Notice On The Implementation Of The Commission's Decision Of 23. April 2008 Amending Annex A To Decision 2006/679/ec Of 28 June 1999. March 2006 Concerning The Technical Specification For Interoperability Relating To The Control-Command And Signalling ...

Original Language Title: Bekendtgørelse om gennemførelse af Kommissionens beslutning af 23. april 2008 om ændring af bilag A i beslutning 2006/679/EF af 28. marts 2006 om den tekniske specifikation for interoperabilitet vedrørende delsystemet Styringskontrol og signaler i det tra

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Table of Contents

Appendix 1

Completion on the implementation of the Commission Decision of 23. April 2008 amending Annex A to Decision 2006 /679/EC of 28. March 2006, on the technical specification for interoperability of the control-command subsystem and signalling of the trans-European conventional rail system and Annex A, Decision 2006 /860/EC of 7. November 2006, on the technical specification for interoperability of the train control and signalling subsystem of the trans-European high-speed rail system 1)

In accordance with section 21 h, in the law of rail, cf. Law Order no. 1171 of 2. In December 2004, as amended by law no. 477 of 30. In May 2007, the Traffic Management Board shall determine the authority of the Transport Minister, in accordance with section 24 (a) :

§ 1. The announcement shall make the decision of the Commission of 23. April 2008 amending Annex A to Decision 2006 /679/EC of 28. March 2006, on the technical specification for interoperability of the control-command subsystem and signalling of the trans-European conventional rail system and Annex A, Decision 2006 /860/EC of 7. In November 2006, on the technical specification for interoperability of the train control and signalling subsystem of the trans-European rail system, the technical specification for the high-speed rail system.

Paragraph 2. The Commission ' s decision and its annexes shall be annexes to this notice.

§ 2. The announcement shall enter into force on 1. June 2008.

Paragraph 2. Annex 1 to Provisions concerning the implementation of technical specifications for interoperability (TSI) for the subsystem train control and signalling in the trans-European conventional rail system and for high-speed trains, BJ 4-02, are hereby repealed in Annex A the list of compulsory specifications and the list of indicative specifications.

Paragraph 3. Annex 2 to the provisions for the implementation of technical specifications for interoperability (TSI) for the subsystem train control and signalling in the trans-European conventional rail system and for high-speed trains, BJ 4-02, are hereby repealed in Annex A the list of compulsory specifications and the list of indicative specifications.

The Traffic Management Board for Railroad and Ferger, the 28th. May 2008 Per Jacobsen / Lise Aena Kobberholm

Appendix 1

COMMISSION DECISION of 23. April 2008 amending Annex A, Decision 2006 /679/EC on the technical specification for interoperability of the control-command and signalling subsystem of the trans-European conventional rail system and Annex A 2006 /860/EC on the technical specification for interoperability of the train control and signalling subsystem of the trans-European high-speed rail system

(notified under document number C (2008) 1565)

(Text with EEA relevance)

(2008/386/EF)

THE COMMISSION FOR THE EUROPEAN COMMUNITIES HAS-

Having regard to the Treaty establishing the European Community,

Having regard to Council Directive 96 /48/EC of 23. July 1996 on the interoperability of the trans-European high-speed rail system 1) , and in particular Article 6 (2), 1,

Having regard to Directive 2001 /16/EC of the European Parliament and of the Council of 19. March 2001 on the interoperability of the trans-European rail system for conventional trains 2) , and in particular Article 6 (2), 1, and

in the following considerations :

(1) Commission Decision 2006 /679/EC 3) the first technical specification for interoperability (TSIs) relating to the train control and signalling subsystem (referred to as ' Control-command and signalling ") of the trans-European conventional rail system.

(2) Commission Decision 2002/731/EC 4) Whereas the first technical specification (TSI) is established for the interoperability of the train control and signalling subsystem (called " control-command and signalling ") of the trans-European high-speed rail system ; it has been repealed and dissolved by : Commission Decision 2006 /860/EC 5) .

(3) In Decision 2007 /153/EC, Annex A to Decision 2006 /679/EC and 2006 /860/EC has been adapted to technical progress.

(4) Annex A should be updated again, because the work groups in the European Railway Agency have reached agreement on sub-requirements 108.

(5) Article 6 (1). 2, of Directive 96 /48/EC and Article 6 (1). 2, in Directive 2001 /16/EC, the Agency shall prepare the review and updating of the TSIs and to submit all relevant recommendations to the Committee referred to in Article 21 to take account of technical developments or the development of the social requirements.

(6) Article 12 of Regulation (EC) No 2 of the European Parliament and of the Council 881/2004 6) If the European Railway Agency is to ensure that the TSIs are adapted to technical developments, market developments and the social requirements, and propose to the Commission the changes in the TSIs as it considers necessary.

(7) The European Railway Agency adopted the 14. January 2008 a recommendation on the list of compulsory specifications and the list of indicative specifications in the TSIs for conventional trains and high speed trains.

(8) The provisions of this Decision are in accordance with the opinion of the Committee set up by Article 21 of Directive 96 /48/EEC;

DECIDUON THE FOLLOWING DECISION :

ARTICLE 1

The encoding of mandatory specifications and the list of indicative specifications, cf. Annex A to TSIM annexed to Decision 2006 /679/EC on the control-command and signalling subsystem of the trans-European conventional rail system and Annex A to the TSIM annexed to Decision 2006 /860/EC of the Community on the railway and signalling subsystem of the trans-European high-speed rail system, the lists of the compulsory and indicative specifications annexed to this Decision shall be replaced by the records of the trans-European high-speed rail system.

ARTICLE 2

Before the 31. In December 2008, the specifications of the European train control system ETCS attached as annexed to this Decision shall be completed with up-to-date common test specifications and corrections of errors.

ARTICLE 3

Before the 31. December. 2008, unless otherwise stated in Directive 96 /48/EC, Article 7 of Directive 2001 /16/EC, Article 7 of Directive 2001 /16/EC, the Commission shall inform the Commission which of their ETCS equipped lines with the applicable mandatory specifications ; or will be before this Decision enters into force.

By the same date, the Member States shall inform the Commission of when the trains which comply with the specifications referred to in this Decision may be operated on each of their ETCS lines.

ARTICLE 4

This Decision shall apply from 1. June 2008.

Article 5

This Decision is addressed to the Member States.

Done at Brussels, 23. April 2008.

For the Commission

Jacques BARROT

Vice-President

EXHIBIT

" LIST OF MANDATORY SPECIFICATIONS

(The documents do not exist in translated form, the original titles shall be retained)

Index #
Handle
Document title
Version
1.
ERA / ERTMS/003204
ERTMS/ETCS Functional Client Sensor
5.0
2.
Exgo
3.
UNION11S-023
Glossary of terms and abbreviations
2.0.0
4.
UNION02-026
System i Slater
2.3.0
5.
UNION02-027
FFFIS Juridical recorder-downloading tool
2.2.9
6.
UNION033-033
FIS for man-machine interface
2.0.0
7.
UNISAY 134-034
FIS for the train interface
2.0.0
8.
UNION351-035
Broadcast module JFFFIS
2.1.1
9.
UNION70-036
FFFIS for Eurobalise
2.4.1
10.
UNIONIS O2-037
EuroRadio FIS
2.3.0
11.
Reserved 05E5 37
Offline key management FIS
12.
UNION3-039
FIS for the RBC/RBC handover
2.1.2
13.
UNISAY 40-040
Dimensioning and engineering rules
2.0.0
14.
UNISAY 4-041
The performance requirements for the '
2.1.0
15.
ERA SUBSET-108
Interoperability related to the TSI, on the TSI, the A documents
1.2.0
16.
UNION.044
FFFIS for Euroloop instance
2.2.0
17.
Exgo
18.
UNISAY 4-4-046
Radio infill FFFS
2.0.0
19.
UNIONATED O2-047
Trackside trainborne FIS for radio infill
2.0.0
20.
UNION-048
Trainborne FFFIS for radio infill
2.0.0
21.
UNION9-049
Radio infill FIS with LEU/interlocking
2.0.0
22.
Exgo
23.
UNION7-054
Assignment of values to ETCS isolation
2.0.0
24.
Exgo
25.
UNION7-056
STM FFFIS Safe time layer
2.2.0
26.
UNISAY 5-057
STM FFFIS Safe layer
2.2.0
27.
UNIONETY-091
Safety requirements for the technical problem of ETCS in levels 1 and 2
2.2.11
28.
Reserved
Reliability-availability requirements
29.
UNISAY ON-102
Test the test for interface "k"
1.0.0
30.
Exgo
31.
UNION4-094
UNISIG Functional requirements for an ant handle test facility
2.0.0
32.
EIRENE FRS
GSM-R Functional requirements for
7
33.
EIRENE SRS
GSM-R System requirements for
15
34.
A11T6001 12
(MORANE) Radio transmission FFFIS for Euroradio
12
35.
ECC/DC (02) 05
ECC Decision of 5 July 2002 on the availability and availability of frequency bands for the purposes for the purposes of the 876-876-880 and 921-925 MHz bands ;
36a.
Exgo
36b.
Exgo
36c.
UNISAY SUBSET-074-2
FFFIS STM Test cases document
1.0.0
37a.
Exgo
37b.
UNISAY SUBSET-076-5-2
Test cases related to features
2.2.2
37c.
UNISAY SUBSET-076-6-3
Test sequences
2.0.0
37d.
UNISAY SUBSET-076-7
Scope of the test specifications
1.0.0
37e.
Exgo
38.
06E068
ETCS Marker Board Definition
1.0
39.
UNISAY SUBSET-092-1
ERTMS EuroRadio conformance requirements
2.2.5
40.
UNISAY SUBSET-092-2
ERTMS Euro Radio test cases safety layer
2.2.5
41.
Reserved
UNISAY 28028
JRU Test Pit
42.
Exgo
43.
UNISAY 8:85.
Test the case for Eurobalise FFFIS
2.2.2
44.
Reserved
Odometry FIS
45.
UNISAY ON-101
Interface "K" Che
1.0.0
46.
UNIONHERSELF HUNDRED-100
Interface "G" Tall
1.0.1
47.
Reserved
Safety requirements and requirements to safety analysis for the 'control' for the control-command and signalling subsystem
48.
Reserved
Test Mobile for mobile equipment GSM-R
49.
UNION5-059
Performance requirements for STM
2.1.1
50.
Reserved
UNISAY ON1103
Test Euroloop Test
51.
Reserved
Ergonomic aspects of the DMI
52.
UNION058-058
FFFIS STM Application layer
2.1.1
53.
Reserved
AEIF-ETCS-Variables-Manual
AEIF-ETCS Variables manual
54.
Exgo
55.
Reserved
Juridical recorder baseline requirements
56.
Reserved
05E538
ERTMS Key management conformance requirements
57.
Reserved
UNISAY F107
Requirements on pre-fitting of ERTMS's equipment equipment
58.
UNIONETY-097
Requirements for the RBC-RBC safe communication interface
1.1.0
59.
Reserved
UNISAY 16-105
Requirements on pre-fitting of ERTMS trackside equipment
60.
Reserved
UNIC W104104
ETCS Version management
61.
Reserved
GSM-R Version management
62.
Reserved
UNION.099
RBC-RBC Test Peck for safe communication interface
63.
UNION9-098
RBC-RBC Safe communication interface
1.0.0 "

" LIST OF INDICATIVE SPECIFICATIONS ;

(The documents do not exist in translated form, the original titles shall be retained)

Index #
Handle
Document title
Version
Type
B1.
EEIG 02S126
RAM requirements (chapter 2 only)
6
2 (index 28)
B2.
EEIG 97S066
Environmental conditions
5
2 (Index A5)
B3.
UNISAY SUBSET-074-1
Methodology for testing FFFIS STM
1.0.0
2 (index 36)
B4.
EEIG 97 E 267
Odometer FFFIS
5
1 (index 44)
B5.
O_2475
ERTMS GSM-R QoS test at
1.0.0
2
B6.
UNION.38-038
Offline key management FIS
2.1.9
1 (index 11)
B7.
UNISAY SUBSET-074-3
FFFIS STM Test Tests mostly cases with specific transmission module FFFIS cases.
1.0.0
2 (index 36)
B8.
UNISAY SUBSET-074-4
FFFIS STM Test Tests on the principle of testing the packets specified in the FFFIS STM application layer
1.0.0
2 (index 36)
B9.
UNISAY 976-0
ERTMS/ETCS Class 1, test plan
2.2.3
2 (index 37)
B10.
UNISAY 976-2
Methodology to prepare features
2.2.1
2 (index 37)
B11.
UNISAY 976-3
Methodology of testing
2.2.1
2 (index 37)
B12.
UNISAY 76-4-1
Test sequence generation : methodology and rules
1.0.0
2 (index 37)
B13.
UNISAY 306-4-2
ERTMS ETCS Class 1 states for test sequences
1.0.0
2 (index 37)
B14.
UNISAY 76-5-3
Onboard data dictionary
2.2.0
2 (index 37)
B15.
UNISAY. UNION076-5-4
SRS v.2.2.2.
2.2.2
2 (index 37)
B16.
UNISAY 76-6-1
UNISIG Test database
2.2.2.
2 (index 37)
B17.
UNISAY 76-6-4
Test cases coverage
2.0.0
2 (index 37)
B18.
Exgo
B19.
UNISAY 77 077
UNISIG causal analysis process
2.2.2
2 (Index 27)
B20.
UNISAY 70-78
RBC interface : failure meet and effects analysis
2.2.2
2 (Index 27)
B21.
UNION79079
MMI : failure meet and effects analysis
2.2.2
2 (Index 27)
B22.
UNISAY. 080.
TIU failure meet and effects analysis
2.2.2
2 (Index 27)
B23.
UNISAY 16081
Transmission system : failure meet and effects analysis
2.2.2
2 (Index 27)
B24.
UNISAY 190
ETCS Application levels 1 and 2-safety analysis
2.2.10
2 (Index 27)
B25.
TS50459-1
Railway applications-Communication, signalling and processing systems-European Rail Traffic Management System-operates machine interface
Part 1-Ergonomic principles of ERTMS/ETCS/GSM-R information
2005
2 (Index 51)
B26.
TS50459-2
Railway applications-Communication, signalling and processing systems-European Rail Traffic Management System-operates machine interface
Part 2-Ergonomic arrangements of ERTMS/ETCS
information
2005
2 (Index 51)
B27.
TS50459-3
Railway applications-Communication, signalling and processing systems-European Rail Traffic Management System-operates machine interface
Part 3-Ergonomic arrangements of ERTMS/GSM-R information
2005
2 (Index 51)
B28.
TS50459-4
Railway applications-Communication, signalling and processing systems-European Rail Traffic Management System-operates machine interface
Part 4-Data entry for the ERTMS/ETCS/GSM-R systems
2005
2 (Index 51)
B29.
TS50459-5
Railway applications-Communication, signalling and processing systems-European Rail Traffic Management System-operates machine interface
Part 5-Symbols
2005
2 (Index 51)
B30.
TS50459-6
Railway applications-Communication, signalling and processing systems-European Rail Traffic Management System-operates machine interface
Part 6-Audible Information
2005
2 (Index 51)
B31.
Reserved
EN50xxx
Railway applications-European Rail Traffic Management System-operates machine interface
Part 7-Specific transmission modules
2 (Index 51)
B32.
Reserved
Guideline for references
None
B33.
A 301 515
Global System for Mobile communication (GSM) ; the requirements for GSM operation in the area are in the same way.
2.1.0
2 (index 32, 33)
B34.
06225
Operational DMI Information
1
1 (index 51)
B35.
Reserved
UNION069
ERTMS Key management conformance requirements
1 (indices 56)
B36.
04E117
ETCS/GSM-R Quality of service user requirements-Operational analysis
1
2 (Index 32)
B37.
UNIONETY-093
GSM-R Interfaces-Class 1 requirements
2.3.0
1 (index 32, 33)
B38.
UNIO UNI-107A
Requirements on pre-fitting of ERTMS's equipment equipment
1.0.0
2 (index 57)
B39.
UNISAY SUBSET-076-5-1
ERTMS ETCS Class 1 feature list
2.2.2
2 (index 37)
B40.
UNISAY SUBSET-076-6-7
Test sequences evaluation and validation
1.0.0
2 (index 37)
B41.
UNIATE SUBSET-076-6-8
Generic train data for test sequences
1.0.0
2 (index 37)
B42.
UNISAY SUBSET-076-6-10
Test sequence viewer (TSV)
2.10
2 (index 37)
B43.
04E083
Safety requirements and requirements to safety analysis for the 'control' for the control-command and signalling subsystem
1.0
1 (index 47)
B44.
04E084
Justification report for safety requirements and requirements to safety analysis for the controllers and signalling subsystem for the safety requirements
1.0
2 (index B43)
B45.
ERA / ERTMS/003205
Traceability of Changes to ETCS FRS
0.1
2 (index 1) "
Official notes

1) The announcement shall be carried out by the Commission Decision of 23. April 2008 amending Annex A to Decision 2006 /679/EC of 28. March 2006, on the technical specification for interoperability of the control-command subsystem and signalling of the trans-European conventional rail system and Annex A, Decision 2006 /860/EC of 7. November 2006, on the technical specification for interoperability of the train control and signalling subsystem of the trans-European high-speed rail system.

1) OJ L 235, 17.9.1996, p. 6. Directive as last amended by Commission Directive 2007 /32/EC (OJ L 141, 2.6.2007, p. 63).

2) OJ L 110, 20.4.2001, p. 1. Directive as last amended by Commission Directive 2007 /32/EC.

3) OJ L 284, 16.10.2006, p. 1. Directive as last amended by Directive 2007 /153/EC (OJ L 67, 7.3.2007, p. 13).

4) OJ L 245, 12.9.2002, p. 37. Directive as amended by Decision 2004 /447/EC (OJ L 155, 30.4.2004, p. 63). Corrigendum in EUT L 193, 1.6.2004, p. 53).

5) The EUT L 342, 7.12.2006, p. 1. Decision as amended by Decision 2007 /153/EC.

6) OJ L 164, 30.4.2004, p. 1. Corrigendum in EUT L 220, 21.6.2004, p. 3.