Fourth Regulation implementing the Federal Immission Control Act (Regulation on annexes in need of approval-4). BImSchV)

Unofficial table of contents

4. BImSchV

Date of completion: 02.05.2013

Full quote:

" Ordinary on approved plants of 2 May 2013 (BGBl. I p. 973, 3756), as defined by Article 3 of the Regulation of 28 April 2015 (BGBl. 670).

Status: Amended by Art. 3 V v. 28.4.2015 I 670

For more details, please refer to the menu under Notes

Footnote

(+ + + Text proof: 2.5.2013 + + +) 
(+ + + Official note from the norm-provider on EC law:
Implementation of the
EURL 75/2010 (CELEX Nr: 32010L0075) cf. V v. 2.5.2013 I 973 + + +)

The V was decided as Article 1 of the V v. 2.5.2013 I 973 by the Federal Government and the Federal Ministry for the Environment, Nature Conservation and Nuclear Safety after consulting the parties concerned and with the approval of the Bundesrat. She's gem. Article 11, first sentence, of this V entered into force on 2 May 2013. Unofficial table of contents

§ 1 Equipment in need of approval

(1) The establishment and operation of the installations listed in Annex 1 shall be subject to authorisation in so far as the circumstances are likely to be expected to operate in the same place for a period longer than during the twelve months following which the plant is put into service. For the installations referred to in point 8 of Annex 1, with the exception of installations for treatment at the place of origin, the first sentence shall also apply to the extent that they are to be operated in the same place less than during the twelve months following the entry into service. For the installations referred to in points 2.10.2, 7.4, 7.5, 7.25, 7.28, 9.1, 9.3 and 9.11 of Annex 1, the first sentence shall apply only in so far as they are used for commercial purposes or are used in the context of economic undertakings. Where the requirements for approval of the installations listed in Annex 1 depend on the achievement or exceeding of a specified performance limit or plant size, it shall be based on the legal and actual possible operating range of the installations covered by the same (2) The approval requirement shall extend to all of the designated operators.
1.
Plant parts and process steps necessary for operation, and
2.
Subsidiary facilities which are related to the parts and process steps referred to in point 1 in a spatial and operational context and which may be of importance for:
a)
the emergence of harmful environmental impacts,
b)
the provision of protection against adverse environmental effects, or
c)
the emergence of other hazards, significant disadvantages or significant nuisances.
(3) The conditions set out in Annex 1 shall also be met if a number of installations of the same type are closely related to the spatial and operational context (joint installation) and together the relevant performance limits or plant sizes can be reached or exceeded. A close spatial and operational relationship shall be provided when the installations are
1.
be on the same premises,
2.
are connected to common operating facilities, and
3.
for a comparable technical purpose.
(4) If part of a plant belongs to parts or subsidiary facilities which would have to be approved separately, only a permit is required. (5) Should the performance limit or plant size to be determined for the approval requirement be The extension of an existing plant is exceeded for the first time, the entire plant is subject to approval. (6) No approval is required to the extent that they require the research, development or testing of new materials, fuels, products, or Procedures in the laboratory or pilot plant scale shall be used, including: such installations in the laboratory or pilot plant scale, in which new products are produced in the quantity required for testing their properties by third parties prior to the market launch, to the extent that the new products are still further researched or (7) No authorisation shall be required for the storage of substances which an authority has ensured in the performance of its legal duty to prevent security. Unofficial table of contents

§ 2 assignment to the types of procedure

(1) The authorisation procedure shall be carried out in accordance with
1.
§ 10 of the Federal Immission Protection Act for
a)
Installations marked in column c of Annex 1 to the letter G,
b)
Installations composed of installations marked in column c of Annex 1 with the letter G and the letter V,
c)
Installations marked with the letter V in column c of Annex 1 and for which an environmental impact assessment is to be carried out in accordance with sections 3a to 3f of the Environmental Impact Assessment Act,
2.
§ 19 of the Federal Immission Protection Act in the simplified procedure for installations marked in column c of Annex 1 with the letter V.
To the extent that the assignment to the approval procedures depends on the performance limit or plant size, § 1 paragraph 1 sentence 4 shall apply. (2) If an installation can be assigned to completely different plant designations in Annex 1, then the (3) For installations marked in column c of Annex 1 to the letter G, which are used exclusively or primarily for the development and testing of new processes, feedstocks, fuels or products, (test facilities), the simplified procedure shall be carried out if the authorisation shall be granted for a period not exceeding three years after the installation has been put into operation; this period may be extended on request for a maximum period of one year. Sentence 1 shall apply only to installations of Appendix 1 (list of projects subject to EIA) to the Environmental Impact Assessment Act only to the extent that no environmental impact assessment is carried out in accordance with the provisions of this Act. If the situation, nature or operation of a plant approved in accordance with the first sentence is to be changed for another development or testing purpose, a procedure in accordance with the first sentence shall be carried out. (4) If the procedure for the allocation to a If the performance limit or the size of the plant shall be reached or exceeded by the establishment and operation of a further sub-installation or by any other extension of the installation, the approval shall be granted for the change in the Method which the asset is equal to or equal to the sum of its power or size. Unofficial table of contents

§ 3 Plants according to the Industrial Emissions Directive

Installations referred to in Article 10 in conjunction with Annex I to Directive 2010 /75/EU of the European Parliament and of the Council of 24 November 2010 on industrial emissions (integrated pollution prevention and control) (recast) (OJ L 378, 27.12.2010, p. 17) are installations marked with the letter E in column d of Annex 1. Unofficial table of contents

Annex 1

(Fundstelle: BGBl. I 2013, 975-996)

Raw material term in point 7The term "raw material" used in plant descriptions in point 7 applies regardless of whether the term "raw material" has been previously processed or not. Waste concept in point 8The term "raw material" in the plant descriptions under points 8.2 to 8.15 the term "waste" refers exclusively to waste to which the provisions of the Circular Economy Act apply. Mixing rules are referred to this mixing rule in plant descriptions in point 7. the production capacity P is calculated on the basis of animal and plant-based raw materials as follows: where A is the percentage of animal raw materials used in the total raw materials used. LegendeNr.:
Asset type asset description number: The complete description of the asset type is derived from the continuous text from the 2. up to the last detail level of the serial number.
(e.g. B. the complete description of the plant type of point 1.2.4.1 of the continuous text of points 1.2, 1.2.4 and 1.2.4.1) Procedure:
G: Approval procedure according to § 10 BImSchG (with public participation)
V: Simplified procedure in accordance with § 19 BImSchG (without public participation)
Annex to Article 10 of Directive 2010 /75/EU:
E: Installation according to § 3


Nr.Asset DescriptionProcess Type Asset in accordance with Art. 10 of Directive 2010 /75/EU abcd
1. Heat generation, mining and energy
1.1 Plants for the production of electricity, steam, hot water, process heat or heated exhaust gas through the use of fuels in a combustion device (such as power plant, heating power plant, heating plant, gas turbine plant, internal combustion engine plant, other Combustion plant), including associated steam boilers, with a thermal output of 50 megawatts or more; G E
1.2 Plants for the production of electricity, steam, hot water, process heat or heated exhaust gas in a combustion device (such as power plant, heating power plant, heating plant, gas turbine plant, internal combustion engine, other combustion plant), including Related steam boilers, other than internal combustion engines for drilling rigs and emergency power units, through the use of
1.2.1 Coal, coke, including petroleum coke, coal briquettes, peat briquettes, torruses, natural wood, emulsified natural bitumen, heating oils, excluding heating oil EL, with a thermal output of 1 megawatt to less than 50 megawatts, V
1.2.2 gaseous fuels (in particular coke oven gas, mine gas, steelgas, refinery gas, synthesis gas, petroleum gas from the tertiary extraction of crude oil, sewage gas, biogas), other than natural gas, liquefied petroleum gas, gas from the public gas supply, or Hydrogen, with a thermal output of
1.2.2.1 10 megawatts to less than 50 megawatts, V
1.2.2.2 1 megawatt to less than 10 megawatts, in the case of internal combustion engines or gas turbine plants, V
1.2.3 Heating oil EL, diesel fuel, methanol, ethanol, natural vegetable oils or vegetable oil methyl esters, natural gas, liquefied petroleum gas, gases from the public gas supply or hydrogen with a thermal output of heat of
1.2.3.1 20 megawatts to less than 50 megawatts, V
1.2.3.2 1 megawatt to less than 20 megawatts, in the case of internal combustion engines or gas turbine plants, V
1.2.4 solid or liquid fuels other than those referred to in point 1.2.1 or 1.2.3 and having a thermal input of 100 kilowatts to less than 50 megawatts; V
1.3 (unoccupied)
1.4 Combustion engine systems or gas turbine systems for the drive of working machines for the use of
1.4.1 Heating oil EL, diesel fuel, methanol, ethanol, natural vegetable oils, vegetable oil methyl esters, coke oven gas, mine gas, steelgas, refinery gas, synthesis gas, petroleum gas from the tertiary extraction of crude oil, sewage gas, biogas, natural gas, Liquefied gas, gases from the public gas supply or hydrogen with a thermal output of
1.4.1.1 50 megawatts or more, G E
1.4.1.2 1 megawatt to less than 50 megawatts, with the exception of combustion engine systems for drilling rigs, V
1.4.2 other fuels other than those referred to in point 1.4.1 with a thermal output of
1.4.2.1 50 megawatts or more, G E
1.4.2.2 100 kilowatts of up to less than 50 megawatts; V
1.5 (unoccupied)
1.6 Installations for the use of wind energy with a total height of more than 50 metres and
1.6.1 20 or more wind turbines, G
1.6.2 less than 20 wind turbines; V
1.7 (unoccupied)
1.8 Electrical substations with an upper voltage of 220 kilovolts or more, including the switching fields, except for the single-hated electrical substations; V
1.9 Plants for the grinding or drying of coal with a capacity of 1 tonne or more per hour; V
1.10 Plants for the briquetting of brown coal or coal; G
1.11 Plants for dry distillation (e.g. (b) coking plants, gas plants and swelry plants), in particular coal or lignite, wood, peat or pitch, with the exception of wood careders; G E
1.12 Installations for the distillation or further processing of tar or tar products or of tar or gas water; G
1.13 (unoccupied)
1.14 Installations for gasification or liquefaction of
1.14.1 Coal, G E
1.14.2 bituminous slate with an energy equivalent of
1.14.2.1 20 megawatts or more, G E
1.14.2.2 less than 20 megawatts, G
1.14.3 fuels other than coal or bituminous shale, in particular for the production of generator, water, or wood gas, with a production capacity of substances, equivalent to an energy equivalent of
1.14.3.1 20 megawatts or more, G E
1.14.3.2 1 megawatt to less than 20 megawatts; V
1.15 Installations for the production of biogas, as far as not covered by point 8.6, with a production capacity of 1.2 million standard cubic metres per year of crude gas or more; V
1.16 Installations for the treatment of biogas with a processing capacity of 1.2 million standard cubic metres per year of crude gas or more; V
2. Stones and earth, glass, ceramics, building materials
2.1 Quarries with a building area of
2.1.1 10 hectares or more, G
2.1.2 less than 10 hectares, to the extent that explosives are used; V
2.2 Installations for the crushing, drying, milling or classification of natural or artificial rocks, except for grading plants for sand or gravel, and installations which are not operated for more than ten days a year; V
2.3 Installations for the production of cement clinker or cements with a production capacity of
2.3.1 500 tonnes or more per day, G E
2.3.2 50 tonnes to less than 500 tonnes per day, unless manufactured in rotary kilns, G E
2.3.3 less than 500 tonnes per day, to the extent that it is produced in rotary kilns, V
2.3.4 less than 50 tonnes per day, if not produced in rotary kilns; V
2.4 Installations for burning
2.4.1 Limestone, magnesite or dolomite with a production capacity of
2.4.1.1 50 tonnes or more of burnt lime or magnesium oxide per day, G E
2.4.1.2 less than 50 tonnes of burnt lime or magnesium oxide per day, V
2.4.2 bauxite, gypsum, diatomaceous earth, quartzite or clay to chamotte; V
2.5 Installations for the production of asbestos; G E
2.6 Installations for the treatment or processing of asbestos or asbestos products; G E
2.7 Plants for the swelling of perlite or slate; V
2.8 Installations for the manufacture of glass, including as far as it is made of waste glass, including glass fibre production facilities, with a melting capacity of
2.8.1 20 tonnes or more per day, G E
2.8.2 100 kilograms to less than 20 tonnes per day, except for installations intended for the manufacture of glass fibres intended for medical or telecommunications purposes; V
2.9 (unoccupied)
2.10 Installations for the burning of ceramic products (including clay) with a production capacity of
2.10.1 75 tonnes or more per day, G E
2.10.2 less than 75 tonnes per day, in so far as the volume of the combustion plant is 4 cubic metres or more, or the stocking density is more than 100 kilograms per cubic metre of space in the combustion plant, except for electrically heated furnaces, which shall: are operated discontinuously and without exhaust air guidance; V
2.11 Installations for the melting of mineral substances, including installations for the production of mineral fibres with a melting capacity of
2.11.1 20 tonnes or more per day, G E
2.11.2 less than 20 tonnes per day; V
2.12 (unoccupied)
2.13 (unoccupied)
2.14 Installations for the production of mouldings using cement or other binding agents, by means of tamping, shocking, shaking or vibrating with a production capacity of 10 tonnes or more per hour; V
2.15 Installations for the production or melting of mixtures of bitumen or tar with mineral substances, with the exception of installations which produce mixtures in a cold-working manner, including processing plants for bituminous road building materials and tar-splitting plants; V
3. Steel, iron and other metals including processing
3.1 Plants for roasting (heating under air supply for conversion into oxides), melting or sintering (piecing of fine-grained substances by heating) of ores; G E
3.2 Plants for the production or melting of pig iron
3.2.1 and for further processing into crude steel, in which the production and processing units are located next to each other and are functionally connected to one another (integrated metallurgical plants), with a melting capacity of
3.2.1.1 2.5 tonnes or more per hour, G E
3.2.1.2 less than 2.5 tonnes per hour, G
3.2.2 or steel, including continuous casting, also to the extent that concentrates or secondary raw materials are used, with a melting capacity of
3.2.2.1 2.5 tonnes or more per hour, G E
3.2.2.2 less than 2.5 tonnes per hour; V
3.3 Plants for the production of non-ferrous raw metals from ores, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; G E
3.4 Installations for the melting, alloying or refining of non-ferrous metals with a melting capacity of
3.4.1 4 tonnes per day or more for lead and cadmium, or 20 tonnes per day or more for other non-ferrous metals, G E
3.4.2 0,5 tonnes to less than 4 tonnes per day for lead and cadmium, or from 2 tonnes to less than 20 tonnes per day for other non-ferrous metals, excluding:
1.
Vacuum melting plants,
2.
Melting plants for cast alloys made of tin and bismuth or of
Fine-zinc and aluminium in combination with copper or magnesium,
3.
Melting plants which are a component of pressure or chill casting machines or which melt down non-ferrous metals or castable alloys which are cast exclusively in connection with individual die casting machines, or which are cast-down,
4.
Melting plants for precious metals or for alloys which are only available from
precious metals or of precious metals and copper;



V
5.
swine soldering baths and
6.
Hot-air tinting systems;
3.5 Installations for the removal of the surfaces of steel, in particular of blocks, slabs, billets, sinks or sheets, by means of vials; V
3.6 Installations for the conversion of
3.6.1 Steel by hot rolling with a capacity per hour of
3.6.1.1 20 tonnes or more, G E
3.6.1.2 less than 20 tonnes, V
3.6.2 Steel by cold rolling with a bandwidth of 650 millimetres or more, V
3.6.3 heavy metals, other than iron or steel, by rolling with a capacity of 1 tonne or more per hour, V
3.6.4 Light metals by rolling with a capacity of 0.5 tonnes or more per hour; V
3.7 Iron, Temper or steel foundries with a processing capacity of liquid metal of
3.7.1 20 tonnes or more per day, G E
3.7.2 2 tonnes to less than 20 tonnes per day; V
3.8 Foundries for non-ferrous metals with a processing capacity of liquid metal of
3.8.1 4 tonnes or more per day for lead and cadmium, or 20 tonnes or more per day for other non-ferrous metals, G E
3.8.2 0,5 tonnes to less than 4 tonnes per day for lead and cadmium, or 2 tonnes to less than 20 tonnes per day for other non-ferrous metals, excluding:
1.
Foundries for bells or artificial castings,
2.
Foundries in which metal moulds are cast, and
3.
Foundries in which the material is located in stationary bricks
is to be melted down;
V
3.9 Installations for the application of metallic protective layers
3.9.1 with the aid of molten baths on metal surfaces with a processing capacity of
3.9.1.1 2 tonnes or more of crude steel per hour, G E
3.9.1.2 2 tonnes or more raw material per hour, unless covered by point 3.9.1.1; G
3.9.1.3 500 kilograms to less than 2 tonnes of raw material per hour, except for continuous galvanising equipment in accordance with the Sendzimir procedure; V
3.9.2 by means of flame, plasma or arc spraying on metal or plastic surfaces with a throughput of lead, tin, zinc, nickel, cobalt or their alloys of 2 kilograms or more per hour; V
3.10 Installations for surface treatment with a volume of active baths of
3.10.1 30 cubic metres or more in the treatment of metal or plastic surfaces by means of an electrolytic or chemical process, G E
3.10.2 1 cubic metre to less than 30 cubic metres in the treatment of metal surfaces by pickling or burning using flute or nitric acid; V
3.11 Installations consisting of one or more machine-driven hammers or trawls, if the impact energy of a hammer or case work
3.11.1 50 kilojoules or more and the thermal heat output of the heat treatment furnaces is 20 megawatts or more, G E
3.11.2 50 kilojoules or more, unless it is covered by point 3.11.1, G
3.11.3 1 kilojoule to less than 50 kilojoules; V
3.12 (unoccupied)
3.13 Installations for explosives or for plating with explosives in case of use of 10 kilograms of explosives or more per shot; V
3.14-3.15 (unoccupied)
3.16 Installations for the production of heat-made seamless or welded steel tubes with a production capacity of
3.16.1 20 tonnes or more per hour, G E
3.16.2 less than 20 tonnes per hour; G
3.17 (unoccupied)
3.18 Installation for the manufacture or repair of vessels or sections (shipyards) of metal having a length of 20 metres or more; G
3.19 Installations for the construction of rail vehicles with a production capacity of 600 rail vehicle units or more per year; 1 rail vehicle unit is equivalent to 0.5 locomotives, 1 tramway, 1 train car of a train, 1 train head, 1 passenger car or 3 freight wagons; G
3.20 Installations for the surface treatment of articles of steel, sheet metal or cast iron with solid blasting materials operated outside closed spaces, excluding non-walk-in hand-jet cabins, and installations with an air flow rate of less than 300 cubic metres per hour; V
3.21 Plants for the production of lead accumulators; V
3.22 Equipment for the treatment of scraps in shredder plants, unless it is covered by point 8.9, with a throughput capacity of input materials of
3.22.1 50 tonnes or more per day, G
3.22.2 10 tonnes to less than 50 tonnes per day; V
3.23 Installations for the production of metal powders or pastes, in particular aluminium, iron or magnesium powder or pastes or blei-or nickel-containing powders or pastes, with the exception of installations for the production of precious metal powder; V
3.24 Installations for the construction and assembly of motor vehicles or installations
for the construction of motor vehicle engines with a capacity of 100 000 units per year or more;
G
3.25 Installations for construction and maintenance, except for maintenance, including minor repairs, of aircraft,
3.25.1 insofar as more than 50 aircraft can be manufactured each year, G
3.25.2 if more than 50 aircraft can be maintained per year, V
4. Chemical products, pharmaceuticals, mineral oil refining and further processing
4.1 Installations for the production of substances or groups of substances by chemical, biochemical or biological conversion to an industrial scale, with the exception of installations for the production or fission of nuclear fuels or for the processing of irradiated products Nuclear fuel, for the manufacture of
4.1.1 Hydrocarbons (linear or ring-shaped, saturated or unsaturated, aliphatic or aromatic), G E
4.1.2 oxygen-containing hydrocarbons such as alcohols, aldehydes, ketones, carboxylic acids, esters, acetates, ethers, peroxides, epoxides, G E
4.1.3 sulphur-containing hydrocarbons, G E
4.1.4 nitrogen-containing hydrocarbons such as amines, amides, nitroso-, nitro-or nitrate compounds, nitriles, cyanates, isocyanates, G E
4.1.5 phosphorus-containing hydrocarbons, G E
4.1.6 halogen-containing hydrocarbons, G E
4.1.7 organometallic compounds, G E
4.1.8 Plastics (synthetic resins, polymers, chemical fibres, cellulose-based fibres), G E
4.1.9 synthetic rubbers, G E
4.1.10 Dyes and pigments, as well as starting materials for paints and paints, G E
4.1.11 surfactants, G E
4.1.12 Gases such as ammonia, chlorine and hydrogen chloride, fluorine and hydrogen fluoride, carbon oxides, sulphur compounds, nitrogen oxides, hydrogen, sulphur dioxide, phosgene, G E
4.1.13 Acids such as chromic acid, hydrofluoric acid, phosphoric acid, nitric acid, hydrochloric acid, sulphuric acid, oleum, sulphurous acids, G E
4.1.14 bases such as ammonium hydroxide, potassium hydroxide, sodium hydroxide, G E
4.1.15 Salts such as ammonium chloride, potassium chlorate, potassium carbonate, sodium carbonate, perborate, silver nitrate, G E
4.1.16 Non-metals, metal oxides or other inorganic compounds such as calcium carbide, silicon, silicon carbide, inorganic peroxides, sulphur, G E
4.1.17 Fertilisers containing phosphorus, nitrogen or potassium (fertilizers or moreutrients), G E
4.1.18 plant protection products, pesticides or biocides, G E
4.1.19 medicinal products, including intermediate products, G E
4.1.20 explosives, G E
4.1.21 substances or groups of substances which do not correspond to any or more of paragraphs 4.1.1 to 4.1.20; G E
4.1.22
-
Organic basic chemicals,
-
inorganic basic chemicals,
-
Fertilizers containing phosphorus, nitrogen or potassium
(nutrient or multinutrient),
-
Starting materials for plant protection products and biocides,
-
Basic medicinal products using a chemical or
biological procedure or
-
explosives,
in combination, where several units are located side by side and are functionally connected to each other (integrated chemical plants);
G E
4.2 Installations in which plant protection products, pesticides, biocides or their active substances are milled or mechanically mixed, packaged or refilled to the extent that such substances are handled in an amount of 5 tonnes per day or more; V
4.3 Installations for the manufacture of medicinal products or intermediate products on an industrial scale, insofar as not covered by point 4.1.19, except for installations intended solely for the production of the pharmaceutical form in which:
4.3.1 Plants, parts of plants or plant components are extracted, distilled or treated in a similar manner, except for extraction plants with ethanol without heating, V
4.3.2 animal carcases, including live animals, as well as body parts, body parts and metabolic products of animals; V
4.4 Installations for the distillation or refining or other processing of crude oil or petroleum products in
4.4.1 Mineral oil refineries, G E
4.4.2 Lubricant refineries, G
4.4.3 Gas refineries, G E
4.4.4 petrochemical plants or in the production of paraffin; G
4.5 Installations for the production of lubricants, such as lubricating oils, greases, metalworking oils; V
4.6 Installations for the production of soot; G E
4.7 Plants for the production of carbon (hard coal) or electrographite by firing or graphitizing, for example for electrodes, pantographs or apparatus parts; G E
4.8 Installations for distilling volatile organic compounds which have a vapour pressure of at least 0.01 kilopascals at a temperature of 293.15 Kelvin, with a throughput capacity of 1 tonne or more per hour; V
4.9 Installations for the melting of natural resins or synthetic resins with a capacity of 1 tonne or more per day; V
4.10 Plants for the production of paint or coating materials
(glazes, varnish, lacquers, emulsion paints) or printing inks using 25 tonnes or more per day of volatile organic compounds which have a vapour pressure of at least 0.01 kilopascals at a temperature of 293.15 Kelvin;
G
5. Surface treatment with organic materials, production of web-like materials from plastics, other processing of resins and plastics
5.1 Installations for the treatment of surfaces, other than installations, to the extent that the paints or varnishes contain exclusively high-boiling oils (with a vapour pressure of less than 0.01 kilopascals at a temperature of 293.15 Kelvin) as organic solvents and the solvents do not have a higher volatility under the conditions of use,
5.1.1 of substances, articles or products, including their drying facilities, using organic solvents, in particular for appreting, printing, coating, degreasing, impregnating, laminating, gluing, lacquering, Cleaning or watering with a consumption of organic solvents from
5.1.1.1 150 kilograms or more per hour, or 200 tonnes or more per year, G E
5.1.1.2 25 kilograms to less than 150 kilograms per hour, or 15 tonnes to less than 200 tonnes per year, except for printing, V
5.1.2 Of sheet-like or tabular materials with rotary printing machines, including the associated drying systems, to the extent that the paints or varnishes
5.1.2.1 Organic solvents containing more than 50% by weight of ethanol and, in total, 50 kilograms to less than 150 kilograms per hour or 30 tonnes to less than 200 tonnes per year in organic solvents is consumed, V
5.1.2.2 other organic solvents and, in the plant, consume a total of 25 kilograms to less than 150 kilograms of organic solvent per hour, or 15 tonnes to less than 200 tonnes per year of organic solvents, V
5.1.3 for the isolation of wires using phenol or cresol-containing wire lacquers with an organic solvent consumption of less than 150 kilograms per hour or less than 200 tonnes per year; V
5.2 Installations for coating, impregnating, laminating, lacquering or impregnating objects, glass or mineral fibres or webs or tabular materials, including the associated drying systems with synthetic resins, which are carried out under a wide range of React self-crosslinking (reaction resins), such as melamine, urea, phenol, epoxy, furan, cresol, resorcinol or polyester resins, with the exception of plants for the use of powder coating materials, with a resin consumption of
5.2.1 25 kilograms or more per hour, G
5.2.2 10 kilograms to less than 25 kilograms per hour; V
5.3 Installations for the conservation of wood or wood products containing chemicals, with the exception of the exclusive use of bluework, with a production capacity of more than 75 cubic metres per day; G E
5.4 Installations for the impregnation or coating of substances or articles with tar, tar oil or hot bitumen, to the extent that the quantity of these hydrocarbons is 25 kilograms or more per hour, excluding installations for the impregnation or overdrawing of cables with hot bitumen; V
5.5 (unoccupied)
5.6 Installations for the production of sheet-like materials on coating machines, including the associated drying equipment, using mixtures of plastics and plasticizers or mixtures of other substances and oxidised linseed oil; V
5.7 Plants for the processing of liquid unsaturated polyester resins containing styrene additives or liquid epoxy resins with amines to form moulding compositions (for example resin mats or fibre moulding compounds) or moulded parts or finished products, insofar as no closed Tools (molds) are used for a resin consumption of 500 kilograms or more per week; V
5.8 Installations for the production of objects using amino or phenoplasts, such as furan, urea, phenol, resorcinol or xylene resins by means of heat treatment, to the extent that the quantity of the starting materials is 10 kilograms or more per hour; V
5.9 Installations for the production of friction linings using 10 kilograms or more per hour of phenoplasts or other synthetic resin binders, to the extent that no asbestos is used; V
5.10 Installations for the production of artificial grinding wheels, bodies, papers or tissues using organic binders or solvents, other than installations covered by point 5.1; V
5.11 Plants for the production of polyurethane moulded parts, components using polyurethane, polyurethane blocks in box moulds or for the foaming of cavities with polyurethane, to the extent that the amount of polyurethane starting materials is 200 kilograms or more per hour, with the exception of installations for the use of thermoplastic polyurethane granules; V
5.12 Installations for the production of PVC films by calendering using mixtures of plastics and additives with a capacity of 10 000 tonnes or more per year; V
6. wood, pulp
6.1 equipment for the production of pulp from wood, straw or similar fibre materials; G E
6.2 Plants for the production of paper, cardboard or paperboard with a production capacity of
6.2.1 20 tonnes or more per day, G E
6.2.2 less than 20 tonnes per day, with the exception of installations consisting of one or more machines for the manufacture of paper, cardboard or paperboard, provided that the length of the paper, cartonboard or paperboard is less than 75 metres for all machinery; V
6.3 Plants for the production of wood chipboard, wood fibre boards or wood fibre mats with a production capacity of
6.3.1 600 cubic metres or more per day, G E
6.3.2 less than 600 cubic metres per day; V
6.4 Plants for the production of wood pressings (e.g. Wood pellets, wood briquettes) with a production capacity of 10 000 tonnes or more per year; V
7. Food, food and feed, agricultural products
7.1 Installations for holding or rearing
7.1.1 Hennen with
7.1.1.1 40 000 or more Hennensquares, G E
7.1.1.2 15 000 to less than 40 000 Hennensquares, V
7.1.2 Young henchmen with
7.1.2.1 40 000 or more young hennes, G E
7.1.2.2 30 000 to less than 40 000 young hennes, V
7.1.3 Fowl wings with
7.1.3.1 40 000 or more of the fowl of the fattening, G E
7.1.3.2 30 000 to less than 40 000 masts of fattening, V
7.1.4 Truthühners with
7.1.4.1 40 000 or more of turkey mastings, G E
7.1.4.2 15 000 to less than 40 000 turkey mastings, V
7.1.5 Bovine animals (other than for suckler cows with more than six months of grazing per calendar year) with 600 or more cattle grounds, V
7.1.6 Calves with 500 or more calves, V
7.1.7 Fattening pigs (pigs of 30 kilograms or more live weight) with
7.1.7.1 2 000 or more fattening pigs, G E
7.1.7.2 1 500 to less than 2 000 mastschweineplaces, V
7.1.8 Sauias including piglets (piglets up to less than 30 kg live weight)
7.1.8.1 750 or more sour places, G E
7.1.8.2 560 to less than 750 sows, V
7.1.9 Piglets for separate rearing (piglets from 10 kilograms to less than
30 kg live weight) with
7.1.9.1 6 000 or more piglet sites, G
7.1.9.2 4 500 to less than 6 000 piglet sites, V
7.1.10 Pelcting with
7.1.10.1 1 000 or more Pelztiercourts, G
7.1.10.2 750 to less than 1 000 furs, V
7.1.11 mixed stocks with a value of 100 or more of the sum of the hundreds of shares up to which the number of places is used up
7.1.11.1 In points 7.1.1.1, 7.1.2.1, 7.1.3.1, 7.1.4.1, 7.1.7.1 or 7.1.8.1, G E
7.1.11.2 in points 7.1.1.1, 7.1.2.1, 7.1.3.1, 7.1.4.1, 7.1.7.1, 7.1.8.1 in conjunction with points 7.1.9.1 or 7.1.10.1, to the extent not covered by point 7.1.11.1, G
7.1.11.3 in points 7.1.1.2, 7.1.2.2, 7.1.3.2, 7.1.4.2, 7.1.5, 7.1.6, 7.1.7.2, 7.1.8.2, 7.1.9.2 or 7.1.10.2, unless it is covered by point 7.1.11.1 or 7.1.11.2; V
7.2 Facilities for slaughtering animals with a capacity of
7.2.1 50 tonnes of live weight or more per day, G E
7.2.2 0,5 tonnes to less than 50 tonnes live weight per day for poultry, V
7.2.3 4 tonnes to less than 50 tonnes of live weight per day for other animals; V
7.3 Assets
7.3.1 for the production of edible fats from animal raw materials, with the exception of milk, with a production capacity of
7.3.1.1 75 tonnes of finished products or more per day, G E
7.3.1.2 less than 75 tonnes of finished products per day, with the exception of installations for the production of edible fats from animal fats obtained by themselves in butchers with a capacity of less than 200 kilograms of fat per week, V
7.3.2 for the melting of animal fats with a production capacity of
7.3.2.1 75 tonnes of finished products or more per day, G E
7.3.2.2 less than 75 tonnes of finished products per day, with the exception of equipment for the processing of animal fats obtained by themselves, in meat establishments with a capacity of less than 200 kilograms of edible fat per week; V
7.4 Plants for the production of food or feed canned products with a production capacity of
7.4.1 animal raw materials, with the exception of milk, alone or with vegetable raw materials,
7.4.1.1 P tonnes of canned food or more per day in accordance with the mixing rule, G E
7.4.1.2 1 tonne to less than P tonnes of canned food per day in accordance with the mixing rule, with the exception of installations for sterilizing or pasteurising these foodstuffs in closed containers; V
7.4.2 exclusively vegetable raw materials with a production capacity of
7.4.2.1 300 tonnes of canned food or more per day or 600 tonnes of preserves or more per day, provided that the installation is in operation for more than 90 consecutive days per year, G E
7.4.2.2 10 tonnes to less than 300 tonnes of canned food per day, with the exception of installations for sterilizing or pasteurising these foodstuffs in closed containers or less than 600 tonnes of canned food per day, provided that the installation is not more than 90 tonnes consecutive days of the year; V
7.5 Plants for smoking meat or fish products with a production capacity of
7.5.1 75 tonnes of smoked goods or more per day, G E
7.5.2 less than 75 tonnes of smoked goods per day, excluding
1.
Facilities in restaurants or
2.
Smokeries with an smoking capacity of less than 1 tonne of meat or fish per week;
V
7.6 (unoccupied)
7.7 (unoccupied)
7.8 Plants for the production of gelatine with a production capacity per day of
7.8.1 75 tonnes of finished products or more, G E
7.8.2 less than 75 tonnes of finished products, as well as equipment for the manufacture of skin glue, leather glues or bone glue; V
7.9 Installations for the production of fodder or fertilisers or technical fats from the offal products of bone, animal hair, feathers, horns, claws or blood, as far as not covered by point 9.11, with a production capacity of:
7.9.1 75 tonnes or more of finished products per day, G E
7.9.2 less than 75 tonnes of finished products per day; G
7.10 (unoccupied)
7.11 Facilities for the storage of untreated bones, excluding installations for bone-in-the-bone in
1.
Meat shops with a processing capacity of less than
4 000 kilograms of meat per week,
2.
Installations not covered by point 7.2;
V
7.12 Installations for
7.12.1 Disposal or recovery of animal carcasses or animal waste with a processing capacity of
7.12.1.1 10 tonnes or more per day, G E
7.12.1.2 50 kilograms per hour to less than 10 tonnes per day, G
7.12.1.3 less than 50 kilograms per hour, V
7.12.2 the collection or storage of animal carcasses, parts of animal body or waste of animal origin for use in installations referred to in point 7.12.1, with the exception of installations with a refrigerated storage capacity of less than 2 cubic metres; G
7.13 Installations for the drying, salting or storing of untanned animal skins or skins, except for installations in which less than 4 tonnes of other animals can be treated as animal skins or skins per day, as referred to in point 7.2.3 are incurred; V
7.14 Plants for tanning, including post-tanning of animal skins or animal skins, with a processing capacity of
7.14.1 12 tonnes of finished products or more per day, G E
7.14.2 less than 12 tonnes of finished products per day, with the exception of installations in which less than 4 tonnes of other animals can be treated in less than 4 tonnes of animal skins or animal skins, as referred to in point 7.2.3; V
7.15 Co-drying equipment; V
7.16 Installations for the production of fishmeal or fish oil; G
7.17 Assets
7.17.1 for the preparation or unspecified storage of fishmeal, G
7.17.2 for the handling or processing of unfinished fishmeal, to the extent that 200 tonnes or more per day can be moved or processed; V
7.18 Installations for burning molasses; V
7.19 Plants for the production of sauerkraut with a production capacity of
7.19.1 300 tonnes of sauerkraut or more per day or 600 tonnes of sauerkraut or more per day, provided that the installation is in operation for no more than 90 consecutive days per year, G E
7.19.2 10 tonnes to less than 300 tonnes of sauerkraut per day or less than 600 tonnes of sauerkraut per day, provided that the installation is in operation for not more than 90 consecutive days a year; V
7.20 Plants for the production of brewed malt (malting) with a production capacity of
7.20.1 300 tonnes of darrmalz or more per day or 600 tonnes of brew malt or more per day, provided that the plant is in operation for not more than 90 consecutive days a year, G E
7.20.2 less than 300 tonnes of darrmalz per day or less than 600 tonnes of brewing malts per day, provided that the installation is in operation for no more than 90 consecutive days a year; V
7.21 Plants for the grinding of foodstuffs, feedingstuffs or similar plant substances not intended as food or feed (mills) with a production capacity of 300 tonnes of finished products or more per day or 600 tonnes Finished products or more per day, provided that the installation is in operation for not more than 90 consecutive days per year; G E
7.22 Plants for the production of yeast or starch flour with a production capacity of
7.22.1 300 tonnes or more yeast or starch flour per day or 600 tonnes of yeast or starch or more or more per day, provided that the plant is in operation for not more than 90 consecutive days per year, G E
7.22.2 1 tonne to less than 300 tonnes of yeast or starch flour per day or less than 600 tonnes of yeast or starch flour per day, provided that the plant is in operation for not more than 90 consecutive days a year; V
7.23 Plants for the production or refining of oils or fats from vegetable raw materials with a production capacity of
7.23.1 300 tonnes of finished products or more per day or 600 tonnes of finished products or more per day, provided that the installation is in operation for not more than 90 consecutive days per year, G E
7.23.2 less than 300 tonnes of finished products per day with the aid of extractants, in so far as the quantity of extractant used is 1 tonne or more or less than 600 tonnes of finished products per day with the aid of extractants, provided that: the installation is in operation for not more than 90 consecutive days per year; V
7.24 Plants for the production or refining of sugar using sugar beet or raw sugar with a production capacity per day of
7.24.1 300 tonnes of finished products or more or 600 tonnes of finished products or more per day, provided that the installation is in operation for not more than 90 consecutive days per year, G E
7.24.2 less than 300 tonnes of finished products or less than 600 tonnes of finished products per day, provided that the installation is in operation for not more than 90 consecutive days a year; G
7.25 Plants for the drying of green fodder, with the exception of equipment for drying of self-produced green fodder in the agricultural holding; V
7.26 Facilities for drying beer trebers; V
7.27 Breweries with a production capacity of
7.27.1 3 000 hectolitres of beer or more per day or 6 000 hectolitres of beer or more per day, provided that the plant is in operation for not more than 90 consecutive days a year, G E
7.27.2 200 hectolitres of beer per day as a quarterly average up to less than 3 000 hectolitres of beer per day or less than 6 000 hectolitres of beer per day, provided that the plant is in operation for not more than 90 consecutive days a year; V
7.28 Plants for the production of edible seasonates
7.28.1 animal raw materials, with the exception of milk, alone or with vegetable raw materials, with a production capacity of
7.28.1.1 P tonnes of edible seasonates or more per day according to the mixing rule, G E
7.28.1.2 less than P tonnes of edible wort per day according to the mixing rule, V
7.28.2 exclusively vegetable raw materials with a production capacity of
7.28.2.1 300 tonnes of edible seasoners or more per day or 600 tonnes of edible seasoners, or more per day, provided that the plant is in operation for not more than 90 consecutive days per year, G E
7.28.2.2 less than 300 tonnes of edible wort per day or less than 600 tonnes of edible wort per day, provided that the plant is in operation for not more than 90 consecutive days a year; V
7.29 Plants for roasting or milling coffee or packaging ground coffee with a production capacity of
7.29.1 300 tonnes of roasted coffee or more per day or 600 tonnes of roasted coffee, or more per day, provided that the plant is in operation for not more than 90 consecutive days a year, G E
7.29.2 0,5 tonnes up to less than 300 tonnes of roasted coffee per day or less than 600 tonnes of roasted coffee per day, provided that the installation is in operation for more than 90 consecutive days per year; V
7.30 Plants for roasting coffee substitute products, cereals, cocoa beans or nuts with a production capacity of
7.30.1 300 tonnes of roasted products or more per day or 600 tonnes of products or more per day, provided that the installation is in operation for not more than 90 consecutive days per year, G E
7.30.2 1 tonne to less than 300 tonnes of roasted products per day or less than 600 tonnes of products per day, provided that the installation is in operation for not more than 90 consecutive days a year; V
7.31 Installations for the manufacture of
7.31.1 Confectionery or syrup with a production capacity of
7.31.1.1 P tonnes or more per day in accordance with the mixing rule for the use of animal raw materials, other than milk, alone or with vegetable raw materials, G E
7.31.1.2 300 tonnes or more per day when using exclusively vegetable raw materials or 600 tonnes or more per day when using exclusively plant-based raw materials, provided that the plant is not more than 90 consecutive days in the year in operation, G E
7.31.2 Cocoa mass produced from raw cocoa or thermal refining of cocoa or chocolate mass with a production capacity of
7.31.2.1 50 kilograms to less than P tonnes per day in accordance with the mixing rule for the use of animal raw materials, excluding milk, alone or with vegetable raw materials, V
7.31.2.2 50 kilograms to less than 300 tonnes per day when using exclusively plant-based raw materials or less than 600 tonnes per day when using exclusively vegetable raw materials, provided that the plant is not more than 90 the following days a year, V
7.31.3 Lakritz with a production capacity of
7.31.3.1 50 kilograms to less than P tonnes per day in accordance with the mixing rule for the use of animal raw materials, excluding milk, alone or with vegetable raw materials, V
7.31.3.2 less than 300 tonnes per day for the use of exclusively vegetable raw materials or less than 600 tonnes per day for the use of exclusively vegetable raw materials, provided that the plant is not more than 90 consecutive days per year is in operation; V
7.32 Installations for the treatment or processing of milk, milk products or milk components with a capacity of the starting materials as the annual average value of
7.32.1 200 tonnes or more of milk per day, G E
7.32.2 5 tonnes to less than 200 tonnes of milk, milk products or milk components per day for spray driers; V
7.33 (unoccupied)
7.34 Installations for the manufacture of other food or feed products
7.34.1 animal raw materials, excluding milk, alone or with vegetable raw materials, with a production capacity of P tonnes of finished products or more per day in accordance with the mixing rule, G E
7.34.2 exclusively vegetable raw materials with a production capacity of 300 tonnes of finished products or more per day; G E
7.35 (unoccupied)
8. Recovery and disposal of waste and other substances
8.1 Installations for the disposal or recovery of solid, liquid or gaseous wastes, landfill gas or other gaseous substances with combustible constituents, by means of:
8.1.1 thermal processes, in particular degassing, plasma processes, pyrolysis, gasification, combustion or a combination of these processes with a throughput capacity of
8.1.1.1 10 tonnes of hazardous waste or more per day, G E
8.1.1.2 less than 10 tonnes of hazardous waste per day, G
8.1.1.3 3 tonnes of non-hazardous waste or more per hour, G E
8.1.1.4 less than 3 tonnes of non-hazardous waste per hour, to the extent that the thermal input is 1 megawatt or more, V
8.1.2 Incineration of waste oil or landfill gas in a combustion engine installation with a thermal output of
8.1.2.1 50 megawatts or more, G E
8.1.2.2 less than 50 megawatts, V
8.1.3 the flaring of landfill gas or other gaseous substances, except in the case of emergency torches, which are necessary for the non-intended operation; V
8.2 Installations for the production of electricity, steam, hot water, process heat or heated exhaust gas in a combustion device (such as power plant, heating power plant, heating plant, other combustion plant), including associated steam boilers, by the use of knitted or varnished wood or plywood, chipboard, fibreboard or otherwise glued wood, as well as any residues obtained therefrom, where no wood preservatives are applied or are included as a result of treatment, or Coatings No halogen organic compounds or heavy metals , with a thermal output of
8.2.1 50 megawatts or more, G E
8.2.2 1 megawatt to less than 50 megawatts; V
8.3 Installations for
8.3.1 thermal processing of steelworks dusts for the production of metals or metal compounds in a rotary tube or in a fluidized bed, G
8.3.2 Treatment for the recovery of metals or metal compounds by thermal processes, in particular pyrolysis, combustion or a combination of these processes, provided that such waste is not hazardous, of
8.3.2.1 wastes containing precious metals, including preparation, to the extent that the quantity of feedstock is 10 kilograms or more per day, V
8.3.2.2 metals contaminated with organic compounds, metal shavings or whalers; V
8.4 Installations in which substances from household waste or household waste are recovered by sorting for the economic cycle, with a throughput capacity of 10 tonnes of feedstock or more per day; V
8.5 Plants for the production of compost from organic waste with a throughput capacity of feedstock from
8.5.1 75 tonnes or more per day, G E
8.5.2 10 tonnes to less than 75 tonnes per day; V
8.6 Biological treatment plants, where not covered by point 8.5 or 8.7, of
8.6.1 hazardous waste with a throughput capacity of feedstock of
8.6.1.1 10 tonnes or more per day, G E
8.6.1.2 1 tonne to less than 10 tonnes per day; V
8.6.2 non-hazardous waste, as far as not covered by point 8.6.3, with a throughput capacity of feedstock of
8.6.2.1 50 tonnes or more per day, G E
8.6.2.2 10 tonnes to less than 50 tonnes per day, V
8.6.3 Manure, provided that the treatment is exclusively for recovery by anaerobic digestion (biogas production), with a throughput capacity of
8.6.3.1 100 tonnes or more per day, G E
8.6.3.2 less than 100 tonnes per day, as far as the production capacity of raw gas is 1.2 million Standard cubic metres per year or more; V
8.7 Installations for the treatment of contaminated soil by biological processes, degassing, stripping or washing with an application of contaminated soil at
8.7.1 hazardous waste from
8.7.1.1 10 tonnes or more per day, G E
8.7.1.2 1 tonne to less than 10 tonnes per day; V
8.7.2 non-hazardous waste from
8.7.2.1 50 tonnes or more per day, G E
8.7.2.2 10 tonnes to less than 50 tonnes per day; V
8.8 Installations for chemical treatment, in particular for chemical emulsion fission, precipitation, flocculation, calcination, neutralization or oxidation, of
8.8.1 hazardous waste with a throughput capacity of feedstock of
8.8.1.1 10 tonnes or more per day, G E
8.8.1.2 less than 10 tonnes per day, G
8.8.2 Non-hazardous waste with a capacity to be used in feedstock of
8.8.2.1 50 tonnes or more per day, G E
8.8.2.2 10 tonnes to less than 50 tonnes per day; V
8.9 Installations for the treatment of
8.9.1 Non-hazardous metallic wastes in shredder systems with a throughput capacity of feedstock
8.9.1.1 50 tonnes or more per day, G E
8.9.1.2 10 tonnes to less than 50 tonnes per day, V
8.9.2 End-of-life vehicles, other commercial vehicles, buses or special-purpose vehicles (including dry-laying) with a throughput capacity of 5 or more end-of-life vehicles, other commercial vehicles, buses or special-purpose vehicles, per week; V
8.10 Facilities for physical-chemical treatment, in particular for distilling, drying or evaporation, with a throughput capacity of feedstock
8.10.1 hazardous waste from
8.10.1.1 10 tonnes per day or more, G E
8.10.1.2 1 tonne to less than 10 tonnes per day; V
8.10.2 non-hazardous waste from
8.10.2.1 50 tonnes per day or more, G E
8.10.2.2 10 tonnes to less than 50 tonnes per day; V
8.11 Installations for
8.11.1 the treatment of hazardous waste, except for installations covered by points 8.1 and 8.8;
1.
by blending or mixing, as well as by conditioning,
2.
for the purpose of the main use as fuel or energy production by other means,
3.
for the purpose of oil refining or other recovery options for oil,
4.
for the purpose of regenerating bases or acids,
5.
for the purpose of recovering or regenerating organic solvents, or
6.
for the purpose of recovering components used to control impurities, including the recovery of catalyst components,
with a throughput capacity of
8.11.1.1 10 tonnes or more per day, G E
8.11.1.2 1 tonne to less than 10 tonnes per day; V
8.11.2 Other treatment, other than installations covered by points 8.1 to 8.10, with a capacity of
8.11.2.1 hazardous waste of 10 tonnes or more per day, G E
8.11.2.2 hazardous waste from 1 tonne to less than 10 tonnes per day, V
8.11.2.3 non-hazardous waste, to the extent that the waste is pretreated for incineration or co-incineration, or is a slag or ash, of 50 tonnes or more per day, G E
8.11.2.4 non-hazardous waste, as far as not covered by point 8.11.2.3, of 10 tonnes or more per day; V
8.12 Installations for the temporary storage of waste, including sludge, other than temporary storage, until collection on the site of the production of the waste and installations covered by point 8.14
8.12.1 hazardous waste with a total storage capacity of
8.12.1.1 50 tonnes or more, G E
8.12.1.2 30 tonnes to less than 50 tonnes, V
8.12.2 non-hazardous waste with a total storage capacity of 100 tonnes or more, V
8.12.3 iron or non-ferrous scraps, including car wrecks, with
8.12.3.1 a total storage area of 15 000 square metres or more or of a total storage capacity of 1 500 tonnes or more, G
8.12.3.2 a total storage area of 1 000 to less than 15 000 square metres, or a total storage capacity of 100 to less than 1 500 tonnes; V
8.13 Installations for the temporary storage of non-hazardous waste, as far as manure or fermentation residues are concerned, with a capacity of 6 500 cubic metres or more; V
8.14 Installations for the storage of waste over a period of more than one year each
8.14.1 a total storage capacity of more than 50 tonnes, to the extent that storage is carried out on a sub-site basis, G E
8.14.2 an absorption capacity of 10 tonnes or more per day or a total storage capacity of 25 000 tonnes or more,
8.14.2.1 for waste other than inert waste, G E
8.14.2.2 for inert waste, G
8.14.3 an absorption capacity of less than 10 tonnes per day and a total storage capacity of
8.14.3.1 less than 25 000 tonnes, as far as hazardous waste is concerned, G
8.14.3.2 150 tonnes to less than 25 000 tonnes, in so far as it is not hazardous waste, G
8.14.3.3 less than 150 tonnes, in so far as the waste is not hazardous; V
8.15 Installations for the transhipment of waste, other than those for the purpose of the transfer of natural gas or of rocks which are obtained from the extraction or treatment of natural resources, unless covered by point 8.12 or 8.14, with a capacity of
8.15.1 10 tonnes or more of hazardous waste per day, G
8.15.2 1 tonne to less than 10 tonnes of hazardous waste per day; V
8.15.3 100 tonnes or more of non-hazardous waste per day; V
9. Storage, loading and unloading of substances and mixtures
9.1 Installations for the storage of substances or mixtures which have an absolute vapour pressure of at least 101.3 kilopascals at a temperature of 293.15 Kelvin and an explosion area with air (combustible gases), in containers or in products, the substances or mixtures thereof, B. as a propellant or fuel gas, other than natural gas tubes and installations covered by point 9.3,
9.1.1 in so far as they are not exclusively individual containers with a volume of not more than 1 000 cubic centimetres each, with a capacity of
9.1.1.1 30 tonnes or more, G
9.1.1.2 3 tonnes to less than 30 tonnes, V
9.1.2 in the case of individual containers with a volume of not more than 1 000 cubic centimetres each, with a capacity of 30 tonnes or more; V
9.2 Installations used for the storage of liquids, other than installations covered by point 9.3, with a capacity of
9.2.1 10 000 tonnes or more, in so far as the liquids have a flashpoint of 373.15 Kelvin or less, G
9.2.2 5 000 tonnes to less than 10 000 tonnes, to the extent that the liquids have a flash point below 294.15 Kelvin and whose boiling point at normal pressure (101.3 kilopascals) is greater than 293.15 Kelvin; V
9.3 Installations used for the storage of substances mentioned in the list of substances to point 9.3 (Annex 2), with a storage capacity of
9.3.1 the quantities referred to in column 4 of the list of substances (Annex 2) or more, G
9.3.2 the quantities shown in column 3 of the list of substances (Annex 2) to less than the quantities shown in column 4 of the Appendix; V
9.4-9.10 (unoccupied)
9.11 Open or incompletely closed installations, other than those covered by point 9.3,
9.11.1 for loading or unloading bulk materials which may be dust in the dry state, by tilting carriages or containers or using excavators, paddle chargers, grippers, suction cups or similar equipment, to the extent that 400 tonnes of bulk materials or more per day, with the exception of installations for the loading or unloading of excavated or rock which is produced during the extraction or treatment of mineral resources, as well as installations for the collection of cereals, oilseeds or legumes, V
9.11.2 for the collection of cereals, oilseeds or legumes, to the extent that 400 tonnes or more per day can be moved and which can be converted to 25 000 tonnes or more per calendar year; V
9.12-
9.35
(unoccupied)
9.36 Installations for the storage of manure or fermentation residues with a storage capacity of 6 500 cubic metres or more; V
9.37 Installations used for the storage of petroleum, petrochemical or chemical substances or products, except for installations covered by points 9.1, 9.2 or 9.3, with a capacity of 25 000 tonnes or more; G
10. Other installations
10.1 Installations in which explosive or explosive substances in the meaning of the Explosives Act are dealt with shall be used for the purpose of:
1.
Manufacture, processing or processing of these substances, to
Use as explosives, ignition materials, fuels, pyrotechnic
Sets or for the manufacture of the same, excluding installations in the
Craft size and manufacture of squips, and
mobile mixing chargers, or
2.
the recovery or destruction of such substances;
G
10.2 (unoccupied)
10.3 Independently operated installations for the treatment of exhaust gases (reduction of air pollutants) from installations requiring approval in accordance with the numbers of this Annex,
10.3.1 to the extent indicated in column d by the letter E, G E
10.3.2 unless indicated in column d with the letter E, and
10.3.2.1 in column c, marked with the letter G, G
10.3.2.2 in column c, marked by the letter V; V
10.4 Independently operated installations for the separation of carbon dioxide streams from installations subject to approval in accordance with this Annex for the purpose of permanent geological storage, as far as indicated in column d by the letter E; G E
10.5 (unoccupied)
10.6 Installations for the production of adhesives, other than installations which make these agents exclusively using water as a diluent, with a capacity of 1 tonne or more per day; V
10.7 Installations for the vulcanization of natural or synthetic rubber using sulphur or sulphur compounds with the use of
10.7.1 25 tonnes or more rubber per hour, G
10.7.2 less than 25 tonnes of rubber per hour, except for installations in which less than 50 kilograms of rubber per hour are processed or exclusively pre-vulcanised rubber; V
10.8 Installations for the manufacture of plant protection, cleaning or wood protection products, provided that these products contain organic solvents and are used by these 20 tonnes or more per day; V
10.9 Installations for the production of wood preprotection agents using halogenated aromatic hydrocarbons; V
10.10 Installations for pre-treatment (washing, bleaching, mercerizing) or for dyeing fibres or textiles with
10.10.1 a processing capacity of 10 tonnes or more of fibres or textiles per day, G E
10.10.2 a dyeing capacity of from 2 tonnes to less than 10 tonnes of fibres or textiles per day for the dyeing of fibres or textiles, using dyeing accelerators, including the chucking frames, except for installations which have been used in the following: are operated at increased pressure, V
10.10.3 a bleaching capacity of less than 10 tonnes of fibres or textiles per day in the case of installations for bleaching fibres or textiles using chlorine or chlorine compounds; V
10.11 -10.14 (unoccupied)
10.15 Test benches for or with
10.15.1 Combustion engines, excluding
1.
Roll test benches operated in enclosed spaces, and
2.
Installations in which catalytic converters or diesel soot filters are fitted
engines are tested,
With a thermal output of 300 kilowatts or more,
V
10.15.2 Gas turbines or engines with a total thermal output of
10.15.2.1 200 megawatts or more, G
10.15.2.2 less than 200 megawatts; V
10.16 test benches for or with air screws; V
10.17 Racing or test tracks for motor vehicles,
10.17.1 as permanent installations, G
10.17.2 for the exercise or exercise of motor sport on five days or more per year, with the exception of installations with electric motor vehicles and installations in closed halls and model sports facilities; V
10.18 Firing stands for handguns, other than those in enclosed spaces and those for firearms up to a calibre of 5.6 mm lfB (.22 l.r.) for ammunition with edge fire ignition, if the mouth energy of the projectiles does not exceed 200 Joules (J) (small-calibre weapons) and shooting places, with the exception of those for small-calibre weapons; V
10.19 (unoccupied)
10.20 Installations for the cleaning of tools, devices or other metallic objects by thermal processes, to the extent that the volume of the furnace is 1 cubic meter or more; V
10.21 Installations for the internal cleaning of railway tank wagons, road tankers, tankers or tank containers, as well as systems for the automatic cleaning of barrels, including related processing plants, to the extent that the containers of organic substances , except for installations in which containers are cleaned exclusively from food, food, feed or feed; V
10.22 Installations for gasification, sterilisation or degassing,
10.22.1 with a capacity of 1 cubic metre or more of the aeration or sterilisation chamber or of the container to be gated, where very toxic or toxic substances or mixtures are used, V
10.22.2 to the extent to which 40 degassing or more per year is to be carried out in accordance with TRGS 512, point 5.4.3; V
10.23 Plants for textile finishing by means of sinking, thermosetting, thermosoiling, coating, impregnation or appretion, including the associated drying facilities, except for installations in which less than 500 square metres of textiles per hour shall be treated; V
10.24 (unoccupied)
10.25 Refrigeration systems with a total content of refrigerant of 3 tonnes of ammonia or more. V
Unofficial table of contents

Annex 2 List of substances to item 9.3 of Annex 1

(Fundstelle: BGBl. I 2013, 997)









Nr.StoffeQuantity- Threshold N ° 9.3.2 Annex 1 (tonnes) quantities- Threshold No. 9.3.1 Annex 1 (tonnes) Column 1Column 2Column 3Column 4
1 Acrylonitrile 20 200
2 Chlorine 10 75
3 Sulphur dioxide 20 250
4 Oxygen 200 2 000
5 Ammonium nitrate or ammonium nitrate-containing preparations of Group A in accordance with Annex I, point 5 of the Hazardous Substances Regulation 25 500
6 Alkalichlorate 5 100
7 Sulphur trioxide 15 100
8 ammonium nitrate-containing preparations of group B in accordance with Annex I
Point 5 of the Hazardous Substances Regulation
100 2 500
9 Ammonia 3 30
10 Phosgene 0.075 0.75
11 Hydrogen sulphide 5 50
12 Hydrogen fluoride 5 50
13 Hydrogen cyanide 5 20
14 Carbon sulphide 20 200
15 Bromine 20 200
16 Acetylene (Ethin) 5 50
17 Hydrogen 3 30
18 Ethylene oxide 5 50
19 Propylene oxide 5 50
20 Acrolein 20 200
21 Formaldehyde or paraformaldehyde (concentration ≥ 90%) 5 50
22 Bromomethane 20 200
23 Methylisocyanate 0.015 0.15
24 Tetraethylblei or Tetramethylblei 5 50
25 1,2-Dibromomethane 5 50
26 Hydrogen chloride (liquefied gas) 20 200
27 Diphenylmethane diisocyanate (MDI) 20 200
28 Toluylene diisocyanate (TDI) 10 100
29 very toxic substances or mixtures 2 20
30 very toxic, poisonous, fire-promoting or explosive substances or mixtures 10 200