194/2007 Sb.



Decree



of 17 May. July 2007,



laying down rules for the heating and hot water supply, the unit of measure

indicators of consumption of thermal energy for heating and hot

water and equipment requirements of internal thermal installations in buildings

the device software and other companies registering the supply of heat energy



Change: 237/2014 Sb.



The Ministry of industry and trade shall be determined according to § 14 para. 5 of law No.

406/2000 Coll. on energy management, as amended by law No. 177/2006 Coll.

(hereinafter referred to as the "Act") to implement section 6a of paragraph 1. 9, 10 and 11 of the Act:



§ 1



The subject of the edit



This Decree incorporates the relevant European Community regulation ^ 1)

and provides for the



and) rules for heating and hot water supply



b) metrics heat consumption for heating and hot

water,



c) equipment requirements of internal thermal installations in buildings, measuring and

crossing technique and devices governing the supply of heat energy

to final consumers,



(d) the equipment range of internal heat) equipment buildings equipment

other companies registering the supply of heat energy.



Rules for heating



§ 2



(1) heating period begins 1. September and end on 31 December. in May of the following year.



(2) the supply of heat energy will start/period, when the average

day temperature outdoor air in the appropriate place or location

falls below + 1 ° C in 2 consecutive days and by the development of

the weather can be expected to increase the temperature above + 13 ° C for

the following day.



(3) the average daily temperature of outdoor air is a quarter of the sum of the

the outdoor temperature measured in the shade to the exclusion of the influence of radiation of the surrounding

areas at 7 am, 2 pm and 9 pm, with the temperature measured at 9 pm

h. is counted twice.



(4) Heating of apartments and non-residential premises in the residential and non-residential buildings

restricts or suspends/period when average daily

outside air temperature in the appropriate place or location will

above + 13 ° C in 2 consecutive days and the weather

This temperature can be expected to decline for the next day. Restrictions

heating is done so in order to meet the requirements of their beat-lotního

the attenuation of ensuring the thermal stability of the room. When subsequent

decrease in the daily average outside air temperature below + 13 ° C,

heating resumes.



(5) in the case of the consent of at least two-thirds of the final consumer,

heating takes place outside the heating period, if required by the progress of the

outdoor temperatures and if permitted by the technical and supply conditions.



(6) during the heating period are flats at the time from 6 am to 10 pm. and

other facilities at the time of their operation heated so that the formal

the average temperature of the internal air temperature afforded the calculated

indoor air provided for project building.



(7) the Calculated temperature of internal air provided for the project is resulting

temperature, which takes into account the internal air temperature and the effect of radiation

the surrounding walls. Checking compliance with the calculated temperature of internal air

validates a spherical thermometer.



(8) the average temperature of indoor air in heated rooms

measured against the odstíněným radiation thermometer surrounding areas and the impact of sunlight

and make one-quarter of the sum of the internal air temperature measured

in the middle of the floor plan of the room at the rate of 1 m above the wear layer of floor

at 8 am, noon, 4 pm and 9 pm.



(9) in the period from 10 pm to 6 am. the heating of the rooms and in the

non-operational time of other heated space as needed to reduce or

short breaks to the extent that, in order to meet the requirements of their

thermal decay, ensuring thermal stability rooms ^ 2).



(10) during the heating is referred to in paragraph 6 in living rooms and in the

other areas with a similar use of equipped with radiators housing

corresponding to the average temperature of the measured indoor air thermometer

odstíněným to the radiation of the surrounding areas and the impact of sunlight compared to the number

the value of the calculated temperature of internal air provided for project



and 1st). C in a room with one outdoor wall, or



(b)) increased by 1.5 ° C in a room with two outdoor walls, or



c) higher about 2 ° C in a room with three or more outdoor walls

or



(d) in addition, 1) ° C in the room in cases where the area of the translucent

fill the external openings exceeds half of the total area of the outer walls

and the roof (the ceiling), if the hole in it.



§ 3



(1) Heating at a higher average temperature of indoor air in heat

the rooms is possible in the case of flats, provided the requirement of more than

two-thirds of the tenants or owners of such final customers

apartments and on the condition that in the homes of non-residential premises or not

internal temperature limits are exceeded.



(2) not be exceeded the limits of average temperatures of indoor air for flats

and non-residential premises in the residential and non-residential buildings are due to an increase in

internal air temperature averages set in accordance with the principles set out in

§ 2 (2). 6, 10 and § 3 (1). 11 about 2 degrees C, or temperatures

in areas designated by the regulations or technological

established professional expertise.



(3) the common rooms in residential homes and commercial spaces in the

residential and non-residential buildings are in the course of the heating season in time

the operations of the heated so that in them have been calculated

internal air temperature provided for project building.



(4) non-residential space Heating in the residential and non-residential buildings in the

the days when not operated, restricts or suspends, so that the

their compliance with the requirements of temperature decline, ensuring heat

the stability of the room.



(5) Calculation of indoor air temperature and relative humidity/

period in heated rooms are set out in Appendix 1 to this

the Decree.



(6) the planned repairs, maintenance and inspection work that may cause

restriction or interruption of heating buildings, are performed outside the heating period.



§ 4



Rules for the supply of hot water



(1) hot water is supplied throughout the year so that the outlet for

the consumer temperature 45 degrees C to 60 degrees C, with the exception of options

the short-term fall in at the time of consumption peaks in consumption posting

drive ^ 3).



(2) Delivery pursuant to paragraph 1 is carried out daily, at least during the period from

6 am to 10 pm.



(3) the delivery to the non-residential buildings in the days when these buildings are not

operated, if it is technically possible.



(4) not be exceeded limits the consumption of thermal energy for the supply of warm

water consumption correspond to the measurement on the preparation and delivery of enhanced

50% of the values set out in annex 2 to this Decree.



(5) in the delivery of hot water Outage outside the heating period due to the planned

maintenance in the range within 14 days shall be agreed between the supplier and the customer,

that it to be notified at least 10 days before the start of all final

consumers.



§ 5



Metrics of consumption of thermal energy for heating and for the preparation of

hot water applied to the use of new or when you change completed

buildings



(1) metrics, the thermal energy consumption for space heating and the production of

hot water apartments, commercial space and common areas of residential

buildings, per 1 m2 of floor area of residential buildings, new or

the buildings, which were completed the change having an effect on all

heat-technical properties of building 1. January 2002, possibly to 1 m3

prepared by warm water, are given in annex 2 to this Decree.



(2) metrics, the thermal energy consumption for heating and for the preparation of

hot water non-residential buildings is determined individually in the manner specified in the

Annex No. 3 to this Decree the calculated according to a special legal

prescription ^ 4).



§ 6



The regulation of central heating and preparation of hot water in the building



(1) the regulation of the heating of residential and non-residential buildings is carried out



and control the parameters of the heat-carrying medium), in particular according to the course

climatic conditions or in outdoor air temperature in relation to the internal

the air temperature in the heated space or by load, if it is not

already provided by the manufacturer or distributor, with the exception of heating

sources with násypnými solid fuel boiler,



(b)) a separate part of the internal control device-zone

Regulation, if it requires the siting of the building due to the world's

Parties, different thermal accumulation or a different way of using its

the various parts, particularly flats and non-residential premises



(c) individual auto-adjusting devices) for each

appliances intended for heating the internal changes-reacting

temperature conditions and the occurrence of heat gains, except in cases where it is

technical or safety reasons impossible, especially for

radiant heating, hot air heating, heating from heat sources

energy with násypnými solid fuel boiler,



d differential pressure control in) the sampling device, if the heat

the internal distribution of heat energy, equipped with individual adjustable according to

subparagraph (c)).



(2) Regulation of hot water parameters is done, if it is not provided by the

already its manufacturer or distributor,




and) hot water temperature control within the range specified in the rules for

the supply of hot water,



(b) requested the necessary overpressure) ensuring the reliable delivery of the

building.



§ 7



Measuring the amount of heat energy and hot water in the unit



(1) the determination of the amount of heat energy in the case of its production inside

the unit of measurement is carried out in the boiler room or scanning

the quantity of fuel consumed and the calculation of the amount of fuel its

the average calorific value and effectiveness of resources.



(2) to measure the amount of hot water in the unit will

performed by measuring the amount of water at the inlet to the heater. Consumption of hot

the water for the final consumer shall be assessed on the basis of stocking and

reading the consumer of water meters, if they are installed.



(3) the determination of the amount of thermal energy for hot water in

the unit is in a residential and non-residential building carried out



and in case the) hot water prepared in a pass-through station

located in the building, by measuring the quantity of thermal energy at the entry to the

hot water heater, or by determining the power consumption of the outside of the heating

period,



(b)) for the preparation of hot water heat source (boiler room)

located in a building can be substituted for the determination of the heat energy measurement

the amount of fuel on its preparation (e.g. According to consumption outside the heating

period), or by using the mutual thermal energy consumption ratio

water heaters 40% and 60% on heating.



(4) Measuring and indication equipment ^ 5), applied by the consumer in

the unit is installed for all consumers and is the same

principle and implementation.



Section 7a



Instrumentation other companies registering the supply of heat energy



(1) in buildings with internal distribution of heat for space heating and the internal distribution of

cool rigs in the case that



and shall enter and out of) an apartment or commercial space in one place,

the working of the meter to measure laid down by heat or cold according to the

the law on metrology at the point of entry of the internal distribution of heat for heating

or internal cooling to the apartment or the divorce of non-residential premises,



(b)) shall enter, and acts of the dwelling or non-residential premises in several

places,



1. a device for the distribution of the costs of heating, or



2. the working of the meter to measure laid down by heat or cold

under the law on metrology.



(2) a device for the distribution of heating cost is the indicator for

the distribution of the costs of heating the room housing the installed otopnými

on each thermostat, indicator installed on the outlet pipe from the

radiator or appliance with internal air temperature sensor in

the heated space and the outside air temperature in the days of heating in

průběhovým/period with a permanent record of temperature differences

air per time interval, which is the number of days/year. In

building to install always the same types of indicators or instruments shall be

the temperature sensor.



(3) in the case of joint preparation of hot water in the House is on the inlet piping

supplying every apartment or commercial space hot water meter fitted.

the hot water that is used for the distribution of the costs of joint training

the hot water in the House, according to the Ordinance, which provides for the gauge to a compulsory

authentication and gauges subject to type-approval.



(4) paragraphs 1 to 3 shall not apply to the cases where it does not

cost breakdown for thermal energy for heating, and the cost of

a joint production of hot water in the House.



§ 8



Regulation (EEC)



Decree No. 152/2001 Coll., laying down rules for heating and

the supply of hot water, heat consumption metrics for

heating and domestic hot water preparation and equipment requirements

internal thermal equipment buildings equipment and conditions governing shipment

the heat energy to final customers, is hereby repealed.



§ 9



The effectiveness of the



This Decree shall enter into force on 1 January 2000. September 7, 2007.



Minister:



Ing. Roman v. r.



Annex 1



Calculated interior temperature and relative humidity of indoor air in

/period in heated rooms

---------------------------------------------------------------------- ----------------- -------------

Type of the room with the desired state of the internal environment Calculated the relative

vnitřníteplota humidity

/internal

period of air

Theta ^ 1) wow ^ 2)

°C %

---------------------------------------------------------------------- ----------------- -------------

1 residential buildings



1.1 Permanently used

Living room (living room, bedroom, dining room, 20 50

dining room with kitchen, Office, children's rooms, etc.)

The kitchen 20 50

Bathroom 24 wow ^ 3)

Klozety 20 50

The heated side of the room (the Hall, corridors, etc.) 15 50

Heated stairway 10 50

1.2 Occasionally used (recreational)-in operation

Living room (living room, bedroom, dining room, 20 50

dining room with kitchen, Office, children's room)

The kitchen 20 50

Bathroom 24 wow ^ 2)

The heated side of the room (the Hall, corridors, etc.) 15 50

Heated stairway 10 50



2 administrative buildings



Offices, waiting rooms, meeting halls, dining room 20 50

The heated side of the room (the main staircase of the corridor, klozety, etc.) 15 50

Heated side staircase 10 50

Hall, a room with desks 18 50



3 school buildings



Classrooms, drawing, and drawing room, cabinets, laboratories, cafeteria 20 55

Teaching workshops 18 55

Gym 15 70

Changing rooms at gyms 20 50

Baths and changing rooms 24 wow ^ 3)

Office and infirmary 24 50

Heated room (corridors, stairwells, klozety, 15 50

the dressing room just for clothes, etc.)

3.1 nursery

Classroom, card room, pharmacy 22 50

Dressing rooms for children 20 50

Washing facilities for children, WC 24 wow ^ 3)

Insulating the room 22 50



4 medical equipment



4.1 Nursery

Classroom, room lehárny 22 50

Dressing rooms for children 20 50

Washing facilities for children, WC 24 wow ^ 3)

Insulating the room 22 50

4.2 health centres, health centres

Practice 24 50

The waiting room, corridor, WC 20 50

4.3 Hospital

Room for the sick 22 55

Gurney, pantries 24 55

Bathroom 24 wow ^ 3)

Operating rooms 25 55-65

Entrance hall, corridor, WC, staircase 20 50

4.4 retirement homes and similar facilities

Living room (living room, bedroom, dining room, 20 50

dining room with kitchen, den, kitchen, etc.)

Bathroom 24 wow ^ 3)

Klozety 20 50

The heated side of the room (the Hall, corridors, etc.) 15 50

Heated stairway 10 50



5 hotels and restaurants



Rooms 20 50

Bathroom 24 wow ^ 3)

The hotel lobby, meeting rooms, dining rooms, halls 20 50



6 Colleges and hostels



The rooms, conference room, meeting room, 20 50

Bunkhouse 16-18 50

Washroom 24 wow ^ 3)

---------------------------------------------------------------------- ----------------- -------------



1) Calculated the internal temperature shall be determined according to ČSN EN 7730, CS EN

12831:2003, ČSNEN or ČSN 73 0540 7726-3.



2) values of relative humidity of indoor air heated rooms

the values are informative.



3) relative humidity of indoor air is calculated as the mean value of the

from day time frame of the internal environment of the internal

space.



Annex 2



Metrics of consumption of thermal energy for heating and hot

water apartments, commercial space and common areas of residential buildings



and metrics) of thermal energy consumption for heating for the average

the height of the ceiling of the room of 2.7 m



1. When heating from the source of heat energy GJ/m2 0.6 for fuel. period

with násypnými solid fuel boiler

or 0.175 MJ/m2. (D) °




2. When heating from the other sources of thermal energy per 0.47 GJ/m2 heating. period

or 0.138 MJ/m2. (D) °



(b) the average height) ceiling rooms is a pointer value

recalculates the actual ceiling height ratio to the value of 2.7 m,



(c) number of denostupňů D °) is determined by the relationship



(D) ° = n. (tis-tes)



where is the



n number of heating days/period

Tis the average calculated indoor air temperature in heated areas

object in ° c Fixed weighted average according to the m3 building

the heated space (usually you can use + 20 ° c),

TES the average outside air temperature in the days of heating/period

in ° c (average temperature is typically used from the daily measurement

Hydrometeorological or other stations on the site)



d) metrics, the thermal energy consumption for hot water when

measurements or determination of the thermal energy consumption for hot water



1. in the Fed building URGJ/m2.rok 0.17

or 0.30 GJ/m3,



2. in the preparation of the device outside of the URGJ/m2.rok 0.21

well-stocked building

or 0.35 GJ/m3.



Annex 3



Determination of specific indicators of consumption of thermal energy for heating and

hot water non-residential buildings



Metric thermal energy consumption for space heating is determined by:



1.2 * (Qfuel; H/Agross) or 1,2 (Qfuel; (H)/(Agross * D °))



Qfuel; (H) supplied energy to the production of hot water at the system boundary of the building (GJ/year)

Agross the total floor area (m2)

D ° the number of denostupňů



Metric thermal energy consumption for hot water shall be determined

by:



1.2 * (DHW/Agross Qfuel;) or 1.2 * (DHW/Qfuel; VDHW)



Qfuel DHW energy supplied; the preparation of hot water on the system boundary of the building

(GJ/year)

Agross the total floor area (m2)

VDHW the amount of annual consumption of hot water (m3/year)



Selected provisions of the novel



Article. (II) Decree No. 237/2014 Sb.



Transitional provision



If it was before the date of entry into force of this Decree, installed in

building equipment for distribution of heating cost, and according to § 7a

paragraph. 1 (b). and) Decree No. 194/2007 Coll., in the version in force from the date of

entry into force of this Decree, the work should be installed

the gauge provided for, then this gauge installed after the end

life of a device for the distribution of the costs of heating set

the manufacturer of these devices.



1) directive of the European Parliament and of the Council 2002/91/EC on energy

performance of buildings.



2) for example, ČSN 73 05 40-2.



3) Decree No. 369/2001 Coll., laying down the rules for distributions

the cost of thermal energy for heating, and the costs of providing warm

hot water between the final consumers.



4) Decree No. 148/2007 Coll., on the energy performance of buildings.



5) DIN EN and ČSN EN 834 835.