104/1988 Coll.
Decree
The Czech Mining Authority
of 20 December. May 1988
about deposits, efficiency of authorisation and notification
mining activity and reporting activities carried out using mining techniques
Change: 242/1993.
Change: 434/2000 Sb.
Change: 299/2005 Sb.
The Czech mining Office lays down pursuant to § 30 para. 7, § 32 para. 5 of law No.
44/1988 Coll., on the protection and utilization of mineral resources (upper), and
According to § 5 para. 4, § 9 para. 2, § 10 para. 8, § 11 (1) 3 and § 13 para.
the Czech National Council Act No. 61/1988 Coll. on mining activities,
explosives and the State Mining Administration:
Part the first
Economical use of deposits
§ 1
cancelled
§ 2
Výrubnost, pollution and loss of
(1) during the conquest of an exclusive bearings it is necessary to use such mining
methods that will allow the gain balance stocks of sole bearings ^ 1) with what
the largest výrubností (solid minerals) or vytěžitelností (for
liquid and gaseous minerals, as well as in leaching), with minimal
losses and the least possible pollution, that are technically and economically
justified.
(2) the Organization shall, in developing the plan, the preparation and extraction
exclusive bearings or parts of it to propose and justify the mining
method, and the resulting výrubnost (exploitable), pollution, and
losses.
§ 3
The yield of the
When editing and refining of minerals, if carried out in connection
with their exploitation, it is necessary to use such procedures that allow
the most complete utilization of the minerals seized the largest yield their
commercial ingredients. How to edit and refining of minerals and seized from the
resulting yield is an organization required to include in the plan
developing, preparation and extraction of the exclusive bearing.
§ 4
The survey results, record keeping and the use of
(1) the organization is required to detect and register the amount of materials to be deposited
on odvalech, mining and tailings impoundments and
and during the conquest of the exclusive bearing) výrubnost (exploitable)
pollution and loss of,
(b)) when you edit and refinement of mineral content of their earned
commercial and harmful ingredients in charge, in poloproduktech, in the final
product refinement and waste.
(2) the organization tracks and records on the seams of minerals and accompanying
rocks in the extent required petrographic and mineralogical composition,
the method and form of occurrence and mutual relations, contents and the chemical bond
commercial and harmful ingredients and physico-mechanical and
chemical-technological properties.
(3) the organization uses results referred to in paragraphs 1 and 2 in the planning and
developing the management, preparation and extraction, as well as the exclusive bearing adjustment
and refining earned minerals.
(4) the organization keeps track of the data necessary for the determination of the amount of the reimbursement of the
won the reserved minerals and from the mining areas.
Part two
Authorisation of mining activities
§ 5
Types of mining activity permit
To enable the district mining Office is required for these mining
activities:
and the search and survey) for the sole mining parts, bearings and that
vertical mining parts to depths greater than 40 m, horizontal or
úklonnými mining parts of the length of more than 100 m, or even referred to
mining parts shorter, if are minted for more mine workings,
along with the above length parts exceeds 100 m; the authorisation shall
It also requires that in order to ensure the destruction of these mines and,
(b)) for the otvírku, the preparation and extraction of the exclusive bearing, as well as for
ensure the mines and quarries and liquidation of main mine works and quarries,
(c)) for special interventions in the Earth's crust, including prospecting and exploration
carried out by mining the parts for these purposes, if this works with our range of
comply with the conditions referred to in point (a)),
(d)) to secure and dispose of old mine workings, including their
the discovery, if the survey is carried out in the scope specified mining parts
in subparagraph (a)).
§ 6
Application for authorisation of mining activities
(1) a request for authorisation of mining activities (hereinafter referred to as "the application") contains the
and) name (business name), the organization identification number and registered office
the Organization,
(b)) the kind of mining activities, for which authorization is sought,
(c)) the name and identification number of the cadastral territory, ^ 3) name and code
the County, ^ 4) more detailed indication of the places of activity, the land-register reference numbers
the planned mining activities concerned,
(d)) when mining activity under section 5 (b). (b) the particulars of the determination)
the protected area and the total area and their changes
e) when mining activity under section 5 (b). (c) particulars of the determination)
the protected area for special interventions in the Earth's crust,
(f)) planned start and end, or interruption of mining
activities,
(g)) the name (business name) and address of the processor's plan, where appropriate,
documentation and organization that will carry out some of the work of the mining
activities for an organization referred to in subparagraph (a)),
(h)) names (trade names), and addresses of the parties to enable the mining
activity. ^ 5)
(2) the Organization shall prepare and submit a request for
and) search and survey of the exclusive bearing mining parts documentation
According to annex No 1,
(b)) to ensure and disposal of mine workings during the search and exploration
the exclusive bearing mining parts of the dossier in accordance with Annex 2,
(c)) otvírku, the preparation and extraction of the exclusive bearing
1. surface and underground mineral-developing the plan, the preparation and extraction
According to annex 3,
2. oil, combustible gas, and technically exploitable natural
gas extraction mining plan spending according to annex No 4,
3. by means of boreholes from the surface liming plan preparation, developing and mining of
loužicího field according to annex No 5
(d) ensure the mine workings and) quarries and liquidation of main mine workings and quarries
1. underground and surface mining plan ensure mining method
works and quarries and the liquidation of main mine workings and quarries, according to annex 6,
2. when oil, inflammable gas and technically usable
natural gas plan ensure and disposal wells in accordance with annex
# 7
3. when conquering liming by means of boreholes from the surface of the arrangements for ensuring and
disposal of loužicího field in accordance with Annex 8,
e) special interventions in the Earth's crust the documentation referred to in annexes 9, 10 and
12,
f) ensuring disposal of old mine workings and the arrangements for ensuring and disposal
old mine workings according to annex No 11.
(3) the Organization shall attach to the request
and evidence of resolve) conflicts of interest, where mining activities are
vulnerable to the objects and interests protected under special laws
regulations, ^ 6)
(b)) the list of exceptions, which were for the planned mining activities
the organization authorized by the competent authority,
c) assessment of influence of mining activities on the surface,
(d) the final report on the results of) the housing survey, or proof of
work permit in the event that this survey has not been completed, ^ 9)
e) outturn with the exclusive bearing, in the case of
authorization to ensure the mine workings and quarries or liquidation of main mine
works and quarries,
f) opinion issued under a special legal regulation, ^ 9a) if
pursuant to this regulation to be handled,
(g)) the quantification of the anticipated costs of the settlement expected mine
the damage affected the influence of conquering the exclusive bearing and a proposal to create a
the necessary financial provisions, including the time during their creation,
h) the quantification of the anticipated costs for remediation and reclamation
^ 9b) concerned land due to the mining of the exclusive bearing and a proposal for
create the necessary financial provisions, including the time during their
creating,
I) certificate of incorporation, and a copy of the permissions to mining activities.
(4) the quantification of the estimated costs referred to in paragraph 3 (b). g) and (h)), and
the proposal to create the necessary financial reserves is not presented by the Organization,
If you meet the conditions listed in the law ^ 9 c) the aggregate amount of
funding for the remediation and reclamation and the aggregate amount of
funding for the settlement of mining damage corresponds to the measurement
the cost of the remediation and reclamation and the cost of mining damage resulting
the expected level of production, and includes the mining,
the authorisation is sought.
(5) an application shall be submitted to the Office of the district mining Office in duplicate.
§ 7
Plans and documentation relating to mining activity
(1) plan and documentation in terms of details must be adapted to the
to local conditions. The graphics of the annex shall be drawn up in such a large scale,
in order to ensure clarity of the display and of the facts; When
maintaining clarity is possible different data and facts appear in the
a graphical annex.
(2) as a plan, where appropriate, documents referred to in paragraph 1 may be
submitted documentation or part thereof, drawn up for other purposes
According to special regulations, ^ 10) to the extent required by this
by Decree.
(3) the plan and approves the documentation Manager for mine racing
mine, mine racing quarry ("Racing"). ^ 10a) in the plan and
documentation and their respective parts of the day must be provided
copy the names, signatures, and function of processors, as well as the heads of the
workers entitled to review the accuracy and completeness of the individual
parts of the plan and documentation.
§ 8
The decision to allow mining activities and the admissibility of changes in plans and
documentation
(1) the district mining Office in the authorisation procedure for mining activity will review
and completeness of the request)
(b) resolution of conflicts of interest) protected by special legal
regulations, ^ 6)
(c)) compliance with the principles of mining technology, while ensuring the efficient
use of the exclusive bearing.
(2) in the decision to allow mining activities the district mining Office
determined according to the applicable mining activities and decides on objections
party to the proceedings.
(3) the district mining Office will send the Organization together with the decision on the authorisation
mining activity one certified copy of the plan, where appropriate,
documentation.
(4) changes in plans and documentation, that there is no deterioration in the
safety and health at work and the safety of operations, will not be
without prejudice to the objects and interests of legal and physical persons protected under
special legislation over the range referred to in the authorisation decision
mining activities, the Organization will report to the district mining Office. In
the Declaration shall state the
and) name (business name), the organization identification number and registered office
the Organization,
(b) a description of and reasons for the changes) with their showing in the plan and documentation.
§ 9
cancelled
Part three
Reporting of mining activities and the activities carried out using mining techniques
§ 10
The subject of the notification
(1) the organization announces the initiation of mining activities and the activities carried out by
using mining techniques (hereinafter referred to as "activities"), as well as its break on time
more than 30 days the district mining Office.
(2) organization development
and mining exploration parts) during the conquest of the exclusive bearing ^ 11) if it is
included in the spending plan, the preparation and extraction of the exclusive bearing,
(b) the drilling of mines) (underground wells),
(c) geological mapping work), laboratory and kamerální.
§ 11
The contents of the report
(1) the Notification contains
and) name, identification number and address of the organization that the activity will be
to perform,
(b)) kind of activity ^ 12)
(c) the purpose and scope of the planned) activities
(d)), a village and district cadastral territory of the qualified registered designation of activities,
e) start date, the scheduled termination or interruption of the activity,
(f)) the kind and the type of technical equipment,
(g)) the manner and extent of blasting, details of their authorisation,
h) measures to ensure the safety and health at work and the
the safety of operations,
I) activity, the consequences of the elimination method
j) evidence of the organisation to carry out an activity that is the subject of
reporting,
to the decision) enabled activity conducted of mining
way under special legislation.
(2) the Declaration shall be attached map showing the location and type of activity.
§ 12
cancelled
section 13 of the
The reporting period
(1) the organisation shall report the commencement, interruption for longer than
30 days and their activities at least 8 days in advance; at the same time
organization announces a change in plans and documentation according to § 8 para. 4.
During the interruption of the activity for a period of more than six months to submit a plan
ensure that must be handled Similarly, under section 6 (1). 2 (a). (d))
and (e)).
(2) changes in the content of the report is the Organization required to notify without delay.
Part four
Final provisions
§ 14
Regulation (EEC)
Shall be deleted:
1. the Decree of the Central Mining Office No. 261/1957 OJ l, which
shall issue more detailed provisions on the drawing up and approval of plans
developing, preparation and extraction, as well as securing and disposal plans
major mines and quarry;
2. Decree of the Central Mining Office No. 264/1957 OJ l, which
regulates the notification of search and exploration of the work of the State mining
Administration;
3. the revenue of the Central Mining Office of 10 February. July 1961 REF.
5026/1961 on the compilation and approval of plans, training, and developing the
mining bearings and provide plans and liquidation of main mine workings for
kamenouhelné doly Ostrava-Karviná coalfield (reg. # in the amount.
43/1961 Coll.);
4. directive of the Central geological Bureau and the Central Mining Office
of 5 April 2004. April 1963 REF. 2531/1963 to supplement Directive and
the instructions of the Central geological authority from 1 January 2000. July 1962 and REF. 9/1962
the research and exploration of mineral deposits (in the amount of no.
22/1963 Coll.);
5. the yield the Central Mining Office REF. 800/1963 of 28. January 1963
drawing up and approval of mining plans, developing and mining of oil and
natural gas, as well as liquidation or conservation plans for Wells
(in the amount of No 11/1963 Coll.);
6. directive of the Central Mining Office of 19 July. July 1960 Kau.
1017-Z/1960 for the establishment and approval of plans, training, and developing the
conquest of bearings and of the plans of the liquidation of main mine workings in the resort
The Central Administration of the research and production of radioactive materials.
§ 15
The effectiveness of the
This Decree shall enter into force on 1 January 2000. July 1988.
President:
Ing. Zíka in r.
Č. 1
Documentation search and survey of the exclusive bearing mining parts
1. purpose of prospecting and exploration: description, purpose, scope and the arrangement of mining
works.
2. The security of operation of the energy, water, machinery and
material; method and system of mine transport.
3. basic measures to ensure the safety and health at work
and traffic safety, the measures in connection with the old mining parts
the surrounding mines and quarries, particularly in terms of the occurrence of explosive gases and
money, spontaneous combustion, rescuer of rocks, coal, and gas, water and průvalů
bahnin and other dangerous phenomena.
4. dealing with mining waters.
5. the way of ensuring the requirements arising from the decision of the institutions and agreements
with the authorities and organizations, for the protection of the objects and interests referred to in
the specific legislation.
6. Measures to ensure that the conditions laid down by decisions on protected
and bearing territories of the mining leases.
7. A list of the mine workings, which will entail on the surface or in such
close to the surface that they are likely to be adverse effects on the surface,
including how they control.
8. assessment of the plan of the proposed mining works in view of their
any use for other purposes.
9. maps and slices, with an indication of the facts necessary for the
assessment of the data points 1, 2, 3, 4 and 7.
Č. 2
Documentation securing and disposal of mine workings and
a survey of the exclusive bearing mining parts
1. Reasons for collateral or liquidation; in the case of term assurance
the planned recovery activities.
2. inventory of the exclusive bearing, method of their protection or pry,
where applicable, the proof of their depreciation in the case that stocks have been identified.
3. To ensure the liquidation and other mine workings, usage time
the progress of work.
4. basic measures to ensure the safety and health at work
and traffic safety, the measures in connection with the old mining parts
the surrounding mines and quarries, particularly in terms of the occurrence of explosive gases and
money, spontaneous combustion, rescuer of rocks, coal, and gas, water and průvalů
bahnin and other dangerous phenomena.
5. The management of mining waters.
6. Method of providing the requirements arising from the decision of the institutions and agreements
with the authorities and organizations, for the protection of the objects and interests referred to in
the specific legislation.
7. maps and slices, with an indication of the facts necessary to
assessment of the data points 2, 3, 4 and 6.
Č. 3
Developing the plan, the preparation and extraction of an exclusive underground mineral-bearing and
surface
1. the text part of the
1.1 Geology and management of stocks of sole of the bearing.
1.1.1 Brief geological, stratigraphic, and.
hydrogeologická characteristics of the exclusive bearing.
1.1.2. the stocks of sole bearings in the plan, as reported in the section concerned
stock of the State of prozkoumanosti.
1.1.3. the Planned changes to the reserves in the listed bearings:
and additions, disposals), inventory transfers and their depreciation,
(b)), výrubnost and pollution,
(c) the closing stocks).
1.1.4. the breakdown of inventory according to readiness for conquest.
1.1.5. The projected quantity and quality of inventory in-bound trade
the pillars, the reasons for the suspension and the measures for their further pry.
1.1.6 distribution, quantity and quality of stocks whose conquest will be
planned otvírkou, preparing and mining more difficult or endangered, and
measures on their protection or pry.
1.1.7 inventory usability Conditions, their calculation and the amount of
vytěžitelných inventory in plan affected parts of the bearing.
1.2 the development, preparation, and conquest.
1.2.1 to ensure the conditions referred to in the decisions on the determination of
the protected area and the total area.
1.2.2 Planned further exploration.
1.2.3. developing the Method, preparation and extraction, their breakdown, time and
the substantive follow-up work; ensure the advance survey, developing and training
before the opening, for quarrying, mining the overburden advance procedure of inventory.
1.2.4. The mining methods, details of their approval, the justification of their
use; Special measures when introducing new mining methods.
1.2.5 General slopes of the overburden, the quarry and the parameters of the overburden and mining
slices; the location and timing of the operation dumps and waste heaps, their
projected capacity and service life; General slopes hoppers, parameters
výsypkových degrees; measures against been recent heavy rains.
1.2.6. The measures in the management of the work of the border area; data on the
mining or planned work in the adjacent mining area,
If the work can interfere with each other, and the necessary measures.
1.2.7. the disintegration of rocks.
1.2.8 the location of mining structures and mining under surface buildings serving
otvírce, preparation or extraction of the exclusive bearing in the quarry and the skrývkách in
the border demarcated the line actually made the overburden or carried out
mining, where appropriate, on the territory of the direct effects of mining issued, if not
made reclamation of the land.
1.2.9 mechanization and electrification, mining, transport, water supply, and ensure the
operation of the material.
1.3 safety and health protection at work and the safety and
protection of objects and of the interests protected by the specific provisions.
1.3.1 basic precautions against the risk of
and the explosion of gases and dusts),
b) spontaneous combustion fires in underground,
(c)) průvalů water and bahnin,
(d))-rescuer of rocks, coal and gas,
e) mining shocks,
f) ionizing radiation,
g) landslides in the quarries, mining, odvalech and
h) other dangerous phenomena.
1.3.2 Basic mine ventilation systems or parts thereof, or. each
separate větrních Department, air conditioning and degassing, measures against
dust; ventilation of deep fractures. The mines in the Ostrava-Karviná
calculation of the volume flow quantity of the hunting grounds of the winds, the Chambers were maintained by the
carried out on the basis of forecasts of plynodajnosti, in the development of the face,
the operation of the face and its disposal.
1.3.3 Drainage:
and collecting and remitting) mine water,
(b)) dealing with mining waters.
1.3.4. An overview of the objects and the interests protected by the specific provisions
scheduled activity concerned, to ensure the requirements
from the decision of the institutions and agreements with the authorities and organisations, for the
their protection; effort data of deformation of the surface of the terrain, the
where are the objects and interests situated, including
the movement of groundwater.
1.4 and coating:
and shipping method to modify) and finishing,
(b)) that folder when you edit will be grown from minerals and finishing
used,
(c)) the quantity and quality of the charge of minerals in the úpravárenského process,
d) technology refinement,
e) yield,
f) quantity and quality of resulting product refinement,
How to store them,
g) quantity and quality of waste and saving it, the decision on the establishment,
change or dispose of the tailings impoundment, and conditions for testing these decisions,
h) basic measures against the occurrence of serious traffic accidents (accidents).
1.5 Assessment Plan of the proposed mining works in view of their
any use for other purposes.
rehabilitation and reclamation Plan 1.6 the territory of mining:
and a technical plan and timetable) of the work,
b) quantify the estimated costs for the expected settlement of mine
damage and sanitation and reclamation of land affected by the influence of mining,
(c)) the proposal to create the necessary financial provisions and on the time course
How to create them.
2. Video section
2.1 Map surface situation and mine situation and cuts in the scope of the planned
mining activities on an appropriate scale, showing the facts
needed for the assessment of the data referred to in items 1.2 and 1.3 below.
2.2 Map blocks showing the area affected stocks of the main tectonic
disorders of the anticipated decreases of inventory and depreciation vytěžitelných inventory.
2.3 ventilation Map on an appropriate scale, or in a special projection
(for example, isometric, axonometric) with an indication of the safety
buildings and equipment for air conditioning; canonical schema for ventilation.
2.4 Plan to divorce, and degazačních energy device.
2.5 geological Characteristic slices and specifying the working
Horizons (cuts, decks).
2.6 Special annex for mines and quarries with complex geological,
hydrogeological and on mining-technical conditions (for example, mines with
the dangers of mining tremors, průvalů water and bahnin, rescuer of minerals, coal and
gases).
Č. 4
The mining plan and developing the oil, combustible gas, and technically
the exploitable natural gas
1. the text part of the
1.1 Geological and hydrogeologická characteristics of bearings, save it
and the characteristics of the surrounding rocks.
1.2 Registered stocks of bearings with the plan of the parts concerned, conditions
usability, the calculation of inventory including vytěžitelných inventory.
1.3 Ensure the conditions referred to in the decisions on the establishment of the protected
the bearing of the territory and the total area.
1.4. The estimated number of wells, their location, depth and purpose,
technical characteristics (construction and insulation wells; isolation
individual horizons, holiday deviation wells, ensuring their
the estuary, where appropriate, measures to protect another exclusive bearing in
mining area).
1.5 the Projected level of production, the time sequence of the upstream developing and mining.
1.6 Security operation of the energy, water, and technological resources.
1.7 extraction Mode of the bearing and use of bearing power.
1.8 technical and technological characteristics of the method of extraction. Way
control measurement of the technical condition of the production wells and surface
mining equipment.
1.9 characteristics of the capture and editing system of oil and gas.
How to measure and record the quantities reserved minerals extracted.
1.10. The application of the secondary and other mining methods.
1.11 basic measures against the risk of
and the formation and effects of eruptions), oil and gas,
(b)) explosion and fire,
(c)) other dangerous phenomena.
1.12 List of objects and the interests protected by the specific provisions,
planned activities concerned; way to ensure the requirements
from the decision of the institutions and agreements with the institutions and organizations with which it is for the
their protection.
1.13 the assessment plan of the proposed works in view of their alternative
use for nehornické purposes.
rehabilitation and reclamation Plan 1.14 territory of mining:
and a technical plan and timetable) of the work,
b) quantify the estimated costs for the expected settlement of mine
damage and sanitation and reclamation of land affected by the influence of mining,
(c)) the proposal to create the necessary financial provisions and on the time course
How to create them.
2. Video section
2.1 Structural maps of productive horizons, showing the boundaries of the
ropoplynových horizons and their changes as a result of mining.
2.2 Map surface situation on an appropriate scale, showing the boundaries of the
the protected area and the total area, the map inventory
the plan concerned, with an indication of the existing and projected boreholes, wells and
the surface of the device.
2.3 the characteristic cuts the bearing.
Č. 5
The plan of training, developing and mining of loužícího field
1. the text part of the
1.1 a brief geological and hydrogeologická characteristics of the bearing, its
the storage conditions and the characteristics of the surrounding rocks.
1.2 Status and inventory their hydrological readiness for mining, the
layout by quality, a breakdown of the bearings on the loužicí field.
1.3 Ensure the conditions referred to in the decisions on the establishment of the protected
the bearing of the territory and the total area.
1.4 the mining method Used.
1.4.1 technical and technological characteristics of the process
including extractions and processing method of creating a trade zone separator
before the procedure, a custom loužicího solution.
1.4.2 network design vtlačných and pumping wells, their average, and
depth, working mode, divorce loužicích solutions, the evacuation of the extract,
the arrangement and method of treatment of the extract.
1.4.3 drilling boreholes, drilling technology, the construction of wells,
including sheeting and insulation, the insulation of the individual zvodněných horizons,
locks the mouth of wells, boreholes and the way in which the downstream surface
vtláčecího Harvester.
1.5 measures for protection of surface and groundwater against influence
loužicími marches with the design of control network of observation wells including
the monitoring system of the whole process and its effect on leaching of the surrounding
environment.
1.6 the sequence of work and the projected volume of extracts.
1.7 traffic Security, water, energy, technological resources, and
materials.
1.8 Fundamental measures to ensure the safety and health at
work and safety, especially when working with chemicals, against
the explosion of gases and vapours, air-pressure when operating the device, the working
machinery, electrical equipment and for protection against ionising radiation.
1.2 control measures to monitor environmental effects of mining activity on the Earth's
surface.
1.10 method of providing the requirements arising from the decision of the authorities and
agreements with the institutions and organizations for the protection of the objects and interests
under the specific legislation.
rehabilitation and reclamation Plan November 1 to the territory of the Liming:
and a technical plan and timetable) of the work,
b) quantify the estimated costs for the expected settlement of mine
damage and sanitation and reclamation of land affected by the influence of leaching,
(c)) the proposal to create the necessary financial provisions and on the time course
How to create them.
2. Video section
2.1 Map surface situation worthy of a scale showing the protected
area, total area, the individual fields and loužicích
protected objects and interests (protected areas, buffer zones),
where appropriate, observation points to monitor the impact of mining on the surface.
2.2 Map inventory showing the wells.
2.3 Map hydrogeological conditions, with an indication of the control of observation
Wells and service center with a projected course of isolines of the levels in the
individual or izopiez Obzor artesian waters.
2.4 Characteristic geological or hydrogeological slices
Bearing with an indication of the progress of individual layers in Obzor.
Č. 6
Plan to ensure the mine workings and quarries and the liquidation of main mine workings and
quarries
1. the text part of the
1.1 reasons for collateral or liquidation.
1.2. In the plan of liquidation of the summary of the results of geological-exploration projects,
developing, preparing and mining in the affected parts of the bearing, as well as editing and
finishing earned minerals.
1.3. a brief summary of the results of the disposal plan for the management of stocks
in the plan concerned portions of the bearing (nil, if approved by the calculate inventory
exclusive bearings with ending the mining).
1.3.1 the inventory status of the exclusive bearing and vytěžitelných inventory in plan
the area concerned.
1.3.2 changes in stocks vydobytím, losses, depreciation, review
under the new conditions of usability, other changes to inventories and final State
stocks.
1.3.3 How regulatory resolve leftover inventory at the border
the total mining area, and in the case that the mining area covered only part of the
and outside the area.
1.3.4 the protection or use of leftover inventory.
1.3.5 definition of areas concerned exploitation (depressions kotlina)
the values of the subsidence along with data on groundwater level and the possible
fissure type of aquifer or surface load values for the parameters of deformation field
(horizontal relative deformation, radius of curvature, tilts) including
information about the conditions of the protected area.
1.4. Method of mine workings and quarries or liquidation of main mine
works and quarries.
1.4.1. Measures to prevent adverse effects on surface and the designation of the
protection zones.
1.4.2. Adjust slopes and bottoms quarries, dumps and waste heaps adjustment.
1.4.3 method of controlling of secured or abandoned mine workings and
quarries and surface installations.
1.5 basic precautions to ensure the safety and health at
work and safety, action in respect of the old mining
parts and the surrounding mines and quarries, particularly in terms of the occurrence of explosive
gases, dust, spontaneous combustion, rescuer of rocks, coal, and gas, water průvalů
and bahnin and other dangerous phenomena.
1.6 timing of reinsurance or winding-up of the work, the cost of
technical liquidation, its method of security, taking into account
financial income from liquidated tangible investment and inventory when
their extraction.
1.7 method of redevelopment and reclamation of the land after extraction and a way to ensure
requirements arising from the decision of the institutions and agreements with the authorities and
organizations, for the protection of the objects and interests according to the specific
regulations and documents to resolve conflicts of interest.
1.8 Alternate use of the mine workings, quarries, installations and structures for other
the purpose and method of use of the land after the implementation of rehabilitation and reclamation.
1.2 management of mining the waters, affecting mine water with harmful substances
arising from the mechanical and electrical equipment retained in the mine, including the
opinions of the water authority and the authority of the public health service (section 40
Act No. 439/1992 Sb.).
1.10 Papers to resolve the work near the border area.
1.11 list of authorisations any derogations or exemptions from the applicable
regulations.
rehabilitation and reclamation Plan 1.12 territory of extraction:
and a technical plan and timetable) of the work,
b) quantify the estimated costs for the expected settlement of mine
damage and sanitation and reclamation of land affected by the influence of mining,
(c)) the proposal to create the necessary financial provisions and on the time course
How to create them.
2. Video section
2.1 Map surface situation on an appropriate scale, showing the protected
area and area, installations and structures on the surface and
the territory where the reflected adverse effects.
2.2 Map mining situation of bearings in a worthy scale with
an indication of timing and method of collateral or liquidation.
2.3 the characteristic cuts affected areas.
Č. 7
The arrangements for ensuring and disposal wells
1. the text part of the
1.1 rationale for collateral or liquidation group wells or wells in the
parts of the bearing in question, a way to ensure their safe disposal, or
implementation.
1.2 layout and technical parameters of the wells.
1.3 assessment of the use of stock in the plan concerned portions of bearings,
technological losses, inventory, including applied nevydobytých
intenzifikačních methods, where appropriate, the possibility of using secondary mining
methods.
1.4 Other reserved deposits detected by drilling in the affected parts of the
space and ways of their protection.
1.5 Pressure and hydrodynamic conditions of the bearings.
1.6 the technical condition of wells designed to guarantee or disposal,
particularly in terms of the isolation of individual horizons, methodology and technique
detection of the technical condition of wells.
1.7. Assessment of the results of filling mining spending mining attempts.
1.8 method of providing the requirements arising from the decision of the authorities and
agreements with the institutions and organizations for the protection of the objects and interests
under the specific legislation.
1.9 in the plan to ensure the measures to restore mining.
1.10 use of wells, installations and structures for other purposes.
1.11 method of follow-up of secured or abandoned wells and
probes. Design of geophysical and geomechanické control method of disposal
Wells, or the effectiveness of repair work in the wells.
1.12 basic precautions to ensure the safety and health at
work and safety.
1.13 Policy disposal wells, the composition of the mixtures tamponážních and carburising
Use separator of liquids. Technology improvements
technical condition of the broken zapažnicových and carburizing.
1.14 support costs, disposal, how it security
taking into account the financial proceeds of liquidated tangible investment and inventory
when their mining.
rehabilitation and reclamation Plan 1.15 of the territory of the affected mining:
and a technical plan and timetable) of the work,
(b) assessing the costs of the settlement) of mining claims and for the rehabilitation and
reclamation of land affected by the influence of mining,
(c) to create the necessary financial reserves) on the locking and winding-up
work and for the rehabilitation of the land affected by mining and reclamation.
2. Video section
2.1 Structural maps showing the facts needed to assess
data points 1.2, 1.3, and information about other exclusive bearings.
2.2 the geological and technical profiles wells in parts of the affected
by providing or liquidation and showing how to perform their
collateral or liquidation.
2.3 the characteristic cuts the bearing with an indication of the facts referred to in
2.1.
Č. 8
The arrangements for ensuring and disposal of loužicího field
1. the text part of the
1.1 rationale for collateral or liquidation of the loužicího field; in the case of
liquidation of the valorisation of results and management of mining stocks in the
loužicím field (eliminates, if approved by the calculate inventory sole bearings
with ending the mining).
1.2 evaluation of the impact of collateral or liquidation on neighbouring and other
loužicí field.
1.3 way of ensuring or liquidation of the loužicího field (method of neutralization
residual loužicích solutions in the dobývaném horizon, the isolation of individual
horizons, preventing discharges of water pressure or water with residual
solutions to the groundwater and surface water, wells and ensure tamponáž
the estuary).
1.4 the time sequence of the individual reinsurance or winding-up of the work;
costs for technical liquidation, its way of security
taking into account the financial proceeds of liquidated tangible investment and inventory
when their mining.
1.5 Other exclusive bearings in the loužicím field, measures for their recovery and
How to protect them.
1.6 How to meet the requirements arising from the decision of the authorities and
agreements with the institutions and organizations for the protection of the objects and interests
under the specific legislation.
1.7. Basic measures to ensure the safety and health at
work and safety in detention or winding-up
the works.
1.8 the use of wells, installations and structures for other purposes.
1.9 in the plan to ensure the measures to restore the conquest.
1.10 Method and time limits for inspections in case of further necessary monitoring
development of hydro-geological conditions in the bearing and in the accompanying rocks.
1.11 method of detecting cavities incurred by or in connection with the
him and focus their shape and volume with the draft of the measures to
protect the surface of the objects and interests.
rehabilitation and reclamation Plan 1.12 territory of liming:
and a technical plan and timetable) of the work,
(b) assessing the costs of the settlement) of mining claims and for the rehabilitation and
reclamation of land affected by the influence of leaching,
(c) to create the necessary financial reserves) on the locking and winding-up
work and to bail out and land reclamation affected due to leaching.
2. Video section
2.1 Map on a scale worthy of showing the facts needed to
assessment of the data points 1.1, 1.2 and 1.11.
2.2 Map current and the resulting hydrogeological and hydrochemických
the ratios in the extracted by fields.
2.3 the characteristic cuts the bearing with an indication of the facts referred to in
points 2.1 and 2.2.
Č. 9
Documentation of specific interventions in the Earth's crust
1. the text part of the
1.1 the purpose of the special intervention in the Earth's crust.
1.2 evaluation of the exploration work and an assessment of the appropriateness of that territory, and
his geological structures to use for the purpose, and integrated
evaluation of storage ^ 13) as a summary of reviews of storage space
in accordance with annex 12 to assess the safe storage of the waste and the safe
isolation of the surrounding environment from the perspective of potential environmental risk
human health and the environment in the location in which it is
the store located, carried out by a competent person with a certificate
issued under a special legal regulation ^ 14).
1.3 ensure the conditions and limitations resulting from the decision on the determination of the
the protected area for special interventions in the Earth's crust.
1.4 Description, scope, structure and time sequence of work scheduled.
1.5 Capacity natural rock structures underground, where appropriate,
areas designated for recovery.
1.6 the assumption of adverse effects of specific interventions in the Earth's crust on the
surface and underground objects and installations, in particular the impact on aggravating or
freeze-out pry out deposits, and measures to protect them.
1.7. Basic measures to ensure the safety and health at
work and safety, in particular
and measures against leakage and) emissions of gases and liquids,
(b) fire-fighting protivýbuchová and measures),
(c) the closure of mine workings) way of storage of radioactive and other
industrial waste,
(d) the designation of places and intervals) measurements spillage of harmful substances from
the place of storage.
1.8 method of providing the requirements arising from the decision of the authorities and
agreements with the institutions and organizations for the protection of the objects and interests
under the specific legislation.
1.2 the plan a bailout and reclamation of territory of specific interventions in the
the Earth's crust:
and a technical plan and timetable) of the work,
b) quantify the estimated costs for the expected settlement of mine
damage and sanitation and reclamation of land affected, due to specific
intervention in the Earth's crust,
(c)) the proposal to create the necessary financial provisions and on the time course
How to create them.
2. Video section
2.1 Map surface situation on an appropriate scale, showing the protected
territory for specific interventions in the Earth's crust, surface installations for
Special interventions in the Earth's crust, and the facts in accordance with points 1.6 and 1.8.
2.2 Map mining situations, where appropriate, the structural maps showing the mine
works and facts required for the assessment of the data referred to in points 1.4 and 1.5.
2.3 the characteristic cuts the area concerned, with an indication of the facts
referred to in points 2.1 and 2.2.
Č. 10
Documentation securing and disposal of specific interventions in the Earth's crust
1. the text part of the
1.1 rationale for collateral or liquidation of mines.
1.2 assessing the possibility of using mines and equipment for other purposes.
1.3. Description, structure, scope and timing of the planned works, the cost of
technical liquidation, its method of security, taking into account
financial income from liquidated tangible investment and inventory when
their extraction.
1.4 basic precautions to ensure the safety and health at
work and safety.
1.5 method of providing the requirements arising from the decision of the authorities and
agreements with the institutions and organizations for the protection of the objects and interests
under the specific legislation.
rehabilitation and reclamation Plan 1.6 the territory of special interventions in the
the Earth's crust:
and a technical plan and timetable) of the work,
(b) assessing the costs of the settlement) of mining claims and for the rehabilitation and
reclamation of land affected, due to specific intervention in the Earth's crust,
(c) to create the necessary financial reserves) on the locking and winding-up
work and to bail out and land reclamation of the concerned intervention in the Earth's
the bark.
2. Video section
2.1 Map surface situation on an appropriate scale, showing the protected
territory for specific interventions in the Earth's crust, surface installations for
Special interventions in the Earth's crust and the facts described in section 1.5.
2.2 Map mining situations, where appropriate, the structural maps showing the mine
works and of the facts referred to in section 1.3.
2.3 the characteristic cuts the area concerned, with an indication of the data referred to in points
2.1 and 2.2.
Č. 11
Plan for securing and disposal of old mine workings
1. the text part of the
1.1 description of the old mine workings and evaluation of their adverse effects
on the surface; equipment and buildings on the surface.
1.2. method of securing or disposing of old mine workings; the nature, scope and
timing of the planned work.
1.3 basic measures to ensure the safety and health at
work and safety, action in the context of other old
mining parts, the surrounding mines and quarries, particularly in terms of the occurrence of the
explosive gases and dusts, spontaneous combustion, rescuer of rock, coal and gas,
průvalů water and bahnin and other dangerous phenomena.
1.4. Method of providing the requirements arising from the decision of the authorities and
agreements with the institutions and organizations for the protection of the objects and interests
under the specific legislation.
2. Video section
2.1 Map surface situation on an appropriate scale, showing the facts
and the data referred to in points 1.1 and 1.2.
2.2 Characteristic cuts the area concerned, with an indication of the facts and
the data referred to in point 2.1.
2.3 the drawing documentation or the manner of disposal of old
mine workings.
Č. 12
The risk assessment of the site in which the store is located
The operator shall submit an integrated evaluation of the storage,
that contains the following sections:
1. geological assessment,
2. geomechanické reviews,
3. hydrogeological assessment
4. geochemical assessment
5. evaluation of the impact on human health and the environment,
6. assessment of the operational phase,
7. the evaluation of the long term,
8. evaluation of the impact of the entrance of surface installations,
1. Geological Assessment
Based on a survey and analysis of the types of rocks, soils and topography
demonstrates comprehensive knowledge of the geological conditions of storage. It is necessary to
include the location, frequency and structure of cracks or breaks the surrounding
geological layers and the potential impact of seismic activity on these
structure. The geological evaluation must demonstrate the suitability of the site for the
underground storage.
2. Geomechanické reviews
Appropriate surveys shall be accompanied by the stability of the excavation. The properties of the
the stored waste must be part of this assessment. The procedures must be
systematically analysed and documented.
It must be clear from the analysis that the
and in the course of making storage) of waste and even then are not expected any
the greater the deformation of underground space or storage of waste themselves, or
the Earth's surface in a specified protected area of the site, which would
damage the uptime or develop store path of escape into
the biosphere,
b) stability of the geological formations underground space at the place of storage
waste is sufficient to avoid their collapse during operation
storage,
c) stored material will have sufficient stability to be compatible with
geomechanickými properties of the rock mass.
3. Hydrogeological assessment
Must be carried out a survey of the hydraulic properties, which provides
structure of the groundwater flow in the surrounding rock environment, on the basis of
information on hydraulic conductivity of rocks, faults and hydraulic
gradients in order to avoid the deterioration of the quality of the groundwater. ^ 15)
4. Geochemical assessment
The survey must be made to the composition of the rock mass and the underground
the water, which will assess the current composition of mine water and its possible future
development, the nature and abundance of mineral filling breaks, as well as
quantitative mineralogical description of the rock environment, including
assessment of the impact of storage (leaching) of the geochemický system.
5. Evaluation of the impact on human health and environmental
Assess the effects of storage of wastes on human health and environmental
environment. Must be carried out a baseline study of the surface of the natural
background on the site storage and potential impact of its construction and
use on vegetation, also, and other protected natural objects.
6. assessment of the operational phase
It must be clear from the analysis that the
and) storage is stable,
(b) any contact between) risk management and environmental components
environment, including the risk to the health of people is dealt with in the plan,
storage,
(c)) the risks regarding the safety of operation of the equipment are an integral
part of the processed and approved emergency plan storage
(d)) for the protection of workers, the wastes are stored on the storage of waste
securely separated from mining activities and the activities carried out by mining
in a way,
(e)) the risk that the throughput was lost during the operation is acceptable
in terms of protection of the environment and human health.
In the evaluation of traffic safety based on periodic analyses
the operation of the store on the basis of all the data about how waste management.
It must be demonstrated that the waste will not react chemically with the rock or
physically. It is also necessary to identify the specific cases that would
could lead to the creation of a communication in the rock environment between management and
the environment during the operation of the store. The different types of possible
operational risks should be summarised into specific categories and evaluate
their possible effect. Measures to limit these effects must be included in
emergency plan.
7. the evaluation of the long term
Risk assessment of waste must cover a longer period of time. Must
be demonstrated and guaranteed, whether in the long term after temporary
or the permanent cessation of operation does not create a store communication
in the rock environment between the wastes and the environmental compartments
including impacts on human health.
Must be quantitatively assessed from a long-term perspective, limiting the
factors such as storage locations. the quality of the waste, the status of the accompanying
rocks, mixing, filling wells, overburden, making mine workings, etc. and
evaluated on the basis of specific data about the site, or on the basis of
sufficiently qualified estimate taking into account the geochemical and
hydro-geological conditions and natural dilution and extraction of stored
the waste.
The long-term safety of storage of waste must be demonstrated
through the evaluation of the safety, containing a description of the default
State at a certain time (e.g. at the time of closure), including variations in the
which outlines the important changes that can be used in geological time
expect. Above all, it must be considered the implications of the release of the relevant
substances from waste storage, in different variants, which shows a possible
long-term development that affect the storage and environmental and
the health of the people.
The packaging used and the design of the mine workings in the assessment of long-term
waste storage risks not taken into account because of their limited
the service life.
8. evaluation of the impact of the entrance of surface installations
Before they reach the waste underground, IE. the final place
destination must be interpreted, tested and possibly even temporarily stored
on the surface. The receiving device must meet the requirements of the landfill and
must be designed and operated so as to prevent damage to human
health and the environment.
1) § 14 para. 2 (a). (b)) of the Act No. 44/1988 Coll., on the protection and use of
mineral wealth (the top of the law).
Regulation of the Government of the CZECHOSLOVAK SOCIALIST REPUBLIC No. 80/1988 Coll., on the establishment, classification kondic
inventory and deposits on the assessment, approval and State expertise
their calculations.
3) section 3 of the Decree of the Federal Statistical Office and the Federal
the Ministry for technical and investment development, no 120/1979 Coll.
spatial identification information.
4) Article. 1 yield the Federal Statistical Office REF. 1793/78-032-918 of the
on 9 April. June 1978, which regulates the number of regions and tagging
districts in CZECHOSLOVAKIA (in the amount of 25/1978 Sb.).
5) section 18 of the Czech National Council Act No. 61/1988 Coll. on mining activities,
explosives and the State Mining Administration.
6) for example, Act No. 71/1967 Coll., on national committees, as
amended (full text for no. 31/1983), law No.
51/1964 Coll., on the railways, and the Decree of the Ministry of transport and Central
Mining Authority no. 28/1967 Coll., laying down rules for railways
with mining activities, Act No. 110/1964 Coll. on telecommunications, the law
No. 20/1966 Coll., on health care to the people, Act No. 53/1966 Coll., on the protection of
agricultural land holdings, as amended by Act No. 75/1976 Coll. (the full text of
No 124/1976 Coll.), Act No. 138/1973 Coll. on waters (Water Act), the law
No 61/1977 Col., on forests, law No. 40/1956 Coll., on State protection
nature, as amended, the law of the Czech National Council No.
20/1987 Coll. on State care monument.
9) section 4 of the Act No. 62/1988 Coll., on geological works, as amended by law
No 543/1991.
9A) for example. Act No. 17/1992 Coll., on the environment, the law No.
244/1992 Coll., on the assessment of the impact on the environment.
9B) Act No. 337/1992 Coll., on the protection of agricultural land resources in
amended by Act No. 10/1993.
Act No. 61/1977 Col., on forests, as amended by Act No. 229/1991 Coll.
9 c) § 37a of Act No. 44/1988 Coll., on the protection and utilization of mineral resource
wealth (the top Act), as amended by Act No. 553/1991 Coll.
10) for example, Decree No. 5/1987 Coll.
10A) § 6 para. 1 of Act No. 61/1988 Coll., as amended
regulations.
11) § 31 para. 3 of the Mining Act.
12) § 2 and 3 of Act No. 61/1988 Coll.
13) Council Directive 1999/31/EC of 26 July 2000. 4.1999 on landfill. The decision of the
Council Directive 2003/33/EC of 19 June 2000. 12.2002, establishing the criteria and
procedures for the acceptance of waste at landfills pursuant to article 16 of and annex II to the
Directive 1999/31/EC.
14) Decree No 298/2005 Coll., on professional qualifications and requirements
competence in mining activities, or activities carried out
using mining techniques and on amendment to certain laws.