 | 133 500 | 148 500 | 162 200 | 176 600 |
40 000 000 | 133 200 | 148 500 | 164 100 | 179 700 | 195 600 |
45 000 000 | 146 400 | 162 900 | 179 900 | 196 800 | 213 900 |
50 000 000 | 159 300 | 177 000 | 195 200 | 213 500 | 231 900 |
55 000 000 | 172 000 | 191 000 | 210 000 | 229 800 | 249 300 |
60 000 000 | 184 700 | 204 600 | 224 900 | 237 200 | 266 600 |
65 000 000 | 197 000 | 218 000 | 240 000 | 261 300 | 283 400 |
70 000 000 | 209 100 | 231 000 | 253 700 | 276 600 | 299 700 |
75 000 000 | 221 000 | 243 900 | 267 600 | 291 600 | 315 900 |
80 000 000 | 232 800 | 256 800 | 281 600 | 306 500 | 332 000 |
85 000 000 | 244 400 | 270 000 | 295 000 | 321 200 | 347 600 |
90 000 000 | 256 000 | 281 900 | 308 600 | 335 600 | 363 200 |
95 000 000 | 267 500 | 294 200 | 321 800 | 349 800 | 378 500 |
100 000 000 | 278 700 | 306 500 | 335 000 | 364 000 | 393 600 |
112 500 000 | 306 500 | 336 300 | 367 200 | 399 000 | 430 500 |
125 000 000 | 333 600 | 365 600 | 399 000 | 432 200 | 466 700 |
137 500 000 | 360 000 | 394 000 | 429 000 | 465 200 | 501 800 |
150 000 000 | 386 400 | 422 100 | 459 300 | 497 400 | 536 300 |
200 000 000 | 498 300 | 530 000 | 574 800 | 620 700 | 658 000 |
250 000 000 | 594 300 | 632 300 | 684 000 | 737 100 | 781 400 |
375 000 000 | 819 000 | 871 400 | 938 100 | 1 007 400 | 1 067 900 |
500 000 000 | 1 028 300 | 1 094 000 | 1 173 800 | 1 257 300 | 1 332 800 |
625 000 000 | 1 226 600 | 1 305 000 | 1 396 700 | 1 493 300 | 1 582 700 |
750 000 000 | 1 416 900 | 1 507 400 | 1 609 800 | 1 718 100 | 1 821 200 |
1 000 000 000 | 1 778 900 | 1 892 400 | 2 014 400 | 2 144 100 | 2 272 800 |
1 250 000 000 | 2 122 200 | 2 257 700 | 2 397 000 | 2 546 300 | 2 699 000 |
1 500 000 000 | 2 451 300 | 2 607 800 | 2 762 900 | 2 930 100 | 3 105 900 |
1 750 000 000 | 2 769 200 | 2 945 900 | 3 115 400 | 3 299 400 | 3 497 400 |
2 000 000 000 | 3 077 600 | 3 273 900 | 3 457 000 | 3 656 900 | 3 876 200 |
25 000 | 300 | 370 | 450 | 530 | 600 |
30 000 | 350 | 430 | 520 | 610 | 700 |
35 000 | 390 | 490 | 590 | 690 | 780 |
40 000 | 430 | 540 | 650 | 760 | 860 |
45 000 | 480 | 590 | 710 | 830 | 950 |
50 000 | 520 | 640 | 770 | 900 | 1 020 |
75 000 | 720 | 890 | 1 060 | 1 230 | 1 400 |
100 000 | 910 | 1 110 | 1 320 | 1 530 | 1 730 |
150 000 | 1 260 | 1 540 | 1 820 | 2 090 | 2 360 |
200 000 | 1 590 | 1 930 | 2 270 | 2 610 | 2 950 |
250 000 | 1 910 | 2 300 | 2 700 | 3 090 | 3 490 |
300 000 | 2 210 | 2 660 | 3 110 | 3 560 | 4 010 |
350 000 | 2 500 | 3 000 | 3 510 | 4 010 | 4 510 |
400 000 | 2 790 | 3 340 | 3 890 | 4 440 | 5 000 |
450 000 | 3 060 | 3 660 | 4 260 | 4 860 | 5 470 |
500 000 | 3 330 | 3 980 | 4 630 | 5 270 | 5 920 |
750 000 | 4 620 | 5 480 | 6 350 | 7 200 | 8 070 |
1 000 000 | 5 830 | 6 880 | 7 940 | 8 990 | 10 000 |
1 500 000 | 8 080 | 9 480 | 10 900 | 12 300 | 13 700 |
2 000 000 | 10 200 | 11 900 | 13 600 | 15 300 | 17 000 |
2 500 000 | 12 200 | 14 200 | 16 200 | 18 200 | 20 200 |
3 000 000 | 14 100 | 16 400 | 18 700 | 21 000 | 23 200 |
3 500 000 | 16 000 | 18 500 | 21 100 | 23 600 | 26 100 |
4 000 000 | 17 800 | 20 600 | 23 400 | 26 200 | 28 900 |
4 500 000 | 19 600 | 22 600 | 25 600 | 28 600 | 31 700 |
5 000 000 | 21 300 | 24 600 | 27 800 | 29 900 | 34 300 |
7 500 000 | 29 600 | 33 900 | 38 200 | 42 500 | 46 800 |
10 000 000 | 37 300 | 42 500 | 47 800 | 53 000 | 58 200 |
15 000 000 | 51 700 | 58 600 | 65 600 | 72 500 | 79 400 |
20 000 000 | 65 300 | 73 700 | 82 100 | 90 500 | 98 900 |
25 000 000 | 78 100 | 87 900 | 97 700 | 107 500 | 117 200 |
30 000 000 | 85 400 | 95 600 | 106 000 | 116 500 | 127 000 |
35 000 000 | 96 700 | 108 000 | 119 600 | 131 200 | 142 900 |
40 000 000 | 107 700 | 120 100 | 132 700 | 145 400 | 158 200 |
45 000 000 | 118 400 | 131 800 | 145 400 | 159 200 | 173 100 |
50 000 000 | 128 900 | 143 200 | 157 900 | 172 600 | 187 500 |
55 000 000 | 139 200 | 154 400 | 170 000 | 185 800 | 201 700 |
60 000 000 | 149 300 | 165 400 | 181 900 | 198 700 | 215 500 |
65 000 000 | 159 200 | 176 300 | 193 700 | 211 300 | 229 100 |
70 000 000 | 169 100 | 186 900 | 205 200 | 223 700 | 242 400 |
75 000 000 | 178 700 | 197 400 | 216 500 | 235 900 | 255 500 |
80 000 000 | 188 300 | 207 700 | 227 700 | 247 900 | 268 400 |
85 000 000 | 197 700 | 217 900 | 238 700 | 259 800 | 281 200 |
90 000 000 | 207 000 | 228 000 | 249 600 | 271 500 | 293 700 |
95 000 000 | 216 300 | 237 900 | 260 300 | 283 000 | 306 100 |
100 000 000 | 225 400 | 247 800 | 270 900 | 294 400 | 318 300 |
112 500 000 | 247 900 | 272 000 | 296 900 | 322 400 | 348 200 |
125 000 000 | 269 800 | 295 600 | 322 300 | 349 600 | 377 400 |
137 500 000 | 291 400 | 318 700 | 347 200 | 376 200 | 405 800 |
150 000 000 | 312 600 | 341 500 | 371 600 | 402 300 | 433 700 |
25 000 | 330 | 410 | 500 | 580 | 660 |
30 000 | 380 | 480 | 570 | 660 | 760 |
35 000 | 430 | 540 | 640 | 750 | 850 |
40 000 | 480 | 590 | 710 | 830 | 950 |
45 000 | 520 | 650 | 780 | 900 | 1 030 |
50 000 | 570 | 710 | 840 | 980 | 1 120 |
75 000 | 780 | 970 | 1 150 | 1 330 | 1 520 |
100 000 | 990 | 1 210 | 1 430 | 1 660 | 1 880 |
150 000 | 1 350 | 1 650 | 1 950 | 2 240 | 2 540 |
200 000 | 1 690 | 2 060 | 2 410 | 2 780 | 3 130 |
250 000 | 2 010 | 2 430 | 2 850 | 3 260 | 3 680 |
300 000 | 2 310 | 2 780 | 3 250 | 3 720 | 4 190 |
350 000 | 2 590 | 3 110 | 3 630 | 4 150 | 4 670 |
400 000 | 2 860 | 3 430 | 3 990 | 4 560 | 5 130 |
450 000 | 3 110 | 3 730 | 4 340 | 4 950 | 5 560 |
500 000 | 3 360 | 4 010 | 4 660 | 5 320 | 5 970 |
750 000 | 4 440 | 5 270 | 6 090 | 6 920 | 7 750 |
1 000 000 | 5 330 | 6 290 | 7 260 | 8 220 | 9 180 |
1 500 000 | 7 390 | 8 670 | 9 950 | 11 200 | 12 500 |
2 000 000 | 9 320 | 10 900 | 12 400 | 14 000 | 15 600 |
2 500 000 | 11 200 | 13 000 | 14 800 | 16 600 | 18 500 |
3 000 000 | 12 900 | 15 000 | 17 100 | 19 200 | 21 200 |
3 500 000 | 14 600 | 16 900 | 19 300 | 21 600 | 23 900 |
4 000 000 | 16 300 | 18 800 | 21 400 | 23 900 | 26 500 |
4 500 000 | 17 900 | 20 700 | 23 400 | 26 200 | 28 900 |
5 000 000 | 19 500 | 22 500 | 25 400 | 28 400 | 31 400 |
7 500 000 | 27 100 | 31 000 | 34 900 | 38 800 | 42 700 |
10 000 000 | 34 100 | 38 900 | 43 700 | 48 500 | 53 200 |
15 000 000 | 47 300 | 53 600 | 59 900 | 66 200 | 72 600 |
20 000 000 | 59 700 | 67 300 | 75 000 | 82 700 | 90 400 |
25 000 000 | 71 400 | 80 400 | 89 300 | 98 200 | 107 200 |
30 000 000 | 80 300 | 90 000 | 99 800 | 109 600 | 119 500 |
35 000 000 | 91 000 | 101 600 | 112 500 | 123 400 | 134 400 |
40 000 000 | 101 300 | 113 000 | 124 800 | 136 800 | 148 800 |
45 000 000 | 111 400 | 124 000 | 136 800 | 149 800 | 162 800 |
50 000 000 | 121 300 | 134 800 | 148 500 | 162 400 | 176 500 |
55 000 000 | 131 000 | 145 300 | 160 000 | 174 800 | 189 800 |
60 000 000 | 140 500 | 155 700 | 171 200 | 180 500 | 202 800 |
65 000 000 | 149 800 | 165 800 | 182 200 | 198 800 | 215 600 |
70 000 000 | 159 100 | 175 800 | 193 000 | 210 500 | 228 100 |
75 000 000 | 168 200 | 185 700 | 203 700 | 222 000 | 240 400 |
80 000 000 | 177 200 | 195 400 | 214 200 | 233 300 | 252 600 |
85 000 000 | 186 000 | 205 000 | 224 600 | 244 400 | 264 500 |
90 000 000 | 194 800 | 214 500 | 234 800 | 255 400 | 276 300 |
95 000 000 | 203 500 | 223 900 | 244 900 | 266 300 | 288 000 |
100 000 000 | 212 100 | 233 100 | 254 900 | 277 000 | 299 500 |
112 500 000 | 233 200 | 255 900 | 279 400 | 303 300 | 327 600 |
125 000 000 | 253 900 | 278 100 | 303 300 | 329 000 | 355 100 |
137 500 000 | 274 200 | 299 900 | 326 700 | 354 000 | 381 800 |
150 000 000 | 294 100 | 321 300 | 349 600 | 378 500 | 408 000 |
200 000 000 | 379 200 | 403 400 | 437 400 | 472 400 | 500 800 |
250 000 000 | 452 300 | 481 200 | 520 500 | 561 000 | 594 700 |
375 000 000 | 623 300 | 663 100 | 713 900 | 766 700 | 812 700 |
500 000 000 | 782 500 | 832 500 | 893 300 | 956 800 | 1 014 200 |
625 000 000 | 933 500 | 993 100 | 1 062 900 | 1 136 200 | 1 204 400 |
750 000 000 | 1 078 300 | 1 147 100 | 1 225 200 | 1 307 500 | 1 385 900 |
1 000 000 000 | 1 353 800 | 1 440 200 | 1 533 000 | 1 631 800 | 1 729 700 |
1 250 000 000 | 1 615 000 | 1 718 100 | 1 824 100 | 1 937 800 | 2 054 000 |
1 500 000 000 | 1 865 500 | 1 984 600 | 2 102 600 | 2 229 900 | 2 363 700 |
1 750 000 000 | 2 107 400 | 2 241 900 | 2 370 900 | 2 511 000 | 2 661 600 |
2 000 000 000 | 2 342 100 | 2 491 600 | 2 630 900 | 2 783 000 | 2 949 900 |
25 000 | 250 | 300 | 370 | 480 |
30 000 | 300 | 360 | 440 | 570 |
35 000 | 350 | 420 | 520 | 670 |
40 000 | 400 | 480 | 590 | 760 |
45 000 | 440 | 540 | 670 | 860 |
50 000 | 500 | 600 | 740 | 950 |
100 000 | 990 | 1 190 | 1 450 | 1 840 |
150 000 | 1 490 | 1 760 | 2 120 | 2 660 |
200 000 | 1 980 | 2 320 | 2 760 | 3 420 |
250 000 | 2 480 | 2 860 | 3 360 | 4 130 |
300 000 | 2 860 | 3 310 | 3 900 | 4 800 |
350 000 | 3 180 | 3 700 | 4 400 | 5 440 |
400 000 | 3 460 | 4 050 | 4 850 | 6 030 |
450 000 | 3 690 | 4 360 | 5 250 | 6 590 |
500 000 | 3 880 | 4 620 | 5 610 | 7 100 |
1 000 000 | 7 050 | 8 360 | 10 100 | 12 700 |
1 500 000 | 10 200 | 12 100 | 14 600 | 18 300 |
2 000 000 | 13 400 | 15 800 | 19 100 | 23 900 |
2 500 000 | 16 600 | 19 600 | 23 600 | 29 500 |
3 000 000 | 19 900 | 23 300 | 27 700 | 34 500 |
3 500 000 | 23 200 | 27 000 | 31 900 | 39 400 |
4 000 000 | 26 500 | 30 600 | 36 100 | 44 400 |
4 500 000 | 29 800 | 34 300 | 40 300 | 49 300 |
5 000 000 | 33 200 | 38 000 | 44 500 | 54 200 |
10 000 000 | 66 300 | 75 400 | 87 500 | 105 600 |
15 000 000 | 99 500 | 112 100 | 128 800 | 154 000 |
20 000 000 | 132 600 | 148 100 | 168 600 | 199 500 |
25 000 000 | 165 800 | 184 300 | 208 800 | 245 700 |
30 000 000 | 186 500 | 206 100 | 232 900 | 273 100 |
35 000 000 | 215 400 | 237 300 | 267 300 | 312 400 |
40 000 000 | 243 000 | 267 100 | 300 200 | 350 100 |
45 000 000 | 269 600 | 295 600 | 331 600 | 386 000 |
50 000 000 | 295 300 | 323 200 | 361 800 | 420 700 |
55 000 000 | 320 100 | 349 900 | 391 300 | 454 100 |
60 000 000 | 344 400 | 375 500 | 419 600 | 486 600 |
65 000 000 | 368 100 | 400 900 | 447 500 | 518 000 |
70 000 000 | 391 200 | 425 500 | 474 500 | 549 000 |
75 000 000 | 414 000 | 449 800 | 501 200 | 579 500 |
80 000 000 | 436 100 | 473 300 | 527 100 | 609 100 |
85 000 000 | 457 900 | 496 600 | 552 600 | 638 200 |
90 000 000 | 479 500 | 519 500 | 577 800 | 666 900 |
95 000 000 | 500 900 | 542 200 | 602 600 | 695 300 |
100 000 000 | 522 100 | 564 700 | 627 200 | 723 300 |
112 500 000 | 574 100 | 619 800 | 687 500 | 791 900 |
125 000 000 | 625 000 | 673 700 | 746 300 | 858 900 |
137 500 000 | 674 900 | 726 400 | 803 800 | 924 300 |
150 000 000 | 724 000 | 778 100 | 860 200 | 988 400 |
101 | Monitoring in the area of railway operations on the basis of suspicion, complaint or sample, if the suspected or the complaint is caused by the person concerned or if a breach of a law has been established | § 3 para. 2 No. 2 BEVVG | 500 DM |
102 | Monitoring in the area of operational installations and Vehicles on the basis of a suspicion, complaint or sample, if the suspected or the complaint is caused by the person concerned or if a breach of a law has been established |
1 500 DM | |
103 | Statement for reasons of operational safety | § 2 para. 4 EBO | by time |
104 | Opinion on deviations from the recognised rules of technology | § 2 para. 2 EBO | by time |
105 | Approval of signals from ESO , with temporary validity |
Section A (a) Paragraph 4 ESO |
by time |
106 | Exception to EBO/ESBO | Section 3 (1) (2) (a) EBO or ESBO |
by time |
107 | Approval by EBO/ESBO | § 3 para. 2 No. 1 EBO or ESBO |
by time |
108 | Confirmation of an operational manager | Section 2 (2) of the Railway Works Directive | by time |
109 | Arrangement of measures taken by the Labour Protection Authority | § 22 ArbSchG i. V. m. § 1 para. 1 Railway-Occupation of the Protection of Occupational Safety | by time |
110 | Recognition of a notified body | § 2 No. 5 EIV | by time |
111 | Assessment and certification of conformity an interoperability constituent |
Section 3 (1) (1) of the EIV | by time |
112 | Certificate of EC verification of a subsystem | § 3 (1) No. 2 of the EIV | by time |
201 | Approval of a railway undertaking or a railway infrastructure undertaking | § 6 AEG | 2 500 DM |
202 | Decision on the decommissioning of Railway infrastructure |
§ 11 AEG | 1 500 DM |
301 | Plan fix -construction of new plants -modification of existing plants |
Section 18 (1) AEG | by Table 1 of the Annex |
302 | Plan Approval | Section 18 (2) AEG | 50% of the fee in accordance with No 301 |
303 | Decision on the maintenance of the plan fixed- and plan approval |
Section 18 (3) AEG | 25% of the fee in accordance with No 301 |
304 | Change of plan of unessential importance Completion of the project |
Section 76 (2) VwVfG | by time |
305 | Patient arrangement | Section 17 AEG | by time |
306 | Reserved decision after completion of the Plan approval or plan approval |
Section 74 (3) VwVfG | by time |
307 | Planning supplement in the case of unforeseeable effects of the project after the unquestionability of the plan | Section 75 (2) sentence 3 VwVfG | by time |
308 | Repeal of the decision or decision the planning permission after the start of construction |
§ 77 VwVfG | by time, up to 75% of the fee in accordance with No 301 or 302 |
309 | Dedictation | Section 18 AEG | by time |
401 | Approval of and consent in individual cases to new construction products and designs as well as railway-specific construction products and types of construction | § 3 para. 2 No. 2 BEVVG | by time |
402 | Granting of a type approval for railway-specific construction equipment | by time | |
403 | Approval of the execution planning including construction supervision and acceptance for engineering structures | § 3 para. 2 No. 2 BEVVG; § 18 AEG i. V. m. Section 74 (2) VwVfG | by Table 2 of the Annex |
404 | for superstructure | by Table 3 of the Annex |
|
405 | for buildings | by Table 4 of the Annex |
|
406 | Review of modified building templates for planning changes with a volume of more than 1/20 of origin planning |
§ 3 para. 2 No. 2 BEVVG; § 18 AEG i. V. m. Section 74 (3) VwVfG |
according to paragraph 403, 404 or 405, multiplied by the ratio of the scope of the change planning to the scope of the original planning |
407 | Approval of the execution planning including construction supervision and removal of conversions of a Existing installation with substantial operations in design or inventory |
§ 3 para. 2 No. 2 BEVVG; § 18 AEG i. V. m. Section 74 (3) VwVfG |
according to paragraph 403, 404 or 405, plus a surname of 20 to 50% depending on the degree of difficulty; the Costs for the Cancelation of construction parts is attributed to the construction costs |
408 | Approval of the execution planning of the Abortion or disposal of installations including construction supervision and acceptance |
by time | |
409 | Construction-technical examination of the building templates | § 3 para. 2 No. 2 BEVVG | 1 000 DM to 3 000 000 DM |
410 | Interim acceptance of certain components or construction work | by time | |
411 | Approval for commissioning of a subsystem | § 2 No. 1 EIV | by time |
421 | Execution planning approval | § 3 para. 2 No. 2 BEVVG; § 18 AEG i. V. m. Section 74 (3) VwVfG |
by time |
422 | Construction inspection of an installation including construction supervision during construction | § 3 para. 2 No. 2 BEVVG | by time |
423 | Approval of a new or modified form of construction -Type approval- |
by time | |
424 | Approval for commissioning of a subsystem | § 2 No. 1 EIV | by time |
441 | Acceptance of the first vehicle of a series | Section 32 (1) of the EBO | by time |
442 | Acceptance of the first converted vehicle | by time | |
443 | Checking a not from the scope of EBO coming vehicle, including notification of the acceptance |
by time | |
444 | Approval of a component | by time | |
445 | Approval of the first modified component of a series | by time | |
446 | Acceptance on the basis of the conformity Proof |
by time | |
447 | Approval for commissioning of a subsystem | § 2 No. 1 EIV | by time |
460 | Type approval, pre-commissioning testing, Exception Approval |
Section 33 (1) of the EBO | by time |
461 | Scheduled recurrent examination of Steam boilers, pressure vessels and other Installations in need of surveillance |
by time | |
462 | Recognition of | Section 33 (5) EBO | 1 000 DM |
463 | Checking the drinking water systems of rails- vehicles and the equipment for the filling of Rail vehicles; testing of the drinking water systems of a rail vehicle |
§ 79 Federal-Disease- Law; § § 19, 20 TrinkwV |
500 DM |
464 | Check the facilities for the filling of Rail vehicles; up to 10 hydrants |
800 DM | |
465 | Check the facilities for the filling of Rail vehicles; 11 to 50 Hydrants |
1 000 DM | |
466 | Check the facilities for the filling of Rail vehicles; 51 to 100 Hydrants |
1 300 DM | |
467 | Check the facilities for the filling of Rail vehicles; 101 to 200 Hydrants |
1 500 DM | |
468 | Check the facilities for the filling of Rail vehicles; more than 200 Hydrants |
DM 2 000 | |
469 | Definition of measures in the case of border and Overshooting of microbiological, chemical and physico-chemical parameters Notification of measures in the event of overshooting |
Section 11 (4) of the Federal Government The disease law; § § 1, 2, 3 TrinkwV |
DM 80 |
470 | Notification of measures at limit value- exceedance |
DM 80 |
501 | Individually attributable public services according to § 4 para. 2 AEG | § 4 para. 2 AEG i. V. m. the respective law |
by time |
502 | Monitoring of conformity and suitability for use of interoperability constituents | § 2 No. 2 EIV | by time |
503 | Monitoring of compliance with TSIs | § 2 No 3 EIV | by time |
504 | Approval of exceptions to the application Certain TSI |
§ 2 No. 4 EIV | by time |
505 | Amendment, extension and extension the validity of an administrative act |
by time, up to half the fee for the administrative act | |
506 | Other non-specified individual public services | like comparable public services that can be attributed individually, otherwise by time |
50 000 | 460 | 580 | 700 | 810 | 930 |
60 000 | 530 | 670 | 800 | 940 | 1 070 |
70 000 | 600 | 750 | 900 | 1 050 | 1 200 |
80 000 | 670 | 830 | 1 000 | 1 160 | 1 330 |
90 000 | 740 | 920 | 1 100 | 1 270 | 1 450 |
100 000 | 800 | 990 | 1 190 | 1 380 | 1 570 |
150 000 | 1 100 | 1 360 | 1 620 | 1 880 | 2 130 |
200 000 | 1 390 | 1 700 | 2 020 | 2 330 | 2 650 |
300 000 | 1 910 | 2 330 | 2 740 | 3 160 | 3 570 |
400 000 | 2 390 | 2 890 | 3 400 | 3 910 | 4 410 |
500 000 | 2 830 | 3 420 | 4 010 | 4 600 | 5 180 |
600 000 | 3 250 | 3 910 | 4 580 | 5 240 | 5 900 |
700 000 | 3 650 | 4 380 | 5 110 | 5 850 | 6 580 |
800 000 | 4 020 | 4 820 | 5 620 | 6 420 | 7 220 |
900 000 | 4 380 | 5 250 | 6 110 | 6 970 | 7 830 |
1 000 000 | 4 730 | 5 650 | 6 570 | 7 490 | 8 410 |
1 500 000 | 6 250 | 7 420 | 8 590 | 9 750 | 10 920 |
2 000 000 | 7 500 | 8 860 | 10 220 | 11 580 | 12 930 |
3 000 000 | 10 400 | 12 210 | 14 010 | 15 820 | 17 620 |
4 000 000 | 13 120 | 15 330 | 17 530 | 19 740 | 21 950 |
5 000 000 | 15 710 | 18 290 | 20 870 | 23 450 | 26 020 |
6 000 000 | 18 190 | 21 120 | 24 050 | 26 980 | 29 910 |
7 000 000 | 20 600 | 23 860 | 27 120 | 30 380 | 33 640 |
8 000 000 | 22 950 | 26 520 | 30 100 | 33 680 | 37 250 |
9 000 000 | 25 230 | 29 110 | 32 990 | 36 870 | 40 760 |
10 000 000 | 27 470 | 31 640 | 35 820 | 39 990 | 44 170 |
15 000 000 | 38 090 | 43 620 | 49 140 | 54 670 | 60 190 |
20 000 000 | 48 040 | 54 770 | 61 510 | 68 240 | 74 980 |
30 000 000 | 66 610 | 75 510 | 84 400 | 93 290 | 102 180 |
40 000 000 | 84 010 | 94 830 | 105 640 | 116 460 | 127 280 |
50 000 000 | 100 570 | 113 160 | 125 750 | 138 340 | 150 940 |
60 000 000 | 113 110 | 126 710 | 140 470 | 154 330 | 168 280 |
70 000 000 | 128 080 | 143 130 | 158 400 | 173 790 | 189 290 |
80 000 000 | 142 640 | 159 080 | 175 770 | 192 610 | 209 590 |
90 000 000 | 156 860 | 174 600 | 192 670 | 210 900 | 229 300 |
100 000 000 | 170 770 | 189 770 | 209 150 | 228 730 | 248 490 |
110 000 000 | 184 410 | 204 630 | 225 270 | 246 150 | 267 240 |
120 000 000 | 197 810 | 219 210 | 241 080 | 254 210 | 285 580 |
130 000 000 | 211 000 | 233 530 | 256 590 | 279 950 | 303 570 |
140 000 000 | 224 000 | 247 630 | 271 850 | 296 390 | 321 230 |
150 000 000 | 236 810 | 261 510 | 286 860 | 312 560 | 338 590 |
160 000 000 | 249 460 | 275 200 | 301 650 | 328 490 | 355 680 |
170 000 000 | 261 960 | 288 720 | 316 240 | 344 200 | 372 520 |
180 000 000 | 274 310 | 302 070 | 330 650 | 359 690 | 389 130 |
190 000 000 | 286 540 | 315 260 | 344 870 | 374 980 | 405 520 |
200 000 000 | 298 640 | 328 310 | 358 940 | 390 090 | 421 700 |
225 000 000 | 328 400 | 360 360 | 393 440 | 427 130 | 461 360 |
250 000 000 | 447 520 | 391 680 | 427 100 | 463 230 | 499 980 |
275 000 000 | 386 090 | 422 340 | 460 030 | 498 520 | 537 700 |
300 000 000 | 414 150 | 452 420 | 492 300 | 533 070 | 574 610 |
400 000 000 | 533 930 | 568 010 | 616 000 | 665 280 | 705 200 |
500 000 000 | 636 950 | 677 610 | 732 970 | 790 030 | 837 430 |
750 000 000 | 877 730 | 933 750 | 1 005 300 | 1 079 600 | 1 144 370 |
1 000 000 000 | 1 101 940 | 1 172 280 | 1 257 910 | 1 347 370 | 1 428 210 |
1 250 000 000 | 1 314 610 | 1 398 520 | 1 496 790 | 1 600 010 | 1 696 010 |
1 500 000 000 | 1 518 490 | 1 615 420 | 1 725 270 | 1 841 220 | 1 951 690 |
2 000 000 000 | 1 906 400 | 2 028 080 | 2 158 780 | 2 297 880 | 2 435 760 |
2 500 000 000 | 2 274 310 | 2 419 480 | 2 568 730 | 2 728 760 | 2 892 480 |
3 000 000 000 | 2 627 030 | 2 794 720 | 2 960 850 | 3 140 130 | 3 328 540 |
3 500 000 000 | 2 967 610 | 3 157 030 | 3 338 720 | 3 535 960 | 3 748 120 |
4 000 000 000 | 3 298 120 | 3 508 640 | 3 704 820 | 3 918 960 | 4 154 100 |
50 000 | 580 | 730 | 880 | 1 030 | 1 180 |
60 000 | 680 | 850 | 1 020 | 1 190 | 1 360 |
70 000 | 760 | 950 | 1 150 | 1 340 | 1 530 |
80 000 | 850 | 1 060 | 1 270 | 1 480 | 1 690 |
90 000 | 930 | 1 160 | 1 390 | 1 620 | 1 850 |
100 000 | 1 020 | 1 260 | 1 510 | 1 760 | 2 000 |
150 000 | 1 410 | 1 740 | 2 070 | 2 400 | 2 730 |
200 000 | 1 780 | 2 180 | 2 590 | 2 990 | 3 390 |
300 000 | 2 470 | 3 010 | 3 550 | 4 090 | 4 620 |
400 000 | 3 110 | 3 780 | 4 440 | 5 100 | 5 760 |
500 000 | 3 730 | 4 500 | 5 280 | 6 050 | 6 830 |
600 000 | 4 320 | 5 200 | 6 080 | 6 960 | 7 840 |
700 000 | 4 890 | 5 870 | 6 860 | 7 840 | 8 820 |
800 000 | 5 450 | 6 530 | 7 610 | 8 690 | 9 770 |
900 000 | 5 990 | 7 160 | 8 340 | 9 510 | 10 690 |
1 000 000 | 6 520 | 7 780 | 9 050 | 10 310 | 11 580 |
1 500 000 | 9 040 | 10 720 | 12 410 | 14 090 | 15 780 |
2 000 000 | 11 400 | 13 460 | 15 520 | 17 590 | 19 650 |
3 000 000 | 15 810 | 18 550 | 21 290 | 24 030 | 26 770 |
4 000 000 | 19 930 | 23 290 | 26 640 | 29 990 | 33 340 |
5 000 000 | 23 860 | 27 780 | 31 700 | 35 620 | 39 530 |
6 000 000 | 27 640 | 32 090 | 36 540 | 40 990 | 45 440 |
7 000 000 | 31 300 | 36 250 | 41 200 | 46 150 | 51 110 |
8 000 000 | 34 860 | 40 290 | 45 720 | 51 160 | 56 590 |
9 000 000 | 38 330 | 44 230 | 50 120 | 56 020 | 61 910 |
10 000 000 | 41 730 | 48 070 | 54 410 | 58 510 | 67 100 |
15 000 000 | 57 860 | 66 260 | 74 650 | 83 050 | 91 440 |
20 000 000 | 72 970 | 83 200 | 93 440 | 103 670 | 113 900 |
30 000 000 | 101 190 | 114 700 | 128 210 | 141 720 | 155 230 |
40 000 000 | 127 620 | 144 050 | 160 490 | 176 920 | 193 360 |
50 000 000 | 152 780 | 171 900 | 191 030 | 210 160 | 229 290 |
60 000 000 | 166 960 | 187 040 | 207 360 | 227 820 | 248 400 |
70 000 000 | 189 060 | 211 280 | 233 820 | 256 530 | 279 410 |
80 000 000 | 210 560 | 234 810 | 259 460 | 284 320 | 309 380 |
90 000 000 | 231 540 | 257 740 | 284 400 | 311 320 | 338 470 |
100 000 000 | 252 070 | 280 130 | 308 730 | 337 630 | 366 810 |
110 000 000 | 272 210 | 302 060 | 332 530 | 363 350 | 394 480 |
120 000 000 | 292 000 | 323 580 | 355 860 | 388 530 | 421 560 |
130 000 000 | 311 460 | 344 720 | 378 760 | 413 240 | 448 100 |
140 000 000 | 330 650 | 365 530 | 401 280 | 437 510 | 474 170 |
150 000 000 | 349 560 | 386 020 | 423 440 | 461 380 | 499 800 |
160 000 000 | 368 240 | 406 240 | 445 280 | 484 900 | 525 030 |
170 000 000 | 386 690 | 426 190 | 466 820 | 508 070 | 549 890 |
180 000 000 | 404 930 | 445 890 | 488 080 | 530 940 | 574 400 |
190 000 000 | 422 970 | 465 370 | 509 080 | 553 520 | 598 600 |
200 000 000 | 440 840 | 484 630 | 529 840 | 575 820 | 622 490 |
225 000 000 | 484 760 | 531 940 | 580 760 | 630 500 | 681 020 |
250 000 000 | 527 750 | 578 160 | 630 450 | 683 790 | 738 040 |
275 000 000 | 569 910 | 623 420 | 679 060 | 735 870 | 793 710 |
300 000 000 | 611 340 | 667 830 | 726 690 | 786 870 | 848 190 |
50 000 | 640 | 800 | 970 | 1 130 | 1 300 |
60 000 | 740 | 930 | 1 110 | 1 300 | 1 490 |
70 000 | 840 | 1 050 | 1 250 | 1 460 | 1 670 |
80 000 | 930 | 1 160 | 1 390 | 1 620 | 1 850 |
90 000 | 1 020 | 1 270 | 1 520 | 1 770 | 2 020 |
100 000 | 1 110 | 1 380 | 1 650 | 1 920 | 2 190 |
150 000 | 1 530 | 1 890 | 2 250 | 2 610 | 2 970 |
200 000 | 1 930 | 2 370 | 2 800 | 3 240 | 3 680 |
300 000 | 2 650 | 3 230 | 3 810 | 4 390 | 4 970 |
400 000 | 3 310 | 4 020 | 4 720 | 5 430 | 6 130 |
500 000 | 3 930 | 4 750 | 5 570 | 6 380 | 7 200 |
600 000 | 4 510 | 5 440 | 6 360 | 7 280 | 8 200 |
700 000 | 5 070 | 6 090 | 7 100 | 8 120 | 9 140 |
800 000 | 5 590 | 6 700 | 7 810 | 8 920 | 10 030 |
900 000 | 6 090 | 7 290 | 8 480 | 9 680 | 10 870 |
1 000 000 | 6 570 | 7 850 | 9 120 | 10 400 | 11 670 |
1 500 000 | 8 690 | 10 310 | 11 920 | 13 540 | 15 160 |
2 000 000 | 10 420 | 12 310 | 14 190 | 16 080 | 17 960 |
3 000 000 | 14 450 | 16 960 | 19 460 | 21 970 | 24 480 |
4 000 000 | 18 220 | 21 290 | 24 350 | 27 420 | 30 490 |
5 000 000 | 21 820 | 25 400 | 28 980 | 32 560 | 36 150 |
6 000 000 | 25 270 | 29 340 | 33 410 | 37 470 | 41 540 |
7 000 000 | 28 620 | 33 140 | 37 670 | 42 200 | 46 730 |
8 000 000 | 31 870 | 36 840 | 41 810 | 46 770 | 51 740 |
9 000 000 | 35 040 | 40 430 | 45 830 | 51 220 | 56 610 |
10 000 000 | 38 150 | 43 950 | 49 750 | 55 550 | 61 350 |
15 000 000 | 52 910 | 60 580 | 68 250 | 75 930 | 83 600 |
20 000 000 | 66 720 | 76 070 | 85 430 | 94 780 | 104 130 |
30 000 000 | 92 520 | 104 870 | 117 220 | 129 570 | 141 920 |
40 000 000 | 116 680 | 131 700 | 146 730 | 161 760 | 176 780 |
50 000 000 | 139 680 | 157 170 | 174 660 | 192 150 | 209 630 |
60 000 000 | 157 100 | 175 980 | 195 100 | 214 350 | 233 720 |
70 000 000 | 177 890 | 198 800 | 220 000 | 241 370 | 262 900 |
80 000 000 | 198 120 | 220 940 | 244 130 | 267 520 | 291 100 |
90 000 000 | 217 860 | 242 510 | 267 590 | 292 920 | 318 470 |
100 000 000 | 237 180 | 263 580 | 290 490 | 317 680 | 345 130 |
110 000 000 | 256 120 | 284 210 | 312 880 | 341 880 | 371 160 |
120 000 000 | 274 740 | 304 450 | 334 830 | 353 070 | 396 640 |
130 000 000 | 293 060 | 324 350 | 356 380 | 388 820 | 421 620 |
140 000 000 | 311 110 | 343 920 | 377 560 | 411 650 | 446 150 |
150 000 000 | 328 910 | 363 210 | 398 420 | 434 120 | 470 270 |
160 000 000 | 346 480 | 382 230 | 418 960 | 456 240 | 494 010 |
170 000 000 | 363 840 | 401 000 | 439 230 | 478 050 | 517 390 |
180 000 000 | 380 980 | 419 540 | 459 230 | 499 560 | 540 460 |
190 000 000 | 397 980 | 437 870 | 478 990 | 520 800 | 563 220 |
200 000 000 | 414 780 | 455 990 | 498 520 | 541 790 | 585 700 |
225 000 000 | 456 110 | 500 510 | 546 440 | 593 240 | 640 780 |
250 000 000 | 496 560 | 543 990 | 593 200 | 643 380 | 694 420 |
275 000 000 | 536 230 | 586 580 | 638 930 | 692 380 | 746 800 |
300 000 000 | 575 210 | 628 360 | 683 750 | 740 370 | 798 070 |
400 000 000 | 741 570 | 788 900 | 855 550 | 924 000 | 979 440 |
500 000 000 | 884 660 | 941 120 | 1 018 020 | 1 097 260 | 1 163 100 |
750 000 000 | 1 219 060 | 1 296 880 | 1 396 260 | 1 499 440 | 1 589 410 |
1 000 000 000 | 1 530 480 | 1 628 170 | 1 747 090 | 1 871 340 | 1 983 620 |
1 250 000 000 | 1 825 840 | 1 942 390 | 2 078 870 | 2 222 230 | 2 355 570 |
1 500 000 000 | 2 109 020 | 2 243 630 | 2 396 210 | 2 557 250 | 2 710 680 |
2 000 000 000 | 2 647 770 | 2 816 780 | 2 998 300 | 3 191 510 | 3 383 000 |
2 500 000 000 | 3 158 760 | 3 360 380 | 3 567 680 | 3 789 940 | 4 017 340 |
3 000 000 000 | 3 648 660 | 3 881 550 | 4 112 290 | 4 361 290 | 4 622 970 |
3 500 000 000 | 4 121 680 | 4 384 760 | 4 637 110 | 4 911 060 | 5 205 720 |
4 000 000 000 | 4 580 720 | 4 873 110 | 5 145 580 | 5 443 000 | 5 769 580 |
50 000 | 490 | 590 | 730 | 940 | 1 080 |
60 000 | 580 | 710 | 870 | 1 120 | 1 290 |
70 000 | 680 | 830 | 1 020 | 1 310 | 1 500 |
80 000 | 780 | 940 | 1 160 | 1 490 | 1 710 |
90 000 | 870 | 1 060 | 1 310 | 1 680 | 1 920 |
100 000 | 970 | 1 170 | 1 440 | 1 850 | 2 120 |
200 000 | 1 940 | 2 320 | 2 830 | 3 590 | 4 100 |
300 000 | 2 910 | 3 440 | 4 140 | 5 200 | 5 900 |
400 000 | 3 880 | 4 530 | 5 390 | 6 680 | 7 540 |
500 000 | 4 850 | 5 590 | 6 580 | 8 070 | 9 060 |
600 000 | 5 600 | 6 470 | 7 630 | 9 380 | 10 540 |
700 000 | 6 220 | 7 240 | 8 600 | 10 630 | 11 990 |
800 000 | 6 760 | 7 930 | 9 480 | 11 800 | 13 350 |
900 000 | 7 220 | 8 530 | 10 270 | 12 890 | 14 640 |
1 000 000 | 7 580 | 9 030 | 10 970 | 13 880 | 15 820 |
2 000 000 | 13 790 | 16 350 | 19 750 | 24 860 | 28 260 |
3 000 000 | 20 010 | 23 660 | 28 530 | 35 830 | 40 700 |
4 000 000 | 26 220 | 30 970 | 37 300 | 46 800 | 53 130 |
5 000 000 | 32 430 | 38 280 | 46 080 | 57 770 | 65 570 |
6 000 000 | 38 920 | 45 500 | 54 270 | 67 430 | 76 210 |
7 000 000 | 45 400 | 52 710 | 62 470 | 77 090 | 86 840 |
8 000 000 | 51 890 | 59 930 | 70 660 | 86 750 | 97 480 |
9 000 000 | 58 370 | 67 150 | 78 850 | 96 410 | 108 110 |
10 000 000 | 64 860 | 74 370 | 87 050 | 106 070 | 118 750 |
20 000 000 | 129 720 | 147 430 | 171 040 | 206 460 | 230 070 |
30 000 000 | 194 580 | 219 170 | 251 970 | 301 160 | 333 950 |
40 000 000 | 259 440 | 289 610 | 329 830 | 390 170 | 430 400 |
50 000 000 | 324 290 | 360 370 | 408 470 | 480 610 | 528 710 |
60 000 000 | 364 690 | 403 150 | 455 420 | 534 090 | 586 040 |
70 000 000 | 421 220 | 464 070 | 522 790 | 611 040 | 669 080 |
80 000 000 | 475 210 | 522 460 | 587 080 | 684 680 | 748 250 |
90 000 000 | 527 260 | 578 050 | 648 650 | 754 940 | 824 340 |
100 000 000 | 577 460 | 632 050 | 707 680 | 822 840 | 896 030 |
110 000 000 | 626 090 | 684 250 | 765 280 | 888 170 | 965 550 |
120 000 000 | 673 610 | 734 450 | 820 600 | 951 630 | 1 032 860 |
130 000 000 | 719 960 | 784 010 | 875 160 | 1 013 150 | 1 099 010 |
140 000 000 | 765 060 | 832 160 | 928 110 | 1 073 730 | 1 164 110 |
150 000 000 | 809 650 | 879 700 | 980 350 | 1 133 460 | 1 228 260 |
160 000 000 | 852 900 | 925 760 | 1 030 900 | 1 191 230 | 1 290 260 |
170 000 000 | 895 630 | 971 230 | 1 080 770 | 1 248 170 | 1 351 350 |
180 000 000 | 937 880 | 1 016 130 | 1 129 990 | 1 304 340 | 1 411 590 |
190 000 000 | 979 680 | 1 060 520 | 1 178 620 | 1 359 800 | 1 471 040 |
200 000 000 | 1 021 050 | 1 104 420 | 1 226 680 | 1 414 590 | 1 529 760 |
225 000 000 | 1 122 790 | 1 212 240 | 1 344 580 | 1 548 910 | 1 673 610 |
250 000 000 | 1 222 350 | 1 317 560 | 1 459 620 | 1 679 840 | 1 813 710 |
275 000 000 | 1 320 010 | 1 420 710 | 1 572 150 | 1 807 790 | 1 950 530 |
300 000 000 | 1 415 960 | 1 521 900 | 1 682 440 | 1 933 080 | 2 084 420 |
101 | Monitoring in the area of railway operations on the basis of suspicion, complaint or sample, if the suspected or the complaint is caused by the person concerned or if a breach of a law has been established | § 3 para. 2 No. 2 BEVVG | 500 DM |
102 | Supervision in the field of equipment and vehicles on the basis of suspicion, complaint or sample, if the suspected or the complaint is caused by the person concerned or is in breach of a law has been identified | 1 500 DM | |
103 | Statement for reasons of operational safety | § 2 para. 4 EBO | by time |
104 | Opinion on deviations from the recognised rules of technology | § 2 para. 2 EBO | by time |
105 | Approval of signals from ESO , with temporary validity |
Section A (a) Paragraph 4 ESO |
by time |
106 | Exception to EBO/ESBO | Section 3 (1) (2) (a) EBO or ESBO |
by time |
107 | Approval by EBO/ESBO | § 3 para. 2 No. 1 EBO or ESBO | by time |
108 | Confirmation of an operational manager | Section 2 (2) of the Railway Works Directive | by time |
109 | Arrangement of measures taken by the Labour Protection Authority | § 22 ArbSchG i. V. m. Section 1 (1) Railway-Occupor-Safety and Security Regulation |
by time |
110 | Recognition of a notified body | § 2 No. 5 EIV | by time |
111 | Assessment and certification of conformity of an interoperability constituent | Section 3 (1) (1) of the EIV | by time |
112 | Certificate of EC verification of a subsystem | § 3 (1) No. 2 of the EIV | by time |
113 | Consent to the collection of charges at Lack of infrastructure capacity |
Section 18 (4) of the EIBV | by time |
114 | Exemption from Section 14 (4) AEG | Section 22 (1) (1) and (2) EIBV | by time |
201 | Approval of a railway undertaking or a railway infrastructure undertaking | § 6 AEG | 2 500 DM |
202 | Decision on the decommissioning of the railways- infrastructural facilities |
§ 11 AEG | 1 500 DM |
203 | Issuing a safety certificate | Section 14 (7) AEG | by time |
301 | Plan fix -construction of new plants -modification of existing plants |
Section 18 (1) AEG | by table 1 of the Annex |
302 | Plan Approval | Section 18 (2) AEG | 50% of the fee in accordance with No 301 |
303 | Decision on the maintenance of the Plan determination and planning approval |
Section 18 (3) AEG | 25% of the fee in accordance with No 301 |
304 | Change of plan of unessential importance Completion of the project |
Section 76 (2) VwVfG | by time |
305 | Patient arrangement | Section 17 AEG | by time |
306 | Reserved decision after completion of the Plan approval or plan approval |
Section 74 (3) VwVfG | by time |
307 | Planning supplement in case of non-foreseeable effects of the project after the unquestionability of the plan |
Section 75 (2) sentence 3 VwVfG | by time |
308 | Repeal of the decision or decision the planning permission after the start of construction |
§ 77 VwVfG | by time, up to 75% of the fee in accordance with No 301 or 302 |
309 | Dedictation | Section 18 AEG | by time |
401 | Approval of and approval in individual cases new construction products and designs as well as railway-specific construction products and construction |
§ 3 para. 2 No. 2 BEVVG | by time |
402 | Granting of a type approval for railway-specific construction equipment | by time | |
403 | Approval of the execution planning including construction supervision and acceptance for engineering structures | § 3 para. 2 No. 2 BEVVG; § 18 AEG i. V. m. Section 74 (2) VwVfG |
by table 2 of the Annex |
404 | for superstructure | by table 3 of the Annex | |
405 | for buildings | by table 4 of the Annex | |
406 | Review of modified building templates for planning changes with a volume of more than 1/20 of origin planning |
§ 3 para. 2 No. 2 BEVVG; § 18 AEG i. V. m. Section 74 (3) VwVfG |
according to No. 403, 404 or 405, multiply with the ratio of the scope of change planning to the scope of origin planning |
407 | Approval of the execution planning including construction supervision and removal of conversions of a Existing installation with substantial operations in design or inventory |
§ 3 para. 2 No. 2 BEVVG; § 18 AEG i. V. m. Section 74 (3) VwVfG |
according to No. 403, 404 or 405, plus a surcharge of 20 to 50% depending on the degree of difficulty; the cost of canceling construction works is attributed to the construction costs |
408 | Approval of the execution planning of the abort or the disposal of installations, including Construction supervision and acceptance |
by time | |
409 | Construction-technical examination of the building templates | § 3 para. 2 No. 2 BEVVG | 1 000 DM up to 3 000 000 DM |
410 | Interim withdrawal of certain Components or construction works |
by time | |
411 | Approval for commissioning of a subsystem | § 2 No. 1 EIV | by time |
421 | Execution planning approval | § 3 para. 2 No. 2 BEVVG; § 18 AEG i. V. m. Section 74 (3) VwVfG | by time |
422 | Construction inspection of an installation including construction supervision during construction | § 3 para. 2 No. 2 BEVVG | by time |
423 | Approval of a new or modified form of construction -Type approval- |
by time | |
424 | Approval for commissioning of a subsystem | § 2 No. 1 EIV | by time |
441 | Acceptance of the first vehicle of a series | Section 32 (1) of the EBO | by time |
442 | Acceptance of the first converted vehicle | by time | |
443 | Consideration of a vehicle not included in the scope of the EBO, including the acceptance of the acceptance | by time | |
444 | Approval of a component | by time | |
445 | Approval of the first modified component a series |
by time | |
446 | Acceptance on the basis of the conformity Proof |
by time | |
447 | Approval for commissioning of a subsystem | § 2 No. 1 EIV | by time |
460 | Type approval, pre-commissioning examination, exception approval | Section 33 (1) of the EBO | by time |
461 | Scheduled recurrent testing of steam Boilers, pressure vessels and other equipment requiring surveillance |
by time | |
462 | Recognition of | Section 33 (5) EBO | 1 000 DM |
463 | Checking the drinking water systems of rails- vehicles and the equipment for the filling of Rail vehicles; testing of the drinking water systems of a rail vehicle |
§ 79 Federal Disease Act; § § 19, 20 TrinkwV | 500 DM |
464 | Checking the equipment for filling rails- vehicles; up to 10 hydrants |
800 DM | |
465 | Checking the equipment for filling rails- vehicles; 11 to 50 hydrants |
1 000 DM | |
466 | Checking the equipment for filling rails- vehicles; 51 to 100 Hydrants |
1 300 DM | |
467 | Checking the equipment for filling rails- vehicles; 101 to 200 Hydrants |
1 500 DM | |
468 | Checking the equipment for filling rails- vehicles; more than 200 Hydrants |
DM 2 000 | |
469 | Determination of measures in the case of cross-border and guide value overruns of microbiological, chemical and physico-chemical parameters, information on measures for overshooting | Section 11 (4) of the Federal Government Health care law; § § 1, 2, 3 TrinkwV |
DM 80 |
470 | Communication on measures in the case of limit values- Write |
DM 80 |
501 | Individually attributable public services according to § 4 para. 2 AEG | § 4 para. 2 AEG i. V. m. the respective law | by time |
502 | Monitoring of conformity and use- Suitability of interoperability constituents |
§ 2 No. 2 EIV | by time |
503 | Monitoring of compliance with TSIs | § 2 No 3 EIV | by time |
504 | Approval of exceptions to the application Certain TSI |
§ 2 No. 4 EIV | by time |
505 | Amendment, extension and extension of the Validity of an administrative act |
by time, up to half of the fee for the Administrative |
|
506 | Other non-specified individual public services | like comparable public services that can be attributed individually, otherwise by time |
601 | Monitoring of access to the railway infrastructure on the basis of suspicion, complaint or sample, if the suspected or the complaint is caused by the person concerned, or a breach of a law has been identified | Section 14c (1) AEC | by time |
602 | Instruction to comply with the provisions on access to railway infrastructure |
Section 14c (1) AEC | by time |
603 | Objection to results and decisions pursuant to § 14d AEG | Section 14e (1) AEG | by time |
604 | Monitoring of access to the railway infrastructure on the basis of suspicion, complaint or sample, if the suspected or the complaint is caused by the person concerned, or a breach of a law has been identified | Section 14f (1) AEG | by time |
605 | Instruction for omission of impairment of the right of access to railway infrastructure |
Section 14f (1) and (3) AEG | by time |
606 | Approval of the duration of a framework contract on the allocation of train paths | Section 14a (2) AEG | by time |
50 000 | 460 | 580 | 700 | 810 | 930 |
60 000 | 530 | 670 | 800 | 940 | 1 070 |
70 000 | 600 | 750 | 900 | 1 050 | 1 200 |
80 000 | 670 | 830 | 1 000 | 1 160 | 1 330 |
90 000 | 740 | 920 | 1 100 | 1 270 | 1 450 |
100 000 | 800 | 990 | 1 190 | 1 380 | 1 570 |
150 000 | 1 100 | 1 360 | 1 620 | 1 880 | 2 130 |
200 000 | 1 390 | 1 700 | 2 020 | 2 330 | 2 650 |
300 000 | 1 910 | 2 330 | 2 740 | 3 160 | 3 570 |
400 000 | 2 390 | 2 890 | 3 400 | 3 910 | 4 410 |
500 000 | 2 830 | 3 420 | 4 010 | 4 600 | 5 180 |
600 000 | 3 250 | 3 910 | 4 580 | 5 240 | 5 900 |
700 000 | 3 650 | 4 380 | 5 110 | 5 850 | 6 580 |
800 000 | 4 020 | 4 820 | 5 620 | 6 420 | 7 220 |
900 000 | 4 380 | 5 250 | 6 110 | 6 970 | 7 830 |
1 000 000 | 4 730 | 5 650 | 6 570 | 7 490 | 8 410 |
1 500 000 | 6 250 | 7 420 | 8 590 | 9 750 | 10 920 |
2 000 000 | 7 500 | 8 860 | 10 220 | 11 580 | 12 930 |
3 000 000 | 10 400 | 12 210 | 14 010 | 15 820 | 17 620 |
4 000 000 | 13 120 | 15 330 | 17 530 | 19 740 | 21 950 |
5 000 000 | 15 710 | 18 290 | 20 870 | 23 450 | 26 020 |
6 000 000 | 18 190 | 21 120 | 24 050 | 26 980 | 29 910 |
7 000 000 | 20 600 | 23 860 | 27 120 | 30 380 | 33 640 |
8 000 000 | 22 950 | 26 520 | 30 100 | 33 680 | 37 250 |
9 000 000 | 25 230 | 29 110 | 32 990 | 36 870 | 40 760 |
10 000 000 | 27 470 | 31 640 | 35 820 | 39 990 | 44 170 |
15 000 000 | 38 090 | 43 620 | 49 140 | 54 670 | 60 190 |
20 000 000 | 48 040 | 54 770 | 61 510 | 68 240 | 74 980 |
30 000 000 | 66 610 | 75 510 | 84 400 | 93 290 | 102 180 |
40 000 000 | 84 010 | 94 830 | 105 640 | 116 460 | 127 280 |
50 000 000 | 100 570 | 113 160 | 125 750 | 138 340 | 150 940 |
60 000 000 | 113 110 | 126 710 | 140 470 | 154 330 | 168 280 |
70 000 000 | 128 080 | 143 130 | 158 400 | 173 790 | 189 290 |
80 000 000 | 142 640 | 159 080 | 175 770 | 192 610 | 209 590 |
90 000 000 | 156 860 | 174 600 | 192 670 | 210 900 | 229 300 |
100 000 000 | 170 770 | 189 770 | 209 150 | 228 730 | 248 490 |
110 000 000 | 184 410 | 204 630 | 225 270 | 246 150 | 267 240 |
120 000 000 | 197 810 | 219 210 | 241 080 | 254 210 | 285 580 |
130 000 000 | 211 000 | 233 530 | 256 590 | 279 950 | 303 570 |
140 000 000 | 224 000 | 247 630 | 271 850 | 296 390 | 321 230 |
150 000 000 | 236 810 | 261 510 | 286 860 | 312 560 | 338 590 |
160 000 000 | 249 460 | 275 200 | 301 650 | 328 490 | 355 680 |
170 000 000 | 261 960 | 288 720 | 316 240 | 344 200 | 372 520 |
180 000 000 | 274 310 | 302 070 | 330 650 | 359 690 | 389 130 |
190 000 000 | 286 540 | 315 260 | 344 870 | 374 980 | 405 520 |
200 000 000 | 298 640 | 328 310 | 358 940 | 390 090 | 421 700 |
225 000 000 | 328 400 | 360 360 | 393 440 | 427 130 | 461 360 |
250 000 000 | 447 520 | 391 680 | 427 100 | 463 230 | 499 980 |
275 000 000 | 386 090 | 422 340 | 460 030 | 498 520 | 537 700 |
300 000 000 | 414 150 | 452 420 | 492 300 | 533 070 | 574 610 |
400 000 000 | 533 930 | 568 010 | 616 000 | 665 280 | 705 200 |
500 000 000 | 636 950 | 677 610 | 732 970 | 790 030 | 837 430 |
750 000 000 | 877 730 | 933 750 | 1 005 300 | 1 079 600 | 1 144 370 |
1 000 000 000 | 1 101 940 | 1 172 280 | 1 257 910 | 1 347 370 | 1 428 210 |
1 250 000 000 | 1 314 610 | 1 398 520 | 1 496 790 | 1 600 010 | 1 696 010 |
1 500 000 000 | 1 518 490 | 1 615 420 | 1 725 270 | 1 841 220 | 1 951 690 |
2 000 000 000 | 1 906 400 | 2 028 080 | 2 158 780 | 2 297 880 | 2 435 760 |
2 500 000 000 | 2 274 310 | 2 419 480 | 2 568 730 | 2 728 760 | 2 892 480 |
3 000 000 000 | 2 627 030 | 2 794 720 | 2 960 850 | 3 140 130 | 3 328 540 |
3 500 000 000 | 2 967 610 | 3 157 030 | 3 338 720 | 3 535 960 | 3 748 120 |
4 000 000 000 | 3 298 120 | 3 508 640 | 3 704 820 | 3 918 960 | 4 154 100 |
50 000 | 580 | 730 | 880 | 1 030 | 1 180 |
60 000 | 680 | 850 | 1 020 | 1 190 | 1 360 |
70 000 | 760 | 950 | 1 150 | 1 340 | 1 530 |
80 000 | 850 | 1 060 | 1 270 | 1 480 | 1 690 |
90 000 | 930 | 1 160 | 1 390 | 1 620 | 1 850 |
100 000 | 1 020 | 1 260 | 1 510 | 1 760 | 2 000 |
150 000 | 1 410 | 1 740 | 2 070 | 2 400 | 2 730 |
200 000 | 1 780 | 2 180 | 2 590 | 2 990 | 3 390 |
300 000 | 2 470 | 3 010 | 3 550 | 4 090 | 4 620 |
400 000 | 3 110 | 3 780 | 4 440 | 5 100 | 5 760 |
500 000 | 3 730 | 4 500 | 5 280 | 6 050 | 6 830 |
600 000 | 4 320 | 5 200 | 6 080 | 6 960 | 7 840 |
700 000 | 4 890 | 5 870 | 6 860 | 7 840 | 8 820 |
800 000 | 5 450 | 6 530 | 7 610 | 8 690 | 9 770 |
900 000 | 5 990 | 7 160 | 8 340 | 9 510 | 10 690 |
1 000 000 | 6 520 | 7 780 | 9 050 | 10 310 | 11 580 |
1 500 000 | 9 040 | 10 720 | 12 410 | 14 090 | 15 780 |
2 000 000 | 11 400 | 13 460 | 15 520 | 17 590 | 19 650 |
3 000 000 | 15 810 | 18 550 | 21 290 | 24 030 | 26 770 |
4 000 000 | 19 930 | 23 290 | 26 640 | 29 990 | 33 340 |
5 000 000 | 23 860 | 27 780 | 31 700 | 35 620 | 39 530 |
6 000 000 | 27 640 | 32 090 | 36 540 | 40 990 | 45 440 |
7 000 000 | 31 300 | 36 250 | 41 200 | 46 150 | 51 110 |
8 000 000 | 34 860 | 40 290 | 45 720 | 51 160 | 56 590 |
9 000 000 | 38 330 | 44 230 | 50 120 | 56 020 | 61 910 |
10 000 000 | 41 730 | 48 070 | 54 410 | 58 510 | 67 100 |
15 000 000 | 57 860 | 66 260 | 74 650 | 83 050 | 91 440 |
20 000 000 | 72 970 | 83 200 | 93 440 | 103 670 | 113 900 |
30 000 000 | 101 190 | 114 700 | 128 210 | 141 720 | 155 230 |
40 000 000 | 127 620 | 144 050 | 160 490 | 176 920 | 193 360 |
50 000 000 | 152 780 | 171 900 | 191 030 | 210 160 | 229 290 |
60 000 000 | 166 960 | 187 040 | 207 360 | 227 820 | 248 400 |
70 000 000 | 189 060 | 211 280 | 233 820 | 256 530 | 279 410 |
80 000 000 | 210 560 | 234 810 | 259 460 | 284 320 | 309 380 |
90 000 000 | 231 540 | 257 740 | 284 400 | 311 320 | 338 470 |
100 000 000 | 252 070 | 280 130 | 308 730 | 337 630 | 366 810 |
110 000 000 | 272 210 | 302 060 | 332 530 | 363 350 | 394 480 |
120 000 000 | 292 000 | 323 580 | 355 860 | 388 530 | 421 560 |
130 000 000 | 311 460 | 344 720 | 378 760 | 413 240 | 448 100 |
140 000 000 | 330 650 | 365 530 | 401 280 | 437 510 | 474 170 |
150 000 000 | 349 560 | 386 020 | 423 440 | 461 380 | 499 800 |
160 000 000 | 368 240 | 406 240 | 445 280 | 484 900 | 525 030 |
170 000 000 | 386 690 | 426 190 | 466 820 | 508 070 | 549 890 |
180 000 000 | 404 930 | 445 890 | 488 080 | 530 940 | 574 400 |
190 000 000 | 422 970 | 465 370 | 509 080 | 553 520 | 598 600 |
200 000 000 | 440 840 | 484 630 | 529 840 | 575 820 | 622 490 |
225 000 000 | 484 760 | 531 940 | 580 760 | 630 500 | 681 020 |
250 000 000 | 527 750 | 578 160 | 630 450 | 683 790 | 738 040 |
275 000 000 | 569 910 | 623 420 | 679 060 | 735 870 | 793 710 |
300 000 000 | 611 340 | 667 830 | 726 690 | 786 870 | 848 190 |
50 000 | 640 | 800 | 970 | 1 130 | 1 300 |
60 000 | 740 | 930 | 1 110 | 1 300 | 1 490 |
70 000 | 840 | 1 050 | 1 250 | 1 460 | 1 670 |
80 000 | 930 | 1 160 | 1 390 | 1 620 | 1 850 |
90 000 | 1 020 | 1 270 | 1 520 | 1 770 | 2 020 |
100 000 | 1 110 | 1 380 | 1 650 | 1 920 | 2 190 |
150 000 | 1 530 | 1 890 | 2 250 | 2 610 | 2 970 |
200 000 | 1 930 | 2 370 | 2 800 | 3 240 | 3 680 |
300 000 | 2 650 | 3 230 | 3 810 | 4 390 | 4 970 |
400 000 | 3 310 | 4 020 | 4 720 | 5 430 | 6 130 |
500 000 | 3 930 | 4 750 | 5 570 | 6 380 | 7 200 |
600 000 | 4 510 | 5 440 | 6 360 | 7 280 | 8 200 |
700 000 | 5 070 | 6 090 | 7 100 | 8 120 | 9 140 |
800 000 | 5 590 | 6 700 | 7 810 | 8 920 | 10 030 |
900 000 | 6 090 | 7 290 | 8 480 | 9 680 | 10 870 |
1 000 000 | 6 570 | 7 850 | 9 120 | 10 400 | 11 670 |
1 500 000 | 8 690 | 10 310 | 11 920 | 13 540 | 15 160 |
2 000 000 | 10 420 | 12 310 | 14 190 | 16 080 | 17 960 |
3 000 000 | 14 450 | 16 960 | 19 460 | 21 970 | 24 480 |
4 000 000 | 18 220 | 21 290 | 24 350 | 27 420 | 30 490 |
5 000 000 | 21 820 | 25 400 | 28 980 | 32 560 | 36 150 |
6 000 000 | 25 270 | 29 340 | 33 410 | 37 470 | 41 540 |
7 000 000 | 28 620 | 33 140 | 37 670 | 42 200 | 46 730 |
8 000 000 | 31 870 | 36 840 | 41 810 | 46 770 | 51 740 |
9 000 000 | 35 040 | 40 430 | 45 830 | 51 220 | 56 610 |
10 000 000 | 38 150 | 43 950 | 49 750 | 55 550 | 61 350 |
15 000 000 | 52 910 | 60 580 | 68 250 | 75 930 | 83 600 |
20 000 000 | 66 720 | 76 070 | 85 430 | 94 780 | 104 130 |
30 000 000 | 92 520 | 104 870 | 117 220 | 129 570 | 141 920 |
40 000 000 | 116 680 | 131 700 | 146 730 | 161 760 | 176 780 |
50 000 000 | 139 680 | 157 170 | 174 660 | 192 150 | 209 630 |
60 000 000 | 157 100 | 175 980 | 195 100 | 214 350 | 233 720 |
70 000 000 | 177 890 | 198 800 | 220 000 | 241 370 | 262 900 |
80 000 000 | 198 120 | 220 940 | 244 130 | 267 520 | 291 100 |
90 000 000 | 217 860 | 242 510 | 267 590 | 292 920 | 318 470 |
100 000 000 | 237 180 | 263 580 | 290 490 | 317 680 | 345 130 |
110 000 000 | 256 120 | 284 210 | 312 880 | 341 880 | 371 160 |
120 000 000 | 274 740 | 304 450 | 334 830 | 353 070 | 396 640 |
130 000 000 | 293 060 | 324 350 | 356 380 | 388 820 | 421 620 |
140 000 000 | 311 110 | 343 920 | 377 560 | 411 650 | 446 150 |
150 000 000 | 328 910 | 363 210 | 398 420 | 434 120 | 470 270 |
160 000 000 | 346 480 | 382 230 | 418 960 | 456 240 | 494 010 |
170 000 000 | 363 840 | 401 000 | 439 230 | 478 050 | 517 390 |
180 000 000 | 380 980 | 419 540 | 459 230 | 499 560 | 540 460 |
190 000 000 | 397 980 | 437 870 | 478 990 | 520 800 | 563 220 |
200 000 000 | 414 780 | 455 990 | 498 520 | 541 790 | 585 700 |
225 000 000 | 456 110 | 500 510 | 546 440 | 593 240 | 640 780 |
250 000 000 | 496 560 | 543 990 | 593 200 | 643 380 | 694 420 |
275 000 000 | 536 230 | 586 580 | 638 930 | 692 380 | 746 800 |
300 000 000 | 575 210 | 628 360 | 683 750 | 740 370 | 798 070 |
400 000 000 | 741 570 | 788 900 | 855 550 | 924 000 | 979 440 |
500 000 000 | 884 660 | 941 120 | 1 018 020 | 1 097 260 | 1 163 100 |
750 000 000 | 1 219 060 | 1 296 880 | 1 396 260 | 1 499 440 | 1 589 410 |
1 000 000 000 | 1 530 480 | 1 628 170 | 1 747 090 | 1 871 340 | 1 983 620 |
1 250 000 000 | 1 825 840 | 1 942 390 | 2 078 870 | 2 222 230 | 2 355 570 |
1 500 000 000 | 2 109 020 | 2 243 630 | 2 396 210 | 2 557 250 | 2 710 680 |
2 000 000 000 | 2 647 770 | 2 816 780 | 2 998 300 | 3 191 510 | 3 383 000 |
2 500 000 000 | 3 158 760 | 3 360 380 | 3 567 680 | 3 789 940 | 4 017 340 |
3 000 000 000 | 3 648 660 | 3 881 550 | 4 112 290 | 4 361 290 | 4 622 970 |
3 500 000 000 | 4 121 680 | 4 384 760 | 4 637 110 | 4 911 060 | 5 205 720 |
4 000 000 000 | 4 580 720 | 4 873 110 | 5 145 580 | 5 443 000 | 5 769 580 |
50 000 | 490 | 590 | 730 | 940 | 1 080 |
60 000 | 580 | 710 | 870 | 1 120 | 1 290 |
70 000 | 680 | 830 | 1 020 | 1 310 | 1 500 |
80 000 | 780 | 940 | 1 160 | 1 490 | 1 710 |
90 000 | 870 | 1 060 | 1 310 | 1 680 | 1 920 |
100 000 | 970 | 1 170 | 1 440 | 1 850 | 2 120 |
200 000 | 1 940 | 2 320 | 2 830 | 3 590 | 4 100 |
300 000 | 2 910 | 3 440 | 4 140 | 5 200 | 5 900 |
400 000 | 3 880 | 4 530 | 5 390 | 6 680 | 7 540 |
500 000 | 4 850 | 5 590 | 6 580 | 8 070 | 9 060 |
600 000 | 5 600 | 6 470 | 7 630 | 9 380 | 10 540 |
700 000 | 6 220 | 7 240 | 8 600 | 10 630 | 11 990 |
800 000 | 6 760 | 7 930 | 9 480 | 11 800 | 13 350 |
900 000 | 7 220 | 8 530 | 10 270 | 12 890 | 14 640 |
1 000 000 | 7 580 | 9 030 | 10 970 | 13 880 | 15 820 |
2 000 000 | 13 790 | 16 350 | 19 750 | 24 860 | 28 260 |
3 000 000 | 20 010 | 23 660 | 28 530 | 35 830 | 40 700 |
4 000 000 | 26 220 | 30 970 | 37 300 | 46 800 | 53 130 |
5 000 000 | 32 430 | 38 280 | 46 080 | 57 770 | 65 570 |
6 000 000 | 38 920 | 45 500 | 54 270 | 67 430 | 76 210 |
7 000 000 | 45 400 | 52 710 | 62 470 | 77 090 | 86 840 |
8 000 000 | 51 890 | 59 930 | 70 660 | 86 750 | 97 480 |
9 000 000 | 58 370 | 67 150 | 78 850 | 96 410 | 108 110 |
10 000 000 | 64 860 | 74 370 | 87 050 | 106 070 | 118 750 |
20 000 000 | 129 720 | 147 430 | 171 040 | 206 460 | 230 070 |
30 000 000 | 194 580 | 219 170 | 251 970 | 301 160 | 333 950 |
40 000 000 | 259 440 | 289 610 | 329 830 | 390 170 | 430 400 |
50 000 000 | 324 290 | 360 370 | 408 470 | 480 610 | 528 710 |
60 000 000 | 364 690 | 403 150 | 455 420 | 534 090 | 586 040 |
70 000 000 | 421 220 | 464 070 | 522 790 | 611 040 | 669 080 |
80 000 000 | 475 210 | 522 460 | 587 080 | 684 680 | 748 250 |
90 000 000 | 527 260 | 578 050 | 648 650 | 754 940 | 824 340 |
100 000 000 | 577 460 | 632 050 | 707 680 | 822 840 | 896 030 |
110 000 000 | 626 090 | 684 250 | 765 280 | 888 170 | 965 550 |
120 000 000 | 673 610 | 734 450 | 820 600 | 951 630 | 1 032 860 |
130 000 000 | 719 960 | 784 010 | 875 160 | 1 013 150 | 1 099 010 |
140 000 000 | 765 060 | 832 160 | 928 110 | 1 073 730 | 1 164 110 |
150 000 000 | 809 650 | 879 700 | 980 350 | 1 133 460 | 1 228 260 |
160 000 000 | 852 900 | 925 760 | 1 030 900 | 1 191 230 | 1 290 260 |
170 000 000 | 895 630 | 971 230 | 1 080 770 | 1 248 170 | 1 351 350 |
180 000 000 | 937 880 | 1 016 130 | 1 129 990 | 1 304 340 | 1 411 590 |
190 000 000 | 979 680 | 1 060 520 | 1 178 620 | 1 359 800 | 1 471 040 |
200 000 000 | 1 021 050 | 1 104 420 | 1 226 680 | 1 414 590 | 1 529 760 |
225 000 000 | 1 122 790 | 1 212 240 | 1 344 580 | 1 548 910 | 1 673 610 |
250 000 000 | 1 222 350 | 1 317 560 | 1 459 620 | 1 679 840 | 1 813 710 |
275 000 000 | 1 320 010 | 1 420 710 | 1 572 150 | 1 807 790 | 1 950 530 |
300 000 000 | 1 415 960 | 1 521 900 | 1 682 440 | 1 933 080 | 2 084 420 |
1.1 | Areas under construction, taking-off, testing, authorisations, authorisations and monitoring for the establishment, modification, maintenance and operation of the operating facilities and for rail vehicles | § 6 para. 3 PflSchG i. V. m. Section 4 (2) AEG, § 4 BImSchG i. V. m. Section 4 (2) AEG, § 8 BImSchG i. V. m. Section 4 (2) AEG, § 8a BImSchG i. V. m. Section 4 (2) AEG, § 9 BImSchG i. V. m. Section 4 (2) AEG, § 16 BImSchG i. V. m. Section 4 (2) AEG, § 17 BImSchG i. V. m. Section 4 (2) AEG, § 20 BImSchG i. V. m. Section 4 (2) AEG, § 21 BImSchG i. V. m. Section 4 (2) AEG, § 24 BImSchG i. V. m. Section 4 (2) AEG, § 25 BImSchG i. V. m. Section 4 (2) AEG, § 26 BImSchG i. V. m. Section 4 (2) AEG, § 29 BImSchG i. V. m. Section 4 (2) AEG, § 29a BImSchG i. V. m. Section 4 (2) AEG, § 31 BImSchG i. V. m. Section 4 (2) AEG, § 52 BImSchG i. V. m. Section 4 (2) AEG, § 53 BImSchG i. V. m. Section 4 (2) AEG, § 58a BImSchG i. V. m. Section 4 (2) AEG, § 20 BImSchV 1 i. V. m. Section 4 (2) AEG, § 1 BImSchV 5 i. V. m. Section 4 (2) AEG, § 2 BImSchV 5 i. V. m. Section 4 (2) AEG, § 4 BImSchV 5 i. V. m. Section 4 (2) AEG, § 5 BImSchV 5 i. V. m. Section 4 (2) AEG, § 6 BImSchV 5 i. V. m. Section 4 (2) AEG, § 8 BImSchV 5 i. V. m. Section 4 (2) AEG, § 9 BImSchV 5 i. V. m. Section 4 (2) AEG, § 6 BImSchV 7 i. V. m. Section 4 (2) AEG, § 6 BImSchV 11 i. V. m. Section 4 (2) AEG, § 1 BImSchV 12 i. V. m. Section 4 (2) AEG, § 6 BImSchV 12 i. V. m. Section 4 (2) AEG, § 9 BImSchV 12 i. V. m. Section 4 (2) AEG, § 16 BImSchV 12 i. V. m. Section 4 (2) AEG, § 19 BImSchV 12 i. V. m. Section 4 (2) AEG, § 26 BImSchV 13 i. V. m. Section 4 (2) AEG, § 24 BImSchV 17 i. V. m. Section 4 (2) AEG, § 8 BImSchV 26 i. V. m. Section 4 (2) AEG, § 11 BImSchV 31 i. V. m. Section 4 (2) AEG, § 3 BImSchV 34 i. V. m. Section 4 (2) AEG, Section 9 (2) BBodSchG i. v. m. Section 4 (2) AEG, Section 10 (1) BBodSchG i. v. m. Section 4 (2) AEG, § 13 BBodSchG i. V. m. Section 4 (2) AEG, § 14 sentence 1 BBodSchG i. v. m. Section 4 (2) AEG, Section 15 (2) BBodSchG i. v. m. Section 4 (2) AEG, Section 16 (1) BBodSchG i. v. m. Section 4 (2) AEG |
by time |
1.2 | Monitoring of railways under the supervision of the railway system in order to comply with the provisions of Section 5 (1) of the AEG on the basis of suspicion, complaint or sample, if the suspicion or complaint of the person concerned is has been held responsible or a breach of a piece of legislation has been established | Section 5a (2) AEC | Expenditure of 300 to 1 000 Euro |
1.3 | Measures to eliminate established infringements and to prevent future infringements of railway law provisions, unless otherwise specified | Section 5a (2) AEC | by time |
1.4 | Testing of new construction products and designs as well as railway-specific construction products and construction types and issuing of a corresponding certificate in case of a responsible or reasonable suspicion or on request | Section 5a (2) AEC | by time |
1.5 | Examination of a type-approval for railway-specific construction equipment and issuing of a corresponding certificate in case of suspected or justified suspicion or on request | Section 5a (2) AEC | by time |
1.6 | Examination of a new or modified form of construction or -type (type approval) of signal, telecommunication and electrical equipment and issuing of a corresponding certificate in case of suspected or substantiated suspicion or on request | Section 5a (2) AEC | by time |
1.7 | Protocol-based testing of certain components or construction work and issue of a corresponding the certificate shall be responsible for the responsibility or reasonable suspicion or on request |
Section 5a (2) AEC | by time |
1.8 | Approval of a railway undertaking, a holder or a railway infrastructure undertaking | § 6 AEG | EUR 5 000 |
1.9 | Amendment of a railway licence- transport company, holder or iron-holder rail infrastructure |
§ 6 AEG | EUR 2 500 |
1.10 | Decision on permission to accept of the holding |
§ 7a AEG | by time |
1.11 | Decision on delivery and decommissioning of railway infrastructure |
§ 11 AEG | EUR 3 000 |
1.12 | Issuing a safety certificate | Section 14 (7) AEG | by time |
1.13 | Exemption from railway operations | Section 23 (1) AEG | by time |
2.1 | Plan determination: -construction of new plants -modification of existing plants |
§ 18 para. 1 AEG i. V. m. Section 74 (1) VwVfG | by table 1 of the Annex |
2.2 | Plan Approval | § 18 para. 2 AEG i. V. m. § 74 VwVfG | 50% of the fee according to item 2.1 |
2.3 | Decision on the decision to decide on plan approval and planning permission | Section 18 (3) (i). V. m. Par. 1 AEG | 25% of the fee according to point 2.1 |
2.4 | Cancellation of the planning approval decision or the planning permission after the start of construction | Section 20 (7) AEG i. V. m. § 77 VwVfG | up to 75% of the fee referred to in point 2.1 or point 2.2 |
2.5 | Construction-technical examination of the building templates | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | 500 Euro to EUR 1 500 000 |
2.6 | Approval of the execution planning including construction supervision and acceptance for civil engineering | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by Table 2 of the Annex |
2.7 | Approval of the execution planning including construction supervision and acceptance for superstructure | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by Table 3 of the Annex |
2.8 | Approval of the execution planning including construction supervision and acceptance for building construction | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by Table 4 of the Annex |
2.9 | Review of modified building templates for planning volumes- With a volume of more than 1/20 of the original planning in engineering, upper or high-end construction |
§ 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | according to No. 2.6, 2.7 or No. 2.8, multiplied by the ratio of the scope of the change planning to the extent of the original planning |
2.10 | Approval of the execution planning including construction supervision and removal of conversions of a Existing installation with substantial intervention in constructions or stock in the engineering, upper or building up |
§ 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | in accordance with point 2.6, 2.7 or 2.8, plus a surname of 20 to 50% depending on the degree of difficulty; the cost of canceling construction works is attributed to the construction costs |
2.11 | Approval of the execution planning for the demolition or removal of equipment, including construction supervision and acceptance in the engineering, upper or high-building construction | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by time |
2.12 | Approval of the execution planning for signal, telecommunication and electrical equipment | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by time |
2.13 | Construction inspection of a signal, telecommunication and electrical engineering system including supervision during construction | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by time |
3.1 | Confirmation of the appointment of an operating manager or a deputy |
§ 2 EBV | 150 Euro |
3.2 | Decision on admission to the examination as an operating manager | § 9 EBPV | 330 Euro |
3.3 | Carrying out an operational management test | § § 13, 14, 20, 21, 22 EBPV | EUR 1 850 |
3.4 | Performance of the repeat examination
|
§ 23 EBPV |
|
4.1 | Exceptions to EBO/ESBO | § 3 (1) (2) (a) EBO or ESBO | by time |
4.2 | Approvals according to EBO/ESBO | § 3 para. 2 No. 1 EBO or ESBO |
by time |
4.3 | Acceptance of a vehicle in the scope the EBO |
Section 32 (1) of the EBO | by time |
4.4 | Installations in need of surveillance: testing of a new or modified design; testing before commissioning; periodic tests; exceptions and issuing of a corresponding certificate | Section 33 (4) (i). V. m. Paragraph 1 EBO |
by time |
4.5 | Approval of derogations from the Railway signalling |
Section A, point (a) (4) ESO 1959 | by time |
5.1 | Consent to the collection of charges at Lack of infrastructure capacity |
Section 18 (4) of the EIBV | by time |
5.2 | Exemption pursuant to § 14 (4) AEG | Section 22 (1) (1) EIBV | by time |
6.1 | Authorisation for the entry into service of a structural subsystem within the scope of the trans-European high-speed rail system | § 2 No. 1 EIV | by time |
6.2 | To monitor the conformity and suitability for use of interoperability constituents within the scope of the trans-European high-speed rail system on the basis of a suspicion, a complaint or for the purpose of a sample, if the Suspicion or the complaint is caused by the person concerned or a breach of a law has been established | § 5a (2) AEG i. V. m. § 2 No. 2 EIV | by time |
6.3 | Monitoring of the application and compliance with TSI, within the scope of the trans-European high-speed rail system, on the basis of a suspicion, a complaint or for the purpose of a sample, where the suspicion or the complaint is caused by the person concerned or a breach of the law has been found against a piece of legislation |
§ 5a (2) AEG i. V. m. Section 2 (3) (a) of the EIV | by time |
6.4 | Approval of derogations for the application of certain TSIs within the scope of the trans-European high-speed rail system | § 2 No. 4 EIV | by time |
6.5 | Recognition of a notified body within the scope of the trans-European high-speed rail system | § 3 para. 3 to 6 EIV i. V. m. § 2 No. 5 EIV | by time |
6.6 | Assessment of conformity and suitability for use- the interoperability constituent and the issuing of an appropriate certificate within the scope of the trans-European high-speed rail system |
Section 3 (1) (1) of the EIV | by time |
6.7 | EC verification of a subsystem and issuing of a corresponding certificate within the scope of the trans-European high-speed rail system | § 3 (1) No. 2 of the EIV | by time |
7.1 | Authorisation for the entry into service of a structural subsystem within the scope of the trans-European conventional rail system | Section 4 (3) of the KonVEIV i. v. m. Section 5 (1) of the KonVEIV |
by time |
7.2 | Approval of a structural subsystem, for which is not TSI, within the scope of the trans-European conventional rail system |
Section 4 (4) of the KonVEIV | by time |
7.3 | Approval for rehearsals and transfers within the scope of the conventional trans-European rail |
Section 4 (6) of the KonVEIV | by time |
7.4 | Authorisation of derogations for the application of certain TSIs within the scope of the conventional trans-European rail |
Section 5 (2) of the KonVEIV | by time |
7.5 | Commissioning of a substantially modified structural sub-system within the scope of the trans-European conventional rail system |
Section 8 (1) of the KonVEIV | by time |
7.6 | Approval of exemptions from the permit requirement for significantly upgraded structural Sub-systems within the scope of the trans-European conventional rail system |
Section 8 (2) of the KonVEIV | by time |
7.7 | Assessment of the conformity and suitability for use of an interoperability constituent and display a corresponding certificate within the scope of the trans-European conventional rail system |
Section 10 (1) (1) of the KonVEIV | by time |
7.8 | EC verification of a subsystem and issue of a certificate of conformity within the scope of the trans-European conventional rail system | Section 10 (1) (2) of the KonVEIV | by time |
8.1 | Arrangement of measures for occupational safety and health | Section 22 (3) ArbSchG | by time |
9.1 | Checking the water supply systems in the Rail vehicles |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | 400 Euro |
9.2 | Check the fixed installations for the the exclusive filling of rail vehicles; up to 10 hydrants |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | 800 euro |
9.3 | Check the fixed installations for the the exclusive filling of rail vehicles; 11 to 50 Hydrants |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | EUR 1 000 |
9.4 | Check the fixed installations for the the exclusive filling of rail vehicles; 51 to 100 Hydrants |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | EUR 1 350 |
9.5 | Check the fixed installations for the the exclusive filling of rail vehicles; 101 to 200 Hydrants |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | EUR 1 500 |
9.6 | Check the fixed installations for the the exclusive filling of rail vehicles; more than 200 hydrants |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | EUR 2 000 |
9.7 | Decision on measures in the event of non-compliance with limit values and requirements | § 39 IfSG, § 9 TrinkwV | by time |
9.8 | Anti-infective monitoring of the Waste water disposal systems in the rail vehicles and in the fixed installations for the exclusive disposal of rail vehicles |
§ 41 IfSG | 400 Euro |
10.1 | Modify, extend, and renew validity of the administrative act |
by time, up to half of the fee for the Administrative |
1 | Approval of the term of a framework contract on the use of train paths | Section 14a (2) AEG | by time |
2 | Monitoring of access to the railway infrastructure on the basis of a suspicion, complaint or sample, if the suspected or the complaint is caused by the person concerned, or if there is a breach of a law has been identified | Section 14c (1) AEC | by time |
3 | Measures to be taken in the event of infringements of rules on access to railway infrastructure | Section 14c (1) AEC | by time |
4 | Examination of the intended decisions to be notified in advance, in so far as the proposed decisions do not comply with the provisions of the railway law relating to access to the railway infrastructure and do not conflict with Article 14e (1) AEC | Section 14e (1) AEG | by time |
5 | Objection to intended decisions to be notified in advance pursuant to Section 14d AEG | Section 14e (1) AEG | by time |
6 | Monitoring of access to the railway infrastructure on the basis of a suspicion, complaint or sample, if the suspected or the complaint is caused by the person concerned or if there is a breach of a law has been | Section 14f (1) AEG | by time |
7 | Measures to be taken in the event of infringements of rules on access to railway infrastructure | § 14f (1) sentence 2 or (3) (i). V. m. Paragraph 2 AEG | by time |
25 000 | 280 | 360 | 440 | 500 | 580 |
30 000 | 330 | 420 | 500 | 580 | 660 |
35 000 | 370 | 470 | 560 | 650 | 740 |
40 000 | 420 | 520 | 620 | 720 | 820 |
45 000 | 460 | 670 | 690 | 790 | 910 |
50 000 | 500 | 610 | 740 | 860 | 980 |
75 000 | 690 | 850 | 1 010 | 1 170 | 1 330 |
100 000 | 860 | 1 060 | 1 260 | 1 450 | 1 650 |
150 000 | 1 190 | 1 450 | 1 700 | 1 960 | 2 220 |
200 000 | 1 490 | 1 800 | 2 120 | 2 430 | 2 740 |
250 000 | 1 750 | 2 120 | 2 500 | 2 860 | 3 220 |
300 000 | 2 020 | 2 430 | 2 850 | 3 260 | 3 670 |
350 000 | 2 270 | 2 720 | 3 180 | 3 640 | 4 100 |
400 000 | 2 500 | 3 000 | 3 500 | 3 990 | 4 490 |
450 000 | 2 720 | 3 260 | 3 800 | 4 340 | 4 870 |
500 000 | 2 940 | 3 510 | 4 090 | 4 660 | 5 230 |
750 000 | 3 890 | 4 610 | 5 340 | 6 070 | 6 800 |
1 000 000 | 4 660 | 5 510 | 6 360 | 7 210 | 8 030 |
1 500 000 | 6 470 | 7 590 | 8 690 | 9 860 | 11 000 |
2 000 000 | 8 180 | 9 560 | 10 900 | 12 300 | 13 700 |
2 500 000 | 9 780 | 11 400 | 13 000 | 14 600 | 16 200 |
3 000 000 | 11 300 | 13 100 | 15 000 | 16 800 | 18 600 |
3 500 000 | 12 800 | 14 800 | 16 900 | 18 900 | 21 000 |
4 000 000 | 14 300 | 16 500 | 18 700 | 21 000 | 23 100 |
4 500 000 | 15 700 | 18 100 | 20 500 | 22 900 | 25 300 |
5 000 000 | 17 100 | 19 700 | 22 300 | 24 900 | 27 400 |
7 500 000 | 23 700 | 27 200 | 30 600 | 34 000 | 37 400 |
10 000 000 | 29 900 | 34 100 | 38 300 | 42 500 | 46 600 |
15 000 000 | 43 300 | 46 900 | 52 500 | 58 000 | 63 600 |
20 000 000 | 52 300 | 59 000 | 65 700 | 72 400 | 79 200 |
25 000 000 | 62 600 | 70 400 | 78 300 | 86 100 | 93 900 |
30 000 000 | 70 400 | 79 000 | 87 400 | 96 000 | 104 700 |
35 000 000 | 79 600 | 89 000 | 99 000 | 108 100 | 117 700 |
40 000 000 | 88 800 | 99 000 | 109 400 | 119 800 | 130 400 |
45 000 000 | 97 600 | 108 600 | 119 900 | 131 200 | 142 600 |
50 000 000 | 106 200 | 118 000 | 130 100 | 142 300 | 154 600 |
55 000 000 | 114 700 | 127 300 | 140 000 | 153 200 | 166 200 |
60 000 000 | 123 100 | 136 400 | 149 900 | 158 100 | 177 700 |
65 000 000 | 131 300 | 145 000 | 159 700 | 174 200 | 188 900 |
70 000 000 | 139 400 | 154 000 | 169 100 | 184 400 | 199 800 |
75 000 000 | 147 300 | 162 600 | 178 400 | 194 400 | 210 600 |
80 000 000 | 155 200 | 171 200 | 187 700 | 204 300 | 221 300 |
85 000 000 | 162 900 | 180 000 | 196 700 | 214 100 | 231 700 |
90 000 000 | 170 700 | 187 900 | 205 700 | 223 700 | 242 100 |
95 000 000 | 178 300 | 196 100 | 214 500 | 233 200 | 252 300 |
100 000 000 | 185 800 | 204 300 | 223 300 | 242 700 | 262 400 |
112 500 000 | 204 300 | 224 200 | 244 800 | 266 000 | 287 000 |
125 000 000 | 222 400 | 243 700 | 266 000 | 288 100 | 311 100 |
137 500 000 | 240 000 | 262 700 | 286 000 | 310 100 | 334 500 |
150 000 000 | 257 600 | 281 400 | 306 200 | 331 600 | 357 500 |
200 000 000 | 332 200 | 353 300 | 383 200 | 413 800 | 438 700 |
250 000 000 | 396 200 | 421 500 | 456 000 | 491 400 | 520 900 |
375 000 000 | 546 000 | 580 900 | 625 400 | 671 600 | 711 900 |
500 000 000 | 685 500 | 729 300 | 782 500 | 838 200 | 888 500 |
625 000 000 | 817 700 | 870 000 | 931 100 | 995 500 | 1 055 100 |
750 000 000 | 944 600 | 1 004 900 | 1 073 200 | 1 145 400 | 1 214 100 |
1 000 000 000 | 1 185 900 | 1 261 600 | 1 342 900 | 1 429 400 | 1 515 200 |
1 250 000 000 | 1 414 800 | 1 505 100 | 1 598 000 | 1 697 500 | 1 799 300 |
1 500 000 000 | 1 634 200 | 1 738 500 | 1 841 900 | 1 953 400 | 2 070 600 |
1 750 000 000 | 1 846 100 | 1 963 900 | 2 076 900 | 2 199 600 | 2 331 600 |
2 000 000 000 | 2 051 700 | 2 182 600 | 2 304 700 | 2 437 900 | 2 584 100 |
25 000 | 300 | 370 | 450 | 530 | 600 |
30 000 | 350 | 430 | 520 | 610 | 700 |
35 000 | 390 | 490 | 590 | 690 | 780 |
40 000 | 430 | 540 | 650 | 760 | 860 |
45 000 | 480 | 590 | 710 | 830 | 950 |
50 000 | 520 | 640 | 770 | 900 | 1 020 |
75 000 | 720 | 890 | 1 060 | 1 230 | 1 400 |
100 000 | 910 | 1 110 | 1 320 | 1 530 | 1 730 |
150 000 | 1 260 | 1 540 | 1 820 | 2 090 | 2 360 |
200 000 | 1 590 | 1 930 | 2 270 | 2 610 | 2 950 |
250 000 | 1 910 | 2 300 | 2 700 | 3 090 | 3 490 |
300 000 | 2 210 | 2 660 | 3 110 | 3 560 | 4 010 |
350 000 | 2 500 | 3 000 | 3 510 | 4 010 | 4 510 |
400 000 | 2 790 | 3 340 | 3 890 | 4 440 | 5 000 |
450 000 | 3 060 | 3 660 | 4 260 | 4 860 | 5 470 |
500 000 | 3 330 | 3 980 | 4 630 | 5 270 | 5 920 |
750 000 | 4 620 | 5 480 | 6 350 | 7 200 | 8 070 |
1 000 000 | 5 830 | 6 880 | 7 940 | 8 990 | 10 000 |
1 500 000 | 8 080 | 9 480 | 10 900 | 12 300 | 13 700 |
2 000 000 | 10 200 | 11 900 | 13 600 | 15 300 | 17 000 |
2 500 000 | 12 200 | 14 200 | 16 200 | 18 200 | 20 200 |
3 000 000 | 14 100 | 16 400 | 18 700 | 21 000 | 23 200 |
3 500 000 | 16 000 | 18 500 | 21 100 | 23 600 | 26 100 |
4 000 000 | 17 800 | 20 600 | 23 400 | 26 200 | 28 900 |
4 500 000 | 19 600 | 22 600 | 25 600 | 28 600 | 31 700 |
5 000 000 | 21 300 | 24 600 | 27 800 | 29 900 | 34 300 |
7 500 000 | 29 600 | 33 900 | 38 200 | 42 500 | 46 800 |
10 000 000 | 37 300 | 42 500 | 47 800 | 53 000 | 58 200 |
15 000 000 | 51 700 | 58 600 | 65 600 | 72 500 | 79 400 |
20 000 000 | 65 300 | 73 700 | 82 100 | 90 500 | 98 900 |
25 000 000 | 78 100 | 87 900 | 97 700 | 107 500 | 117 200 |
30 000 000 | 85 400 | 95 600 | 106 000 | 116 500 | 127 000 |
35 000 000 | 96 700 | 108 000 | 119 600 | 131 200 | 142 900 |
40 000 000 | 107 700 | 120 100 | 132 700 | 145 400 | 158 200 |
45 000 000 | 118 400 | 131 800 | 145 400 | 159 200 | 173 100 |
50 000 000 | 128 900 | 143 200 | 157 900 | 172 600 | 187 500 |
55 000 000 | 139 200 | 154 400 | 170 000 | 185 800 | 201 700 |
60 000 000 | 149 300 | 165 400 | 181 900 | 198 700 | 215 500 |
65 000 000 | 159 200 | 176 300 | 193 700 | 211 300 | 229 100 |
70 000 000 | 169 100 | 186 900 | 205 200 | 223 700 | 242 400 |
75 000 000 | 178 700 | 197 400 | 216 500 | 235 900 | 255 500 |
80 000 000 | 188 300 | 207 700 | 227 700 | 247 900 | 268 400 |
85 000 000 | 197 700 | 217 900 | 238 700 | 259 800 | 281 200 |
90 000 000 | 207 000 | 228 000 | 249 600 | 271 500 | 293 700 |
95 000 000 | 216 300 | 237 900 | 260 300 | 283 000 | 306 100 |
100 000 000 | 225 400 | 247 800 | 270 900 | 294 400 | 318 300 |
112 500 000 | 247 900 | 272 000 | 296 900 | 322 400 | 348 200 |
125 000 000 | 269 800 | 295 600 | 322 300 | 349 600 | 377 400 |
137 500 000 | 291 400 | 318 700 | 347 200 | 376 200 | 405 800 |
150 000 000 | 312 600 | 341 500 | 371 600 | 402 300 | 433 700 |
25 000 | 330 | 410 | 500 | 580 | 660 |
30 000 | 380 | 480 | 570 | 660 | 760 |
35 000 | 430 | 540 | 640 | 750 | 850 |
40 000 | 480 | 590 | 710 | 830 | 950 |
45 000 | 520 | 650 | 780 | 900 | 1 030 |
50 000 | 570 | 710 | 840 | 980 | 1 120 |
75 000 | 780 | 970 | 1 150 | 1 330 | 1 520 |
100 000 | 990 | 1 210 | 1 430 | 1 660 | 1 880 |
150 000 | 1 350 | 1 650 | 1 950 | 2 240 | 2 540 |
200 000 | 1 690 | 2 060 | 2 410 | 2 780 | 3 130 |
250 000 | 2 010 | 2 430 | 2 850 | 3 260 | 3 680 |
300 000 | 2 310 | 2 780 | 3 250 | 3 720 | 4 190 |
350 000 | 2 590 | 3 110 | 3 630 | 4 150 | 4 670 |
400 000 | 2 860 | 3 430 | 3 990 | 4 560 | 5 130 |
450 000 | 3 110 | 3 730 | 4 340 | 4 950 | 5 560 |
500 000 | 3 360 | 4 010 | 4 660 | 5 320 | 5 970 |
750 000 | 4 440 | 5 270 | 6 090 | 6 920 | 7 750 |
1 000 000 | 5 330 | 6 290 | 7 260 | 8 220 | 9 180 |
1 500 000 | 7 390 | 8 670 | 9 950 | 11 200 | 12 500 |
2 000 000 | 9 320 | 10 900 | 12 400 | 14 000 | 15 600 |
2 500 000 | 11 200 | 13 000 | 14 800 | 16 600 | 18 500 |
3 000 000 | 12 900 | 15 000 | 17 100 | 19 200 | 21 200 |
3 500 000 | 14 600 | 16 900 | 19 300 | 21 600 | 23 900 |
4 000 000 | 16 300 | 18 800 | 21 400 | 23 900 | 26 500 |
4 500 000 | 17 900 | 20 700 | 23 400 | 26 200 | 28 900 |
5 000 000 | 19 500 | 22 500 | 25 400 | 28 400 | 31 400 |
7 500 000 | 27 100 | 31 000 | 34 900 | 38 800 | 42 700 |
10 000 000 | 34 100 | 38 900 | 43 700 | 48 500 | 53 200 |
15 000 000 | 47 300 | 53 600 | 59 900 | 66 200 | 72 600 |
20 000 000 | 59 700 | 67 300 | 75 000 | 82 700 | 90 400 |
25 000 000 | 71 400 | 80 400 | 89 300 | 98 200 | 107 200 |
30 000 000 | 80 300 | 90 000 | 99 800 | 109 600 | 119 500 |
35 000 000 | 91 000 | 101 600 | 112 500 | 123 400 | 134 400 |
40 000 000 | 101 300 | 113 000 | 124 800 | 136 800 | 148 800 |
45 000 000 | 111 400 | 124 000 | 136 800 | 149 800 | 162 800 |
50 000 000 | 121 300 | 134 800 | 148 500 | 162 400 | 176 500 |
55 000 000 | 131 000 | 145 300 | 160 000 | 174 800 | 189 800 |
60 000 000 | 140 500 | 155 700 | 171 200 | 180 500 | 202 800 |
65 000 000 | 149 800 | 165 800 | 182 200 | 198 800 | 215 600 |
70 000 000 | 159 100 | 175 800 | 193 000 | 210 500 | 228 100 |
75 000 000 | 168 200 | 185 700 | 203 700 | 222 000 | 240 400 |
80 000 000 | 177 200 | 195 400 | 214 200 | 233 300 | 252 600 |
85 000 000 | 186 000 | 205 000 | 224 600 | 244 400 | 264 500 |
90 000 000 | 194 800 | 214 500 | 234 800 | 255 400 | 276 300 |
95 000 000 | 203 500 | 223 900 | 244 900 | 266 300 | 288 000 |
100 000 000 | 212 100 | 233 100 | 254 900 | 277 000 | 299 500 |
112 500 000 | 233 200 | 255 900 | 279 400 | 303 300 | 327 600 |
125 000 000 | 253 900 | 278 100 | 303 300 | 329 000 | 355 100 |
137 500 000 | 274 200 | 299 900 | 326 700 | 354 000 | 381 800 |
150 000 000 | 294 100 | 321 300 | 349 600 | 378 500 | 408 000 |
200 000 000 | 379 200 | 403 400 | 437 400 | 472 400 | 500 800 |
250 000 000 | 452 300 | 481 200 | 520 500 | 561 000 | 594 700 |
375 000 000 | 623 300 | 663 100 | 713 900 | 766 700 | 812 700 |
500 000 000 | 782 500 | 832 500 | 893 300 | 956 800 | 1 014 200 |
625 000 000 | 933 500 | 993 100 | 1 062 900 | 1 136 200 | 1 204 400 |
750 000 000 | 1 078 300 | 1 147 100 | 1 225 200 | 1 307 500 | 1 385 900 |
1 000 000 000 | 1 353 800 | 1 440 200 | 1 533 000 | 1 631 800 | 1 729 700 |
1 250 000 000 | 1 615 000 | 1 718 100 | 1 824 100 | 1 937 800 | 2 054 000 |
1 500 000 000 | 1 865 500 | 1 984 600 | 2 102 600 | 2 229 900 | 2 363 700 |
1 750 000 000 | 2 107 400 | 2 241 900 | 2 370 900 | 2 511 000 | 2 661 600 |
2 000 000 000 | 2 342 100 | 2 491 600 | 2 630 900 | 2 783 000 | 2 949 900 |
25 000 | 250 | 300 | 370 | 480 |
30 000 | 300 | 360 | 440 | 570 |
35 000 | 350 | 420 | 520 | 670 |
40 000 | 400 | 480 | 590 | 760 |
45 000 | 440 | 540 | 670 | 860 |
50 000 | 500 | 600 | 740 | 950 |
100 000 | 990 | 1 190 | 1 450 | 1 840 |
150 000 | 1 490 | 1 760 | 2 120 | 2 660 |
200 000 | 1 980 | 2 320 | 2 760 | 3 420 |
250 000 | 2 480 | 2 860 | 3 360 | 4 130 |
300 000 | 2 860 | 3 310 | 3 900 | 4 800 |
350 000 | 3 180 | 3 700 | 4 400 | 5 440 |
400 000 | 3 460 | 4 050 | 4 850 | 6 030 |
450 000 | 3 690 | 4 360 | 5 250 | 6 590 |
500 000 | 3 880 | 4 620 | 5 610 | 7 100 |
1 000 000 | 7 050 | 8 360 | 10 100 | 12 700 |
1 500 000 | 10 200 | 12 100 | 14 600 | 18 300 |
2 000 000 | 13 400 | 15 800 | 19 100 | 23 900 |
2 500 000 | 16 600 | 19 600 | 23 600 | 29 500 |
3 000 000 | 19 900 | 23 300 | 27 700 | 34 500 |
3 500 000 | 23 200 | 27 000 | 31 900 | 39 400 |
4 000 000 | 26 500 | 30 600 | 36 100 | 44 400 |
4 500 000 | 29 800 | 34 300 | 40 300 | 49 300 |
5 000 000 | 33 200 | 38 000 | 44 500 | 54 200 |
10 000 000 | 66 300 | 75 400 | 87 500 | 105 600 |
15 000 000 | 99 500 | 112 100 | 128 800 | 154 000 |
20 000 000 | 132 600 | 148 100 | 168 600 | 199 500 |
25 000 000 | 165 800 | 184 300 | 208 800 | 245 700 |
30 000 000 | 186 500 | 206 100 | 232 900 | 273 100 |
35 000 000 | 215 400 | 237 300 | 267 300 | 312 400 |
40 000 000 | 243 000 | 267 100 | 300 200 | 350 100 |
45 000 000 | 269 600 | 295 600 | 331 600 | 386 000 |
50 000 000 | 295 300 | 323 200 | 361 800 | 420 700 |
55 000 000 | 320 100 | 349 900 | 391 300 | 454 100 |
60 000 000 | 344 400 | 375 500 | 419 600 | 486 600 |
65 000 000 | 368 100 | 400 900 | 447 500 | 518 000 |
70 000 000 | 391 200 | 425 500 | 474 500 | 549 000 |
75 000 000 | 414 000 | 449 800 | 501 200 | 579 500 |
80 000 000 | 436 100 | 473 300 | 527 100 | 609 100 |
85 000 000 | 457 900 | 496 600 | 552 600 | 638 200 |
90 000 000 | 479 500 | 519 500 | 577 800 | 666 900 |
95 000 000 | 500 900 | 542 200 | 602 600 | 695 300 |
100 000 000 | 522 100 | 564 700 | 627 200 | 723 300 |
112 500 000 | 574 100 | 619 800 | 687 500 | 791 900 |
125 000 000 | 625 000 | 673 700 | 746 300 | 858 900 |
137 500 000 | 674 900 | 726 400 | 803 800 | 924 300 |
150 000 000 | 724 000 | 778 100 | 860 200 | 988 400 |
1.1 | Areas under construction, taking-off, testing, authorisations, authorisations and monitoring for the establishment, modification, maintenance and operation of the operating facilities and for rail vehicles | § 6 para. 3 PflSchG i. V. m. Section 4 (2) AEG, § 4 BImSchG i. V. m. Section 4 (2) AEG, § 8 BImSchG i. V. m. Section 4 (2) AEG, § 8a BImSchG i. V. m. Section 4 (2) AEG, § 9 BImSchG i. V. m. Section 4 (2) AEG, § 16 BImSchG i. V. m. Section 4 (2) AEG, § 17 BImSchG i. V. m. Section 4 (2) AEG, § 20 BImSchG i. V. m. Section 4 (2) AEG, § 21 BImSchG i. V. m. Section 4 (2) AEG, § 24 BImSchG i. V. m. Section 4 (2) AEG, § 25 BImSchG i. V. m. Section 4 (2) AEG, § 26 BImSchG i. V. m. Section 4 (2) AEG, § 29 BImSchG i. V. m. Section 4 (2) AEG, § 29a BImSchG i. V. m. Section 4 (2) AEG, § 31 BImSchG i. V. m. Section 4 (2) AEG, § 52 BImSchG i. V. m. Section 4 (2) AEG, § 53 BImSchG i. V. m. Section 4 (2) AEG, § 58a BImSchG i. V. m. Section 4 (2) AEG, § 20 BImSchV 1 i. V. m. Section 4 (2) AEG, § 1 BImSchV 5 i. V. m. Section 4 (2) AEG, § 2 BImSchV 5 i. V. m. Section 4 (2) AEG, § 4 BImSchV 5 i. V. m. Section 4 (2) AEG, § 5 BImSchV 5 i. V. m. Section 4 (2) AEG, § 6 BImSchV 5 i. V. m. Section 4 (2) AEG, § 8 BImSchV 5 i. V. m. Section 4 (2) AEG, § 9 BImSchV 5 i. V. m. Section 4 (2) AEG, § 6 BImSchV 7 i. V. m. Section 4 (2) AEG, § 6 BImSchV 11 i. V. m. Section 4 (2) AEG, § 1 BImSchV 12 i. V. m. Section 4 (2) AEG, § 6 BImSchV 12 i. V. m. Section 4 (2) AEG, § 9 BImSchV 12 i. V. m. Section 4 (2) AEG, § 16 BImSchV 12 i. V. m. Section 4 (2) AEG, § 19 BImSchV 12 i. V. m. Section 4 (2) AEG, § 26 BImSchV 13 i. V. m. Section 4 (2) AEG, § 24 BImSchV 17 i. V. m. Section 4 (2) AEG, § 8 BImSchV 26 i. V. m. Section 4 (2) AEG, § 11 BImSchV 31 i. V. m. Section 4 (2) AEG, § 3 BImSchV 34 i. V. m. Section 4 (2) AEG, Section 9 (2) BBodSchG i. v. m. Section 4 (2) AEG, Section 10 (1) BBodSchG i. v. m. Section 4 (2) AEG, § 13 BBodSchG i. V. m. Section 4 (2) AEG, § 14 sentence 1 BBodSchG i. v. m. Section 4 (2) AEG, Section 15 (2) BBodSchG i. v. m. Section 4 (2) AEG, Section 16 (1) BBodSchG i. v. m. Section 4 (2) AEG |
by time |
1.2 | Monitoring of railways under the supervision of the railway system in order to comply with the provisions of Section 5 (1) of the AEG on the basis of suspicion, complaint or sample, if the suspicion or complaint of the person concerned is has been held responsible or a breach of a piece of legislation has been established | Section 5a (2) AEC | Expenditure of 300 to 1 000 Euro |
1.3 | Measures to eliminate established infringements and to prevent future infringements of railway law provisions, unless otherwise specified | Section 5a (2) AEC | by time |
1.4 | Testing of new construction products and designs as well as railway-specific construction products and construction types and issuing of a corresponding certificate in case of a responsible or reasonable suspicion or on request | Section 5a (2) AEC | by time |
1.5 | Examination of a type-approval for railway-specific construction equipment and issuing of a corresponding certificate in case of suspected or justified suspicion or on request | Section 5a (2) AEC | by time |
1.6 | Examination of a new or modified form of construction or -type (type approval) of signal, telecommunication and electrical equipment and issuing of a corresponding certificate in case of suspected or substantiated suspicion or on request | Section 5a (2) AEC | by time |
1.7 | Protocol-based testing of certain components or construction work and issue of a corresponding the certificate shall be responsible for the responsibility or reasonable suspicion or on request |
Section 5a (2) AEC | by time |
1.8 | Approval of a railway undertaking, a holder or a railway infrastructure, The |
§ 6 AEG | EUR 5 000 |
1.9 | Amendment of a railway licence- transport company, holder or iron-holder rail infrastructure |
§ 6 AEG | EUR 2 500 |
1.10 | Issuing a safety certificate | Section 7a (2) AEG | by time |
1.11 | Issuing a national certificate | Section 7a (4) AEG | by time |
1.12 | Granting a security permit | Section 7c (2) AEG | by time |
1.13 | Approval of training facilities | Section 7d (2) AEG | by time |
1.14 | Decision on permission to take up the holding | § 7e AEG | by time |
1.15 | Decision on the supply and decommissioning of railway infrastructure | § 11 AEG | EUR 3 000 |
1.16 | Exemption from railway operations | Section 23 (1) AEG | by time |
1.17 | Transfer of tasks to a notified body , within the scope of High-speed rail system |
Section 25b (1) AEC | by time |
2.1 | Plan determination: -construction of new plants -modification of existing plants |
§ 18 para. 1 AEG i. V. m. Section 74 (1) VwVfG |
by Table 1 of the Annex |
2.2 | Plan Approval | § 18 para. 2 AEG i. V. m. § 74 VwVfG | 50% of the fee according to point 2.1 |
2.3 | Decision on the decision to decide on plan approval and planning permission | Section 18 (3) (i). V. m. Par. 1 AEG | 25% of the fee according to point 2.1 |
2.4 | Repeal of the decision or decision the planning permission after the start of construction |
Section 20 (7) AEG i. V. m. § 77 VwVfG |
up to 75% of the fee referred to in point 2.1 or point 2.2 |
2.5 | Construction-technical examination of the building templates | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | 500 Euro to EUR 1 500 000 |
2.6 | Approval of the execution planning including construction supervision and acceptance for civil engineering | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by Table 2 of the Annex |
2.7 | Approval of the execution planning including construction supervision and acceptance for superstructure | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by Table 3 of the Annex |
2.8 | Approval of the execution planning including construction supervision and acceptance for building construction | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by Table 4 of the Annex |
2.9 | Review of modified building templates for planning changes with a volume of more than 1/20 of the original planning of the engineer-, Ober- or building up |
§ 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | according to No. 2.6, 2.7 or No. 2.8, multiplied by the ratio of the scope of the change planning to the extent of the original planning |
2.10 | Approval of the implementation planning including construction supervision and acceptance of conversions of an existing installation with essential interventions in constructions or stock in the engineering, upper or high-end construction | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | according to item 2.6, 2.7 or 2.8, plus a surcharge of 20 to 50% depending on the degree of difficulty; the cost of canceling of construction works is attributed to the construction costs |
2.11 | Approval of the execution planning for the demolition or removal of equipment, including construction supervision and acceptance in the engineering, upper or high-building construction | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by time |
2.12 | Approval of the execution planning for signal, telecommunication and electrical equipment | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by time |
2.13 | Construction inspection of a signal-, Telekom- Communication and electrical equipment, including supervision during construction |
§ 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by time |
3.1 | Confirmation of the appointment of an operating manager or a deputy |
§ 2 EBV | 150 Euro |
3.2 | Decision on admission to the examination as an operating manager | § 9 EBPV | 330 Euro |
3.3 | Carrying out an operational management test | § § 13, 14, 20, 21, 22 EBPV | EUR 1 850 |
3.4 | Performance of the repeat examination
|
§ 23 EBPV |
|
4.1 | Exceptions to EBO/ESBO | § 3 (1) (2) (a) EBO or ESBO | by time |
4.2 | Approvals according to EBO/ESBO | § 3 para. 2 No. 1 EBO or ESBO | by time |
4.3 | Acceptance of a vehicle in the scope the EBO |
Section 32 (1) of the EBO | by time |
4.4 | Installations in need of surveillance: testing of a new or modified design; testing before commissioning; periodic tests; exceptions and issuing of a corresponding certificate | Section 33 (4) (i). V. m. Paragraph 1 EBO | by time |
4.5 | Approval of derogations from the Railway signalling |
Section A, point (a) (4) ESO 1959 | by time |
5.1 | Consent to the collection of charges at Lack of infrastructure capacity |
Section 18 (4) of the EIBV | by time |
5.2 | Exemption pursuant to § 14 (4) AEG | Section 22 (1) (1) EIBV | by time |
6.1 | Authorisation of derogations for the application of certain TSIs within the scope of the trans-European rail system | § 5 (1) TEIV | by time |
6.2 | Approval of the entry into service of a structural subsystem within the scope of the trans-European rail system | Section 6 (3) TEIV | by time |
6.3 | Authorisation for the commissioning of a struc the non-TSI part-systems within the scope of the trans-European rail system |
Section 6 (4) TEIV | by time |
6.4 | Authorisation for test drives within the scope of the trans-European rail system | Section 6 (7) TEIV | by time |
6.5 | General approval of vehicle series (type approval) within the scope of the trans-European rail system | Section 7 (2) TEIV | by time |
6.6 | Simplified authorisation for commissioning for vehicles of an approved type within the scope of the trans-European rail system |
Section 7 (4) TEIV | by time |
6.7 | Simplified authorisation for commissioning for foreign vehicles within the scope of the trans-European rail system |
Section 8 (1) TEIV | by time |
6.8 | Authorisation for the commissioning of a large-scale or renewed structural Sub-systems within the scope of the transeuro- the European railway system or the Approval requirement for the commissioning of a reequipped or renewed structural Sub-systems within the scope of the transeuro- European railway system |
Section 9 (1) TEIV | by time |
6.9 | To monitor the conformity and suitability for use of interoperability constituents within the scope of the trans-European rail system based on a suspicion, a complaint or for the purpose of a sample, if the suspicion or the A complaint has been caused by the person concerned or a breach of a piece of legislation has been established | § 5a (2) AEG i. V. m. § 11 TEIV | by time |
6.10 | Setting of a vehicle into the vehicle registration register | § 20 (2) and (3) TEIV | 50 Euro |
6.11 | Adjustment of up to 10 vehicles of the same type to the vehicle registration register | § 20 (2) and (3) TEIV | 35 Euro per vehicle |
6.12 | Adjustment of 11 up to 100 vehicles of the same type in the register of vehicles | § 20 (2) and (3) TEIV | 30 Euro per vehicle |
6.13 | Adjustment of more than 100 vehicles of the same type in the vehicle registration register |
§ 20 (2) and (3) TEIV | 25 Euro per vehicle |
6.14 | Modification/addition of data in the vehicle- Register-register |
Section 20 (4) TEIV | 10 Euro per vehicle |
8.1 | Arrangement of measures for occupational safety and health | Section 22 (3) ArbSchG | by time |
9.1 | Checking the water supply systems in the Rail vehicles |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | 400 Euro |
9.2 | Check the fixed installations for the exclusive filling of rail vehicles; up to 10 hydrants |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | 800 euro |
9.3 | Check the fixed installations for the exclusive filling of rail vehicles; 11 to 50 Hydrants |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | EUR 1 000 |
9.4 | Check the fixed installations for the exclusive filling of rail vehicles; 51 to 100 Hydrants |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | EUR 1 350 |
9.5 | Check the fixed installations for the exclusive filling of rail vehicles; 101 to 200 Hydrants |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | EUR 1 500 |
9.6 | Check the fixed installations for the exclusive filling of rail vehicles; more than 200 Hydrants |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | EUR 2 000 |
9.7 | Decision on measures in the event of non-compliance with limit values and requirements | § 39 IfSG, § 9 TrinkwV | by time |
9.8 | Anti-infectious monitoring of waste water- Disposal systems in rail vehicles as well as in the fixed installations for the exclusive disposal of rail vehicles |
§ 41 IfSG | 400 Euro |
10.1 | Change, extend and renew the validity of the administrative act | by time, up to half the fee for the administrative act |
1 | Approval of the term of a framework contract on the use of train paths | Section 14a (2) AEG | by time |
2 | Monitoring of access to the railway infrastructure on the basis of a suspicion, complaint or sample, if the suspected or the complaint is caused by the person concerned, or if there is a breach of a law has been identified | Section 14c (1) AEC | by time |
3 | Measures in respect of infringements of rules relating to access to railway infrastructure |
Section 14c (1) AEC | by time |
4 | Examination of the intended decisions to be notified in advance, in so far as the proposed decisions do not comply with the provisions of the railway law relating to access to the railway infrastructure and do not conflict with Article 14e (1) AEC | Section 14e (1) AEG | by time |
5 | Objection to intended decisions to be notified in advance pursuant to Section 14d AEG | Section 14e (1) AEG | by time |
6 | Monitoring of access to the railway infrastructure on the basis of a suspicion, complaint or sample, if the suspected or the complaint is caused by the person concerned or if there is a breach of a law has been | Section 14f (1) AEG | by time |
7 | Measures in respect of infringements of rules relating to access to railway infrastructure |
§ 14f (1) sentence 2 or (3) (i). V. m. Paragraph 2 AEG | by time |
1 | Assessment of the conformity and suitability for use of an interoperability constituent and display a corresponding certificate within the scope of the trans-European rail system |
Section 15 (1) No. 1 of the TEIV | by time |
2 | EC verification of a subsystem and issuing of a corresponding certificate within the scope of the trans-European rail system | Section 15 (1) No. 2 of the TEIV | by time |
25 000 | 280 | 360 | 440 | 500 | 580 |
30 000 | 330 | 420 | 500 | 580 | 660 |
35 000 | 370 | 470 | 560 | 650 | 740 |
40 000 | 420 | 520 | 620 | 720 | 820 |
45 000 | 460 | 670 | 690 | 790 | 910 |
50 000 | 500 | 610 | 740 | 860 | 980 |
75 000 | 690 | 850 | 1 010 | 1 170 | 1 330 |
100 000 | 860 | 1 060 | 1 260 | 1 450 | 1 650 |
150 000 | 1 190 | 1 450 | 1 700 | 1 960 | 2 220 |
200 000 | 1 490 | 1 800 | 2 120 | 2 430 | 2 740 |
250 000 | 1 750 | 2 120 | 2 500 | 2 860 | 3 220 |
300 000 | 2 020 | 2 430 | 2 850 | 3 260 | 3 670 |
350 000 | 2 270 | 2 720 | 3 180 | 3 640 | 4 100 |
400 000 | 2 500 | 3 000 | 3 500 | 3 990 | 4 490 |
450 000 | 2 720 | 3 260 | 3 800 | 4 340 | 4 870 |
500 000 | 2 940 | 3 510 | 4 090 | 4 660 | 5 230 |
750 000 | 3 890 | 4 610 | 5 340 | 6 070 | 6 800 |
1 000 000 | 4 660 | 5 510 | 6 360 | 7 210 | 8 030 |
1 500 000 | 6 470 | 7 590 | 8 690 | 9 860 | 11 000 |
2 000 000 | 8 180 | 9 560 | 10 900 | 12 300 | 13 700 |
2 500 000 | 9 780 | 11 400 | 13 000 | 14 600 | 16 200 |
3 000 000 | 11 300 | 13 100 | 15 000 | 16 800 | 18 600 |
3 500 000 | 12 800 | 14 800 | 16 900 | 18 900 | 21 000 |
4 000 000 | 14 300 | 16 500 | 18 700 | 21 000 | 23 100 |
4 500 000 | 15 700 | 18 100 | 20 500 | 22 900 | 25 300 |
5 000 000 | 17 100 | 19 700 | 22 300 | 24 900 | 27 400 |
7 500 000 | 23 700 | 27 200 | 30 600 | 34 000 | 37 400 |
10 000 000 | 29 900 | 34 100 | 38 300 | 42 500 | 46 600 |
15 000 000 | 43 300 | 46 900 | 52 500 | 58 000 | 63 600 |
20 000 000 | 52 300 | 59 000 | 65 700 | 72 400 | 79 200 |
25 000 000 | 62 600 | 70 400 | 78 300 | 86 100 | 93 900 |
30 000 000 | 70 400 | 79 000 | 87 400 | 96 000 | 104 700 |
35 000 000 | 79 600 | 89 000 | 99 000 | 108 100 | 117 700 |
40 000 000 | 88 800 | 99 000 | 109 400 | 119 800 | 130 400 |
45 000 000 | 97 600 | 108 600 | 119 900 | 131 200 | 142 600 |
50 000 000 | 106 200 | 118 000 | 130 100 | 142 300 | 154 600 |
55 000 000 | 114 700 | 127 300 | 140 000 | 153 200 | 166 200 |
60 000 000 | 123 100 | 136 400 | 149 900 | 158 100 | 177 700 |
65 000 000 | 131 300 | 145 000 | 159 700 | 174 200 | 188 900 |
70 000 000 | 139 400 | 154 000 | 169 100 | 184 400 | 199 800 |
75 000 000 | 147 300 | 162 600 | 178 400 | 194 400 | 210 600 |
80 000 000 | 155 200 | 171 200 | 187 700 | 204 300 | 221 300 |
85 000 000 | 162 900 | 180 000 | 196 700 | 214 100 | 231 700 |
90 000 000 | 170 700 | 187 900 | 205 700 | 223 700 | 242 100 |
95 000 000 | 178 300 | 196 100 | 214 500 | 233 200 | 252 300 |
100 000 000 | 185 800 | 204 300 | 223 300 | 242 700 | 262 400 |
112 500 000 | 204 300 | 224 200 | 244 800 | 266 000 | 287 000 |
125 000 000 | 222 400 | 243 700 | 266 000 | 288 100 | 311 100 |
137 500 000 | 240 000 | 262 700 | 286 000 | 310 100 | 334 500 |
150 000 000 | 257 600 | 281 400 | 306 200 | 331 600 | 357 500 |
200 000 000 | 332 200 | 353 300 | 383 200 | 413 800 | 438 700 |
250 000 000 | 396 200 | 421 500 | 456 000 | 491 400 | 520 900 |
375 000 000 | 546 000 | 580 900 | 625 400 | 671 600 | 711 900 |
500 000 000 | 685 500 | 729 300 | 782 500 | 838 200 | 888 500 |
625 000 000 | 817 700 | 870 000 | 931 100 | 995 500 | 1 055 100 |
750 000 000 | 944 600 | 1 004 900 | 1 073 200 | 1 145 400 | 1 214 100 |
1 000 000 000 | 1 185 900 | 1 261 600 | 1 342 900 | 1 429 400 | 1 515 200 |
1 250 000 000 | 1 414 800 | 1 505 100 | 1 598 000 | 1 697 500 | 1 799 300 |
1 500 000 000 | 1 634 200 | 1 738 500 | 1 841 900 | 1 953 400 | 2 070 600 |
1 750 000 000 | 1 846 100 | 1 963 900 | 2 076 900 | 2 199 600 | 2 331 600 |
2 000 000 000 | 2 051 700 | 2 182 600 | 2 304 700 | 2 437 900 | 2 584 100 |
25 000 | 300 | 370 | 450 | 530 | 600 |
30 000 | 350 | 430 | 520 | 610 | 700 |
35 000 | 390 | 490 | 590 | 690 | 780 |
40 000 | 430 | 540 | 650 | 760 | 860 |
45 000 | 480 | 590 | 710 | 830 | 950 |
50 000 | 520 | 640 | 770 | 900 | 1 020 |
75 000 | 720 | 890 | 1 060 | 1 230 | 1 400 |
100 000 | 910 | 1 110 | 1 320 | 1 530 | 1 730 |
150 000 | 1 260 | 1 540 | 1 820 | 2 090 | 2 360 |
200 000 | 1 590 | 1 930 | 2 270 | 2 610 | 2 950 |
250 000 | 1 910 | 2 300 | 2 700 | 3 090 | 3 490 |
300 000 | 2 210 | 2 660 | 3 110 | 3 560 | 4 010 |
350 000 | 2 500 | 3 000 | 3 510 | 4 010 | 4 510 |
400 000 | 2 790 | 3 340 | 3 890 | 4 440 | 5 000 |
450 000 | 3 060 | 3 660 | 4 260 | 4 860 | 5 470 |
500 000 | 3 330 | 3 980 | 4 630 | 5 270 | 5 920 |
750 000 | 4 620 | 5 480 | 6 350 | 7 200 | 8 070 |
1 000 000 | 5 830 | 6 880 | 7 940 | 8 990 | 10 000 |
1 500 000 | 8 080 | 9 480 | 10 900 | 12 300 | 13 700 |
2 000 000 | 10 200 | 11 900 | 13 600 | 15 300 | 17 000 |
2 500 000 | 12 200 | 14 200 | 16 200 | 18 200 | 20 200 |
3 000 000 | 14 100 | 16 400 | 18 700 | 21 000 | 23 200 |
3 500 000 | 16 000 | 18 500 | 21 100 | 23 600 | 26 100 |
4 000 000 | 17 800 | 20 600 | 23 400 | 26 200 | 28 900 |
4 500 000 | 19 600 | 22 600 | 25 600 | 28 600 | 31 700 |
5 000 000 | 21 300 | 24 600 | 27 800 | 29 900 | 34 300 |
7 500 000 | 29 600 | 33 900 | 38 200 | 42 500 | 46 800 |
10 000 000 | 37 300 | 42 500 | 47 800 | 53 000 | 58 200 |
15 000 000 | 51 700 | 58 600 | 65 600 | 72 500 | 79 400 |
20 000 000 | 65 300 | 73 700 | 82 100 | 90 500 | 98 900 |
25 000 000 | 78 100 | 87 900 | 97 700 | 107 500 | 117 200 |
30 000 000 | 85 400 | 95 600 | 106 000 | 116 500 | 127 000 |
35 000 000 | 96 700 | 108 000 | 119 600 | 131 200 | 142 900 |
40 000 000 | 107 700 | 120 100 | 132 700 | 145 400 | 158 200 |
45 000 000 | 118 400 | 131 800 | 145 400 | 159 200 | 173 100 |
50 000 000 | 128 900 | 143 200 | 157 900 | 172 600 | 187 500 |
55 000 000 | 139 200 | 154 400 | 170 000 | 185 800 | 201 700 |
60 000 000 | 149 300 | 165 400 | 181 900 | 198 700 | 215 500 |
65 000 000 | 159 200 | 176 300 | 193 700 | 211 300 | 229 100 |
70 000 000 | 169 100 | 186 900 | 205 200 | 223 700 | 242 400 |
75 000 000 | 178 700 | 197 400 | 216 500 | 235 900 | 255 500 |
80 000 000 | 188 300 | 207 700 | 227 700 | 247 900 | 268 400 |
85 000 000 | 197 700 | 217 900 | 238 700 | 259 800 | 281 200 |
90 000 000 | 207 000 | 228 000 | 249 600 | 271 500 | 293 700 |
95 000 000 | 216 300 | 237 900 | 260 300 | 283 000 | 306 100 |
100 000 000 | 225 400 | 247 800 | 270 900 | 294 400 | 318 300 |
112 500 000 | 247 900 | 272 000 | 296 900 | 322 400 | 348 200 |
125 000 000 | 269 800 | 295 600 | 322 300 | 349 600 | 377 400 |
137 500 000 | 291 400 | 318 700 | 347 200 | 376 200 | 405 800 |
150 000 000 | 312 600 | 341 500 | 371 600 | 402 300 | 433 700 |
25 000 | 330 | 410 | 500 | 580 | 660 |
30 000 | 380 | 480 | 570 | 660 | 760 |
35 000 | 430 | 540 | 640 | 750 | 850 |
40 000 | 480 | 590 | 710 | 830 | 950 |
45 000 | 520 | 650 | 780 | 900 | 1 030 |
50 000 | 570 | 710 | 840 | 980 | 1 120 |
75 000 | 780 | 970 | 1 150 | 1 330 | 1 520 |
100 000 | 990 | 1 210 | 1 430 | 1 660 | 1 880 |
150 000 | 1 350 | 1 650 | 1 950 | 2 240 | 2 540 |
200 000 | 1 690 | 2 060 | 2 410 | 2 780 | 3 130 |
250 000 | 2 010 | 2 430 | 2 850 | 3 260 | 3 680 |
300 000 | 2 310 | 2 780 | 3 250 | 3 720 | 4 190 |
350 000 | 2 590 | 3 110 | 3 630 | 4 150 | 4 670 |
400 000 | 2 860 | 3 430 | 3 990 | 4 560 | 5 130 |
450 000 | 3 110 | 3 730 | 4 340 | 4 950 | 5 560 |
500 000 | 3 360 | 4 010 | 4 660 | 5 320 | 5 970 |
750 000 | 4 440 | 5 270 | 6 090 | 6 920 | 7 750 |
1 000 000 | 5 330 | 6 290 | 7 260 | 8 220 | 9 180 |
1 500 000 | 7 390 | 8 670 | 9 950 | 11 200 | 12 500 |
2 000 000 | 9 320 | 10 900 | 12 400 | 14 000 | 15 600 |
2 500 000 | 11 200 | 13 000 | 14 800 | 16 600 | 18 500 |
3 000 000 | 12 900 | 15 000 | 17 100 | 19 200 | 21 200 |
3 500 000 | 14 600 | 16 900 | 19 300 | 21 600 | 23 900 |
4 000 000 | 16 300 | 18 800 | 21 400 | 23 900 | 26 500 |
4 500 000 | 17 900 | 20 700 | 23 400 | 26 200 | 28 900 |
5 000 000 | 19 500 | 22 500 | 25 400 | 28 400 | 31 400 |
7 500 000 | 27 100 | 31 000 | 34 900 | 38 800 | 42 700 |
10 000 000 | 34 100 | 38 900 | 43 700 | 48 500 | 53 200 |
15 000 000 | 47 300 | 53 600 | 59 900 | 66 200 | 72 600 |
20 000 000 | 59 700 | 67 300 | 75 000 | 82 700 | 90 400 |
25 000 000 | 71 400 | 80 400 | 89 300 | 98 200 | 107 200 |
30 000 000 | 80 300 | 90 000 | 99 800 | 109 600 | 119 500 |
35 000 000 | 91 000 | 101 600 | 112 500 | 123 400 | 134 400 |
40 000 000 | 101 300 | 113 000 | 124 800 | 136 800 | 148 800 |
45 000 000 | 111 400 | 124 000 | 136 800 | 149 800 | 162 800 |
50 000 000 | 121 300 | 134 800 | 148 500 | 162 400 | 176 500 |
55 000 000 | 131 000 | 145 300 | 160 000 | 174 800 | 189 800 |
60 000 000 | 140 500 | 155 700 | 171 200 | 180 500 | 202 800 |
65 000 000 | 149 800 | 165 800 | 182 200 | 198 800 | 215 600 |
70 000 000 | 159 100 | 175 800 | 193 000 | 210 500 | 228 100 |
75 000 000 | 168 200 | 185 700 | 203 700 | 222 000 | 240 400 |
80 000 000 | 177 200 | 195 400 | 214 200 | 233 300 | 252 600 |
85 000 000 | 186 000 | 205 000 | 224 600 | 244 400 | 264 500 |
90 000 000 | 194 800 | 214 500 | 234 800 | 255 400 | 276 300 |
95 000 000 | 203 500 | 223 900 | 244 900 | 266 300 | 288 000 |
100 000 000 | 212 100 | 233 100 | 254 900 | 277 000 | 299 500 |
112 500 000 | 233 200 | 255 900 | 279 400 | 303 300 | 327 600 |
125 000 000 | 253 900 | 278 100 | 303 300 | 329 000 | 355 100 |
137 500 000 | 274 200 | 299 900 | 326 700 | 354 000 | 381 800 |
150 000 000 | 294 100 | 321 300 | 349 600 | 378 500 | 408 000 |
200 000 000 | 379 200 | 403 400 | 437 400 | 472 400 | 500 800 |
250 000 000 | 452 300 | 481 200 | 520 500 | 561 000 | 594 700 |
375 000 000 | 623 300 | 663 100 | 713 900 | 766 700 | 812 700 |
500 000 000 | 782 500 | 832 500 | 893 300 | 956 800 | 1 014 200 |
625 000 000 | 933 500 | 993 100 | 1 062 900 | 1 136 200 | 1 204 400 |
750 000 000 | 1 078 300 | 1 147 100 | 1 225 200 | 1 307 500 | 1 385 900 |
1 000 000 000 | 1 353 800 | 1 440 200 | 1 533 000 | 1 631 800 | 1 729 700 |
1 250 000 000 | 1 615 000 | 1 718 100 | 1 824 100 | 1 937 800 | 2 054 000 |
1 500 000 000 | 1 865 500 | 1 984 600 | 2 102 600 | 2 229 900 | 2 363 700 |
1 750 000 000 | 2 107 400 | 2 241 900 | 2 370 900 | 2 511 000 | 2 661 600 |
2 000 000 000 | 2 342 100 | 2 491 600 | 2 630 900 | 2 783 000 | 2 949 900 |
25 000 | 250 | 300 | 370 | 480 |
30 000 | 300 | 360 | 440 | 570 |
35 000 | 350 | 420 | 520 | 670 |
40 000 | 400 | 480 | 590 | 760 |
45 000 | 440 | 540 | 670 | 860 |
50 000 | 500 | 600 | 740 | 950 |
100 000 | 990 | 1 190 | 1 450 | 1 840 |
150 000 | 1 490 | 1 760 | 2 120 | 2 660 |
200 000 | 1 980 | 2 320 | 2 760 | 3 420 |
250 000 | 2 480 | 2 860 | 3 360 | 4 130 |
300 000 | 2 860 | 3 310 | 3 900 | 4 800 |
350 000 | 3 180 | 3 700 | 4 400 | 5 440 |
400 000 | 3 460 | 4 050 | 4 850 | 6 030 |
450 000 | 3 690 | 4 360 | 5 250 | 6 590 |
500 000 | 3 880 | 4 620 | 5 610 | 7 100 |
1 000 000 | 7 050 | 8 360 | 10 100 | 12 700 |
1 500 000 | 10 200 | 12 100 | 14 600 | 18 300 |
2 000 000 | 13 400 | 15 800 | 19 100 | 23 900 |
2 500 000 | 16 600 | 19 600 | 23 600 | 29 500 |
3 000 000 | 19 900 | 23 300 | 27 700 | 34 500 |
3 500 000 | 23 200 | 27 000 | 31 900 | 39 400 |
4 000 000 | 26 500 | 30 600 | 36 100 | 44 400 |
4 500 000 | 29 800 | 34 300 | 40 300 | 49 300 |
5 000 000 | 33 200 | 38 000 | 44 500 | 54 200 |
10 000 000 | 66 300 | 75 400 | 87 500 | 105 600 |
15 000 000 | 99 500 | 112 100 | 128 800 | 154 000 |
20 000 000 | 132 600 | 148 100 | 168 600 | 199 500 |
25 000 000 | 165 800 | 184 300 | 208 800 | 245 700 |
30 000 000 | 186 500 | 206 100 | 232 900 | 273 100 |
35 000 000 | 215 400 | 237 300 | 267 300 | 312 400 |
40 000 000 | 243 000 | 267 100 | 300 200 | 350 100 |
45 000 000 | 269 600 | 295 600 | 331 600 | 386 000 |
50 000 000 | 295 300 | 323 200 | 361 800 | 420 700 |
55 000 000 | 320 100 | 349 900 | 391 300 | 454 100 |
60 000 000 | 344 400 | 375 500 | 419 600 | 486 600 |
65 000 000 | 368 100 | 400 900 | 447 500 | 518 000 |
70 000 000 | 391 200 | 425 500 | 474 500 | 549 000 |
75 000 000 | 414 000 | 449 800 | 501 200 | 579 500 |
80 000 000 | 436 100 | 473 300 | 527 100 | 609 100 |
85 000 000 | 457 900 | 496 600 | 552 600 | 638 200 |
90 000 000 | 479 500 | 519 500 | 577 800 | 666 900 |
95 000 000 | 500 900 | 542 200 | 602 600 | 695 300 |
100 000 000 | 522 100 | 564 700 | 627 200 | 723 300 |
112 500 000 | 574 100 | 619 800 | 687 500 | 791 900 |
125 000 000 | 625 000 | 673 700 | 746 300 | 858 900 |
137 500 000 | 674 900 | 726 400 | 803 800 | 924 300 |
150 000 000 | 724 000 | 778 100 | 860 200 | 988 400 |
1.1 | Areas under construction, taking-off, testing, authorisations, authorisations and monitoring for the establishment, modification, maintenance and operation of the operating staff, and for rolling stock |
§ 6 para. 3 PflSchG i. V. m. Section 4 (2) AEG, § 4 BImSchG i. V. m. Section 4 (2) AEG, § 8 BImSchG i. V. m. Section 4 (2) AEG, § 8a BImSchG i. V. m. Section 4 (2) AEG, § 9 BImSchG i. V. m. Section 4 (2) AEG, § 16 BImSchG i. V. m. Section 4 (2) AEG, § 17 BImSchG i. V. m. Section 4 (2) AEG, § 20 BImSchG i. V. m. Section 4 (2) AEG, § 21 BImSchG i. V. m. Section 4 (2) AEG, § 24 BImSchG i. V. m. Section 4 (2) AEG, § 25 BImSchG i. V. m. Section 4 (2) AEG, § 26 BImSchG i. V. m. Section 4 (2) AEG, § 29 BImSchG i. V. m. Section 4 (2) AEG, § 29a BImSchG i. V. m. Section 4 (2) AEG, § 31 BImSchG i. V. m. Section 4 (2) AEG, § 52 BImSchG i. V. m. Section 4 (2) AEG, § 53 BImSchG i. V. m. Section 4 (2) AEG, § 58a BImSchG i. V. m. Section 4 (2) AEG, § 20 BImSchV 1 i. V. m. Section 4 (2) AEG, § 1 BImSchV 5 i. V. m. Section 4 (2) AEG, § 2 BImSchV 5 i. V. m. Section 4 (2) AEG, § 4 BImSchV 5 i. V. m. Section 4 (2) AEG, § 5 BImSchV 5 i. V. m. Section 4 (2) AEG, § 6 BImSchV 5 i. V. m. Section 4 (2) AEG, § 8 BImSchV 5 i. V. m. Section 4 (2) AEG, § 9 BImSchV 5 i. V. m. Section 4 (2) AEG, § 6 BImSchV 7 i. V. m. Section 4 (2) AEG, § 6 BImSchV 11 i. V. m. Section 4 (2) AEG, § 1 BImSchV 12 i. V. m. Section 4 (2) AEG, § 6 BImSchV 12 i. V. m. Section 4 (2) AEG, § 9 BImSchV 12 i. V. m. Section 4 (2) AEG, § 16 BImSchV 12 i. V. m. Section 4 (2) AEG, § 19 BImSchV 12 i. V. m. Section 4 (2) AEG, § 26 BImSchV 13 i. V. m. Section 4 (2) AEG, § 24 BImSchV 17 i. V. m. Section 4 (2) AEG, § 8 BImSchV 26 i. V. m. Section 4 (2) AEG, § 11 BImSchV 31 i. V. m. Section 4 (2) AEG, § 3 BImSchV 34 i. V. m. Section 4 (2) AEG, Section 9 (2) BBodSchG i. v. m. Section 4 (2) AEG, Section 10 (1) BBodSchG i. v. m. Section 4 (2) AEG, § 13 BBodSchG i. V. m. Section 4 (2) AEG, § 14 sentence 1 BBodSchG i. v. m. Section 4 (2) AEG, Section 15 (2) BBodSchG i. v. m. Section 4 (2) AEG, Section 16 (1) BBodSchG i. v. m. Section 4 (2) AEG |
by time |
1.2 | Monitoring of railways under the supervision of the railway system in order to comply with the provisions of Section 5 (1) of the AEG on the basis of suspicion, complaint or sample, if the suspicion or complaint of the person concerned is has been held responsible or a breach of a piece of legislation has been established | Section 5a (2) AEC | Expenditure of 300 to 1 000 Euro |
1.3 | Measures for the elimination of detected infringements and in order to prevent future breaches of iron Railway legislation, insofar as nothing special is regulated |
Section 5a (2) AEC | by time |
1.4 | Testing of new construction products and construction types as well as railway-specific construction products and construction and issuing of a corresponding certificate in the event of responsibility or reasonable suspicion or on request |
Section 5a (2) AEC | by time |
1.5 | Examination of a type-approval for railway-specific construction equipment and issuing of a corresponding certificate in case of suspected or justified suspicion or on request | Section 5a (2) AEC | by time |
1.6 | Examination of a new or modified form of construction or -type (type approval) of signal, telecommunication and electrical equipment and issuing of a corresponding certificate in the case of responsible suspected or substantiated suspicion or on request |
Section 5a (2) AEC | by time |
1.7 | Inspection of certain components or construction work and issuing of a corresponding certificate in case of suspected or justified suspicion or on request | Section 5a (2) AEC | by time |
1.8 | Approval of a railway undertaking, a holder or a railway infrastructure undertaking | § 6 AEG | EUR 5 000 |
1.9 | Modification of a licence for a railway undertaking, a holder or a railway undertaking, infrastructure company |
§ 6 AEG | EUR 2 500 |
1.10 | Issuing a safety certificate | Section 7a (2) AEG | by time |
1.11 | Issuing a national certificate | Section 7a (4) AEG | by time |
1.12 | Granting a security permit | Section 7c (2) AEG | by time |
1.13 | Approval of training facilities | Section 7d (2) AEG | by time |
1.14 | Decision on permission to accept of the holding |
§ 7e AEG | by time |
1.15 | Decision on delivery and decommissioning of railway infrastructure |
§ 11 AEG | EUR 3 000 |
1.16 | Exemption from railway operations | Section 23 (1) AEG | by time |
1.17 | Transfer of tasks to a notified body , within the scope of High-speed rail system |
Section 25b (1) AEC | by time |
2.1 | Plan determination: -construction of new plants -modification of existing plants |
§ 18 para. 1 AEG i. V. m. Section 74 (1) VwVfG | by Table 1 of the Annex |
2.2 | Plan Approval | § 18 para. 2 AEG i. V. m. § 74 VwVfG | 50% of the fee according to item 2.1 |
2.3 | Decision on the decision to decide on plan approval and planning permission | Section 18 (3) (i). V. m. Par. 1 AEG | 25% of the fee according to point 2.1 |
2.4 | Cancellation of the planning approval decision or the planning permission after the start of construction | Section 20 (7) AEG i. V. m. § 77 VwVfG | up to 75% of the fee referred to in point 2.1 or point 2.2 |
2.5 | Construction-technical examination of the building templates | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | 500 Euro to EUR 1 500 000 |
2.6 | Approval of the execution planning including construction supervision and acceptance for civil engineering | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by Table 2 of the Annex |
2.7 | Approval of the execution planning including construction supervision and acceptance for superstructure | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by Table 3 of the Annex |
2.8 | Approval of the execution planning including construction supervision and acceptance for building construction | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by Table 4 of the Annex |
2.9 | Review of modified building templates during planning changes with a volume of more than 1/20 of the original planning in the engineering, upper or high-construction sector | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | pursuant to No 2.6, 2.7 or 2.8, multiplied by the ratio of Scope of change planning to the extent of origin planning |
2.10 | Approval of the execution planning including construction supervision and removal of conversions of a Existing installation with substantial intervention in constructions or stock in the engineering, upper or building up |
§ 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | according to item 2.6, 2.7 or 2.8, plus a supplement of 20 to 50%, depending on the degree of difficulty; the Costs for canceling construction parts are attributed to the construction costs |
2.11 | Approval of the execution planning for the Demolition or removal of equipment, including construction supervision and inspection in the engineering, upper or building up |
§ 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by time |
2.12 | Approval of the execution planning for signal, telecommunication and electrical equipment | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by time |
2.13 | Construction inspection of a signal, telecommunication and electrical engineering system including supervision during construction | § 18 AEG i. V. m. Section 74 (2) sentence 2 VwVfG | by time |
3.1 | Confirmation of the appointment of an operating manager or a deputy |
§ 2 EBV | 150 Euro |
3.2 | Decision on approval for examination as operational manager |
§ 9 EBPV | 330 Euro |
3.3 | Carrying out an operational management test | § § 13, 14, 20, 21, 22 EBPV | EUR 1 850 |
3.4 | Performance of the repeat examination
|
§ 23 EBPV |
|
4.1 | Exceptions to EBO/ESBO | § 3 (1) (2) (a) EBO or ESBO | by time |
4.2 | Approvals according to EBO/ESBO | § 3 para. 2 No. 1 EBO or ESBO |
by time |
4.3 | Acceptance of a vehicle within the scope of the EBO | Section 32 (1) of the EBO | by time |
4.4 | Installations in need of surveillance: Examination of a new or amended type of construction; Examination before commissioning; periodic tests; exceptions and issuing an appropriate certificate |
Section 33 (4) (i). V. m. Paragraph 1 EBO |
by time |
4.5 | Approval of derogations from the Railway signalling |
Section A, point (a) (4) ESO 1959 | by time |
5.1 | Consent to the collection of charges at Lack of infrastructure capacity |
Section 18 (4) of the EIBV | by time |
5.2 | Exemption pursuant to § 14 (4) AEG | Section 22 (1) (1) EIBV | by time |
6.1 | Authorisation of derogations for the application of certain TSIs within the scope of the trans-European rail system | § 5 (1) TEIV | by time |
6.2 | Approval of the entry into service of a structural subsystem within the scope of the trans-European rail system | Section 6 (3) TEIV | by time |
6.3 | Authorisation for the entry into service of a structural subsystem for which there is no TSI, within the scope of the trans-European rail system | Section 6 (4) TEIV | by time |
6.4 | Authorisation for test drives within the scope of the trans-European rail system | Section 6 (7) TEIV | by time |
6.5 | General approval of vehicle series (type approval) within the scope of the trans-European rail |
Section 7 (2) TEIV | by time |
6.6 | Simplified authorisation for entry into service of vehicles of approved type within the scope of the trans-European rail system | Section 7 (4) TEIV | by time |
6.7 | Simplified authorisation for commissioning for foreign vehicles in the scope the trans-European rail system |
Section 8 (1) TEIV | by time |
6.8 | Authorisation for the entry into service of a full-scale or renewed structural subsystem within the scope of the trans-European rail system or a failure to approve the authorisation requirement for the entry into service of a Modified or renewed structural sub-system within the scope of the trans-European Rail system |
Section 9 (1) TEIV | by time |
6.9 | To monitor the conformity and suitability for use of interoperability constituents within the scope of the trans-European rail system on the basis of a suspicion, complaint or sample, if the suspicion or the A complaint has been caused by the person concerned or a breach of a piece of legislation has been established | § 5a (2) AEG i. V. m. § 11 TEIV | by time |
6.10 | Setting of a vehicle into the vehicle- Register-register |
§ 20 (2) and (3) TEIV | 50 Euro |
6.11 | Adjustment of up to 10 vehicles of the same type in the vehicle registration register |
§ 20 (2) and (3) TEIV | 35 Euro per vehicle |
6.12 | Adjustment of 11 up to 100 vehicles of the same type in the register of vehicles | § 20 (2) and (3) TEIV | 30 Euro per vehicle |
6.13 | Adjustment of more than 100 vehicles of the same type in the vehicle registration register |
§ 20 (2) and (3) TEIV | 25 Euro per vehicle |
6.14 | Modification/addition of data in the vehicle- Registry |
Section 20 (4) TEIV | 10 Euro per vehicle |
8.1 | Arrangement of measures for occupational safety and health | Section 22 (3) ArbSchG | by time |
9.1 | Checking the water supply systems in the Rail vehicles |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | 400 Euro |
9.2 | Check the fixed installations for the exclusive filling of rail vehicles; up to 10 hydrants |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | 800 euro |
9.3 | Check the fixed installations for the exclusive filling of rail vehicles; 11 to 50 Hydrants |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | EUR 1 000 |
9.4 | Check the fixed installations for the exclusive filling of rail vehicles; 51 to 100 Hydrants |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | EUR 1 350 |
9.5 | Check the fixed installations for the exclusive filling of rail vehicles; 101 to 200 Hydrants |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | EUR 1 500 |
9.6 | Check the fixed installations for the exclusive filling of rail vehicles; more than 200 Hydrants |
§ 39 IfSG, § § 18, 19, 20 TrinkwV | EUR 2 000 |
9.7 | Decision on measures in the event of non-compliance with limit values and requirements | § 39 IfSG, § 9 TrinkwV | by time |
9.8 | Anti-infectious monitoring of waste water- Disposal systems in rail vehicles as well as in the fixed installations for the exclusive disposal of rail vehicles |
§ 41 IfSG | 400 Euro |
10.1 | Change, extend and renew the validity of the administrative act | by time, up to half the fee for the administrative act |
1 | Approval of the term of a framework contract on the use of train paths | Section 14a (2) AEG | by time |
2 | Monitoring of access to the railway infrastructure on the basis of a suspicion, complaint or sample, if the suspected or the complaint is caused by the person concerned, or if there is a breach of a law has been identified | Section 14c (1) AEC | by time |
3 | Measures to be taken in the event of infringements of rules on access to railway infrastructure | Section 14c (1) AEC | by time |
4 | Examination of the intended decisions to be notified in advance, in so far as the proposed decisions do not comply with the provisions of the railway law relating to access to the railway infrastructure and do not conflict with Article 14e (1) AEC | Section 14e (1) AEG | by time |
5 | Objection to intended decisions to be notified in advance pursuant to Section 14d AEG | Section 14e (1) AEG | by time |
6 | Monitoring of access to the railway infrastructure on the basis of suspicion, complaint or sample, if the suspicion or complaint is caused by the person concerned or if there is a breach of a law has been | Section 14f (1) AEG | by time |
7 | Measures to be taken in the event of infringements of rules on access to railway infrastructure | § 14f (1) sentence 2 or (3) (i). V. m. Paragraph 2 AEG | by time |
1 | Assessment of the conformity and suitability for use of an interoperability constituent and the issuing of a corresponding certificate within the scope of the trans-European rail system | Section 15 (1) sentence 1 no. 1 TEIV | by time |
2 | EC verification of a subsystem and issuing of a corresponding certificate within the scope of the trans-European rail system | Section 15 (1) sentence 1 no. 2 or sentence 2 or 3 TEIV | by time |
25 000 | 280 | 360 | 440 | 500 | 580 |
30 000 | 330 | 420 | 500 | 580 | 660 |
35 000 | 370 | 470 | 560 | 650 | 740 |
40 000 | 420 | 520 | 620 | 720 | 820 |
45 000 | 460 | 670 | 690 | 790 | 910 |
50 000 | 500 | 610 | 740 | 860 | 980 |
75 000 | 690 | 850 | 1 010 | 1 170 | 1 330 |
100 000 | 860 | 1 060 | 1 260 | 1 450 | 1 650 |
150 000 | 1 190 | 1 450 | 1 700 | 1 960 | 2 220 |
200 000 | 1 490 | 1 800 | 2 120 | 2 430 | 2 740 |
250 000 | 1 750 | 2 120 | 2 500 | 2 860 | 3 220 |
300 000 | 2 020 | 2 430 | 2 850 | 3 260 | 3 670 |
350 000 | 2 270 | 2 720 | 3 180 | 3 640 | 4 100 |
400 000 | 2 500 | 3 000 | 3 500 | 3 990 | 4 490 |
450 000 | 2 720 | 3 260 | 3 800 | 4 340 | 4 870 |
500 000 | 2 940 | 3 510 | 4 090 | 4 660 | 5 230 |
750 000 | 3 890 | 4 610 | 5 340 | 6 070 | 6 800 |
1 000 000 | 4 660 | 5 510 | 6 360 | 7 210 | 8 030 |
1 500 000 | 6 470 | 7 590 | 8 690 | 9 860 | 11 000 |
2 000 000 | 8 180 | 9 560 | 10 900 | 12 300 | 13 700 |
2 500 000 | 9 780 | 11 400 | 13 000 | 14 600 | 16 200 |
3 000 000 | 11 300 | 13 100 | 15 000 | 16 800 | 18 600 |
3 500 000 | 12 800 | 14 800 | 16 900 | 18 900 | 21 000 |
4 000 000 | 14 300 | 16 500 | 18 700 | 21 000 | 23 100 |
4 500 000 | 15 700 | 18 100 | 20 500 | 22 900 | 25 300 |
5 000 000 | 17 100 | 19 700 | 22 300 | 24 900 | 27 400 |
7 500 000 | 23 700 | 27 200 | 30 600 | 34 000 | 37 400 |
10 000 000 | 29 900 | 34 100 | 38 300 | 42 500 | 46 600 |
15 000 000 | 43 300 | 46 900 | 52 500 | 58 000 | 63 600 |
20 000 000 | 52 300 | 59 000 | 65 700 | 72 400 | 79 200 |
25 000 000 | 62 600 | 70 400 | 78 300 | 86 100 | 93 900 |
30 000 000 | 70 400 | 79 000 | 87 400 | 96 000 | 104 700 |
35 000 000 | 79 600 | 89 000 | 99 000 | 108 100 | 117 700 |
40 000 000 | 88 800 | 99 000 | 109 400 | 119 800 | 130 400 |
45 000 000 | 97 600 | 108 600 | 119 900 | 131 200 | 142 600 |
50 000 000 | 106 200 | 118 000 | 130 100 | 142 300 | 154 600 |
55 000 000 | 114 700 | 127 300 | 140 000 | 153 200 | 166 200 |
60 000 000 | 123 100 | 136 400 | 149 900 | 158 100 | 177 700 |
65 000 000 | 131 300 | 145 000 | 159 700 | 174 200 | 188 900 |
70 000 000 | 139 400 | 154 000 | 169 100 | 184 400 | 199 800 |
75 000 000 | 147 300 | 162 600 | 178 400 | 194 400 | 210 600 |
80 000 000 | 155 200 | 171 200 | 187 700 | 204 300 | 221 300 |
85 000 000 | 162 900 | 180 000 | 196 700 | 214 100 | 231 700 |
90 000 000 | 170 700 | 187 900 | 205 700 | 223 700 | 242 100 |
95 000 000 | 178 300 | 196 100 | 214 500 | 233 200 | 252 300 |
100 000 000 | 185 800 | 204 300 | 223 300 | 242 700 | 262 400 |
112 500 000 | 204 300 | 224 200 | 244 800 | 266 000 | 287 000 |
125 000 000 | 222 400 | 243 700 | 266 000 | 288 100 | 311 100 |
137 500 000 | 240 000 | 262 700 | 286 000 | 310 100 | 334 500 |
150 000 000 | 257 600 | 281 400 | 306 200 | 331 600 | 357 500 |
200 000 000 | 332 200 | 353 300 | 383 200 | 413 800 | 438 700 |
250 000 000 | 396 200 | 421 500 | 456 000 | 491 400 | 520 900 |
375 000 000 | 546 000 | 580 900 | 625 400 | 671 600 | 711 900 |
500 000 000 | 685 500 | 729 300 | 782 500 | 838 200 | 888 500 |
625 000 000 | 817 700 | 870 000 | 931 100 | 995 500 | 1 055 100 |
750 000 000 | 944 600 | 1 004 900 | 1 073 200 | 1 145 400 | 1 214 100 |
1 000 000 000 | 1 185 900 | 1 261 600 | 1 342 900 | 1 429 400 | 1 515 200 |
1 250 000 000 | 1 414 800 | 1 505 100 | 1 598 000 | 1 697 500 | 1 799 300 |
1 500 000 000 | 1 634 200 | 1 738 500 | 1 841 900 | 1 953 400 | 2 070 600 |
1 750 000 000 | 1 846 100 | 1 963 900 | 2 076 900 | 2 199 600 | 2 331 600 |
2 000 000 000 | 2 051 700 | 2 182 600 | 2 304 700 | 2 437 900 | 2 584 100 |
25 000 | 300 | 370 | 450 | 530 | 600 |
30 000 | 350 | 430 | 520 | 610 | 700 |
35 000 | 390 | 490 | 590 | 690 | 780 |
40 000 | 430 | 540 | 650 | 760 | 860 |
45 000 | 480 | 590 | 710 | 830 | 950 |
50 000 | 520 | 640 | 770 | 900 | 1 020 |
75 000 | 720 | 890 | 1 060 | 1 230 | 1 400 |
100 000 | 910 | 1 110 | 1 320 | 1 530 | 1 730 |
150 000 | 1 260 | 1 540 | 1 820 | 2 090 | 2 360 |
200 000 | 1 590 | 1 930 | 2 270 | 2 610 | 2 950 |
250 000 | 1 910 | 2 300 | 2 700 | 3 090 | 3 490 |
300 000 | 2 210 | 2 660 | 3 110 | 3 560 | 4 010 |
350 000 | 2 500 | 3 000 | 3 510 | 4 010 | 4 510 |
400 000 | 2 790 | 3 340 | 3 890 | 4 440 | 5 000 |
450 000 | 3 060 | 3 660 | 4 260 | 4 860 | 5 470 |
500 000 | 3 330 | 3 980 | 4 630 | 5 270 | 5 920 |
750 000 | 4 620 | 5 480 | 6 350 | 7 200 | 8 070 |
1 000 000 | 5 830 | 6 880 | 7 940 | 8 990 | 10 000 |
1 500 000 | 8 080 | 9 480 | 10 900 | 12 300 | 13 700 |
2 000 000 | 10 200 | 11 900 | 13 600 | 15 300 | 17 000 |
2 500 000 | 12 200 | 14 200 | 16 200 | 18 200 | 20 200 |
3 000 000 | 14 100 | 16 400 | 18 700 | 21 000 | 23 200 |
3 500 000 | 16 000 | 18 500 | 21 100 | 23 600 | 26 100 |
4 000 000 | 17 800 | 20 600 | 23 400 | 26 200 | 28 900 |
4 500 000 | 19 600 | 22 600 | 25 600 | 28 600 | 31 700 |
5 000 000 | 21 300 | 24 600 | 27 800 | 29 900 | 34 300 |
7 500 000 | 29 600 | 33 900 | 38 200 | 42 500 | 46 800 |
10 000 000 | 37 300 | 42 500 | 47 800 | 53 000 | 58 200 |
15 000 000 | 51 700 | 58 600 | 65 600 | 72 500 | 79 400 |
20 000 000 | 65 300 | 73 700 | 82 100 | 90 500 | 98 900 |
25 000 000 | 78 100 | 87 900 | 97 700 | 107 500 | 117 200 |
30 000 000 | 85 400 | 95 600 | 106 000 | 116 500 | 127 000 |
35 000 000 | 96 700 | 108 000 | 119 600 | 131 200 | 142 900 |
40 000 000 | 107 700 | 120 100 | 132 700 | 145 400 | 158 200 |
45 000 000 | 118 400 | 131 800 | 145 400 | 159 200 | 173 100 |
50 000 000 | 128 900 | 143 200 | 157 900 | 172 600 | 187 500 |
55 000 000 | 139 200 | 154 400 | 170 000 | 185 800 | 201 700 |
60 000 000 | 149 300 | 165 400 | 181 900 | 198 700 | 215 500 |
65 000 000 | 159 200 | 176 300 | 193 700 | 211 300 | 229 100 |
70 000 000 | 169 100 | 186 900 | 205 200 | 223 700 | 242 400 |
75 000 000 | 178 700 | 197 400 | 216 500 | 235 900 | 255 500 |
80 000 000 | 188 300 | 207 700 | 227 700 | 247 900 | 268 400 |
85 000 000 | 197 700 | 217 900 | 238 700 | 259 800 | 281 200 |
90 000 000 | 207 000 | 228 000 | 249 600 | 271 500 | 293 700 |
95 000 000 | 216 300 | 237 900 | 260 300 | 283 000 | 306 100 |
100 000 000 | 225 400 | 247 800 | 270 900 | 294 400 | 318 300 |
112 500 000 | 247 900 | 272 000 | 296 900 | 322 400 | 348 200 |
125 000 000 | 269 800 | 295 600 | 322 300 | 349 600 | 377 400 |
137 500 000 | 291 400 | 318 700 | 347 200 | 376 200 | 405 800 |
150 000 000 | 312 600 | 341 500 | 371 600 | 402 300 | 433 700 |
25 000 | 330 | 410 | 500 | 580 | 660 |
30 000 | 380 | 480 | 570 | 660 | 760 |
35 000 | 430 | 540 | 640 | 750 | 850 |
40 000 | 480 | 590 | 710 | 830 | 950 |
45 000 | 520 | 650 | 780 | 900 | 1 030 |
50 000 | 570 | 710 | 840 | 980 | 1 120 |
75 000 | 780 | 970 | 1 150 | 1 330 | 1 520 |
100 000 | 990 | 1 210 | 1 430 | 1 660 | 1 880 |
150 000 | 1 350 | 1 650 | 1 950 | 2 240 | 2 540 |
200 000 | 1 690 | 2 060 | 2 410 | 2 780 | 3 130 |
250 000 | 2 010 | 2 430 | 2 850 | 3 260 | 3 680 |
300 000 | 2 310 | 2 780 | 3 250 | 3 720 | 4 190 |
350 000 | 2 590 | 3 110 | 3 630 | 4 150 | 4 670 |
400 000 | 2 860 | 3 430 | 3 990 | 4 560 | 5 130 |
450 000 | 3 110 | 3 730 | 4 340 | 4 950 | 5 560 |
500 000 | 3 360 | 4 010 | 4 660 | 5 320 | 5 970 |
750 000 | 4 440 | 5 270 | 6 090 | 6 920 | 7 750 |
1 000 000 | 5 330 | 6 290 | 7 260 | 8 220 | 9 180 |
1 500 000 | 7 390 | 8 670 | 9 950 | 11 200 | 12 500 |
2 000 000 | 9 320 | 10 900 | 12 400 | 14 000 | 15 600 |
2 500 000 | 11 200 | 13 000 | 14 800 | 16 600 | 18 500 |
3 000 000 | 12 900 | 15 000 | 17 100 | 19 200 | 21 200 |
3 500 000 | 14 600 | 16 900 | 19 300 | 21 600 | 23 900 |
4 000 000 | 16 300 | 18 800 | 21 400 | 23 900 | 26 500 |
4 500 000 | 17 900 | 20 700 | 23 400 | 26 200 | 28 900 |
5 000 000 | 19 500 | 22 500 | 25 400 | 28 400 | 31 400 |
7 500 000 | 27 100 | 31 000 | 34 900 | 38 800 | 42 700 |
10 000 000 | 34 100 | 38 900 | 43 700 | 48 500 | 53 200 |
15 000 000 | 47 300 | 53 600 | 59 900 | 66 200 | 72 600 |
20 000 000 | 59 700 | 67 300 | 75 000 | 82 700 | 90 400 |
25 000 000 | 71 400 | 80 400 | 89 300 | 98 200 | 107 200 |
30 000 000 | 80 300 | 90 000 | 99 800 | 109 600 | 119 500 |
35 000 000 | 91 000 | 101 600 | 112 500 | 123 400 | 134 400 |
40 000 000 | 101 300 | 113 000 | 124 800 | 136 800 | 148 800 |
45 000 000 | 111 400 | 124 000 | 136 800 | 149 800 | 162 800 |
50 000 000 | 121 300 | 134 800 | 148 500 | 162 400 | 176 500 |
55 000 000 | 131 000 | 145 300 | 160 000 | 174 800 | 189 800 |
60 000 000 | 140 500 | 155 700 | 171 200 | 180 500 | 202 800 |
65 000 000 | 149 800 | 165 800 | 182 200 | 198 800 | 215 600 |
70 000 000 | 159 100 | 175 800 | 193 000 | 210 500 | 228 100 |
75 000 000 | 168 200 | 185 700 | 203 700 | 222 000 | 240 400 |
80 000 000 | 177 200 | 195 400 | 214 200 | 233 300 | 252 600 |
85 000 000 | 186 000 | 205 000 | 224 600 | 244 400 | 264 500 |
90 000 000 | 194 800 | 214 500 | 234 800 | 255 400 | 276 300 |
95 000 000 | 203 500 | 223 900 | 244 900 | 266 300 | 288 000 |
100 000 000 | 212 100 | 233 100 | 254 900 | 277 000 | 299 500 |
112 500 000 | 233 200 | 255 900 | 279 400 | 303 300 | 327 600 |
125 000 000 | 253 900 | 278 100 | 303 300 | 329 000 | 355 100 |
137 500 000 | 274 200 | 299 900 | 326 700 | 354 000 | 381 800 |
150 000 000 | 294 100 | 321 300 | 349 600 | 378 500 | 408 000 |
200 000 000 | 379 200 | 403 400 | 437 400 | 472 400 | 500 800 |
250 000 000 | 452 300 | 481 200 | 520 500 | 561 000 | 594 700 |
375 000 000 | 623 300 | 663 100 | 713 900 | 766 700 | 812 700 |
500 000 000 | 782 500 | 832 500 | 893 300 | 956 800 | 1 014 200 |
625 000 000 | 933 500 | 993 100 | 1 062 900 | 1 136 200 | 1 204 400 |
750 000 000 | 1 078 300 | 1 147 100 | 1 225 200 | 1 307 500 | 1 385 900 |
1 000 000 000 | 1 353 800 | 1 440 200 | 1 533 000 | 1 631 800 | 1 729 700 |
1 250 000 000 | 1 615 000 | 1 718 100 | 1 824 100 | 1 937 800 | 2 054 000 |
1 500 000 000 | 1 865 500 | 1 984 600 | 2 102 600 | 2 229 900 | 2 363 700 |
1 750 000 000 | 2 107 400 | 2 241 900 | 2 370 900 | 2 511 000 | 2 661 600 |
2 000 000 000 | 2 342 100 | 2 491 600 | 2 630 900 | 2 783 000 | 2 949 900 |
25 000 | 250 | 300 | 370 | 480 |
30 000 | 300 | 360 | 440 | 570 |
35 000 | 350 | 420 | 520 | 670 |
40 000 | 400 | 480 | 590 | 760 |
45 000 | 440 | 540 | 670 | 860 |
50 000 | 500 | 600 | 740 | 950 |
100 000 | 990 | 1 190 | 1 450 | 1 840 |
150 000 | 1 490 | 1 760 | 2 120 | 2 660 |
200 000 | 1 980 | 2 320 | 2 760 | 3 420 |
250 000 | 2 480 | 2 860 | 3 360 | 4 130 |
300 000 | 2 860 | 3 310 | 3 900 | 4 800 |
350 000 | 3 180 | 3 700 | 4 400 | 5 440 |
400 000 | 3 460 | 4 050 | 4 850 | 6 030 |
450 000 | 3 690 | 4 360 | 5 250 | 6 590 |
500 000 | 3 880 | 4 620 | 5 610 | 7 100 |
1 000 000 | 7 050 | 8 360 | 10 100 | 12 700 |
1 500 000 | 10 200 | 12 100 | 14 600 | 18 300 |
2 000 000 | 13 400 | 15 800 | 19 100 | 23 900 |
2 500 000 | 16 600 | 19 600 | 23 600 | 29 500 |
3 000 000 | 19 900 | 23 300 | 27 700 | 34 500 |
3 500 000 | 23 200 | 27 000 | 31 900 | 39 400 |
4 000 000 | 26 500 | 30 600 | 36 100 | 44 400 |
4 500 000 | 29 800 | 34 300 | 40 300 | 49 300 |
5 000 000 | 33 200 | 38 000 | 44 500 | 54 200 |
10 000 000 | 66 300 | 75 400 | 87 500 | 105 600 |
15 000 000 | 99 500 | 112 100 | 128 800 | 154 000 |
20 000 000 | 132 600 | 148 100 | 168 600 | 199 500 |
25 000 000 | 165 800 | 184 300 | 208 800 | 245 700 |
30 000 000 | 186 500 | 206 100 | 232 900 | 273 100 |
35 000 000 | 215 400 | 237 300 | 267 300 | 312 400 |
40 000 000 | 243 000 | 267 100 | 300 200 | 350 100 |
45 000 000 | 269 600 | 295 600 | 331 600 | 386 000 |
50 000 000 | 295 300 | 323 200 | 361 800 | 420 700 |
55 000 000 | 320 100 | 349 900 | 391 300 | 454 100 |
60 000 000 | 344 400 | 375 500 | 419 600 | 486 600 |
65 000 000 | 368 100 | 400 900 | 447 500 | 518 000 |
70 000 000 | 391 200 | 425 500 | 474 500 | 549 000 |
75 000 000 | 414 000 | 449 800 | 501 200 | 579 500 |
80 000 000 | 436 100 | 473 300 | 527 100 | 609 100 |
85 000 000 | 457 900 | 496 600 | 552 600 | 638 200 |
90 000 000 | 479 500 | 519 500 | 577 800 | 666 900 |
95 000 000 | 500 900 | 542 200 | 602 600 | 695 300 |
100 000 000 | 522 100 | 564 700 | 627 200 | 723 300 |
112 500 000 | 574 100 | 619 800 | 687 500 | 791 900 |
125 000 000 | 625 000 | 673 700 | 746 300 | 858 900 |
137 500 000 | 674 900 | 726 400 | 803 800 | 924 300 |
150 000 000 | 724 000 | 778 100 | 860 200 | 988 400 |