346/2000 Sb.



DECREE



The Ministry of transport and communications



of 13 October. September 2000,



amending the Decree of the Ministry of transport no. 177/1995 Coll., which

construction and technical issues of procedure, as amended by Decree No. 243/1996 Coll.



The Ministry of transport and communications shall establish under section 66 paragraph 1. 1 and 4 to perform

§ 3 para. 1, § 5 para. 3, § 6 (1). 1, § 7 (2). 2 and article 20 (2). 3

Act No. 266/1994 Coll., on rail, as amended by Act No. 23/2000 Coll.:



Article. (I)



Decree 177/1995 Coll. issuing the construction and technical regulations

railways, as amended by Decree No. 243/1996 Coll., is amended as follows:



1. in article 1, paragraph 1 reads:



"(1) for the purposes of this order for a track national, regional and path

a train means



and bottom of the body) the railway substructure, buildings and equipment

of the substructure, including transport areas,



(b)) body of the substructure grading, structural layers of the body

of the substructure and the drainage device



(c) the construction of the substructure construction) that replace in part or in

the very body of the substructure, increasing its stability or

It protects, or serves a different purpose, IE. culverts, bridges, objects

similar bridges, tunnels, retaining, door frames, protective and obkladní the wall

Gallery, the protective and regulatory structures, passages, protective devices

against the fallout of foreign objects, fire, and water,



(d) the transport areas, areas) that are intended for entering and

disembarking passengers, handling and storage, and to ensure the

transport services in the operation of railways (platform, namely, ramps,

arrivals on the loading yard)



e) safety belt platform part of the stage platform at boarding

the edges of the desktop platform, separate from the other color and contrast

a vnímatelným (a white stick and nášlapem) warning stripe,



f) devices of the substructure of the device, which are complemented by a solid or

the construction of the substructure or is replaced by, in particular, the buffer stop,

fencing, railing, sightseeing and cleaning pits,



g) plain substructure housing the upper limiting area

of the substructure, which is the interface between the railway and

Railway uppers,



h) railway track which part of uppers fulfils the supporting and guiding function

for driving the vehicle overhead



I) gauge, cross section, the outline of the shape in the plane perpendicular to the axis of the track, whose

the axis is perpendicular to the line whose tracks and passes through the Centre of the track, and

which defines the distance outside the buildings, facilities and situated objects from

the track axis and from temen Rails, except where the functional

There must be reasons to contact these devices with the rail vehicle. ".



2. In article 1 (1). 5 letter b) reads: "(b)) track gauge distance

pojížděných the edges of the opposite rail strips, measured in the plane of the

section, ".



3. In article 2 (2). 4 the third sentence, after the words "reserved word

"exclusively".



4. In section 2, at the end of paragraph 4, the following sentence: "the College intended to

for driving vehicles for technological operation, as well as for the movement of railway

the vehicles are part of the siding and must comply with the conditions laid down by law,

No. 266/1994 Coll. on railways, as amended by Act No. 23/2000 Coll. ".



5. In paragraph 4, at the end of paragraph 3, the dot is replaced by a comma and the following

These words: "If závorová is intercepted by the road of the bridge across the

breadth. ".



6. In paragraph 4, at the end of paragraph 3 the following sentence: "in the case of level crossings

used only at a specific time of the year can be a light level crossing

security device is replaced by a lockable latch. ".



7. in section 4, paragraph 4. 5, after the word "moment" is replaced by the word "and" with a comma and

the word "circumstances" with the words "and the" alert parameters.



8. in § 5 para. 2 (a). and), the word "operational" is replaced by

"technical".



9. in § 5 para. 2 (a). (b)), after the words "the plains" is inserted after the word "bodies".



10. In paragraph 6 (b). (e)), the second sentence is replaced by the phrase "Load test

may only take place within the main tour or afterwards. ".



11. In § 8 para. 2, the second sentence shall be deleted.



12. section 9 reads as follows:



"section 9



Part of the track are



and, that the railway substructure) consists of the substructure, the construction and

the device of the substructure, and transport areas,



(b)), which is the superstructure made up of Rails, switches, special

structures and structural elements; the railway superstructure components are

in particular, rail, rail fasteners, support, small kolejivo,

switch components, expansion devices, isolated, conductive and

a special connection, check rails, protective rail, COG

rods, the device against wandering Rails, anchors, rail bed padding,

heating of switches,



c) railway crossing,



(d)) of the building and fixed installations necessary to protect against the adverse effects of

track, i.e. equipment against noise, stray currents, corrosion, noise

telecommunications systems, high voltage and to limit the impact of

the operation of railways and railway transport on the electricity system,



e) communication equipment for the transmission of information containing transmission paths,

device terminal, connector, transmission, connected to separate circuits

or telephone, telex, data and radio network, radio equipment

and hour, information, CCTV and fire

signalling,



f) safety devices containing the technical means of security, and

management of railway transport in railway stations and on the lines, equipment

for the mechanization and automation of spádovišť and related transmission paths,



g) electrical equipment that contains devices that provide power

electric traction (traction power supply and switching stations,

overhead lines), resources, dispatching control of railway electric

heavy-current equipment for the production, conversion, procurement, and use of

electric power, special electrical equipment, apparatus and

lighting equipment, power protection devices,

the electric pre-heating device for pre-heating of the trainsets,

device for protection against the effects of atmospheric electricity, equipment for

protection from the negative effects of the rear traction currents, or

other electrical devices powered from overhead line,



h) fixed measuring equipment, maintenance and repair of railways and their

associated buildings



I) buildings and equipment intended to organize, control and security of railway

transport and shipping to meet the needs and the provision of services

associated with the transportation, including public utility networks required to

their operation. ".



13. in paragraph 10, the words "the geometric arrangement of the track and arrangement"

inserted the word "housing".



14. in section 11 (1) 2 (a). and the number "350)" is replaced by "300".



15. In article 11 (1) 2 (a). (b)), point 1, the number "350" is replaced by

"300".



16. in paragraph 11 (1) 2 (a). (b)) (2) the number "350" is replaced by

"300".



17. in paragraph 11 (1) 3 the number "350" is replaced by "300".



18. In paragraph 11 (1) 6, the second sentence is replaced by the phrase



"Free and space is walkable defined width, i.e. distances

of a vertical line passing through the axis of the track, and height above top of rail, and

must be waived for colleges



and to a height gauge) of a normal 3 050 mm and width of 3 000 mm,



(b) narrow-gauge track to a height) 2 800 mm and widths of 2 300 mm. ".



19. in section 11 paragraph 7 is added:



"(7) on the plain track, where it is not manipulation is permissible width

free viable and handling space in dorm



and 2 500 mm gauge) of a normal,



(b) narrow-gauge 1 900 mm), in other cases, where the length of the obstacle

along the track is not more than 3 000 mm, must be on the other side of the tracks

retained free walkable and handling space referred to in paragraph 6 or

the center of the next track shall be a minimum of 4 750 mm tracks

normal gauge and 3 800 mm for the tracks of the narrow gauge. In this

space must not be rolling or clutch points. ".



20. in § 12 para. 1 the first sentence, after the words "length", the words

"and the type of chassis".



21. in § 13 para. 10 the second sentence, after the word "siding" deleted the comma and

the words "that are not in the national," shall be deleted.



22. section 14 including the title reads as follows:



"section 14



The arrangement of the housing of the substructure



(1) the shape and dimensions of the body of the substructure shall be proposed by the

the relative positions of the terrain and the length of the track and the Geotechnical properties of the

the subsoil and the materials from which it is to be a body of the substructure

built.



(2) the Structural layer of the body of the substructure must be able

the security prescribed by the geometric parameters of the College and to ensure

the load carrying capacity in level plains of the housing of the substructure. The values of the

the loading capacity of the housing of the substructure of the plain contains the recommended

technical standard referred to in annex 5.



(3) basic horizontal width of the plains of the housing of the substructure

single-track trails must be for new construction on the plain line track with the

the tracks of the normal separation of at least 6 m, with the tracks of the narrow

breakup at least 4.4 m. for double-track lines and often improvised dialogues, and

tracks railway stations will increase the width of the Plains at least distance


OS track. The values of the extension of the plains in the curves depending on the

cant contains the recommended technical standard referred to in the annex to

5.



(4) the Body of the substructure must ensure the project determined

load carrying capacity and must be set up so that both static and dynamic effects

caused by the operation of rail vehicles and climate influences do not cause

permanent deformation and does not jeopardize its stability. The values of the load-bearing capacity and

the degree of compaction of soils in the housing of the substructure contains the recommended

technical standard referred to in annex 5.



(5) the Body of the substructure must be protected from the adverse

the effects of surface and ground water drainage facilities. Terms and conditions

for the establishment of dewatering equipment are met, if the

the featured technical standard referred to in annex 5.



(6) the location of cable routes along the tracks must not interfere with the stability of the

the body of the substructure may not prevent the maintenance of the track and must be

designed with respect to the construction of the substructure and the railway

crossings. ".



23. in article 16, paragraph 1 reads:



"(1) the platform shall be established to ensure a smooth, comfortable and

safe embarking and disembarking passengers at the tracks, which regularly

passenger trains stop. A new island platform and external

the platform must have at least one wheelchair access and use

provide persons with reduced mobility. 2) ".



24. In § 16 para. 3, the words "must be 1 650 mm in straight track; the values of the

to increase this distance in the curves ' are deleted.



25. in article 16, the following paragraph 6 is added:



"(6) because of the limited space or particularly complex local

conditions in a built-up area or State proclaimed protected areas

the railway administrative Bureau may not insist on compliance with the conditions referred to in

paragraph (4). If the parameters cannot be referred to in this paragraph must comply with the

be safety operation of railways and railway transport provided

stavebnětechnickým solutions and appropriate organisational measures. ".



26. in section 18 paragraph 5 is added:



"(5) the smallest thickness of the track bed from the loading area railway sleepers must be

at the national and regional railways, with the exception of the track with the Rails

the narrow gauge track, the main track and průjezdných and passing

station tracks with concrete sleeper 350 mm, with wooden sleepers 300

for railways with tracks of the narrow gauge track regional and siding must be

the smallest thickness of the track bed from the loading area in Rails with sleepers

concrete sleeper 250 mm and in the rails and wooden sleepers 200 mm. ".



27. in section 18 paragraph 5 the following paragraph 6 is added:



"(6) on the bridges with rail bed and přesypávkou thickness must be

the track bed and the construction of the railway superstructure, the same as in the

the adjacent sections of the track. On the bridges with rail bed without přesypávky

must be for the railways of the national and regional, with the exception of the track

with the narrow gauge tracks of the regional, the smallest thickness of the track bed

from the loading area of the sleeper in the main track and průjezdných and

passing station tracks 300 mm. On the bridges with rail bed

without přesypávky the railways with tracks of the narrow gauge track regional and siding

the thickness of the track bed must be the same as in adjacent sections of the

the track ".



Paragraphs 6, 7 and 8 shall be renumbered as paragraphs 7, 8 and 9.



28. in section 18 shall be added to paragraph 10 and 11 which reads as follows:



"(10) on the lines of electrified DC traction current

system must be within a distance of 1 km on either side of the connection points

the return line on the rail, rail connections and cable link

Double. Duplication refers to just the tracks, which flows through the overhead traction

current interstation sections or from the neighbouring railway stations.

The tracks, which are trakčně connected to the Rails on which the

connected a reverse overhead lines in only one place, twin

jumper power station due to the vicinity of nevybavují. Longitudinal

rail connections and the other jumpers must be one of its copies.



(11) the provisions of paragraphs 5 and 6 shall apply always, unless

the complexity of the local conditions in a built-up area or State-protected

territory, or. unfavourable geological conditions. If the parameters cannot be specified

in these paragraphs cannot be met, must be the safety of the operation of the railways and

the rail transport stavebnětechnickým appropriate solution and

organisational measures. ".



29. in section 21 para. 1 (b). (f)), after the words "departing trains" the words

"electronic information system must be accessible for persons with

limited ability to orientation, 2) ".



30. in paragraph 21 of the paragraph. 1 the letter g) is added:



"g) orientation marks on access to trains, including haptic or

acoustic indication of access to trains for persons with reduced mobility

orientation, 2) ".



31. in section 21 para. 2 (c)):



"(c)) access for disabled people to the platform, including haptic or

acoustic indication of access to trains for persons with reduced mobility

mobility, 2) ".



32. In section 22, the following paragraph 6 is added:



"(6) the remote control of electricity devices shall meet the following

terms and conditions:



and reliably transmit commands from) the management of the workplace to the controlled

equipment; Enter the command must consist of at least two operations, a possible

your device may not automatically grant disorder guidelines; the device must

be equipped with an alarm condition and function of the equipment,



(b) make it possible to switch from the remote) to local control, and vice versa,



(c)) shall not be affected by the mass of the remote control signals

power equipment or higher Harmonic frequencies of the energy

the network and the inductive, capacitive or electromagnetic effects of the

the operation of electric power system and vice versa shall not in itself negatively

interfere with other electrical equipment.



(7) remote control of electricity equipment must have to ensure

emergency power supply for at least 30 minutes when you use computing

techniques to control the remote control shall be carrier grade power. ".



33. In § 23 paragraph 1 reads:



"(1) the security devices must be designed and constructed so that the



and subject to operating conditions), for which it is designed, it can perform

his features the safe operation of railways and railway transport and

management of railway transport,



(b)), the range and quality of the technical means of security of railway

stations and tracks match the line speed, and



1. in the speed of 60 km/h interlocking device must

eliminate illicit opposite direction trains, the correct position of the

pojížděných and catch/trap points and výkolejek in the train route

monitor and ensure the intended employee until the end of the train route



2. the speed of 100 km/h at least the main signal and the running and

odvratné switches and odvratné slider pusher must be mutually dependent, must

be excluded all illicit current trains and permission to

driving shifts controlled by signals; each device can be made

closure elements to ensure train running to cancel up to its use

carrying out a drive or an emergency service,



3. at a speed higher than 100 km/h all main and marshalling

the signal and the running and odvratné the switch point and slider pusher must be mutually

dependent, all main and marshalling signals must be dependent on the

freedom train and Frameshift paths, all current illegal

secure drive and all displacement-controlled movement signals

must be eliminated, and every device made by the conclusion of the elements for

ensure secure rides must be canceled automatically just after his

the use of making driving or an emergency service,



(c)) in the determined range ensure the level crossings,



(d) respecting the control commands issued) by the device operating instructions

rail vehicles, if the line speed higher than 100 km/h,



(e)) was secured by the use of track speed on tracks and on the main

the tracks at the railway station when the line speed is greater than 60

km/h,



(f) provide the required traffic throughput) of the track,



g) allow remote control of each object security

the device, if it is technologically practical. Details of the design and

perform a security device contains the recommended technical standard

listed in annex 5. ".



34. In article 23, the following paragraph 6 is added:



"(6) the safety devices must not be the source of the interference of a media or

Another electrical device and must not be interrupted by another device. ".



35. In section 24, the following paragraph 13, which read as follows:



"(13) communication equipment must not be a source of interference protection

device or another device. ".



36. In paragraph 25, the following shall be added at the end of paragraph 8, the words:



"leading to permanent restrictions on line speed and safe passage capability of vehicles".



37. In paragraph 25, the dot at the end of paragraph 13 is replaced by a comma and the following

the letter k), which read as follows:



"k) stavebnětechnické parameters (geometry, type, production)

technical equipment electrical for operation of the railways,


including record of examinations, measurements and revisions. ".



38. In section 26 paragraph 2 reads as follows:



"(2) the periodic inspection and measurement referred to in paragraph 1 shall be carried out



and walk the line, at) which performs a regular inspection of the track for

determine the status of railway superstructure and substructure, railway crossings and

construction of the substructure and the discovery of a possible occurrence of the source

the threat of the track,



(b)) the control on a traction unit or ride in the last car of the train to

top speed for the findings of the technical condition of transport routes,



(c)) by measuring gauge, mutual position and the height of cut slope

the harness tracks and turnouts, including measurement of direction measuring vehicle or other

device with continuous record, which are finding values

geometrical parameters of tracks and switches,



(d) the spatial continuity) by checking the entire length of the tracks, and it

Mobile measuring template or any other technical device. College

siding on which the inspection is carried out shall be determined by the operator according to

traffic importance,



e) tour, which is determined by the overall condition of the switch point,



(f) non-destructive inspection of Rails,) clams, and languages of the switches and

Visual inspection of the welds in order to detect fractures or defects,



(g) a comprehensive inspection of the track), which assesses the status of the railway

the upper body of the substructure, the buildings of the substructure,

platforms, ramps, and at level crossings after the winter season and are detected

defects and their scope,



h) normal inspection of bridges, tunnels, bridges and similar objects, which

identifies the overall condition of the object,



I) inspection of bridges, tunnels, bridges and similar objects,

which finding defects on each part of the object,



j) tour of the telecommunication and signalling equipment,



to the media and visiting the) complex signalling



l) by measuring the contact line measurement of the car in which the verification of the

technical parameters of the contact line,



measurement of corrosive influences, m) of stray currents for steel and

reinforced concrete construction. ".



39. In paragraph 27 (b). m), after the words "transport" is inserted the comma and the following

the following words: "to the shut-down of rail vehicles and for the implementation of their

the technical inspections, maintenance and repair (depo) ".



40. In § 37 para. 4, the second sentence is replaced by the phrase "tags are placed in the

straight track at a distance of 50 m, in the arc at a distance of 25 m and

the main vytyčovacích points and turnouts. ".



41. In paragraph 41, paragraph 7 is added:



"(7) equipment of traction substation infrastructure must be designed so as to cover

the estimated load trains, plus 20%. Current capacity

rectifying traction substation infrastructure groups contains the recommended technical

standard referred to in annex 5. In addition, the group must meet the Rectifier

the condition of the load capacity of 300% for 15 seconds. ".



42. In § 47 para. 14, the words "need a power electric

energy "are replaced by the words" the electricity supply from the two sections

the main switchboard with ACMI flight options ".



43. In § 48 para. 2, after the words "to the dep", the words "in the basement" and

the numbers of the "-3" shall be replaced by the numbers "-5".



44. In paragraph 50 (b). I) after the word "transport" is inserted the comma and the following

the following words: "to the shut-down of rail vehicles and for the implementation of their

the technical inspections, maintenance and repair (depo) ".



45. In paragraph 67 (c)):



"(c)) actuators, cables and equipment for carrying and keeping vehicles and

LAN, ".



46. In paragraph 67 (a). I) after the word "divorce", the words "of the replacement

the source, a device for protection against the effects of atmospheric electricity ".



47. In section 70, paragraph 9 shall be deleted.



Paragraphs 10, 11, 12 and 13 shall become paragraphs 9, 10, 11

and 12.



48. In § 71 para. 2 the words "the values recommended technical standards, which

is listed in annex 5.0 shall be replaced by the value set by the

project ".



49. In section 73, paragraph 1 reads:



"(1) ropes must be selective, and material quality

made according to the following conditions. The quality of the lan must be accompanied by the

Metallurgical certified, certified rope and rope-pull test record and

issued a declaration of compliance. "



50. in paragraph 73, at the end of paragraph 3 the following sentence: "in a technically

justified cases, it can be used for the towing rope funicular

and lana osmipramenná. ".



51. In paragraph 74, at the end of paragraph 2 the following sentence:



"For funicular railways and stations for the gondola lift shuttle must

ensure access and use by people with reduced mobility

orientation. 2) ".



52. Annex No 1 part 1:



"1.



Inspection and measurement on the national and regional track

--------------------------------------------------------------------------------------------------------------------

Time

Pol. object and method of inspection interval Object

tours

--------------------------------------------------------------------------------------------------------------------

1. Beat the track all tracks with lower speed než120 km/h determined

the operator

--------------------------------------------------------------------------------------------------------------------

2. control driving the main track 1 month

--------------------------------------------------------------------------------------------------------------------

3. measurement of gauge, the track and the height of the main mutual station track 4 months

the position of the rail tracks, and the direction at a speed higher than 120 km/h

tracks and turnouts measuring means

with continuous



the track and the main track for 6 months

at a speed greater than 60 km/h

and lower or equal to 120 km/h



the track and the main track 12 months

at speeds less than or equal

60 km/h



other transport College

-When measuring gauge and 12 months

height of treadle belts

-When measuring the direction of the arc track 36 months



handling College determines

the operator

--------------------------------------------------------------------------------------------------------------------

4. measurement of the mutual position of the switch point in the means of the height of the rails and on the track for 3 months

treadle belts and breakup

in switches



turnouts in other halls of residence for 6 months

--------------------------------------------------------------------------------------------------------------------

5. Check the spatial continuity of the main track for 24 months

the other track will determine the

the operator

--------------------------------------------------------------------------------------------------------------------

6. tour the turnout switch point in means of the tracks and the track 3 months

turnouts in other halls of residence for 6 months

--------------------------------------------------------------------------------------------------------------------

7. Non-destructive inspection of Rails, the main track at a speed of more than 140 km/h 1 4 months

frogs and turnout and Visual languages

a tour of their welds



the main track at a speed of 80 km/h 1 6 months

up to 140 km/h, including the



the main track at a speed of 60 km/h 1 12 months

up to 80 km/h, including the



the main and the other tracks at speeds of up to 60 km/h determined

the operator

--------------------------------------------------------------------------------------------------------------------

8. A comprehensive tour of the track all tracks 12 months



--------------------------------------------------------------------------------------------------------------------

9. normal inspection of bridges, objects, all 12 months

similar bridges and tunnels

--------------------------------------------------------------------------------------------------------------------

10. A more detailed inspection of bridges all 36 months

and bridges of similar objects

--------------------------------------------------------------------------------------------------------------------

11. the detailed inspection of the tunnels all 60 months

--------------------------------------------------------------------------------------------------------------------

12. tour the telecommunication traffic track on lines 3 months

and security device with a speed of 100 km/h and more



the transport track on lines 6 months

with the speed to 100 km/h

and other college

--------------------------------------------------------------------------------------------------------------------

13. A comprehensive tour of the media all 60 months

and signalling equipment

--------------------------------------------------------------------------------------------------------------------

14. measurement of the contact line system the main Rails 6 months


measuring the car with a speed of over 100 km/h



the main College for 12 months

with the speed to 100 km/h

--------------------------------------------------------------------------------------------------------------------

15. measurement of corrosive effects on the steel rails on the lines of the DC 24 months ".

and the traction current system of reinforced concrete structure

and in adjacent sections of the



--------------------------------------------------------------------------------------------------------------------



53. In annex 1, part 2, "Tours and measurement on the siding" entry # 2.

added:

--------------------------------------------------------------------------------------------------------------------

"2. The measurement of the height gauge, mutual

the position of the rail tracks, and the direction of the

the tracks-with continuous track with a speed greater than 40 km/h 1 12 months

-without continuous recording other tracks will determine

the operator ".



--------------------------------------------------------------------------------------------------------------------



54. In annex 1, part 2, "Tours and measurement on the siding" item No. 3.

added:

--------------------------------------------------------------------------------------------------------------------

"3. the measurement of the height of the switch point with a speed greater than 40 km/h 1 3 months

treadle belts and breakup

in switches

other switches will determine

the operator ".

--------------------------------------------------------------------------------------------------------------------



55. In annex 1, part 3 "Tours and measurement on the runway special

(metro) "item # 1. the words "every day" are replaced by the words "shall determine the

the operator "and the word" week "shall be replaced by the words" determined ".



56. In annex 1, part 3 "Tours and measurement on the runway special

(metro) "item # 5. the words "two months" shall be replaced by "3 months".



57. In annex 1, part 3 "Tours and measurement on the runway special

(metro) "item No. 7. added:

--------------------------------------------------------------------------------------------------------------------

"7. Non-destructive control of resistive continuous track 1. After you perform a

the welds of rails of the weld



2. after 24 months ".



--------------------------------------------------------------------------------------------------------------------



58. In annex 1, part 3 "Tours and measurement on the runway special

(metro) "shall be added to item 7., to read:

--------------------------------------------------------------------------------------------------------------------

' 7a. the non-destructive inspection of welds continuous track 1. After you perform a

Rails made electric weld on the newly built lines

the arch or a a termite

2. before you start

operation



continuous track after making

on the track of the weld



After 12 months of continuous welded track ".

in operation



59. In annex 1, part 3 "Tours and measurement on the runway special

(metro) "shall be added to item No. 13., to read:

--------------------------------------------------------------------------------------------------------------------

"13. the measurement of the deformation of buildings and equipment under ground 1. 12 months after the period of time

4 years from the start of

operation

2. next 24 months

3. further, every

60 months ".

--------------------------------------------------------------------------------------------------------------------



60. in annex No. 2, the "Note" on the letter d), which read as follows:



"(d)) normal lighting uniformity in public areas

stations shall be 0.3 +/-15%, in the public areas of the surface stations

must be 0.2 +/-15%. ".



61. In annex 3, table 2, for the item "Emergency lighting"

the following item is added:

--------------------------------------------------------------------------------------------------------------------

"Control and auxiliary circuit in 400/230, Department,

circuits for traction 50 Hz, 220 V DC, additional insulation-".

device (mn, 6 circuits up to 60 V DC

nn)

--------------------------------------------------------------------------------------------------------------------



62. Appendix 5:



"Č. 5



A list of recommended technical standards-related

1.02 4460 Šestipramenná steel wire rope

2.03 8350 requirements for corrosion protection of storage devices

3.03 8370 reduced the effect of stray currents on storage

device

4.27 3005 Swinging personal cableway. Design, construction

and installation

5. EN 115 safety rules for the construction and installation of

(27 4802) escalators and moving walkways



6.28 0318 Passable cross-sections of the tram tracks

7. IEC 38 Electrical regulations. IEC standard voltages

(33 0120)

8.33 2000-Electrotechnical regulations. Electrical equipment

-4-43 part 4: safety. Chapter 43: protection against

overcurrents

9.33 2000-Electrotechnical regulations. Electrical equipment

-4-473 part 4: safety. Chapter 47: application of safeguard

measures to ensure safety. Section 473:

Measures for the protection against overcurrents

10.33 2000-Electrotechnical regulations. Electrical equipment

-5-523 part 5: selection and construction of electrical equipment.

Section 523: Permissible currents

11.33 2000-Electrotechnical regulations. Electrical equipment

-4-41 part 4: safety. Chapter 41: protection against

electric shock

12.33 2000-Electrotechnical regulations. Electrical equipment

-5-54 part 5: selection and construction of electrical equipment.

Chapter 54: earthing and protective conductors

13.33 2000-Electrotechnical regulations. Electrical equipment

-7-707 part 7: requirements for special installations or

spaces.

Section 707: grounding requirements in installations

data-processing equipment

14.33 2030 e-prescriptions. Protection against dangerous

the effects of static electricity

15.33 2160 Electrotechnical regulations. Provisions for the protection of

media management and equipment from hazardous

effects of three-phase HIGH VOLTAGE and HV, EHV

16.33 3505 regulations for electric traction power supply and switching

station

17.33 3510 Electric traction equipment underground

18.33 3516 regulations for overhead line tram

and trolley tracks

19.33 3525 Metro contact line

20.33 3570 electrical devices, cableways and ski lifts

21.33 4000 Electrotechnical regulations. The requirements for durability

the media device against overvoltage and overcurrent

22.34 1050 Electrotechnical regulations. Regulations for the asking

power wiring

23. the provisions of ČSN 34 1390 electrical engineering. The code for the protection of

Lightning

24.34 1500 Electrotechnical regulations. Regulations for electrical

traction devices

25.34 1530 electric traction rail lines

national, regional and industrial

26.34 1540 Electrotechnical regulations. Electric traction

overhead lines

27.34 2040 Electrotechnical regulations. Provisions for the protection of

communication and security management and equipment before

hazardous and interferences of electric traction 25

kV, 50 Hz

28.34 2090 Railway communication equipment

29.34 2100 Electrical regulations. Regulations for above-ground

media management

30.34 2300 regulations for internal wiring of the media leadership

31.34 2600 Electrical railway signalling equipment

32.34 2606 Analyses of safety circuits of the railway

signalling equipment

33.34 2613 Railway signalling equipment. Track circuits

and external conditions for their activities, the operation of

and the use of track circuits

34.34 2614 Railway signalling equipment. Track circuits.

Regulations for designing

35.34 2617 determination and verification of reliability indicators

railway signalling equipment

36.34 2620 regulations for railway station security

device

37. Provisions for railway track 34 2630 security

device

38.34 2640 Railway signalling equipment. Regulations for the

ATC system

39.34 2650 Railway signalling equipment. Level crossing

security device

40.34 2670 Provisions for remote control security

device

41.34 2860 Electrotechnical regulations DIN. Regulations for interference suppression

electrical machinery, apparatus and equipment

42.34 2885 Electrotechnical regulations DIN. Regulations for interference suppression

electric traction

43.34 2895 Electrotechnical regulations DIN. Regulations for interference suppression

telecommunication facilities after a management

44.34 3100 Electrotechnical regulations DIN. Safety regulations

for the operator and work on the electrical system

45.34 3109 Electrotechnical regulations. Safety rules for the


activity on the traction line and near the

Railway rail systems of national, regional

and the sidings

46.35 1530 power semiconductor converter

47.36 0004 artificial light and lighting. General provisions

48.36 0061 lighting of railway areas

49.36 0450 artificial lighting of indoor spaces

50.36 0451 Artificial illumination of industrial spaces

51.37 6605 Connecting electrical equipment of national railways

on electrical wiring

52.37 6750 traction substation for the tram and trolley tracks

53.72 1006 Check ground ramming and sypanin

54.72 1511 aggregates for construction purposes. Basic provisions

55.72 1512 Dense aggregates for construction purposes. Technical

the requirements of the

56.73 0039 Designing objects on undermined areas. Basic

the provisions of the

57.73 2400 implementation and control of concrete structures

58.73 2603 Implementation of steel bridge structures

59.73 4130 Stairs and sloping ramps. Basic provisions

60.73 4959 platform and the platform shelters on the runways

national, regional, and railway sidings

61.73 6201 Projecting bridge structures

62.73 6203 Load bridges

63.73 6205 design of steel bridge structures

64.73 6206 Designing of concrete and reinforced concrete bridge

structures

65.73 6209 load tests of bridges

66.73 6260 Steel floors on bridge structures

railway bridges

67.73 6301 rail Design

68.73 6310 Designing of railway stations

69.73 6334 Fencing and railings on the runways of the national

and regional

70.73 6360-Structural and geometric arrangement of the track

-1 rail and its spatial position

Part 1: Planning

71.73 6360-Structural and geometric arrangement of the track

-2 railway tracks and its spatial position

Part 2: the construction and inspection, operation and maintenance

72.73 6380 railway crossings and crossings

73.73 6388 spatial arrangement of the door above the rails of gauge 1

435 mm and (1 524) 1 520 mm

74.73 6390 Inscriptions of names of stations and stops

75.73 6395 Track tags. Staničníky and milestones. Shapes,

dimensions and location of the

76.73 6405 Designing tram tracks

77.73 6412 Geometric arrangement of the track tram tracks

78.73 6425 Bus, trolley bus and tram stops

79.73 6430 Geometric arrangement of the tracks of the Metro. The track superstructure

Metro

80.73 6949 Drainage of railway lines and stations

81.73 7501 mined underground design objects.

Common provisions

82. The design and implementation of 73 7508 railway tunnels

83.73 7509 Metro gauge

84.73 6311 kolejišť in Designing habitats and the operating control posts

national railways

85.73 6320 Passable slicers on runways nationwide, runways

regional and normal gauge railway sidings

86. EN 457 safety of machinery. Acoustic warning

(83 3291) signals. General requirements, design and testing

method ".



63. Annex 6 is added:



"Č. 6



The content of some of the technical specifications for a track nationwide, runway

regional and siding



And.



The transitoriness of rail vehicles and track load class



1. information on the safe passage capability of rolling stock are among the fundamental

the parameters of the tracks. The parameters of the transitory tracks and the resulting

transitory rolling stock must be systematically and consistently

recorded, tracked and audited.



2. Přechodností means the ability of the rail structure

convert rolling stock after its own design while maintaining

the safety of railway operations.



3. In terms of safe passage capability of railway vehicles (hereinafter referred to as "vehicle")

tracks are classified into classes of load (hereinafter referred to as "the line"),

with vehicle efficiency that characterise the line class is given by:



and their structures,)



b) axle loads,



(c)) mass per unit length of the vehicle,



d) sorting vehicles and way of involvement in the train.



4. the use of track classes is mandatory.



5. the Trails are classified into class A, B1, B2, C2, C3, C4, D2, D3 and

D4 listed in table A1.

Table A1:

+---------------------+---------------------------+

| Dividing limits | Mass per axle |

| track classes | |

+---------------------+------+------+------+------+

| Weight | And | (B) | (C) | (D) |

| the standard metre +------------------------+

| hire | 16 t | 18 t | 20 t | 22 tons |

+---+-----------------+------+------+------+------+

| 1 | 5.0 t/m | And | B1 | | |

+---+-----------------+------+------+------+------+

| 2 | 6.4 t/m | | B2 | C2 | D2 |

+---+-----------------+------+------+------+------+

| 3 | 7.2 t/m | | | C3 | D3 |

+---+-----------------+------+------+------+------+

| 4 | 8.0 t/m | | | C4 | D4 |

+---+-----------------+------+------+------+------+



6. The inclusion of the track to the track of a class is considered a train composed of

vehicles with two two-axle bogies (fig. 1) that correspond to the

arrangement of the axles according to table A2.

Fig. 1: the vehicle with two two-axle bogies



Table A2:

+-------+------------+-------------------+--------+---------+

| Class | Weight | Weight | (c) | (d) |

| | per axle | per unit length | [m] | [m] |

| | [t] | [t/m] | | |

+-------+------------+-------------------+--------+---------+

| And | 16 | 5.0 | 6.20 | 12.80 |

+-------+------------+-------------------+--------+---------+

| B1 | 18 | 5.0 | 7.80 | 14.40 |

+-------+------------+-------------------+--------+---------+

| B2 | 18 | 6.4 | 4.65 | 11.25 |

+-------+------------+-------------------+--------+---------+

| C2 | 20 | 6.4 | 5.90 | 12.50 |

+-------+------------+-------------------+--------+---------+

| C3 | 20 | 7.2 | 4.50 | 11.10 |

+-------+------------+-------------------+--------+---------+

| C4 | 20 | 8.0 | 3.40 | 10.00 |

+-------+------------+-------------------+--------+---------+

| D2 | 22.5 | 6.4 | 7.45 | 14.05 |

+-------+------------+-------------------+--------+---------+

| D3 | 22.5 | 7.2 | 5.90 | 12.50 |

+-------+------------+-------------------+--------+---------+

| D4 | 22.5 | 8.0 | 4.65 | 11.25 |

+-------+------------+-------------------+--------+---------+



7. Track will be added to the appropriate track class, unless it can be

operated by an unlimited number of vehicles with a mass and dimensional

the parameters listed in table A2 for this line class.



8. Vehicle efficiency that characterise the line class and other vehicles

quantifying the value of comparing the biggest bending moments and

shearing forces on the plain of the beam of any distance of the supports when the

load an unlimited number of such vehicles.



(B).



Permissible wear of rail crossings, turnouts, turnout

structures



Each part of the turnouts must comply when operation of railway transport

the following requirements:



1. Výměnová part



and top of the head) of the language may not be reduced against opornici about 5 mm and more in

where is pojížděná opornice from the edge of the active edge to it

the adjacent language of 60-100 mm.



(b)) must not be put Výměnový the conclusion to conclude, if the switches pojížděných

at a speed of 60 km/h and higher the gap between language and the stock in place

the first conclusion is greater than 3.5 mm, and at turnouts lower speed pojížděných

than 60 km/h space greater than 5 mm.



c) clearance between the language and culture of the adjacent stand the backrest shall not be

greater than 5 mm for speed = 90 km in 160

km h-1.



(d)) of the closing devices must be securely to ensure the oil level of the adjacent

the language of the opornici and the distance from the opornice language in a remote place

its largest zoom to opornici must be at least 60 mm.



2. the Srdcovková part



a) to ensure the safe and nonviolent transit vehicle Wheelsets

via srdcovku must be observed in the maximum normal breakup in

relation to frog-přídržnice the following values: U

single and dual frogs L. ... in the range of 1 393 mm to 1

398 mm, and. .... the most 1 356 mm, L = distance of the head

the edges of the přídržnice from the active edge of the wedge of cockles, A = distance

the leading edges of the přídržnice and the corresponding wing Rails (in a double

srdcovce distance of the leading edges of check-rails).



b) Rise over the top of přídržnice height-used rail

exceed the value of 54 mm.



c) Wear the workspaces přídržnice shape (Kn60 and the like

shape) must not be more than 20 mm for < = 90 km/h and 12 mm for >

90 km/h.



In the case that the requirements listed for each part of the turnouts are not

are met, it must be carried out without delay such measures so as not to

the threat to the safety of the operation of railway transport ".



Article II



This Decree shall enter into force on 1 January 2000. October 2000.



Minister:



Ing. Schling in r.