BauwAbdAusbV
Date of completion: 24.04.1997
Full quote:
" Regulation on vocational training for the construction company of the building seal of 24 April 1997 (BGBl. I p. 946) "
This legal regulation is a training order within the meaning of Section 25 of the Vocational Training Act. The training regulations and the coordinated framework curriculum for the vocational school, agreed by the Standing Conference of the Ministers of Education and Cultural Affairs of the Länder in the Federal Republic of Germany, will soon be published as a supplement to the Federal Gazette.1. | in the Technology Examination | 120 minutes, |
2. | in the examination subject Technical Mathematics | 60 minutes, |
3. | Work planning in the examination subject | 120 minutes, |
4. | in the examination subject Economic and social studies | 60 minutes. |
I. Basic vocational training | ||||||||
Lfd. No. | Part of the training profession | Skills and knowledge to be conveyed through the involvement of self-employed planning, implementation and control | Timeframe values in weeks in the training year | |||||
1 | 2 | 3 | 4 | |||||
1 | 2 | 3 | 4 | |||||
1 | Vocational training (§ 5 no. 1) | a) | The importance of the training contract, in particular the conclusion, duration and termination of the contract, | throughout the training | ||||
b) | Mutual rights and obligations arising from the training contract | |||||||
c) | The possibilities of continuing vocational training | |||||||
2 | Establishment and organization of the training company (§ 5 no. 2) | a) | Explaining the structure and tasks of the training company | |||||
b) | Explain the basic functions of the training company, such as procurement, manufacturing, offer processing and administration | |||||||
c) | The relationship between the training company and its workforce on economic organisations, professional representatives and trade unions | |||||||
d) | Describe the basics, tasks and working methods of the constitutional bodies of the training company | |||||||
3 | Labour and collective bargaining law (§ 5 no. 3) | a) | Essential parts of the employment contract | |||||
b) | the main provisions of the collective agreements applicable to the establishment of the establishment | |||||||
4 | Safety and health protection at work, environmental protection and rational use of energy (§ 5 n. 4) | a) | Observe and apply relevant occupational safety and accident prevention regulations | |||||
b) | Explain the tasks of occupational health and safety at work and the relevant professional association and industrial inspectorate | |||||||
c) | The main provisions of the occupational health and safety legislation applicable to the establishment of the training | |||||||
d) | Use personal protective equipment to prevent injuries and occupational diseases | |||||||
e) | Hazards that arise when dealing with electric current | |||||||
f) | Hazards associated with poisons, vapours, gases and highly flammable substances, as well as working materials, and taking protective measures | |||||||
g) | Take measures for preventive fire and explosion protection, as well as service fire protection devices and fire-fighting equipment | |||||||
h) | behave objectively in case of occupational accident situations | |||||||
i) | Initiate First Aid Measures | |||||||
k) | contribute to the prevention of operational environmental pressures in the field of occupational exposure, in particular: | |||||||
aa) | comply with environmental protection regulations applicable to the training establishment | |||||||
bb) | Use the possibilities of economical and environmentally friendly use of energy and materials | |||||||
cc) | Supply residual materials separately from disposal | |||||||
5 | Planning and preparation of work processes, setting up construction sites, controlling the work results (§ 5 no. 5) | a) | Collect work order, especially on the basis of the performance directory | |||||
b) | Set work items and work equipment | |||||||
c) | Determining the need for building materials | |||||||
d) | Setting tools and construction equipment | |||||||
e) | Setting up, maintaining and clearing the workplace | |||||||
f) | Prepare and take measures for the separate disposal of building and construction materials | |||||||
g) | Securing a workplace to prevent accidents and hazards | |||||||
h) | Control work results of work steps and work order | |||||||
6 | Installation and testing of work and protective scaffold, testing of excavations and trenches (§ 5 no. 6) | a) | Check the operational safety of working and protective scaffold, arrange for operational safety | 4 | ||||
b) | Set up, maintain and dismantled working and protective scaffolders | |||||||
c) | Digging excavations and trenches on the necessity of a verb | |||||||
d) | Testing excavations and trenches with regard to the working space width | |||||||
e) | Construction of excavations and trenches to be tested for safety | |||||||
7 | Reading and making of sketches, drawings and laying plans, carrying out measurements (§ 5 no. 7) | a) | Read and apply plans, drawings, laying plans and bill of materials | 6 | ||||
b) | Apply technical tables, manuals, standards, guidelines and information sheets | |||||||
c) | Prepare sketches and parts lists | |||||||
d) | Perform length measurements | |||||||
e) | Curse straight | |||||||
f) | Apply and secure measurement points | |||||||
g) | apply and check right angles | |||||||
h) | Transfer heights with spirit level and hose balance | |||||||
i) | Measurements with leveling instruments | |||||||
8 | Testing of building materials and building materials according to type and quantity, storage and transport (§ 5 no. 8) | a) | Assigning construction and building aids to different uses | 6 | ||||
b) | Adhesive compositions and coatings, in particular bitumen, pre-coatings, filled masses and potting compounds, testing and storing | |||||||
c) | Check and store liquid plastics | |||||||
d) | Hot and cold-processable spatula compounds, especially mastic, asphalt and plastic spatula masses, test and store | |||||||
e) | Check and store bitumen and polymer bitumen membranes | |||||||
f) | Testing and storing plastic webs | |||||||
g) | Check and store metal tapes | |||||||
h) | Building auxiliary materials, in particular propane gas, heating oil and source welding agents, transport and storage | |||||||
9 | Provision of construction and construction aids, tools and construction equipment, commissioning and waiting (§ 5 No. 9) | a) | Providing construction and construction aids, tools and construction equipment | 8 | ||||
b) | Maintenance of small devices and tools | |||||||
c) | Commissioning and maintenance of construction equipment | |||||||
d) | Take gas burners, hose breakers, regulators and thermostats into operation and wait | |||||||
e) | Detecting faults in construction equipment and causing disturbance elimination | |||||||
10 | Carrying out woodwork (§ 5 No. 10) | a) | Making formwork | 6 | ||||
b) | Apply wood preservatives | |||||||
c) | Edit wood | |||||||
d) | Connecting and replacing workpieces made of wood | |||||||
11 | Carrying out wall, plaster, concrete and stemmed works (§ 5 No. 11) | a) | Manufacture and install mortars and concrete mixes | 8 | ||||
b) | Repair masonry and plaster | |||||||
c) | Make wall and ceiling breakthroughs and close | |||||||
12 | Processing of sealants and insulation materials (§ 5 No. 12) | a) | Measuring and cutting sealants and insulation materials | 14 | ||||
b) | Apply paint | |||||||
c) | Prepare molten material in accordance with the boiler and melting temperature | |||||||
d) | Pay attention to processing temperatures | |||||||
II. Vocational training |
||||||||
Lfd. No. | Part of the training profession | Skills and knowledge to be conveyed through the involvement of self-employed planning, implementation and control | Timeframe values in weeks in the training year | |||||
1 | 2 | 3 | 4 | |||||
1 | 2 | 3 | 4 | |||||
1 | Testing of building materials and building materials according to type and quantity, storage and transport (§ 5 no. 8) | a) | Check fasteners and associate them with the purpose of use | 2 | ||||
b) | Check and store insulation materials | |||||||
2 | Carrying out wall, plaster, concrete and stemmed works (§ 5 No. 11) | a) | Check concrete surfaces with regard to sealing work | 6 | ||||
b) | Repair concrete surfaces | |||||||
3 | Processing of sealants and insulation materials (§ 5 No. 12) | a) | Bonding bitumen, polymer bitumen and plastic webs as well as metal strips, in particular in the | 10 | ||||
- | Brush strobe procedure, | |||||||
- | Casting procedure, | |||||||
- | Casting and rolling-in processes, | |||||||
- | welding procedures and | |||||||
- | Application of plastic adhesives | |||||||
b) | Set the type of seam joints in accordance with the building material and manufacture seam joints, in the case of plastic webs in particular by | |||||||
- | source welding, | |||||||
- | Hot gas welding, | |||||||
- | Heating wedge welding and | |||||||
- | Gluing with contact adhesives | |||||||
c) | Install the insulating materials | |||||||
d) | Install bitumen, polymer bitumen and plastic webs with loose laying and mechanical fastening | 4 | ||||||
e) | Insert sealing tapes and set up cover strips | |||||||
f) | Apply spelt masses hot and cold | |||||||
g) | Apply liquid plastics | |||||||
4 | Preparing the sealing work on the construction site (§ 5 No. 13) | a) | Check the usefulness of the sealing action, in particular with regard to the protection of heat and fire, on the spot | 6 | ||||
b) | Assess the weather conditions with regard to the type of seal and arrange for appropriate measures | |||||||
c) | Check the waterproofing background on condition and suitability | |||||||
d) | Check the temperature and humidity of the sealing base and the air | |||||||
5 | Sealing against soil moisture, against non-pressing and crushing water (§ 5 No. 14) | a) | Sealing horizontal, vertical, inclined and shaped surfaces | 14 | ||||
b) | Sealing corners, edges, pre-and back jumps | |||||||
c) | Make sealing and sealing | |||||||
d) | Make sweeping ports | 10 | ||||||
e) | Manufacture falling and folded shocks | |||||||
f) | Producing auxiliary constructions for moving wall connectors | |||||||
g) | Sealing Penetrations | |||||||
h) | Sealing disc anchors | |||||||
i) | Laying protection and separation layers from different materials | |||||||
k) | Take protective measures to seal off work interruptions | |||||||
l) | Make movement joints with respect to vertical, horizontal and combined movements through reinforcements and joint flange constructions | 8 | ||||||
m) | check existing seals, establish connections between existing and new seals | |||||||
n) | Repair seals | |||||||
6 | Sealing of roofs (§ 5 no. 15) | a) | Sealing horizontal, vertical, inclined and shaped roof surfaces as well as corners, edges and roofs on roof structures | 6 | ||||
b) | Sealing and sealing of seals, in particular wall connections, attic connections and roof edge termini | |||||||
c) | Form throats | |||||||
d) | Connect to light domes and light bands | 18 | ||||||
e) | Installation and sealing of roof penetrations and roof | |||||||
f) | Make movement joints in the roof area and in the connection area | |||||||
g) | Connecting old and new roof sealings | |||||||
h) | Installation of insulating layers, in particular barrier insulation layers, and steam barriers | |||||||
i) | Creating protective layers | |||||||
k) | Maintenance and repair of roof gaskets | |||||||
l) | Check sealants for roof justifications | |||||||
m) | Performing seals under roof-based justifications | |||||||
7 | Sealing of traffic areas, in particular of bridge boards (§ 5 No. 16) | a) | Check the surface of the building with a view to sealing work and arrange for measures | 12 | ||||
b) | Measuring the tear resistance of concrete surfaces | |||||||
c) | select system-bound sealing materials | |||||||
d) | Check and log the height and profile-appropriate location of the surface | |||||||
e) | priming prepared surfaces, sealing, scratching and coating | |||||||
f) | Install sealants in a system-compatible way | |||||||
g) | Connecting terminals to end profiles, drip sleeves and processes | |||||||
8 | Manufacture of construction reports and scale sketches, quality control (§ 5 No. 17) | a) | Daily and weekly reports, hourly wage and building material evidence | 8 | ||||
b) | Prepare stock and scale sketches of executed sealing work, carry out building material consumption calculations | |||||||
c) | Check sealing work on quality |