541/2005 Sb.
DECREE
of 21 June 1999. December 2005
of the electricity market rules, the principles of price formation for the activities
the electricity market operator and perform some other provisions of the
the Energy Act
Change: 552/2006 Coll. (part)
Change: 552/2006 Sb.
Change: 552/2006 Coll. (part)
Change: 365/2007 Sb.
Change: 365/2007 Coll. (part)
Change: 552/2006 Coll. (part), 365/2007 Coll. (part)
Change: 454/2008 Sb.
Change: 454/2008 Coll. (part), 468/2009 Sb.
Change: 468/2009 Coll. (part)
Change: 468/2009 Coll. (part), 400/2010 Sb.
Change: 400/2010 Coll. (part)
Change: 400/2010 Coll. (part)
Change: 371/2007 Sb.
Change: 371/2007 Coll. (part)
Change: 438/2009 Sb.
The Energy Regulatory Office (hereinafter referred to as "the authority"), pursuant to section 98 provides for paragraph 1. 7
Act No. 458/2000 Coll., on conditions for business and public administration
in the energy sectors and on amendments to certain acts (the energy
Act), as amended by law No 670/2004 Coll., and according to the article. (II) section 18 of the Act
No 670/2004 Coll., amending Act No. 458/2000 Coll., on conditions for
business and public administration in energy sectors and amending
Some laws (Energy Act), as amended, to the
the implementation of § 17 para. 7 (b). (e)), h) and k) and section 27 para. 7 energy
the law:
§ 1
The subject of the edit
This Decree lays down the rules for the electricity market, which provides for
and) conditions for access to the transmission system and distribution systems,
the range of published information to allow access to the transmission and
distribution system and ways to address the lack of capacity in the electricity
the system,
(b)) the dates for the submission of applications for the conclusion of contracts on the market with
the electricity and the dates of their contracts and registering with the operator
market,
(c)) the procedures and conditions for migration and the transfer of responsibility for
the derogation,
(d)) the extent and terms of the transmission of data for the evaluation of imbalances and
the billing for the supply of electricity and other services, the procedures for
evaluation, clearing and settlement of imbalances, including clearing and
settlement of regulating energy in a State of emergency and the State of prevention
emergency,
(e) procedures for the procurement of regulatory) energy and ways of clearing
regulating energy,
f) organisation of the short-term electricity market and the balancing market and
their methods of settlement
g) rules, assignment and use of type-delivery diagrams
electricity,
h) terms, and how to select the electricity supplier,
I) procedure for interruption, restriction and restoration of power supply in the
unauthorized subscription distribution, unjust and unlawful transfer,
j) to ensure the supply of electricity supplier last
instance.
§ 2
Definition of terms
(1) For the purposes of this Ordinance, means the
and the explicit auctions)-a market-based way of allocation of cross-border
transmission capacity, which is based on the quotations of participants
the auction allocated tradable transfer capacity, published
(b) decentralized production-production) of electricity from generating stations for electricity
connected to other than the transmission system operator,
(c))-diagram, the agreed quantity of electricity of the subject of settlement for
each trading hour in MWh with resolution to 1 decimal place,
d-the manufacturer or supplier) electricity trader, who, on the basis of the
the Treaty supplies electricity to other participants in the electricity market
through the electricity system
e) bilateral trades-trades with the physical supply of electricity
registered with the market operator in addition to the transactions concluded on the organized
short-term electricity market, or the balancing market with regulating
energy,
(f) the local distribution system)-distribution system, which is not
directly connected to the transmission system,
g) local consumption as producers-electricity produced in the production of electricity
and consumed by the manufacturer or by another participant of the electricity market
without the use of the transmission or the regional distribution system; local
consumption does not include technology producers own electricity consumption,
h) normal climatic conditions-a 30-year national average
daily air temperatures for each trading days for the whole
State and thirty-year regional average daily air temperatures for the
individual trading days for the territory of the region type of diagrams
I) business hour-base time period in which it is contractually
limited supply or electricity consumption; business hour is an essential
the time section for evaluation of imbalances of the subjects of settlement,
j) business day-24 business hours of the day, in which it does business, with
the exception of the transition from winter to summer time and back; on the day, when the
the transition to daylight saving time, this is the sequence of 23 business hours and for
the day on which the transition occurs on the Central European time, about 25
business hours; the first trading hour of the trading day begins in
00.00.00 hours and ends in 01.00.00 hours,
to short-term market organised) electricity-electricity market
organized by the market operator; its components are organized block
electricity market, organized day-ahead electricity market and organized
Intraday electricity market,
l) support electricity-support of electricity production from renewable sources
energy, the combined production of electricity and heat and electricity production from
secondary sources
m) delivery place-a place of handover and takeover of electricity between
transmission or distribution system operator and another participant
the electricity market, which the device is connected to this system, with
the exception of the sampling points,
n) cross-border trade-trade realized by transmission
electricity or transmission of electricity from abroad,
o) regional distribution system-distribution system directly
connected to the transmission system,
p) registration number-třináctimístný identification code number
allocated by the market operator of the electricity market participant,
q) reserved capacity-contracting 1/4-hour performance at the point of use
the customer or the manufacturer of the second category, or the 1/4-hour performance in
delivery place local distribution system operator or
Contracting 1/4 hour performance in summary, for the pass-through space between the
the operator of regional distribution system referred to in the contract of
distribution of electricity,
r) negotiated electricity body clearing in the trading hour
-the amount of electricity an agreed settlement with the rest of the body
entrepreneurs in the given trading hour and notified to the market operator,
with the actual quantity of electricity) responsibilities in the trading hour-
a summary of the amount of electricity the evaluated according to a special legal
Regulation ^ 1) based on data obtained from the measurements and using the type-
diagrams in the sampling or pass-through entity clearing and in places
delivery and transfer electricity market participants ' locations, for which
He took over the body of the settlement obligation to deliver electricity to the electricity
system or remove the electricity from the power system, and passed to the
the market operator,
t) actual weather conditions-national average actual
daily air temperatures for each trading days for the whole
State and regional average daily air temperatures for each
business days for the territory of the region type of diagrams
for the transmission of electricity from abroad)-electricity contracted for and arriving at a
the basis of the agreement on cross-border transmission of electricity into the electricity
system through the transmission system from neighbouring transmission system operators in
given period,
in the transmission of electricity)-electricity contracted for and arriving at a
the basis of the agreement on cross-border transmission of electricity from the power
system through the transmission system to the neighbouring transmission system operators in
given period,
w) region type of diagrams-region defined for the purposes of evaluation
residual diagram in terms of the market operator ^ 2)
x) system variation-sum of positive and negative imbalances of all
the subjects of settlement in the trading hour.
(2) for the purposes of this Ordinance means
and custom power technology)-power consumption
energy for electricity production in the production of electricity, or electricity and heat
in the main production equipment and auxiliary plant manufacture
directly related, including the production, transformation or modification of the fuel, losses in the
divorce, own consumption and losses to zvyšovacích transformers
production of electricity for supply to the distribution network or transmission
system,
(b)) of the type class diagram-a type of electricity supply for the diagram
the Group of customers with the measurement of C ^ 1) with a defined character
the collection,
c) type chart-relative values, characterizing the progress
electricity consumption-by customer type (C), used for the
evaluation of deviations,
d) participant in the organized short-term market-clearing body
the derogations, that is based on the Treaty on access to organized
the short-term electricity market takes part in this market, or organizer
the market for organizing the daily electricity market together for
market area of the Czech Republic and the surrounding market area,
(e) evaluation of deviations)-determine the size of the deviation of the bodies
clearing the market operator in a given trading hour in MWh with a resolution on the
1 decimal place,
f) settlement of deviations-payments made and payments between the subject
clearing and the market operator for the evaluated and cleared the derogations
responsibilities carried out by day,
(g)) the second category of manufacturer-the manufacturer who is not a manufacturer first
category,
h) manufacturer of the first category-producer, whose production under consideration
electricity is connected to the transmission or distribution system, and that
at least 80% of the annual quantity of electricity produced in the operated
production of electricity, less technological own consumption
electricity, supplied to the transmission or distribution system, or of the manufacturer,
that provides supportive services pursuant to a contract with the operator
the transmission system,
I) commitment to deliver electricity to the electricity system-obligation to deliver
electricity to the electricity system from its own electricity production or
acceptance of the agreement for the supply of electricity to the obligation of transmission system
or distribution system or the commitment of the electricity imported into the
the power system,
j) obligation to remove electricity from the power system-commitment
a custom collection of electricity from the power system or contract
acceptance of the undertaking in the electricity supply to the customer's equipment or
This commitment to export electricity from the power system,
redispatching to)-overload resolution according to the transmission system directly
of the applicable legislation of the European communities ^ 9) by reducing or increasing the
the performance of one or more blocks of electricity production, which may be
accompanied by a simultaneous increase in or a reduction of the performance of another block or
multiple blocks of electricity generating stations, or by changing the balance of foreign exchange
l) implicit auctions-a market-based way of allocation of cross-border
transmission capacity, which is based on quotations
traded electricity auction allocated participants published
tradable transfer capacity and where its allocation arises
auction participant commitment of supplies and electricity,
m) market-organized by the market operator and the organizers of the spot markets
electricity in neighbouring countries,
n) protiodchylkou-a positive difference of the subject of settlement in the event of
negative system imbalance or a negative difference of the subject of settlement in
If a positive system imbalance,
about) the market areas of the territory, which is the organizer of the market
organized short-term electricity market as a rule within one
the power system as defined in relation to other areas of the places with
the lack of capacity in the transmission system or in linked
transmission systems, usually cross-border transmission profiles,
p) identification code number-identification number osmnáctimístný
code assigned to the operator of a transmission or distribution system
supply or předávacímu.
§ 3
Electricity market
(1) subject to the electricity market is the supply of active electrical energy.
Electricity market will take place on the basis of the
and on the organized short-term participation) of the electricity market,
(b) bilateral trades between participants) of the electricity market,
(c)) on the balancing market participation with regulating energy, or
(d)) with market participation support services.
(2) in the context of the electricity market are all time data placed in time
valid on the territory of the Czech Republic ^ 3).
§ 4
Registration of participants in the electricity market, and assigning responsibility for the
the derogation
(1) the market operator creates and manages a register of the registered participants
electricity market, dials and offtake points in heat transfer
system and distribution systems and other dials are necessary to
the identification of participants in the electricity market and the particular places of connection.
The registration number of the customer may be identical with the identification number
the code of its load.
(2) on the basis of the instructions of the market operator allocates transmission
system or distribution system by the sampling and delivery points
participants in the electricity market identification code number of dials. On
the request of a market participant shall notify the operator of electricity
transmission or distribution system that party identification
the numeric codes its offtake, and forward positions.
(3) if any of the sampling and the forward points are not assigned to subjects
clearing, the market operator will prompt the transmission or the
distribution system to remedy the situation.
(4) in the event that the distribution system operator operates a part of the
distribution system non electric systems of the Czech
Republic, registers for one market operator summary submission site
for all the pass-through space with the measurement of type A or B ^ 1) connecting this
part of its distribution system to foreign countries. For this summary
submission site passes data to the extent of the market operator and the deadlines
for the type of measurement referred to in section 18.
(5) in the event that the distribution system is connected to the foreign
distribution system that is not connected to a foreign power
the system, the distribution system operator shall register with the operator
single market summary submission site for all pass-through space with
the measurement of type A or B connecting this part of its distribution system is
foreign countries. For this summary submission site passes the market operator
the information in the extent and dates listed for the type of measurement in section 18.
(6) the operator of a local distribution system operator to market demands
the registration of all operated by local distribution systems in
the market operator's system. The parent distribution system operator
registers with the market operator pass-through space for input of electricity to
the local distribution system.
(7) the operator of a local distribution system registers with the operator
the market for individual sampling or pass-through space of all market participants with the
electricity connected to the local distribution system, with the exception of
the sampling or pass-through points at which took over responsibility for the
deviation of the supplier of electricity, which is part of a vertically
the integrated company, whose part is also the operator of the
the local distribution system.
(8) the sampling or pass-through space with electricity market participants, which
do not register the procedure referred to in paragraph 7, the operator registers the local
the distribution system for the market operator as the sampling locations
customers or summary pass-through space electricity producers individually
Depending on the type of measurement. At this sampling or pass-through space passes
the operator of a local market data distribution system operator in
the extent and dates according to § 18 individually according to the type of measurement.
(9) an operator of a regional distribution system registers with the operator
individual sampling space market of all participants of the electricity market, where it is
by the supplier according to § 31 para. 1 or 2 the supplier of last resort.
(10) if the assigned sampling or forward instead of a market participant with
electricity to the responsibilities referred to in paragraph 3, the market operator
does not include sampling or submission site to evaluate the derogations referred to in §
21, art. 2 and unregisters the sampling or a pass-through space in
the market operator's system. The market operator shall inform the
transmission or the distribution system and the
participant of the electricity market. In this case, the electricity consumption of
a sampling of space or the supply of electricity to a pass-through space assessed
pursuant to section 8 (2). 2.
§ 5
Providing regulated access to the transmission system and distribution
networks
(1) a regulated access to the transmission system and distribution systems
be made on the basis of the contract
and the transmission of electricity) ^ 5),
(b) the distribution of electricity) ^ 6)
c) on cross-border electricity transmission.
(2) the contract of electricity transmission or distribution of electricity shall be concluded on the
the basis of the requests for the provision of electricity transmission or distribution
electricity. Application for an electricity transmission or distribution
the applicant shall submit to the operators of the electricity transmission and distribution
system in the case of a newly established sampling locations, or in case of changes
reserved input at that point at least 30 calendar
days prior to the required date begin transmission of electricity or
distribution of electricity, and that for each hub transport or supply point
separately. Requirements for the provision of electricity transmission and requests for
the provision of electricity distribution are listed in annexes 1 and 2 to the
This Decree.
(3) the contract of transfer of electricity or the distribution of electricity is in the case
the customer contracted for supply point of the customer or its summary, and in
the case of a distribution system operator for a summary of transfer points
stipulated in the contract. For each sampling or pass-through
the place is concluded only one contract on the transit of electricity or with one
distribution system operator only one contract for the distribution of
electricity. In the case that this is a customer with the measurement type (C)
the region type of diagrams, is part of a contract for the distribution of electricity and
the placing of the type class diagram for each sampling location. Condition
for the possibility of the negotiation of a Treaty on the transit of electricity or the Treaty on
the distribution of electricity to the load of the customer by the supplier is
the consent of the customer.
(4) in the event that the supplier provides electricity supply to the customer
through the contract pursuant to § 7 para. 1 (b). (d)), the operator shall conclude
distribution system with this supplier framework contract on distribution
electricity. General contract on distribution of electricity means the contract for the
distribution of electricity for more sampling or forward sites participants
of the electricity market.
(5) the supplier submits proposals to the distribution system operator
the change of the framework contract for the distribution of electricity, as a rule, to the last day
the calendar month preceding the calendar month in which the
the change of the framework contract take effect, at the latest, however, within the deadline referred to in
the provisions of this Decree governing the procedure for change of the supplier in
the regime transferred responsibility for deviation. Distribution operator
the system passes to the supplier within 5 working days after the end of
calendar month, a report containing information on the sampling or
transfer points that are current as of the first day of the month in
which the report is sent to the distribution system operator in
the scope and structure of the annex 6a.
(6) in the event that it is between the distribution system operator and
supplier of contract referred to in paragraph 4, the operator of distribution
the system will enable suppliers through electronic invoicing
the market operator's information system.
(7) on the basis of the Treaty on the transit of electricity shall be borne by the regulated price,
that is the price for transmission of electricity, the price for system level services
the transmission system, and in the case of the customer whose device is connected
to the transmission system, as well as the price to cover the extra costs associated with the support
electricity and the price of clearing the market operator.
(8) on the basis of the Treaty on the distribution of electricity shall be borne by the regulated price,
that is the price for distribution, the price for system level services
the transmission system, the price to cover the extra costs associated with the support
electricity and the price of clearing the market operator.
(9) the operator of a transmission or distribution system concerned
evaluates and invoiced payments arising from the Treaty on the transfer of
of electricity or the distribution of electricity in relation to each of the sampling
locations for each voltage level separately, with the exception of cases
in accordance with paragraph 12.
(10) the payment for electricity transmission and electricity distribution payment
consists of payments for the use of networks, payment for the reserved capacity, and in
the case of the distribution of electricity also from payment for exceeding the reserved
capacity. Electricity market participant pays the payment for electricity transmission
or for the distribution of electricity transmission system operators or
the operators of the distribution system to which the device is
electricity market participant connected. Payment for electricity transmission
arranged only for the subscription of the transmission system. Payment for distribution
electricity is taken out separately for each subscription of the distribution system operator with
the voltage between phases
and) greater than 52 kV,
(b)), from 1 kV up to 52 kV inclusive and
(c)) up to 1 kV including.
(11) the reserved capacity agreed in the contract on distribution of electricity
can not be greater than the value of the reserved input power stipulated in the
the Treaty on the connection. If there is a change in the connection agreements
on the value of the main element of the electricity meter,
the distribution system operator shall inform about this
the fact electricity supplier.
(12) the reserved capacity for the collection of the relevant distribution system
to supply the electricity market participants, whose devices are
connected to the local distribution system, arranges for a local operator
the distribution system.
(13) to the customer, which has one of the very high levels of stress
voltage or high voltage of a single distribution system operator
multiple locations with the průběhovým measurement of type A or B,
the subscription is linked to its own electrical networks and which are
powered by electric traction vehicles, by operator
the distribution system capacity reserved for the purposes of evaluation and
the determination of payments for reserved capacity for each voltage level
separately from the sum of the maximum measured in the performance of the sampling points in the
time when the sum of the highest in the month.
(14) the manufacturer of the first category nesjednává reserved capacity does not
payment for reserved capacity for generating electricity connection points
even for the space of connection devices designed to receive electricity for
technology its own electricity consumption with the exception of electricity from
the transmission system or distribution system by prolonged outage
in the duration of more than 30 days. The second category of manufacturer
and arranges for payment and paid) for reserved capacity separately for each
the making of the electricity
(b)) nesjednává capacity and shall stipulate that the payment of the reserved reserved
the capacity to place connections intended for electricity only for
technology its own electricity consumption,
(c)) nesjednává reserved capacity, and shall be paid by the payment of the maximum
the measured value of čtvrthodinového electrical power when
It removes the electricity from the transmission or distribution system in a continuous
period of a maximum of 4 weeks per calendar year, and shall notify the
transmission system operator or distribution system at least 5
weeks before electricity.
(15) If a manufacturer Draws electricity from the transmission or distribution
system, including electricity for their own use of technology
electricity and electricity for pumping pumped hydro
power plants, paid for the electricity transmission or distribution of electricity payment
for the use of networks and nesjednává reserved capacity and will not refund the payment for the
reserved capacity for connection device intended only to
electricity for own consumption of electricity or technology
consumed by the manufacturer for the pumping of pumped hydro power plants.
(16) the payment for the use of the network refers to the electricity actually collected
of the transmission system or distribution system.
(17) the payment for the reserved capacity, and for the use of networks, including payments for
reserved capacity being exceeded are listed separately on the invoice.
Method of payment payment for electricity transmission or distribution of electricity,
payment deadlines and advance payments are listed in the rules of operation of the
the transmission system operator ^ 7) and in the rules of operation of the distribution
System ^ 8).
(18) the distribution system operator shall be charged for non-compliance range
the values of power factor price fixed price by a decision of the Office.
Section 5a
Test operation
(1) electricity transmission or distribution of electricity in the test operation is
electricity transmission or distribution of electricity for the verification of the technical
parameters, operating values and demonstrate the operability of the newly
installed or refurbished sampling of electrical equipment
the Subscriber whose sampling device is connected to the voltage level 1
kV or higher.
(2) in the case of the existing sampling devices are the transmission of electricity, or
electricity distribution in trial operation, made possible in the case that
the installed output of the newly installed or refurbished
the electrical equipment in the point reaches a minimum of 10% of the value
reserved input power stipulated in the contract, or if the connection
installation of new electrical equipment installed input of at least
1 MW.
(3) the request for the provision of electricity transmission or distribution of electricity in the
test operation, the applicant shall submit to the operator of a transmission or
the distribution system of at least 30 calendar days before
the required date begin transmission or distribution of electricity in the
test operation for each hub transport or supply point separately.
Requirements for an application for the provision of transmission or distribution of electricity in the
test operation are listed in annexes 1a and 2a this Ordinance.
(4) the operator of a transmission or distribution system for transmission or
electricity distribution in trial operation at the Subscriber first day
referred to in the request and terminates on the date specified in the application, but not later than
the last day of the third calendar month following the month in the
which the transfer or distribution of electricity was launched.
(5) during the evaluation and billing payments in test operation progresses
the operator of a transmission or distribution network pursuant to § 5 para. 8
by analogy.
(6) the payment for electricity transmission and distribution of electricity in the payment
test operation consists of payments for the use of networks and payment for
reserve capacity and the maximum measured values čtvrthodinového
electrical power in the supply or delivery point of the customer in the
during each calendar month in which it was provided, the transfer
or the distribution of electricity in test operation. The maximum value of
taken čtvrthodinového of electrical power can not be higher than the
the value of the reserved input power stipulated in the contract.
(7) in the case that has a transport or distribution of electricity in the test
traffic continue transmission or distribution of electricity, during the
trial operation of the applicant to apply for the allocation of reserved capacity, and
not later than 1 working day before the end of transmission or distribution
electricity in test operation.
(8) if the customer Asks for trial operation in the defined territory of the operator
local distribution system and the estimated power consumption of the
the electrical equipment in the test operation is higher than 20% of the agreed
input of the local distribution system operator
system, to which this local distribution system connected to
the request shall provide the operator of the local distribution system distribution
electricity in trial operation to the extent required by the customer.
§ 6
The conditions of access to networks for cross-border exchanges in electricity
(1) cross-border trade in electricity is carried out on the basis of the Treaty
on cross-border transmission of electricity under the conditions laid down directly
the applicable law of the European communities) and ^ 9 rules of operation
the transmission system.
(2) cross-border trade in electricity is carried out no more than
transmission capacity reserved on the basis of the results of explicit auctions
the capacity is obtained by converting the reserved for cross-border transmission capacity
from other natural or legal persons, on the basis of implicit auctions or
with the use of the negotiation of transit of electricity within the business day.
(3) the settlement of cross-border business by financing section
23 para. 1. If the market operator shall be notified by transmission system operators
the lack of financial security payments subject to clearing, the operator of
electricity transmission system or transmission of electricity
from abroad, the subject of settlement in accordance with the Treaty on cross-border
transmission of electricity.
§ 7
Agreement on the electricity market
(1) the bilateral trades on the electricity market are carried out on the basis of
in particular, the following contracts:
and contracts for the supply of electricity) ^ 10), which is made as a
1. a contract for the supply of electricity between bodies of reckoning, when both Contracting
the parties have concluded a Treaty on the settlement of imbalances ^ 11); part of the
subject of the contract is not ensuring the transmission, distribution, system services
Neither the transfer of responsibility for deviation,
2. the contract on electricity supply by the supplier of last resort, when
one party to such a contract is the customer who is the vendor of the
the last instance exercises his right of ensuring a supply of last resort
pursuant to the Energy Act ^ 12); part of the subject of the contract is the migration
liability for deviation to the supplier of last resort, and if so
agreed, also ensuring the transmission, distribution and system services
3. the contract on electricity supply, assuming the obligation to deliver electricity to a
the power system, where the parties to the contract are the
the one hand, the manufacturer or the electricity trader, who took over the commitment of the
to supply electricity to the electricity system, and on the other, a trader with
electricity takes commitment to deliver electricity to the electricity
system,
4. a contract for the supply of electricity, assuming the obligation to remove electricity from
the power system, where the parties to the contract are the
the one hand, the customer or the electricity trader, who took over
commitment to remove electricity from the power system, or operator
transmission or distribution system to cover losses and own consumption,
and on the other hand, electricity trader takes commitment to remove
electricity from the power system,
5. the contract for the supply of electricity under the hard market participant diagram
with electricity, the hub transport or the place of consumption is equipped with measurement
Type A or B; part of the subject of the contract is not a commitment to take
liability for deviation,
(b)) of the Treaty on the settlement of regulating energy ^ 13),
(c)) of the Treaty on the operational delivery of electricity from abroad and to foreign countries,
which is concluded as
1. the contract of operational supply of electricity from abroad and abroad
to balance the system imbalance, when contracting parties to such a contract
are the transmission system operator on the one hand and the supplier
supplying electricity, after prior agreement with the foreign
the transmission system operator or the foreign operator
the transmission system on the other; This agreement may be concluded in
After the closure of the bilateral trades,
2. operational electricity abroad, when Contracting
the parties to such contracts are subject to supplying after clearing the previous
agreement with the transmission system operator electricity abroad at the
the one hand and foreign transmission system operator or
the trader after prior agreement with the operator of a foreign transfer
system on the other; This agreement may be concluded in the period after
block bilateral deals,
(d)) of the Treaty on associated electricity supply services ^ 14).
(2) when concluding contracts referred to in paragraph 1. a) points 2 to 4 (a).
(d)) of the electricity market participants shall enumerate and offtake transfer
the places for which the contract concluded.
(3) participation in the organized short-term electricity market is being made
on the basis of contracts for access on the organized short-term market
electricity ^ 15). Party to this contract can only be the subject
the showdown.
(4) participation on the balancing market with regulating energy takes place on
the basis of the agreement on access to the balancing market with regulating energy ^ 16).
Party to this contract can only be the subject of settlement or
a registered participant of the electricity market, with the consent of the subject
the showdown, which it took over responsibility for imbalances.
§ 8
Responsibility for deviation
(1) responsibility for the derogation applying to each individual
supply the place of the customer or total transfer seats each
individual production of electricity or heat places for each summary
each of the defined territory of the distribution system operator can be
bring only 1 body clearing. With the newly emerging
forward electricity generating stations or locations at the request of a market participant with
electricity consumption for already registered and forward locations generating stations
the operator registers the electricity transmission or distribution system
instead of connecting the device to a transmission or distribution system, in
which it is carried out the delivery and collection, as two production SQL pass-through
places, especially for the supply of electricity and especially for electricity consumption.
Responsibility for the following registered a pass-through space can be transferred to 2
the various bodies of the reckoning with the fact that one submission site are
forwarded to the actual value of the supply of electricity and the second submission site
are forwarded to the actual value of the donations. When you register a new
a pass-through space production of electricity for the supply of electricity to the
power system and electricity consumption of the electricity system is in
the system of the market operator primarily assigned responsibility for deviation
transmission system operators or the operators of the distribution
system to which it is connected to the electricity production. When migrating
liability for deviation submission site supplies to the system on the
other body clearing the fourth sentence shall be treated under Section 31b. When
change of the supplier for a pass-through space for the electricity consumption of electricity
the system shall, mutatis mutandis, in accordance with § 31a.
(2) in the event that the electricity market participant chooses none of the regimes
liability for deviation ^ 17), is the deviation of the assessed as
unauthorized consumption of electricity from the power system or unauthorized
the supply of electricity to the electricity system.
(3) the electricity market Participant that has selected the mode of the migrated
liability for deviation and has concluded a contract pursuant to § 7 para. 1 (b). and)
section 4, you may have one or more contractors or customers
electricity. The requirement for multiple vendors or customers served
the market operator together with electricity market participant, authorizing more
suppliers or purchasers of electricity, and electricity market participant,
for sampling or pass-through space market participant concerned has taken over
responsibility for deviation.
(4) a request for the transfer of responsibility for deviation serves a market participant with
electricity market operator through the information system and
the subject of settlement shall agree through the information system
the market operator to assign responsibility for deviation in sampling or
In summary, the hub site or transfer points over a defined territory
distribution system operator.
(5) the market operator responsibility for the derogation provided for in paragraph 4
After the approval of the assignment of responsibility for deviation clearing body
does not register, should assume responsibility for deviation caused
the lack of financial security payments clearing the accepting entity
responsibility for deviation. Up to 120 minutes after submission of the application and agreement
accepting body clearing the market operator shall inform the transferring
participant of the electricity market, the accepting entity clearing and
the respective operator of the transmission or distribution system
the result of the assessment of the assignment of responsibility for deviation. The effectiveness of the
the assignment of responsibility for a deviation occurs first following
calendar day after receipt of the registration of the market operator. To the effective date of
changes in responsibilities or provides the transmission operator shall be deducted
or distribution system status, measuring equipment, pursuant to section 30a of paragraph 1. 8 and
9.
(6) the reckoning may delegate responsibility for deviation to another
the subject of settlement. Transferring responsibility for deviation to another entity
clearing can be transferred responsibility for the difference of the values of consumption
electricity specified pursuant to section 19 para. 15 that carries responsibilities.
Request for transfer of responsibility for deviation of the transmitting entity served
clearing through the information system of the market operator.
The accepting entity agrees to transfer responsibility for clearing
deviation through the information system of the market operator.
(7) the market operator responsibility for the derogation provided for in paragraph 6, the
responsibilities after the approval of the assignment of responsibility for deviation
the accepting entity clearing does not register, if the takeover
liability for deviation caused a lack of financial security
the subject of settlement payments, accepting responsibility for deviation. Up to 120
minutes after submission of the request and approval of the accepting entity clearing
the operator shall inform the market through its information system on
the result of the assessment of the assignment of responsibility for deviation of the transmitting and
the accepting entity. The effectiveness of the transfer of responsibility for
derogation for other body clearing occurs the day after the first
It has been registered by the market operator. Responsibility for imbalances of the body
the showdown, which has taken over responsibility for deviation from the other entity
clearing cannot be further transferred to another body.
§ 9
Register data from bilateral trades
(1) the participants in the electricity market operator shall submit to the
the registration of data on bilateral trades on the supply of electricity within the
trades carried out on the territory of the Czech Republic by 1.30 pm
hours 1 day prior to the start of the business day when the electricity
carried out, and this time is uzavírkou bilateral trading.
The data are transmitted to the technical data of the treaties
and the electricity market participants) with its own responsibility for deviation;
data shall be the subject of settlement for the commitment to supply electricity to
power system and for a commitment to remove electricity from electricity
system,
(b) the electricity market participants) with its own responsibility for deviation
concluded on the stock exchange; data change, and under obligation to deliver
electricity to the electricity system and for a commitment to remove electricity from
the power system; for the accuracy of the passed values corresponds to the change;
Exchange technical data passed from the contracts shall be considered as confirmed
the competent bodies of the clearing,
c) concluded pursuant to § 7 para. 1 (b). and) in point 4,
(d)) of the electricity market participants with own responsibility for a deviation on
electricity supply abroad and from abroad; the data passes
the transmission system operator, particularly for the commitment to deliver electricity
to the electricity system and separately for the commitment to remove electricity from
the power system; TSO submissions
the treaties are considered to be confirmed by the competent bodies.
(2) the market operator verifies that all subjects of settlement, which
submit or change presented to register technical data
from the contracts they have concluded a contract on the settlement of imbalances. In the case that
a participant of the electricity market does not have a Treaty on the settlement of imbalances
concluded, the market operator does not register technical data and submitted for
the purpose of the evaluation of deviations are not considered. After inspection
the market operator will register technical data from contracts that meet all
formalities and send electricity to market participants, confirmation of their
registration. In each trading hour, each subject of settlement
set out the agreed amount of electricity for the commitment to supply electricity to
the electricity system and the agreed amount of electricity for the commitment to remove
electricity in MWh of electricity system with a resolution of 3
space. Information on the total contracted volume of electricity for commitment
to supply electricity to the electricity system and the total amount of the agreed
electricity for the commitment to remove electricity from the power system
the market operator shall provide each operator clearing in a manner allowing
remote access within 30 minutes after the closure of the bilateral trade.
§ 10
Organized short-term electricity market
(1) the Organized short-term electricity market consists of
and) organized block market in electricity, which can be administered
supply and demand on the individual business blocks (hereinafter referred to as "block
the market "),
(b)), organized day-ahead market in electricity, which can be administered
supply and demand on the following business day (hereinafter referred to as the "daily market"),
and
(c) intra-day) of the electricity market, which can be administered
supply and demand for the following period of time inside the business day
(hereinafter referred to as "intra-day market).
(2) the Organized short-term electricity market can be realized
together for the market area of the Czech Republic and the surrounding market area, if
so the TSOs and the organizers of the markets agree.
(3) the demand is submitted to a participant in the short-term market means commitment,
that the demanded amount of electricity for a given trading hour of the participant
short-term market removes them from the power system at a given time, if the
will be submitted to meet this demand.
(4) the tender submitted by the participant of the short-term market means a commitment that
the offered amount of electricity for a given trading hour of the participant
short-term market supplies in the power system at a given time, if the
will meet that submitted bids.
(5) the supply or demand can include time conditions, if they are
agreed in the contract on the access to the organized short-term market
electricity. Minimum quantity demanded or offered by electricity
the organized short-term electricity market is 1 MWh with a resolution of 1
decimal place.
(6) as a result of trades is the determination of the contracted supplies, subscriptions and prices.
(7) any trades on the organized short-term market
electricity are anonymous to each other.
(8) the place of delivery and place of electricity traded entity
the showdown on the organized short-term electricity market is
the electricity system of the Czech Republic.
section 10a
Block market
(1) the subject of the block market block are supply and demand of electricity,
where the smallest unit is a constant value of hourly output 1
MW in hours time period block.
(2) the demand and supply on the block market is possible not earlier than 30 days
before the trading day, depending on the trading block.
(3) termination of the trading block is in 1.30 pm the day preceding the
the date on which the supply of electricity from this block.
(4) Arranging supplies and electricity is ultimately with
demand.
(5) To 1.30 p.m. on each business day, when the block is traded,
the market operator shall notify each participant short-term market way
referred to in the agreement on access to the organized short-term market
electricity trading information on the results of the tenders submitted and
demands on the block market. The following information are:
and the size of the agreed electricity supply) and the size of the agreed subscription
electricity in MWh,
b) achieved price.
(6) following evaluation of the stores referred to in paragraph 5 shall include the market operator
contracted supplies and electricity for a given trading hours into the system
evaluation and settlement of deviations.
(7) in the course of daily trading on the block market, the market operator
publish the manner allowing remote access information about ongoing
trading by individual State of commercial blocks.
Immediately after the block market block for the trading block
the market operator shall publish in a way allowing remote access quantity
electricity from trades on the block market and weighted average prices
electricity traded in the individual business blocks.
§ 11
Day-ahead market
(1) the daily market, the market operator organizes in cooperation with the Organizer
daily electricity market in the surrounding market area.
(2) a participant in the organized short-term market may submit tenders and
demand on the day-ahead market each day to the day preceding business day.
On the basis of the tenders received and requests are for the individual business
clock set day-ahead market results in the structure:
and the resulting electricity to) abroad or from abroad in the case of
link market area of the United States and the surrounding market area,
(b)) the resulting achieved price of electricity on the day-ahead market,
(c)) zobchodovaná the amount of electricity.
(3) the market operator enters the information system data on the agreed
quantities of electricity to individual subjects of settlement in the market area
The United States after the individual business hours. The agreed delivery and
subscriptions for the trading hours for the market area in the Czech Republic
the market operator to the system includes evaluation and settlement of deviations.
(4) after the determination of the results of the day-ahead market, the market operator shall notify each
short-term market participant in the manner specified in the contract on access to
organized short-term electricity market information on the results
the evaluation of the submitted bids and offers on a daily market for each
business hour. This information includes the
and the size of the agreed electricity supply) and the size of the agreed subscription
electricity in MWh on the daily market,
(b) the price of natural achieved) market.
(5) after notification of the results of the day-ahead market shall disclose to each participant
the market operator in a way allowing remote access to the offer and
demand curves, the amount of electricity from the trades, formal
the price of electricity for every trading hour, the resulting clock Green
bonuses for each category of renewable sources for each
business hour, the amount of electricity from the missing menu bar and
demands, the number of successful and unsuccessful bids and the number of
adopted by successful and unsuccessful demands. Published data
do not contain information about each of the participants in the day-ahead market.
(6) following evaluation of the submitted bids and offers on the day-ahead market
the market operator will include the agreed supply and electricity for the
trading hours into the system of evaluation and settlement of deviations.
§ 12
Intra-day market
(1) intra-day market is organized for hours within the business day.
For the given trading day is at 3 p.m. the preceding business day
open to all hours of the trading day intraday market and can be
to enter and accept offers for supply or electricity consumption.
Intraday market can be organised with the organizer of the intraday market
the electricity market in the surrounding area.
(2) the Intraday market is gradually being closed after each clock, time
When the menu bar on the supply or electricity consumption for each
trading hours is 1 hour before the trade.
(3) the information relating to transactions entered into on the intra-day market includes operator
market in the system of evaluation and settlement of deviations.
(4) within 30 minutes after the conclusion of each traded hours in intraday
the market operator the market adjusts the total agreed amount of electricity for
commitment to deliver electricity to the electricity system and the total negotiated
the amount of electricity for the commitment to remove electricity from electricity
each body's clearing system about the details of the transactions concluded on the
intra-day market and follows the modified value of the entity provides clearing
through the information system of the market operator.
(5) To 1.30 a.m. of the day following the trading day, the market operator
publish the manner allowing remote access quantities of electricity from
trades and the weighted average price in the relevant trading hours
the intra-day market.
section 13 of the
Financial settlement of trades on the organized short-term market
electricity
(1) the financial settlement of trades on the organized short-term market
electricity is independent on the actual values of the electricity supply to the
the electricity system and the actual values of donations of electricity from
the electricity system.
(2) each business day by 2 p.m., the market operator shall notify each
short-term market participant, the following information for the preceding
trading period broken down by individual markets
and the size of the agreed electricity supply) and the size of the agreed subscription
electricity in MWh with resolution to 1 decimal place,
(b)) the prices obtained,
c) payment for the agreed remuneration for the electricity consumption and the agreed delivery
electricity.
(3) the prices obtained and payments are made in the currency agreed upon by the organizers
markets.
§ 14
The balancing market with regulating energy
(1) the balancing market with regulating energy is carried out after the closure
bilateral trading and after the Interstate organized short-term
of the electricity market. Registered market participants are involved in the balancing
market with regulating energy with the consent of the subject of settlement, which has taken over
responsibility for their tolerance. At the conclusion of the contract on access to
the balancing market with regulating energy showing registered market participant with
electricity market operator consent responsibilities with participation in
This market.
(2) on the balancing market with regulating energy being positive and
negative regulating energy in MWh. minimum quantity of one menu on a
the balancing market with regulating energy serves registered participants
market no later than 30 minutes before the start of the trading hours, when the
delivery of positive or negative regulating energy transmission
system, as the only poptávajícím, used to cover system
deviations. The transmission system operator shall evaluate the accepted offer
regulatory power as construction of regulating energy and passes
the market operator to settle it.
(3) supply tenders received positive and negative regulating energy on
the balancing market with regulating energy for the trading hours will include
the market operator to the system evaluation and settlement of deviations.
§ 15
Support services provided by the transmission system operator
(1) the transmission system operator buys for the electricity system
support services at the level of the transmission system. Offer to provide
support services may be natural or legal person that meets the
the conditions for the provision of support services by
the transmission system.
(2) the range of support services required for the following calendar year
exposes the transmission system operator shall, no later than 30 June 2005. November
of the previous year.
(3) the transmission system operator performs the evaluation of the submitted
menus for each service offered separately. In the absence of tenders may
demand to be repeated. All offers must be informed of the
the result of the assessment in relation to its menu, immediately after the evaluation
menu bar. Then closes the transmission system operator with offering
contract for the provision of support services. If not, even after repeated
demand ensured sufficient support services, in case the operator
the transmission system directly to specific participants in the electricity market.
section 16 of the
cancelled
§ 17
Evaluation of support services, the transmission system operator
(1) transmission system operator shall continuously evaluated based on
data from the preparation of the operation ^ 19) and from the measurement of the quantity and quality of delivered
support services.
(2) the TSO shall publish in a manner allowing
remote access
and the support services purchased), based on the average price on contracts
each trading hour for every supportive service as a weighted average
the price of the contracts,
(b)) in the support services purchased on a daily market price of the highest received
the menu at each trading hour for every supportive service.
section 18
The transmission of the actual values for the financial settlement of imbalances
(1) each year no later than 11.00 hours passes the operator of a transmission
the system of the market operator for every trading hour of the preceding day
the actual values of
and supply and electricity subscriptions) in the forward areas of the individual
electricity generating stations equipped with measuring and type,
(b) electricity each customer subscriptions) equipped with the measurement type, and,
(c) the supply and consumption of electricity) in forward locations between transmission
system and distribution systems equipped with the measurement type, and,
(d) the quantity I eat with) regulating energy and electricity obstarané from
abroad,
e) electricity transfers abroad and from abroad for individual subjects
clearing, market operator and foreign natural or legal
people; for the actual values are treated as negotiated; the values of the
transmission of electricity market operator do not enter into special arrangements
clearing and financial settlement of imbalances under section 26,
(f) the amount of electricity it bearing) for the needs of redispatching,
(g) the amount of electricity in the unclaimed) makers of electricity when
dispatching control pursuant to section 26 paragraph 1. 5 the Energy Act.
(2) each year no later than 11.00 hours passes the operator
distribution system operator to market for each trading hour
the preceding day
and actual values)
1. the supply and consumption of electricity in the forward areas of the individual
electricity generating stations equipped with measuring and type,
2. subscriptions of electricity customers in each of the sampling points
equipped with measuring type and in which the change was made not a vendor
or change the vendor for the supplier of last resort,
3. the supply and consumption of electricity in forward locations between each
regions of the type or local distribution systems diagrams
equipped with measuring and type,
4. electricity for all other customer sampling space equipped
the measurement type, and in total for each type of diagrams or regions
local distribution system,
(b)) preliminary values
1. subscriptions of electricity customers in each of the sampling points
equipped with a measurement of type B, in which it was carried out change of supplier
or change the vendor for the supplier of last resort,
2. the supply and consumption of electricity in forward locations between each
regions of the type or local distribution systems diagrams
equipped with a measurement of type B,
3. electricity for all other customer sampling space equipped
the measurement of type B in total for each type of diagrams or regions
the local distribution system.
(3) no later than the last working day of the calendar month to 6 pm
hours passes the distribution system operator the market operator
preliminary values of monthly supply and consumption of electricity for the following
month in forward locations between regions of load diagrams
or local distribution systems with the measurement type (C).
(4) in the event that the market operator does not receive the value referred to in paragraph 2 (a).
(b)), be used for the settlement of imbalances value calculated as an average
the actual values in the same business hours the same days in period
4 the last weeks stored in the system of the market operator. If the system
the market operator has not saved any real value and operator
the distribution system has not sent the preliminary values referred to in paragraph 2 (a).
(b)), it's the market operator for the settlement of deviations of the values equal to zero. In
If the operator does not receive market value referred to in paragraph 3, the
for the settlement of imbalances of the last known of the true value of the monthly
subscription and monthly electricity supply in transfer between
individual regions or local distribution diagrams of type-
systems equipped with a measurement of type C in the system of the market operator
There are no real value or actual values
do not apply to the full moon, it's the market operator for the settlement
deviations of the values equal to zero.
(5) each year no later than 11.00 o'clock clearing body transmitted
the market operator for every trading hour of the preceding day
the preliminary value of the supply and consumption of electricity in forward locations
individual electricity generating stations equipped with measurement of B-type, for which the
clearing body took responsibility for deviation.
(6) no later than the last working day of the calendar month to 6 pm
hours of body clearing the market operator passes the preliminary values
monthly subscription, and supply of electricity for the following month in the
forward electricity generating stations equipped with individual locations by measuring
type C, for which the operator clearing took responsibility for deviation.
(7) in the event that the market operator does not receive the value referred to in paragraph 5,
be used for the settlement of imbalances value calculated as an average
the actual values in the same business hours the same days in period
4 the last weeks stored in the system of the market operator. If the system
the market operator has not saved any real value, it uses operator
the market for the settlement of imbalances values equal to zero. In the event that the operator
the market does not receive the value referred to in paragraph 6, applied to the settlement of imbalances
the last known of the true value of the monthly subscription and monthly deliveries
electricity generating stations in places of each electricity forward
equipped with a measurement of type C If the market operator in the system are not
no real value or actual values do not apply to
full moon, it's the market operator for the settlement of deviations of the values
equal to zero.
(8) by 6 p.m. on the fifth working day after the end of the month passes
the distribution system operator the market operator
and) for each trading hour of the preceding month of the actual value
1. the supply and consumption of electricity in forward locations between the distribution
systems equipped with a measurement of type B,
2. subscriptions of electricity customers in each of the sampling points
equipped with a measurement of type B, in which it was carried out change of supplier
or change the vendor for the supplier of last resort,
3. the supply and consumption of electricity in the forward areas of the individual
electricity generating stations equipped with measurement of type B,
4. electricity for all other customer sampling space equipped
the measurement of type B in total for the distribution system,
(b) the actual value of the supplies and) of donations in the form of total electricity delivered and
total electricity consumed for the previous month
1. the transfer of electricity generating stations equipped with measuring points of type C,
2. from the transfer of posts between distribution systems equipped with measurement
type C,
(c) the actual value of donations) electricity consumption points with the measurement type (C)
customers are connected to the local distribution system for the previous
month
1. individually for customers who have changed the vendor or changed
the vendor for the supplier of last resort,
2. in total for the other customers.
(9) on the basis of the data transmitted in accordance with paragraph 8 (b). a) and b) performs
the market operator adjustment of the values passed in accordance with paragraph 2 (a). (b)),
Alternatively, set out under paragraphs 4 and 5 or under paragraph 7 and the
values of hourly charts resulting from the linear distribution of the preliminary
the values passed in accordance with paragraphs 3 and 6.
(10) the transmission of the actual values of supply and consumption of electricity by
in the case of a customer to its supply point, in the case of the manufacturer to
předávacímu point of each individual production of electricity, or to
Summary of the forward posts, and in the case of the transmission system operator
or distribution system operator to a set of forward places,
agreed in the contract on the transfer of data.
(11) the market operator does not accept the data to be sent in accordance with paragraphs 1 to 3, 5, 6
and 8 between
and) 6 p.m. of the third working day of the month and 6.00 a.m. of the fourth
working day of the month
(b)) 6 p.m. 5th working day of the month and 6.00 a.m. of the sixth
working day of the month
c) 6 p.m. of the seventh working day of the month and 6.00 p.m. on the eighth day
working day of the month
d) 6 p.m. the last calendar day of the month and 6.00 p.m.
the first working day of the following month.
(12) the distribution system operator, to which they are attached only
the sampling sites of customers or a pass-through space stations of electricity,
equipped with a measurement of type C, can register the information in a simplified manner.
Details of the simplified how to register are listed in business
the conditions of the market operator.
(13) when passing the actual values from measurements of A or B, indicates the
the market operator on the basis of data from the operator of a transmission or
the distribution system to be passed to the values in the following way:
valid value)-this is a true value, which was adopted by the operator
the market referred to in paragraph 1 (b). a), paragraph 2. a) and paragraphs 8 and
the measuring device has shown no signs of failure,
b) replacement valid value-the replacement value that you received
the market operator referred to in paragraph 1 (b). a), paragraph 2. a) and paragraph
8 for the duration of the disorder of the measuring devices; operator of a transmission
system operator or distribution system operator, whose system is
the submission site sampling or attached, to be passed to the replacement of a valid
the values marked in a way defined in the terms and conditions of the operator
market,
(c) the preliminary value) replacement-the case of the preliminary value that
the market operator has adopted or established under paragraph 2 (a). (b)) and paragraphs
3 to 7
d) value of zero-the zero value of the electricity consumption of the
the location from which the transmission system operator or the operator
distribution system, to which the system is connected to the place of consumption,
temporarily does not send out the actual value; shall inform the
the operator the market operator in a way defined in the business
the conditions of the market operator.
(14) the supplier submits data by the distribution system operator
paragraph 2 (a). (b) point 1) in the desired format every day at the latest
9 a.m.. The distribution system operator passes these details
the market operator in the period referred to in paragraph 2. If the operator
data distribution system does not receive from the vendor, the operator passes
market data for the previous comparable period, provided
that the market operator does not have this information available.
(3) if the Court decides about the decline of the customer's insolvency law,
the operator of a transmission or distribution system shall make the deduction
in the manner prescribed by law, which shall lay down the details of the measurement
electricity and the transmission of technical data "^ 1"), or the status of the measuring
the device, in the case of the sampling or measurement type submission site (C),
and this within 3 working days from the date of receipt of the request the electricity supplier
on the implementation of reading. For the determination of the status of the measuring apparatus shall be used
mutatis mutandis, the provisions of this Decree governing the procedure for reading
the measuring device or determining the status of the measuring device when you change
a vendor in the mode of the transferred responsibility for deviation. The request of the
electricity supplier must include a list of pick-up and transfer points
and information from the insolvency register about the Court's decision on bankruptcy
customer.
§ 19
Evaluation of deviations using the type of diagrams in the regions
type of diagrams
(1) use the diagrams for evaluation of deviations of electricity
customers with the measurement type (C) from the low-voltage network and the networks of other
regional distribution system voltage levels, if these
electricity is not a special legal regulation ^ 1) established
the obligation to install continuous measurement.
(2) a standardised type-chart is a sequence of relative values
average hourly electricity subscriptions, related to the value of the annual
maximum average hourly subscriptions relevant customer groups
a type defined by a class diagram and a passenger on the normal
climatic conditions.
(3) Standard type, the market operator creates diagrams for each
class for each calendar year on the basis of data provided by the
the operator of regional distribution networks. Standard type
the diagrams are valid uniformly for all regions, with diagrams, type number
the exception type-the class diagram 5 in annex No 4 to this Decree,
the validity is defined by the appropriate region type diagram.
(4) the Calculated type type are normalized diagrams diagrams
calculated on actual weather conditions in the trading day.
(5) for each trading day, the market operator establishes residual diagram
the load on the individual business hours for individual regions
type of diagrams. The residual graph is defined as the difference
the sum of actual values for the supply of electricity into the collecting and transfer
region type of diagrams with measurements of type A, B and C, and the sum of the
the actual values of donations of electricity with the measurements of the type A and B in the relevant
regions of the type and value of loss diagrams specified by the Office in accordance
the special legislation ^ 20). In the case of the supply of electricity with
the measurement of type B or C and electricity subscriptions by type B in the relevant
regions of the type of diagrams apply the values and practices referred to in section 18.
A contractual energy donations is considered to be zero.
(6) the planned yearly electricity consumption by type of customer (C)
sets the distribution system operator, on the basis of the procedure
referred to in annex 3 to this notice.
(7) the distribution system operator establishes and shall be sent by the operator
the market value of the projected annual electricity consumption
and sampling sites for) individually by customer type (C) who
have changed supplier,
(b)) for other customers collectively with the measurement type (C) after each
classes type-diagrams.
(8) the distribution system operator performs the update values
the planned annual electricity consumption in accordance with paragraph 7 (b). and)
the updated value is sent by the market operator in the case that was for
consumption location exposed to accounting document, based on our reading and from
the previous update the values planned annual electricity consumption
at least 50 days have elapsed. Update the values planned annual consumption
electricity referred to in paragraph 7 (b). (b) the operator of a distribution)
the system at least once per calendar month for all
trading days preceding calendar month, and updated
the market operator sends the values to 6 p.m. 5th working day
the next calendar month. Update planned annual values
electricity consumption in accordance with paragraph 7 covers cases connected new
places, cases, cancellation of the consumption points and cases where
the distribution system operator accepted the claim of the customer
on reading and on the basis of such a claim was for repair
readings of the measurement type (C). The market operator does not accept the data
to be sent in accordance with paragraph 7 in terms of § 18 para. 11.
(9) the value of donations of electricity in the sampling locations of customers with measurement
type C type diagrams in the regions who have changed supplier, in
individual business hours of the trading day, the market operator sets
on the basis of their annual electricity consumption and their assigned
passenger type-diagrams. Electricity subscriptions totals
customers in the sampling locations with the measurement of type C, who did not change the
the vendor, in individual trading hours of the business day after
each type of charts and diagrams, type number regions
sets the market operator on the basis of their planned annual consumption
electricity and their assigned passenger type-diagrams.
(10) the residual graph in each trading hour, he counts out
on the sampling locations of customers with the measurement of type C, who have changed supplier,
and in the summary on the other sampling locations of customers with the measurement type (C)
each type of diagrams, in proportion to the sizes of their subscriptions
electricity in a given hour, established under paragraph 9. Thus provided for
values are treated as values of donations of electricity customers with measurement
type C for the settlement of imbalances.
(11) the market operator assigns the value of donations to entities settlement
electricity referred to in paragraph 10, for each class type
charts and diagrams, type number regions. Follow these steps to set the value of donations
electricity market operator shall apply for the calculation of the deviations. The values referred to in
paragraph 10 of the market operator shall inform the competent bodies of the clearing
by 2 p.m. the following day.
(12) the assignment of the individual classes of load diagrams to the sampling points
customers with the measurement type (C) is performing regional distribution operator
system when you connect customers or when you change the nature of the sampling
space. Assign the consumption points in regions of load diagrams to
individual classes of load diagrams is based on categorization
customers by Annex No. 4a and the nature of the abstraction of electricity in accordance with
of annex 4 to this notice. Assign class type of diagrams to
the sampling sites is effective at the moment of registering the assignment in
the market operator. The market operator keeps records of assigning class type
diagrams at least for the period of the last 3 years.
(13) the assignment of class change request type-diagrams as a result
changes the nature of the sampling points shall be sent by the operator of regional
distribution system operator to market no later than 5 working days from the
the data, which requires a change of assignment type class diagrams.
Regional distribution system operator performs on the date of implementation
class assignment changes the type electricity consumption and reading diagrams
the readings of the electricity consumption within the market operator shall send the
10 working days from the date of any change in assignment type class diagrams.
(14) the market operator shall make available to the participants in the electricity market in a way
allowing remote access and by means of the information system
the market operator
and normal climatic conditions) that apply throughout the calendar year, and
within 3 calendar months prior to the first trading day of the
the calendar year,
(b)) the normalized type diagrams that apply throughout the calendar year, and
within 3 calendar months prior to the first trading day of the
the calendar year,
(c)) the actual weather conditions, no later than the day following the
the date on which the data relate,
d) residual coefficients of individual regions of the diagram type
diagrams and temperature coefficient not later than the day following the date on
the concern; details of the method of determination of coefficient of residual
diagram and temperature coefficient are listed in the terms and conditions
the market operator.
(15) following the receipt of the readings of the sampling locations, electricity subscriptions
customers in regional distribution systems, who have changed
the vendor performs the evaluation of the difference between the market values of the
the actual electricity consumption, obtained on the basis of meter readings and the values
laid down in accordance with paragraph 11 of the same period.
(16) the market operator zúčtovává to the individual subjects of settlement differences
designated in accordance with paragraph 15 the price according to price decision
The Office. In the case that in the period to which it relates to the evaluation of the difference,
the buffer is changed prices, evaluated the differences before and
After you change the balancing prices separately. If the operator
the system does not pass the market operator splitting energy in kWh per quantity
before and after the change in the price shall be determined by the market operator energy distribution with
using typed diagrams.
(17) the market operator sums the differences referred to in paragraph 15 of each
regions of the type of charts and this sum with opposite sign cleared
the price of the subject of settlement compensation, which has taken over responsibility for the
the variance in the appropriate region type of diagrams.
(18) for the locations of customers with the measurement of type C in the regions of the type
diagrams, who changed the vendor performs operator market clearing
the differences referred to in paragraphs 16 and 17 in two stages:
and the monthly assessment of the differences) is done by the 12th working day of the month
following the month to which they relate consumption readings
electricity in these places; the values of these readings are
the market operator sent in term according to § 32 para. 2 and their corrections
no later than the 11th working day of the month following the month of the
that view, reading
(b) the monthly evaluation) the final differences shall be carried out on the 10th working day
the fourth month following the month to which they relate reading
the electricity consumption in these places; the values of these readings are
the market operator sent in term according to § 32 para. 2 and their corrections
no later than the ninth working day of the fourth month following the month
to which the meter reading.
(19) the Settlement of the differences referred to in paragraphs 16 and 17 is not part of the settlement
derogations provided for in § 25.
(20) on the settlement of the differences referred to in paragraphs 16 and 17 are issued
separate tax documents. The market operator shall make available on request
the subject of settlement, which took over responsibility for imbalances in the
the region type diagram, data, on the basis of which made the clearing
the differences referred to in paragraphs 16 and 17. Details are given in the business
the conditions of the market operator.
(21) financial settlement of the differences referred to in paragraphs 16 and 17 carried out
the market operator.
section 20
Evaluation of variations in local distribution systems
(1) the market operator determines the load diagrams locations of local
the distribution system with the measurement of type C and the value of the losses in this system in
the case of the
and the daily settlement of imbalances as) the difference of the sum of actual values
the supply of electricity to transfer jobs to the measurement type, and local
distribution system and preliminary values of electricity supply to the
transfer seats to the measurement type (B) and (C) the local distribution system, and
the sum of actual values of donations of electricity from places with the measurement
the type and in the local distribution system and preliminary values donations
electricity from places with the measurement of type B in local distribution
the system,
(b)) of the monthly and final monthly settlement of imbalances as the difference
the sum of actual values for the supply of electricity to the local distribution
system and the sum of actual values of donations of electricity from places with
the measurement of type A and B in the local distribution system.
(2) the Operator of the market determines the value of the losses in the local distribution system, and
the value of donations of electricity in the sampling locations of customers with the measurement type (C)
When
and settlement of imbalances of the day Division) the values set in accordance with
paragraph 1 (b). and, in the ratio of the last) actual monthly value of losses
the local distribution system, and one twelfth of the annual
the consumption referred to in paragraph 6 in the sampling locations of customers with the measurement type
(C),
(b)) and the final month monthly settlement of imbalances by splitting
the values set pursuant to paragraph 1 (b). (b)), in the ratio of the size of the
the actual losses of the local distribution system during the month,
referred to in paragraph 5, and the size of the actual values of donations
electricity in the sampling locations of customers with the measurement of type C in the
month according to § 18 para. 8 (a). (c)).
(3) the value of donations of electricity referred to in paragraph 2 (a). and the market operator)
assigns and communicates to the competent bodies of settlement no later than 2 pm
hours the following day for the previous day.
(4) details of the method of determining loss, residual load diagram and
the determination of the values of donations of electricity customers with the measurement type (C)
local distribution systems are listed in the terms and conditions
the market operator.
(5) the actual value of the loss of individual local distribution systems
for the previous month shall be determined as the difference between the values laid down pursuant to
paragraph 1 (b). (b)) for the month and the sum of all actual
the values in the sampling areas electricity subscriptions with the measurement of type C in the
the local distribution system.
(6) the value of the planned annual electricity consumption by customer type
(C) an operator shall establish local distribution system of values
the last 12 monthly reading of consumption of these customers and as follows
set the values of the market operator sends
and sampling sites for) individually by customer type (C) who
have changed supplier,
(b)) for other customers collectively with the measurement type (C).
(7) the operator of a local distribution system refreshes
planned annual electricity consumption values referred to in paragraph 6 as follows
the updated value shall send once a month for the market operator
the previous month, after taking readings. Update planned annual values
electricity consumption includes cases of new consumption points are connected,
case of cancellation offtake points and cases where the operator of a local
the distribution system has accepted the claim of the customer relating to the deduction of the
and on the basis of such a claim was to correct the readings of the measuring
type C.
section 21
The calculation of the deviations
(1) the market operator shall verify the completeness of the information provided pursuant to section 18 to 20 and
in the case of shortcomings prompt transmission or distribution
system to amplify them.
(2) the market operator establishes the responsibilities of the actual value of the shipment
electricity and actual electricity in each trading hour in MWh with
resolution to 1 decimal place, and as a summary of electricity supply
the subject of settlement to the power system and electricity subscriptions summary
responsibilities of the electricity system, determined on the basis of data on
the actual delivery of electricity and actual electricity subscriptions pursuant to §
18, the type of diagrams in accordance with § 19 and values under section 20. The agreed delivery
electricity into the electricity system is a positive sign and
the maximum electricity consumption of the electricity system is marked by a negative
signed integer. The actual delivery of electricity to the electricity system is
marked a positive sign, and the actual consumption of electricity
the system is marked with a minus sign.
(3) for electricity consumption of the subject of settlement is considered a custom subscription
the subject of settlement and collection of the participants in the electricity market, from which the
clearing body took over the commitment to remove electricity from electricity
the system. For the supply of electricity to the body is treated as custom clearance
the delivery of the subject of settlement and delivery of electricity market participants with
electricity, from which body clearing took over the obligation to deliver electricity
in the power system.
(4) the Derogation of the subject of settlement for each trading hour is the sum of the
deviations of the subject of settlement for the commitment to deliver electricity to the electricity
system and for a commitment to tolerance to remove electricity from electricity
the system.
(5) in the case of the transfer of electricity from abroad and of traffic
electricity is the body which confirms the accuracy of the data from the
These contracts for the purposes of evaluation of imbalances and who has responsibility for
deviation from the agreed balance of foreign exchanges, the operator of a transmission
the system. Check-balance of foreign exchanges is the difference between the transfer of the
electricity and the transmission of electricity; the balance is
negative, if there is a taxi service electricity greater than
taxi service of electricity from abroad; otherwise, the balance
positive.
(6) with the amount of electricity in electricity plants not removed when
dispatching control pursuant to section 26 paragraph 1. 5 the Energy Act passed
the transmission system operator shall, for the purposes of evaluation of deviations
treated as regulating energy with zero price.
section 22
Rounding real values when calculating variance
(1) the subjects of settlement Variations are evaluated in MWh with a resolution of 1
decimal place.
(2) the actual values relating to the obligation of the subject of settlement to remove
electricity from the power system and the obligation to deliver electricity to a
power system for evaluation of deviations shall be rounded to the
tenths of MWh in the following way:
and) if it is in second place after the decimal (hundredths MWh) digits
greater than or equal to 5, then the number in the first place after the decimal point
a comma plus the 1 's digit of the second, and the next place after the decimal point
is removed,
(b)) in other cases, all numerals in the second and another place for
the decimal point.
(3) the difference of the sum of actual values for the daily supply of electricity
the needs evaluation and settlement of imbalances in a given month and actual
the monthly value of the power supply for the bill payment for the transfer or
electricity distribution can vary with consumption or transfer points
equipped with measuring type and a maximum of 15 kWh per calendar month,
delivery or transfer seats equipped with measurement of B-type 1
kWh per calendar month.
(4) if the supply or electricity consumption measured on the secondary side
the transformer, it is considered that the actual values are measured
values increased in the case of a subscription or reduced in the case of delivery
electricity on the values set by the pricing decisions of the Office. The following modified
passes the value of the distribution system operator the market operator for the
evaluation and settlement of imbalances and delivery or subscription billing
electricity.
Article 23 of the
Financial collateral payments to the subjects of settlement
(1) the operator shall provide the market clearing financial collateral
payments to cover the foreseeable risks associated with
the activities of the subject of settlement. Financial collateral payments to cover the
the risks associated with the delivery and collection of the electricity, the bilateral trades,
shops closed on the organized short-term electricity market and
cross-border shopping. The amount of the financial security of payments are
also included commitments to the market operator's responsibilities. Shops on
the balancing market with regulating energy are not financially backed.
(2) if the entity does not have sufficient financial settlement payment for
Register of trade, the market operator does not register such a trade.
Refusal to register such a trade, the market operator shall notify without
undue delay in the entity, and in the case of clearing
cross-border trade also by transmission system operators, and at the same time
prompts the body to increase the clearance of financial collateral payments.
(3) if the entity does not have sufficient financial security payments clearing,
the market operator performs the reduction already registered shops. If it does not have
body clearing sufficient financial payment even after the truncation
shops, proceed in accordance with section 31.
section 24
Electricity transmission system operator obstaraná
(1) in order to address the imbalance between the contractually secured status and
actually implemented supplies and electricity in electricity
the system takes care of the transmission system operator electricity for
each trading hour.
(2) the transmission system operator procures electricity
and as the regulating energy through) the activation of support services,
(b)) on the balancing market with regulating energy, or
(c)) from abroad on the basis of the contract pursuant to § 7 para. 1 (b). (c)), point 1.
(3) electricity prices referred to in paragraph 2 is used to determine the posting price
According to § 25 para. 2 and are included in the system of evaluation and clearing
deviations.
(4) the transmission system operator shall determine the total costs associated with the
the solution to the imbalance between the contractually secured State and actually
the implemented supplies and electricity for every trading hour
in the form of quantity of electricity referred to in paragraph 2 in MWh and their prices in
CZK/MWh and passes this information to the market operator 11 hours of the day
following the vyhodnocovaném trading day. The data are transmitted in
the form of the quantities and prices of positive and negative regulating energy broken down by
the individual blocks of electricity generating stations in the case of regulatory
energy resulting from the activation of the support services, or by individual
registered market participants in the case of electricity using
from abroad. In the case of regulating energy secured on the balancing
market data are transmitted for each hour in the form of the sum of the
accepted on the balancing market energy and total payments for each
registered market participants.
(5) the Electricity referred to in paragraph 2 shall be the market operator, and it
and providers of business support services) on the basis of a contract for the supply of
regulating energy or contracts for access to the market
regulating energy,
(b)) a registered market participants on the basis of contracts for access to
the balancing market with regulating energy,
(c)) by transmission system operators for electricity obstarané from abroad
on the basis of the contract pursuant to § 7 para. 1 (b). (c)), point 1.
(6) the TSO shall publish in a manner allowing
remote access and amount of electricity prices broken down in accordance with paragraph 2 for
each trading hour.
(7) the transmission system operator procures for the needs of redispatching
electricity from participants in the electricity market, or the operator
Foreign transmission system. Cost of the provision or application of
This electricity are included in the total cost of providing support
services.
§ 25
Clearing and financial settlement of imbalances
(1) the clearing and financial settlement of imbalances to be carried out by the market operator
ensure electricity market participants payment for electricity, which was
delivered to the electricity system or removed from power system
beyond the agreed amount, or has not been delivered to the electricity
system or have not been removed from the power system, although it was in the
the treaties negotiated.
(2) Posting prices for individual trading hours down the market operator
on the basis of the prices of electricity in accordance with § 24 para. 2. the method of making the posting
the price is given in annex 5.
(3) the market operator checks for every trading hour difference between
total revenue from the system of settlement of imbalances and electricity costs
According to § 24 para. 2. A summary of these differences for a given calendar month
the market operator will by transmission system operators on the basis of
the contract, the object of which is the settlement of differences arising from clearing
the costs of deviations and the cost of electricity in accordance with § 24 para. 2.
The subject of this contract is also the payment of electricity in accordance with § 24 para. 2
(a). c). Total income from the system imbalance settlement shall be fixed as
the absolute value of the sum of the product of sums of imbalances of the subjects of settlement and
the posting price variances.
(4) the differences referred to in paragraph 3, the authority shall take into account in the determination of prices for
system services.
(5) on the basis of the settlement of imbalances carried out for each subject
Showdown in each trading hour shall determine the amount for payment of the market operator
responsibilities for the variance and the amount of payment for settlement. The amount of the payment
for clearing price is determined from the settlement activity of the market operator.
Payment responsibilities for the variance is calculated as the product of the size of the
derogations and clearing prices.
(6) every day by 2 p.m., the market operator shall notify the operator clearing
the manner set out in the Treaty on the settlement of imbalances evaluation
derogations for the previous day. This evaluation contains for each
business hour
and) size and direction deviation in MWh,
(b) the posting price variances in) €/MWh
(c) the payment to the clearing in the body).
(7) after the end of a billing period, which is 1 calendar month
the market operator based on the sum of the payments clearing body issues
a tax receipt for the entire billing period, where the value added tax
the value of the output of the market operator, or a basis for tax document
where the value added tax on the output of the subject of settlement.
Settlement of payments provides the market operator at least once every
calendar month.
(8) if the entity fails to pay showdown due the market operator
commitments within their maturity, the market operator on their
payment of part of the resources of the financial protection payments, and this way
referred to in the Treaty on the settlement of imbalances. If the body is clearing
in violation of the Treaty on the settlement of imbalances, the operator can market
cancel the registration.
(9) the cancellation of registration under paragraph 8 exposes the market operator
manner allowing remote access and at the same time about this fact
informs all subjects of settlement reported in the previous
trading day volume of electricity agreed to be subject to clearing,
which the registration was cancelled. Part of the notice of cancellation of registration
is the date from which the registration is cancelled. Diagrams of the agreed quantities
electricity, which is on the side of delivery or collection identified by the
the body is repealed, the market operator will not accept registrations and
shall not include in the agreed quantity of the subjects of settlement.
(10) the financial settlement of imbalances, the market operator carries out in 3 stages:
and the settlement in the form of day) advance payments
(b)) the monthly settlement, which is done after the end of the calendar month
and exposing the tax document and the advance of the day's longest
settlement,
(c)) the final monthly settlement, which is carried out for all concerned
entrepreneurs after the deadline for the submission of complaints by
terms and conditions of the market operator.
(11) the procedure and the exact dates of the stages are listed in the
the market operator's terms and conditions.
(12) for the financial settlement of deviations using the type-in diagrams
regions of the type referred to in paragraph 10 (a) diagrams. and) uses operator
the market last current value of planned annual electricity consumption,
the distribution system operator shall send the market operator under
§ 19 para. 7 and 8. For the financial settlement of deviations using type-
the diagrams in the regions of the type referred to in paragraph 10 (a) diagrams. (b)), and (c))
the market operator uses the most current planned annual values
electricity consumption for each settled trading days that
the distribution system operator posted by the market operator under § 19
paragraph. 7 and 8.
(13) for the financial settlement of imbalances in the local distribution
systems in accordance with paragraph 10 (a). and the market operator last used)
the current value of the projected annual electricity consumption, which
the operator of the local distribution system posted by the market operator under
section 20 (2). 6 and 7. For the financial settlement of imbalances in the local
distribution systems in accordance with paragraph 10 (a). (b)), and (c)) uses
the market operator last planned annual consumption current values
electricity for each business settled the days that the operator
local distribution system posted by the market operator under section 20 (2). 6
and 7.
section 26
The special arrangements for clearing and financial settlement of imbalances
(1) the settlement of imbalances in a special mode of reckoning is done for
clock
and he was named) for which a State of emergency in the electricity grid for the entire
the territory of the State under a special legal regulation ^ 21), or
(b)) laid down by the transmission system operator, for which it was
proclaimed the situation immediately to eliminate the States of emergency in the electricity
the system for the entire territory of the State under a special legal regulation ^ 21).
(2) in a special mode of clearing the market operator does not perform the clearing
derogations provided for in § 25.
(3) a special regime applies for the entire settlement of the power system
and for all subjects of settlement.
(4) in a special mode of reckoning for the evaluation and settlement of deviations
are the agreed amount of electricity for the commitment to supply electricity to
power system and negotiated amount of electricity for the commitment to remove
electricity from the power system subjects of settlement, including electricity
with the transmission system operator pursuant to § 24 para. 2 (a).
7, equal to zero, including the resulting flow between the different market areas in
the organized day-ahead electricity market.
(5) in a special mode of settlement do not organize the market operator
organized short-term electricity market.
(6) Settlement of electricity in a special mode of reckoning performed by operator
market on the basis adopted by the actual values of supply and consumption of electricity.
(7) the average price of electricity for each hour sets
the market operator as the weighted average on the basis of prices according to the price
decisions of the Office.
(8) the Aggregate of the actual values of supply and consumption of electricity carried out
the market operator for individual subjects of settlement in accordance with the valid pass
liability for deviation.
(9) Rounding real values of supply and consumption of electricity carried out
the market operator according to the rules that are applied when aggregating
the actual values of supply and consumption of electricity for imbalance settlement
outside of the special mode of reckoning.
(10) the market operator zúčtovává the true supply of electricity to the body
reckoning, including the actual amount of electricity procured abroad,
at an average price of electricity supply fixed pursuant to paragraph 7. When
payment of the price for the actual supply of electricity shall follow the procedure referred to in paragraph
12. the claim arises responsibilities to the market operator.
(11) the market operator zúčtovává the actual electricity consumption of the body
reckoning, including the actual amount of electricity supplied to foreign countries, for
the average price of electricity supplies, determined in accordance with paragraph 7. When
pay the price for the actual electricity consumption shall follow the procedure referred to in paragraph 12.
Responsibilities this creates commitment to the market operator.
(12) the settlement of payments in a special mode of reckoning performed by operator
the market. First, the market operator receives payments from the subjects of settlement,
that obligation to the market operator. The market operator shall be borne by their
commitments from the special scheme to require clearing clearing up to
the amount of the payments received from the subjects of settlement on the basis of their obligations
to the market operator and accepted by financial collateral subjects
the showdown. Claims of the subjects of settlement shall be borne by the market operator proportional
manner according to the size of the individual subjects of settlement of the claims.
Details of the settlement payments are listed in the terms and conditions
the market operator.
(15) for the settlement of the special settlement scheme exposes the market operator
separate tax documents.
(14) the transmission system operator shall, without undue delay, no later than
However, the term pursuant to § 18 para. 1 to announce the implementation of the market operator
the settlement of imbalances of the special arrangements pursuant to paragraph 1. (b)).
(15) the market operator rozúčtuje the claims and liabilities arising from the difference in the
revenue and expenditure of the clearing of the resulting flow between market
areas of progress on the organized short-term electricity market on
individual subjects of settlement in proportion to their actual values of supply
and subscriptions.
section 27 of the
The transmission of data for bill payments and payments for the provision of payment
system services
(1) a producer of electricity production plants of electricity after prior registration in
the information system of the market operator the market operator passes
through the information system of the market operator data for the past
calendar month in accordance with Annex 5a to this Decree, no later than
the tenth calendar day of the following calendar month. It
is true even if, if it is connected to the electricity consumption of the manufactory
the electrical equipment of the customer, which is a different legal entity or
a natural person other than the operator of the plant. Electricity producers whose
production of electricity is connected to the supply of electrical equipment
the customer shall be borne by the distribution system operator, to the system
It is connected to the customer's place of consumption, the price for system services. At the same time
the manufacturer, the production of electricity on the power of 30 kW
the exception of plants generating electricity using solar energy
radiation or wind power is connected to the electrical power consumption
the equipment of the customer, the distribution system operator, which
the system is connected to the customer's place of consumption, the price for a reduced need for
system services for local consumption of electricity.
(2) the transmission of data referred to in paragraph 1 shall not apply to the manufacturer who
passes the data needed for the purposes of determining payment for system services in the
the reporting of data for the payment of support under the Act on supported
energy sources ^ 29) and the implementing legislation to this Act.
(3) the operator of a local distribution system passes the market operator
through its information system data for the previous calendar
month in annex 5b to the Ordinance, and at the latest within
the fifteenth calendar day after the end of the calendar month. No later than
to the 15th calendar day after the end of the calendar month the
each distribution system operator shall local manufacturers with the exception
production of power up to 30 kW including or producer manufacturing
electricity using the energy of sunlight, or wind energy,
the device is connected to the local distribution system, the size of the
local manufacturers in the defined territory of the operator of a local
the distribution system for the previous calendar month, which relates to the
This producer. This local consumption is calculated as the product of sums of
local consumption of all producers in a defined territory of the operator
local distribution system, and the proportion of the amount of electricity produced
by the manufacturer, less technological own consumption
electricity, to the total amount of electricity produced by all manufacturers in the
defined territory local distribution system operator reduced the
technology its own electricity consumption.
(4) the operator of a regional distribution system operator passes
market through its information system by the twelfth
day of the next calendar month for the previous month in MWh
and an estimate of the total amount of electricity) transported by the operator
the distribution system
1. customers whose device is connected to its distribution
the system, with the exception of electricity purchased outside of the power system
The United States, which is consumed in the island's service proven
separate from the power system of the Czech Republic,
2. the operators of local distribution systems, the device is
connected to its distribution system,
3. the producers, for which the device is connected to a distribution system,
In addition to the technology your own electricity consumption,
4. for other consumption distribution system operator,
(b) an estimate of the total amount) local manufacturers in generating stations
connected to a distribution system,
(c) the total amount of electricity) taken from the Czech power system
the Republic as a result of full or partial connection originally divided by the
Island traffic beyond the approved in the daily preparation of diagram
operation.
(5) the transmission system operator shall, for the purposes of reimbursement of payments for
the provision of system services the amount of electricity collected from customers
the transmission system, and directly from the manufacturers, whose devices removed is
connected to the transmission system of the measured values of the subscriptions.
(6) on the basis of the information referred to in paragraphs 1 and 3 and the information referred to in the Act on
supported by energy sources ^ 29) charged a local operator
the price for the distribution system manufacturer or system service to the customer,
the sampling or the submission site is connected to the operated
the local distribution system. Operator of the parent local
distribution system charges a price for system services also
the distribution system operator, whose distribution system is
attached to its distribution system.
(7) on the basis of the information referred to in paragraphs 1, 3 and 4 and figures under the law on
supported by energy sources ^ 29) charged the operator of regional
prices for distribution system operators of the system services
local distribution systems or customer or producers whose
device is connected to a regional distribution system.
(8) on the basis of the information referred to in paragraph 4, the operator of a transmission charges
the system of prices for system services by the relevant regional
the distribution system.
(9) on the basis of the information referred to in paragraph 5 of the transmission operator posts
the system of prices for system services the customer whose device is
connected to the transmission system or the manufacturers whose equipment is
connected to the transmission system.
(10) the manufacturer with the installed power plant over 30 kW of electricity charges
operator of a transmission or distribution system, to which the system is
production of electricity is connected, the price for a reduced need for system
services for local consumption by the producers on the basis of the information referred to in paragraphs 1 and
3; This price does not charge electricity producers producing electricity with the use of
solar radiation or wind power plant.
(11) the amount of the payments for the provision of system services is intended
the product of the electricity market electricity prices for
system services in Eur/MWh in accordance with the pricing decisions of the Office.
(12) the payment for system services is no cost for electricity consumed
for pumping in pumped hydro power plants and electricity
shipped abroad, with the exception of the power supply from the power
system of the Czech Republic in part of the territory of another State unconnected with the
Foreign electricity system.
(13) the distribution system operator pays the price for reduced the need for
system services for local consumption, manufacturer of transmission
or distribution system to which the device is the payer system
services connected. The amount of the payments is determined by the product of the size of the local
manufacturers and prices for system services in Eur/MWh in accordance with
price decision of the Office.
(2) not later than the twenty-eighth day of the calendar month
following the period for which billing system services
done, passes the regional distribution system operator
the market operator through its information system the final
data on the total amount of electricity transported and consumed in the
calendar month. Any deviations in quantity compared to the expense report
the transmission system operator shall without delay to the competent
the distribution system operator.
(15) the information referred to in paragraphs 1, 3, 4 and 14, the market operator will make available on your
information system to all participants in the electricity market, which is
use for posting prices for system services.
(16) the manufacturer shall communicate, by 31 March each year. January operators
the transmission system operator or distribution system operator, which is an
connected electricity production, electricity production as a producer of classification
the first category or the other categories on the basis of measurement
identified in the preceding calendar year. If the manufacturer does not communicate
inclusion in the category of producers of electricity production within the time limit referred to in the sentence
First, it is considered that the production is placed in the second category.
(17) in the case of the production plants of electricity put into service during the
the calendar year of the transmission system operator or the operator
distribution system operators shall decide on the inclusion of the manufacturer in the first or second
category on the basis of the ratio between the installed power plant and
reserved input in a given supply or delivery location. For
the manufacturer of the first category in this case is considered to be the manufacturer with
the ratio between the installed power plant and the reserved power in
the discharge or delivery point equal to or greater than 5. After
the end of the calendar year of the transmission system operator or
the distribution system operator shall reassess the classification of producer to the first
or the second category on the basis of data from measurements found in the
preceding calendar year.
(18) the inclusion in the categories of producers referred to in paragraphs 16 and 17 apply
the transmission system operator or distribution system operator
to determine the payment for electricity or for the electricity distribution and
related services from the beginning of the second quarter of the year to the end of
the first quarter of the following year.
section 28
The scope and timing of the bill payments for the services of the market operator
(1) for services to the participants of the market operator of the electricity market charges
the prices for the market operator's activities referred to in paragraph 2 to the extent and terms
referred to in paragraphs 3 to 11.
(2) the prices for market operator's activities are
and the price for the activity of the operator) market in the electricity sector in EUR/MWh in reference
on
1. the electricity consumed by the customer, the manufacturer or operator of the
transmission or distribution system, in addition to electricity for pumping
pumped hydro power plants and technological consumption
electricity and losses in the transmission and distribution system,
2. the electricity consumed by the customer on the island operate on the territory of the
The United States shown to be separate from the power system of the Czech
States and in the established Island operation abroad connected to
the electricity system of the Czech Republic,
(b) for clearing) price of the market operator, which consists of
1. registration of the subject of settlement prices in CZK,
2. the annual price for clearing activity in CZK/year,
c) fixed price for providing market participants with actual values
electricity in CZK/year; the price paid by a registered market participant with
electricity, which is not subject to clearing,
d) price for the amount of electricity traded on the organized block
market day-ahead market and intraday market in Eur/MWh; the price paid by the entity
the clearing house which has concluded a contract on the access to the organized short-term
the market for electricity.
(3) the prices for market operator's activities shall be paid by the participant of the electricity market
the market operator directly, with the exception of the prices referred to in paragraph 2 (a). and)
which shall be borne by the participant of the electricity market operator of a transmission or
distribution system to which the device is a participant in the electricity market
connected, and at least once a month.
(4) the prices referred to in paragraph 2 (a). and are not charged for electricity)
consumed by the manufacturer for the pumping of water plants, přečerpávajících
for the consumption of electricity and its own technology for the losses in the transmission
or distribution system.
(5) the operator of a regional distribution system operator passes
market through its information system by the twelfth
day of the next calendar month for the previous month in MWh
and an estimate of the total amount of electricity) transported by the operator
all customers, distribution system operators, local
distribution systems, the device is connected to its distribution
system, and other distribution system operator, consumption
(b) an estimate of the total amount of electricity) according to § 27 para. 1 and 3,
(c) the total amount of electricity) collected from customers in the established island
operation abroad connected to the electricity network and in the island's
operation on the territory of the United States shown to be separate from the power
the system.
(6) the transmission system operator passes the market operator
through its information system no later than the twelfth day
After the end of the calendar month, an estimate of the amount of electricity
collected from customers directly from the transmission network, local consumption
manufacturers whose equipment is connected to the transmission system, and the other
the consumption of the transmission system operator. For local consumption
the manufacturer of the market operator passes through its information
system according to § 27 para. 1 the size of the other power in the area
electricity production and consumption on the premises of the size of foreign electricity production,
no later than the 10th day of the calendar month following
the period for which the Bill is fixed prices for market operator's activities
carried out. The transmission of data referred to in this paragraph shall not apply to
the manufacturer, which passes the data needed for the purposes of determining payment for
system services in the framework of the reporting data for the payment of aid under the
the law on the supported resources ^ 29) and its implementing provisions.
(7) the information referred to in paragraph 6 shall make available to the market operator on your information
system to all electricity market players, who use them for
posting prices for system services.
(8) on the basis of the information referred to in section 27 para. 1, 2 and 4 and the data pursuant to the Decree on the
How to price regulation in the energy sectors, and procedures for the regulation of
price ^ 30) charged the operator of regional distribution system
the local distribution system operator or customer
or manufacturer whose device is connected to the regional distribution
system, the price for the market operator's activities referred to in paragraph 2 (a). and)
electricity referred to in paragraph 2 (a). a) points 1 and 2 and for electricity on the
the other consumption of local distribution system operator.
(9) on the basis of the information referred to in paragraph 5 and the data pursuant to the Decree on the way
price regulation in the energy sectors and procedures for regulating prices ^ 30)
the market operator the operator charges the regional distribution
system price for market operator's activities referred to in paragraph 2 (a). and)
electricity referred to in paragraph 2 (a). a) points 1 and 2 and for electricity on the
the other consumption of distribution system operators.
(10) on the basis of the information referred to in paragraph 6 and the data pursuant to the Decree on the way
price regulation in the energy sectors and procedures for regulating prices ^ 30)
posts by transmission system operators, the market operator Award for the activity
the market operator referred to in paragraph 2 (a). and) for electricity referred to in paragraph 2
(a). and) points 1 and 2, and the consumption of electricity on the other
the transmission system operator.
(11) no later than the twenty-eighth day of the calendar month
following the period for which it has been billing prices referred to in paragraph 2
(a). and electricity referred to in paragraph) 2 (a). a) points 1 and 2 and further
electricity on the other consumption of distribution system operators
done, passes the regional distribution system operator and
the transmission system operator the market operator through its
the information system of the definitive data on the total amount of electricity
transported and consumed in a given calendar month, broken down by
paragraphs 5 and 6. Any deviations in quantity compared to settle the Bill
the market operator shall without delay to inform the distribution
the system.
section 29
Disclosure of information by the market operator
(1) the market operator handles and publishes monthly and annual report on the market
electricity in the Czech Republic ^ 22). The report contains, in particular,
and hourly statistics) electricity prices and payment for zobchodovaná
the amount of electricity on the day-ahead market and intraday market and price statistics
and payment for electricity zobchodovaná the quantity of electricity on the block market
for the days Monday through Sunday,
(b)) the evolution of average daily prices of electricity from the daily market,
c) volume of electricity traded out of the block market, market
intraday market,
(d) information about the complaints relied on) with electricity market participants to
the market operator,
(e) the number of changes of supplier) in the sampling locations of customers and customer
forward electricity generating stations, locations
f) time course the size of the system imbalance,
g) timing of costs incurred by the coverage of the system imbalance,
h) statistics of hourly green bonuses for each category
renewable energy sources.
(2) when the special mode of clearing and financial settlement pursuant to section 26
is the market operator developed analysis of the situation in
electricity. This analysis is the market operator to be exposed in a way
allowing remote access. At the request of the subjects of settlement are
also published their comments to the analysis. Operator of a transmission
or distribution system operator provides on-demand market
additional information.
(3) the market operator also exposes and at each change updates
manner allowing remote access a list of all registered
participants in the electricity market, with the exception of the customer category (D).
the list contains
and the business name of the participant) of the electricity market; If doing business
the natural person does not have a business name, then her name, last name, and
any amendment, in the case of a legal person registered in the commercial
register its name,
(b) participant identification number) of the electricity market, where it has been
allocated,
(c) the registration number allocated)
d) indicate whether the body of the settlement,
(e)) the validity period of the imbalance settlement concluded with the body
the showdown.
(4) published data showing that the electricity market is a participant in the
body time reckoning.
(5) the Operator shall provide the market participants in the electricity market law
access to the information system of the market operator the information referred to in
Annexes 7 and 8 through the information system of the market operator.
(6) the market operator shall provide the transmission system operators
and on the day before) business day for the purposes of the preparation of the traffic data
of the obligation to deliver electricity to the system and on the commitment to remove electricity from
system of individual subjects of settlement,
(b)) the day following the trading day for the purposes of the evaluation of the data on the
individual subjects of settlement, where the discrepancy this deviation exceeds
on a given entity clearing 50 MWh in one interval.
(7) the market operator will provide the compulsory vykupujícímu of the calculated differences between
farm gate prices and green bonuses for each category
renewable energy sources.
(8) the market operator without undue delay the exposes the way
allowing remote access information on the implementation of the clearing and
the financial settlement of imbalances in a special mode of settlement pursuant to §
26. the information defined in the trading hours for which to be special
way of reckoning is made.
Change of supplier in the mode of the transferred responsibility for deviation
section 30
the title launched
(1) prior to application of the first amendment to the vendor serves a market participant
with electricity, the sampling or the submission site is connected to the
the transmission or the distribution system with the voltage between phases of more than
1 kV, with the transmission system operator or of the relevant operator
distribution system application for the conclusion of new contracts on connection, if
contract for the connections according to the existing legislation has not already been
closed, no later than the dates referred to in paragraph 5.
(2) the procedure referred to in paragraph 1 shall not apply to the pass-through space stations
electricity connected to the electricity system and the sampling locations
customers that have been connected to the transmission or distribution system
from the 1. January 1, 2002.
(3) a precondition for lodging an application for amendment of a new vendor
the vendor is a contract for the supply of electricity and/or combined
electricity supply services concluded between the electricity market participant and
new supplier.
(4) at least 4 months in advance and no later than 10:00 a.m. tenth
the working day before the date on which the shipment has to be effected (
"the effective date of the change of the supplier"), serves a new supplier for
the market operator's application for change of the supplier that contains
the following data:
and the new vendor registration number),
(b) the type of contract), the object is to be the supply of electricity,
(c) the effective date of the change of the supplier),
(d)) the duration of the legal relationship established by the Treaty,
(e)), the name or trading name, name, head office or place of business and
the registration number of the entity, which is responsible for clearing the derogation for
the sampling locations for that shipment will be effected,
f) identification numeric codes offtake, or transfer points,
(g)) whether the contract was for the supply of electricity or combined
electricity supply services concluded by the consumer or business
a natural person at the premises of the usual business or outside spaces
the usual business.
(5) If a request for change of the supplier referred to in paragraph 4 is lodged
the market later than 10:00 a.m., the request for
the implementation of changes to the vendor was made the next business day.
(6) the market operator will allow the sending of the request for change of the supplier for the
the sampling or pass-through space information system and market operator in
where in the information system of the market operator is not sampling or
submission site is registered. Identity of such sampling
or a pass-through space is allocated identification code number in accordance with § 4
paragraph. 2. If the identification code number was not for sampling or
pass-through space assigned, shall ensure that the operator of a transmission or
delay to the allocation distribution system.
(7) not later than the date referred to in paragraph 4 or 5 serves a market participant
electricity in the transmission system operator or the competent
distribution system operator request to conclusion of the contract of transfer
electricity or electricity distribution arrangements referred to in
Annex No. 1 or 2, or to request the negotiation of changes to legal relations
the existing treaty-based transmission of electricity or the Treaty on
distribution of electricity for sampling or pass-through space referred to in paragraph 4
or 5, if there is such agreement between the electricity market participants already
closed. Request for an agreement on the transit of electricity or the Treaty on
distribution of electricity is not served if such contract between the
electricity market participants concluded. The application is made
and if the new supplier) is to be carried out, the supply of electricity on the
under the contract pursuant to § 7 para. 1 (b). (d)), or
(b)), another participant of the electricity market, if the supply of electricity
carried out on the basis of a contract.
(8) the Operator shall inform the market no later than 12:00 a.m. of the date on which the
a request was made under paragraph 4 or 5, on receipt of a request for
the implementation of changes to the vendor and the vendor's implementation of the planned changes
an existing vendor, an existing body of reckoning, the new vendor,
a new body of clearing, or other stakeholders of clearing and
the transmission system operator or of the relevant operator
distribution system, to which the sampling or pass-through space
electricity market participant connected. At the same time, the market operator will transmit
new suppliers and new entity data in the range according to the clearing
paragraph 4 (b). a) to (g)). The market operator to an existing
suppliers and the existing data in the range of responsibilities under the
paragraph 4 (b). (c)), f) and (g)) and also by transmission system operators
the distribution system operator or the relevant data in the range
in accordance with paragraph 4 (b). a) to (d)), f) and (g)).
(9) the transmission system operator or the owner of the distribution
the system sends the market operator for the sampling or pass-through space for
which has lead to a change of the supplier and that are not registered in the
the market operator's information system, the data needed for their
registration until 12:00 hours the fifth working day following the period referred to in
paragraph 8.
(10) the operator of a transmission system operator or distribution
the system operator shall inform the market about the outcome of the assessment of the application for
the conclusion of the Treaty or of the Treaty on the transit of electricity distribution
of electricity or the request for negotiation of changes to legal relationships established
the existing treaty or of the Treaty on the transit of electricity distribution
electricity until 18:00 hours the fifth working day following the period referred to in
paragraph 8, if it is a change of the supplier, when a new supplier
has concluded a contract on associated electricity supply services. The operator
the transmission system operator or distribution system operator refuses to
a request under the first sentence, stating the specific grounds for this refusal in
the message sent by the market operator only if the
and) from the application not possible to uniquely identify a market participant, and it
by assigning an identifying code number of the sampling sites with name,
last name and date of birth of a market participant or trade name,
where appropriate, a market participant's name and identification number of the person if
has been assigned,
(b)) the sampling location at which you want to change the vendor is not included
the applications for the closure or the negotiation of the Treaty changes to the framework
distribution of electricity,
(c)) in the request is not listed as the billing address of a market participant in the
point has to change supplier,
(d)) is not delivered the application for conclusion of a contract on connection or request for
negotiation of changes to existing legal relationships established by the Treaty
connection, if required,
(e)) in the request reserved capacity is required, which is higher than the
the value of the reserved power input connection specified in the contract,
f) request for an agreement on the transit of electricity or the Treaty on
distribution of electricity or to request the negotiation of changes to legal relations
the existing treaty-based transmission of electricity or the Treaty on
electricity distribution includes the earlier start date of transmission or
distribution of electricity than the effective date of the change of the supplier in
request for change of the supplier,
(g)) the application for conclusion of a contract on the transit of electricity or the Treaty on
distribution of electricity or to request the negotiation of changes to legal relations
the existing treaty-based transmission of electricity or the Treaty on
distribution of electricity includes a later start date of transmission or
distribution of electricity than the effective date of the change of the supplier in
request for change of the supplier.
(11) the transmission system operator or the owner of the distribution
the system informs you about the specific reasons for denial of the request referred to in
paragraph 10 a new vendor through the information system
the market operator no later than 6:00 p.m. on the fourth working day following the
transmission of the information referred to in paragraph 8. The transmission system operator
or the distribution system operator accepts the request referred to in paragraph 10,
If the new supplier of the shortcomings of the application pursuant to paragraph 10 (a). and), (c)),
e) or (f)), which are the reason for its refusal, it deletes until 14:00
hours of the fifth working day following the submission of information in accordance with paragraph 8.
(12) if the request is a new vendor on the conclusion or the negotiation changes
framework contract for the distribution of electricity includes additional information different from
the data referred to in paragraph 10 (a). a) to (c)), that are inconsistent with the
data distribution system operator pursuant to § 5 para. 5, the
an indication of the billing address of a market participant referred to the new supplier and
an indication of the classification of a market participant to regulation levels, current value
main circuit breaker electricity meter and distribution rate shown
distribution system operator; If the customer meets the conditions
laid down for the granting of distribution tariffs specified in the application of the new
the vendor, it is an indication of the new distribution rate shown
by the supplier.
(13) the Operator shall immediately inform the market of the current vendor, new
the vendor, and all stakeholders of the outcome of the assessment of the settlement
the application for conclusion of the Treaty on the transit of electricity or the Treaty on
distribution of electricity or a request for extension of the existing contract for the
electricity transmission or distribution of electricity referred to in paragraph 10
and in case of refusal of the application for conclusion of a contract for the transmission of electricity
or contract for the distribution of electricity or a request for extension of the existing
Treaty or of the Treaty on the transit of electricity distribution of electricity by
paragraph 10 shall also inform the existing vendor and an existing entity
the showdown on the continuation of electricity supply.
(14) the new supplier may submit a request for a termination of the process changes
vendor until 14:00 hours eighth working day following the submission of information
in accordance with paragraph 8.
(15) the current supplier may submit an application for suspension of the process of change
vendor until 18:00 hours the fifth working day following the submission of information
in accordance with paragraph 8, if the effective date of change of the supplier not to
termination of the contract with an existing supplier, the object of which is the supply of
electricity, or if the market participant in writing reflected the will of the process changes
vendor to stop.
(16) in the event that the request for change of the supplier was listed information
about the contract outside the areas common to the business and the customer has resigned
from the contract pursuant to § 11a. 2 ^ 9) Energy Act and at the same time
requests the continuation of supply from the existing vendor, can the existing
supplier to stop through the information system of the market operator
change of the supplier in the period referred to in paragraph 15.
section 30a
(1) if in the 6 p.m. 5th working day following the submission of information
According to § 30 para. 8 is not in the system of the market operator is registered with the consent of the
the new entity by assigning responsibility for the showdown with the derogation in
discharge or the place of delivery, it shall inform the operator of an existing market
the supplier, an existing body of clearing, other stakeholders
reckoning, the new vendor and the transmission system operator or
appropriate distribution system operator to which the sampling
or a pass-through space electricity market participant connected, terminating
the process of change of the supplier.
(2) the Operator shall inform the market of the current vendor, a new vendor,
the existing body of clearing, settlement, and other interested entities
the transmission system operator or of the relevant operator
distribution system, to which the sampling or pass-through space
electricity market participant connected to a request referred to in section 30
paragraph. 14 or 15 to 8 hours working day, in which the application was
taken. If the new contractor must lodge an application according to § 30 para. 14, operator
market change of supplier process terminates.
(3) If an existing supplier shall submit an application in accordance with section 30 paragraph 2. 15, but
new supplier on the basis of the customer's written observations, from which it is
clear that the customer intends to change supplier, confirmed in the information
the system of the market operator request for change of the supplier, and not later than
2 pm on the eighth working day following the date of specific information on the planned
the implementation of changes to the supplier according to § 30 para. 8, the market operator
continues in the process of change of the supplier. New supplier shall provide written
representation of the customer at the request of the market operator. Otherwise,
the market operator change of supplier process exits and shall immediately inform the
an existing vendor, a new vendor, all stakeholders
clearing and the transmission system operator or the competent
distribution system operator to which a sampling or
pass-through space electricity market participant connected, on the continuation of
the supply of existing supplier.
(4) the market operator shall notify the existing suppliers, new suppliers,
all clearing and the entities concerned by transmission system operators
or the relevant distribution system operator, to which they are
the sampling or pass-through space electricity market participant connected,
registration changes in 8 a.m. ninth working day from the date of
information about the planned implementation date of change of the supplier according to § 30
paragraph. 8.
(5) following the notification of the registration of the change of the supplier enters into a new supplier
the Treaty on the transit of electricity or electricity or distribution agreement
arranges for Treaty change to electricity transmission or distribution
electricity including a sampling or pass-through space according to § 30 para. 4.
The transmission system operator or distribution system operator
to ensure that the effective date of change of supplier the transmission of electricity, or
the distribution of electricity to the sampling or a pass-through space of a market participant
the electricity in the first sentence and ends the transmission or distribution of electricity
electricity for the current vendor.
(6) change of supplier is deemed to be the first commercial
the hour of the effective change of the supplier.
(7) the market operator to the effective date of change of the supplier cancels any
individual assignment of sampling or a pass-through space for those suppliers,
the delivery period is by assigning a sampling or a pass-through space
new suppliers, and shall inform the concerned
vendor settlement body concerned and of the transmission
system operator or distribution system operator to which the sampling
, or pass-through space is connected.
(8) to the effective date of the change of the supplier or operator performs clearing
the transmission system operator or relevant distribution operator
System readout way modified by a law which provides for the
the details of the measurement of electricity and the transmission of technical data in the ^ 1)
the case of pick-up or transfer points with the measurement type (C) provides the status of the
measuring device in accordance with paragraph 9 and the data subsequently
send the market operator. The market operator the following information without undue delay
passes the previous body clearing and suppliers to doúčtování and
settlement of obligations. The market operator shall transmit the information concerning the final status of the measuring
the device, upon request, the new suppliers and new responsibilities.
The data shall not be despatched in the case that the previous vendor is part of
a vertically integrated company, whose part is the operator
the distribution system, and this consumption location is in the system of the market operator
newly registered. To the effective date of change of the supplier shall make available
the market operator to the new responsibilities and new suppliers in the
information system data on the planned annual electricity consumption in the
each of the sampling locations of customers with the measurement of type C, which will be
new supplier to supply electricity. After the effective date of the vendor
the market operator passes the new entity to clearing and new suppliers
details of the actual quantities of electricity in the range according to the legal
the regulation, which sets out the details of the measurement of electricity and transmission of
technical data ^ 1).
(9) the determination of the status of the measuring device for the delivery or transfer points
with the measurement type (C) is performing the distribution system operator reading to
the effective date of the change of the supplier or of the subject of settlement or an estimated
the State of the measuring device to the effective date of change of the supplier or agency
the showdown with the use of the associated type-converted diagram and
the last current expected annual electricity consumption or on
the basis of the samoodečtu of a market participant to the effective date of change of the supplier
or responsibilities and delivered, the distribution system operator
directly or through an existing or a new vendor to 5
working days from the effective date of change of the supplier. Thus provided for
passes the value of the distribution system operator the market operator to
10 working days from the effective date of change of the supplier or agency
the showdown.
(10) the communication between the market operator and electricity market participants in
the change of supplier process takes the form of electronic messages in
communication environment defined by the market operator. Messages are
electricity market participant sent in a format that you define
the market operator.
(11) the market operator to the requests to make changes to the vendor in
the order in which they were received by the market operator. If a request for
the implementation of changes to the vendor for the same sampling or pass-through space is
the same required the effective date of change of the supplier more vendors
the market operator registers the change of the supplier according to the request of implementation
change of the supplier, which he received last. In this case,
the market operator informs about the planned change of the supplier referred to in
§ 30 paragraph 2. 8 and notify the change of supplier registration according to § 30 para. 4
all vendors and operators, who are posting by changing supplier
According to the second sentence.
(12) For change of the supplier because of the change in the point of the customer
the provisions of this Decree on the change of the supplier in the mode of the migrated
liability for deviation shall apply mutatis mutandis, with the exception of § 30 paragraph 2. 15 and
section 30a para. 3. before submitting an application for change of the supplier under the first sentence
serves the electricity market participant in the transmission system operator
or distribution system operator request for new
connection agreements, and not later than the dates referred to in § 30 paragraph 2. 4, in
otherwise, the transmission system operator or the operator
distribution system rejects the request about the conclusion of the contract of transfer
of electricity or the contract for the distribution of electricity or the trade request
changes to the existing treaty or of the Treaty on the transit of electricity distribution
electricity. New supplier filed with the request for the market operator implementation
change of the supplier showing the changes to the customer in the point of use. If
When you change the in point of the customer there is no change of the supplier,
are activities within the process, carried out by market participants concerned with
electricity so as to guarantee an uninterrupted supply of electricity to
load of the customer.
(13) in order to change the supplier of last resort for another
the supplier, the number of suppliers, changing supplier in the delivery place
the plant, the change of the supplier in the delivery place of the operator of a local
the distribution system in case of the purchase of electricity to cover system losses and in
the case of modifications of the contract pursuant to § 7 para. 1 (b). a) and (d))
existing supplier, shall apply mutatis mutandis the provisions of this Ordinance
governing the procedure for changing supplier in the mode of the transferred liability
for the variance.
(14) in order to begin the supply of electricity to the unlawful collection
or after the unauthorized distribution of electricity, when the supplier is not an entity
that is a supplier of last resort in the distribution area,
shall apply mutatis mutandis the provisions of this Decree governing the procedure for
changing supplier in the regime of deviation with the transferred responsibility for the fact that
and a request for change of the supplier) according to § 30 para. 4 supplier for
the market operator no later than 10.00 o'clock the fifth working day before the
the required date the start of delivery of electricity,
(b)) change of supplier to perform acts pursuant to § 30 para. 9 to 15 and under
section 30a para. 1 and 2 shall be carried out by the third working day following the submission of the
the request pursuant to § 30 para. 4; periods of hours remain
retained and
(c) the operator shall notify the result of the assessment) request for change of the supplier referred to in
section 30a para. 4 not later than 12 noon on the fourth working day following the
request referred to in section 30 paragraph 2. 4.
§ 30b
(1) the request for reducing the supply of electricity to the load sends the
the supplier market operator through the information system
the market operator no later than 23:00 hours last calendar day
prior to the scheduled termination of the supply of electricity to the load.
The market operator cancels on your system to the requested termination date
supply of electricity load assignment to suppliers and to the concerned
responsibilities and shall immediately inform the
the vendor involved clearing and transmission
system or appropriate distribution system operator, which
consumption location is connected. Shortening the supply of electricity is, in
If the contract of associated electricity supply services cut
load of a framework contract for the distribution of electricity.
(2) an application for extension of the supply of electricity to the load sends the
the supplier market operator through the information system
the market operator no later than 10:00 a.m. on the fourth business day prior to the
on the last day of the power supply. The market operator shall without delay about this
informs the clearing and the entity concerned operator
the transmission system operator or relevant distribution system operator,
that is the supply point is connected. If the operator of a transmission
system or the relevant distribution system operator and operator
clearing procedure, for which applies mutatis mutandis to section 30 paragraph 2. 10 to 14,
request for extension of the supply of electricity shall agree not later than 6:00 pm
hours of the last day of the power supply, the extension of electricity supply
It shall take effect from the day following the last day of the delivery
electricity. The market operator shall immediately inform the
vendor settlement body concerned and of the transmission
system or appropriate distribution system operator, which
consumption location is connected. Extension of the supply pursuant to this paragraph
shall take effect only if the requested extension of the deadline is not in
point recorded another electricity supplier.
(3) in the event that the customer has withdrawn from the agreement or resigned from more
contracts under section 11a. 2 the Energy Act and this fact
was shown by the supplier, that is within the nearest vendor changes
being replaced by another supplier (hereinafter referred to as "the original supplier"), and
at the same time requires from the original vendor of the continuation of the supply from the
the existing vendor sends original request for extension supplier
the supply of the market operator the operator through the information system
market no later than 12:00 p.m. next business day before the date of
their delivery. At the latest at the same time serves the original
the vendor with the relevant distribution system operator request
contract for the distribution of electricity with the particulars referred to in annex No.
2 to this Decree, or to request the negotiation of changes to legal relations
the existing treaty-based distribution of electricity for delivery or
pass-through space, if there is such agreement between market participants with
electricity already closed.
(4) the submission of the application for an extension of the supply referred to in paragraph 3 shall inform the
the market operator immediately to the appropriate distribution system operator
and concerned bodies. If the body is clearing and the operator
the request for extension distribution system agrees not later than
23:00 hours of the calendar day preceding the day on which should take
the effectiveness of the change of supplier in the market operator's system, the
the extension of the supply and the market operator immediately of this fact
the vendor, the competent body shall inform the clearing and the operator
the transmission system operator or relevant distribution system operator,
that is the supply point is connected.
(5) the market operator to the effective date of an extension of the supplies referred to in paragraph 4
cancels any individual assignments of the sampling space to those suppliers for
which customer proven resigned under section 11a. 2
the Energy Act, and shall inform the supplier in question,
stakeholders clearing and transmission or distribution
system to which is appended to the place of consumption.
section 31
Electricity supplier of last resort
(1) if the Office decides, on the revocation of a license of a participant of the electricity market in the
trade with electricity or electricity production, inform
the market operator without delay. The market operator on the basis of information of the Office
ensure that the electricity market participant concerned, if the body is
the clearing was from the date of the decision on revocation of license
prevent the registration of data on bilateral supply stores
electricity and prevent the participation of the organized electricity markets.
Similarly, the market operator shall proceed, in the case where the supplier of electricity
the option shall cease to supply electricity or stops the supply of electricity
According to section 12a paragraph 1. 2 the Energy Act.
(2) if the supplier or responsibilities that the supplier
take responsibility for deviation, prevent the registration of data on
bilateral trades on the electricity or participation in markets with
electricity market operator, organized by the market operator shall inform the
the operator of this fact without delay of distribution networks,
the relevant electricity supplier and manufacturer and supplier of last resort
and at the same time this information exposes the way allowing remote
access. At the same time, the market operator will provide suppliers of last resort
customer lists, which should be launched in accordance with the Energy Act
electricity supplier of last resort, with an indication of their
identifying information, enumerated their offtake, or transfer points with
the identification code numbers.
(3) on the basis of the information referred to in paragraph 2, suppliers and manufacturers,
who have transferred responsibility for deviation to the entity to whom the clearing
bilateral data have been registered to supply stores
electricity or prevent participation in electricity markets
organized by the market operator, and 24.00 hours of the day, in which the
published information referred to in paragraph 2, to submit through the
the market operator's information system application for the transfer of responsibility for
deviation to another entity.
(4) On the basis of the information referred to in paragraph 2, the market participants with
electricity, or who have their own devolved responsibility for deviation,
filed in conjunction with the customer, to whom the shipment is to be launched
electricity referred to in paragraph 2, to 24 hours on the day in which the
published information referred to in paragraph 2, through the information
of the market operator's request for an accelerated change of the supplier. For
an accelerated change of the supplier shall apply mutatis mutandis the provisions of this
the decree governing the procedure for change of the supplier in the mode of the migrated
liability for deviation.
(5) If a request for transfer of responsibility for the derogation provided for in
paragraph 3, or to request an accelerated change of the supplier referred to in paragraph 4 and
the distribution system operator request for an accelerated change of the supplier
agree to 10 a.m. the next day following the day on which the
published information referred to in paragraph 2, then such amendment shall take
efficiency from the first business hour of the day following the date on
which was published information referred to in paragraph 2.
(6) in the absence of the delegation of responsibility to another entity clearing
in accordance with paragraph 3, or if there is no change of the supplier according to accelerated
paragraph 4 of the first business hour of the day following the date on
which was published information referred to in paragraph 2, to the load
customer initiated electricity supplier of last resort.
(7) the supplier of last resort will send customers concerned by
paragraph 6 within 2 working days after the start of supply of electricity
supplier of the last instance of a message that contains:
and) notice of initiation of the power supply by the supplier of last resort
and its reason
b) notification of the amount regulated prices for the supply of electricity supplier
the last instance or on the way of its establishment,
(c) notification of the conditions of supply) electricity supplier last
instance, which include in particular the conditions relating to the change of supplier
the last instance of a third-party vendor and the conditions for payments of advances and payments
for the supply of electricity to the supplier of last resort,
d) warning that the electricity supplier last
an instance may take a maximum of 6 months.
(8) the procedure for making changes to the supplier last
an instance is as follows:
and) in the case of the contracts originally pursuant to § 7 para. 1 (b). (d))
closes the supplier of last resort with the distribution
of the system to a new contract on electricity distribution,
(b)) to the effective date of change of the supplier for the supplier of last resort
the distribution system operator performs a readout of consumption points with
the measurement of type A or B, in the case of consumption points with the measurement type (C)
provides the status of the measuring device with the procedure referred to in subparagraph (c)), and
data, unless the previous supplier part of a vertically integrated
entrepreneurs, part of which is the distribution system operator, to the
the system of sampling locations are connected, it will send the market operator;
the market operator the following information without undue delay shall send the previous
suppliers to doúčtování and at the same time, make available to the supplier and settlement
the last instance data about the actual quantities of electricity taken in
the sampling points concerned in the last calendar year before the start of
the supply of last resort; After the entry into force of the changes to the vendor for the
supplier of last resort, the market operator forwards the details of the actual
quantities of electricity suppliers of last resort,
(c) the determination of the status of the measuring device) in places with the measurement type (C)
the distribution system operator performs the reading to the effective date of
changes to the vendor for the supplier of last resort or an estimate of the State of
the measuring device to the effective date of the changes to the vendor for the vendor
the last instance on the basis of the assigned type-converted diagram
and the last of the current estimated annual electricity consumption or on
the basis of mutually agreed exchanges carried out by the supplier of the last
an instance of or participants in the electricity market at the date of change effectiveness
the vendor for the supplier of last resort and that the operator
distribution system within 5 working days from the date of commencement
the supplier of last resort; set values
the market operator within 15 working days from the effective date of change
the vendor for the supplier of last resort.
§ 31a
The first supply of electricity to the newly established sampling locations
(1) no later than the date referred to in § 5 para. 2 shall submit a market participant with
electricity, which has concluded a contract on connection and who has completed her
terms and conditions for the relevant transmission or
request for distribution system of electricity transmission or
electricity distribution,
and, if you will) the supplier the supply of electricity implemented on the basis of
the contract pursuant to § 7 para. 1 (b). (d)),
(b)), another participant of the electricity market, where supply of electricity
take place on the basis of a contract; at the same time this market participant with
electricity shall communicate to the transmission or distribution system operators,
which supplier will supply the newly established sampling locations.
(2) no later than 5 working days prior to the supply of electricity shall conclude
supplier of electricity market with the participant agreement on electricity supply.
(3) in the case that the new supplier will supply the load,
that is not part of a vertically integrated company, whose
the distribution system operator is part of the new sampling
# connected, serves the supplier no later than 10.00 am of the fifth
the working day before the transmission or distribution of electricity at the
a request for the market operator's supply to the load
(hereinafter referred to as "request to initiate delivery"), which contains the following
details:
and the registration number of the supplier)
(b) the type of contract), the object is to be the supply of electricity,
(c)) the date from which the shipment is to be made (hereinafter referred to as "date
the effectiveness of "deliverable start),
(d)) the duration of the legal relationship established by the Treaty,
(e) the registration number of the subject of settlement), which is responsible for the variance for
the sampling locations for that shipment will be effected,
(f) the identification code numbers) to enumerate the delivery or transfer
places.
If the request for the initiation of delivery to a new sampling and pass-through space
submitted to the carrier market later than 10.00 am,, request for
begin deliveries to a new sampling and pass-through space has been made
the following working day.
(4) the market operator will allow the sending of the request to begin deliveries to
of the sampling space information system and market operator in
where in the information system of the market operator does not supply point
registered. Identifier, such a load is
identification code number allocated in accordance with § 4 para. 2. If the
identification number code was not for sampling or submission site
granted, the operator shall ensure that the transmission or distribution system
delay to the allocation.
(5) no later than 12 noon on the day on which the application was submitted
deliverable start, the market operator will transmit a request for the deliverable start
vendor responsibilities, who takes over for sampling and pass-through
place responsibility for deviation, and the operator of a transmission or
distribution system, which is the sampling or the submission site
electricity market participant connected. At the same time, the market operator will transmit
the data in the range referred to in paragraph 3.
(6) the operator of a transmission or distribution system concerned shall conclude with the
a participant in the market contract on electricity transmission or distribution of electricity
not later than 3 business days prior to the effective date of the deliverable.
(7) not later than the date referred to in paragraph 6, the operator of a transmission or
distribution system accepts or rejects a request for the supply and
shall inform the market operator the market operator and the body
clearing and the vendor who demanded a deliverable. Refuse to
a request for the supply of transmission or distribution, the operator may
the system only in the case that the data transmitted under paragraph 5 are not
complete.
(8) if the operator of a transmission or distribution system, to which the
the place of consumption of the electricity market participant connected, accepted the request
to initiate the delivery, and if the deadline referred to in paragraph 6 is in the information
the market operator system, consent of the subject of settlement registered with
by assigning responsibility for deviation, registers, the market operator
begin deliveries in the period referred to in paragraph 7, by assigning a sampling
the place of the electricity market participant to the vendor with the effective date of
deliverable in accordance with paragraph 10. Registration with the deliverable start date
the effectiveness of the deliverable according to paragraph 10, the market operator will report
without delay to the competent suppliers and also responsibilities that
He took over for a given supply point responsibility for deviation.
(9) before accepting the application for the initiation of delivery pursuant to paragraph 7 shall be sent by
the operator of a transmission or distribution system operator market
This place of consumption, which is not registered in the information system
the market operator, the information necessary for his registration.
(10) the registration shall become effective deliverable to the first commercial
the hour of the day the effectiveness of the deliverable.
(11) the market operator will allow sending a request for the initiation of delivery even after
the term referred to in paragraph 3 and the acceptance or refusal of the request on the
begin deliveries after the deadline referred to in paragraph 7, but no later than
10.00 a.m. of the last day prior to the effective date of commencement of delivery, if
to begin the shipment agree all market participants.
(12) sending a request for the initiation of the supply referred to in paragraph 3 and of the data
necessary for the registration of places takes the form of electronic
messages in the communication environment defined by the market operator. Messages are
to the relevant electricity market participant sent in the format
an operator defined market.
Section 31b
How to transfer responsibility for a deviation of a newly created pass-through
the place of production of electricity
(1) electricity trader on the basis of concluded contracts for the supply of
electricity ^ 10) will ask the operator through the information system
market no later than 10:00 a.m. of the third working day before the date of the acquisition of
the effectiveness of the contracts for the supply of electricity on the assignment of responsibility for
the variance for the electricity production submission site associated with the
start of supply of electricity from the power plant.
(2) in the case that this is a contract concluded with the compulsory vykupujícím,
the electricity trader as part of the application whether the
This is the purchase of electricity in the form of feed-in tariffs or the purchase of electricity
under section 11 (1) 12 of the law on energy sources supported ^ 29).
(3) an application for the assignment of responsibility for deviation, for the supply of electricity from
electricity production includes the following data:
and pass-through space) identification number of the electricity production,
(b) the registration number of the dealer) with electricity, which has concluded a contract
on electricity supply,
(c)) date from which the electricity is to take place,
(d)) the duration of the legal relationship established by the Treaty for the supply of electricity,
(e) the registration number of the subject of settlement), which is responsible for the variance for
pass-through space stations.
(4) the market operator will allow the sending of the request referred to in paragraph 1 for
the forward place of production plants of electricity market operator's information system and
in cases where in the information system of the market operator this pass-through
the place is not registered.
(5) no later than 12:00 a.m. of the date on which the complete application was submitted by
deliverable in accordance with paragraph 1, it shall transmit a request for the market operator
begin delivery of the subject of settlement, which takes place in the forward
electricity production plants responsible for the deviation, and transmission
or distribution system, which is a pass-through space plant
electricity is connected. At the same time, the market operator shall forward the information to the extent under
of paragraph 2.
(6) the transmission system operator or the owner of the distribution
the system sends the market operator for the production of electricity, the submission site
for which the request was submitted in accordance with paragraph 1 and which do not
registered in the market operator's information system, the data needed for
his registration until 12:00 hours on the last working day before the date
the contract takes effect on electricity supply.
(7) if the entity has not been refused a request for clearance to assign responsibility for the
the variance for the electricity production submission site into one
working day from the receipt of the request, the market operator registers begin
deliveries in the period referred to in paragraph 2, and by assigning a pass-through space
the production plants of electricity trader and operator of settlement. Registration
start of supply of electricity with the effective date of commencement of delivery according to the
paragraph 2 shall communicate without delay to the competent market trader and
also, who took over responsibilities for the submission site
responsibility for deviation.
(8) when you change the vendor or change responsibilities for
the existing electricity generating stations with pass-through points shall proceed mutatis mutandis
in accordance with the provisions of this Decree governing the change of supplier process.
(9) the market operator lets you change the responsibilities for existing
pass-through space stations of electricity even after the deadline referred to in paragraph 1,
no later than 10:00 p.m. on the last working day before the date
the effectiveness of the initiation of the supply of electricity if the change operator
clearing all the market participants concerned shall agree.
§ 32
The billing for the supply of electricity and related services
(1) the distribution system operator shall be sent by the operator
market after the end of the calendar month until 6 p.m. 5th working
day of the following month of electricity market participants for their
customers who have taken advantage of the right to change supplier and the sampling
sites are equipped with measurement of type A or type B measurements, with the exception of
places equipped by measurement of B-type connected to the low levels
voltage, the data needed for billing for the supply of electricity and related
services according to the law, which governs the scope, terms and
deadlines of supply of electricity, gas or heat energy and
related services ^ 27). From the 1. April 2007 sends the operator
such data distribution system, even for customers who have taken advantage of the law
on the change of the supplier and the consumption location is equipped with measurement of B-type
and connected to the low voltage level, and that by 6 p.m. on the 10th
working day of the following month.
(2) the distribution system operator shall be sent by the operator
market within 10 working days after making the deduction of electricity consumption in the
the sampling locations of customers with the measurement of type C, who had taken advantage of the right to
change of the supplier, the electricity market participants for their customers
the data required to Bill the supply of electricity and related services
under the law, which governs the scope, requirements and deadlines
the billing for the supply of electricity, gas or heat energy and
related services ^ 27).
(3) the deadlines for forwarding the data referred to in paragraph 1 or 2 shall be extended by
60 calendar days in cases of complaint, the measurement of the power supply or
the exchange of the measuring device and ensure its examination. The period is further
by the time of the investigation in cases where the point is
investigation of the unauthorized supply of electricity, electricity
or unauthorized distribution of electricity.
(4) the information referred to in paragraphs 1 and 2 also used a market participant with
electricity for the determination of power that came his
to customers.
(5) if the local distribution system operator takes over prices
regional distribution system operator, which is its
device is connected, the following prices:
and regional operators) prize serves as a distribution system,
the capacity for the collection of the distribution system to the voltage between phases over 1
kV, or the price for power consumption according to the nominal current of the main values
circuit breaker electricity meter for the sampling of the voltage distribution system
between phases up to 1 kV including,
(b) the price of the respective operator's regional) distribution system for
the use of networks of distribution system operators,
(c) the relevant operator will price) regional distribution
system for the use of regional distribution manager's network
of systems above 1 kV high voltage on the surface,
d) price for system services
(e) the price to cover the extra costs) related to support of electricity
f) price for the market operator's activities according to § 28 para. 1 (b). a), point 3.
(6) the distribution system operator shall publish in a manner allowing
remote access information about the planned restriction or interruption of the
electricity distribution, for a period of 15 days before the planned restrictions or
interruption of distribution of electricity. The information published shall include in particular
and specifically defined location) that is to be scheduled by limiting or
interruption of distribution of electricity,
(b)) date and time of the start and end of the planned restriction or interruption of the
distribution of electricity in the delivery or transfer points.
(7) the distribution system operator shall be sent by electronic means at
upon request, information about the planned market participant limits or
interruption of distribution of electricity at the voltage a very high level and
high voltage. The information shall include, in particular,
and the numeric codes) identification of pick-up or transfer of places
to be scheduled by limiting or interruption of distribution of electricity
prejudice,
(b)) date and time of the start and end of the planned restriction or interruption of the
distribution of electricity in the delivery or transfer points.
(8) the electricity market Participant can in a calendar year to the operator
distribution system to send a maximum of 10 samoodečtů with the exception of
samoodečtu performed on the last day of the calendar year. Shall send the
participant of the electricity market, the distribution system operator
samoodečty to any day of the year, but not later than 30
calendar days after their execution, the distribution system operator
sent by samoodečty or the electricity market participant shall notify the
the reasons for their refusal, within 15 calendar days after they are sent.
Samoodečty, which accepts, the distribution system operator shall include in the
the data required to Bill referred to in paragraphs 1 and 2.
(9) If a participant sends the electricity market before receiving your Bill
electricity supply that includes the last day of the calendar year
the distribution system operator samoodečty made on the last
day of the calendar year, but not later than within 30 calendar days after their
implementation, the distribution system operator shall adopt the samoodečty sent
or the electricity market participant shall communicate the reasons for their rejection, and it
within 15 calendar days after they are sent. Samoodečty, which
the distribution system operator shall adopt, shall be used when billing for
distribution of electricity, except where the operator
the system performs within one month after the end of the calendar year of the ordinary
or extraordinary reading.
(10) in the case of deduction of the consumption of electricity according to § 18 para. 15 shall send
the distribution system operator electricity consumption data
the market operator, which shall immediately transmit this information to the vendor.
(11) the customer who subscribes to electricity from the transmission system operator or from the
the distribution system with the voltage between phases of higher than 1 kV, and that in the
during the calendar month changes of the supplier, or which is in the course of
calendar month started electricity supplier last
instance, the original supplier award for reserved capacity in the
the ratio of the number of days from the beginning of the calendar month until the time of the change
vendor or supplier of electricity last deliverable start
for instance, the total number of days of the calendar month.
(12) the distribution system operator shall charge electricity producers whose
production is connected to the low voltage network, prices for system services
the prices for the market operator's activities and prices to cover the extra costs associated with
support for the production of electricity at least once a year.
§ 33
cancelled
§ 34
To stop the migration of responsibility for deviation and interrupt
the supply of electricity due to the unlawful collection or distribution
electricity
(1) If, in a given sampling or a delivery point of the supply of electricity with
transferring responsibility for deviation and is not attached to the shipment
electricity for more electricity with the transfer of responsibility for deviation
or if the transfer of the responsibility for a deviation on the body of the settlement,
the market operator shall inform the competent operator
transmission or distribution system, and the electricity market participants,
who have registered for the market operator's devolved, or custom
responsibility for deviation in this sampling or a pass-through space, and
electricity market participants supplying electricity to this sampling
space or for electricity from the pass-through of the place based on
the contract pursuant to § 7 para. 1 (b). and) point 4, and no later than 30
calendar days prior to the date of termination.
(2) electricity market Participant that has for the market operator
registered devolved responsibility for deviation in sampling or
delivery place referred to in paragraph 1, it shall inform the customer in this
the sampling or the delivery place of their supply with transfer
liability for deviation, or about their responsibility for
derogation for clearing body, no later than 25 calendar days before
the date of termination.
(3) in the case of unauthorized sampling of electricity passes vendor
the operator of a transmission or distribution system to which they are
attached to the sampling points and that the cutoff is required
electricity, electricity supply interruptions request not later than 5
working days before the date of interruption of electricity supply. Included in the request
is a list of locations where you want to break the supply
electricity. The operator of a transmission or distribution system performs
the interruption of electricity supply in the period referred to in the request for interruption
the supply of electricity. If it is not in the case of consumption points for reasons of customer
worthy of special attention possible to interrupt the supply of electricity in the
the required time, the distribution system operator shall inform about this
the fact of the vendor who asked about the interruption of electricity supply and
interrupts the supply of electricity at the latest within 3 working days from the
the deadline specified in the request.
(4) the request referred to in paragraph 3 or in the event of undue
distribution of electricity, the distribution system operator shall inform the
through the market operator with electricity market participants who have
for the market operator registered devolved or sole responsibility for
the variance in the consumption points, for which of them will break the supply
electricity, and no later than 4 working days before the date of interruption of supply
electricity.
(5) in the case of interruption of the supply of electricity on the basis of the requests referred to in
paragraph 3, or because of an unauthorized collection of electricity or the
unauthorized distribution of electricity shall inform the operator of a transmission or
distribution system to which it is connected, the supply point about this
fact, no later than the next working day after the cutoff
electricity through the market operator with electricity market participants,
who have registered for the market operator's devolved, or custom
responsibility for deviation in this point, and in the case that when you
disrupting the supply of electricity to the dismantling of the measuring device, and
be sent to the market operator reading the date of interruption of the power supply
electricity in the place of consumption. Reading is in the case of consumption points
equipped with a measurement of type A or B sent within the deadlines referred to in section 18 and
in the case of locations equipped by measurement of type C in terms of
referred to in § 32 para. 2.
(6) on restoring the electricity supply due to the removal of the causes of
unauthorized subscription requested by a party of the electricity market operator
distribution system to which it is connected, the supply point
where appropriate, the supplier, at whose request the supply of electricity was interrupted.
(7) on restoring the electricity supply due to the removal of the causes of
unlawful or unauthorized distribution of electricity shall inform the
the operator of a transmission or distribution system, which is the
consumption location connected through a market operator the market participants
electricity market operator who have registered a devolved
or your own responsibility for deviation in places that have a
to restore the electricity supply, no later than the following working day after
restore the electricity supply.
(8) if the contract Is for the supply of electricity or a contract for the distribution of
electricity closed for more sampling or transfer points can be
make electricity supply interruptions for any sampling or
a pass-through space only if it is impossible to determine for which of the sampling
or transfer points or causing unauthorized subscription
or unauthorized distribution.
Repeal, transitional and
§ 35
(1) the operator of a local distribution system performs before 28 September 2005. February
2006 extraordinary reading of electricity consumption in all sampling locations
final customers with the measurement of type C, for which the device is connected to
its local distribution system, and send these data to the market operator
no later than 5. March 2006 to 6 pm.
(2) the Trades made on the basis of contracts participants in the electricity market
concluded before 1 January 2002. in January 2002, who made the right change
the vendor shall be considered as been made in delegated arrangements
liability for deviation.
section 36
Shall be deleted:
1. Decree No. 373/2001 Coll., laying down rules for the
the organisation of the electricity market and the pricing policy for the activities
the market operator.
2. Decree No. 12/2003 Coll., amending Decree No. 373/2001 Coll.
laying down rules for the organisation of the electricity market and policy
pricing for the market operator's activities.
3. Decree No 461/2003 Coll., amending Decree No. 373/2001 Coll.
laying down rules for the organisation of the electricity market and policy
pricing for electricity market operator's activities, as amended by Decree
No 12/2003 Coll.
4. Decree No. 614/2004 Coll., amending Decree of the energy
regulator No. 373/2001 Coll., laying down rules for the
the organisation of the electricity market and the pricing policy for the activities
the electricity market operator, as amended.
5. Decree No 19/2002 Coll., laying down the method of organization
the short-term electricity market.
6. Decree No. 435/2004 Coll., amending Decree No 19/2002 Coll.
laying down the method of organizing the short-term electricity market.
§ 37
The effectiveness of the
This Decree shall enter into force on 1 January 2000. in January 2006, with the exception of section 18
paragraph. 8 (a). (c)) and section 20, which will become effective on 1 January 2004. March 2006.
President:
Ing. The firt in r.
Annex 1
Requirements for the provision of electricity transmission
Part A-information on the applicant
1. Business name-if a natural person does not have a trade name shall state its
surname and name of the legal person not registered in the commercial register shall be
its name
2. the legal status of a legal person/purpose of collection
3. Line of business
4. the registered office-the only legal person fills in the structure: State, County, municipality with
ZIP/POSTAL CODE, street and house number
5. the person or persons who are the statutory body-fills only
legal persons-last name, first name and date of birth of all members of this
authority
6. The basic data-fills only a natural person-name, first name,
date of birth
7. the address of the place of residence or domicile or place of business-
only a natural person fills in the structure: State, County, municipality, street, and zip/postal code
House number
8. Connection-telephone, fax or e-mail
9. Address for service into their own hands: surname, first name, titles,
full address
10. The identification number, if one has been assigned to
11. Tax identification number, if one has been assigned to
Part B-technical information
1. The dates and the duration of the provision of electricity transmission
2. the size of the reserved power (the maximum power required transfer)
delivery place:
a. the total reserved power in covering all site forwarding
the expected agreement on electricity supply
(b). the manufacturer of the total reserved power in covering the hub site
all of the expected agreement on electricity supply
A statement of the accuracy and veracity of the information given.
Annex 1a
Requirements for the provision of electricity transmission in the test operation
Part A-information on the applicant
1. Business name-if a natural person does not have a business name, state your
surname and given name or names, the legal person not registered in the commercial
register shall be your name/legal status of a legal person
2. purpose of collection
3. Line of business
4. the registered office-the only legal person fills in the structure: State, County, municipality with
ZIP/POSTAL CODE, street and house number
5. the person or persons who are the statutory body-fills only
legal persons-last name, first name, or names, and date of birth
all the members of this body
6. The basic data-fills only a natural person-name, first name,
where appropriate, the name, date of birth
7. the address of the place of residence or domicile or place of business-
only a natural person fills in the structure: State, County, municipality, street, and zip/postal code
House number
8. Connection-telephone, fax or e-mail
9. Address for service into their own hands: surname, first name, or
name, title, address,
10. The identification number, if one has been assigned to
11. Tax identification number, if one has been assigned to
Part B-technical information
1. The dates and the duration of the provision of electricity transmission in the test
operation
2. the technical documentation of the newly connected or the reconstructed
device
Annex 2
Requirements for the provision of electricity distribution
Part A-information on the applicant
1. Business name-if a natural person does not have a trade name shall state its
surname and name of the legal person not registered in the commercial register shall be
its name
2. the legal status of a legal person/purpose of collection
3. Line of business
4. the registered office-the only legal person fills in the structure: State, County, municipality with
ZIP/POSTAL CODE, street and house number
5. the person or persons who are the statutory body-fills only
legal persons-last name, first name and date of birth of all members of this
authority
6. The basic data-fills only a natural person-name, first name,
date of birth
7. the address of the place of residence or domicile or place of business-
only a natural person fills in the structure: State, County, municipality, street, and zip/postal code
House number
8. Connection-telephone, fax or e-mail
9. Address for service into their own hands: surname, first name, titles,
full address
10. The identification number, if one has been assigned to
11. Tax identification number, if one has been assigned to
12. Bank details and account number
Part B-technical information
1. The dates and duration of the granting of distribution
2. the size of the reserved capacity, or power distribution in the delivery
location:
a. the total reserved capacity in the delivery place, including all
the expected agreement on electricity supply
(b). the manufacturer of the total reserved power in covering the hub site
all of the expected contract on electricity supply to customers, suppliers
and traders with electricity
3. The anticipated quantity of electricity per year
4. The requested distribution rate
A statement of the accuracy and veracity of the information given.
Applicant's consent with the wording of the Treaty on the distribution of published by the competent
distribution system operator manner allowing remote
access.
Annex 2a
Requirements for the provision of electricity distribution in the test
operation
Part A-information on the applicant
1. Business name-if a natural person does not have a business name, state your
surname and given name or names, the legal person not registered in the commercial
register shall be your name/legal status of a legal person
2. purpose of collection
3. Line of business
4. the registered office-the only legal person fills in the structure: State, County, municipality with
ZIP/POSTAL CODE, street and house number
5. the person or persons who are the statutory body-fills only
legal persons-last name, first name, or names, and date of birth
all the members of this body
6. The basic data-fills only a natural person-name, first name,
where appropriate, the name, date of birth
7. the address of the place of residence or domicile or place of business-
only a natural person fills in the structure: State, County, municipality, street, and zip/postal code
House number
8. Connection-telephone, fax or e-mail
9. Address for service into their own hands: surname, first name, or
name, title, address,
10. The identification number, if one has been assigned to
11. Tax identification number, if one has been assigned to
12. Bank details and account number
Part B-technical information
1. The dates and duration of the granting of distribution
2. The estimated amount of electricity consumed per month
3. The requested distribution rate
4. the technical documentation of the newly connected or the reconstructed
device
A statement of the accuracy and veracity of the information given.
Applicant's consent with the wording of the Treaty on the distribution of published
distribution system operator manner allowing remote
access.
Annex 3
Procedure for determining the annual consumption of electricity customers with measurement
type C
(1) the determination of the planned annual consumption of electricity for supply point with
the measurement of type C, for which the readings were conducted covering the period
at least the previous 100 days, and that was not in this period
a change in the assignment of a class type of diagrams:
and calculate the sum) of the relative values of Kf appropriate equivalents
Type a valid diagram for the given calendar period from the date of
the initial deduction until the date the final deduction referred to in a relationship
where
KF summary volume relative values for the billing period,
DPO odečtového period beginning the day,
DKO odečtového period end date
kTDDn, d, htp the relative value of the n-th converted the type diagram
on the day (d), in the hour (h),
(b)) shall be calculated the sum of the relative values of Kr of the relevant standard
the type of diagram for the calendar year in which it is located, which
the settlement of imbalances, is carried out according to the relation where Round summary volume
relative values for a complete calendar year in which the day, per
that will be carried out the settlement of imbalances, an acre of the current calendar year,
kTDDn, d, hnorm the relative value of the n-th standard type
the diagram on the day (d), in the hour (h),
(c)) for that value shall be used instead of consumption electricity consumption of
the last odečtového period, marked as Efak. The planned annual
electricity consumption applicable to the place of consumption is then proportional to the Eplan
the last value between the readings in the ratio of the relevant sum of relative
values typed as diagrams
KR
EPlan =----x Efak.
KF
(2) the envisaged annual electricity consumption for the customer's consumption location
measurement type (C), shall not apply for the determination of the procedure under paragraph
1, is equal to the average consumption of electricity subscriptions of the same type
diagram and circuit breakers of the same size as those of the electricity off.
The average electricity consumption is determined on the basis of tariff statistics
processed by the Office on the basis of supporting documents transmitted by the operator
distribution system operators. The value of the average consumption of electricity provided by the
The Office, which shall be valid for the entire calendar year, the market operator exposes
manner allowing remote access no later than 3 calendar months
before the first business day of the calendar year.
(3) in the event that the supply point is fitted with a measuring device with multiple
dials (vícetarifní), is used to estimate the power consumption
the sum of the measured electricity subscriptions of all dials.
(4) the envisaged annual electricity consumption for each customer designed and
converted to normal climatic conditions is established
distribution system operator individually for sampling locations
customers with the measurement type (C). The market operator are forwarded to these
sampling space information individually for customers with the measurement of type C,
who changed the supplier, and in aggregate for other customers with measurement
type C type diagrams after classes. The planned annual electricity consumption
It is measured in kWh.
(5) at the request of the subject of settlement, which bears responsibility for a deviation in the
the sampling locations with the measurement type (C), that have been scheduled
annual electricity consumption, in which the body clearing proves
the facts on the basis of which can be expected to change the planned annual
electricity consumption by more than 50%, is the operator of distribution
the system made a new calculation of the planned annual electricity consumption,
taking account of the facts submitted by the body.
Annex 4
Class type supply diagrams
-----------------------------------------------------------------------------------------
The class character of the Type fixed-price subscription distribution
the customer according to the price
decisions of the Office
-----------------------------------------------------------------------------------------
1 Subscriber-subscription without a thermal electricity usage-C01d, C02d, C03d
category (C)
-----------------------------------------------------------------------------------------
2 customer-akumulačním subscription with appliance-C25d, C26d, C35d
category C-subscription with a hybrid heating
-----------------------------------------------------------------------------------------
3 Subscriber-subscription with a direct heater system for heating-C45d, C55d, C56d
category C-subscription with a heat pump
-----------------------------------------------------------------------------------------
4 customer-subscription without a thermal electricity usage-D01d, D02d, D61d
category D
-----------------------------------------------------------------------------------------
5 customer-subscription with akumulačním appliance-D25d, D26d
category D
-----------------------------------------------------------------------------------------
6 customer-subscription with a hybrid heating system-D35d
category D
-----------------------------------------------------------------------------------------
7 customer-subscription with a direct heater system for heating-D45d, D55d, D56d
category D-subscription with a heat pump
-----------------------------------------------------------------------------------------
8 customer-subscription for public lighting-C62d
category (C)
-----------------------------------------------------------------------------------------
The assignment of the type class to the existing diagram of the sampling locations will carry out
the distribution system operator according to the current plan, and this
of the annex.
Annex 4a
Customer categorization
For the purposes of the organisation of the electricity market, the customers are divided into
the following categories:
Subscriber categories and)-the Subscriber whose place of consumption is connected
to the transmission system or the Subscriber, whose consumption location is connected to the
the distribution system with the voltage between phases of more than 52 kV,
(b)) category B-Subscriber subscriber whose place of consumption is connected
to the distribution system with the voltage between phases from 1 kV up to 52 kV including,
(c) category C-subscriber) to a Subscriber that is not a customer category
And, (B) or (D),
(d) category D) Subscriber-natural person, whose place of consumption is
connected to the distribution system with the voltage up to 1 kV between phases, including and
that takes electricity to meet her personal needs
with housing or personal needs of the members of their household; for the customer
category D is regarded as the natural or legal person to the extent of sampling
electricity only for the needs of the management and operation of the common parts of the House
are only for the common use of the owners or users of the flats.
Annex 5
Method of regulating energy clearing
(1) price per delivered positive regulating energy or electricity
obstaranou from abroad in accordance with § 24 para. 2 is the
and) electricity pursuant to § 24 para. 2 (a). and) and c) is equal to
the tender price of positive regulating energy provided on blocks that provide
support services or bearing from abroad (hereinafter referred to as "raised positive
regulating energy "),
(b)) for the supply of electricity in accordance with § 24 para. 2 (a). (b)) is equal to
1. higher prices; the agreed price on the balancing market or
the weighted average price of positive regulating energy-activated, if it is in the
trading hour the system imbalance is negative,
2. to the offer price, if in a given trading hour the system imbalance
positive.
(2) the price for the supplied negative regulating energy or electricity
obstaranou transmission system operator from abroad in accordance with § 24
paragraph. 2 is the
and) electricity pursuant to § 24 para. 2 (a). and) and c) is equal to
the tender price of negative regulating energy provided on blocks
providing support services or bearing from abroad (hereinafter referred to as
"activated negative regulating energy"),
(b)) for the supply of electricity in accordance with § 24 para. 2 (a). (b)) is equal to
1. lower prices; the agreed price on the balancing market or
the weighted average price of the activated negative regulating energy, if in a given
trading hour the system imbalance is positive,
2. to the offer price, if in a given trading hour the system imbalance
negative.
(3) the price of both positive and negative regulating energy provided the blocks in the
trading hour as part of the activation of the secondary support services regulation
provides for price decision of the Office.
(4) the market operator establishes for each trading hour posting price
variance as follows:
and) is if the system imbalance is negative or equal to zero, the posting price
deviations in the direction of the system imbalance the highest bid price of electricity
According to § 24 para. 2 delivered in this trading hour and paid by the operator
market providers of electricity; If it is so established, the price lower than the price
fixed price decision of the Office or if in this business
an hour of no electricity supplied pursuant to § 24 para. 2, the price
fixed by the Office,
(b)) is positive if the system imbalance, the posting price variances in
the direction of the highest bid price system imbalance of electricity under section 24
paragraph. 2 delivered in this trading hour for positive settlement system
variations, and a provider of electricity market operator; If
on this basis the price lower than the price fixed by the pricing decisions of the Office
or if in this trading hour supplied no power under section 24
paragraph. 2, the price fixed by the Office.
(5) the market operator establishes for each trading hour posting price
protiodchylky as follows:
and) is if the system imbalance is negative or equal to zero, the posting price
protiodchylky the weighted average price of positive regulating energy-activated
(including the balancing market); If in this trading hour delivered
no electricity in accordance with § 24 para. 2, the price fixed by the Office,
(b)) is positive if the system imbalance, the posting price protiodchylky
the weighted average price of the activated negative regulating energy including
the balancing market; If in this trading hour delivered no
electricity in accordance with § 24 para. 2, the price fixed by the Office.
Annex 5a
PATTERN
Monthly statement
About the production and consumption of electricity producers
Annex 5b
PATTERN
Monthly statement of the electricity consumption in the local distribution system
Annex 5 c
cancelled
Annex 6
cancelled
Annex 6a
PATTERN
The scope and structure of the data on the sampling or pass-through points HV and VHV
Annex 7
The data made available by the market operator for each region, the type of diagrams
-------------------------------- ------------------------------------------------------------ -------------------------------
No Item type of measuring Unit made available to Role
-------------------------------- ------------------------------------------------------------ -------------------------------
1. the sum of the deliveries in forward Electricity supplied to the region type and dates identical to the kWh in terms
places generating stations power diagrams for the settlement of imbalances under §
25, para. 11
2. the sum of the deliveries in forward Electricity supplied to the region type B kWh
places generating stations power diagrams
3. the sum of the deliveries in forward Electricity supplied to the region type (C) kWh
places generating stations power diagrams
4. Sum of donations in the forward Electricity collected from the region of typed and kWh
places generating stations power diagrams
without the regulatory energy
5. Sum of donations in the forward Electricity collected from the region of type-B kWh
places generating stations power diagrams
6. The sum of donations in the forward Electricity collected from the region of type (C) kWh
places generating stations power diagrams
7. The sum of the supplies in the forward Electricity supplied to the region type and kWh
between the systems diagrams
8. The sum of the supplies in the forward Electricity supplied to the region type B kWh
between the systems diagrams
9. The sum of the supplies in the forward Electricity supplied to the region type (C) kWh
between the systems diagrams
10. Sum of donations in the forward Electricity collected from the region of typed and kWh
between the systems diagrams
11. Sum of donations in the forward Electricity collected from the region of type-B kWh
between the systems diagrams
12. Sum of donations in the forward Electricity collected from the region of type (C) kWh
between the systems diagrams
13. the sum of the subscriptions in the subscription/delivery and electricity consumption kWh
places without regulatory
energy, including sums subscriptions in
transfer locations generating stations
electricity (i.e. including 4.)
14. the sum of the subscriptions in the subscription/delivery (B) electricity consumption kWh
places including sums of donations
transfer locations generating stations
electricity (i.e. including 5.)
15. the sum of the subscriptions in the subscription/delivery electricity consumption (C) kWh
places including sums of donations
transfer locations generating stations
electricity (i.e. including 6.)
16. The sum of positive regulating electricity kWh
energy
17. The sum of the negative regulatory electricity consumption kWh
energy
18. Loss of kWh
-------------------------------- ------------------------------------------------------------ -------------------------------
Annex 8
The data made available by the market operator for each local distribution
System
------------------------------------------------ ----------------------------------------------------------------------------------
No type of Role Entry Unit made available
measurement
------------------------------------------------ ----------------------------------------------------------------------------------
1. the sum of the deliveries in forward locations generating Electricity supplied to lokálnídistribuční and kWh in terms of
electricity without energy the same regulatory system
the dates for the
settlement
deviations
pursuant to section 25,
paragraph. 11
2. the sum of the deliveries in forward locations generating Electricity supplied to local distribution (B) kWh
electricity system
3. the sum of the deliveries in forward locations generating Electricity supplied to local distribution (C) kWh
electricity system
4. Sum of donations in the forward areas, electricity generating stations collected from local distribution and kWh
electricity without regulating energy system
5. Sum of donations in the forward areas, electricity generating stations collected from local distribution (B) kWh
electricity system
6. The sum of donations in the forward areas, electricity generating stations collected from local distribution (C) kWh
electricity system
7. the sum of the deliveries in forward locations between the Electricity supplied to local distribution and kWh
systems of systems
8. Sum of deliveries in forward locations between the Electricity supplied to local distribution (B) kWh
systems of systems
9. the sum of the deliveries in forward locations between the Electricity supplied to local distribution (C) kWh
systems of systems
10. Sum of donations in the pass-through between the Electricity collected from local distribution and kWh
systems of systems
11. Sum of donations in the pass-through between the Electricity collected from local distribution (B) kWh
systems of systems
12. Sum of donations in the pass-through between the Electricity collected from local distribution (C) kWh
systems of systems
13. Sum of donations in the sampling locations without electricity consumption and subscription/kWh
energy, including amounts of donations in the forward
places of production of electricity (i.e. including 4.)
14. The sum of donations in the sampling locations, including the sums of the subscription/kWh electricity consumption (B)
subscriptions in forward locations generating stations
electricity (i.e. including 5.)
15. The sum of donations in the sampling locations, including the sums of the subscription/electricity consumption (C) kWh
subscriptions in forward locations generating stations
electricity (i.e. including 6.)
16. The sum of positive regulating energy electricity kWh
17. The sum of negative regulating energy electricity consumption kWh
18. Loss or gross up for local distribution kWh
System
------------------------------------------------ ----------------------------------------------------------------------------------
Selected provisions of the novel
Article. (II) Decree No. 365/2007 Sb.
Transitional provision
To change the vendor that was initiated before the date of entry into force of
of this order, shall be completed according to the existing legislation.
Article. (II) Decree No. 438/2012 Sb.
Transitional provisions
1. for forward places production from renewable sources, which
the operator of a transmission or distribution system regional passes
the market operator under § 13 para. 5 of Decree No. 346/2009 Coll., on
terms and procedures for the selection of forms of support, the registration procedures of aid
for the market operator, deadlines, and procedures of the selections and changes modes of green
bonus on electricity and term offer electricity compulsory vykupujícímu,
and for which the manufacturer has chosen to support in the form of feed-in tariffs, as amended by
effective on the date of entry into force of this order, is 1. January 2013
the market operator registered as the subject of the mandatory clearing
redeeming.
2. In the case of a request for change of the supplier lodged from 1. December 2012
including to 31. December 2012, including prompts the operator market no later than 5
working days from the date of entry into force of this order the applicant to the
completion of data requests for change of the supplier within the scope of the data according to § 30
paragraph. 4 Regulation No. 541/2005 Coll., in the version in force from the date of acquisition
the effectiveness of this Ordinance; the procedure for change of the supplier shall be completed according to the
Decree No. 541/2005 Coll., in the version in force from the date of entry into force of
of this order.
3. for the purposes of paragraph 2, the procedure for change of the supplier considers it launched
at the time, the supplier shall lodge an application for the amendment of the market operator
vendor.
1) Decree No. 218/2001 Coll., laying down the details of the measurement
electricity and the transmission of technical data, as amended.
2) section 27 para. 9 Energy Act.
3) Act No. 54/1946 Coll., on summer time.
5) § 50 para. 4 the Energy Act.
6) § 50 para. 5 the Energy Act.
7) § 24 para. 10 (a). (f)) of the Energy Act.
8) § 25 para. 11 (a). (g)) of the Energy Act.
9) Council Regulation (EC) No 1228/2003 on conditions for access to the network for
cross-border trade in electricity.
10) § 50 para. 1 the Energy Act.
11) § 50 para. 11 the Energy Act.
12) § 12a paragraph 1. 6 the Energy Act.
13) § 50 para. 6 the Energy Act.
14) § 50 para. 2 the Energy Act.
15) § 50 para. 7 Energy Act.
16) § 50 para. 8 Energy Act.
17) section 22 para. 2 the Energy Act.
18) § 22 para. 2 (a). (b)) of the Energy Act.
19) Decree No. 220/2001 Coll., on the order of power system dispatching
Of the Czech Republic.
20) Decree No. 435/2001 Coll., laying down the content of economic
information and procedures for the regulation of prices in the energy sector, as amended
regulations.
21) Decree No 219/2001 Coll., on the procedure in the case of imminent or
the current state of emergency in the electricity sector.
22) section 27 para. 4 (b). (f)) of the Energy Act.
23) section 12a paragraph 1. 1 the Energy Act.
24) § 28 para. 2 (a). (g)) of the Energy Act
27) Decree No. 210/2010 Coll., on the scope, terms and deadlines
the billing for the supply of electricity, gas or heat energy and
related services.
29) Act No. 165/2012 Coll., on supported energy sources and amending
Some laws.
30) Decree No. 140/2009 Coll. on the method of price regulation in the energy
and procedures for the regulation of prices, as amended by Decree No. 348/2012
SB.