416/2016 Sb.
DECREE
of 13 October. December 2016,
amending Decree No 349/2015 Coll., on rules of the gas market
The Energy Regulatory Office shall, pursuant to section 98, para. 2 (a). I) of the Act
No. 458/2000 Coll., on conditions for business and the public administration in
energy sectors and on amendments to certain acts (the Energy Act),
as amended by law No 158/2009 Coll., Act No. 211/2007 Coll., Act No.
165/2012 Coll., Act No. 90/2014 Coll., Act No. 104/2015 Coll. and Act No.
131/2015:
Article. (I)
Decree No 349/2015 Coll., on rules of the gas market, is amended as follows:
1. In article 2 (2). 1 (b). j), the words "transmission or distribution"
shall be replaced by the word "gas".
2. In article 2 (2). 2 (a). (d)), the words "transport or distribution"
shall be replaced by the word "gas".
3. In article 2 (2). 2 at the end of paragraph 2, the period is replaced by a comma and
the following point), which read as follows:
"in average technical capacity)-the arithmetic mean of the values
technical capacity on the relevant point for the previous natural gas
year. ".
4. In article 3, paragraph 3. 2, after the words "transfer or transfer summary
positions among transport "is inserted after the word" system ".
5. § 9 para. 6 and 7 for the number "2" is added to the text ", 3".
6. In section 10, at the end of paragraph 4, the following sentence "means the body or
Foreign participant in the reserves for the virtual gas storage
carrying capacity up to the maximum of the booked
the extractive or performance of or vtláčecího to the stack gas. ".
7. In article 12, paragraph 3 shall be deleted.
8. in article 13, paragraph 3 is deleted.
9. in § 14 para. 1 the words "§ 10, 11, 12, and 13" are replaced by the words "§ 10
up to 13 ".
10. in paragraphs 14 to present paragraph becomes paragraph 1 and the following
paragraph 2, which reads as follows:
"(2) the clearing or foreign participant in the reserves for the point
virtual stack gas, interruptible load capacity according to § 10
up to 13 up to such a height, where the sum of the fixed and interruptible
transportation capacity of clearing or from a foreign participant, subject to
the virtual gas storage of body clearing and/or
Foreign participant in the reserved a maximum of extractive or
performance of vtláčecího or to the stack gas. ".
11. In paragraph 17, at the end of the text of paragraph 1, the words ", and at the latest
2 hours before beginning the transport. "
12. in section 18 para. 4, after the word "operator", the words "transport
system ".
13. in section 18 paragraph 5 is added:
"(5) for the transport capacity of the soutěženou at auction for frontier point shall be paid
floating or fixed price. A floating price is the price for a reservation
transport capacity laid down by the Energy Regulatory Office (hereinafter referred to as
"The authority") in the price at the time the decision is the load capacity can be
and plus the auction premium. The fixed price is the price for a reservation
transport capacity provided for the Office in the price at the time of decision
auction, eskalovaná on the price level of the calendar year in which the
carrying capacity can be used, plus the auction premium. ".
14. in section 22 para. 1 the words "early start" shall be replaced by
"the beginning".
15. in section 28 paragraph 4 is added:
"(4) the transmission system operator offers unlimited size
interruptible capacity ".
16. in section 29, paragraph 3 reads:
"(3) the size of the interruptible transport capacity offered by the operator
transport capacity of the subject of settlement or a foreign participant
It is not limited. All offered interruptible load capacity is
allocated for the reserve price, which shall be set in the price
decision. ".
17. in section 29 para. 4, the words "standard daily interruptible transportation
Intraday capacity and standard ' shall be deleted.
18. section 30 reads:
"section 30
(1) in the event that for the gas day in the input or output
the border point is not available fixed daily standard shipping
the capacity of the transmission system operator shall be notified in the information system
the transmission system operator and market operator in the system limitations
renominací transport for the border point for a coordinated and
nekoordinovanou shipping capacity.
(2) the clearing or foreign participant using the border point
the transmission system operator referred to in paragraph 1 may, after filing nominations transport
pursuant to § 63 para. 1 (b). and or § 63 paragraph). 2 (a). and according to)
§ 63 para. 6 renominovat carriage within the firm, coordinated and firm
uncoordinated capacity so that it performs the renominaci a maximum of:
and 90%) to the value of the reserved capacity of the subject of settlement
or a foreign participant in the case that brought nominations pursuant to § 66
paragraph. 1 is 80 percent or less of the clearing or foreign body
a participant in the reserved capacity at this point, if you want to be
the increase of the administered nominations,
(b)) by half the difference between the amount of reserved capacity body
Clearing or foreign participant at this point and brought nominations
pursuant to section 66 paragraph 1. 1 in the case that brought nominations under section 66 paragraph 1. 1
reaches more than 80% of body clearing or foreign participant
reserved capacity at this point, if you want to be the increase of the administered
nominations,
(c)) to a value of 10% of the booked transportation capacity of the subject of settlement
or a foreign participant in the case that brought nominations pursuant to § 66
paragraph. 1 reaches 20% or more of body clearing or foreign
a participant in the reserved capacity at this point, if you want to
reduction of the submitted nominations,
(d)) half the difference between the amount of reserved capacity body
Clearing or foreign participant at this point and brought nominations
pursuant to section 66 paragraph 1. 1 in the case that brought nominations under section 66 paragraph 1. 1
with less than 20% of body clearing or foreign participant
reserved capacity at this point, if you want to reduce the administered
the nominations.
(3) Renominaci, which is in contravention of paragraph 2, the subject of settlement
or a foreign participant increased or reduced contrary to
paragraph 2 of the transmission system operator.
(4) information about limitations renominací served transmission
system no later than 9:00:00 hours of the calendar day preceding the
gas day on which to limit the renominací transport occurs.
(5) the restriction of renominací pursuant to paragraph 2 shall not apply to entities
Clearing or foreign participants who, in the preceding
the gas year had booked less than 10% of the average of the technical
capacity in frontier point referred to in paragraph 1.
(6) for the assessment of the achievement of the limit of 10% referred to in paragraph 5, the amount of
the reserved capacity of the subject of settlement or a foreign participant
calculated as the arithmetic average of the reserved capacities of all contracts to
provision of transport of gas, that had a body or
Foreign participant in frontier closed section referred to in paragraph 1 in
the previous gas. ".
19. in section 30 the following new section 30a and 30b shall be inserted:
"section 30a
(1) the clearing or foreign participant is offering unused
reserved a fixed shipping capacity on the secondary market with the transport
capacity, or according to § 30b.
(2) the transmission system operator shall monitor the use of the reserved
transport capacity on border points of individual subjects of settlement
or foreign participants of the reserved for a period longer than one year
separately for the period from 1. October to 31 December 2006. March and for the period from 1 January 2005. April to
on 30 September.
(3) Reserved transport capacity is considered empty if
in two consecutive periods referred to in paragraph 2
It is not a body or a foreign participant used an average of
at least 80%.
(4) the transmission system operator also analyzes whether the nominations filed
individual entrepreneurs or foreign participants pursuant to § 66
paragraph. 1 are not systematically reduced to prevent restrictions renominací
According to § 30.
(5) the transmission system operator shall inform the Agency and the body concerned
Clearing or from a foreign participant of unused reserved
transport capacity referred to in paragraph 3, within one month after the end of
the reference period referred to in paragraph 2. In this information the operator
the transmission system operator shall:
and clearing or from a foreign body) of the participant with a reserved
unused transport capacity,
(b)), the reserved capacity utilization analysis responsibilities
or a foreign participant after each day of the period in which the
There was an under-utilisation of the reserved capacity,
(c)) the amount of the technical and reserved a fixed transportation capacity after
each day of the period in which there was an under-utilisation of the reserved
transport capacity, with the identification of the subject of settlement or foreign
the participant, who requested a booking firm transportation capacity including
the size of the fixed transportation capacity,
(d) the amount of the rejected request) a fixed carrying capacity after each
the days of the period in which there was an under-utilisation of the reserved transportation
capacity,
analysis of the systematic reduction of e) nominations referred to in paragraph 4.
(6) the transmission system operator of stores, how much of the
reserved capacity marked as unused under paragraph
3, but not more than 50% of the transport capacity of the reserved service agreement
transportation of gas. Carrying capacity of clearing or from a foreign body
the participant, that is marked as unused under the preceding sentence, the
offered by the transmission system operator auction
When the booking platform in section 30b shall apply mutatis mutandis.
(7) the transport capacity will not be marked as unused under paragraph
3, when a subject of clearing or foreign party proves that the
and he offered the carrying capacity) on the secondary market in accordance with paragraph 2 for
a price that is higher than the price of the used transmission
When the booking system primary or those who transport
pursuant to section 30b capacity offered by the transmission system operator at the time of
and the extent of non-utilisation of capacity that are marked as unused, and
(b)) is the transport capacity needed to ensure the obligations arising
of contractual relations, in particular with regard to ensuring the safety of
the supplies.
§ 30b
(1) transmission system operator shall allow the clearing entity or
Foreign participant who has reserved a fixed shipping
the capacity on the border point of entry or exit by the transmission system
abandonment of this capacity.
(2) the clearing or foreign participant may leave annual,
quarterly or monthly fixed carrying capacity or long-term
fixed shipping capacity.
(3) transport capacity, which he wants to subject the clearing or foreign
the participant is offered to surrender, the transmission system operator
through the auction to booking platform after the exhaustion of unallocated fixed
transport capacity.
(4) the clearing or foreign participant announces the operator
the transmission system operator request for quotation transportation capacity according to the
paragraph 3 in the information system of the transmission system operator.
(5) the requirement for the sale of those who served in the capacity of clearing body
or a foreign participant no later than 8:00:00 hours of the last
gas day of the month preceding the first day of a natural gas
months, to which should be left to the capacity.
(6) for determining the price at which the capacity, which he wants to subject
Clearing or foreign participant to leave, offered, shall apply section 18
paragraph. 5.
(7) a financial settlement between the transmission system operator
body clearing or foreign participant, that he had left his
carrying capacity, is within the range in which the transport
capacity is allocated to another entity or to a foreign
the participant.
(8) in the event that a request for abandonment of transport capacity enters the for
the same period several subjects of settlement or the foreign participants,
It is this capacity through auction booking platform
based on the timestamp of the notice referred to in paragraph
4. ".
20. In § 32 para. 1 (b). (e)), after the word "operator", the words
"transmission system operator".
21. in paragraph 32, at the end of paragraph 1, the period is replaced by a comma and the following
the letter l) and m) are added:
"l) daily summary status buffers all user positions at the beginning of
each balancing period and a forecast of the General State of the compensatory
positions of all users at the end of each gas day,
m) at the end of the gas delivery forecast the amount of accumulation of transport
system to the next gas day updated within
gas day, for which it was intended. ".
22. in § 32 para. 2, the following sentence "the information provided by the
paragraph 1 (b). l) exposes the transmission system operator
the latest in the 06:00:00 hours of the gas day. Information
provided pursuant to paragraph 1 (b). m) transmission
the system is updated on an hourly basis. ".
23. in § 32 para. 3, the words "on the virtual point" shall be replaced by "on the
point the virtual ".
24. In article 35, the following paragraphs 5 and 6 are added:
"(5) if it exists in the distribution system operator, the distribution
the system of at least 200 places, where there is no gas supplier
legal or natural person, operating within the same vertically
integrated company as a distribution system operator, then
distribution system operator shall at the request of the merchant with the
gas passes the Bill for the use of the distribution system services
through electronic invoicing via the information system operator
the market.
(6) the distribution system operator provides the trader with gas,
with which it has entered into an agreement referred to in paragraph 1 within 10 working days
each calendar month for a list of locations covered by this
the Treaty on the first day of the calendar month, and at least in the
the extent and structure provided for in annex 2 to this Ordinance. ".
25. In § 46 para. 1, after the words "of type (C), the words" or "CM".
26. in § 47 para. 1 (b). (c)), after the words "from the type C" the words "or
Cm ".
27. in § 51 para. 2 is the number "10" is replaced by "7" and at the end of
paragraph, the following sentence "the operator of the storage tank may point
2 (a). and) of annex 3 to this notice no later than 12 hours before
the term begin auctions on storage capacity to adjust the minimum price
per unit of storage capacity. The adjustment of the minimum price per unit
storage capacity does not affect the amount of financial security. ".
28. in § 52 para. 1, the number "3" is replaced by "2".
29. In article 52, paragraph 4 reads:
"(4) the minimum duration of each auction are 2 minutes.
The duration of the auction round will determine the operator of gas storage in
terms and conditions of the auction. ".
30. In § 53 para. 2, the words "10 calendar" is replaced by "5
working ".
31. in § 54 para. 2 is the number "10" is replaced by "5" and at the end of
paragraph, the following sentence "the operator of the storage tank may point
2 (a). and) of annex 3 to this notice no later than 12 hours before
the term begin auctions on storage capacity to adjust the minimum price
per unit of storage capacity. The adjustment of the minimum price per unit
storage capacity does not affect the size of the financial detention. ".
32. In article 55, paragraph 1 reads:
"(1) an application for the reservation daily storage capacity with a solid performance
Clearing or foreign body shall submit the participant electronic
gas storage operator no later than 18:00:00 pm
gas day, on which reservations are required, and the first 90
calendar days before the start of the first gas on which
a reservation is required. The operator of the storage tank may allow the operator
Clearing or foreign participant to submit a reservation request daily
storage capacity with a solid performance, even after the deadline in the first sentence. ".
33. In paragraph 55, at the beginning of paragraph 2 the following sentence "the operator stack
gas will evaluate the applications received in order of time marks acceptance
the application and shall notify the results of book storage capacity within 30 minutes of
request a reserve storage capacity. '.
34. In article 56, paragraph 2 reads as follows:
"(2) a reservation request daily storage capacity with přerušitelným
the performance presents a body of clearing or foreign participant
electronically no later than 18:00:00 hours of the natural gas the date on which
is the daily storage capacity with the přerušitelným of performance required. The price of the
for storage capacity with přerušitelným performance is paid only for the
Daily uninterrupted part of the allocated storage capacity with přerušitelným
performance. The operator of the storage tank will evaluate the application in the order of
time of receipt and by electronic means shall notify the reservation day
storage capacity with přerušitelným performance. The delivery of the notice of
the reservation is considered a daily storage capacity with přerušitelným performance
for reserved. The operator of the storage tank may allow the operator
Clearing or foreign participant to submit a reservation request daily
storage capacity with přerušitelným performance even after the deadline referred to in the sentence
the first ".
35. In § 58 para. 4, the words "five calendar days" are replaced by the words "2
working days ".
36. In article 59 paragraph 2. 1 the words "owned by the body or
Foreign participant "shall be replaced by" that uskladnil body
Clearing or foreign party ".
37. In article 59, paragraph 3 reads:
"(3) the operator of the storage tank serves within the intraday
an organised gas market offer to sell gas for the last known
intraday market price plus 0.5 EUR/MWh. in the case where it is not
a request to trade delivered within 5 minutes, the operator shall reduce the stack
gas price of about 0.1 EUR/MWh, even repeatedly, but no more than about 3 €/MWh
compared to the initial value. The last known price intraday market
means the price of the completed trade on intra-day market market operator
for the day on which the request is made, in which the zobchodovalo
at least 50 MWh, and carried out at the latest before the beginning of the whole hour,
in which the request is lodged. If this price is not available, the
the price of the last trade of the realised in the intraday market operator
the market, in which at least 50 zobchodovalo MWh, and made
at the latest before the beginning of the hours in which the request is lodged.
The operator of the storage tank exposes the way allowing remote
access volume of gas each day, which will be offered in the framework of intra-day
an organised gas market. ".
38. In paragraph 65, at the end of paragraph 2 the following sentence "the operator stack
the gas performs warehousing operators before submitting the nomination
the transmission system of a possible reduction of an interruptible storage capacity
and ensure the immediate sending of the following modified nomination storage
by transmission system operators. ".
39. In section 66 paragraph 1. 3 the words "summary of storage of submitted nominations"
replaced by the words "storage of submitted nominations" and at the end of the text
paragraph 3, the words "by using anonymous code".
40. In article 67, the following paragraph 3 is added:
"(3) the transmission system operator will wait before making the reconciliation
nominations pursuant to paragraph 1 to the point of virtual stack gas
send values gas storage operator of the stack nomination
gas under section 65 paragraph 1. 2. the transmission system operator shall, before
any curtailment of interruptible capacity and making
reconciliation procedure will reduce the transportation responsibilities or nominations
Foreign participant to the value sent by the nomination of the storage pursuant to section
65 paragraph 1. 2. ".
41. In paragraph 70, the following paragraph 5 is added:
"(5) the transmission system operator waits before accepting and
by registering on renominations pursuant to paragraph 2 point a virtual
stack gas to send values for renominations gas storage
gas storage operator pursuant to § 71 para. 4. the operator
the transmission system against any curtailment of interruptible transportation
capacity and follow the procedure reduces the transport of renominations reconciliation
Clearing or from a foreign participant subject to the value sent
renominations storage pursuant to § 71 para. 4. ".
42. In § 71 para. 1 the text of § 68 para. " 3 "is replaced by the text" § 68 para.
2. "
43. In paragraph 71, the following paragraph 4 is added:
"(4) the operator shall carry out any reduction of gas storage
of an interruptible storage capacity and ensure the prompt sending
renominations storage by transmission system operators, in order to
perform reconciliation procedure. ".
44. In § 72 para. 3 the words "summary of renominací storage of submitted"
replaced by the words "renominations warehousing administered" and at the end of paragraph 3
the words "by using anonymous code".
45. In paragraph 77, the following paragraph 5 is added:
"(5) the daily amount of compensation responsibilities, that he
the total deviation to another body, the natural gas clearing day
prior to the first date on which the derogations on the migration occurs
other body clearance, increased by the value of the balance of the account of deviations
responsibilities, which brought the total deviation to another entity
the settlement ".
46. In § 78 para. 3, after the words "the Energy Act" the words
"or in the case of termination pursuant to § 11a. 3 energy
the law ".
47. In section 78 para. 5, the word "operator" is replaced by
"operator".
48. In § 78 para. 6, the words "provable way" are deleted.
49. In § 79 paragraph 2. 3, the word "supply" is replaced by "services
supply of gas ".
50. in § 79 paragraph 2. 4, the words "and the assignment of the subjects of settlement is effective
the latest "shall be replaced by the words" or the assignment of the subjects of settlement
effective no later than ".
51. In article 81 paragraph 1. 1, after the words "for each subject of settlement"
the words "and the transmission system operator for each foreign
participant "and the words" settlement body may "shall be inserted the words" or
Foreign participant by means of transmission system operator ".
52. In article 81 paragraph 1. 2, after the word "body", the words "the clearing and
the transmission system operator for each foreign participant ".
53. In article 81 paragraph 1. 3 and 4, the words "interim balancing account imbalances"
replaced by the words "a preliminary value of balance sheet account".
54. In paragraph 81, the following paragraphs 6 and 7 are added:
"(6) the Operator of the market each day before 13:00:00 pm operator
the transmission system of the allocated value of flexibility in total for all
entrepreneurs and foreign participants for ongoing gas
day.
(7) the Operator of the market every day after the announcement of the results of the market with spare
the flexibility of the transmission system operator usage data
flexibility in total for all subjects of settlement and foreign
participants in the preceding day gas. ".
55. In section 82 para. 2 the words "the following gas day" are replaced by
the words "with effect from 06:00:00 a.m. of the next gas day"
and at the end of paragraph 2, the following sentence "business daily balancing
deviations in the prevention of the emergency State will for the first time carried out in
gas day under the first sentence. ".
56. In § 82 para. 3 and 4, the words "the level of the State" shall be replaced by the words "the level of
use of the flexibility allocation ".
57. In paragraph 83, at the end of paragraph 2 the following sentence "Trade balancing
the daily variations in the State of emergency will be first performed for natural gas
the day on which the Declaration of a State of emergency. ".
58. In § 83 para. 3 (b). (b)), and (c)) and in § 83 para. 4 (b). (b)), and (c))
the words "the initial value of the balance of the account of deviations" are replaced by the words
"the balance sheet account ending value of deviations from the previous
gas day ".
59. In § 89 paragraph 1. 3, the words ' flexibility ' is replaced by
"flexibility".
60. In § 94 paragraph. 1 the words "the subjects of settlement" shall be deleted and the end of the
the text of the paragraph with the words "from the first gas delivery
by the end of the last calendar year gas day calendar
of the year ".
61. In § 96 para. 1 (b). (d)) and section 96 paragraph 1. 2 (a). (c)),
"transport" is inserted after the word "system".
62. In § 96 para. 4, the word "third" is replaced by the word "fourth".
63. In § 100 para. 4, the word "normal" is replaced by
"normalized".
64. In paragraph 102, the dot at the end of paragraph 2 is replaced by a comma and the following
the letter j) is added:
"j) Cap flexibility collectively for all subjects
clearing and foreign participants. ".
65. In paragraph 102, the following paragraph 7 is added:
"(7) the Operator market exposes no later than 14:00:00 pm
gas day usage flexibility allocation summary for all
entrepreneurs and foreign participants. ".
66. In § 103 para. 1 the words "revenue and expenditure for compensatory day
the amount received from the subjects of settlement or foreign participants
through the transmission system operator or paid
entities or foreign participants through
the transmission system operator shall be replaced by the difference between
accepted payments from the subjects of settlement or foreign participants
through the transmission system operator for a daily balancing
the quantity and uhrazenými payments clearing or foreign bodies
participants through the transmission system operator for a day
the compensatory amount ".
67. In § 103 para. 5, the word "appeal" is deleted, and the words
"evaluation of deviations" are the words "after sending the correction values
reading ".
68. In § 104 paragraph. 2, the word "value" is replaced by "value".
69. In § 104 paragraph. 3, the words "for the monthly values of the gas"
shall be deleted.
70. In paragraph 104 at the end of paragraph 4, the following sentence "For unit prices
If necessary, convert them to CZK/MWh used day course
vyhlašovaný the Czech National Bank for the day, to which the unit
prices determined. ".
71. In § 105 para. 1, the words "in the case of losses for" shall be replaced by "for the losses,"
and at the end of paragraph 1, the following sentence "For the unit price in the
If necessary, convert them to CZK/MWh used day course
vyhlašovaný the Czech National Bank for the day, to which the unit
prices determined. ".
72. In article 106 paragraph. 2, after the words "the subject of settlement", the words "and
each foreign participant ", at the end of the paragraph, the following sentence
"For the price per unit, if necessary, convert them to CZK/MWh
It's the daily vyhlašovaný the Czech National Bank exchange rate for the day, to
which the unit price determined. ".
73. In paragraph 106, at the end of paragraph 3 the following sentence "if it is not, the 13th
calendar day a working day, the market operator performs the settlement to
17:00:00 pm on the first working day following the thirteenth
calendar day. ".
74. In paragraph 106 paragraph. 4, after the word "clearing" the words "and each
Foreign participant ", at the end of the paragraph, the following sentence" For
the unit price shall, where necessary, convert them to CZK/MWh
It's the daily vyhlašovaný the Czech National Bank exchange rate for the day, to
which the unit price determined. ".
75. In paragraph 106, at the end of paragraph 6 the following sentence "the market operator shall be
and do away with the transmission system operator, the difference between adopted and
uhrazenými payments for differences referred to in paragraphs 2 to 5. ".
76. In § 111 paragraph. 1 the words "registers the place of consumption of the customer
pursuant to § 112 para. 4.0 ' shall be deleted and the end of the paragraph, the following sentence
"Failure to meet the obligations of the operator, the distribution of information or
the transmission system operator pursuant to § 110 paragraph 2. 5 shall not affect the obligation to
distribution or transmission system operator pursuant to § 112 para.
4. ".
77. In § 112 para. 7, the word "the" be deleted and the word "closure"
the word "Treaty" shall be inserted.
78. In section 113 para. 3, the second sentence is replaced by the phrase "in the case that the reading
the State of the measuring device is not filed or is filed after the end of the fifth
working day from the date of change of the supplier of the gas, the status of the measuring
an estimated consumption of gas devices for the effective date of the change gas supplier
in accordance with annex 18 to this Ordinance. ".
79. In section 113 para. 4, the words "A and B" shall be replaced by the words "A or B".
80. in section 114 para. 2 at the end of the text of the first sentence, the words "and to
the offset of the term responsibility for deviation of the existing body of
clearing "and at the end of the paragraph, the following sentence" to shorten the supply
the market operator shall inform the clearing and the entity concerned operator
distribution or transmission system that is a place of consumption
connected. ".
81. In article 114, paragraph 3 shall be deleted.
Paragraphs 4 and 5 shall become paragraphs 3 and 4.
82. In section 114 para. 3, the words "in which the change should take effect
a vendor in the market operator's system, or should take effect
withdrawal from the contract pursuant to § 11a. 2, 5 and 6 of the energy
the law ^ 12) or termination of the contract should become effective under section 11a.
the Energy Act 3 ^ 12) "shall be replaced by" in which it has acquired
the effectiveness of the change of supplier in the market operator's system, or have experience
effects of withdrawal from the contract pursuant to § 11a. 2, 5 and 6 of the energy
the law ^ 12) or have the experience the effects of termination pursuant to § 11a. 3
the Energy Act ^ 12). ".
83. In article 115 paragraph. 3, the words "on behalf of another gas supplier" shall be replaced by
the words "other supplier of gas".
84. In paragraph 118, the following shall be added at the end of paragraph 2, the phrase "the market operator on your
information system assigns to the supply point vendor
the last instance. After the expiry of the other legislation ^ 12)
the market operator shall proceed in accordance with § 78 and 79. ".
85. In § 118 paragraph 5 is added:
"(5) quick change gas supplier in accordance with § 116 paragraph. 3 to 5 and § 117,
also be used for the sampling of the place where the supplier of the gas customers easily
permission or ability to deliver, or does not have a guaranteed shipping service
or distribution system in the case of the supply of gas on the basis of the Treaty on
associated gas supply services. In these cases, suspend
the market operator of the gas suppliers, who lost privilege or option
gas supply or service provider does not have transport or distribution
system in the case of the supply of gas under a contract for the joint
gas supply services, the ability to nominate, transmit and take
responsibility for deviation and to participate in the intraday gas market.
The market operator shall promptly provide that information, including the enumeration of EIC codes
places to which the fact is concerned, all registered
participants in the gas market and publish it in a manner allowing remote
access. The procedure under § 116 paragraph. 2 shall not apply. ".
86. In section 119 is at the end of the text of paragraph 1, the words ", first
However, 4 months before the date of the desired termination or interruption
gas ".
87. In section 119 paragraph 1. 2, the words "by the deadline of 4:00:00 pm a
business day before the day "are replaced by the words" within 16:00:00 pm
the business day immediately preceding the day ".
88. In section 119 paragraph 1. 3 (b). and), the word "third" is replaced by
"the fifth".
89. In section 119 paragraph 1. 4 (b). and), the word "third" is replaced by
"the fourth".
90. in § 120 paragraph 1. 3, the text "section 73" is replaced by the text "§ 74".
91. In § 121 paragraph 2. 1 the words "places the operator" is replaced by "places for
operator ".
92. In paragraph 123 of paragraph 1. 3 the words "customer sampling space directly connected"
replaced by the words "the collecting places customers directly connected".
93. In paragraph 125 of paragraph 1. 6, the words "A and B" shall be replaced by the words "A or B".
94. In Appendix 3, point 2, point (j)):
"j) booking type storage capacity pursuant to § 50 para. 4 (b). and) or
(c)); for booking pursuant to § 50 para. 4 (b). and the beginning of the book)
storage capacity and the maximum time to book storage capacity,
that the reservation is storage capacity offered; for booking pursuant to § 50
paragraph. 4 (b). (c)) the beginning of the book storage capacity and the maximum
the number of months of the book storage capacity. '.
95. Appendix 5:
' Annex No. 5 to Decree No 349/2015 Sb.
Flexibility through the accumulation of the gas system provided for
the market operator for the gas day
and Flexibility for the consumption location) of the customer with the measurement of type A or B FOPMA
in 1/1000ths MWh for the gas day
FOPMA = [KOPM1 x RKOPM x KOPM2 x Spt + (RKOPM x Spt-AlOPM)],
where
KOPM1 is the value of the coefficient provided for in 0.04979,
KOPM2 is the coefficient laid down to 0,
RKOPM is the sum of all the reserved capacity of the responsibilities in the point of the customer on the gas
the day of the m3 passed pursuant to § 95 para. 1 (b). (f)) or § 96 para. 1 (b). n),
SPT average gross calorific value passed pursuant to § 96 para. 1 (b). f) vtisícinách MWh/m3
AlOPM is a daily allocation of responsibilities at the point of customer transmitted pursuant to § 96 para. 1 (b). (e)) or § 95 para. 1 (b). (e))
or the procedure provided for in § 101 paragraph. 2.
For the customer's consumption location is connected to the transmission system is the product of the
RKOPM x Spt replaces the sum of all the reserved capacity of the entity
the showdown in the point of the customer on the day of the gas
one thousand MWh.
(b)) for the customer's consumption location Flexibility with the measurement of type C or CM
FOPMC in 1/1000ths MWh for the gas day
Cy Cy
FOPMC = [KOPM1 x------x Spt + KOPM2 x (------x Spt-DHOPM)],
KLFSP KLFSP
where
CY is the value of the planned annual consumption in MWh for the thousands of natural gas a day for the daily variation in the information
the system of the market operator,
SPT is the average value of the gross calorific value passed pursuant to § 96 para. 1 (b). (f)), in 1/1000ths of MWh/m3
KLFSP is the coefficient laid down to 1171 in 1/1000ths MWh/m3
DHOPM is a daily value of gas sampling in accordance with § 99 paragraph 2. 6.
(c) Flexibility in point production) gas
FVP = [KVP x RKVP],
where
KVP is set to 0, coefficient,
Is the sum of all the RKVP reserved capacities of the responsibilities in point production of the gas to the gas day
thousand MWh passed pursuant to § 96 para. 1 (b). o) or under section 95 para. 1 (b). I).
(d)) for the input Flexibility border point at the entry point of the cross-border
pipeline and gas storage entry point
FVB = [RKVB + KVB1 x KVB2 x (RKVB-AlVB)],
where
KVB1 and KVB2 are the coefficients set out in the following table
------------------------------------------------------------
The name of the entry point KVB1 KVB2
------------------------------------------------------------
The border point of 0.00567 0
------------------------------------------------------------
The virtual gas storage 0.00567 0
------------------------------------------------------------
Point of cross-border gas pipeline 0 0
------------------------------------------------------------
where
RKVB is the sum of all the reserved capacity of the subject of settlement at the appropriate entry point of the gas
system in 1/1000ths of MWh according to § 96 para. 1 (b). (j)) or § 95 para. 1 (b). (j)),
AlVB is the daily allocation of responsibilities on the entry point of the gas system of the passed
the market operator under § 96 para. 1 (b). a) and b) or § 95 para. 1 (b). and).
e) Flexibility in the output point of the border exit point for cross-border
the gas pipeline and gas storage, output point
FVyB = [RKVyB + KVyB1 x KVyB2 x (RKVyB-AlVyB)],
where
KVyB1 and KVyB2 are the coefficients set out in the following table
------------------------------------------------------------
Name of the output point KVyB1 KVyB2
------------------------------------------------------------
The border point of 0.00567 0
------------------------------------------------------------
The virtual gas storage 0.00567 0
------------------------------------------------------------
Point of cross-border gas pipeline 0.04309 0
------------------------------------------------------------
where
RKVyP is the sum of all the reserved capacity of the subject of settlement on the appropriate output point of the gas
system in 1/1000ths of MWh according to § 96 para. 1 (b). (j)) or § 95 para. 1 (b). (j)),
AlVyB is a daily allocation of responsibilities to the out port of the gas system of the passed
the market operator under § 96 para. 1 (b). a) and b) or § 95 para. 1 (b). d).".
96. In annex 7, point 1, the words "less than 3372 MWh" shall be replaced by
"the lower than-3372 MWh".
97. In annex 7, point 3, fourth sentence, after the words "trade"
the words "the following gas day", at the end of paragraph, the following sentence
"If this price is not available, the price of the last
the completed trade on intraday market operator, in which the
zobchodovalo at least 50 MWh, and carried out at the latest before the beginning of
for hours, in which the request is made. ".
98. In Annex 8, point 1, the words "annex 5, para. 1 "shall be replaced by
"in Appendix No. 7 to point 1".
99. In Annex 8, point 2, the text "kWh" is replaced by the text "MWh".
100. In Annex 8, point 2, the words "annex 5" shall be replaced by
"Annex 7".
101. In Annex 8, point 2, the text "paragraph. 1 "shall be replaced with" paragraph 1.
2. "
102. In Annex 8, point 3, after the word "trade", the words "on
the ongoing gas day "and at the end of paragraph, the following sentence" If
This price is not available, the price of the last of the completed
trade in the market operator's intra-day market, in which the zobchodovalo
at least 50 MWh, and carried out at the latest before the beginning of the whole hour,
in which the request is made. ".
103. In Annex 8, paragraph. 4, after the words "plus", the text "0.1 EUR/MWh"
replaced by the text "0.5 EUR/MWh. After the words "the price", the text "0.5 EUR/MWh"
replaced by the text "0.1 EUR/MWh.
104. In annex 11, part (C) of paragraph 1. I, points 3, 4 and 6 of the following
subparagraph (f)), which read as follows:
"f) factor of the calendar month according to the pricing decisions of the Office".
105. In annex 11, part (C) of paragraph 1. I, point 7 the following point (c)),
added:
"(c)) of the calendar month from the price factor of the decision of the authority".
106. In annex 2 section 1, the words "A and B" shall be replaced by the words "or
(B) ".
107. Appendix 3:
' Annex # 15 to Decree No 349/2015 Sb.
Procedure to determine the planned and calculated annual consumption of gas customers
with the measurement of type C or CM
And.
1. For the determination of the planned annual gas consumption for consumption location
the customer with the measurement of type C or CM shall apply the last invoice
subscriptions of gas in the past three years. If the customer used the gas in
period of less than three years but not longer than 10 months, it shall apply to
determination of planned annual consumption of this shorter period.
2. If the total length of time with the available values invoiced
donations of less than 10 months, the anticipated gas consumption
agreed in the contract of providing services to the distribution system.
3. the planned annual consumption OPRSilR for supply point in the distribution
System l with the measurement of type C or CM, for which deductions were made
covering the period (D) length of at least 10 previous months,
calculated according to the formula
(B).
1. for the determination of the calculated annual gas consumption for consumption location
the customer with the measurement of type C or CM is applied last invoiced
gas consumption. If the length of the last billing period shorter than
10 months, the details of the more your billing period covering
a minimum period of 10 months. The power consumption of the gas in the period thus defined
calculate the value of the calculated annual gas consumption for the relevant
supply point with the measurement of type C or CM.
2. If the total length of time with the available values invoiced
donations of less than 10 months, the anticipated gas consumption
agreed in the contract of providing services to the distribution system.
3. Calculated annual consumption of OPpRSiR for the place of consumption and to the measurement of
C or CM, for which deductions were made, covering the period, and the length of the
at least 10 of the previous months, is calculated according to the formula:
4. Calculated annual consumption of gas will be used for the classification of the sampling
the place of the customer's household and residential categories into the sampling zone
for the purposes of billing, gas consumption in the point of the customer. ".
108. in annex # 19 part. (II) paragraph 2, the word "frontier"
repealed.
109. in annex # 19 of part (C) of paragraph 1. I, point 1 (b). (f)), the word "MWh"
replaced by the word "month".
Article II
The effectiveness of the
This Decree shall enter into force on 1 January 2000. January 2017.
Chair:
Ing. Vaghela in r.