Advanced Search

Amendment Of The Decree On The Rules Of The Gas Market

Original Language Title: změna vyhlášky o Pravidlech trhu s plynem

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
416/2016 Sb.



DECREE



of 13 October. December 2016,



amending Decree No 349/2015 Coll., on rules of the gas market



The Energy Regulatory Office shall, pursuant to section 98, para. 2 (a). I) of the Act

No. 458/2000 Coll., on conditions for business and the public administration in

energy sectors and on amendments to certain acts (the Energy Act),

as amended by law No 158/2009 Coll., Act No. 211/2007 Coll., Act No.

165/2012 Coll., Act No. 90/2014 Coll., Act No. 104/2015 Coll. and Act No.

131/2015:



Article. (I)



Decree No 349/2015 Coll., on rules of the gas market, is amended as follows:



1. In article 2 (2). 1 (b). j), the words "transmission or distribution"

shall be replaced by the word "gas".



2. In article 2 (2). 2 (a). (d)), the words "transport or distribution"

shall be replaced by the word "gas".



3. In article 2 (2). 2 at the end of paragraph 2, the period is replaced by a comma and

the following point), which read as follows:



"in average technical capacity)-the arithmetic mean of the values

technical capacity on the relevant point for the previous natural gas

year. ".



4. In article 3, paragraph 3. 2, after the words "transfer or transfer summary

positions among transport "is inserted after the word" system ".



5. § 9 para. 6 and 7 for the number "2" is added to the text ", 3".



6. In section 10, at the end of paragraph 4, the following sentence "means the body or

Foreign participant in the reserves for the virtual gas storage

carrying capacity up to the maximum of the booked

the extractive or performance of or vtláčecího to the stack gas. ".



7. In article 12, paragraph 3 shall be deleted.



8. in article 13, paragraph 3 is deleted.



9. in § 14 para. 1 the words "§ 10, 11, 12, and 13" are replaced by the words "§ 10

up to 13 ".



10. in paragraphs 14 to present paragraph becomes paragraph 1 and the following

paragraph 2, which reads as follows:



"(2) the clearing or foreign participant in the reserves for the point

virtual stack gas, interruptible load capacity according to § 10

up to 13 up to such a height, where the sum of the fixed and interruptible

transportation capacity of clearing or from a foreign participant, subject to

the virtual gas storage of body clearing and/or

Foreign participant in the reserved a maximum of extractive or

performance of vtláčecího or to the stack gas. ".



11. In paragraph 17, at the end of the text of paragraph 1, the words ", and at the latest

2 hours before beginning the transport. "



12. in section 18 para. 4, after the word "operator", the words "transport

system ".



13. in section 18 paragraph 5 is added:



"(5) for the transport capacity of the soutěženou at auction for frontier point shall be paid

floating or fixed price. A floating price is the price for a reservation

transport capacity laid down by the Energy Regulatory Office (hereinafter referred to as

"The authority") in the price at the time the decision is the load capacity can be

and plus the auction premium. The fixed price is the price for a reservation

transport capacity provided for the Office in the price at the time of decision

auction, eskalovaná on the price level of the calendar year in which the

carrying capacity can be used, plus the auction premium. ".



14. in section 22 para. 1 the words "early start" shall be replaced by

"the beginning".



15. in section 28 paragraph 4 is added:



"(4) the transmission system operator offers unlimited size

interruptible capacity ".



16. in section 29, paragraph 3 reads:



"(3) the size of the interruptible transport capacity offered by the operator

transport capacity of the subject of settlement or a foreign participant

It is not limited. All offered interruptible load capacity is

allocated for the reserve price, which shall be set in the price

decision. ".



17. in section 29 para. 4, the words "standard daily interruptible transportation

Intraday capacity and standard ' shall be deleted.



18. section 30 reads:



"section 30



(1) in the event that for the gas day in the input or output

the border point is not available fixed daily standard shipping

the capacity of the transmission system operator shall be notified in the information system

the transmission system operator and market operator in the system limitations

renominací transport for the border point for a coordinated and

nekoordinovanou shipping capacity.



(2) the clearing or foreign participant using the border point

the transmission system operator referred to in paragraph 1 may, after filing nominations transport

pursuant to § 63 para. 1 (b). and or § 63 paragraph). 2 (a). and according to)

§ 63 para. 6 renominovat carriage within the firm, coordinated and firm

uncoordinated capacity so that it performs the renominaci a maximum of:



and 90%) to the value of the reserved capacity of the subject of settlement

or a foreign participant in the case that brought nominations pursuant to § 66

paragraph. 1 is 80 percent or less of the clearing or foreign body

a participant in the reserved capacity at this point, if you want to be

the increase of the administered nominations,



(b)) by half the difference between the amount of reserved capacity body

Clearing or foreign participant at this point and brought nominations

pursuant to section 66 paragraph 1. 1 in the case that brought nominations under section 66 paragraph 1. 1

reaches more than 80% of body clearing or foreign participant

reserved capacity at this point, if you want to be the increase of the administered

nominations,



(c)) to a value of 10% of the booked transportation capacity of the subject of settlement

or a foreign participant in the case that brought nominations pursuant to § 66

paragraph. 1 reaches 20% or more of body clearing or foreign

a participant in the reserved capacity at this point, if you want to

reduction of the submitted nominations,



(d)) half the difference between the amount of reserved capacity body

Clearing or foreign participant at this point and brought nominations

pursuant to section 66 paragraph 1. 1 in the case that brought nominations under section 66 paragraph 1. 1

with less than 20% of body clearing or foreign participant

reserved capacity at this point, if you want to reduce the administered

the nominations.



(3) Renominaci, which is in contravention of paragraph 2, the subject of settlement

or a foreign participant increased or reduced contrary to

paragraph 2 of the transmission system operator.



(4) information about limitations renominací served transmission

system no later than 9:00:00 hours of the calendar day preceding the

gas day on which to limit the renominací transport occurs.



(5) the restriction of renominací pursuant to paragraph 2 shall not apply to entities

Clearing or foreign participants who, in the preceding

the gas year had booked less than 10% of the average of the technical

capacity in frontier point referred to in paragraph 1.



(6) for the assessment of the achievement of the limit of 10% referred to in paragraph 5, the amount of

the reserved capacity of the subject of settlement or a foreign participant

calculated as the arithmetic average of the reserved capacities of all contracts to

provision of transport of gas, that had a body or

Foreign participant in frontier closed section referred to in paragraph 1 in

the previous gas. ".



19. in section 30 the following new section 30a and 30b shall be inserted:



"section 30a



(1) the clearing or foreign participant is offering unused

reserved a fixed shipping capacity on the secondary market with the transport

capacity, or according to § 30b.



(2) the transmission system operator shall monitor the use of the reserved

transport capacity on border points of individual subjects of settlement

or foreign participants of the reserved for a period longer than one year

separately for the period from 1. October to 31 December 2006. March and for the period from 1 January 2005. April to

on 30 September.



(3) Reserved transport capacity is considered empty if

in two consecutive periods referred to in paragraph 2

It is not a body or a foreign participant used an average of

at least 80%.



(4) the transmission system operator also analyzes whether the nominations filed

individual entrepreneurs or foreign participants pursuant to § 66

paragraph. 1 are not systematically reduced to prevent restrictions renominací

According to § 30.



(5) the transmission system operator shall inform the Agency and the body concerned

Clearing or from a foreign participant of unused reserved

transport capacity referred to in paragraph 3, within one month after the end of

the reference period referred to in paragraph 2. In this information the operator

the transmission system operator shall:



and clearing or from a foreign body) of the participant with a reserved

unused transport capacity,



(b)), the reserved capacity utilization analysis responsibilities

or a foreign participant after each day of the period in which the

There was an under-utilisation of the reserved capacity,



(c)) the amount of the technical and reserved a fixed transportation capacity after

each day of the period in which there was an under-utilisation of the reserved

transport capacity, with the identification of the subject of settlement or foreign

the participant, who requested a booking firm transportation capacity including

the size of the fixed transportation capacity,



(d) the amount of the rejected request) a fixed carrying capacity after each

the days of the period in which there was an under-utilisation of the reserved transportation

capacity,



analysis of the systematic reduction of e) nominations referred to in paragraph 4.



(6) the transmission system operator of stores, how much of the


reserved capacity marked as unused under paragraph

3, but not more than 50% of the transport capacity of the reserved service agreement

transportation of gas. Carrying capacity of clearing or from a foreign body

the participant, that is marked as unused under the preceding sentence, the

offered by the transmission system operator auction

When the booking platform in section 30b shall apply mutatis mutandis.



(7) the transport capacity will not be marked as unused under paragraph

3, when a subject of clearing or foreign party proves that the



and he offered the carrying capacity) on the secondary market in accordance with paragraph 2 for

a price that is higher than the price of the used transmission

When the booking system primary or those who transport

pursuant to section 30b capacity offered by the transmission system operator at the time of

and the extent of non-utilisation of capacity that are marked as unused, and



(b)) is the transport capacity needed to ensure the obligations arising

of contractual relations, in particular with regard to ensuring the safety of

the supplies.



§ 30b



(1) transmission system operator shall allow the clearing entity or

Foreign participant who has reserved a fixed shipping

the capacity on the border point of entry or exit by the transmission system

abandonment of this capacity.



(2) the clearing or foreign participant may leave annual,

quarterly or monthly fixed carrying capacity or long-term

fixed shipping capacity.



(3) transport capacity, which he wants to subject the clearing or foreign

the participant is offered to surrender, the transmission system operator

through the auction to booking platform after the exhaustion of unallocated fixed

transport capacity.



(4) the clearing or foreign participant announces the operator

the transmission system operator request for quotation transportation capacity according to the

paragraph 3 in the information system of the transmission system operator.



(5) the requirement for the sale of those who served in the capacity of clearing body

or a foreign participant no later than 8:00:00 hours of the last

gas day of the month preceding the first day of a natural gas

months, to which should be left to the capacity.



(6) for determining the price at which the capacity, which he wants to subject

Clearing or foreign participant to leave, offered, shall apply section 18

paragraph. 5.



(7) a financial settlement between the transmission system operator

body clearing or foreign participant, that he had left his

carrying capacity, is within the range in which the transport

capacity is allocated to another entity or to a foreign

the participant.



(8) in the event that a request for abandonment of transport capacity enters the for

the same period several subjects of settlement or the foreign participants,

It is this capacity through auction booking platform

based on the timestamp of the notice referred to in paragraph

4. ".



20. In § 32 para. 1 (b). (e)), after the word "operator", the words

"transmission system operator".



21. in paragraph 32, at the end of paragraph 1, the period is replaced by a comma and the following

the letter l) and m) are added:



"l) daily summary status buffers all user positions at the beginning of

each balancing period and a forecast of the General State of the compensatory

positions of all users at the end of each gas day,



m) at the end of the gas delivery forecast the amount of accumulation of transport

system to the next gas day updated within

gas day, for which it was intended. ".



22. in § 32 para. 2, the following sentence "the information provided by the

paragraph 1 (b). l) exposes the transmission system operator

the latest in the 06:00:00 hours of the gas day. Information

provided pursuant to paragraph 1 (b). m) transmission

the system is updated on an hourly basis. ".



23. in § 32 para. 3, the words "on the virtual point" shall be replaced by "on the

point the virtual ".



24. In article 35, the following paragraphs 5 and 6 are added:



"(5) if it exists in the distribution system operator, the distribution

the system of at least 200 places, where there is no gas supplier

legal or natural person, operating within the same vertically

integrated company as a distribution system operator, then

distribution system operator shall at the request of the merchant with the

gas passes the Bill for the use of the distribution system services

through electronic invoicing via the information system operator

the market.



(6) the distribution system operator provides the trader with gas,

with which it has entered into an agreement referred to in paragraph 1 within 10 working days

each calendar month for a list of locations covered by this

the Treaty on the first day of the calendar month, and at least in the

the extent and structure provided for in annex 2 to this Ordinance. ".



25. In § 46 para. 1, after the words "of type (C), the words" or "CM".



26. in § 47 para. 1 (b). (c)), after the words "from the type C" the words "or

Cm ".



27. in § 51 para. 2 is the number "10" is replaced by "7" and at the end of

paragraph, the following sentence "the operator of the storage tank may point

2 (a). and) of annex 3 to this notice no later than 12 hours before

the term begin auctions on storage capacity to adjust the minimum price

per unit of storage capacity. The adjustment of the minimum price per unit

storage capacity does not affect the amount of financial security. ".



28. in § 52 para. 1, the number "3" is replaced by "2".



29. In article 52, paragraph 4 reads:



"(4) the minimum duration of each auction are 2 minutes.

The duration of the auction round will determine the operator of gas storage in

terms and conditions of the auction. ".



30. In § 53 para. 2, the words "10 calendar" is replaced by "5

working ".



31. in § 54 para. 2 is the number "10" is replaced by "5" and at the end of

paragraph, the following sentence "the operator of the storage tank may point

2 (a). and) of annex 3 to this notice no later than 12 hours before

the term begin auctions on storage capacity to adjust the minimum price

per unit of storage capacity. The adjustment of the minimum price per unit

storage capacity does not affect the size of the financial detention. ".



32. In article 55, paragraph 1 reads:



"(1) an application for the reservation daily storage capacity with a solid performance

Clearing or foreign body shall submit the participant electronic

gas storage operator no later than 18:00:00 pm

gas day, on which reservations are required, and the first 90

calendar days before the start of the first gas on which

a reservation is required. The operator of the storage tank may allow the operator

Clearing or foreign participant to submit a reservation request daily

storage capacity with a solid performance, even after the deadline in the first sentence. ".



33. In paragraph 55, at the beginning of paragraph 2 the following sentence "the operator stack

gas will evaluate the applications received in order of time marks acceptance

the application and shall notify the results of book storage capacity within 30 minutes of

request a reserve storage capacity. '.



34. In article 56, paragraph 2 reads as follows:



"(2) a reservation request daily storage capacity with přerušitelným

the performance presents a body of clearing or foreign participant

electronically no later than 18:00:00 hours of the natural gas the date on which

is the daily storage capacity with the přerušitelným of performance required. The price of the

for storage capacity with přerušitelným performance is paid only for the

Daily uninterrupted part of the allocated storage capacity with přerušitelným

performance. The operator of the storage tank will evaluate the application in the order of

time of receipt and by electronic means shall notify the reservation day

storage capacity with přerušitelným performance. The delivery of the notice of

the reservation is considered a daily storage capacity with přerušitelným performance

for reserved. The operator of the storage tank may allow the operator

Clearing or foreign participant to submit a reservation request daily

storage capacity with přerušitelným performance even after the deadline referred to in the sentence

the first ".



35. In § 58 para. 4, the words "five calendar days" are replaced by the words "2

working days ".



36. In article 59 paragraph 2. 1 the words "owned by the body or

Foreign participant "shall be replaced by" that uskladnil body

Clearing or foreign party ".



37. In article 59, paragraph 3 reads:



"(3) the operator of the storage tank serves within the intraday

an organised gas market offer to sell gas for the last known

intraday market price plus 0.5 EUR/MWh. in the case where it is not

a request to trade delivered within 5 minutes, the operator shall reduce the stack

gas price of about 0.1 EUR/MWh, even repeatedly, but no more than about 3 €/MWh

compared to the initial value. The last known price intraday market

means the price of the completed trade on intra-day market market operator

for the day on which the request is made, in which the zobchodovalo

at least 50 MWh, and carried out at the latest before the beginning of the whole hour,

in which the request is lodged. If this price is not available, the

the price of the last trade of the realised in the intraday market operator

the market, in which at least 50 zobchodovalo MWh, and made


at the latest before the beginning of the hours in which the request is lodged.

The operator of the storage tank exposes the way allowing remote

access volume of gas each day, which will be offered in the framework of intra-day

an organised gas market. ".



38. In paragraph 65, at the end of paragraph 2 the following sentence "the operator stack

the gas performs warehousing operators before submitting the nomination

the transmission system of a possible reduction of an interruptible storage capacity

and ensure the immediate sending of the following modified nomination storage

by transmission system operators. ".



39. In section 66 paragraph 1. 3 the words "summary of storage of submitted nominations"

replaced by the words "storage of submitted nominations" and at the end of the text

paragraph 3, the words "by using anonymous code".



40. In article 67, the following paragraph 3 is added:



"(3) the transmission system operator will wait before making the reconciliation

nominations pursuant to paragraph 1 to the point of virtual stack gas

send values gas storage operator of the stack nomination

gas under section 65 paragraph 1. 2. the transmission system operator shall, before

any curtailment of interruptible capacity and making

reconciliation procedure will reduce the transportation responsibilities or nominations

Foreign participant to the value sent by the nomination of the storage pursuant to section

65 paragraph 1. 2. ".



41. In paragraph 70, the following paragraph 5 is added:



"(5) the transmission system operator waits before accepting and

by registering on renominations pursuant to paragraph 2 point a virtual

stack gas to send values for renominations gas storage

gas storage operator pursuant to § 71 para. 4. the operator

the transmission system against any curtailment of interruptible transportation

capacity and follow the procedure reduces the transport of renominations reconciliation

Clearing or from a foreign participant subject to the value sent

renominations storage pursuant to § 71 para. 4. ".



42. In § 71 para. 1 the text of § 68 para. " 3 "is replaced by the text" § 68 para.

2. "



43. In paragraph 71, the following paragraph 4 is added:



"(4) the operator shall carry out any reduction of gas storage

of an interruptible storage capacity and ensure the prompt sending

renominations storage by transmission system operators, in order to

perform reconciliation procedure. ".



44. In § 72 para. 3 the words "summary of renominací storage of submitted"

replaced by the words "renominations warehousing administered" and at the end of paragraph 3

the words "by using anonymous code".



45. In paragraph 77, the following paragraph 5 is added:



"(5) the daily amount of compensation responsibilities, that he

the total deviation to another body, the natural gas clearing day

prior to the first date on which the derogations on the migration occurs

other body clearance, increased by the value of the balance of the account of deviations

responsibilities, which brought the total deviation to another entity

the settlement ".



46. In § 78 para. 3, after the words "the Energy Act" the words

"or in the case of termination pursuant to § 11a. 3 energy

the law ".



47. In section 78 para. 5, the word "operator" is replaced by

"operator".



48. In § 78 para. 6, the words "provable way" are deleted.



49. In § 79 paragraph 2. 3, the word "supply" is replaced by "services

supply of gas ".



50. in § 79 paragraph 2. 4, the words "and the assignment of the subjects of settlement is effective

the latest "shall be replaced by the words" or the assignment of the subjects of settlement

effective no later than ".



51. In article 81 paragraph 1. 1, after the words "for each subject of settlement"

the words "and the transmission system operator for each foreign

participant "and the words" settlement body may "shall be inserted the words" or

Foreign participant by means of transmission system operator ".



52. In article 81 paragraph 1. 2, after the word "body", the words "the clearing and

the transmission system operator for each foreign participant ".



53. In article 81 paragraph 1. 3 and 4, the words "interim balancing account imbalances"

replaced by the words "a preliminary value of balance sheet account".



54. In paragraph 81, the following paragraphs 6 and 7 are added:



"(6) the Operator of the market each day before 13:00:00 pm operator

the transmission system of the allocated value of flexibility in total for all

entrepreneurs and foreign participants for ongoing gas

day.



(7) the Operator of the market every day after the announcement of the results of the market with spare

the flexibility of the transmission system operator usage data

flexibility in total for all subjects of settlement and foreign

participants in the preceding day gas. ".



55. In section 82 para. 2 the words "the following gas day" are replaced by

the words "with effect from 06:00:00 a.m. of the next gas day"

and at the end of paragraph 2, the following sentence "business daily balancing

deviations in the prevention of the emergency State will for the first time carried out in

gas day under the first sentence. ".



56. In § 82 para. 3 and 4, the words "the level of the State" shall be replaced by the words "the level of

use of the flexibility allocation ".



57. In paragraph 83, at the end of paragraph 2 the following sentence "Trade balancing

the daily variations in the State of emergency will be first performed for natural gas

the day on which the Declaration of a State of emergency. ".



58. In § 83 para. 3 (b). (b)), and (c)) and in § 83 para. 4 (b). (b)), and (c))

the words "the initial value of the balance of the account of deviations" are replaced by the words

"the balance sheet account ending value of deviations from the previous

gas day ".



59. In § 89 paragraph 1. 3, the words ' flexibility ' is replaced by

"flexibility".



60. In § 94 paragraph. 1 the words "the subjects of settlement" shall be deleted and the end of the

the text of the paragraph with the words "from the first gas delivery

by the end of the last calendar year gas day calendar

of the year ".



61. In § 96 para. 1 (b). (d)) and section 96 paragraph 1. 2 (a). (c)),

"transport" is inserted after the word "system".



62. In § 96 para. 4, the word "third" is replaced by the word "fourth".



63. In § 100 para. 4, the word "normal" is replaced by

"normalized".



64. In paragraph 102, the dot at the end of paragraph 2 is replaced by a comma and the following

the letter j) is added:



"j) Cap flexibility collectively for all subjects

clearing and foreign participants. ".



65. In paragraph 102, the following paragraph 7 is added:



"(7) the Operator market exposes no later than 14:00:00 pm

gas day usage flexibility allocation summary for all

entrepreneurs and foreign participants. ".



66. In § 103 para. 1 the words "revenue and expenditure for compensatory day

the amount received from the subjects of settlement or foreign participants

through the transmission system operator or paid

entities or foreign participants through

the transmission system operator shall be replaced by the difference between

accepted payments from the subjects of settlement or foreign participants

through the transmission system operator for a daily balancing

the quantity and uhrazenými payments clearing or foreign bodies

participants through the transmission system operator for a day

the compensatory amount ".



67. In § 103 para. 5, the word "appeal" is deleted, and the words

"evaluation of deviations" are the words "after sending the correction values

reading ".



68. In § 104 paragraph. 2, the word "value" is replaced by "value".



69. In § 104 paragraph. 3, the words "for the monthly values of the gas"

shall be deleted.



70. In paragraph 104 at the end of paragraph 4, the following sentence "For unit prices

If necessary, convert them to CZK/MWh used day course

vyhlašovaný the Czech National Bank for the day, to which the unit

prices determined. ".



71. In § 105 para. 1, the words "in the case of losses for" shall be replaced by "for the losses,"

and at the end of paragraph 1, the following sentence "For the unit price in the

If necessary, convert them to CZK/MWh used day course

vyhlašovaný the Czech National Bank for the day, to which the unit

prices determined. ".



72. In article 106 paragraph. 2, after the words "the subject of settlement", the words "and

each foreign participant ", at the end of the paragraph, the following sentence

"For the price per unit, if necessary, convert them to CZK/MWh

It's the daily vyhlašovaný the Czech National Bank exchange rate for the day, to

which the unit price determined. ".



73. In paragraph 106, at the end of paragraph 3 the following sentence "if it is not, the 13th

calendar day a working day, the market operator performs the settlement to

17:00:00 pm on the first working day following the thirteenth

calendar day. ".



74. In paragraph 106 paragraph. 4, after the word "clearing" the words "and each

Foreign participant ", at the end of the paragraph, the following sentence" For

the unit price shall, where necessary, convert them to CZK/MWh

It's the daily vyhlašovaný the Czech National Bank exchange rate for the day, to

which the unit price determined. ".



75. In paragraph 106, at the end of paragraph 6 the following sentence "the market operator shall be

and do away with the transmission system operator, the difference between adopted and

uhrazenými payments for differences referred to in paragraphs 2 to 5. ".



76. In § 111 paragraph. 1 the words "registers the place of consumption of the customer

pursuant to § 112 para. 4.0 ' shall be deleted and the end of the paragraph, the following sentence

"Failure to meet the obligations of the operator, the distribution of information or


the transmission system operator pursuant to § 110 paragraph 2. 5 shall not affect the obligation to

distribution or transmission system operator pursuant to § 112 para.

4. ".



77. In § 112 para. 7, the word "the" be deleted and the word "closure"

the word "Treaty" shall be inserted.



78. In section 113 para. 3, the second sentence is replaced by the phrase "in the case that the reading

the State of the measuring device is not filed or is filed after the end of the fifth

working day from the date of change of the supplier of the gas, the status of the measuring

an estimated consumption of gas devices for the effective date of the change gas supplier

in accordance with annex 18 to this Ordinance. ".



79. In section 113 para. 4, the words "A and B" shall be replaced by the words "A or B".



80. in section 114 para. 2 at the end of the text of the first sentence, the words "and to

the offset of the term responsibility for deviation of the existing body of

clearing "and at the end of the paragraph, the following sentence" to shorten the supply

the market operator shall inform the clearing and the entity concerned operator

distribution or transmission system that is a place of consumption

connected. ".



81. In article 114, paragraph 3 shall be deleted.



Paragraphs 4 and 5 shall become paragraphs 3 and 4.



82. In section 114 para. 3, the words "in which the change should take effect

a vendor in the market operator's system, or should take effect

withdrawal from the contract pursuant to § 11a. 2, 5 and 6 of the energy

the law ^ 12) or termination of the contract should become effective under section 11a.

the Energy Act 3 ^ 12) "shall be replaced by" in which it has acquired

the effectiveness of the change of supplier in the market operator's system, or have experience

effects of withdrawal from the contract pursuant to § 11a. 2, 5 and 6 of the energy

the law ^ 12) or have the experience the effects of termination pursuant to § 11a. 3

the Energy Act ^ 12). ".



83. In article 115 paragraph. 3, the words "on behalf of another gas supplier" shall be replaced by

the words "other supplier of gas".



84. In paragraph 118, the following shall be added at the end of paragraph 2, the phrase "the market operator on your

information system assigns to the supply point vendor

the last instance. After the expiry of the other legislation ^ 12)

the market operator shall proceed in accordance with § 78 and 79. ".



85. In § 118 paragraph 5 is added:



"(5) quick change gas supplier in accordance with § 116 paragraph. 3 to 5 and § 117,

also be used for the sampling of the place where the supplier of the gas customers easily

permission or ability to deliver, or does not have a guaranteed shipping service

or distribution system in the case of the supply of gas on the basis of the Treaty on

associated gas supply services. In these cases, suspend

the market operator of the gas suppliers, who lost privilege or option

gas supply or service provider does not have transport or distribution

system in the case of the supply of gas under a contract for the joint

gas supply services, the ability to nominate, transmit and take

responsibility for deviation and to participate in the intraday gas market.

The market operator shall promptly provide that information, including the enumeration of EIC codes

places to which the fact is concerned, all registered

participants in the gas market and publish it in a manner allowing remote

access. The procedure under § 116 paragraph. 2 shall not apply. ".



86. In section 119 is at the end of the text of paragraph 1, the words ", first

However, 4 months before the date of the desired termination or interruption

gas ".



87. In section 119 paragraph 1. 2, the words "by the deadline of 4:00:00 pm a

business day before the day "are replaced by the words" within 16:00:00 pm

the business day immediately preceding the day ".



88. In section 119 paragraph 1. 3 (b). and), the word "third" is replaced by

"the fifth".



89. In section 119 paragraph 1. 4 (b). and), the word "third" is replaced by

"the fourth".



90. in § 120 paragraph 1. 3, the text "section 73" is replaced by the text "§ 74".



91. In § 121 paragraph 2. 1 the words "places the operator" is replaced by "places for

operator ".



92. In paragraph 123 of paragraph 1. 3 the words "customer sampling space directly connected"

replaced by the words "the collecting places customers directly connected".



93. In paragraph 125 of paragraph 1. 6, the words "A and B" shall be replaced by the words "A or B".



94. In Appendix 3, point 2, point (j)):



"j) booking type storage capacity pursuant to § 50 para. 4 (b). and) or

(c)); for booking pursuant to § 50 para. 4 (b). and the beginning of the book)

storage capacity and the maximum time to book storage capacity,

that the reservation is storage capacity offered; for booking pursuant to § 50

paragraph. 4 (b). (c)) the beginning of the book storage capacity and the maximum

the number of months of the book storage capacity. '.



95. Appendix 5:



' Annex No. 5 to Decree No 349/2015 Sb.



Flexibility through the accumulation of the gas system provided for

the market operator for the gas day



and Flexibility for the consumption location) of the customer with the measurement of type A or B FOPMA

in 1/1000ths MWh for the gas day

FOPMA = [KOPM1 x RKOPM x KOPM2 x Spt + (RKOPM x Spt-AlOPM)],



where



KOPM1 is the value of the coefficient provided for in 0.04979,

KOPM2 is the coefficient laid down to 0,

RKOPM is the sum of all the reserved capacity of the responsibilities in the point of the customer on the gas

the day of the m3 passed pursuant to § 95 para. 1 (b). (f)) or § 96 para. 1 (b). n),

SPT average gross calorific value passed pursuant to § 96 para. 1 (b). f) vtisícinách MWh/m3

AlOPM is a daily allocation of responsibilities at the point of customer transmitted pursuant to § 96 para. 1 (b). (e)) or § 95 para. 1 (b). (e))

or the procedure provided for in § 101 paragraph. 2.



For the customer's consumption location is connected to the transmission system is the product of the

RKOPM x Spt replaces the sum of all the reserved capacity of the entity

the showdown in the point of the customer on the day of the gas

one thousand MWh.



(b)) for the customer's consumption location Flexibility with the measurement of type C or CM

FOPMC in 1/1000ths MWh for the gas day

Cy Cy

FOPMC = [KOPM1 x------x Spt + KOPM2 x (------x Spt-DHOPM)],

KLFSP KLFSP



where



CY is the value of the planned annual consumption in MWh for the thousands of natural gas a day for the daily variation in the information

the system of the market operator,

SPT is the average value of the gross calorific value passed pursuant to § 96 para. 1 (b). (f)), in 1/1000ths of MWh/m3

KLFSP is the coefficient laid down to 1171 in 1/1000ths MWh/m3

DHOPM is a daily value of gas sampling in accordance with § 99 paragraph 2. 6.



(c) Flexibility in point production) gas

FVP = [KVP x RKVP],



where



KVP is set to 0, coefficient,

Is the sum of all the RKVP reserved capacities of the responsibilities in point production of the gas to the gas day

thousand MWh passed pursuant to § 96 para. 1 (b). o) or under section 95 para. 1 (b). I).



(d)) for the input Flexibility border point at the entry point of the cross-border

pipeline and gas storage entry point

FVB = [RKVB + KVB1 x KVB2 x (RKVB-AlVB)],



where



KVB1 and KVB2 are the coefficients set out in the following table



------------------------------------------------------------

The name of the entry point KVB1 KVB2

------------------------------------------------------------

The border point of 0.00567 0

------------------------------------------------------------

The virtual gas storage 0.00567 0

------------------------------------------------------------

Point of cross-border gas pipeline 0 0

------------------------------------------------------------



where



RKVB is the sum of all the reserved capacity of the subject of settlement at the appropriate entry point of the gas

system in 1/1000ths of MWh according to § 96 para. 1 (b). (j)) or § 95 para. 1 (b). (j)),

AlVB is the daily allocation of responsibilities on the entry point of the gas system of the passed

the market operator under § 96 para. 1 (b). a) and b) or § 95 para. 1 (b). and).



e) Flexibility in the output point of the border exit point for cross-border

the gas pipeline and gas storage, output point

FVyB = [RKVyB + KVyB1 x KVyB2 x (RKVyB-AlVyB)],



where



KVyB1 and KVyB2 are the coefficients set out in the following table



------------------------------------------------------------

Name of the output point KVyB1 KVyB2

------------------------------------------------------------

The border point of 0.00567 0

------------------------------------------------------------

The virtual gas storage 0.00567 0

------------------------------------------------------------

Point of cross-border gas pipeline 0.04309 0

------------------------------------------------------------



where



RKVyP is the sum of all the reserved capacity of the subject of settlement on the appropriate output point of the gas

system in 1/1000ths of MWh according to § 96 para. 1 (b). (j)) or § 95 para. 1 (b). (j)),

AlVyB is a daily allocation of responsibilities to the out port of the gas system of the passed

the market operator under § 96 para. 1 (b). a) and b) or § 95 para. 1 (b). d).".



96. In annex 7, point 1, the words "less than 3372 MWh" shall be replaced by

"the lower than-3372 MWh".



97. In annex 7, point 3, fourth sentence, after the words "trade"

the words "the following gas day", at the end of paragraph, the following sentence

"If this price is not available, the price of the last

the completed trade on intraday market operator, in which the

zobchodovalo at least 50 MWh, and carried out at the latest before the beginning of


for hours, in which the request is made. ".



98. In Annex 8, point 1, the words "annex 5, para. 1 "shall be replaced by

"in Appendix No. 7 to point 1".



99. In Annex 8, point 2, the text "kWh" is replaced by the text "MWh".



100. In Annex 8, point 2, the words "annex 5" shall be replaced by

"Annex 7".



101. In Annex 8, point 2, the text "paragraph. 1 "shall be replaced with" paragraph 1.

2. "



102. In Annex 8, point 3, after the word "trade", the words "on

the ongoing gas day "and at the end of paragraph, the following sentence" If

This price is not available, the price of the last of the completed

trade in the market operator's intra-day market, in which the zobchodovalo

at least 50 MWh, and carried out at the latest before the beginning of the whole hour,

in which the request is made. ".



103. In Annex 8, paragraph. 4, after the words "plus", the text "0.1 EUR/MWh"

replaced by the text "0.5 EUR/MWh. After the words "the price", the text "0.5 EUR/MWh"

replaced by the text "0.1 EUR/MWh.



104. In annex 11, part (C) of paragraph 1. I, points 3, 4 and 6 of the following

subparagraph (f)), which read as follows:



"f) factor of the calendar month according to the pricing decisions of the Office".



105. In annex 11, part (C) of paragraph 1. I, point 7 the following point (c)),

added:



"(c)) of the calendar month from the price factor of the decision of the authority".



106. In annex 2 section 1, the words "A and B" shall be replaced by the words "or

(B) ".



107. Appendix 3:



' Annex # 15 to Decree No 349/2015 Sb.



Procedure to determine the planned and calculated annual consumption of gas customers

with the measurement of type C or CM



And.



1. For the determination of the planned annual gas consumption for consumption location

the customer with the measurement of type C or CM shall apply the last invoice

subscriptions of gas in the past three years. If the customer used the gas in

period of less than three years but not longer than 10 months, it shall apply to

determination of planned annual consumption of this shorter period.



2. If the total length of time with the available values invoiced

donations of less than 10 months, the anticipated gas consumption

agreed in the contract of providing services to the distribution system.



3. the planned annual consumption OPRSilR for supply point in the distribution

System l with the measurement of type C or CM, for which deductions were made

covering the period (D) length of at least 10 previous months,

calculated according to the formula



(B).



1. for the determination of the calculated annual gas consumption for consumption location

the customer with the measurement of type C or CM is applied last invoiced

gas consumption. If the length of the last billing period shorter than

10 months, the details of the more your billing period covering

a minimum period of 10 months. The power consumption of the gas in the period thus defined

calculate the value of the calculated annual gas consumption for the relevant

supply point with the measurement of type C or CM.



2. If the total length of time with the available values invoiced

donations of less than 10 months, the anticipated gas consumption

agreed in the contract of providing services to the distribution system.



3. Calculated annual consumption of OPpRSiR for the place of consumption and to the measurement of

C or CM, for which deductions were made, covering the period, and the length of the

at least 10 of the previous months, is calculated according to the formula:



4. Calculated annual consumption of gas will be used for the classification of the sampling

the place of the customer's household and residential categories into the sampling zone

for the purposes of billing, gas consumption in the point of the customer. ".



108. in annex # 19 part. (II) paragraph 2, the word "frontier"

repealed.



109. in annex # 19 of part (C) of paragraph 1. I, point 1 (b). (f)), the word "MWh"

replaced by the word "month".



Article II



The effectiveness of the



This Decree shall enter into force on 1 January 2000. January 2017.



Chair:



Ing. Vaghela in r.