DECREE



The Ministry of agriculture



of 14 July 1999. December 2001



about technickobezpečnostním the supervision of water



255/2010: Sb.



The Ministry of agriculture lays down pursuant to § 61 para. 3 and § 62 para. 2

Act No. 254/2001 Coll. on waters and on amendments to certain acts (the water

the law):



§ 1



The subject of the edit



This Decree defines the water works subject to technickobezpečnostnímu

supervision (hereinafter referred to as "oversight"), lays down the criteria and the procedure for their acceptance

into categories the scope and frequency of monitoring for each

categories of water works in the various stages of their preparation, construction,

changes of water works after their completion or operation and requirements

the surveillance programme.



§ 2



Basic concepts



For the purposes of this Ordinance, means the



and the limits of alertness-informative) criteria for phenomena and facts before

reaching the limit or critical values,



(b)) the limit value-a predetermined limit values of variables describing the

phenomena and facts, or their time of development for selected

maximum load condition



(c) the critical value-value) of variables that describe phenomena and facts,

that indicate the statuses of the threat to the security and stability of the water works,



(d) the preparation of the construction stage) works-the processing of the preparatory

documentation of the intention of the construction of water works, documentation for territorial control

and project documentation for building permit,



(e)) by changing the water works-water works that result in

change the purpose or technical parameters



f) stage of construction or change of water works after it is completed-execution

construction and Assembly works on design, functional pounds

objects or parts of works critical for its stability,

safety and reliable function of the receipt of the construction site to the beginning of the

stages of the operation,



(g) the verification stage operation) period of the first load of water works

or a part of the warped water, covering the trial operation in this

the range that can be used to evaluate the fulfillment of project assumptions, reliable

functionality, security and stability of the water works,



h) stage of continuous operation-the period of use of the works from the end of

the authentication service until the extinction of the obligation to ensure the water work

supervision; for water projects, where the stage of the verification operation cannot be guaranteed, since

the period of the first load of the detained or warped water up until the demise of

the obligation to ensure the work of supervision,



even water) identified work-water project, which was established pursuant to §

paragraph 61. 5 the water law to ensure oversight.



§ 3



The definition of the water works subject to surveillance



Surveillance shall be subject to



and dams, levees and) weirs, with the exception of transverse structures in open channel

Watercourses and adjacent territories, whose height from the foot of the dam after the

the Crown is less than 1 m and the total volume of water the water does not exceed 1

000 m3, or fixed and stationary cross vzdouvacích buildings

Open watercourses, whose solid přelivná edge is overtaken by the above

on the day in the upper less than 1.5 m,



(b)) buildings on flood protection,



(c) the construction of tailings dams),



d) Hydro-galleries and tunnels,



e) building, which is to be established at forks nautical purposes of watercourses

or on their shores,



(f)) to use the building energy potential of surface water, if

swell or holding back water, with the exception of transverse structures referred to in

(a)),



g) other constructions for the impoundment or the retention of water, with the exception of

the tanks completely sunk in the ground without the vzdouvacího element, pools, lagoons,

blind arms, water mains and water reservoirs, sewerage systems and

recreational swimming pools.



§ 4



The determination of the criteria and procedures for the classification of the water works in categories



(1) the criteria for the classification of the water works in class I to IV. category in terms of

the supervision provided for in annex 1 to this notice.



(2) the classification of works into one of four categories is carried out according to the

the size of the potential damage that can occur when the failure of the stability and

the safety of water works, accompanied by the emergence of the flood wave special

floods. The amount of the possible damage to the potential damages by using the tempo (P) as a

the sum of the point value of the possible threats to human lives, the possible

losses to property in the adjacent territory and possible losses from the impairment and

benefits in the public interest, that would have occurred in the crash on the water works

the work of the heart and in the territories under him.



(3) quantification of potential damages (P) ^ 3), the designated person within

expert for the classification of water works to the category on the basis of



and quantification of specific parameters) floods and the effects of its spread under the

water work



(b)) scoring potential damage, which may arise as a result of

the crash of the water works.



(4) the water work is proposed fall into one of four categories according to the

the number of points achieved the potential damage (P)



(P) = 1 500 > category I

200 = < (P) II 1 500