Advanced Search

About Terms Of Handling Systems And Operational Rules Of The Water Works

Original Language Title: o náležitostech manipulačních řádů a provozních řádů vodních děl

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
216/2011 Sb.



DECREE



of 15 November 2004. July 2011



about terms of handling systems and operational rules of the water works



The Ministry of agriculture lays down, pursuant to section 59 paragraph 1. 1 (b). a) of law No.

254/2001 Coll. on waters and on amendments to certain acts (the Water Act), in

amended by Act No 150/2010 Coll.:



§ 1



Basic concepts



For the purposes of this Ordinance, means the



and handling regulations, water works)-a set of principles and guidelines for the

manipulate water to its effective and economical utilization according to the

authorisation to dealing with surface or groundwater and construction

water permit part, to reduce the adverse effects of floods,

droughts and ice phenomena, to protect and improve water quality, as well as to

to ensure security, stability and reliability of the water works,



(b) the operational order of the water works)-a set of principles, guidelines, and documentation

for the operation and maintenance of the objects and the device works,



(c)) zabezpečeností-the probability of securing the desired purpose for

that is a water work determined, expressed as a percentage,



(d)) identification-for natural persons first and last name, date of birth,

where appropriate, the name of company, address of the place of residence and telephone,

Fax and e-mail (hereinafter referred to as "communications link"); for legal persons

business name or name, identification number, if one has been assigned,

address of the registered office and the communication links



(e) the comprehensive handling of procedure)-a set of principles and guidelines for the coordination of

the handling of water in the system of water works.



§ 2



Requirements of material handling systems



(1) the Particulars of the handling of the order works are



and) information about the



1. identify the owner or user "^ 1"), or the Builder

water works,



2. identification of the person responsible for the handling of water,



3. identification of the water flow administrator,



4. water management dispatching Manager, basin



5. locally relevant vodoprávním Office,



6. the identification of the persons responsible for the implementation of the technickobezpečnostního

sight ^ 2), and the persons in charge to carry out the technical revision of the water works

announced in accordance with section 15a of the Water Act,



7. the competent authorities of the flood



(b)) technical information on water works and data related thereto, which

are



1. the name, location and a brief description of the works, the description of the function of water

works and those parts of it that are used to manipulate water and to check

the handling of water,



2. the data on building permits for water and a decision on its part

acceptance,



3. the purpose of the water works; used if the water work multiple purposes, in

order of importance,



4. permission to load data with surface or groundwater

related to the water part, including data on the extent of the authorisation,



5. categories of works under other legislation ^ 3),



6. zabezpečenost the required claims to the use of water for water works,

that accumulates or building up water,



7. to reduce flood flows at the water works, which accumulates

or building up water,



8. Basic hydrologic data of the water flow, which is a water work

placed or any other hydrological data or evidence related

with water or with the way the water in the water tank,



9. a list of the technical and legal regulations related to the aquatic part

and used for the preparation of the handling of the order,



(c)) the essential requirements, principles and guidelines for the handling of water on the water

the work,



(d)) the essential requirements, principles and guidelines for the handling of water on the water

work integrated into the system of water works, resulting from a comprehensive

the handling of the order, if it is for a system of water works is processed,



e) guidelines for the handling of water in emergency situations and the implementation of the

the security measures, especially with regard to



1. flood protection in excess of the design parameters of the water

works,



2. the situation in the threat to the security and stability of the water works,



3. the situation regarding the damage to the buildings and equipment of water works,



4. the critical situation of the lack of water in the watercourse,



5. the situation in the crash ^ 4) on the water works or water flow above and below the

water work



6. the situation in such a deterioration in the quality of surface water, that water work

cannot serve its purpose,



(f) the nature, requirements) method, the scope and frequency of measurement and observation on

water works required for the handling of water,



g) lists of pertinent addresses and communication links, in particular the competent

the Building Authority, territorial, health officer of the Czech fire brigade

Republic, police of the Czech Republic, emergency medical service,

components of the integrated rescue system and the authorities of the flood and

crisis management; If the water-work part of a tracked waterways

significant traffic used, then, in the list of important addresses and

communication links indicate the locally relevant branch of the State ferry

Administration,



h) principles of cooperation in the handling of water between owners or

^ 1) related water projects, where appropriate, common principles

handling orders of these water works,



I) other provisions that contain



1. the method and frequency of measurement on the implementation of the control of the sea and

the sampling devices in the range and the time limits for the verification capacity and measurement

curves,



2. determine the period of time for revisions and maintenance of individual

objects and devices, water works, appropriate in terms of the hydrological

and in terms of providing the purpose of the water works,



3. the rules for the keeping of records on the implementation of the handling of water and

evaluation of emergency handling of water,



j) of the annex of the handling of the order, which contain



1. AIDS to control the handling of water, which provide information

needed for deciding on the manipulations of water referred to in points (c)) and (e)), and

for the evaluation of measurements and observations referred to in subparagraph (f)),



2. drafting part of project documentation works in the range of

required for the handling of water,



3. legal and other important documentation for the management of the handling on the water

work or for the assessment of achieved results, such as permission to

water piece and work related with the water, the annex may also be part of the

flood plans, which are related to manipulations on the water works,



4. the documents concerning the update of the handling of the order,



5. the Protocol on the introduction of the operator works with handling regulations.



(2) if the water work divided into comprehensive, functionally separate parts or

contributes to the manipulations on the work of more than one owner or

users ^ 1), can be drawn up within the framework of the handling of the order for each

an integrated part of the water works or for each individual owner or

user ^ 1) relevant section of the handling of the order within a reasonable range

separately.



(3) for the water works in the watercourse, which together operationally related, may

be drawn up in a procedure.



(4) Handling of procedure contains a cover sheet ^ 5) that connects

a list of the annexes thereto. The note warns on documents and place their

store that are stored outside the file handling procedure; the following are the

sorted the particulars referred to in paragraph 1.



§ 3



Essentials of operating systems



(1) the operational order of the Arrangements of the water works are



and) information about the



1. identify the owner or user "^ 1"), or the Builder

water works together with their share of the operation and maintenance of water works,



2. identification of the operator of a water main or sewer ^ 6) and its market share

on the operation and maintenance of water works, if it is the water supply and

the sewer system for public use,



3. identification of the person responsible for the operation of the water works,



4. the territorial vodoprávním Office,



5. identification of the persons responsible for the implementation of the technickobezpečnostního

sight ^ 2), and the persons in charge to carry out the technical revision of the water works

announced in accordance with section 15a of the Water Act,



(b)) technical information on water works and data related thereto, which

are



1. the name, location and a brief description of the water works and its function, basic

technical information on the capacity or performance, the enumeration of its parts and equipment,

which will refers to the code of conduct,



2. details of the permission to the management of water related to water piece,

the construction permit for water piece, a decision on its acceptance or

kolaudačním consent to the water part



3. categories of works under other legislation ^ 3),



4. particulars of the approval and the validity of the handling of the order, if it is

processed,



c) operating data and indicators necessary to ensure the proper and

reliable operation



1. for the water works in accordance with § 55 para. 1 (b). a), d), (f)), g), (h)), i), l)

Water Act, according to the relevant parts of the technical standards ^ 7),



2. for water works in accordance with § 55 para. 1 (b). c) Water Act, according to the

relevant parts of the technical standards ^ 8),



3. for water works in accordance with § 55 para. 1 (b). e) Water Act, according to the

the relevant parts of the technical standards ^ 9),



d) instructions for operation and maintenance, broken down by function and type of objects and

device



1. for the water works in accordance with § 55 para. 1 (b). a), d), (f)), g), (h)), i), l)

Water Act, according to the relevant parts of the technical standards ^ 7),



2. for water works in accordance with § 55 para. 1 (b). c) Water Act, according to the

relevant parts of the technical standards ^ 8),




3. for water works in accordance with § 55 para. 1 (b). e) Water Act, according to the

the relevant parts of the technical standards ^ 9),



4. specify the period of time for revisions and maintenance of individual objects and

the device works, appropriate in terms of the hydrological and

ensure the purpose of the water works,



5. the method and frequency of measurement on the implementation of the control of the sea and

the sampling devices in the range and the time limits for the verification capacity and measurement

curves,



e) instructions for operation, maintenance and servicing in winter,



f) instructions for operation and handling in emergency situations, including

the danger of a terrorist threat situations caused by water works,



g) lists of pertinent addresses and communication links, in particular the competent

the Building Authority, territorial, health officer of the Czech fire brigade

Republic, police of the Czech Republic, emergency medical service,

components of the integrated rescue system and emergency management authorities,

the Inspectorate of the Czech environmental inspection, the administrator

watercourse, watershed Manager; If the water-work part of the monitored water

the path is easily used by significant, then the list of important addresses and

communication links indicate the locally relevant branch of the State ferry

Administration,



(h) the relationship between the parties), which are involved in the operation of the water

works, and common principles of incremental operating schedules,



I) security guidelines to comply with related regulations

regulations, for example, with handling regulations, with a program of supervision by

another law ^ 3), breakdown and crisis plans (determination of the

the extent and frequency, location and the kind of periodic measurements and observations

necessary for the operation of the water works),



j) provisions on the scope, frequency, location and type of periodic measurements and

observations during the operation of the water works for water projects, which are

does not handle the manipulation of procedure and does not technickobezpečnostní the sight,



to) information about the



1. the period of validity of the operating procedure water works,



2. making changes to a production order when changing the construction of water works or

When you change the conditions of operation of the water works,



3. operational management journal, reviewing operating records and books, and changes

maintenance,



4. file security, fire and hygiene instructions,



5. Overview of measures ensuring the safety of workers,



l) of the annex, which include



1. drafting part of project documentation to the extent and in the implementation of

required to operate and maintain water works,



2. the Protocol on the introduction of the operator with the operational order of the water works.



(2) if the water work divided into comprehensive, functionally separate parts or

contributes to the operation of multiple people, the minor may be drawn up

interconnected operating regulations for the individual parts, or

technological equipment of water works.



(3) the rules of operation of the water works intended for the treatment of waste water into the

capacity 50 population equivalent, of which an essential part of pursuant to §

15A paragraph 1. 1 Water Act products are marked CE according to law No.

22/1997 Coll., on technical requirements for products and the addition of some

laws, as amended, shall be considered operating instructions

processed by the supplier of the water works, supplemented with the data referred to in paragraph 1

(a). and), e), (f)), g) and k) points 3 and 4, if the Building Authority in the

construction authorisation provides otherwise.



(4) the code of conduct contains a cover sheet ^ 5), which joins the list

its annexes. The note warns on documents and place their

store that are stored outside the file the operating procedure; the following are the

sorted the particulars referred to in paragraph 1.



§ 4



Transitional provision



Handling and operating regulations drawn up and approved in accordance with the existing

laws remain in force.



§ 5



Regulation (EEC)



Decree of the Ministry of agriculture no. 195/2002 Coll., on terms

handling orders and orders of provozích water works, is hereby repealed.



§ 6



The effectiveness of the



This Decree shall enter into force on 1 January 2000. August 2011.



Minister:



Ing. Fuksa in r.



1) § 126 paragraph. 1 of Act No. 254/2001 Coll. on waters and amending certain

laws (Water Act).



2) § 61 para. 9 and § 62 para. 4 (b). a) of Act No. 254/2001 Coll., on

amended by Act No. 20/2004 Coll. and Act No. 150/2010 Sb.



3) Decree No. 471/2001 Coll., on the technickobezpečnostním supervision

water, as amended by Decree No 255/2010 Sb.



4) section 40 of Act No. 254/2001 Coll.



5) 75 2910 Handling orders water TNV works on watercourses.



6) § 2 (2). 4 Act No. 276/2001 Coll. on water supplies and sewerage Act for

public use and on amendments to certain acts (the Act on water supply and

sewerage Act), as amended by Act No 76/2006 Sb.



7) TNV 75 2920 operating regulations of the water works.



8) TNV 75 5950 operating regulations.



TNV 75 6911 operational rules of sanitation.



TNV 75 2569 operation and maintenance of sewers.



TNV 75 6930 operate and maintain wastewater treatment plants.



TNV 75 5922 maintenance and servicing water pipes of public water systems.



9) operational rules of the TNV 75 4931 irrigation.