104/1988 Coll.



Decree



The Czech Mining Authority



of 20 December. May 1988



about deposits, efficiency of authorisation and notification

mining activity and reporting activities carried out using mining techniques



Change: 242/1993.



Change: 434/2000 Sb.



Change: 299/2005 Sb.



The Czech mining Office lays down pursuant to § 30 para. 7, § 32 para. 5 of law No.

44/1988 Coll., on the protection and utilization of mineral resources (upper), and

According to § 5 para. 4, § 9 para. 2, § 10 para. 8, § 11 (1) 3 and § 13 para.

the Czech National Council Act No. 61/1988 Coll. on mining activities,

explosives and the State Mining Administration:



Part the first



Economical use of deposits



§ 1



cancelled



§ 2



Výrubnost, pollution and loss of



(1) during the conquest of an exclusive bearings it is necessary to use such mining

methods that will allow the gain balance stocks of sole bearings ^ 1) with what

the largest výrubností (solid minerals) or vytěžitelností (for

liquid and gaseous minerals, as well as in leaching), with minimal

losses and the least possible pollution, that are technically and economically

justified.



(2) the Organization shall, in developing the plan, the preparation and extraction

exclusive bearings or parts of it to propose and justify the mining

method, and the resulting výrubnost (exploitable), pollution, and

losses.



§ 3



The yield of the



When editing and refining of minerals, if carried out in connection

with their exploitation, it is necessary to use such procedures that allow

the most complete utilization of the minerals seized the largest yield their

commercial ingredients. How to edit and refining of minerals and seized from the

resulting yield is an organization required to include in the plan

developing, preparation and extraction of the exclusive bearing.



§ 4



The survey results, record keeping and the use of



(1) the organization is required to detect and register the amount of materials to be deposited

on odvalech, mining and tailings impoundments and



and during the conquest of the exclusive bearing) výrubnost (exploitable)

pollution and loss of,



(b)) when you edit and refinement of mineral content of their earned

commercial and harmful ingredients in charge, in poloproduktech, in the final

product refinement and waste.



(2) the organization tracks and records on the seams of minerals and accompanying

rocks in the extent required petrographic and mineralogical composition,

the method and form of occurrence and mutual relations, contents and the chemical bond

commercial and harmful ingredients and physico-mechanical and

chemical-technological properties.



(3) the organization uses results referred to in paragraphs 1 and 2 in the planning and

developing the management, preparation and extraction, as well as the exclusive bearing adjustment

and refining earned minerals.



(4) the organization keeps track of the data necessary for the determination of the amount of the reimbursement of the

won the reserved minerals and from the mining areas.



Part two



Authorisation of mining activities



§ 5



Types of mining activity permit



To enable the district mining Office is required for these mining

activities:



and the search and survey) for the sole mining parts, bearings and that

vertical mining parts to depths greater than 40 m, horizontal or

úklonnými mining parts of the length of more than 100 m, or even referred to

mining parts shorter, if are minted for more mine workings,

along with the above length parts exceeds 100 m; the authorisation shall

It also requires that in order to ensure the destruction of these mines and,



(b)) for the otvírku, the preparation and extraction of the exclusive bearing, as well as for

ensure the mines and quarries and liquidation of main mine works and quarries,



(c)) for special interventions in the Earth's crust, including prospecting and exploration

carried out by mining the parts for these purposes, if this works with our range of

comply with the conditions referred to in point (a)),



(d)) to secure and dispose of old mine workings, including their

the discovery, if the survey is carried out in the scope specified mining parts

in subparagraph (a)).



§ 6



Application for authorisation of mining activities



(1) a request for authorisation of mining activities (hereinafter referred to as "the application") contains the



and) name (business name), the organization identification number and registered office

the Organization,



(b)) the kind of mining activities, for which authorization is sought,



(c)) the name and identification number of the cadastral territory, ^ 3) name and code

the County, ^ 4) more detailed indication of the places of activity, the land-register reference numbers

the planned mining activities concerned,



(d)) when mining activity under section 5 (b). (b) the particulars of the determination)

the protected area and the total area and their changes



e) when mining activity under section 5 (b). (c) particulars of the determination)

the protected area for special interventions in the Earth's crust,



(f)) planned start and end, or interruption of mining

activities,



(g)) the name (business name) and address of the processor's plan, where appropriate,

documentation and organization that will carry out some of the work of the mining

activities for an organization referred to in subparagraph (a)),



(h)) names (trade names), and addresses of the parties to enable the mining

activity. ^ 5)



(2) the Organization shall prepare and submit a request for



and) search and survey of the exclusive bearing mining parts documentation

According to annex No 1,



(b)) to ensure and disposal of mine workings during the search and exploration

the exclusive bearing mining parts of the dossier in accordance with Annex 2,



(c)) otvírku, the preparation and extraction of the exclusive bearing



1. surface and underground mineral-developing the plan, the preparation and extraction

According to annex 3,



2. oil, combustible gas, and technically exploitable natural

gas extraction mining plan spending according to annex No 4,



3. by means of boreholes from the surface liming plan preparation, developing and mining of

loužicího field according to annex No 5



(d) ensure the mine workings and) quarries and liquidation of main mine workings and quarries



1. underground and surface mining plan ensure mining method

works and quarries and the liquidation of main mine workings and quarries, according to annex 6,



2. when oil, inflammable gas and technically usable

natural gas plan ensure and disposal wells in accordance with annex

# 7



3. when conquering liming by means of boreholes from the surface of the arrangements for ensuring and

disposal of loužicího field in accordance with Annex 8,



e) special interventions in the Earth's crust the documentation referred to in annexes 9, 10 and

12,



f) ensuring disposal of old mine workings and the arrangements for ensuring and disposal

old mine workings according to annex No 11.



(3) the Organization shall attach to the request



and evidence of resolve) conflicts of interest, where mining activities are

vulnerable to the objects and interests protected under special laws

regulations, ^ 6)



(b)) the list of exceptions, which were for the planned mining activities

the organization authorized by the competent authority,



c) assessment of influence of mining activities on the surface,



(d) the final report on the results of) the housing survey, or proof of

work permit in the event that this survey has not been completed, ^ 9)



e) outturn with the exclusive bearing, in the case of

authorization to ensure the mine workings and quarries or liquidation of main mine

works and quarries,



f) opinion issued under a special legal regulation, ^ 9a) if

pursuant to this regulation to be handled,



(g)) the quantification of the anticipated costs of the settlement expected mine

the damage affected the influence of conquering the exclusive bearing and a proposal to create a

the necessary financial provisions, including the time during their creation,



h) the quantification of the anticipated costs for remediation and reclamation

^ 9b) concerned land due to the mining of the exclusive bearing and a proposal for

create the necessary financial provisions, including the time during their

creating,



I) certificate of incorporation, and a copy of the permissions to mining activities.



(4) the quantification of the estimated costs referred to in paragraph 3 (b). g) and (h)), and

the proposal to create the necessary financial reserves is not presented by the Organization,

If you meet the conditions listed in the law ^ 9 c) the aggregate amount of

funding for the remediation and reclamation and the aggregate amount of

funding for the settlement of mining damage corresponds to the measurement

the cost of the remediation and reclamation and the cost of mining damage resulting

the expected level of production, and includes the mining,

the authorisation is sought.



(5) an application shall be submitted to the Office of the district mining Office in duplicate.



§ 7



Plans and documentation relating to mining activity



(1) plan and documentation in terms of details must be adapted to the

to local conditions. The graphics of the annex shall be drawn up in such a large scale,

in order to ensure clarity of the display and of the facts; When

maintaining clarity is possible different data and facts appear in the

a graphical annex.



(2) as a plan, where appropriate, documents referred to in paragraph 1 may be

submitted documentation or part thereof, drawn up for other purposes

According to special regulations, ^ 10) to the extent required by this

by Decree.



(3) the plan and approves the documentation Manager for mine racing

mine, mine racing quarry ("Racing"). ^ 10a) in the plan and


documentation and their respective parts of the day must be provided

copy the names, signatures, and function of processors, as well as the heads of the

workers entitled to review the accuracy and completeness of the individual

parts of the plan and documentation.



§ 8



The decision to allow mining activities and the admissibility of changes in plans and

documentation



(1) the district mining Office in the authorisation procedure for mining activity will review



and completeness of the request)



(b) resolution of conflicts of interest) protected by special legal

regulations, ^ 6)



(c)) compliance with the principles of mining technology, while ensuring the efficient

use of the exclusive bearing.



(2) in the decision to allow mining activities the district mining Office

determined according to the applicable mining activities and decides on objections

party to the proceedings.



(3) the district mining Office will send the Organization together with the decision on the authorisation

mining activity one certified copy of the plan, where appropriate,

documentation.



(4) changes in plans and documentation, that there is no deterioration in the

safety and health at work and the safety of operations, will not be

without prejudice to the objects and interests of legal and physical persons protected under

special legislation over the range referred to in the authorisation decision

mining activities, the Organization will report to the district mining Office. In

the Declaration shall state the



and) name (business name), the organization identification number and registered office

the Organization,



(b) a description of and reasons for the changes) with their showing in the plan and documentation.



§ 9



cancelled



Part three



Reporting of mining activities and the activities carried out using mining techniques



§ 10



The subject of the notification



(1) the organization announces the initiation of mining activities and the activities carried out by

using mining techniques (hereinafter referred to as "activities"), as well as its break on time

more than 30 days the district mining Office.



(2) organization development



and mining exploration parts) during the conquest of the exclusive bearing ^ 11) if it is

included in the spending plan, the preparation and extraction of the exclusive bearing,



(b) the drilling of mines) (underground wells),



(c) geological mapping work), laboratory and kamerální.



§ 11



The contents of the report



(1) the Notification contains



and) name, identification number and address of the organization that the activity will be

to perform,



(b)) kind of activity ^ 12)



(c) the purpose and scope of the planned) activities



(d)), a village and district cadastral territory of the qualified registered designation of activities,



e) start date, the scheduled termination or interruption of the activity,



(f)) the kind and the type of technical equipment,



(g)) the manner and extent of blasting, details of their authorisation,



h) measures to ensure the safety and health at work and the

the safety of operations,



I) activity, the consequences of the elimination method



j) evidence of the organisation to carry out an activity that is the subject of

reporting,



to the decision) enabled activity conducted of mining

way under special legislation.



(2) the Declaration shall be attached map showing the location and type of activity.



§ 12



cancelled



section 13 of the



The reporting period



(1) the organisation shall report the commencement, interruption for longer than

30 days and their activities at least 8 days in advance; at the same time

organization announces a change in plans and documentation according to § 8 para. 4.

During the interruption of the activity for a period of more than six months to submit a plan

ensure that must be handled Similarly, under section 6 (1). 2 (a). (d))

and (e)).



(2) changes in the content of the report is the Organization required to notify without delay.



Part four



Final provisions



§ 14



Regulation (EEC)



Shall be deleted:



1. the Decree of the Central Mining Office No. 261/1957 OJ l, which

shall issue more detailed provisions on the drawing up and approval of plans

developing, preparation and extraction, as well as securing and disposal plans

major mines and quarry;



2. Decree of the Central Mining Office No. 264/1957 OJ l, which

regulates the notification of search and exploration of the work of the State mining

Administration;



3. the revenue of the Central Mining Office of 10 February. July 1961 REF.

5026/1961 on the compilation and approval of plans, training, and developing the

mining bearings and provide plans and liquidation of main mine workings for

kamenouhelné doly Ostrava-Karviná coalfield (reg. # in the amount.

43/1961 Coll.);



4. directive of the Central geological Bureau and the Central Mining Office

of 5 April 2004. April 1963 REF. 2531/1963 to supplement Directive and

the instructions of the Central geological authority from 1 January 2000. July 1962 and REF. 9/1962

the research and exploration of mineral deposits (in the amount of no.

22/1963 Coll.);



5. the yield the Central Mining Office REF. 800/1963 of 28. January 1963

drawing up and approval of mining plans, developing and mining of oil and

natural gas, as well as liquidation or conservation plans for Wells

(in the amount of No 11/1963 Coll.);



6. directive of the Central Mining Office of 19 July. July 1960 Kau.

1017-Z/1960 for the establishment and approval of plans, training, and developing the

conquest of bearings and of the plans of the liquidation of main mine workings in the resort

The Central Administration of the research and production of radioactive materials.



§ 15



The effectiveness of the



This Decree shall enter into force on 1 January 2000. July 1988.



President:



Ing. Zíka in r.



Č. 1



Documentation search and survey of the exclusive bearing mining parts



1. purpose of prospecting and exploration: description, purpose, scope and the arrangement of mining

works.



2. The security of operation of the energy, water, machinery and

material; method and system of mine transport.



3. basic measures to ensure the safety and health at work

and traffic safety, the measures in connection with the old mining parts

the surrounding mines and quarries, particularly in terms of the occurrence of explosive gases and

money, spontaneous combustion, rescuer of rocks, coal, and gas, water and průvalů

bahnin and other dangerous phenomena.



4. dealing with mining waters.



5. the way of ensuring the requirements arising from the decision of the institutions and agreements

with the authorities and organizations, for the protection of the objects and interests referred to in

the specific legislation.



6. Measures to ensure that the conditions laid down by decisions on protected

and bearing territories of the mining leases.



7. A list of the mine workings, which will entail on the surface or in such

close to the surface that they are likely to be adverse effects on the surface,

including how they control.



8. assessment of the plan of the proposed mining works in view of their

any use for other purposes.



9. maps and slices, with an indication of the facts necessary for the

assessment of the data points 1, 2, 3, 4 and 7.



Č. 2



Documentation securing and disposal of mine workings and

a survey of the exclusive bearing mining parts



1. Reasons for collateral or liquidation; in the case of term assurance

the planned recovery activities.



2. inventory of the exclusive bearing, method of their protection or pry,

where applicable, the proof of their depreciation in the case that stocks have been identified.



3. To ensure the liquidation and other mine workings, usage time

the progress of work.



4. basic measures to ensure the safety and health at work

and traffic safety, the measures in connection with the old mining parts

the surrounding mines and quarries, particularly in terms of the occurrence of explosive gases and

money, spontaneous combustion, rescuer of rocks, coal, and gas, water and průvalů

bahnin and other dangerous phenomena.



5. The management of mining waters.



6. Method of providing the requirements arising from the decision of the institutions and agreements

with the authorities and organizations, for the protection of the objects and interests referred to in

the specific legislation.



7. maps and slices, with an indication of the facts necessary to

assessment of the data points 2, 3, 4 and 6.



Č. 3



Developing the plan, the preparation and extraction of an exclusive underground mineral-bearing and

surface



1. the text part of the



1.1 Geology and management of stocks of sole of the bearing.



1.1.1 Brief geological, stratigraphic, and.

hydrogeologická characteristics of the exclusive bearing.



1.1.2. the stocks of sole bearings in the plan, as reported in the section concerned

stock of the State of prozkoumanosti.



1.1.3. the Planned changes to the reserves in the listed bearings:



and additions, disposals), inventory transfers and their depreciation,



(b)), výrubnost and pollution,



(c) the closing stocks).



1.1.4. the breakdown of inventory according to readiness for conquest.



1.1.5. The projected quantity and quality of inventory in-bound trade

the pillars, the reasons for the suspension and the measures for their further pry.



1.1.6 distribution, quantity and quality of stocks whose conquest will be

planned otvírkou, preparing and mining more difficult or endangered, and

measures on their protection or pry.



1.1.7 inventory usability Conditions, their calculation and the amount of

vytěžitelných inventory in plan affected parts of the bearing.



1.2 the development, preparation, and conquest.



1.2.1 to ensure the conditions referred to in the decisions on the determination of

the protected area and the total area.



1.2.2 Planned further exploration.



1.2.3. developing the Method, preparation and extraction, their breakdown, time and


the substantive follow-up work; ensure the advance survey, developing and training

before the opening, for quarrying, mining the overburden advance procedure of inventory.



1.2.4. The mining methods, details of their approval, the justification of their

use; Special measures when introducing new mining methods.



1.2.5 General slopes of the overburden, the quarry and the parameters of the overburden and mining

slices; the location and timing of the operation dumps and waste heaps, their

projected capacity and service life; General slopes hoppers, parameters

výsypkových degrees; measures against been recent heavy rains.



1.2.6. The measures in the management of the work of the border area; data on the

mining or planned work in the adjacent mining area,

If the work can interfere with each other, and the necessary measures.



1.2.7. the disintegration of rocks.



1.2.8 the location of mining structures and mining under surface buildings serving

otvírce, preparation or extraction of the exclusive bearing in the quarry and the skrývkách in

the border demarcated the line actually made the overburden or carried out

mining, where appropriate, on the territory of the direct effects of mining issued, if not

made reclamation of the land.



1.2.9 mechanization and electrification, mining, transport, water supply, and ensure the

operation of the material.



1.3 safety and health protection at work and the safety and

protection of objects and of the interests protected by the specific provisions.



1.3.1 basic precautions against the risk of



and the explosion of gases and dusts),



b) spontaneous combustion fires in underground,



(c)) průvalů water and bahnin,



(d))-rescuer of rocks, coal and gas,



e) mining shocks,



f) ionizing radiation,



g) landslides in the quarries, mining, odvalech and



h) other dangerous phenomena.



1.3.2 Basic mine ventilation systems or parts thereof, or. each

separate větrních Department, air conditioning and degassing, measures against

dust; ventilation of deep fractures. The mines in the Ostrava-Karviná

calculation of the volume flow quantity of the hunting grounds of the winds, the Chambers were maintained by the

carried out on the basis of forecasts of plynodajnosti, in the development of the face,

the operation of the face and its disposal.



1.3.3 Drainage:



and collecting and remitting) mine water,



(b)) dealing with mining waters.



1.3.4. An overview of the objects and the interests protected by the specific provisions

scheduled activity concerned, to ensure the requirements

from the decision of the institutions and agreements with the authorities and organisations, for the

their protection; effort data of deformation of the surface of the terrain, the

where are the objects and interests situated, including

the movement of groundwater.



1.4 and coating:



and shipping method to modify) and finishing,



(b)) that folder when you edit will be grown from minerals and finishing

used,



(c)) the quantity and quality of the charge of minerals in the úpravárenského process,



d) technology refinement,



e) yield,



f) quantity and quality of resulting product refinement,

How to store them,



g) quantity and quality of waste and saving it, the decision on the establishment,

change or dispose of the tailings impoundment, and conditions for testing these decisions,



h) basic measures against the occurrence of serious traffic accidents (accidents).



1.5 Assessment Plan of the proposed mining works in view of their

any use for other purposes.



rehabilitation and reclamation Plan 1.6 the territory of mining:



and a technical plan and timetable) of the work,



b) quantify the estimated costs for the expected settlement of mine

damage and sanitation and reclamation of land affected by the influence of mining,



(c)) the proposal to create the necessary financial provisions and on the time course

How to create them.



2. Video section



2.1 Map surface situation and mine situation and cuts in the scope of the planned

mining activities on an appropriate scale, showing the facts

needed for the assessment of the data referred to in items 1.2 and 1.3 below.



2.2 Map blocks showing the area affected stocks of the main tectonic

disorders of the anticipated decreases of inventory and depreciation vytěžitelných inventory.



2.3 ventilation Map on an appropriate scale, or in a special projection

(for example, isometric, axonometric) with an indication of the safety

buildings and equipment for air conditioning; canonical schema for ventilation.



2.4 Plan to divorce, and degazačních energy device.



2.5 geological Characteristic slices and specifying the working

Horizons (cuts, decks).



2.6 Special annex for mines and quarries with complex geological,

hydrogeological and on mining-technical conditions (for example, mines with

the dangers of mining tremors, průvalů water and bahnin, rescuer of minerals, coal and

gases).



Č. 4



The mining plan and developing the oil, combustible gas, and technically

the exploitable natural gas



1. the text part of the



1.1 Geological and hydrogeologická characteristics of bearings, save it

and the characteristics of the surrounding rocks.



1.2 Registered stocks of bearings with the plan of the parts concerned, conditions

usability, the calculation of inventory including vytěžitelných inventory.



1.3 Ensure the conditions referred to in the decisions on the establishment of the protected

the bearing of the territory and the total area.



1.4. The estimated number of wells, their location, depth and purpose,

technical characteristics (construction and insulation wells; isolation

individual horizons, holiday deviation wells, ensuring their

the estuary, where appropriate, measures to protect another exclusive bearing in

mining area).



1.5 the Projected level of production, the time sequence of the upstream developing and mining.



1.6 Security operation of the energy, water, and technological resources.



1.7 extraction Mode of the bearing and use of bearing power.



1.8 technical and technological characteristics of the method of extraction. Way

control measurement of the technical condition of the production wells and surface

mining equipment.



1.9 characteristics of the capture and editing system of oil and gas.

How to measure and record the quantities reserved minerals extracted.



1.10. The application of the secondary and other mining methods.



1.11 basic measures against the risk of



and the formation and effects of eruptions), oil and gas,



(b)) explosion and fire,



(c)) other dangerous phenomena.



1.12 List of objects and the interests protected by the specific provisions,

planned activities concerned; way to ensure the requirements

from the decision of the institutions and agreements with the institutions and organizations with which it is for the

their protection.



1.13 the assessment plan of the proposed works in view of their alternative

use for nehornické purposes.



rehabilitation and reclamation Plan 1.14 territory of mining:



and a technical plan and timetable) of the work,



b) quantify the estimated costs for the expected settlement of mine

damage and sanitation and reclamation of land affected by the influence of mining,



(c)) the proposal to create the necessary financial provisions and on the time course

How to create them.



2. Video section



2.1 Structural maps of productive horizons, showing the boundaries of the

ropoplynových horizons and their changes as a result of mining.



2.2 Map surface situation on an appropriate scale, showing the boundaries of the

the protected area and the total area, the map inventory

the plan concerned, with an indication of the existing and projected boreholes, wells and

the surface of the device.



2.3 the characteristic cuts the bearing.



Č. 5



The plan of training, developing and mining of loužícího field



1. the text part of the



1.1 a brief geological and hydrogeologická characteristics of the bearing, its

the storage conditions and the characteristics of the surrounding rocks.



1.2 Status and inventory their hydrological readiness for mining, the

layout by quality, a breakdown of the bearings on the loužicí field.



1.3 Ensure the conditions referred to in the decisions on the establishment of the protected

the bearing of the territory and the total area.



1.4 the mining method Used.



1.4.1 technical and technological characteristics of the process

including extractions and processing method of creating a trade zone separator

before the procedure, a custom loužicího solution.



1.4.2 network design vtlačných and pumping wells, their average, and

depth, working mode, divorce loužicích solutions, the evacuation of the extract,

the arrangement and method of treatment of the extract.



1.4.3 drilling boreholes, drilling technology, the construction of wells,

including sheeting and insulation, the insulation of the individual zvodněných horizons,

locks the mouth of wells, boreholes and the way in which the downstream surface

vtláčecího Harvester.



1.5 measures for protection of surface and groundwater against influence

loužicími marches with the design of control network of observation wells including

the monitoring system of the whole process and its effect on leaching of the surrounding

environment.



1.6 the sequence of work and the projected volume of extracts.



1.7 traffic Security, water, energy, technological resources, and

materials.



1.8 Fundamental measures to ensure the safety and health at

work and safety, especially when working with chemicals, against

the explosion of gases and vapours, air-pressure when operating the device, the working

machinery, electrical equipment and for protection against ionising radiation.



1.2 control measures to monitor environmental effects of mining activity on the Earth's

surface.




1.10 method of providing the requirements arising from the decision of the authorities and

agreements with the institutions and organizations for the protection of the objects and interests

under the specific legislation.



rehabilitation and reclamation Plan November 1 to the territory of the Liming:



and a technical plan and timetable) of the work,



b) quantify the estimated costs for the expected settlement of mine

damage and sanitation and reclamation of land affected by the influence of leaching,



(c)) the proposal to create the necessary financial provisions and on the time course

How to create them.



2. Video section



2.1 Map surface situation worthy of a scale showing the protected

area, total area, the individual fields and loužicích

protected objects and interests (protected areas, buffer zones),

where appropriate, observation points to monitor the impact of mining on the surface.



2.2 Map inventory showing the wells.



2.3 Map hydrogeological conditions, with an indication of the control of observation

Wells and service center with a projected course of isolines of the levels in the

individual or izopiez Obzor artesian waters.



2.4 Characteristic geological or hydrogeological slices

Bearing with an indication of the progress of individual layers in Obzor.



Č. 6



Plan to ensure the mine workings and quarries and the liquidation of main mine workings and

quarries



1. the text part of the



1.1 reasons for collateral or liquidation.



1.2. In the plan of liquidation of the summary of the results of geological-exploration projects,

developing, preparing and mining in the affected parts of the bearing, as well as editing and

finishing earned minerals.



1.3. a brief summary of the results of the disposal plan for the management of stocks

in the plan concerned portions of the bearing (nil, if approved by the calculate inventory

exclusive bearings with ending the mining).



1.3.1 the inventory status of the exclusive bearing and vytěžitelných inventory in plan

the area concerned.



1.3.2 changes in stocks vydobytím, losses, depreciation, review

under the new conditions of usability, other changes to inventories and final State

stocks.



1.3.3 How regulatory resolve leftover inventory at the border

the total mining area, and in the case that the mining area covered only part of the

and outside the area.



1.3.4 the protection or use of leftover inventory.



1.3.5 definition of areas concerned exploitation (depressions kotlina)

the values of the subsidence along with data on groundwater level and the possible

fissure type of aquifer or surface load values for the parameters of deformation field

(horizontal relative deformation, radius of curvature, tilts) including

information about the conditions of the protected area.



1.4. Method of mine workings and quarries or liquidation of main mine

works and quarries.



1.4.1. Measures to prevent adverse effects on surface and the designation of the

protection zones.



1.4.2. Adjust slopes and bottoms quarries, dumps and waste heaps adjustment.



1.4.3 method of controlling of secured or abandoned mine workings and

quarries and surface installations.



1.5 basic precautions to ensure the safety and health at

work and safety, action in respect of the old mining

parts and the surrounding mines and quarries, particularly in terms of the occurrence of explosive

gases, dust, spontaneous combustion, rescuer of rocks, coal, and gas, water průvalů

and bahnin and other dangerous phenomena.



1.6 timing of reinsurance or winding-up of the work, the cost of

technical liquidation, its method of security, taking into account

financial income from liquidated tangible investment and inventory when

their extraction.



1.7 method of redevelopment and reclamation of the land after extraction and a way to ensure

requirements arising from the decision of the institutions and agreements with the authorities and

organizations, for the protection of the objects and interests according to the specific

regulations and documents to resolve conflicts of interest.



1.8 Alternate use of the mine workings, quarries, installations and structures for other

the purpose and method of use of the land after the implementation of rehabilitation and reclamation.



1.2 management of mining the waters, affecting mine water with harmful substances

arising from the mechanical and electrical equipment retained in the mine, including the

opinions of the water authority and the authority of the public health service (section 40

Act No. 439/1992 Sb.).



1.10 Papers to resolve the work near the border area.



1.11 list of authorisations any derogations or exemptions from the applicable

regulations.



rehabilitation and reclamation Plan 1.12 territory of extraction:



and a technical plan and timetable) of the work,



b) quantify the estimated costs for the expected settlement of mine

damage and sanitation and reclamation of land affected by the influence of mining,



(c)) the proposal to create the necessary financial provisions and on the time course

How to create them.



2. Video section



2.1 Map surface situation on an appropriate scale, showing the protected

area and area, installations and structures on the surface and

the territory where the reflected adverse effects.



2.2 Map mining situation of bearings in a worthy scale with

an indication of timing and method of collateral or liquidation.



2.3 the characteristic cuts affected areas.



Č. 7



The arrangements for ensuring and disposal wells



1. the text part of the



1.1 rationale for collateral or liquidation group wells or wells in the

parts of the bearing in question, a way to ensure their safe disposal, or

implementation.



1.2 layout and technical parameters of the wells.



1.3 assessment of the use of stock in the plan concerned portions of bearings,

technological losses, inventory, including applied nevydobytých

intenzifikačních methods, where appropriate, the possibility of using secondary mining

methods.



1.4 Other reserved deposits detected by drilling in the affected parts of the

space and ways of their protection.



1.5 Pressure and hydrodynamic conditions of the bearings.



1.6 the technical condition of wells designed to guarantee or disposal,

particularly in terms of the isolation of individual horizons, methodology and technique

detection of the technical condition of wells.



1.7. Assessment of the results of filling mining spending mining attempts.



1.8 method of providing the requirements arising from the decision of the authorities and

agreements with the institutions and organizations for the protection of the objects and interests

under the specific legislation.



1.9 in the plan to ensure the measures to restore mining.



1.10 use of wells, installations and structures for other purposes.



1.11 method of follow-up of secured or abandoned wells and

probes. Design of geophysical and geomechanické control method of disposal

Wells, or the effectiveness of repair work in the wells.



1.12 basic precautions to ensure the safety and health at

work and safety.



1.13 Policy disposal wells, the composition of the mixtures tamponážních and carburising

Use separator of liquids. Technology improvements

technical condition of the broken zapažnicových and carburizing.



1.14 support costs, disposal, how it security

taking into account the financial proceeds of liquidated tangible investment and inventory

when their mining.



rehabilitation and reclamation Plan 1.15 of the territory of the affected mining:



and a technical plan and timetable) of the work,



(b) assessing the costs of the settlement) of mining claims and for the rehabilitation and

reclamation of land affected by the influence of mining,



(c) to create the necessary financial reserves) on the locking and winding-up

work and for the rehabilitation of the land affected by mining and reclamation.



2. Video section



2.1 Structural maps showing the facts needed to assess

data points 1.2, 1.3, and information about other exclusive bearings.



2.2 the geological and technical profiles wells in parts of the affected

by providing or liquidation and showing how to perform their

collateral or liquidation.



2.3 the characteristic cuts the bearing with an indication of the facts referred to in

2.1.



Č. 8



The arrangements for ensuring and disposal of loužicího field



1. the text part of the



1.1 rationale for collateral or liquidation of the loužicího field; in the case of

liquidation of the valorisation of results and management of mining stocks in the

loužicím field (eliminates, if approved by the calculate inventory sole bearings

with ending the mining).



1.2 evaluation of the impact of collateral or liquidation on neighbouring and other

loužicí field.



1.3 way of ensuring or liquidation of the loužicího field (method of neutralization

residual loužicích solutions in the dobývaném horizon, the isolation of individual

horizons, preventing discharges of water pressure or water with residual

solutions to the groundwater and surface water, wells and ensure tamponáž

the estuary).



1.4 the time sequence of the individual reinsurance or winding-up of the work;

costs for technical liquidation, its way of security

taking into account the financial proceeds of liquidated tangible investment and inventory

when their mining.



1.5 Other exclusive bearings in the loužicím field, measures for their recovery and

How to protect them.



1.6 How to meet the requirements arising from the decision of the authorities and

agreements with the institutions and organizations for the protection of the objects and interests

under the specific legislation.



1.7. Basic measures to ensure the safety and health at

work and safety in detention or winding-up

the works.



1.8 the use of wells, installations and structures for other purposes.




1.9 in the plan to ensure the measures to restore the conquest.



1.10 Method and time limits for inspections in case of further necessary monitoring

development of hydro-geological conditions in the bearing and in the accompanying rocks.



1.11 method of detecting cavities incurred by or in connection with the

him and focus their shape and volume with the draft of the measures to

protect the surface of the objects and interests.



rehabilitation and reclamation Plan 1.12 territory of liming:



and a technical plan and timetable) of the work,



(b) assessing the costs of the settlement) of mining claims and for the rehabilitation and

reclamation of land affected by the influence of leaching,



(c) to create the necessary financial reserves) on the locking and winding-up

work and to bail out and land reclamation affected due to leaching.



2. Video section



2.1 Map on a scale worthy of showing the facts needed to

assessment of the data points 1.1, 1.2 and 1.11.



2.2 Map current and the resulting hydrogeological and hydrochemických

the ratios in the extracted by fields.



2.3 the characteristic cuts the bearing with an indication of the facts referred to in

points 2.1 and 2.2.



Č. 9



Documentation of specific interventions in the Earth's crust



1. the text part of the



1.1 the purpose of the special intervention in the Earth's crust.



1.2 evaluation of the exploration work and an assessment of the appropriateness of that territory, and

his geological structures to use for the purpose, and integrated

evaluation of storage ^ 13) as a summary of reviews of storage space

in accordance with annex 12 to assess the safe storage of the waste and the safe

isolation of the surrounding environment from the perspective of potential environmental risk

human health and the environment in the location in which it is

the store located, carried out by a competent person with a certificate

issued under a special legal regulation ^ 14).



1.3 ensure the conditions and limitations resulting from the decision on the determination of the

the protected area for special interventions in the Earth's crust.



1.4 Description, scope, structure and time sequence of work scheduled.



1.5 Capacity natural rock structures underground, where appropriate,

areas designated for recovery.



1.6 the assumption of adverse effects of specific interventions in the Earth's crust on the

surface and underground objects and installations, in particular the impact on aggravating or

freeze-out pry out deposits, and measures to protect them.



1.7. Basic measures to ensure the safety and health at

work and safety, in particular



and measures against leakage and) emissions of gases and liquids,



(b) fire-fighting protivýbuchová and measures),



(c) the closure of mine workings) way of storage of radioactive and other

industrial waste,



(d) the designation of places and intervals) measurements spillage of harmful substances from

the place of storage.



1.8 method of providing the requirements arising from the decision of the authorities and

agreements with the institutions and organizations for the protection of the objects and interests

under the specific legislation.



1.2 the plan a bailout and reclamation of territory of specific interventions in the

the Earth's crust:



and a technical plan and timetable) of the work,



b) quantify the estimated costs for the expected settlement of mine

damage and sanitation and reclamation of land affected, due to specific

intervention in the Earth's crust,



(c)) the proposal to create the necessary financial provisions and on the time course

How to create them.



2. Video section



2.1 Map surface situation on an appropriate scale, showing the protected

territory for specific interventions in the Earth's crust, surface installations for

Special interventions in the Earth's crust, and the facts in accordance with points 1.6 and 1.8.



2.2 Map mining situations, where appropriate, the structural maps showing the mine

works and facts required for the assessment of the data referred to in points 1.4 and 1.5.



2.3 the characteristic cuts the area concerned, with an indication of the facts

referred to in points 2.1 and 2.2.



Č. 10



Documentation securing and disposal of specific interventions in the Earth's crust



1. the text part of the



1.1 rationale for collateral or liquidation of mines.



1.2 assessing the possibility of using mines and equipment for other purposes.



1.3. Description, structure, scope and timing of the planned works, the cost of

technical liquidation, its method of security, taking into account

financial income from liquidated tangible investment and inventory when

their extraction.



1.4 basic precautions to ensure the safety and health at

work and safety.



1.5 method of providing the requirements arising from the decision of the authorities and

agreements with the institutions and organizations for the protection of the objects and interests

under the specific legislation.



rehabilitation and reclamation Plan 1.6 the territory of special interventions in the

the Earth's crust:



and a technical plan and timetable) of the work,



(b) assessing the costs of the settlement) of mining claims and for the rehabilitation and

reclamation of land affected, due to specific intervention in the Earth's crust,



(c) to create the necessary financial reserves) on the locking and winding-up

work and to bail out and land reclamation of the concerned intervention in the Earth's

the bark.



2. Video section



2.1 Map surface situation on an appropriate scale, showing the protected

territory for specific interventions in the Earth's crust, surface installations for

Special interventions in the Earth's crust and the facts described in section 1.5.



2.2 Map mining situations, where appropriate, the structural maps showing the mine

works and of the facts referred to in section 1.3.



2.3 the characteristic cuts the area concerned, with an indication of the data referred to in points

2.1 and 2.2.



Č. 11



Plan for securing and disposal of old mine workings



1. the text part of the



1.1 description of the old mine workings and evaluation of their adverse effects

on the surface; equipment and buildings on the surface.



1.2. method of securing or disposing of old mine workings; the nature, scope and

timing of the planned work.



1.3 basic measures to ensure the safety and health at

work and safety, action in the context of other old

mining parts, the surrounding mines and quarries, particularly in terms of the occurrence of the

explosive gases and dusts, spontaneous combustion, rescuer of rock, coal and gas,

průvalů water and bahnin and other dangerous phenomena.



1.4. Method of providing the requirements arising from the decision of the authorities and

agreements with the institutions and organizations for the protection of the objects and interests

under the specific legislation.



2. Video section



2.1 Map surface situation on an appropriate scale, showing the facts

and the data referred to in points 1.1 and 1.2.



2.2 Characteristic cuts the area concerned, with an indication of the facts and

the data referred to in point 2.1.



2.3 the drawing documentation or the manner of disposal of old

mine workings.



Č. 12



The risk assessment of the site in which the store is located



The operator shall submit an integrated evaluation of the storage,

that contains the following sections:



1. geological assessment,



2. geomechanické reviews,



3. hydrogeological assessment



4. geochemical assessment



5. evaluation of the impact on human health and the environment,



6. assessment of the operational phase,



7. the evaluation of the long term,



8. evaluation of the impact of the entrance of surface installations,



1. Geological Assessment



Based on a survey and analysis of the types of rocks, soils and topography

demonstrates comprehensive knowledge of the geological conditions of storage. It is necessary to

include the location, frequency and structure of cracks or breaks the surrounding

geological layers and the potential impact of seismic activity on these

structure. The geological evaluation must demonstrate the suitability of the site for the

underground storage.



2. Geomechanické reviews



Appropriate surveys shall be accompanied by the stability of the excavation. The properties of the

the stored waste must be part of this assessment. The procedures must be

systematically analysed and documented.



It must be clear from the analysis that the



and in the course of making storage) of waste and even then are not expected any

the greater the deformation of underground space or storage of waste themselves, or

the Earth's surface in a specified protected area of the site, which would

damage the uptime or develop store path of escape into

the biosphere,



b) stability of the geological formations underground space at the place of storage

waste is sufficient to avoid their collapse during operation

storage,



c) stored material will have sufficient stability to be compatible with

geomechanickými properties of the rock mass.



3. Hydrogeological assessment



Must be carried out a survey of the hydraulic properties, which provides

structure of the groundwater flow in the surrounding rock environment, on the basis of

information on hydraulic conductivity of rocks, faults and hydraulic

gradients in order to avoid the deterioration of the quality of the groundwater. ^ 15)



4. Geochemical assessment



The survey must be made to the composition of the rock mass and the underground

the water, which will assess the current composition of mine water and its possible future

development, the nature and abundance of mineral filling breaks, as well as

quantitative mineralogical description of the rock environment, including

assessment of the impact of storage (leaching) of the geochemický system.



5. Evaluation of the impact on human health and environmental



Assess the effects of storage of wastes on human health and environmental

environment. Must be carried out a baseline study of the surface of the natural


background on the site storage and potential impact of its construction and

use on vegetation, also, and other protected natural objects.



6. assessment of the operational phase



It must be clear from the analysis that the



and) storage is stable,



(b) any contact between) risk management and environmental components

environment, including the risk to the health of people is dealt with in the plan,

storage,



(c)) the risks regarding the safety of operation of the equipment are an integral

part of the processed and approved emergency plan storage



(d)) for the protection of workers, the wastes are stored on the storage of waste

securely separated from mining activities and the activities carried out by mining

in a way,



(e)) the risk that the throughput was lost during the operation is acceptable

in terms of protection of the environment and human health.



In the evaluation of traffic safety based on periodic analyses

the operation of the store on the basis of all the data about how waste management.

It must be demonstrated that the waste will not react chemically with the rock or

physically. It is also necessary to identify the specific cases that would

could lead to the creation of a communication in the rock environment between management and

the environment during the operation of the store. The different types of possible

operational risks should be summarised into specific categories and evaluate

their possible effect. Measures to limit these effects must be included in

emergency plan.



7. the evaluation of the long term



Risk assessment of waste must cover a longer period of time. Must

be demonstrated and guaranteed, whether in the long term after temporary

or the permanent cessation of operation does not create a store communication

in the rock environment between the wastes and the environmental compartments

including impacts on human health.



Must be quantitatively assessed from a long-term perspective, limiting the

factors such as storage locations. the quality of the waste, the status of the accompanying

rocks, mixing, filling wells, overburden, making mine workings, etc. and

evaluated on the basis of specific data about the site, or on the basis of

sufficiently qualified estimate taking into account the geochemical and

hydro-geological conditions and natural dilution and extraction of stored

the waste.



The long-term safety of storage of waste must be demonstrated

through the evaluation of the safety, containing a description of the default

State at a certain time (e.g. at the time of closure), including variations in the

which outlines the important changes that can be used in geological time

expect. Above all, it must be considered the implications of the release of the relevant

substances from waste storage, in different variants, which shows a possible

long-term development that affect the storage and environmental and

the health of the people.



The packaging used and the design of the mine workings in the assessment of long-term

waste storage risks not taken into account because of their limited

the service life.



8. evaluation of the impact of the entrance of surface installations



Before they reach the waste underground, IE. the final place

destination must be interpreted, tested and possibly even temporarily stored

on the surface. The receiving device must meet the requirements of the landfill and

must be designed and operated so as to prevent damage to human

health and the environment.



1) § 14 para. 2 (a). (b)) of the Act No. 44/1988 Coll., on the protection and use of

mineral wealth (the top of the law).



Regulation of the Government of the CZECHOSLOVAK SOCIALIST REPUBLIC No. 80/1988 Coll., on the establishment, classification kondic

inventory and deposits on the assessment, approval and State expertise

their calculations.



3) section 3 of the Decree of the Federal Statistical Office and the Federal

the Ministry for technical and investment development, no 120/1979 Coll.

spatial identification information.



4) Article. 1 yield the Federal Statistical Office REF. 1793/78-032-918 of the

on 9 April. June 1978, which regulates the number of regions and tagging

districts in CZECHOSLOVAKIA (in the amount of 25/1978 Sb.).



5) section 18 of the Czech National Council Act No. 61/1988 Coll. on mining activities,

explosives and the State Mining Administration.



6) for example, Act No. 71/1967 Coll., on national committees, as

amended (full text for no. 31/1983), law No.

51/1964 Coll., on the railways, and the Decree of the Ministry of transport and Central

Mining Authority no. 28/1967 Coll., laying down rules for railways

with mining activities, Act No. 110/1964 Coll. on telecommunications, the law

No. 20/1966 Coll., on health care to the people, Act No. 53/1966 Coll., on the protection of

agricultural land holdings, as amended by Act No. 75/1976 Coll. (the full text of

No 124/1976 Coll.), Act No. 138/1973 Coll. on waters (Water Act), the law

No 61/1977 Col., on forests, law No. 40/1956 Coll., on State protection

nature, as amended, the law of the Czech National Council No.

20/1987 Coll. on State care monument.



9) section 4 of the Act No. 62/1988 Coll., on geological works, as amended by law

No 543/1991.



9A) for example. Act No. 17/1992 Coll., on the environment, the law No.

244/1992 Coll., on the assessment of the impact on the environment.



9B) Act No. 337/1992 Coll., on the protection of agricultural land resources in

amended by Act No. 10/1993.



Act No. 61/1977 Col., on forests, as amended by Act No. 229/1991 Coll.



9 c) § 37a of Act No. 44/1988 Coll., on the protection and utilization of mineral resource

wealth (the top Act), as amended by Act No. 553/1991 Coll.



10) for example, Decree No. 5/1987 Coll.



10A) § 6 para. 1 of Act No. 61/1988 Coll., as amended

regulations.



11) § 31 para. 3 of the Mining Act.



12) § 2 and 3 of Act No. 61/1988 Coll.



13) Council Directive 1999/31/EC of 26 July 2000. 4.1999 on landfill. The decision of the

Council Directive 2003/33/EC of 19 June 2000. 12.2002, establishing the criteria and

procedures for the acceptance of waste at landfills pursuant to article 16 of and annex II to the

Directive 1999/31/EC.



14) Decree No 298/2005 Coll., on professional qualifications and requirements

competence in mining activities, or activities carried out

using mining techniques and on amendment to certain laws.