Law on the Federal Requirements Plan (Bundesbedarf Plan Act-BBPlG)

Unofficial table of contents

BBPlG

Date of completion: 23.07.2013

Full quote:

" Bundesbedarf Plangesetz vom 23. Juli 2013 (BGBl. I p. 2543; 2014 I p. 148, 271), which is defined by Article 11 of the Law of 21 July 2014 (BGBl. 1066).

Status: Amended by Art. 11 G v. 21.7.2014 I 1066
§ 1 iVm No. 33 of the Appendix is in accordance with. Bek. v. 18.2.2014 I 148 entered into force on 8.1.2014
§ 1 iVm No. 29 of the Appendix is gem. Bek. v. 17.3.2014 I 271 entered into force on 7.3.2014

For more details, please refer to the menu under Notes

Footnote

(+ + + Text proof: 27.7.2013 + + +) 

The G was decided by the Bundestag as Article 1 of the G v. 23.7.2013 I 2543. It occurs gem. Article 5 (1) of this Act entered into force on 27 July 2013. § 1 iVm No. 29 and 33 of the annex to the Federal Requirements Planning Act shall enter into force on the date on which the strategic environmental assessment required by Section 14b (1) (1) of the Law on Environmental Impact Assessment (EIA) for the The project has been completed (see entry into force) Status). Unofficial table of contents

§ 1 Subject matter of the Federal Demand Plan

(1) For the projects listed in the Annex to this Act, which shall include the adaptation, development and development of transmission networks for the integration of electricity from renewable energy sources, for the interoperability of electricity networks within the European Union, the connection of new power stations or the prevention of structural bottlenecks in the transmission system, the need for energy and the urgent need to ensure a safe and reliable Network operation as a federal demand plan according to § 12e of the (2) The projects referred to in paragraph 1 also include the facilities necessary for the operation of power lines, including the necessary changes to the network links. The projects will start and end at the network link points. Unofficial table of contents

§ 2 Signed Projects

(1) The projects identified in the Federal Demand Plan with "A1" are transnational within the meaning of Article 2 (1) of the Network Development Acceleration Act (NetzausbauAccelerungsgesetz). The projects identified in the Federal Demand Plan with "A2" are cross-border within the meaning of § 2 (1) of the Network Development Acceleration Act. (2) Projects marked "B" in the Federal Requirements Plan may be pilot projects. For a low-loss transfer of high performance over long distances according to § 12b (1) sentence 3 (3) (a) of the German Energy Economic Law (Energiewirtschaftsgesetz) are being constructed and operated. In order to test the use of underground cables for pilot projects as set out in the first sentence, they may be constructed and operated or modified on technically and economically efficient subsections as underground cables, if the requirements of Article 2 (2), first sentence, Point 1 or point 2 of the Energy Management Act. At the request of the authority responsible for the approval of the project, the pilot projects referred to in the first sentence shall be constructed and operated on technically and economically efficient sub-sections as underground cables, if the requirements of 2 (2), first sentence 1, point 1 or point 2 of the Energy Law on Construction of the Energy Law. The provisions of sentences 2 and 3 shall not apply to the extent that the project is to be constructed and operated or amended on the route of an existing or already approved high or maximum voltage supply line. Section 43, first sentence, points 3 and 4 of the Energy Economic Law remains unaffected. (3) The projects marked "D" in the Federal Demand Plan are pilot projects for the use of high-temperature conductor ropes in accordance with § 12b (1) sentence 3 (3) (3) (3) (3) (3) (3) b of the Energy Economics Act to establish and operate or to modify it. The competent authority responsible for the approval of the project may authorise the use of high-temperature conductor ropes in the case of projects of the Federal Requirements Plan, which do not fall under the first sentence, to the extent that this is technically and economically efficient. Unofficial table of contents

§ 3 Reporting obligation of the transmission system operators

(1) On the basis of the experience gained in the pilot projects referred to in Article 2 (2) and (3), the responsible operator of the transmission system of the Federal Network Agency shall submit a report each year on 3 March each year, in which the technical feasibility, the economic viability and environmental impact of the pilot projects. The first report shall be submitted by 3 March of the second year after the first part of a pilot project has been put into service. (2) The report may be submitted in accordance with the common network development plan referred to in Article 12b (1) sentence 1 of the Energy Economics Act. Unofficial table of contents

§ 4 Legal protection

Section 50 (1) (6) of the administrative court order is to be applied to the projects included in the Federal Demand Plan. Unofficial table of contents

Annex (to § 1 paragraph 1) Federal demand plan

(Fundstelle: BGBl. I 2013, 2544-2545)
Projects for which there is a need for energy and the need for urgent action:
Nr.VorhabenKenn- Drawing
1 Maximum voltage line Emden-Borssum-Osterath; DC A1, B
2 Maximum voltage line Osterath-Philippsburg; DC A1, B
3 Maximum voltage line Brunsbüttel-Großgartach; DC A1, B
4 Maximum voltage line Wilster-Grafenrheinfeld; DC A1, B
5 Maximum voltage line Lauchstädt-Meitingen; DC A1, B
6 Maximum voltage line Conneforde-Cloppenburg-Westerkappeln; rotary current rated voltage 380 kV A1
7 Max voltage line Dollern-Stade-Sottrum-Wechold-Landesbergen; rotary current rated voltage 380 kV
with the individual measures
-
Action Dollern-Sottrum
-
Measure Sottrum-Wechold
-
Action Wechold-Landesbergen
-
8 Max voltage line Brunsbüttel-Barlt-Heide-Husum-Niebüll-Bundesfrontier (DK); rotational current rated voltage 380 kV
with the individual measures
-
Measure Barlt-Heide
-
Brunsbüttel-Barlt measure
-
Measure Heide-Husum
-
Action Husum-Niebüll
-
Action Niebüll-frontier DK
-
9 High voltage line Hamm-Uentrop-Kruckel; rotary current rated voltage 380 kV -
10 Maximum voltage line Wolmirstedt-Helmstedt-Wahle; rotary current rated voltage 380 kV A1
11 High voltage line Bertikow-Pasewalk; rotary current rated voltage 380 kV A1
12 Maximum voltage line Vieselbach-Eisenach-Mecklar; rotary current rated voltage 380 kV A1
13 Maximum voltage line Pulgar-Vieselbach; rotary current rated voltage 380 kV A1
14 Maximum voltage line Röhrsdorf-Remptendorf; rotary current rated voltage 380 kV A1
15 Max voltage line point Metternich-Niederstedem; rotary current rated voltage 380 kV -
16 Max voltage line Kriftel-Obererlenbach; rotary current rated voltage 380 kV -
17 Maximum voltage line Mecklar-Grafenrheinfeld; rotary current rated voltage 380 kV A1
18 Maximum voltage line Redwitz-Mechlenreuth-Etzenricht-Schwandorf; rotary current rated voltage 380 kV -
19 Max voltage line Urberach-Pfungstadt-Weinheim-Punkt G380-Altdecisiheim-Daxlanden, Kriftel-Farbwerke Höchst Süd; rotary current rated voltage 380 kV
with the individual measures
-
Measure Urberach-Pfungstadt-Weinheim
-
Measure Kriftel-Farbwerke Höchst Süd
-
Measure Weinheim-Daxlanden
-
Measure Weinheim-G380
-
Action G380-Altdecisiheim
-
Action Altdecisiheim-Daxlanden
A1
20 Max voltage line Grafenrheinfeld-Kupferzell-Großgartach; rotary current rated voltage 380 kV
with the individual measures
-
Measure Grafenrheinfeld-Kupferzell
-
Measure Großgartach-Kupferzell
A1
21 Maximum voltage line Daxlanden-Bühl/Kuppenheim-Eichstetten; rotary current rated voltage 380 kV D
22 Maximum voltage line Großgartach-Endersbach; rotary current rated voltage 380 kV -
23 Maximum voltage line Herbertingen-Tiengen; rotary current rated voltage 380 kV -
24 Maximum voltage line point Rommelsbach-Herbertingen; rotary current rated voltage 380 kV -
25 Maximum voltage line point bead chains-point Niederwangen; rotary current rated voltage 380 kV A1
26 Maximum voltage line Bärwalde-Schmölln; rotary current rated voltage 380 kV -
27 Maximum voltage line branch Welsleben-Förderstedt; rotary current rated voltage 380 kV -
28 Maximum voltage line branch Parchim Süd-Neuburg; rotary current rated voltage 380 kV -
29 Maximum voltage line Connection offshore wind farm Kriegers Flak (DK) with connection offshore wind park Kriegers Flak (DK)-offshore wind farm Baltic 2 (Combined Grid Solution); DC, three-phase current nominal voltage 380 kV B
30 Maximum voltage line Oberzier-Bundesfrontier (BE); DC B
31 Maximum voltage line Wilhelmshaven-Conneforde; rotary current rated voltage 380 kV -
32 Maximum voltage line Federal border (AT)-Altheim with branch Matzenhof-Simbach, Isar-Ottenhofen; rotary current rated voltage 380 kV
-
Measure Abzweig Simbach
-
Measure Altheim-Bundesfrontier AT
-
Action Isar-Ottenhofen
-
33 Maximum voltage line Schleswig-Holstein-Südnorwegen (NORD.LINK); DC B
34 Max voltage line Emden Ost-Conneforde Süd; rotary current rated voltage 380 kV -
35 Maximum voltage line Birkenfeld-Mast 115A; rotary current rated voltage 380 kV -
36 Maximum voltage line Vöhringen-Bundesfrontier (AT) with branch Woringen-Memmingen; rotary current rated voltage 380 kV
with the individual measures
-
Action Vöhringen-Memmingen
-
Measure Point Woringen-Memmingen
A2
Marking
A1 =
Cross-country management within the meaning of Article 2 (1)
A2 =
Cross-border management within the meaning of Article 2 (1)
B =
Pilot project for low-loss transmission of high performance over long distances within the meaning of § 2 (2) sentence 1
D =
Pilot project for high-temperature conductor ropes within the meaning of § 2 (3) sentence 1