Advanced Search

The Announcement Of The Binding Section Of The Zoning Plan Of The Zlín Agglomeration

Original Language Title: vyhlášení závazné části územního plánu Zlínské aglomerace

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
87/1994 Coll.



GOVERNMENT REGULATION



of 23 December 2003. March 1994,



promulgating a binding part of the master plan of the great territorial unit

Agglomeration in Zlín



Change: 213/1997 Coll.



Change: 393/2000 Sb.



Change: 1/2003



Change: 1/2004



Change: 1/2006



Government pursuant to § 29 para. 2 Act No. 50/1976 Coll., on urban planning

building code (the building Act), as amended by Act No. 265/1992 Coll.,

ordering:



§ 1



The mandatory part of the master plan of the great territorial unit agglomeration, Zlín

as defined in annex 1 to this regulation, is indicated in annex No. 2

of this regulation.



§ 2



Territorial plan of the great territorial unit of the Zlín conurbation, approved by the

resolution of the Government No. 150 of 23 December 2003. in March 1994, is stored on the

district offices in Kroměříž, Uherské Hradiště, Zlín and the

The Ministry of economy.



§ 3



This Regulation shall enter into force on the date of publication.



Prime Minister:



Doc. Ing. Klaus CSc. v. r.



Minister of economy:



Doc. Ing. Dyba CSc. v. r.



Č. 1



Č. 2



The mandatory part of the master plan



1. In the use of the territory of the territorially to protect corridors and areas for:



and (D) 1 in the highway) stretch Bezměrov-Hulín in advanced position from the

interchanges (hereinafter referred to as "TRAFFIC INTERCHANGE") in Kroměříž (upper Garden)-

TRAFFIC INTERCHANGE North of Hulína,



(b)) D 47 Highway (D 1) in section TRAFFIC INTERCHANGE North of the northern boundary of the Hulína-

the District of Kroměříž with another course west of Prerov,



(c) R 49) communication in the section TRAFFIC INTERCHANGE North of the Eastern Hulína

the boundary of the District of Zlín (cadastral Bratřejov), with road penstock on Zlin

(II/490), Sheffield (II/490) and Blackburn (II/438)



d) speed communication R 55 in the section TRAFFIC INTERCHANGE North of Hulína-South

the boundaries of the area Uherské Hradiště, including the road to the North and feeders

South of Otrokovice, Babic (Kudlovic) and the old town on the road I/55,



(e) to edit the specific routing) on the roads I/49 (North of Lobolabiano), I/50

(a bypass of Uherský Brod and Bánova to the South and deleted edit for

Bystřice pod Lopeníkem), I/55 (transition of CD tracks on the northern border

the District of Kroměříž, and linking with the road II/497 North of Hungarian

Hradiště), I/57 (bypass East of the Brumova-Galway), I/69 (holdout and

a bypass road in the Northwest position of Vizovice and Lutoniny), II/432 (North

bypass Třebětic and edit the road between Hulínem and Holešovem), II/490

(the holdout and the Southwest bypass Nivnice), II/495 (bridge and edit roads in

Brumově-Bylnici), and (II)/498 (South bypass St.petersburg)



(f)) new lines 110 kV corridors (Strání, Uherský Brod-Zdounky-

San Diego) and the transformer station 110/22 kV, including the loop from the leadership of the 110 kV

(Pozlovice, Bojkovice and Holešov)



g) modernisation of the railway line Otrokovice-Zlin-Vizovice, Center-



h) 110 kV HIGH VOLTAGE lines Hulin-Holešov.



2. for expanding the territory protected corridors for high pressure gas pipelines

Chválkovice-Kostelany, Vizovice-Carmarthen, Osvětimany-Polešovice,

Strání, Uherský Brod-Uherský Brod-Havřice.



3. for the need for gradual to ensure flood protection of settlements and

territory territorial protect area for construction of the option:



and the island's protection, Plučisko), dykes, Chropyně and Zářičí

Plešovce, edit Moštěnky in the Žalkovicích dam, the riverbed and by-pass

Dam Kroměříž, island protection, Bílan, hulin, the island's levees

Lawn protection including production areas, levees, and Záhlinice

additions and modifications to the system hrázového Kvasice, in Kroměříž district,



b) cofferdams Tlumačov, levees Otrokovice including adjustment for

The dřevnice River, levees left and right (with editing the road I/55)

the banks of the Morava in napajedla and ohrázování Spytihněv, district Zlín,



c) dykes Topolná, Kněžpole, Babice and Huštěnovice, road

the link I/55 and II/497 as a polder dike, including the transfer of the object

right-bank dam of Uherské Hradiště, levees Kostelany in Moravia,

ohrázování Nedakonic, ohrázování of the left bank of the Morava over Hungarian

Spit and further Merriment in Moravia, extending the hard Weir in

Hungarian Promontory about 1 moving box, and levees of the left bank New

Moravia, in Uherské Hradiště.



4. the territorial protection corridor D 1 and D 47 approved by resolution of the Government of the Czech

Republic of 16 May. July 1997, no. 423, and renowned in annex No. 2

1 (b). a) and b) to the Government Regulation No. 213/1997 Coll. has been made

the Government of the Czech Republic of 13 October. September 2000, no. 891 changed.



5. Construction related to the execution of projects listed in points 1 to 3 and territorial

defined in the graphics part 2. large territorial zoning plan changes

the whole Zlin conurbation, in the graphics section of the No. 3 plan

large territorial unit of the Zlín conurbation, in the graphics section of Amendment No 4

the zoning plan of the great territorial unit of the Zlín conurbation, in the graphics

part of Amendment No 5 great territorial unit zoning plan of the Zlín

agglomeration and in the graphics section of Amendment No 6 large master plan

the local authority of the Zlín agglomerations in the scale 1:50 000, with a

the approval clause, are public benefit.