Key Benefits:
Publication of the amendment of the review of the caveman ' s inspection system
(Exhibit of the administrative fee per the state and prohibition of the building expert receives the order of a status report from the seller ' s real estate) ;
§ 1
Notice no. 1667 of 21. December 2010 on the review system, as amended by Notice No 432 of 10. In May 2011, the following changes are made :
1. I Section 11 (1). 1, is inserted after no 8 as new number :
" 9) not to receive a condition report from the property of the seller ' s real estate,
Number 9-14 is then being referred to. 10-15.
2. I Section 11 (1). 1, no. 12, which is being no. 13 the following shall be replaced by the following : "after the decision of the decision", the following shall be replaced by : `.
3. Appendix 1 the text of Annex 1 shall be replaced by this notice.
§ 2
The announcement shall enter into force on 1. August, 2011.
The Ministry of Economic and Business, the 6th. July, 2011
Henning Steenhimself
/ Janni Torp Kjargaard
Appendix 1
' Appendix 1
Remuneration to the groundwork for housekeeping inspection and fees for the remission and so on by the competent court. 1.8.2011
Maximum remuneration per the property for the execution of the caps and the preparation of the state report :
Reviews and state reports shall be carried out by the property, and the size of the fee is determined part of the total building area and, on the other hand, when the significant building on the property-"Main house" has been entered, cf. the following.
Parcellants, chain, chain, or double houses, summer houses and farmhouses for closed agricultural outdoors :
|
*) Total Building Area is the sum of the area of the floors, the area of the ground area and the area of any possible area. Mansardebut, but excl. the area of the basement and the rooftop. As the basis for the size of the floors, the built area (BBR field 216) is used.
Condos :
|
Other buildings, including the oversight of joint and common ownership (s) related to ownership of ownership :
The remuneration is agreed on an individual basis.
Condition Reports Renewal :
In the case of renewal of the state reports, the amount of the payment to be paid shall be agreed upon.
Addendum for administration fee :
For each of the prepared state reports, the building expert may be attributable to the basic tariff for DKK kr. 403, to cover the fees charged by the construction expert.
Reduction of remuneration for combined scrapping and energy labelling :
If a structural expert performs cavesification according to the law of consumer protection by acquiring a firm, etc., cf. Law Order no. 1142 of 28. September 2007, and, at the same time as an energy consultant, energy labelling with building review following the Act on Promomuse Energy Savings in Buildings is reduced the maximum fee for housing review, cf. the above tariff, DKK DKK FOUR HUNDRED.
The above maximum remuneration is including expenses for equipment, run, insurance, etc.
Adjustment of remuneration :
The remuneration shall be governed by the Danish Agency for the Development and Construction Agency with effect from 1. January each year according to Statistics Denmark's net price index. The adjustment shall be made on the basis of the annual percentage change in the net index, calculated on the basis of the index in September.
FEES :
The following charges shall be levied to the building expert :
$DKK 2-byte. 1,345,
Chargey for renewal of a $DKK 670,
Administration fee per provided condition report table kr. 403,
The secretariat shall be responsible for the collection of fees on behalf of the Danish Agency for Trade and Construction.
RECORDING COURSE :
Charges for the busy course : DKK 12.989, "