Sb 350/2013.
The DECREE
of 31 March 2004. October 2013
amending Decree No 347/2012 Coll., laying down the
Techno-economic parameters of renewable resources for the production of
electricity and the lifetime of the generation of electricity from the supported sources
The Energy Regulatory Office shall, pursuant to section 53, paragraph. 2 (a). and (b)))
Act No. 165/2012 Coll., on supported energy sources and amending
Some laws (law on the supported sources of energy), as amended by
Act No. 310/2013 Coll., to implement section 7 (2). 3 and section 12, paragraph. 1 (a).
and):
Article. (I)
Decree No 347/2012 Coll., laying down the technical and economic
parameters of renewable resources for the production of electricity and useful life
production of electricity from the supported sources, is hereby amended as follows:
1. In section 2 (c)):
"(c)) own electricity consumption of technology electrical
energy for electricity production in the production of electricity, or electricity and heat
in the main production equipment and auxiliary plant manufacture
directly related, including the production, transformation or modification of the fuel, the loss in the
divorce, own consumption and zvyšovacích transformers
the production plants of electricity for supply to the distribution system or the transmission
the system, '.
2. the annex shall be added:
"The annex to Decree No 347/2012 Sb.
Techno-economic parameters and the lifetime of the generation of electricity from
renewable energy sources
The production plants of electricity from renewable energy sources
(I).
The power of water-Water power plant
1. Lifetime of the production plants: 30 years.
2. The request of the primary content of the energy efficiency: the efficiency of the newly
installed turbines in production is assumed to be optimum > = 85%,
renovation of older types of > = 80% (as measured at the coupling of the turbine).
3. The cost of the installed unit performance and annual use
installed power:
--------------------------------------------------------------
Specific investment costs the annual use of the installed
[$/KWe] performance [kWh/kWe]
--------------------------------------------------------------
< 150 000 > 4 000
--------------------------------------------------------------
II.
Biomass energy
1. Lifetime of the production plants: 20 years.
2. for the production of renewable electricity using biomass is
assumes the application of useful heat from renewable sources.
3. The cost of the installed unit performance, annual use of the installed
performance and cost of fuel:
-------------------------------------------------------------------------------
Characteristics of the cost of Annual fuel cost recovery
the production plants, the installed installed
drive performance [kWh/kWe]
performance
[Kč/kWe] -----------------------
Prize Categories
biomass biomass
[Czk/GJ]
-------------------------------------------------------------------------------
The source of the scorching < 75 000 > 5 0000 1 170 NET 2 < biomass < 120 3 < 70------------------------------------------------------------------------------Source burning < 75 000 > < 5 0000 1 170
(separately) gas
from the gasification of solid
biomass
2 < 120
3 < 70
-------------------------------------------------------------------------------
Note: the classification of the various categories of biomass provides the Decree
No 477/2012 Coll., on determination of kinds and parameters supported by
renewable resources for the production of electricity, heat, or biometanu and
determination and storage of documents. Unit investment costs are expressed
the total investment cost per installed electrical power.
--------------------------------------------------------------------------------
Characteristics of Investment Annual fuel cost recovery
the production plants, the cost of the installed [CZK/GJ]
[EUR/t] performance [kWh/kWe]
--------------------------------------------------------------------------------
The source of the scorching < 20 000 > 4 400 00
municipal waste
--------------------------------------------------------------------------------
Note: for the burning municipal waste are the sources of specific investment
the costs relate to the quantity of incinerated municipal waste per year [EUR/t].
III.
Wind energy-wind power
1. Lifetime of the production plants: 20 years.
2. The request of the primary content of the energy efficiency: Annual
the average wind speed at the site of the construction of wind turbines in the height
the axis of the rotor, the proposed power plants assumes > = 6 m/s.
3. The cost of the installed unit performance and annual use
installed power:
------------------------------------------------------------
The investment costs of the annual usage of the installed
[$/KWe] performance [kWh/kWe]
------------------------------------------------------------
2 100 < 44 000 >
------------------------------------------------------------
IV.
Geothermal energy-the use of low-potential heat
1. Lifetime of the production plants: 20 years.
2. The request of the primary content of the energy efficiency: Energy
potential sources of geothermal energy is assumed at least in such
amount of the heat transfer medium can be through permanently
to obtain the minimum heat gain corresponding to 50 to 70 litres of water per
Second, at a temperature of 95 ° c one > megawatts of installed electric
the performance of the source.
3. The cost of the installed unit performance and annual use
installed power:
----------------------------------------------------------------
The cost of Annual use of the installed
installed power [kWh/kWe]
Unit
including Wells
[$/KWe]
----------------------------------------------------------------
< 275 000 > 5 700
----------------------------------------------------------------
The explanatory notes to the tables:
kWh. power unit (kilowatt hour),
Kwe ... Unit of electrical power (kilowatt) ".
Article. (II)
The transitional provisions of the
For referred to in service before 1 May 2004. January 2014 shall apply
the value of technical-economic parameters according to Decree No 347/2012
Coll., laying down the technical and economic parameters of renewable
resources for the production of electricity and the production of electricity from lifetime
supported by the sources in the version effective before the date of entry into force of this
the Decree.
Article. (III)
The effectiveness of the
This Decree shall enter into force on 8 July 2006. November 2013.
Chair:
Ing. Vaghela in r.