370/2010 Coll.
DECREE


Dated 8 December 2010

Amending Decree no. 365/2009 Coll., On the gas market rules

Energy Regulatory Office pursuant to § 98a paragraph. 2 point. i)
Law no. 458/2000 Coll., On business conditions and public administration in
energy sectors and amending certain laws (Energy Act)
amended by Act no. 158/2009 Coll .:

Art. I

Decree no. 365/2009 Coll., On the gas market rules, as follows:

First In § 1, paragraph 3 is deleted.

Second In § 2 para. 1, letter b) reads:

"B) financial security - securing the obligations of a financial nature
gas market participant arising from business relations with the operator
market or distribution system operator".

Third In § 2 para. 1 at the end of the text of letter j) the words "in
calendar year, assuming normal weather conditions."

Fourth In § 2 para. 1 letter r) reads:

"R) storage capacity - the amount of traffic of all or part of the virtual
m3 gas storage, extraction or injection rate in m3 / day or production or injection
curve m3 / day."

Fifth In § 2 para. 1, letter t) reads:

"T) normal climatic conditions - the average daily temperature of
years 1971 - 2000 for the gas created by the Czech Hydrometeorological Institute
calculated from data of all measuring stations of the Czech Hydrometeorological Institute
lying to an altitude of 700 m n.
m., ".

6th In § 2 para. 2 at the end of subparagraph p) is replaced by a comma and subparagraphs
q) to t), added:

"Q) the planned annual gas consumption - gas consumption value obtained from historical
actual subscriptions gas, adjusted for the effect of temperature,
determined in accordance with Annex no. 10 hereto,

R) real climatic conditions - the average actual daily
air temperature in the Czech Republic for individual trading days
which is calculated from data of all measuring stations of the Czech Hydrometeorological Institute
lying to an altitude of 700 m n.
m.,

S) Restated annual gas consumption - gas consumption value obtained from actual subscriptions
gas converted to a 365-day period pursuant to Annex
no. 10 hereto,

T) planned monthly consumption of gas - monthly value of gas consumption
agreed in the contract for the distribution of gas. ".

7th In § 4, at the end of paragraph 1 the phrase 'gas market participant
or foreign natural or legal persons who are not parties
settlement, negotiated transporting gas to the border point. ".

8th In § 5, paragraph 1 reads:

"(1) Under a contract on gas transmission allows the operator of the transmission system
cleared entity reservation
standard firm transmission capacity, daily firm transmission capacity, standard interruptible transmission capacity
daily interruptible transmission capacity | || firm coordinated transmission capacity on a day or
firm uncoordinated transmission capacity on a day.
Applications to conclude contracts on gas transmission shall be submitted not later than 10 working days
10:00 am prior to the shipment.
Transmission system operator evaluates the request to conclude a contract on gas transmission
and if a positive evaluation send a draft contract for gas
applicant for a contract within 5 working days from 16:00
application . The applicant receives a contract proposal for the conclusion
contract for gas so that the gas contract of carriage was
closed no later than two working days until 12:00 pm before the
shipments. ".

9th In § 5 para. 2, the first sentence is replaced "Reservation Request
standard transmission capacity, daily transport capacity and transport
capacity on a day electronically filed.".

10th In § 5, at the end of paragraph 3 the phrase "Carrying capacity in
scheme for the following day is reserved for border points.".

11th In § 5, paragraph 4 reads:

"(4) Transportation of gas at the reservation of the standard transmission capacity
launches first gas day of the calendar month for which the transmission capacity is reserved
. Settlement entity may
reserve transmission capacity and the other gas month than the gas
month immediately following the month in which the reservation

Transportation capacity requests, but no earlier than 24 calendar months before the beginning of transmission by
reservations standard transmission capacity.
The standard transmission capacity for border points and a virtual
gas storage facility can be reserved for a maximum period of 120
gas months following the month in which the request for reservation
standard firm or interruptible transmission capacity according to § 6 paragraph.
first. "

12th In § 5, after paragraph 5, the following paragraphs 6 and 7 are added:

"(6) Fixed coordinated transmission capacity on the following day
can only be booked for border points for which follow-up
TSO performs the reservation of transmission capacity on
same period, the same amount in the same time by mutual agreement between the two
adjoining TSO.
Reservation firm coordinated transmission capacity in the next
mode is considered as the nomination of transport according to § 29 paragraph. 1 point. a) or §
29 paragraph. 2 point. a) that the amount of booked firm
coordinated transmission capacity on a day it is not possible to carry
transmission renomination in accordance with § 33 para. 4th

(7) firm transmission capacity on the following day reserves
settlement entity last trading day of the exchange in the Federal Republic of Germany
which are traded gas preceding the commencement
gas transmission using fixed transmission capacity mode
following day. Gas transmission using transmission capacity in
on a day is performed for one gas
date. ".

Former paragraphs 6 to 8 shall be renumbered 8 to 10

13th Under § 5, the following § 5a is inserted:

"§ 5a

(1) Long-term contracts on gas transmission with firm transmission capacity
agreed with the TSO gas market participant
or foreign natural or legal person for a single entry and exit border
point transmission system for the period at least 10 years.
Minimum size required long-term firm transmission capacity is 10
000 MWh / day.

(2) Reservation of long-term firm transmission capacity is only possible in the
above, in which the sum of all other capacities
reserved for a period longer than 10 years will not exceed 65% of the technical capacity of the corresponding input
or exit border point, in every
time period required reserve capacity.

(3) The applicant shall submit the request for a long-term firm transmission capacity
TSO earliest 24 and at least 3
calendar months before the first gas day of the calendar month in which to
gas transmission started. The TSO
evaluate all applications received during the preceding calendar month
on the 15th day of the calendar month for which the term application delivery
not decisive.

(4) The transmission system operator shall notify the applicant
reservation required long-term firm transmission capacity throughout
desired range or if the lack of capacity in less than the required
range. Reservation of long-term firm transmission capacity will expire if
long-term contract on gas transmission with firm capacity will not be closed
the fifth working day including the date of receipt of the notice.

(5) In the event that you can not satisfy all applicants reservation
long-term firm transmission capacity, reserves the transmission system
free long-term firm transmission capacity
individual applicants in proportion to the size of their requirements on long-term reservation | || firm transmission capacities. If demand exceeds the free
long-term firm transmission capacity, reduce the transmission
system before the distribution of free long-term firm transmission capacity
this requirement on the amount of available long-term firm transmission capacity.

(6) In the case of booking long-term firm transmission capacity for the newly constructed
transportation infrastructure is put into use after 1 January 2011
value is the maximum amount of capacity booked under paragraph 2
increases to 90% of technical capacity the entry or exit point of the transmission system
a 24-month period referred to in paragraph 3 shall be extended to 60 months
. ".

14th § 6 para. 1, the word "10:00" and in paragraph 2, the word "12:00"
replaced by the word "8:00".


15th § 6 para. 3, "13:00" is replaced by "8:30".

16th In § 6, the following paragraphs 5 and 6 are added:

"(5) Request for booking firm transmission capacity on
next day settlement entity served 9:00 to 7:00 p.m. hours
deadline under § 5 para. 7th

(6) TSO immediately after receipt of the request
booking firm transmission capacity on a day
performed to evaluate the application and capacity in the case of free transmission capacity
books. ".

17th In § 7 para. 3, "13:30" is replaced by "8:45".

18th In § 7 para. 5, "13:00" is replaced by "9.00".

19th In § 7 the following paragraph 9 is added:

"(9) of transmission capacity booking foreign individuals or legal persons
at border points and evaluating applications from foreign individuals or legal entities
the reservation of transmission capacity at border points
provisions of § 5-7 apply Similarly.".

20th In § 9, paragraphs 7 and 8, added:

"(7) For each customer's supply point to a distribution agreement
gas with only one gas market participant. For each transfer
place, or the sum of delivery points of gas production is concluded
gas distribution agreements with each participant receiving gas market
delivery point, or the aggregate of delivery points of gas production.
For cross-border pipeline delivery point to a contract of gas distribution
with each subject receiving the transfer
settlement instead of a cross-border pipeline. For delivery points between distribution systems
conclude a gas distribution operators
distribution systems.

(8) If the customer's supply point category
offtake or medium offtake, which is equipped with measurement type A or B, or
customer's supply point low offtake category, which is equipped
measurement type A or B and which are proper monthly readings, the
contract on gas distribution lists booked distribution capacity.
Customer categorization set out in Annex no. 2 hereto. For
supply point with multiple measuring points in the contract on gas distribution
listed booked distribution capacity for measuring points with measurement type
A and B and the calculated distribution capacity for measuring points with measurement type
C. Distribution capacity for metering points with type C metering for customers
with gas consumption over 630 MWh / year is determined using the procedure for calculating daily
allocated firm capacity for annual gas consumption in the range of over 630 MWh in accordance with the price
Office's decision. Distribution capacity for measuring
points with type C metering for customers with gas consumption up to 630 MWh / year
including and measuring points with measurement type A or B for customers with
gas consumption up to 630 MWh / year, including with annual billing is
procedures for the calculation of daily booked firm capacity for
annual gas consumption in the band over 63 MWh to 630 MWh in line with the price
Office's decision. For evaluation purposes, exceeding the capacity of the distribution
apply only values ​​agreed and measured at measuring points with
measurement type A and B. ".

21st In § 10 paragraph. 3, the word "intended" is replaced by
"planned".

22nd In § 11 para. 1, the first sentence is replaced "Reservation Request
distribution capacity and contract for gas distribution to customers' supply points
filed electronically in cases under § 52 paragraph. 1 and § 53 paragraph
. 5, in the terms according to § 52 paragraph. 3 and § 53 par. 5
client has with him for the supply point is not
contract for gas distribution made, or new gas supplier in case
concluded that customer agreement on bundled gas supply services. ".

23rd In § 11 paragraph 2 reads:

"(2) Request for distribution capacity booking and arranging a
gas distribution to customers' supply points except
request pursuant to paragraphs 1, 3 and 7 presents the customer or gas supplier
later than the fifth business day 10:00 and the first 12 calendar months before the start of the first
gas day at which an effect reservations
distribution capacity. Request for distribution capacity booking for customers' supply points
addition to the application of paragraphs 1, 3 and 7
contains the elements listed in Annex no. 3 hereto. Operator

Distribution system evaluates incoming reservation requests
distribution capacity and announces the results of distribution capacity booking
all applicants for distribution capacity booking no later than the third working day
12.00 after the day on which the application was
distribution capacity reservation is made. Confirming the request distribution capacity
reserved. Unless the customer or supplier
gas distribution system operator contract for gas distribution to customers' supply points
negotiated, the deadline for the latest
application and notification of reservation of distribution capacity by 5
work days.".

24th In § 11 para. 7 of the third sentence, the words "distribution capacity"
replace the words "dvacetičtyřnásobku secured hourly capacity".

25th In § 11, paragraph 8 shall be added:

"(8) The distribution capacity for supply points of customers can not be
booked with insufficient financial security of the applicant, if the application
booking distribution capacity does not meet the established requirements,
not submitted within the specified deadline or applicant failed to amend or
failed modification request submitted by 14:00 pm next working day after the notice
distribution system operator indicating
required adjustments. ".

26th In § 12 para. 1 and 2, the words "A or B," the words "for
customer's supply point, which is situated in the low offtake category,
is equipped with measurement type A or B and which are carried out properly
monthly readings, or for delivery points between distribution systems
".

27th In § 12, the following paragraph 4 is added:

"(4) The distribution system will change the reserved
distribution capacity for delivery between distribution systems
also the case that the distribution system operator so requests and the need for change
distribution capacity reservation proves." .

28th In § 13 par. 3, the words "maximum daily distribution capacity"
replaced by "dvacetičtyřnásobek secured hourly capacity".

29th In § 16 para. 4 at the end of the text in subparagraph d) the words "
date of submission of the daily storage capacity with firm capacity".

30th In § 17 para. 1 second sentence deleted.

31st In § 17 para. 2 of the introductory part of the provision reads:

"The underground gas storage
public in a manner allowing for remote access not later than 30 calendar days before the beginning
multi-round auction, and earlier than 12 months before the first
gas day immediately following storage year for which
annual storage capacity with fixed capacity booked,
conditions of the auction for free storage capacity. Conditions
auction must be reasonable, non-discriminatory and transparent. Terms of the auction include ".

32nd In § 17 par. 2 letter a) reads:

") Minimum price per unit of storage capacity for the first storage
year and the method of calculating prices for other storage years after the reservation time
storage capacity."

33rd In § 17 para. 8, the words' by CZK 0.02 to CZK 0.05 per 1 m3
traffic volume "is replaced by" manner under the terms of the auction. "

34th In § 21 para. 5 of the introductory part of the following sentence added after the first sentence
"If this is an auction for new storage capacity, which has been offered at auction
, but has not been booked, publish underground operator
gas storage auction conditions at least 30 days before the scheduled start of the auction
. ".

35th In § 21 para. 5 letter a) reads:

") Minimum price per unit of storage capacity and calculation
prices for other storage years for reserve storage capacity
".

36th In § 21 para. 5 at the beginning of the letter g) the words "minimum and maximum
".

37th In § 21 para. 8, the second sentence deleted.

38th In § 26 paragraph 4 reads:

"(4) Responsibility for imbalance at the entry and exit border point
be borne by market participants or foreign natural or legal person using
point transmission system. It is believed that
entry and exit border points with the exception of output
Waidhaus border point, the last registered
nomination or renomination respective cleared entity is regarded as
actually supplied or consumed amount gas, except in cases

Occurs when the restriction or interruption of gas under the Energy Act
^ 5). ".

39th In § 28 para. 2, § 43 par. 3 and § 50 para. 3, the words "§ 49 para. 2"
replaced by "§ 49 par. 3".

40th In § 29, the following paragraph 6 is added:

"(6) The gas market participant or a foreign natural or legal person
who are not cleared entities and use only border points
served nomination and renomination in the information system
TSO. The TSO
checks for equality nomination or renomination at border points
entry and exit border points and in the case of inequality
sum nomination or renomination at the entry and exit border points
taking into account gas on
drive such nomination or renomination accept. ".

41st In § 33 para. 4 point. d) and paragraph. 5 point. d) the words "following
4: 00 hours" are deleted.

42nd In § 36, the following paragraph 9 is added:

"(9) The market operator in a manner allowing remote access
later than the thirteenth day of the calendar month actual income from imbalances over the allowed tolerance
for the last 12 calendar months
division by individual months.".

43rd In § 39 paragraph 1 reads:

"(1) The market operator organizes

A) daily gas market with the closing date for tenders at 10:00 hours the following day
gas,

B) intraday gas market,

C) the unused tolerance market. ".

44th In § 39 paragraph 1 reads:

"(1) The market operator organizes daily gas market with the closing date for tenders in
10: 00 hours on the following gas day and intraday market
gas.".

45th In § 39, paragraph 9 is deleted.

Existing paragraph 10 shall be renumbered 9th

46th In § 40, the words "morning and afternoon", "morning and afternoon"
a "morning and afternoon" are deleted.

47th In § 40 par. 3, "11:00 and 17:00" is replaced by
"10:30".

48th In § 41 paragraph. 2, "17:00" is replaced by "10:30".

49th Under § 42 the following § 42a, including the heading reads:

"§ 42a

Unused Tolerance Market

(1) The market operator organizes unused tolerance market and allows
registration of bilateral unused tolerance transactions.

(2) If the unused tolerance opposite sign system
deviation is unused tolerance equals zero.

(3) Unused Tolerance Market runs from the eleventh day of the calendar month
from 12:00 hours to 10:00 hours the following calendar day
for all gas days of the preceding calendar month.

(4) The market operator will announce the results unused tolerance market at 11:00 pm
twelfth day of a calendar month. After the announcement of the results of market
unused tolerance to individual subscribers will publish the market operator
manner enabling remote access, supply and demand curves
amount of trades on the unused tolerance market and
prices achieved for unused tolerance for each gas
day of the preceding month. Published data do not contain information about individual participants
stores unused tolerance market.

(5) The registration of bilateral transactions with unused tolerance
underway since the eleventh day of the calendar month from 12:00 pm to 9:00 pm
thirteenth day of the calendar month for all gas
days preceding month.

(6) Market unused tolerance and registration of bilateral transactions with unused tolerance
carried out separately for each gas day. ".

50th In § 44 para. 1 point. b) and paragraph. 2 point. b) the word "values"
insert the word "allocation".

51st In § 44 para. 1 at the end of the text of letter f) and paragraph. 2 at the end of the text
letters g) to i), the words "broken down by nature
distribution of gas consumption in calendar year".

52nd In § 44 paragraph 3 reads:

"(3) No later than the third calendar day before the beginning of the following calendar month
12.00
sends the distribution system operator market

A) the estimated value of the booked distribution capacity in
customers' supply points offtake category or medium
subscriber measurement type A and B and customers with low offtake category

Measurement type A and B, for which proper monthly readings,
valid from the first day of the following month at all points
customers who switched gas supplier,

B) the expected value of the sum booked distribution capacity in
customers' supply points offtake category or medium
subscriber measurement type A and B and customers with low offtake category
measurement type A and B, in which they are carried proper monthly readings,
valid from the first day of the following month at all points
customers who have not changed their gas supplier, split by
nature of the distribution of gas consumption in calendar year

C) the value of the planned monthly consumption of gas at supply points
customer category offtake or medium offtake measurement
B and small customer categories of customers with type B metering, where
are proper monthly readings valid
from the first day of the following month for the next 3 months at all points
customers who switched gas supplier,

D) the sum of the projected monthly consumption of gas at supply points
all customer categories offtake or medium offtake
with type B metering and low offtake category of customers with type B metering, u
which are proper monthly readings in effect from the first day of the following month
the next three months at all points
customers who have not changed their gas supplier, split by
nature of the distribution of gas consumption in the calendar year. '.

53rd In § 44 para. 4 the word "sent" is replaced by the word 'will'.

54th In § 44, the following paragraph 9 is added:

"(9) The information referred to in paragraphs 1, 2, 5 and 6 exposes the subject of settlement,
which the data relates, the market operator no later than 30 minutes after receiving their
. Subject of Settlement can in the information system market operator
disclose such data to any other registered market participants
gas. ".

55th In § 46 paragraph 7 reads:

"(7) In the event that the preliminary evaluation of imbalances during the month
gas market operator receives preliminary data collection
gas at supply points of customers with type B metering from the operator
respective transmission or distribution system to which the sample
point is connected, the market operator will use for settlement of imbalances spare
daily estimate of expected consumption of gas determined as a proportion of the planned
monthly gas consumption and the number of days in a calendar month. In the event that
planned monthly consumption of gas is not available, the operator
market estimate, calculated as an average of the actual values ​​for the last 4
known gas days by the same name stored in the market operator.
If the system operator's market no stored actual values ​​used
market operator settlement
preliminary imbalances values ​​calculated as 66% of the booked distribution capacity converted to energy units
gross calorific value of 10.55 kWh / m3. ".

56th In § 47 par. 3 point. d) the word "tenth" is replaced by
"eleventh".

57th In § 47 para. 3, at the end of letter f) is replaced by a comma and
subparagraph g), added:

"G) per day until 13:00 annualized typical supply profiles for gas
next 7 days based on forecasts of climatic conditions
.".

'58. In § 49 after paragraph 1 the following paragraph 2 is added:

"(2) Every day until 13:30 hours clearing entity can send operator
market disagreement with the results of the preliminary evaluation of imbalances for the preceding gas day
pursuant to paragraph 1. a) to c) and § 44 paragraph
. Ninth Market Operator receives disagreement with the results of the preliminary evaluation of imbalances
only from the subject of settlement that is based on
notification under paragraph 1 received in the respective gas day to
tolerance deviations or deviation is cleared entity greater than 3 | || 000 MWh. In the event that the market operator evaluates disagreement with the results
preliminary evaluation of imbalances for the preceding gas day as
authorized to notify individual entities clearing new deadline for submission of nominations
preliminary imbalance according to § 32 par. 2 within one hour || | before the new deadline for submission of nominations preliminary imbalance, not later

However, until 16:00 pm on the same day. ".

Paragraphs 2 to 4 shall be renumbered as paragraphs 3 to 5

59th In § 49, the following paragraph 6 is added:

"(6) On the day of notification referred to in paragraph 5, no later than 15:00
settlement entity may send the market operator disagreement with the results of the evaluation
imbalances for the preceding gas month under paragraph
fifth Market operator receives disagreement with the results of the evaluation of deviations from only
cleared entity that is subject to notification pursuant to paragraph 5
received in the respective gas day to tolerance variation or deviation
cleared entity greater than 3,000 MWh. In the event that the market operator
evaluate disagreement with the results of evaluation of imbalances for the preceding gas
month as a legitimate notify individual
entities clearing new values ​​in accordance with paragraph 5, no later than 18:00 pm
same day. " .

60th In § 50 para. 1 the words "§ 49 para. 4 point. e) "is replaced by" §
49 paragraph. 5 point. E)".

61st In § 50 para. 1 the words "§ 39 par. 9" is replaced by "§ 42a".

62nd In § 52 paragraph 3-14 added:

"(3) 12 months before the change of gas supplier and the latest
tenth working day until 10:00 pm before the desired date change
gas supplier delivers new gas supplier request to change the standard
gas supplier to the operator market. In the event that the new gas supplier
ensures delivery under the contract on bundled gas supply services,
a request for distribution capacity booking under § 11
later than the date of application for change of standard gas supplier first 10 || | working days before applying for a standard supplier change
gas. Request for change of standard gas supplier must contain the following information
:

A) identification of new gas suppliers in the form of code assigned according to §
25 paragraph. 1

B) type of a gas supply agreement and the date from which the supply is effected
gas, and duration of the contract,

C) settlement entity that should be assigned responsibility for
imbalance at the supply point, which is changing gas supplier prejudice, a code assigned
according to § 25 paragraph. 1

D) supply point and the identification of a code assigned according to § 25 paragraph
. 1st

(4) Each working day by 12:00 hours if the request
under paragraph 3 received by 10:00 of the working day,
operator informs the market through its information system
current supplier gas, current cleared entity, the new
gas supplier, the new cleared entity, the operator
distribution or transmission system to which the supply point is connected, and more
entities concerned by the application of a standard supplier change concerns,
about the planned standard changed their gas supplier by sending identification
supply point in code assigned according to § 25 par. 1 and the date
from which to supply new gas supplier take place.

(5) In the period referred to in paragraph 3 delivers a new gas supplier
operators of distribution or transmission system reservation request
distribution or transmission capacity into the customer's supply point by
paragraph 3 in the event that the new gas supplier
concluded with the customer agreement on bundled gas supply services.

(6) the fifth business day until 18:00 pm after informing
pursuant to paragraph 4 of the distribution or transmission system operator
inform the market about the possibility or impossibility of reservation of distribution or transport capacity
supply points customer pursuant to paragraph 3
distribution or transmission capacity for supply points of customers
not be booked with insufficient financial collateral or
failure of the application for book distribution or transmission capacity
. For failing to meet requirements for application shall not be considered if the new
gas supplier shall complete or adapt to 14:00 pm
business day following the date on which operator to distribution or transmission system
request rectification of deficiencies in the application showing
desired adjustments. In the event that the operator of the distribution or transmission system
operator informs the market under the first sentence to
fourth working day until 18:00 pm after forwarding the information referred to in paragraph 4
market operator to the fact that the distribution

Or transmission system alerts. If the operator of the distribution or transmission system
still fails to fulfill the notification obligation pursuant sentences
first, but registers the customer's supply point under paragraph 15, it has
is considered that the market operator the possibility to book distribution or
transport capacity.

(7) The market operator immediately after the deadline provided for in paragraph 6
inform the current gas supplier, the new gas supplier, all affected
cleared entities and operators of distribution or transmission system,
to which the customer's supply point connected on the possibility of booking
distribution or transmission capacity into the customer's supply point by
paragraph 3. In the event that it is not possible to book distribution or transmission capacity
into the customer's supply point under paragraph 3,
market operator informs through the information system
existing and new gas suppliers, existing and new body
clearing the transmission or distribution system to which
's supply point is connected, and other bodies concerned by the application of standard
change of supplier concerns about stopping the standard change
gas supplier. Current gas supplier and the existing subject of settlement
market operator through an information system informs
a request for continuation of gas supplies.

(8) the fifth business day until 18:00 pm after forwarding the information referred to in paragraph 4 may
current gas supplier through the information system
market operator to ask for stopping the standard supplier change
gas.

(9) the fifth business day until 18:00 pm after informing
pursuant to paragraph 4, the new gas supplier through the information system
market operator's request for a standard supplier change be undone.

(10) No later than the fifth business day until 18:00 hours after the
information pursuant to paragraph 4 of the cleared entity whether they agree with
assigning responsibility for deviation. Immediately after the expression of consent
cleared entity with the assignment of responsibility for imbalance at the offtake point
operator informs the market through an information system
current gas supplier, the current cleared entity,
other stakeholders clearing and operator of the transmission or | || distribution system to which the supply point is connected, about the assignment
cleared entity. When the fifth working day until 18:00 hours
transmission of information pursuant to paragraph 4 is not in the information system operator
market acceptance cleared entity with the assignment of responsibility for imbalance at the supply point
inform the market operator through || | information system of existing and new gas suppliers, existing and new
cleared entities and other stakeholders
clearing and operator of the transmission or distribution system to which the electricity supply
point is connected, about stopping the standard supplier change gas.
Existing gas supplier and the existing subject of settlement operator
market information service system informs
request for continuation of gas supplies.

(11) No later than 20:00 hours working day, which was adopted
application under paragraph 9 to 18:00 pm of the working day, informing
market operator through the information system of the current gas supplier
, the current cleared entity, the transmission
or distribution system to which the supply point is connected, and more
entities concerned by the application of a standard supplier change concerns,
about the withdrawal of the standard change their gas supplier.

(12) No later than 20:00 hours working day, which was adopted
request under paragraph 8 to 18:00 pm of the working day, informing
market operator through an information system for a new supplier of gas
, clearing all the parties concerned and the transmission
or distribution system to which the supply point is connected to the existing gas supplier
asked about stopping the standard changes
gas supplier.

(13) If the current gas supplier asked about stopping the standard supplier change
gas under paragraph 8, confirm the new gas supplier in
information system market operator that a customer with changing
gas agreement, no later than the eighth working day after the date of filing

Information market operator under paragraph 4 to 14:00. In case
that the set deadline not confirm the new gas supplier in the information system
market operator that the customer is changing gas supplier
agrees to change the standard gas supplier is stopped and the operator shall immediately inform the market
current supplier gas, new
gas supplier, all the parties concerned and clearing operator
distribution or transmission system to which the supply point is connected
customer, a continuation of the current supplier
gas.

(14) After submitting a request for the continuation of deliveries under paragraph 7 or
10, no later than the eighth working day after the submission of information
market operator under paragraph 4 to 14:00 pm, the existing gas supplier
and the current cleared entity sent through
information system market operator consent to the continuation of supplies.
Market operator shall immediately inform the current gas supplier,
all actors concerned with clearing operator of the distribution or transmission system
to which the customer's supply point is connected, and
other bodies concerned by the application of a standard change
suppliers concerned about the consent of the existing gas supplier and the existing subject
showdown with the continuation of supplies. If the eighth working day in
14: 00 hours after the information referred to in paragraph 4 is not
Information System Operator market acceptance of the existing gas supplier
existing subject of settlement with the continuation of supplies at the supply
site proceed in accordance with § 54 para. 4-13 adequately with the fact that
for a term specified in § 54 para. 5 and 9 to 11 is defined as 1 day prior
term, since it is not guaranteed supply from existing suppliers | || gas. ".

63rd In § 53 par. 1, "the first gas day of a calendar month
" is replaced by "gas day".

64th In § 53 par. 3, "the effective date of change of gas supplier on the basis
assigned to the adjusted typical supply current and the last
estimated annual gas consumption" is replaced by "
consumption of gas to the effective date of the change of gas supplier pursuant to Annex no. 13 to
this decree. "

65th In § 53 the following paragraph 5 is added:

"(5) There is a change in the customer's supply point, and also a change
gas supplier, the provisions of the standard supplier change
gas analogy. To start deliveries to the water outlet newly connected
customer when the supplier of gas is a gas trader, who is
supplier of last resort in the respective domestic zone, and to start deliveries
supply points after unauthorized gas consumption or | || unauthorized distribution of new gas supplier, who is not a supplier of last resort
in the respective domestic zone, the provisions of the standard
changed their gas supplier by analogy with the fact that

A) a request to change the standard gas supplier according to § 52 paragraph. 3
market operator delivers gas supplier no later than the fifth working day
10:00 hours before the desired date of commencement of supply

B) acts to make a change supplier according to § 52 paragraph. 6-12 and paragraph.
15 are realized by the third working day; the deadline specified in hours
retained and

C) The operator shall notify the result of the examination of the application of the standard change
gas supplier according to § 52 paragraph. 16 later than the fourth business day
12: 00 hours. ".

66th In § 54 paragraph 14 reads:

"(14) For customers' supply points where gas supplier
lost its authorization or possibility to supply, and the supply point of a customer that is not from a specific day
assigned supplier or subject of settlement or not
for the customer's supply point is reserved distribution or transmission capacity
, the provisions of paragraphs 1 to 13 similarly, that
market operator publishes information about the lack of financial security under paragraph 1
fourth calendar day at 17:30 hours before the date on which
not supply points assigned to a contractor or entity
clearing or not the customer's supply point
reserved distribution or transmission capacity. The fact that the customer's supply point
not reserved distribution or transmission capacity, informs
operator of the distribution or transmission system operator market,

If it is not the case when a customer requested a termination or interruption of gas supplies
. ".

67th § 55 including the heading deleted.

68th § 56 including the title reads:

"§ 56

The use of typical gas supply for the billing of gas


(1) For customers in the bill indicate separately the payment for distribution
gas and payment for the market operator in accordance with the price
Office's decision. In the case of supply points, which are equipped with
measurement type A and B categories offtake and medium offtake and supply points of customers
low offtake category, which is equipped
measurement type A or B and which are proper monthly readings,
in the bill further states charge for exceeding
booked distribution capacity and the size of the overrun.

(2) The gas supply billing customer with type C metering the amount of gas consumed
, including the initial and final state of the gas meter
for the period, and the identification of supply points in code assigned
under § 25 . 1st

(3) Natural gas consumption and its allocation to each period shall be determined in accordance with Annex
no. 13 hereto, taking into account
readings made by the operator of the distribution system and customers own readings
customer or supplier.

(4) In case of unavailability of data recorded measuring device for
period stipulated by law ^ 6) the distribution
system used to determine the consumption of customers with type C metering
readings made by the operator of the distribution system and properly
customers own readings taken this customer or gas supplier since last
gas supply billing. To estimate the gas consumption for the remaining period
DSO
proceed in accordance with Annex no. 13 paragraph 2 of this decree. ".

69th In § 57 par. 1 point. b) the words "after receipt of the interruption or termination of
" are replaced by "working day required
specified in the request for termination or interruption of supply in case
request for termination or interruption of the operator
distribution network received at least 5 working days before the desired date
termination or interruption of supply; in other cases it takes effect
interruption or termination of the thirtieth day after the date of receipt of the request
".

70th In § 58 para. 1 the words "or transmission capacity" is replaced
'capacity or transmission capacity customer directly connected to the transmission system
".

71st In § 58 after paragraph 1 new paragraphs 2 and 3 are added:

"(2) The transport capacity of the border point and the point of virtual storage
gas is reserved in thousandths of MWh / day.

(3) Nominations transportation and allocation for border point and the point of virtual
gas storage is done in thousandths of MWh. ".

Paragraphs 2 and 3 shall become paragraphs 4 and 5.

72nd In Annex no. 1 point 5 reads:

"5. The size of the required capacities in MWh / day in the
entry or exit point of the transmission system or m3 / day to supply point
customers directly connected to the transmission system. "

73rd Annex no. 6 reads:

"Annex no. 6 to Decree no. 365/2009.

The terms and procedures for submission of tenders and requests the transmission system operator
short-term market for erratic deviations

First The market operator shall disclose the difference between the nominees of clearing entities
according to § 28 para. 1 point. c) and d) and the value of the sum of the maximum possible
nominations under § 49 par. 3 and § 50 para. 2 no later than two hours after
deadline for submitting nominations preliminary total imbalances pursuant to § 32 paragraph
. 2 and adjusted where appropriate according to § 49 para. 2nd

Second The market operator shall submit for TSO requirement
buy gas on intraday gas market for the next gas
day in the amount of the positive difference between the nominees of clearing entities pursuant to §
28 paragraph. 1 point. c) and d) and the value of the sum of the maximum possible nominations
according to § 49 par. 3 and § 50 para. 2 at a price determined as the lower of
gas prices announced for the following day on an international stock exchange in the Federal Republic
Germany, which is traded on the gas, and the prices of daily
market. In the case where there is no requirement to trade conducted within 15 minutes
increases operator market price of 0.3 euros / MWh, and even repeatedly

No more than the price of missing balancing gas.

Third The market operator shall submit for TSO requirement
sell gas on intraday gas market organized by OTE
market for the next gas day, equal to the negative difference between
nominations clearing entities pursuant to § 28 para. 1 point. c) and d) and
value of the sum of the maximum possible nominations under § 49 par. 3 and § 50 paragraph
. 2 at a price determined as the higher of the price of gas for
announced the following day on an international stock exchange in the Federal Republic of Germany, on
which are traded gas prices and the daily market. In the case where there is no requirement to store
implemented within 15 minutes, reducing the market operator
price of 0.3 euros / MWh, even repeatedly, up to a maximum price
surplus balancing gas.

Fourth Gas prices announced for the following day on an international stock exchange in
Federal Republic of Germany, which are traded gas means
value for balancing gas price by the Authority.

Fifth Daily market price means the amount resulting matched prices
daily market organized in the respective gas day.

74th In Annex. 8, the words "900 m3 / year" is replaced by "
7.56 MWh / year."

75th Annex no. 9-11 added:

"Annex no. 9 of Decree no. 365/2009.

Determination of residual gas consumption patterns and calculation of gas off by typical supply






Annex no. 10 of Decree no. 365/2009.

A.

First To determine the planned annual gas consumption for supply point
customer with type C metering was used last invoiced subscriptions
gas in the past three years. If the customer bled gas
period of less than three years but not more than 10 months shall be used to determine
planned annual consumption this shorter period.

Second If the total length of the period with available values ​​invoiced
donations of less than 10 months, then the expected gas consumption
agreed in the contract on gas distribution.

Third The planned annual consumption for the supply point in the distribution system
ls metering type C, for which deductions were made, covering the period D
length of at least 10 previous months, according to the formula

B.

First To determine adjusted annual gas consumption for supply point
customer with type C metering shall be the latest invoiced gas consumption.
If the length of the last billing period shorter than 10 months
apply data from multiple billing period covering the period
least 10 months. Of gas consumption thus defined period
calculated value adjusted annual gas consumption for the respective offtake
place with measurement type C.

Second If the total length of the period with available values ​​invoiced
donations of less than 10 months, then the expected gas consumption
agreed in the contract on gas distribution.

Third Adjusted annual OiRPpRS for supply points with type A metering
C, for which deductions were made involving delta period
length of at least 10 previous months, according to the formula:

Fourth Adjusted annual consumption of gas will be used for the inclusion of supply
place of household customers and small customer to offtake band
for billing gas consumption in the customer's supply point.

Annex no. 11 of Decree no. 365/2009.

Classes typical supply

Class of typical gas supply and assign them to the extraction
points for the household and small customer categories and medium
buyer are as follows.

First Category Household
--------------------------------------------- -----
CLASS TDD: DOM1 -------------------------------------------
-------
Annual consumption S01 (cooking) S02 (hot water) S03
(Heating)
-------------------------------------------- ------
to 7.56 MWh 1 0 0
to 7.56 MWh 0 1 0
to 7.56 MWh 0 0 1
to 7.56 MWh 1 1 0
to 7.56 MWh 1 0 1
to 7.56 MWh 0 1 1
to 7.56 MWh 1 1 1 ---------------------------------------
-----------

DOM1 household with gas consumption of less than 7.56 MWh / year.
CLASS TDD: DOM2 -------------------------------------------
-------
Annual consumption S01 (cooking) S02 (hot water) S03
(Heating)

----------------------------------------------- ---
over 7.56 MWh 1 0 0
over 7.56 MWh 0 1 0
over 7.56 MWh 1 1 0
over 7.56 MWh 0 1 1
over 7.56 MWh 0 1 1
--------------------------------------- -----------

DOM2 household with gas consumption greater than or equal to 7.56 MWh / year, without
gas heating (only for cooking or hot water preparation, or both options simultaneously
). Furthermore, household gas consumption greater than or equal
7.56 MWh / year, a combination of cooking and heating gas or domestic hot water and heating
gas.



CLASS TDD: DOM3 -------------------------------------------
-------
Annual consumption S01 (cooking) S02 (hot water) S03
(Heating)
-------------------------------------------- ------
over 7.56 MWh 1 1 1
--------------------------------------- -----------

DOM3 household with gas consumption greater than or equal to 7.56 MWh / year, while
cooking and heating gas and hot water preparation.

----------------------------------------------- ---
CLASS TDD: DOM4

Annual consumption S01 (cooking) S02 (hot water) S03
(Heating)
-------------------------------------------- ------
over 7.56 MWh 0 0 1
--------------------------------------- -----------

DOM4 household with gas consumption greater than or equal to 7.56 MWh / year only
gas heating.

Second Low offtake category

----------------------------------------------- ---
CLASS TDD: MO1 -------------------------------------------
-------
code S01 S02 S03 S04
use (cooking) (TUV) (heating) (technology)
-------------------------- ------------------------
M
R02 1 0 0 x
R02 0 1 0 x
R03 1 0 0 0
R03 0 1 0 0
R03 0 0 0 1
R03 1 1 0 0
R03 1 0 1 0
R03 1 0 0 1
R03 0 1 1 0
R03 0 1 1 0
R03 0 0 1 1
R03 1 1 1 0
R03 1 1 0 1
R03 1 0 1 1
R03 0 1 1 1
R03 1 1 1 1
R04 1 0 0 0
R04 0 1 0 0
R04 0 0 0 1
R04 1 1 0 0
R04 1 0 0 1
R04 0 1 1 0
R04 0 0 1 1
R04 1 1 0 1
R04 1 0 1 1
R04 0 1 1 1
R04 1 1 1 1
R05 1 0 0 0
R05 0 1 0 0
R06 1 0 0 0
R07 1 0 0 0
R07 0 1 0 0
R07 0 0 1 0
R07 0 0 0 1
R07 1 1 0 0
R07 1 0 1 0
R07 1 0 0 1
R07 0 1 1 0
R07 0 1 1 0
R07 0 0 1 1
R07 1 1 1 0
R07 1 1 0 1
R07 1 0 1 1
R07 0 1 1 1
R07 1 1 1 1
R08 xxx 1
R09 xxx 1
R10 xx 0 1
R11 1 0 xx
R11 0 1 xx
R11 1 1 xx

MO1 All customers with low offtake category code uses the consumption
space R02 to R11 and all combinations of parameters enabled S01 to S04,
who are not enrolled in MO2 to MO4.
----------------------------------------------- ---
CLASS TDD: MO2

code S01 S02 S03 S04
use (cooking) (TUV) (heating) (technology)
-------------------------- ------------------------
M
R02 1 1 0 x
R04 1 0 1 0
R04 0 1 1 0
R05 0 0 0 1
R05 1 1 0 0
R05 1 0 0 1
R05 0 1 1 0
R05 0 0 1 1
R05 1 1 0 1
R05 1 0 1 1
R05 0 1 1 1
R05 1 1 1 1
R06 0 1 0 0
R06 0 0 0 1
R06 1 1 0 0
R06 1 0 1 0
R06 1 0 0 1
R06 0 1 1 0
R06 0 0 1 1
R06 1 1 0 1
R06 1 0 1 1
R06 0 1 1 1
R06 1 1 1 1
R10 xx 1 0
R10 xx 1 1 -------------------------------------------
-------

Customers MO2 low offtake category code usage
supply point for the R02 to the procurement combination cooking and hot water. Customers
code usage supply point for the R04 with the collection and the combination of heating

Hot water preparation or heating and cooking. Customers with code utilization
supply point R05 to the procurement only for technology or combination
cooking and hot water, cooking and technology, technology and
domestic hot water and heating technology, as well as combinations
technology and hot water preparation and cooking, technology and heating and cooking
technology and heating and hot water combination
technology and heating and hot water preparation and cooking. Customers
code usage supply point R06 to the collection only hot water or only
technology or a combination of cooking and preparation
hot water heating and cooking, and cooking technology, technology and prepare
hot water and heating technology, as well as combinations
technology and hot water preparation and cooking, technology and heating and cooking
technology and heating and hot water combination
technology and heating and hot water and cooking. Customers
code usage supply point R10 to the procurement for heating only or for
combination of technology and heating.
----------------------------------------------- ---
CLASS TDD: MO3 -------------------------------------------
-------
code S01 S02 S03 S04
use (cooking) (TUV) (heating) (technology)
-------------------------- ------------------------
M
R02 1 0 1 x
R02 0 1 1 x
R02 1 1 1 x
R03 0 0 1 0
R04 1 1 1 0
R05 1 0 1 0
R05 1 1 1 0
R06 0 1 1 0
R06 1 1 1 0

----------------------------------------------- ---

Customers MO3 low offtake category code usage supply point
R02 with the collection for the combination of heating and cooking or heating and preparation
hot water or space heating and hot water preparation and cooking. Customers
code usage supply point R03 to the procurement for heating only.
Customers with supply point use code R04 with the collection
for a combination of heating and hot water preparation and cooking. Customers with code utilization
supply point for the R05 with the collection of the combination of heating and cooking or
heating and hot water preparation and cooking. Customers with code utilization
supply point for the R06 with the collection of a combination of heating and hot water or
heating and hot water preparation and cooking.
----------------------------------------------- ---
CLASS TDD: MO4 -------------------------------------------
-------
code S01 S02 S03 S04
use (cooking) (TUV) (heating) (technology)
-------------------------- ------------------------
M
R02 0 0 1 0
R04 0 0 1 0
R05 0 0 1 0
R05 0 1 1 0
R06 0 0 1 0
------------------------------------------ --------

Customers MO4 low offtake category code uses the consumption point
R02, R04 or R06 with the collection for heating only. Customers with code utilization
supply point R05 to the procurement for heating only or for
combination of heating and hot water.

Third Category of medium offtake
-------------------------------------------- ------
CLASS TDD: SO1 -------------------------------------------
-------
code S01 S02 S03 S04
use (cooking) (TUV) (heating) (technology)
-------------------------- ------------------------
M
R02 1 0 0 x
R02 0 1 0 x
R03 1 0 0 0
R03 0 1 0 0
R03 0 0 0 1
R03 1 1 0 0
R03 1 0 1 0
R03 1 0 0 1
R03 0 1 1 0
R03 0 1 1 0
R03 0 0 1 1
R03 1 1 1 0
R03 1 1 0 1
R03 1 0 1 1
R03 0 1 1 1
R03 1 1 1 1
R04 1 0 0 0
R04 0 1 0 0
R04 0 0 0 1
R04 1 1 0 0
R04 1 0 0 1
R04 0 1 1 0
R04 0 0 1 1
R04 1 1 0 1
R04 1 0 1 1
R04 0 1 1 1
R04 1 1 1 1
R05 1 0 0 0
R05 0 1 0 0
R06 1 0 0 0
R07 1 0 0 0
R07 0 1 0 0
R07 0 0 1 0
R07 0 0 0 1
R07 1 1 0 0
R07 1 0 1 0
R07 1 0 0 1
R07 0 1 1 0
R07 0 1 0 1

R07 0 0 1 1
R07 1 1 1 0
R07 1 1 0 1
R07 1 0 1 1
R07 0 1 1 1
R07 1 1 1 1
R08 xxx 1
R09 xxx 1
R10 xx 0 1
R11 1 0 xx
R11 0 1 xx
R11 1 1 xx -------------------------------------------
-------
All customers
SO1 medium-sized customer category code usage
supply point R02 to R11 and all permissible parameter combinations
S01 to S04, who are not included in SO2 to SO4.
----------------------------------------------- ---
CLASS TDD: SO2 -------------------------------------------
-------
code S01 S02 S03 S04
use (cooking) (TUV) (heating) (technology)
-------------------------- ------------------------
M
R02 1 1 0 x
R04 1 0 1 0
R04 0 1 1 0
R05 0 0 0 1
R05 1 1 0 0
R05 1 0 0 1
R05 0 1 1 0
R05 0 0 1 1
R05 1 1 0 1
R05 1 0 1 1
R05 0 1 1 1
R05 1 1 1 1
R06 0 1 0 0
R06 0 0 0 1
R06 1 1 0 0
R06 1 0 1 0
R06 1 0 0 1
R06 0 1 1 0
R06 0 0 1 1
R06 1 1 0 1
R06 1 0 1 1
R06 0 1 1 1
R06 1 1 1 1
R10 xx 1 0
R10 xx 1 1 -------------------------------------------
-------

SO2 Customers category of medium offtake code uses the consumption
space R02 to the procurement combination cooking and hot water.
Customers with supply point use code R04 with the collection
for a combination of heating and hot water or heating and cooking. Customers
use code R05 with supply point for the collection technology or combination
for cooking and hot water, and cooking technology,
technology and hot water, and heating technology and further for combination
technology and hot water preparation and cooking, technology and
heating and cooking, technology and heating and hot water for
combination of technology and heating and hot water preparation and cooking.
Customers with supply point use code R06 with the collection only
hot water preparation or for technology or for a combination
cooking and hot water, heating and cooking, and cooking technologies, technologies and preparing
hot water and heating technology and for
combination of technology and hot water preparation and cooking, technology and
heating and cooking, technology and heating and hot water for
combination of technology and heating and hot water and cooking.
Customers with supply point use code R10 with the collection only
heating or for combining technology and heating.
----------------------------------------------- ---
CLASS TDD: SO3 -------------------------------------------
-------
code S01 S02 S03 S04
use (cooking) (TUV) (heating) (technology)
-------------------------- ------------------------
M
R02 1 0 1 x
R02 0 1 1 x
R02 1 1 1 x
R03 0 0 1 0
R04 1 1 1 0
R05 1 0 1 0
R05 1 1 1 0
R06 0 1 1 0
R06 1 1 1 0
------------------------------------------ --------

SO3 Customers category of medium offtake code uses the consumption
space R02 with the collection for the combination of heating and cooking or heating and
hot water preparation or space heating and hot water preparation and cooking.
Customers with supply point use code R03 with the collection only
heating. Customers with supply point use code R04 with the collection
for the combination of heating and hot water preparation and cooking. Customers with code utilization
supply point for the R05 with the collection of the combination of heating and cooking
or heating and hot water preparation and cooking. Customers with code utilization
supply point for the R06 with the collection of a combination of heating and hot water or
heating and hot water preparation and cooking.
----------------------------------------------- ---
CLASS TDD: SO4 -------------------------------------------
-------
code S01 S02 S03 S04
use (cooking) (TUV) (heating) (technology)
-------------------------- ------------------------
M
R02 0 0 1 0

R04 0 0 1 0
R05 0 0 1 0
R05 0 1 1 0
R06 0 0 1 0
------------------------------------------ --------

SO4 Customers category of medium offtake code uses the consumption
points R02, R04 or R06 with the collection for heating only. Customers with code utilization
supply point R05 to the procurement for heating only or for
combination of heating and hot water.

Note: For customers with supply point usage code R08 and R09
(seasonal technological consumption) are typical supply profiles
individually regulated distribution system operator based on the assessment of a specific period
gas sampling the customer.

76th Annex no. 13 reads:

"Annex no. 13 of Decree no. 365/2009.

The use of typical gas supply when appropriate, the proportion of invoiced
consumption using typical supply gas distribution system operator
and consumption estimates in case of unavailability of data recorded
measuring devices in the customer's supply point with type C metering




77th The Annex no. 14, which reads:

"Annex no. 14 of Decree no. 365/2009.

Table GCV conversion of booked transport and storage capacities


First Transport capacity at the entry points of the transmission system
recalculates the gross calorific value (in kWh / m3): --------------------------
------------------------------
entry point transmission system 15 ° C, 20 ° C
---- -------------------------------------------------- - 10,596 10,415

Lanžhot Lanžhot - Mokrý Háj 10596 10415 10597 10416 Waidhaus

Mount St. Catherine - Olbernhau 10,507 10,328
Mount St. Catherine - Sayda 10,522 10,343
virtual gas storage point 10,620 - ---------------------------------------------
-----------

Second Transport capacity at the exit points of the transmission system
recalculates the gross calorific value (in kWh / m3): --------------------------
------------------------------
Exit point of the transmission system of 15 ° C, 20 ° C
---- -------------------------------------------------- - 10,596 10,415

Lanžhot Lanžhot - Mokrý Háj 10596 10415 10597 10416 Waidhaus

Mount St. Catherine - Olbernhau 10,538 10,358
Mount St. Catherine - Sayda 10,532 10,352
virtual gas storage point 10,620 - ---------------------------------------------
-----------

Art. II
Transitional provisions


First In evaluating the application for the reservation of standard and daily transmission capacity
filed before the effectiveness of this Decree shall be governed by
existing legislation.

Second The provisions of Decree no. 365/2009 Coll., As amended by this Decree, the
apply to gas transmission agreements concluded before the entry into force of this regulation
designed to negotiate
reserve transmission capacity for a pair of entry and output border point.
This does not apply if after the effective date of this decree was negotiated
change in gas transmission agreements entered into before the effective date of this decree
whose purpose is to reserve transmission capacity
separately for entry and exit border point transmission system.

Third The transmission system operator transferred on 1 January 2011, all
reserved transmission capacity with the exception of reserved transport capacities
customers directly connected to the transmission system and transport
capacity reserved for a pair of input and output boundary point of the unit m3
/ day thousandth MWh / day using combustion heat
listed in Annex no. 14 of Decree no. 365/2009 Coll., as amended by this ordinance.

Fourth If after the effective date of this decree renegotiated contract on gas transmission
concluded prior to the effective date of this decree, which
amend the agreed reserve transmission capacity for a pair
input and output boundary point on the reservation of transmission
capacity separately for entry and exit border point transmission system converts
TSO effective date of such change
contract for gas reserved transmission capacity of the unit
m3 / day thousandth MWh / day using gross calorific value specified in Annex no.
14 of Decree no. 365/2009 Coll., as amended by this ordinance.

Art. III
Efficiency


This decree comes into force on 1 January 2011, except for paragraphs 22,

23, 63, 65 and 67, which come into effect on July 1, 2011, and points
44, 45, 49 and 61, which come into effect on 1 January 2012.

Chairman:

Ing. Fiřt