Law Requirements On The Federal Plan

Original Language Title: Law on the Federal requirements plan

Read the untranslated law here: http://www.gesetze-im-internet.de/bbplg/BJNR254310013.html

Law on the federal requirement plan (Federal demand Plan Act - BBPlG) BBPlG copy date: 23/07/2013 full quote: "Federal demand Plan Act of 23 July 2013 (Federal Law Gazette I p 2543;)" 2014 i p 148 271)., guaranteed by article 11 of the law of 21st has been amended in July 2014 (Federal Law Gazette I p 1066). "Status: amended by article 11 G v 07.21.2014 I 1066 article 1 in conjunction with no." 33 of the plant's gem... BEK. V. 02.18.2014 I 148 came into force on 01.08.2014 article 1 in conjunction with no. 29 of the facility's gem... I BEK v 17/03/2014 271 entered into force on 03.07.2014 details about the status indication can be found in the menu under instructions footnote (+++ text detection from: 07.27.2013 +++) the G what as article 1 of G v. 07/23/2013 I 2543 adopted by the Bundestag. It occurs as per article 5 para. 1 of this G on 07/27/2013 in force. Article 1 in conjunction with Nos. 29 and 33 of the system of federal requirements plan law occurred on the day in force, on which in structures with § 14A para. 1 no. 1 of the Act required the environmental impact assessment strategic environmental assessment has been completed for the projects referred to there (number as of the entry into force see.). § 1 subject matter of the federal requirement plan (1) for products listed in the annex to this Act projects, the adaptation, development and expansion of the transmission grids for the integration of electricity from renewable energy sources, to the interoperability of electricity networks within the European Union, for the connection of new power plants or serve to avoid structural bottlenecks in the transmission grid , the energy industry and the need for urgent need to ensure safe and reliable operation of the network will be detected as a federal requirement plan according to § 12 of the German Energy Industry Act. (2) the projects referred to in paragraph 1 includes the necessary for the operation of power-lines system including the necessary changes to network connection points. The projects begin and end respectively on the grid connection points. § 2 featured projects (1) the projects marked the federal requirement plan with "A1" across countries within the meaning of article 2 paragraph 1 of the grid expansion acceleration Act transmission network. The projects identified in the federal requirement plan with "A2" across borders within the meaning of article 2 paragraph 1 of the grid expansion acceleration Act transmission network. (2) the project marked the federal requirement plan "B" may be 3, paragraph 3 lit. built and operated a of the energy act as pilot projects for low - loss transmission of high power over long distances in structures with § 12b paragraph 1 sentence. Cables in pilot projects in structures with sentence 1 to test the use of underground, they can be built in a technically and economically efficient sections underground cables and operated or altered if the requirements according to § 2 paragraph 2 sentence 1 No. 1 or no. 2 of the power grid expansion Act are met. At the request of the areas responsible for the approval of the project authority, the pilot projects are to be constructed in structures with sentence 1 in a technically and economically efficient sections underground cables and operate or change when the requirements of § 2 paragraph 2 sentence 1 No. 1 or no. 2 of the power grid expansion Act are met. Sentences 2 and 3 shall not apply, as far as the projects to be built in the path of at existing or already approved high or very high voltage overhead lines and operated or changed. § 43 sentence 1 number 3 and 4 of the Energy Act shall remain unaffected. (3) the projects marked the federal requirement plan with "D" shall be constructed as pilot projects for the use of high-temperature conductor cables in structures with § 12b paragraph 1 sentence 3 number 3 letter b of the energy industry Act and to operate or modify. The competent authority for approval of the project authority to the use of high-temperature conductor cables for projects of federal requirements plan, not covered by clause 1, approve, as far as technically and economically efficient. § 3 reporting obligation of transmission system operator (1) about the experience according to § 2 paragraph 2 and 3 gained't in the pilot projects shall submit to the respective responsible TSOs the Federal Network Agency of annually March 3, a report in which the technical feasibility, economic viability and environmental impact of pilot projects will be evaluated. The first report must be submitted 3 March of the second year after the start of each first section of a pilot project. (2) the report can be connected to the common network development plan in last with § 12b paragraph 1 sentence 1 of the German Energy Industry Act. Article 4 legal protection for the recorded in the federal requirement plan projects is § 50 paragraph 1 number 6 apply the administrative procedure code. . Facility (to § 1 paragraph 1) federal requirement plan (.) Reference: Federal Law Gazette I 2013, 2544-2545) projects, for which there are the energy-economic necessity and the urgent need for: No. projects marking 1 high voltage line Emden-Borssum - Osterath; DC A1, B-2 high voltage line Osterath - Philippsburg; DC A1, B-3 high voltage line Brunsbüttel - prominent; DC A1, B-4 high voltage line Wilster - Grafenrheinfeld; DC A1, B-5 high voltage line Lauchstädt - Meitingen; DC A1, B 6 high voltage line Conneforde - Cloppenburg - Westerkappeln; Phase AC rated voltage 380 kV high voltage line A1 7 Dollern - Stade - Sottrum - Wechold - country mountains; Phase AC rated voltage 380 kV with the individual measures - measure Dollern - Sottrum - Sottrum measure - Wechold - measure Wechold - landesbergen - 8 high-voltage line Brunsbüttel - Barlt - Heide – Husum – Niebüll - federal border (DK); Phase AC rated voltage of 380 kV with the individual measures - measure Barlt - Heath - measure measure Brunsbüttel - Barlt - Measure Heide – Husum – Husum – Niebüll - Niebüll measure - border DK - 9 high voltage line Hamm-Uentrop - Kruckel; Phase AC rated voltage of 380 kV - 10 high voltage line Wolmirstedt – helmstedt - Wafa; Phase AC rated voltage of 380 kV high voltage line 11 A1 Bertikow - Pasewalk; Phase AC rated voltage of 380 kV high voltage line 12 A1 Vieselbach - Eisenach - Mecklar; Phase AC rated voltage of 380 kV high voltage line 13 A1 Pulgar - Vieselbach; Phase AC rated voltage of 380 kV high voltage line 14 A1 rad village - Remptendorf. Phase AC rated voltage of 380 kV high voltage line 15 A1 point Metternich - Niederstedem; Phase AC rated voltage of 380 kV - 16 high voltage line Kriftel - upper Erlenbach; Phase AC rated voltage of 380 kV - 17 high voltage line Mecklar - Grafenrheinfeld; Phase AC rated voltage 380 kV high voltage line 18 A1 Redwitz - Mechlenreuth - Etzenricht - Schwandorf. Phase AC rated voltage of 380 kV - 19 high voltage line Urberach - Pfungstadt - Weinheim - point G380 - Altlußheim - Daxlanden, Kriftel - FARBWERKE HOECHST South; Phase AC rated voltage 380 kV with the individual measures - measure Urberach - Pfungstadt - Weinheim - measure Kriftel - FARBWERKE HOECHST South - measure Weinheim - Daxlanden - measure Weinheim - G380 - measure 20 high voltage line Grafenrheinfeld - Kupferzell - prominent G380 - Altlußheim - measure Altlußheim - Daxlanden A1; Phase AC rated voltage 380 kV with the individual measures - measure Grafenrheinfeld - Kupferzell - measure prominent - Kupferzell A1 21 high voltage line Daxlanden - Bühl / Kuppenheim - Eichstetten; Phase AC rated voltage of 380 kV high voltage line D 22 prominent - Endersbach; Phase AC rated voltage of 380 kV - 23 high voltage line Herbertingen - Tiengen; Phase AC rated voltage of 380 kV - 24 high voltage line point Rommel b - Herbertingen; Phase AC rated voltage of 380 kV - 25 high voltage line point Wullenstetten - point low arms; Phase AC rated voltage of 380 kV high voltage line 26 A1 Bärwalde - Schmölln. Phase AC rated voltage of 380 kV - 27 high voltage line branch Welsleben - Förderstedt. Phase AC rated voltage of 380 kV - 28 high voltage line branch South of Parchim - Neuburg; Phase AC rated voltage of 380 kV - 29 high-voltage line linking offshore wind farm Warrior flak (DK) connecting offshore wind farm Warrior flak (DK) - offshore wind farm Baltic 2 (combined grid solution); DC, three-phase AC rated voltage 380 kV high voltage line 30 B upper decorative - federal border (BE); DC 31 B high voltage line Wilhelmshaven - Conneforde; Phase AC rated voltage of 380 kV - 32 high voltage line state boundary (AT) – old home with branch Mace of Justice - Simbach, ISAR - Atlanta; Phase AC rated voltage of 380 kV - measure branch Simbach - measure Altheim - federal border AT - measure ISAR - Atlanta - 33 high voltage line Schleswig-Holstein - southern Norway (North. LINK); DC 34 B, high voltage line-Emden, East - Conneforde South; Phase AC rated voltage of 380 kV - 35 high voltage line Birkenfeld - mast 115A; Phase AC rated voltage of 380 kV - 36 high voltage line with branch Vöhringen - federal border (AT) Woringen - Memmingen; Phase AC rated voltage 380 kV with the individual measures - measure Vöhringen - Memmingen - Measure point Woringen - Memmingen A2 marking A1 = transnational line within the meaning of article 2 paragraph 1 A2 = cross-border management within the meaning of article 2 paragraph 1 B = pilot project for low-loss transmission of high power over long distances within the meaning of § 2 paragraph 2 sentence 1 D = pilot project for high temperature conductors within the meaning of § 2 para 3 sentence 1