282/2007 Sb.



DECREE



of 5 April 2004. November 2007,



amending the Decree of the Czech Mining Authority No 22/1989 Coll., on

safety and health at work and the safety of operations at

mining activities and mining of non-reserved minerals underground, in

as amended, Decree No. 387/2003 Coll. on safety

the operation of technical equipment and dedicated technical requirements

pressure equipment, lifting and gas in mining activities and activities

by using mining techniques, and Decree No. 656/2004 Coll., on the safety of

and occupational health and safety in mines with danger

mining tremors



The Czech mining Office lays down pursuant to § 5 para. 3, § 6 (1). 6 (a). and) and §

paragraph 8A. 8 of Act No 61/1988 Coll. on mining activities, explosives and

the State Mining Administration, as amended by Act No. 542/1991 Coll. and Act No.

124/2000 Coll.:



PART THE FIRST



AMENDMENT OF THE DECREE ON HEALTH AND SAFETY AT WORK AND SAFETY

WHEN OPERATING IN MINING ACTIVITIES AND MINING OF NON-RESERVED MINERALS IN

The UNDERGROUND



Article. (I)



Decree of the Czech Mining Authority No 22/1989 Coll., on safety and protection of the

occupational health and safety in mining activities and in the

mining of non-reserved minerals underground, as amended by Decree No. 477/1991

Coll., Act No. 340/1992 Coll., Decree No. 3/1994 Coll., Decree No.

54/1996 Coll., Act No. 111/1998 Coll., Decree No. 434/2000 Coll.

Decree No. 330/2002 Coll., Decree No 141/2004 Coll. and Decree No.

298/2005 is amended as follows:



1. In paragraph 1, at the end of the paragraph the following sentence: "this Decree was

notified in accordance with European Parliament and Council Directive 98/34/EC of

on 22 November. June 1998 on the procedure for the provision of information in the field of standards

and technical regulations and of rules on information society services, in

the texts of Directive 98/48 EC ".



2. In article 2 (2). 1 points), b) and (g)) be deleted.



Subparagraph (c)) to (f)) are known as a) to (d)), and

subparagraph (h)) to z) shall become letters (e))-w).



3. § 2 paragraph 2 reads as follows:



"(2) For the purposes of this Ordinance shall be further considered



and)



the burden of excessive weight

the subject, of which the weight is greater than 4000 kg,



(b))



the burden of excessive dimensions

course, which transportation or handling spaces cannot be met on

route laid down by this Decree,



(c))



the burden of bulky

the subject that requires for its safe loading and transport to the transport

resource from the point of view of stability to ensure maintaining him in the Special

the stabilized location,



(d))



the burden of the Special

the burden of excessive weight, the burden of excessive size or burden

bulky,



(e))



the ground track

to the right of the load carrying platform or transporter chassis with

under its own power after a traffic line placed and anchored to the invert of the mining

works with security against derailment or roll-over of traffic

resources,



(f))



transport skid

to the right of the burden after the rock substrate after Invert on either the transport platform

or without it, or to transport the platform after a special leadership located and

docked on the invert excavation using a windlass or other machine

the device,



(g))



the main ground lead

the grounding cable from the electrode to the mining strojeného switching station and transformation

stations,



(h))



cable hanger

equipment for flexible cable management on the reinforcement bars or walls of the mine

works,



I)



Tipping load

the sum of the moments of the tangential components of the vehicle and tangent to the weight the weight of the load folder

related to klopnému point



(j))



nezápalný electrical circuit

electrical circuit, which in normal operating condition does not create sparks

or thermal effects, which would be capable of causing ignition of explosive

gaseous atmosphere,



k)



current protection

overcurrent protection time-independent (short-circuit) 2-speed,

overcurrent protection of the time-dependent or inverse (overload) and

natural protection area code,



l)



Special transport

shipping and handling with the burden of special transport using rail,

hanging or road and to the right of any burden of skid when you

using the device with the tractive force greater than 45 kN



m)



the stabilized location

the position of the subject, which is a stabilizing torque greater than flip-flop

wait a minute,



n)



stabilizing moment

the sum of the moments of the normal weight of a vehicle and moments folder normal folder

the weight of the burden related to klopnému point



about)



grounding system

file connections and elements, which are necessary for separate or joint

grounding of electrical equipment,



p)



power contactor over 1 kV

electrical device, with one resting position, which is not controlled by

manually and is able to turn on and off, transmit currents under normal

conditions, including operational overload



q)



over 1 kV circuit breaker

electrical device designed to connect and disconnect the electrical

circuits, lines or equipment, even under voltage at full load and

also in the faults. ".



4. in § 5 para. 1 the words "instructions for use" ^ 77) and user manual ^ 78) "

replaced by the words "instructions for use" ^ 77) ".



Footnote # 77:



"77) Section 1.7.4 of Annex No. 2 of Decree-Law No. 24/2003 Coll., amending

laying down technical requirements for machinery.



Annex, point 1.0.6 No. 2 of Decree-Law No 23/2003 Coll., laying down

technical requirements for equipment and protective systems intended for use in

potentially explosive atmospheres.

".



Footnote No. 78 is repealed.



5. In paragraph 6, the following paragraph 8 and 9 shall be added:



"(8) during the inspection referred to in paragraph 7 shall also detect whether the cover plates

floor gratings or platforms are secured against inadvertent

slide, flip, and tilted position and whether the cover plates or grates are

nášlapně fixed. For platforms with external defects they find visually and tap. U

platforms, which are of welded construction, Visual examination

Retrieves the status of the load-bearing parts of weld on the outside of the defect.

When the findings of the external defects in the welds shall be carried out using their check

non-destructive testing (e.g., capillary method) that welds cracks.



(9) the cover plates platforms must have a minimum thickness of 5 mm, if the project

does not set the value higher. The surface of the plates must be fluted or otherwise

roughened. ".



6. in article 7, paragraph 4 is added:



"(4) the inspection site pursuant to paragraph 2 (a). a) and b) must be

also holding checked and security of explosives, evidence

explosives, and to perform blasting operations, also her training,

where appropriate, implementation. ".



7. In § 8 para. 1, the last sentence is replaced by the phrases: "preliminary

tours done by a pair of workers designated race or mine

by authorized personnel. At the same time must be determined for each pair

workplace to control access and time limits and reporting points

inspection service. ".



8. In section 8 shall at the end of paragraph 3, the following sentence including notes

footnote # 80a be added: "If these mining methane concentration

measured by the continual parsers that are located under the law

governing the separate ventilation in gassy mines ^ 80a) does not exceed the

for vacation mine the value of 0.8%, it is sufficient if the

workings of preliminarily checked after vacation longer than 2 shifts.



80A) section 12 of Decree No. 163/2002 Coll. ".



9. in paragraph 19, the following new section 19a, which including the title and notes

line no. 10a and 10b:



"§ 19a



Cumulation of functions



In gassy mines cannot be combined the functions of a race, the head of the mine

ventilation and the worker to control the Assembly, operation and maintenance of electrical

device or for more down, or with other functions; in mines with

the dangers of mining tremors ^ 10a) must not be cumulated also features

geomechanika ^ 10b) with other functions.



10A) § 2 (b). and) Decree No. 656/2004 Coll., on the safety and protection of the

occupational health and safety in mines with the dangers of mining

the tremors.



10B) § 3 (1). 2 Decree No. 656/2004 Coll. ".



10. section 21 including title and footnotes # 13:



"section 21



Reporting of serious work-related accidents, major events, serious

traffic accidents and hazardous conditions



(1) a racing pit shall ensure prompt reporting of serious work

accidents, major events, serious traffic accidents and dangerous

conditions to the competent Office of the district mining Office.



(2) reports to these serious accidents at work:



and) fatality,



(b)) injury, which is a life-threatening injury with consequent loss of authority

(anatomical or functional), life-threatening damage to health, including

industrial poisoning, and accident with such a character of the accident happening that

It was as a result of violation of safety regulations and suggests

significant threat to the safety and health protection at work,



(c)) in an accident at which you merge the same casualty storyline have been hurt at least 3

persons, of whom at least one has suffered mortal injury, or when the

injured more than 10 people.



(3) this is a serious event, significant operational accidents and hazardous

States, and it



and ignition and explosion of methane) or coal dust,




(b)), mining, and Concussive shock phenomenon ^ 13), in which the working

accident,



c) mining and surface fire fire exogenous within a radius of 60 m from the intersection of the pit

with the surface,



(d)) the presence of carbon monoxide at a concentration exceeding 0.013% if

the measurement results are not affected by the processes of non-residents is the link with the

samovzněcujícím process or neohrožujícími the occupational safety and

traffic, such as blasting,



e) gas supply of the mining works lasting longer than 8 hours,



(f) the) caving in mine workings, whose zmáhání is assumed for more than 24

hours,



g) průval water and bahnin (zvodněných)



to heavy rocks, coal) or gases



l) confiscation of persons, machines or equipment to the mining work or other

the underground space,



m) leak of radioactive and other industrial waste stored in

the underground areas, the loss of radioactive emitters, or demonstrable

leak closed the radiator,



n) search for missing persons,



an accident during transport of) people on the conveyor belt,



p) death of a person in the object or in the workplace for the organization.



(4) Furthermore, the reports of serious events, significant operational accidents and

dangerous conditions, if they occur at



and handling of explosives,) including accidents, přiotrávení fumes

emerging during the explosion, burglary, theft or to the warehouse to find

explosives,



(b)) use of reserved technical equipment including electrical injuries

shock,



c) operation of the mining machinery, including injuries incurred in the operation of the hoist

device.



13) § 2 (b). (b)) Decree No. 659/2004 Coll. ".



11. section 22, including the title reads as follows:



"§ 22



The conservation status of the place of serious accidents at work, a significant event

unsafe conditions and significant operational accident (accident)



(1) at the place where happened a serious accident at work or where there has been a

a significant event, a dangerous State or significant operational accident

(the crash), it should not change anything, as long as the district mining Office did not

an inspection of the place or not decided otherwise, except when it comes to the rescue

affected, or the next rescue work or safety.

Changes required on other serious grounds can only be made with the

the consent of the district mining Office.



(2) on the site of a serious occupational accident, serious, dangerous events

State and significant operational accident takes organization documentation,

in particular, drawing, map, photos, etc. ".



12. § 74 and 75, including title deleted.



13. section 82 including title and footnotes # 24a, 24b and 24 c:



"§ 82



Relations with the neighbouring mines



(1) in mining connecting gassy mines must be for isolation

větrních systems hrázové objects constructed ^ 24a). In the case that hrázové

objects are equipped with hrázovými doors, shall be constructed in such a

the number and distance of each other, so that at least one was always closed. On

neplynujících mines will suffice to the insulation of the wind objects ^ 24b).



(2) Connect wind down without insulation systems is only possible with the consent of

the district mining Office under conditions set by the proposal of racing

down documented measures to ensure safety at work and

the operation, in particular for the disposal of coal dust, the establishment

protection CAP, limiting the concentration of methane gas, ensuring

the stability of ventilation and a fast conclusion of the větrního options

the link.



(3) when combining multiple down into one system are větrního racing

down or by specifying the workers must immediately discuss the changes and

the events that can affect ventilation, particularly on the composition of the mining

the air, and on the control of accidents affecting the adjacent mine or

requiring assistance United down. The planned changes must be

discussed well in advance. About these projednáních must be

the record is made.



(4) create a new větrního connection down or change its involvement in

větrním system down is considered to be a substantial change in ventilation.



(5) when combining multiple down to a single větrního system without insulation

the Organization shall determine by a competent person ^ 24 c) responsible for coordination

the activities of the heads of the ventilation of each United down.



24A) § 2 (b). d) Decree No. 4/1994 Coll., which sets the requirements

on the design and construction of buildings and equipment for the divorce and the isolation of the winds and

closure of mine workings, as amended.



24B) § 2 (b). and) Decree No. 4/1994 Coll.



24 c) section 4 (b). I) Decree No. 301/2005 Coll. on technical requirements

eligibility when mining activity or activities carried out by mining

way and amending some laws. ".



14. in paragraph 86, at the end of paragraph 5, the following sentence is added: "the operational

characteristics must also be verified at least once every seven years. ".



15. section 89, including the title shall be deleted.



16. in paragraph 90, the existing text shall become paragraph 1 and the following

paragraph 2, which reads as follows:



"(2) the inclusion of výpomocného fan to the wind network, its exclusion from

it and change its technical parameters shall be regarded as a substantial change

ventilation. ".



17. in section 93 para. 3 the words "hrázové door or výbuchuvzdorné

the closing of the dam "is replaced by" hrázové "objects.



18. in section 94 para. 1 the word "levees" is replaced by "hrázovými

objects ' and ' wind door "is replaced by" wind "objects.



19. in section 94 para. 3 the words "výbuchuvzdorné dam or hrázové door"

replaced by "hrázové objects" and the words "wind door" are replaced by

the words "wind objects".



20. in section 94, paragraph 5 shall be deleted.



21. in section 96 paragraph 3 reads:



"(3) the Hrázový object with the passage for the conveyor may be used only in

exceptional cases, with the agreement of the race down. When you issue the consent

Specifies the racing down measures to ensure work safety and operation at

maintenance of this object and for disposal of coal dust in its surroundings and

the method for control. ".



22. in paragraph 99, paragraph 6 shall be deleted.



23. § 103 para. 1, after the word "greases" the words ", including

standby stock of flammable liquids and solid lubricants, ".



24. In § 103 para. 2 is the number "10" is replaced by "15".



25. In § 103 para. 4, after the word "greases" the words ", including

standby stock of flammable liquids and solid lubricants, ".



26. in § 103 para. 6, after the word "greases" the words ", including

standby stock of flammable liquids and solid lubricants, ".



27. in § 103 para. 7, after the word "greases" the words ", including

standby stock of flammable liquids and solid lubricants, ".



28. In article 106, paragraph 3, including footnote # 20a:



"(3) on the gassy mines II. danger class samples

mining the air from the area behind the dam, performs their technical analyses

at oxygen, methane and oxides carbon monoxide and dioxide, and measures the pressure of the air

a dam at least once every 3 months, for větrními uzávěrami ^ at least 20a)

Once a month. The other mines will determine the frequency of sampling of the air

and measuring the pressure of the air in the levees and větrními uzávěrami racing down.



20A) § 2 (b). (b)) Decree No. 4/1994 Coll. ".



29. in paragraph 106, the following paragraphs 4 to 6 shall be added:



"(4) the provisions of paragraph 3 shall not apply to the dam, behind which is the

proven to be filled in an enclosed space, and dykes enclosing the front

the corridor when the komorovém conquest. The fact that a closed area behind the dam

is filled, shall be recorded in the book of dykes (section 188).



(5) status, and the tightness of the Causeway and větrních CAP is checked at least once a

for 14 days. Part of the checks is also measuring the concentrations of oxygen, methane

and oxides of carbon dioxide and monoxide before them.



(6) the results of controls of the Causeway and větrních CAP and the results of analyses of the air

and measuring the pressure of the air behind them are written into books. ".



30. In section 109a para. 1 (f)) repealed.



Subparagraph g) and (h)) shall become points (f) and (g))).



31. in paragraph 2 of section 109a. 1 (b). (f)), the text "(SNM 0) ' is replaced by the text

"(BNM)" and the text "(SNM 2)" is replaced by "(SNM)".



32. In section 109a para. 6, the words "30 days" shall be replaced by "1 year".



33. In paragraph 110, paragraph 9 is added:



"(9) sampling mine air is carried out according to the standard 83 0050. To

overcoming the negative pressure sampling at the větrních dam and lock and

the remote mining air sampling can be used just the ejector or the suction

the pump; before the collection is necessary to prevent aspiration of air from the

sampling tubes and containers, at least five times the value of the

the internal volume of hoses and the container. ".



34. In section 114 para. 1, the second sentence shall be deleted.



35. section 126 including the title shall be deleted.



36. In paragraph 127, the existing text shall become paragraph 1 and the following

paragraph 2, which reads as follows:



"(2) the inclusion of výpomocného fan to the wind network, its exclusion from

it and change its technical parameters shall be regarded as a substantial change

ventilation. ".



37. In § 139 paragraph 2. 6 is the number "10" is replaced by "15".



38. In paragraph 150 para. 1, the second sentence shall be deleted. At the same time abolishing the numbering

paragraph.



39. In article 155 para. 1 at the end of subparagraph (c)) is replaced by a comma and dot

the following point (d)), which read as follows:



"(d)) in the sites referred to in points (a) to (c))), for which it is issued

the agreement of the race with an increase in the concentration of methane mine pursuant to § 83 para.

5, one sample per 14 days. ".




40. In article 159 para. 1 the words "after the preliminary consent of the district mining

the Office "be deleted.



41. In section 182 paragraph. 3, after the word "establishment", the words "warehouses

flammable liquids and solid lubricants, including emergency warehouses

flammable liquids and solid lubricants ".



42. the following section is inserted after section 184a 184b, which including the title reads as follows:



"§ 184b



Emergency warehouses of flammable liquids and solid lubricants,



(1) a contingency stock of flammable liquids and solid lubricants up just

According to the project approved racing down. The use of standby warehouse

enables racing to mine.



(2) in a separate větrním Department can be set up only one

emergency stock of flammable liquids and solid lubricants. The entrance to the

standby stock of flammable liquids and solid lubricants can only be of

průchodního větrního stream. A standby stock of flammable liquids

and solid lubricants in the unaffected výdušném větrním stream must be

implemented a permanent control of the concentration of carbon monoxide continuous

by the parser.



(3) fire protection standby stock of flammable liquids and solid

lubricants shall be ensured at least two vzduchopěnovými or similar small

fire extinguishers and at least 50 kg of sand or fire-extinguishing powder

placed in a box with a shovel. Extinguishing agents are placed at the entrance to

warehouse. In standby the warehouse of flammable liquids and solid lubricants must

also be at least 20 kg of absorbent material designed to bail out the releases

the stored materials.



(4) in a standby stock of flammable liquids and solid lubricants may only be

store a maximum of 800 litres of flammable liquids and 175 kg of solid lubricants.



(5) for the storage of flammable liquids shall be used sealed mobile

zajistitelná tank against abuse. For the mobile tank is considered to be

container with double shell, or sud embedded in the sheet metal containers

or to store the edited mining wagon; free volume sheet metal containers

and the mining of the car must be at least 15% more than the volume of stored

flammable liquids.



(6) in a standby stock of flammable liquids and solid lubricants, and to

a distance of 10 m from him must not be placed in electrical equipment and

associated cables, with the exception of telecommunication cables, media

equipment and lighting and their controls.



(7) for continuous Analyzer under paragraph 2 shall also apply the requirements of §

109a para. 4, 5 and 6. For the storage of flammable liquids in the standby

warehouse of flammable liquids and solid lubricants also applies the requirements of section 184a

paragraph. 2, 5 and 7; for the handling of flammable liquids and solid lubricants

also applies the provisions of § 184 para. 2 to 8 and sections 184a para. 9. ".



43. section 186, including a heading is deleted.



44. section 187, including the title reads as follows:



"§ 187



Spontaneous combustion



(1) the coal seams are divided into seams prone to spontaneous combustion and the seams without

susceptibility to spontaneous combustion. Before beginning the conquest must be verified

susceptibility to spontaneous combustion of the seams. According to the results of the verification shall be included

like the district mining Office in the appropriate category.



(2) on the bottom with the appearance of the seam prone to spontaneous combustion must be created

conditions for the making inert of mine air with nitrogen.



(3) the Organization shall ensure that a uniform procedure for the prevention and control of spontaneous combustion

at the release of the guidelines (working rules), which provides in particular for

guidelines for preparing the project prevention of spontaneous combustion for leadership

mine workings in the seams prone to spontaneous combustion, the method of determining the rate of

risk of spontaneous combustion in coal are often various and necessary measures.



(4) the project of prevention of coal spontaneous combustion and its changes approved racing

mine. The measures provided for in it are part of the technological procedure

for the management of mine workings.



(5) in the management of mine workings in the seams prone to spontaneous combustion must

be



and prevent delays mine) winds through the vyrubané areas, stařiny and

the pillars between the mining parts communicating utěsňováním collapse, especially in

place the default subterra's catch word during the conquest stěnováním, in porubních corridors in the

following the procedure of the face and in the place of their face, even with a view

on the time and spatial management of mine workings,



(b)) shall immediately be closed-won areas completed porubů and mining

the work leading to them,



(c)) and implementing measures to reduce the větrních drops, on the

based on the analysis of the pressure of the slide area, wind



(d)), there is the smallest daily face procedure with regard to the expected

incubation period and measures in case of stopping or slowing down the procedure

the face,



e) created conditions for the reduction of accumulation of heat



f) immediately filled out the free spaces for reinforcement in the mining,



g) are countered by the formation of endogenous fires by appropriate technical

means, in particular by grouting, proplavováním, building closures

flood of cuffs or inertizací,



h) chosen mining method and walling and such reinforcement, in order to

the loss of coal mass in a cave-in were as small as possible. Map documentation

operated by the face must be marked in places, and the layer thickness of coal

matter left in the závale.



(6) For the early detection of spontaneous combustion process of the Organization at the appropriate

places detects and evaluates the development of carbon monoxide.



(7) like a susceptible to spontaneous combustion, it is possible to conquer the field only when

conquering the full elementary school together, or if in the overburden to five times

the New York Times is not a dirty vyrubaná powers or nevyrubaná like. On the contact

the demolished area with vtažným and výdušným mining work shall be established

základkové belts or ribs that prevent delay mining winds vyrubanými

spaces. ".



45. In paragraph 188 paragraph. 1 the words "and other dykes and hrázové door"

replaced by the words "dam, hrázové objects and wind".



46. In article 190 paragraph 1. 2 the term "Golden Hill" replaced by the word "master".



47. In paragraph 216, the words "instructions for operation and maintenance" shall be replaced by

"Instructions for use".



48. In § 222 para. 3 the dot at the end of subparagraph (c)) is replaced by a comma and

the following point (d)), which read as follows:



"(d)) for pipe rozvádějícího nitrogen green (green area of majova).".



49. In paragraph 231, the following paragraph 5 is added:



"(5) any leadership and protective conductors, with the exception of the main earthing

Management (section 231b upright sprinkler with (2)), shall be copper. Protective conductors that are not

mechanically protected, unless otherwise stipulated, must have a cross section

at least 6 mm2. ".



50. in section 231a of paragraphs 2 and 3 shall be added:



"(2) electricity network referred to in paragraph 1 (b). and) with greater than 1

kVA, in lignite mines with more than 3 kVA, can be operated

provided that the insulation resistance drops below 15 O/network in the

provided that State and in gassy mines is in addition

ensures automatic shutdown of the network.



(3) electrical network referred to in paragraph 1 (b). and) with an input power of less than 1

kVA, in lignite mines with less than 3 kVA, can be operated

provided that the



and operated as a network) is referred to in paragraph 2,



(b)) for the cable network cable is used with armour, metal shielding

or polovodivým and short-circuit protection shield is made so that the

Disconnects the electrical circuit from the source in time to 0.1 s

a short circuit in an electric circuit, or



c) network conforms to the nezápalný electric circuit. ".



51. In section 231a, the following paragraph 4 is added:



"(4) Electrical network referred to in paragraph 1 (b). (b)) in the gassy mines II.

class of danger must be operated in order to



and when the single-pole ground current) natural connection does not exceed 7,



(b) the value of the permissible touch voltage) does not exceed 50 V, and



(c)) the decrease the insulation resistance network was signaled to the place with a permanent

Valet service.



Check the insulation resistance of the network is governed by operating rules. The measured

insulation resistance values shall be recorded. ".



52. In section 231b ty5151, ty5251 paragraph 2 reads as follows:



"(2) the grounding cable must be made up of a copper wire or

copper shield cable with a cross-section of at least 50 mm2 or steel

the galvanized wire with a cross-section of at least 95 mm2; If the steel

zinc-coated wire used tapes, it must be at least 3 mm thickness.

The main ground lead must be connected to at least two fake

ground electrodes. Cross section of the main earthing cable must not be weakened. "



53. In section 231b sprinklers before the period at the end of paragraph 3 the following text "; protective

wire electrical equipment above 1 kV must have a cross-section of at least 16 mm2, with

the exception of the device connected to a towing cable that connects

natural wire towing cable. ".



54. In section 231b pendent sprinkler para. 4, the second sentence is replaced by the following sentences:



"The master of the earthing connection of space management and strojených

earthing connections shall allow for their surveys. The resistance of earthing system

expressed in O must not be greater than the proportion to the sum of the lengths of all 50 cables

for voltages above 1 kV, expressed in km, that are connected to the same

power supply, and at the same time must not exceed 15 of the Main ground lines.

It is on the surface connected to the ground lead of the substations, which is powered by

mine. The main ground lines are made according to technical standards

relating to the application of this provision. ".



55. In section 231b sprinklers, the following paragraphs 5 to 10, including notes

footnote 56 d shall be added:



"(5) the resistance of earthing system at the connection point to the inanimate parts must not

be greater than 15 on low voltage networks.




(6) checking the condition of the main earthing lead is done at least

Once a year and always after a seismic shift in the mine affected by mining

shock; This does not apply for the main ground lead in the joint lining.



(7) of the connection to the main grounding cable must be protected against corrosion.

Joints between steel galvanized wire or steel galvanized

strap and copper wire must be protected so that between them did not arise

Galvanic cell, or protected by a protective coating to prevent

access of moisture to the joints.



(8) the Inanimate parts of electrical equipment up to 1 kV must be attached to the

the main leadership of the copper grounding electrode, which is part of the

the supply cable. For cable lines must not use protective conductor

as the power wire.



(9) the cabling, the lifeless parts of electrical equipment and their connection

on the main ground lines are made according to technical standards ^ 56 d)

related to this provision.



(10) for the media establishment for which it is necessary to protect against part of the dead

dangerous touch voltage, protection grounding is carried out either directly by the

protective earthing system Earth conductor cross-sections of copper

at least 4 mm2 or through one pair of wires in the cable. For

the protective earth conductor may be used as well as the cloak and armouring cable. Communication and

telecommunications equipment without a direct connection to a conductive force

circuits can be protected by a separate ground, whose resistance shall not exceed 75.



56 d) for example, ČSN 33 3201 electrical installation of AC 1 kV. ".



56. Section 231b sprinklers, the following new section 231c and 231d, including the headings

shall be added:



"§ 231c



The location of the electrical equipment above 1 kV



(1) electrical equipment shall be installed so as to allow for

sufficient heat dissipation of it and secure access to him and to

prevent mechanical damage of peace that creates danger.

Electrical equipment above 1 kV, with the exception of cables, including fittings and

electrical equipment intended for consumption of electric energy and

electrical equipment suspended on the hanging coaster or reinforcement bars of the mining

work or fixed firmly to the other technological devices are placed

in the Chamber, niche or in an extended profile of the mining works.



(2) electrical equipment above 1 kV over the belt or conveyor designed to

shall be placed so that the goods being těživem and electrical equipment

was the free space at least 0.4 m. On this electric device

It does not apply to section 301 para. 1 (b). (b)).



(3) the free space for the operation and maintenance of the electric přemístitelného

equipment above 1 kV shall be determined pursuant to § 224 of paragraph 1. 2. If, within this

free space reaches a transit profile of transport equipment shall not

be mine transport carried out operation and maintenance of the electrical

device. When you specify an intermediate profile hanging track taking into account (i)

the usual fluctuation of the vehicle (section 292 (6)). After their transport must not

of the vehicle or cargo being carried to interfere with the free space for the

přemístitelného operation and maintenance of electrical equipment.



(4) the electrical equipment above 1 kV in areas of excavation and porubů is placed

so that its distance from the face or the face or contact dobývky

with vtažným or výdušným the mining work in the direction the front queue

or quarrying was at least 20 m.



§ 231d



Switching equipment above 1 kV in the areas listed in 2. or 3. the degree of

the dangers of mining tremors



(1) Power on/off switch above 1 kV, the cable outlet is powered by

electrical equipment in areas listed in 2. or 3. the degree of

the dangers of mining tremors, can only be used provided that it is

Verify the status of the insulation of cables and connected electrical machines.



(2) can only be Operated with the circuit breaker control circuit that can be

control of the places designated race down.



(3) above 1 kV circuit breaker must be fitted with protections that ensure

its off when exceeding the set fault

quantities. Protection against short circuit current streams must ensure automatic

disconnect the lead in by a short circuit. Protection must be able

set up and control the switching characteristics, so as to ensure the

selectivity protection. ".



57. section 232 including the title reads as follows:



"§ 232



Marshaling areas gassy down in terms of the risk of explosion

methane



(1) the gassy underground spaces in terms of down to the risk of explosion

methane and the requirements for the operation of electrical equipment are



and without the explosion hazard areas) of methane (hereinafter referred to as ' BNM '),



b) areas with danger of explosion of methane gas (hereinafter referred to as "SNM spaces").



(2) areas to be classified as a BNM underground spaces ventilated vtažnými

the winds that have not yet been used in places where lead or conquers, and

directly related to vyrubanými or nevětranými and

pending mining parts in which is when their marshaling and

when their organisation intended such a leakage rate of mine

the winds that the concentrations of methane in the mine atmosphere does not exceed 0.25% and

failure of ventilation, or stopping for a period specified by the emergency

the plan is in them excluded the accumulation of explosive mixtures of methane with

through the air.



(3) the Spaces not listed in paragraph 2 are areas of SNM.



(4) in accordance with paragraphs 2 and 3 shall be classified and surface areas of deep-sea

down, in which they are located and where electrical devices could

danger of explosion of gases, in particular, the space above the ohlubní testing

the pit and the area around difusoru the main fan to a distance of 30

m. ".



58. section 233 including title:



"§ 233



Marshaling areas of coal mines in terms of the risk of explosion of coal

dust



(1) the underground coal mines, in terms of the risk of explosion

coal dust and the requirements for operation of electrical equipment be allocated

on



and without the explosion hazard areas) of coal dust (hereinafter referred to as "space

The BNP "),



b) areas with danger of explosion of coal dust (hereinafter referred to as "space

SNP ").



(2) the BNP are classified as premises the underground spaces, in which the

not coal dust, does not create a continuous layer of coal dust and

coal dust is regularly deleted.



(3) the Spaces not listed in paragraph 2 are areas of SNP.



(4) in accordance with paragraphs 2 and 3 shall be classified and surface areas of deep-sea

down, in which they are located and where electrical devices could

danger of explosion of coal dust. ".



59. section 235 including title:



"§ 235



Cables and cable management



(1) cables used in underground workings must have outer packaging of materials which

do not support the spread of fire.



(2) for the cable network over 1 kV can be mined in the mining and

porubech used only with metal shielding cables or cables with metal

shielding lived, in other mining cables may be used with

metal pancéřem. Metal armouring and metal shielding on the cable is connected with the

grounding system on both ends of the cable and in the places provided for

operating documentation copper grounding, whose cross section is at least

6 mm2 in cross-section of extreme cables up to 50 mm2, mm2 in cross-section 10

extreme cables up to 95 mm2 and 16 mm2 in cross-section of cables over the last 95

mm2. Metal shielding lived with the grounding system under section 240b

paragraph. 2.



(3) on the premises of the SNM and the areas of SNP can be on the network with the watchmen

insulation condition used only cables with metal pancéřem, metal

shielding, metal shielding lived or polovodivým shield.



(4) cables, with the exception of cables stored in raceways, cables

firmly fixed, cable spools and cables for movable devices

or machines must be willingly hung in the top half of the mining works

on the cable with a spacing of hinges the hinges no more than 3 m. Organization shall designate

method of storage, and hanging cable line in the operational

the documentation.



(5) the imposition, restraints and hook the cable line must continue to comply with the

the following conditions:



and) communication cables must be fitted separately from mining

power cables; Cruising these cables is allowed only in the most necessary

case. Cables, power and the media will not touch each other,



(b)), you must store the cables together and connect to voltage

induced by the weight of the cable and fittings is not transferred on the wire; valves

must be hung separately,



(c) fixing unruly cable line) is permitted only in mining

works with unbending reinforcement and in the mining and mined in hard

rocks that do not require reinforcement,



d) cable must be positioned so that it is accessible

inspections; This does not apply to leadership in boreholes and passes for the cable.



(6) in vertical mine works (article 294, paragraph 1), with the exception of drillings and

chimneys must be firmly anchored on the cable lines the cable to the console

built independently of the equipment of the mining works. Distance brackets may only be

be the most 6 m. in the section between the cable handles may be keeping busy

only its own weight. Grip the handle of the cable must be such that

cable damage.



(7) the requirements for the consolidation of the cables in accordance with paragraphs 5 and 6 shall not apply

Lightweight cables hanging from the stroke on the rope and self-supporting


cables. These cables must be fitted at least every 6 m, so that the

the weight of the heat on wires or the terminals of the cables.



(8) in the well must be cable, with the exception of cables of self-supporting, pegged to the

the carrying rope at least every 6 m so that its weight does not on

the tip or on the wires of the cable. Between the two handles may be burdened with cable

only their own weight. The carrier, including its anchor rope must have

four stages of initial safety due to stroke vyvozovanému

the weight of the suspended cable and must not be docked on the reinforcement of the hole. Cable

in a borehole must not be associated.



(9) the Bore designed for cable must be zapažen. The design of the mouth of the well and

Wired handles must not damage the cable when you save it and when its

continuous operation.



(10) the cable must meet the following conditions:



and) tractor power supply cable of the excavation and mining machines over 1 kV must

be stored in the ukladači cable; move the cable into the face and cord storage

in the face must be addressed in the operational documentation



b) power supply cable electric machine in the face of the mining works

You must have a sufficient safety margin to avoid tensile stress on migration

conductor cable when moving the machine,



(c)) and plug-in connections may be used only for moving

and moveable cable lines, the two connecting parts must be in

circuit protected by a cover against mechanical damage and

pollution,



d) management must be carried out in accordance with technical standards setting

requirements for sizing and protection of electrical wiring,



e) smallest permitted cable cross-section lived in the power line is 1.5

mm2, in the media, telecommunications and control cables is the smallest

the allowable diameter of 0.8 mm core; It does not apply to circuits, nezápalné



f) movable wiring, if not navíjeny on the drum, can only

According to the conditions laid down by the manufacturer,



g) unused cables must be connected at both ends and zaizolovány

or otherwise safely completed. ".



60. In paragraph 236, at the end of paragraph 1, the following sentence, "for keeping above 1 kV to

the movable devices must be used with a metallic cable tractor or

polovodivým shielding metal shielding, lived and shared. ".



61. In paragraph 239, the words "SNM-0 and SNP-0" shall be replaced by the words "of BNM and the BNP".



62. section 240b including title:



"sec. 240b



The use of cables with shielding layer



(1) to power a moving device or machine with a tractor in cable

the premises of the SNM apply to low-voltage cable only with polovodivým shielding

or cable with metal shielding lived and for voltages above 1 kV cable only

Metallic shielding or metal shielding lived, except for cables nezápalných

circuits. Portable electrical equipment or the machine must be as follows

equipped with, both are to be under stress.



(2) the semi-conducting layer of the cable and the metal shielding wires must be connected to the

a protective relay or at both ends of the cable, electrically connected with the Earth

the leadership. The outer metal shielding must be connected to the Earth. ".



63. In section 240 c, the word "SNM-2" shall be replaced by the word "SNM".



64. section 242, including title and footnotes # 52a is inserted:



"§ 242



Special conditions for operation of electrical equipment



(1) if the concentration of methane in the mine air quality in the area of BNM 0.25

%, can in this space to stay in operation, only electrical equipment

referred to in paragraph 2 and the device on which the head of the

emergency action. Other electrical devices in this space must

be turned off.



(2) on the premises of the SNM can be used only by device category M1 and

M2 ^ 52a). In the area of SNM, for which the consent is issued a racing mine

by increasing the concentration of methane under § 83 para. 5, can be used

only the devices of category M1.



(3) if the concentration of methane in the mine air quality in the area of SNM 1.5

%, can in this space to stay in operation, only electrical equipment

category M1 and the device on which the head of the liquidation so decides

crash. Other electrical devices in this space must be turned off.



(4) on the premises of the SNP may use only those devices of category M2

or M1, the surface temperature does not exceed 150 C in the stack of coal and

in an area immediately related to the distance of 30 m may

only use the device of category M1.



(5) in the cases referred to in paragraphs 1 and 3 shall be carried out without delay

measures to ensure work safety and operation. These measures

must be included in the emergency plan. The head of the emergency action shall determine the

the conditions for the temporary operation of the electrical equipment, which according to the

paragraphs 1 and 3 should be turned off and the procedure for their opening.



(6) on the premises of the SNM and the SNP must be for electrical circuits on

workplaces that are not occupied for more than three hours, turned off and

secured against unintended switching on, in addition to power any device that

are necessary to ensure safety at work and traffic.



(7) after you turn off electrical equipment from unknown causes must be before

switching off reason and any detected defect has been rectified.



(8) upon completion of the work moving equipment shall be in the cases

intended operating documentation power cable disconnected from the

voltage or it must be safety and operation assured otherwise.



52A) Government Regulation No. 23/2003 Coll., laying down technical

requirements for equipment and protective systems intended for use in a

with the danger of explosion.



EN 1127-2 explosive atmospheres-explosion prevention and protection-

Part 2: basic concepts and methodology for mining. ".



65. In § 243 para. 3, the words "in the areas of SNM 1 and SNM 2" are replaced by

the words "in the area of SNM".



66. In § 243 para. 3 (b). (b)), the words "in the area of SNM 1 shall not exceed

0.5% and in the area of SNM 2 exceed 1% "shall be replaced by" in the area of SNM

shall not exceed 1% ".



67. In § 243 para. 3 (b). (c)), the words "the SNP 2" shall be replaced by "SNP".



68. In § 243 para. 4, the word "SNM-0" is replaced by "BNM".



69. In paragraph 244, the following paragraph 10 is added:



"(10) for the electrical switching equipment above 1 kV operational documentation

referred to in paragraph 2 shall determine the method and time limits for inspections at least in this range:



and) Visual inspection at least once per shift in mining tunnel

and porubech, and at least once a week for other switching equipment above

1 kV,



(b)) to verify the health isolation built-in test facility for power

the switch above 1 kV in mined mining and porubech before each

turn on the circuit breaker and after every shutdown current protections

short circuits or the inverter and at least once every two months for the other

circuit breakers above 1 kV,



(c)) to verify the health isolation built-in test facility for power

the contactor over 1 kV in mined mining and porubech after every shutdown

by the action of current protection short circuit and after each action of relay

blocking to turn on cable with reduced insulation vývodního status and

at least once every two months for the other power contactors above 1 kV,



d) functional testing of Jet protection switching equipment above 1 kV, and

This test software using command buttons or in mined once a year

mining and porubech, verify reverse blocking power on after

over-current protection equipment or verification of the locking circuit that

turn on low it prevents the outlet isolation status at least once

a year in equipment in mining and mined, and porubech, and at least once

in three years with other switching equipment above 1 kV,



(e) the switching device) the opening of over 1 kV and inspection after every shutdown

short circuit current protection, once a year for a device in the mined

mining and porubech, and at least once every three years for other

switching equipment above 1 kV. ".



70. In paragraph 245 at the end of the text of paragraph 5, the dot is replaced by a semicolon and

the words "this is not true for networks with up to 1 kVA, for lignite

down to 3 kVA. ".



71. In paragraph 245 of paragraph 1. 8, the words "SNM 1, SNM 2 or SNP 2" shall be replaced by

"SNM or SNP".



72. In article 250 paragraph 2 reads as follows:



"(2) Mining personal luminaires for mine rescuers must be separately

identified and separately saved. ".



73. In article 250, paragraph 3 shall be deleted.



74. In paragraph 275 paragraph 2. 6 letter a) is added:



") the conveyor belt must have a width of at least 0.8 m, for the speed of transportation to

2.1 m. s-1 and at least 1.2 m for transport speed greater; speed

transport shall not exceed 2.5 m. s-1 ".



75. In paragraph 308 of paragraph 1. 1 (b). k), the words "excessive weight or dimensions"

shall be replaced by the word "special".



76. In paragraph 308, after paragraph 2, the following new paragraphs 3, 4 and 5, which

shall be added:



"(3) traffic order for special transportation must further specify



and) how the handling of loads and loads of special in a way to ensure

stable position, even during transport,



(b) the special position of load) means of transport so that its

the Centre of gravity was as low as possible and as close as possible to the center of the means of transport,



(c)) with regard to the status and conditions of transport routes not exceeding the allowable number of

vehicles in the kit, when a special transport by hanging the track up

permissible mass transport sets and the number and type of braking carriages


Depending on the tensile force of the traction device, the largest bow pendant

railways and the permitted loading reinforcement of the mining works,



(d)), if applicable, binding attachment points and the method of safe storage and tethering

loads of special means of transport with the determination of centre of gravity

transported parts or components,



(e)) the number of persons in transit and endangered places (section 17 (2)),



f) slings and the place and the method of storage, where appropriate, suspension

břemenových beam and slings for when they are not

used, the conditions for their postponement (§ 266 (2)) and the conditions of

prohibiting their use.



(4) traffic order for special transportation around the ground track must further specify



and the laying and anchor) way to ground the track and its implementation, in particular

with regard to the changes in direction or inclination of the mining works,



(b)) maximum unit load ground and its individual

parts or components with respect to the load carrying capacity for,



(c)) way to ensure against unwanted elements of transport disconnection.



(5) traffic order for special transport skid must further specify



and hauling wires connection) the way a traffic plateau, where appropriate, to

the special burdens of displacement and the nature and execution of jobs,



(b) measures for cases of carriage) through sudden changes in the vertical direction

plane transport travel and transport in curves. ".



The former paragraph 3 shall become paragraph 6.



77. § 314:



"§ 314



Special transport



(1) the Organization shall issue the burden of special handling also work

instructions. This documentation must include clear and

clear diagrams showing how the imposition of the suspension and, where appropriate,

ensure the transported load special in a stable position.



(2) Special transport may exercise only workers with at least two years

experience in mining, transport.



(3) traffic order and work instructions must be based on the conclusions of the assessment of the

the burden of the special transport equipment and infrastructure elements, in particular

from the perspective of the carrying capacity of the sling hanging tracks, where appropriate, the load carrying capacity of the substrate

traffic routes used to traffic, static force loading under § 314a

paragraph. 5, bow traffic routes, the weights and dimensions of the load, stability

the burden of having regard to his position and the position of its centre of gravity during transport and

assessment of the necessary bed area of means of transport and the way

fastening of the load, and that to the extent that it cannot be

unwanted movement, folding or roll-over burden.



(4) in the section transport routes, where it is carried out by special transport, and in the

the immediate surroundings of the place the burden of special handling must not be

any other activity, nor shall not delay no person

nezúčastněná on special transport.



(5) Special right shall be considered as work associated with increased

danger. ".



78. in paragraph 314, the following new section 314a and 314b, including headings

shall be added:



"§ 314a



Special transportation requirements



(1) before the commencement of the special transport peeks at the designated by the

device intended for special transport, that it is not damaged or visibly

worn over the vacation-bound and whether it conforms to the accompanying documentation

the manufacturer, transport regulations and the guidelines, and will check

the direction of traffic routes and due to the type of special transport also

control:



and the track, in particular) rail joints and horizontal and vertical

arcs with a focus on fixed transverse flatness, and switches,



(b)) and reinforcement of the mining works in terms of their health and

stability,



(c) the quality and load-bearing capacity for) traffic routes with regard to weight

transported loads and how they were transported and verifies the status of the

ground track, especially the connection of individual sections, stability, anchor

and the flatness of the track and if necessary, shall determine the measures to eliminate the risk of

resulting from sudden changes in direction in both vertical and horizontal,



(d) the quality and load-bearing capacity for) traffic routes with regard to weight

transported loads and the way they transport skid and verifies the status

transport routes in the mine workings.



(2) transport and handling when a special transport, and at the same

repeated cases, only the first transport and handling, will monitor the

specified by the worker pursuant to § 307 para. 2, which also evaluates the effectiveness of the

safety and technical-operational measures in all operations

Special transport and depending on the result tightens the measures provided for in the transport

of procedure and work instructions. The measures taken shall inform the worker

designated pursuant to § 307 para. 1.



(3) when a special transport may be used only with a specified, or

pursuant to paragraph 2 specified transport and lifting slings.



(4) when the special transport by rail of the track must be axial load

over 60 CN tracks, and use the category ^ 1).



(5) when transporting loads of excessive weight after hanging the track must be

use two or more load-bearing trucks or load must be used

beam, to the static force transmitted by the curtain hanging on the reinforcement

mine did not exceed 40 kN, if the operational documentation does not specify the value of the

lower.



(6) the Load beams and slings used in the transport must

have marked load. Their use must be monitored and registered.

The accounting records shall also record the results of their review and

tests carried out by the function within the deadlines set by the manufacturer and, if they are not

established within the time limits specified, then racing down.



(7) when a special transport by land the track locomotives and tractors:



and) must be equipped with a locking device against undesirable driving

sets independent of the engine operation or otherwise secured against

undesirable driving rigs,



(b)) must be equipped with an interlocking, or other security

the device permanently reporting at least double security in relation

to the relevant rule of the kits,



(8) when a special transport skid you must



and for the transport of traffic) the platform after a special leadership to draw up

the project, which will take into account the suitability of the geological conditions and suitability of the

for, both for construction and maintenance of a special management to be

limited the possibility of sudden changes in the direction of conduction in vertical plane

that could cause a loss of management traffic platforms,



b) use winches with smooth start.



section 314b



Requirements for the harnesses, slings and locking elements in special

transport



(1) when a special transport must be fitted to the towing rope harness so

to avoid his eccentricity, the shoulders of the harness was as long

and to ensure the safety of each shoulder harness, at least according to §

paragraph 266. 1.



(2) transport transport skid platform must allow the use of slings

resources. Transport platform during transport skid after a special leadership

must be equipped with an effective leadership across the transport track so that the

stable and prevent its unwanted rotation or flip

or the loss of leadership.



(3) a chain harness must be manufactured so as to stress the individual

chain at their design matches the articles

Dimensioning of the ratio of the length to the chain to the spacing of the attachment of lifting chain

the special was relative burden 1.2:1 or more and to chain

articles have not been yet another load of stressed before that was established

by their manufacturer. After each use, the chain harness during transport

the burden of the Special Visual inspection must be carried out each

links of the chain; in the event of their excessive wear or

damage to the relevant part of the chain must be excluded from further

use. ".



79. In paragraph 322, the at the end of paragraph 6, the words "and the conveyor belt must not

be slippery. "



80. the following section is inserted after section 328 328a, which including the title reads as follows:



"§ 328a



Mutual recognition clause



If this Decree lays down the requirements beyond the requirements laid down

the relevant regulations of the European communities, these shall not apply

the requirements for products that have been produced or placed on the market in

a Member State of the European Union or Turkey or having origins in

one of the States of the European free trade association that is

at the same time a party to the agreement on the European economic area,

provided, that such product is



and technical rules), which are for the manufacture or placing on the market,

where appropriate, for the use of this product in one of these States

binding,



(b)) technical standards or rules of practice that are released

national standardisation body or entity equivalent Department built,

in accordance with the laws and requirements of the State which is a Contracting

a party to the European economic area,



(c)), the international technical standards is legitimately used in one of the

of those States, or



d) traditional or innovative production methods used in any of the

those States, in accordance with its legislation, for which there is

sufficiently detailed technical documentation to ensure that this product

can be assessed for the purpose of use, if necessary, on the basis of


additional (not identical) product tests, if these technical

regulations, technical standards, codes of good practice or procedures to ensure

the degree of protection of the legitimate interest of the appropriate extent of this protection in the Czech

Republic. ".



Article. (II)



Transitional provisions



1. cumulation of functions race down, head of ventilation or worker

to control the installation, operation and maintenance of electrical equipment for more

down or with other functions in gassy mines and also features

geomechanika in the mines with the dangers of mining shocks must be put into

accordance with this Decree, within six months from the effective date of its effectiveness.



2. the premises of gassy mines included in terms of the risk of explosion

methane entry into force of this Ordinance as premises of SNM 0

consider spaces of BNM.



3. the premises of gassy mines included in terms of the risk of explosion

methane entry into force of this Ordinance as premises of SNM, SNM 1 2

or SNM 3 are considered as spaces of the SNM.



4. the premises of coal mines included in terms of the risk of explosion

coal dust to the entry into force of this Ordinance as premises of SNP 0

are considered as spaces of the BNP.



5. the premises of coal mines included in terms of the risk of explosion

coal dust to the entry into force of this Ordinance as premises of SNP 1

or SNP 2 are considered as spaces of the SNP.



6. the requirements of section 231a of paragraph 1. 4 shall be met by 1. January

2012. This does not apply to mines with published by the programme and the

mines with expected the termination of mining activities until 31 December 2006. December 2013;

the assumption of their mining activities should be accompanied by the opinion of the

the district mining Office.



7. the requirements of § 231d must be implemented by 31 December 1992. December

2010. It does not apply to mines with published by the programme and the

mines with expected the termination of mining activities until 31 December 2006. December 2012;

the assumption of their mining activities should be accompanied by the opinion of the

the district mining Office.



PART TWO



AMENDMENT TO THE DECREE ON THE SAFETY OF TECHNICAL EQUIPMENT AND

DEDICATED TECHNICAL EQUIPMENT REQUIREMENTS, PRESSURE, LIFTING AND GAS

WHEN MINING ACTIVITIES AND ACTIVITIES CARRIED OUT USING MINING TECHNIQUES



Article. (III)



Decree No. 392/2003 Coll., on the safety of technical equipment and

about the requirements for dedicated technical equipment pressure, lifting and

gas in mining activities and activities carried out using mining techniques,

is amended as follows:



1. In section 14 para. 2 (c)):



"(c)) for the operation of reserved technical equipment of pressure, dedicated

technical equipment lifting and dedicated technical facilities

gas, ".



2. section 16, including the title shall be deleted.



3. In annex 7 part II. point 2 is deleted (c)), ca), cb) and cc).



PART THREE



AMENDMENT OF THE DECREE ON HEALTH AND SAFETY AT WORK AND SAFETY

TRAFFIC IN THE MINES WITH THE DANGERS OF MINING TREMORS



Article. (IV)



In the Decree No 659/2004 Coll. on safety and health at work and the

safety in mines with the dangers of mining tremors, in § 15

paragraphs 2 and 3, including footnote # 16:



"(2) wiring ^ 16) above 1 kV in mining listed in 2.

or 3. the degree of danger of upheaval at the end of the beam must be wired

divorce equipped with achieving their shutdown when natural

connection in time not more than 0.2 s.



(3) Cable distribution systems over 1 kV in mining listed in 2. or 3.

the degree of risk of shocks must be equipped with a device for automatic

turn off electric power initiated by shock. The way and places

self shutdown will determine the emergency plan. Click the race mine can

device for automatic shut down of activities necessarily disposed

necessary time during blasting works carried out in a large scale mining

piece.



16) section 235 paragraph. 2 Decree No. 22/1989 Coll. ".



Transitional provision



Article. In



The requirements laid down in article 15, paragraph 2. 2 and 3 is to be filled before 31 March. December

2009.



PART FOUR



The effectiveness of the



Article. (VI)



This Decree shall enter into force on 1 January 2000. January 1, 2008.



President:



Prof. JUDr. Ing. Makarius, CSc. v. r.