408/2015 Coll.
DECREE


Dated December 23, 2015

Os electricity

Energy Regulatory Office (the "Office") pursuant to § 98a paragraph.
2 point. h) of the Act no. 458/2000 Coll., on business conditions and
state administration in the energy sectors and amending certain laws
(Energy Act), as amended by Act no. 158/2009 Coll., Act.
211/2011 Coll., Act no. 90/2014 Coll. and Act no. 131/2015 Coll., and pursuant to §
53 paragraph. 2 point. g), h), j) and k) of the Act no. 165/2012 Coll., on
supported energy sources and amending certain acts, as amended
Act no. 131/2015 Coll .:
PART ONE

PRELIMINARY PROVISIONS


§ 1
Subject Matter


(1) This Decree lays down

A) conditions for access to the transmission system and distribution systems
disclosure requirements to permit access to the transmission and distribution system
and ways of dealing with congestion in the electricity grid
,

B) the deadlines for submission of applications for contracts on market terms
electricity and contracting, registration with the operator
market

C) the procedures and conditions for transferring and taking responsibility for
deviation

D) the scope and terms of the transmission of data for the evaluation of imbalances and
billing of electricity, evaluation procedures, clearing and settlement
imbalances, including clearing and settlement of balancing energy in
state of emergency and to prevent emergencies ,

E) procedures for the procurement of balancing energy and ways of clearing
regulating energy

F) rules for the organization of short-term electricity market and balancing
market and ways of their settlement

G) rules of creation, allocation and use of typical gas supply
electricity

H) terms and procedure for selection and change of electricity supplier registration
including supply and delivery points,

I) the procedure interruption, restriction and restore electricity supply at
unauthorized consumption, unauthorized distribution and unauthorized transfer

J) the procedure for ensuring the supply of electricity supplier last
instance,

K) track the price of service transmission system, track service price
distribution system and other regulated prices for electricity and
method and terms of data transmission between market participants electricity bill
regulated prices and the method and terms accounting and settlement
regulated prices between electricity market participants,

L) technical requirements for operation for verification technology

M) disclosure and market operator

N) the procedure for the determination of advance payments.

(2) This Decree also provides

A) the manner and procedure for determining the difference between the hourly price and the redemption price and its
payment market operator

B) the method of determining the hourly green bonus for electricity
hourly rates and cost-per-action compulsorily redeeming,

C) the terms and means of informing the manufacturer or compulsorily vykupujícím
vykupujícím to achieve a negative price on the daily market in electricity and
situation where not matched supply and demand of electricity on a daily
market

D) the manner and terms of billing and payment services component prices
distribution system and the components of the transmission system services to support electricity
between the market operator and the transmission system operator
regional distribution network and between operators | || distribution systems.

§ 2


Definitions
For the purposes of this Decree

A) diagram contracted quantity of electricity subject of settlement for each
trading hour in MWh with a resolution of 3 decimal places

B) the supplier or manufacturer of electricity electricity trader, who buys
under contract or has supplied electricity to other market participants with
electricity through the electricity grid,

C) Business hours of basic time slot in which it is contractually defined
supply or consumption of electricity; Business class is a basic time period for evaluation
imbalances of clearing entities,

D) day supply of 24-hour trading day on which the performance occurs
concluded deals for the supply and consumption of electricity, with the exception
transition to daylight saving time and back; the day when the transition to summer time, a
a sequence of 23 business hours for the day, which occurs
switching to Central European Time, 25 business hours; first commercial

Hour day deliveries begins at 00.00.00 pm and ends at 01.00.00 hours

E) over point instead of the handover and takeover of electricity between
the transmission or distribution system and another participant
electricity market, whose equipment is connected to this system, with the exception
offtake point,

F) booked capacity contractual maximum performance in a quarter hour
customer's supply point or the second category or contractual
quarter hour maximum performance at the delivery point operators
local distribution system or contractual maximum performance in a quarter hour
summary at transfer points between regional
distribution systems mentioned in the contract to ensure service
distribution system, or in the agreement on bundled electricity supply services,

G) System imbalance sum of positive and negative deviations of
cleared entities in business class,

H), a participant in organized short-term market imbalances
cleared entity that is under contract for access to the organized
short-term electricity market participates in this market, or nominated
organizer electricity market ^ 1) in the case organizing daily market
electricity or intraday electricity market jointly bid for
zone ^ 2) Czech Republic and surrounding supply zone

I) re-dispatch solutions overloaded transmission system according
directly applicable European Community ^ 2)

J) protiodchylkou positive difference cleared entity in the event of a negative
system deviation or a negative deviation cleared entity in case
positive system imbalance,

K) information system market operator's information system operator
market to which they have access by registered market participants and
through which communication with the market operator,

L) the obligation to supply electricity to the grid
obligation to supply electricity to the grid from their own generating plants or the liability assumed
contract to supply electricity to the transmission system or distribution system
or commitment to bring this electricity | || electricity system,

M) commitment to take electricity from the electricity grid commitment
own consumption of electricity from the electricity grid or contract assumed
commitment to electricity consumption in the sampling device or customer commitment
this electricity exported from the electricity grid,

N) normal climatic conditions
thirty national average daily temperatures for each calendar day for the whole country and
thirty regional average daily temperatures for each
calendar days for the region of load profiles, || |
O) the actual climatic conditions
national average actual daily temperatures for each calendar day for the whole
state and regional average daily temperatures for each
calendar days for the region of load profiles,

P) region of typical region defined for the purpose of evaluating
residual profile,

Q) class type chart type diagram of electricity supply for the
group of customers with type C metering with a defined character collection,

R) type diagram relative values ​​characterizing the progress
customers' electricity consumption measurement Type C used for
variance analysis,

S) registered electricity market participant market participant
electricity, which has access to the information system market operator
on the basis of registration according to § 15 para. 1

T) contracted amounts of electricity subject to clearing in business class
amount of electricity contracted by an accounting entity with other entities
settlement in the respective trading hour and notified to the market operator
through the information system market operator.
PART TWO


ORGANIZATION term electricity market, FINANCIAL SETTLEMENT AND SUBMISSION


§ 3

Electricity market

(1) The object of the electricity market is the supply of active energy.
The electricity business is mainly carried

A) on the organized short-term electricity market

B) through bilateral trades between market participants
including electricity trades concluded on energy exchanges, or

C) the balancing market with regulating energy.


(2) The trading may be taking delivery or reactive electrical energy
. Buyer's transmission system operator or distribution system operator
.

(3) The TSO organizes the market for ancillary services
.

(4) In the electricity market, all time data shown in the time
valid in the Czech Republic.

§ 4

Organized short-term electricity market

(1) organized short-term electricity market pursuant to § 20a paragraph. 4 point.
) Of the Energy Act, consists of

A) block market

B) day-ahead market and

C) intra-day market.

(2) Participation of market participant's own responsibility for deviation to
organized short-term electricity market takes place on the basis
agreement on access to the organized short-term electricity market.

(3) The demand submitted by the parties organized short-term market
means undertaking to organized short-term market
taken from the Czech electricity grid traded volume of electricity in the
business hours if there is to meet that demand.

(4) The tender submitted by a party organized short-term market
commitment means that the market participant shall deliver to the grid Czech Republic
amount of electricity traded in the trading hour, if
will satisfy this menu.

(5) Trades on organized short-term electricity market are underway
anonymous and connecting supply with demand.

(6) Place of delivery and place of electricity consumption traded entity
clearing on organized short-term electricity market
electricity system of the Czech Republic.

§ 5
Block market


(1) The smallest unit of a trade bloc to block market is a constant value
hourly output of 1 MW hour period block.

(2) demand for and supply of block market can be given earlier than 30 days before the relevant date
deliveries by individual business units.

(3) The market operator shall notify each party organized short-term market
manner specified in the agreement on access to the organized short-term electricity market
size of contracted electricity supply and the size
contracted consumption of electricity and the price achieved.

(4) The market operator shall include the agreed supply and use of electricity for the
business hours to the evaluation and settlement of imbalances.

(5) During the day's trading on the block market, the market operator
publish in a manner allowing remote access, information about the status of ongoing
trading by individual business units traded.
Immediately after roadblock block market for the trading bloc
market operator shall publish a manner enabling remote access
amount of electricity from the trades on the block market, and the weighted average prices
electricity traded in the individual trading blocs.

§ 6
Daily Market


(1) Daily Market can organize market operator in collaboration with the organizers of the nominated
daily electricity market in the surrounding
bidding zones.

(2) supply and demand on the daily market participant may submit
organized short-term market in the manner specified in the contract
access to the organized short-term electricity market
until the day preceding the day of delivery. For individual business hours is evaluated


A) uniform balance for the supply zone of the Czech Republic and business hour
in the case of interconnection supply zone Czech Republic and neighboring
bidding zones

B) the resulting price of electricity on the daily market and

C) the quantities traded electricity.

(3) The market operator enters into its information system data on the contracted quantities of electricity
individual subjects of settlement in the supply zone
Czech Republic after the individual business hours and include them in
evaluation and settlement of imbalances.

(4) The market operator shall notify each party organized short-term market
manner specified in the agreement on access to the organized short-term electricity market
for every business hour of the agreed size
supply of electricity and contracted consumption of electricity and achieved price .

(5) Following the announcement of the results of the daily market individual participants
organized short-term market, the market operator shall publish the way

Enabling remote access, supply and demand curves
amount of electricity from the trades, realized price of electricity for each hour
business, resulting hourly green bonus for each
renewable categories for each trading hour, amount | || electricity from unaccepted offers and requests received, number
successful and unsuccessful bids and the number of successful and unsuccessful
inquiries. Published data do not contain information about individual participants
daily market.

§ 7
Intraday Market


(1) The intraday market is organized business hours within the day
supply and can be used to enter it and transact supply and demand of electricity
for all hours of the day of delivery in the manner specified in the contract
access organized short-term electricity market. Intraday Market
can be ordered with the organizers of the nominated intraday market
electricity in the surrounding bidding zones.

(2) Trades concluded on the market include intraday market operator to
evaluation and settlement of imbalances.

(3) After the conclusion of each clock traded on the intraday market adjusts
market operator in the manner specified in the agreement on access to the organized
short-term electricity market total contracted quantities of electricity for
obligation to supply electricity to the grid and
total contracted amount of electricity for the obligation to draw electricity from the electricity system
each entity clearing of data on transactions concluded on
intraday market and thus adjusted value of the entity providing clearing.

(4) Market Operator shall publish in a manner allowing remote access
amount of electricity from the trades and the weighted average price in the commercial
hours on the intraday market.

§ 8

Financial settlement of transactions on organized short-term electricity market


(1) The financial settlement of transactions on the organized spot market
electricity is independent of the actual values ​​of electricity supply to the electricity grid
and actual values ​​of
consumption of electricity power grid.

(2) Each day, the market operator shall notify each party
organized short-term market in the manner specified in the agreement on access to the
organized short-term electricity market following information for the period ended
business broken down into individual markets: | ||
A) the size of contracted electricity supply and the size of the contracted consumption
electricity

B) the prices obtained and

C) payments for contracted electricity consumption and payment for the agreed delivery
electricity.

§ 9

Submission of data on bilateral trades

(1) Bilateral trade is deemed trades with physical delivery of electricity
registered in the system operator's market in addition to shops
concluded on organized short-term electricity market or
balancing market with regulating energy.

(2) Subject imbalance settlement (the "settlement entity") presents
market operator registration data from the agreements on bilateral trades carried
electricity in the Czech Republic between subjects
settlement, including stores these entities settlement closed at
energy exchanges no later than 13.30 hours on the day preceding the relevant date
deliveries, and this time the closures
bilateral trade. Transmitted data are diagrams of contracts

A) clearing entities; transmitting the data subject of settlement for
obligation to deliver electricity to the grid and commitment to take electricity from the power system
,

B) clearing entities concluded on the Exchange; It transmits data exchange, for
obligation to supply electricity to the grid and commitment to take
electricity from the power system; the accuracy of transmitted values ​​
corresponding exchange; exchange technical data transmitted from contracts are considered
confirmed by competent bodies and clearing

C) clearing entities for the supply of electricity abroad and from abroad;
Transferring the data transmission system operator, and separately for
obligation to supply electricity to the grid and especially the commitment to take
electricity from the power system; TSO
data transmitted from contracts are considered by the competent bodies
settlement.

(3) The market operator verifies that all settlement entities that

Submitted or for which the Exchange has submitted for registration diagrams of
contracts, they have concluded an agreement on settlement of imbalances. After the performed check registers
market operator diagrams of contracts fulfilling all the requirements and sends
entities clearing confirmation of their registration.
In the event that a registered electricity market participant has concluded
agreement on settlement of imbalances, market operator submitted diagrams
not registered and is not at variance analysis.

(4) In every hour, every business entity settlement established on the basis of the data
bilateral trades, the agreed quantity of electricity
obligation to supply electricity to the grid and
contracted quantity of electricity for the commitment to remove
electricity from the grid in MWh with a resolution of 3 decimal places.
Information on the total agreed amount of electricity pursuant to paragraph 2
point. a) and b) provide each operator, the market operator settlement
manner enabling remote access within 60 minutes after the deadline for registering income
bilateral transactions referred to in paragraph 2.
PART THREE


ORGANIZATION balancing market with the regulating energy

§ 10

Electricity purchased is TSO

(1) The TSO procures for each business
hour electricity for the purpose of addressing the imbalances in the contract
detainees and the actual realization of electricity supply and contract
detainees and the actual realization of the electricity consumption in the electricity
system (hereinafter the "electricity for dealing with imbalances in"). Price
such electricity is used to determine the settlement price pursuant to § 29 par. 2 and
included in the system of evaluation and settlement of imbalances.

(2) The TSO procures electricity for addressing imbalances in


A) as regulating energy by activating support services

B) the balancing market with regulating energy, or

C) a supply from abroad or to foreign countries under contracts
designed to supply operational power to compensate for deviations
system.

(3) Electricity prices under paragraph 2 except for the prices of electricity provided
to verify the capability of the provider of support services used to determine
clearing price and quantity of electricity of measures to deal
imbalance is included in the assessment system and settlement of imbalances.

(4) The TSO shall publish in a manner allowing remote access
amount of electricity bought in to deal with an
imbalance and its price breakdown in accordance with paragraph 2 for each business
hour. TSO forward market operator
till 11.00 pm on the day following the delivery of the quantities and price of the positive and negative regulating energy


A) broken down by individual blocks of power plants for electricity
procured pursuant to paragraph 2. a)

B) the sum of the accepted form of energy on the balancing market and the overall
payment for each registered market participants in the electricity procured
pursuant to paragraph 2. b) and

C) broken down by registered market participants in the electricity procured
pursuant to paragraph 2. c) for each trading hour of the day of delivery.

(5) Electricity is provided by an operator of the transmission system for resolving imbalances in
include market operator in the system of evaluation and settlement of imbalances and

cleared
A) providers of support services under a contract for clearing
regulating energy

B) a registered market participant on the basis of an agreement on access to the
balancing market with regulating energy, or

C) the transmission system operator for electricity procured by
paragraph 2. C).

(6) TSO caters for the needs of redispatching
electricity from registered participants in the electricity market or the operator
TSO. Cost of the provision or
use this electricity are included in the total cost of securing
support services.

§ 11

Balancing market with regulating energy

(1) The balancing market with regulating energy traded positive and negative
regulatory power, which is TSO
used to cover the system imbalance. The balancing market with regulating energy
is implemented after closure of bilateral trading and after

Roadblock organized short-term electricity market.

(2) Participation in the balancing market with regulating energy takes place on the basis
agreement on access to the balancing market with regulating energy
by the market operator closes

A) are subject to clearing or

B) with another registered participant in the electricity market, which is
licensed to trade electricity or licensed to produce electricity
if you agree with his participation cleared entity that
for this registered participants electricity market
took over responsibility for imbalance, and if a registered market participant
electricity market operator provides financial security for their stores
balancing market with regulating energy and submit consent of the subject
settlement with the participation of registered market participant the balancing market with regulating energy
.

(3) Offers the balancing market with regulating energy served
registered electricity market participants no later than 30 minutes before the start of
business hours, at which delivery is to be regulating energy
transmission system operator, as one inquirer , used to cover
system imbalances. Offers on the balancing market with regulating energy
are served with a resolution of one decimal place for the
trading hour. Minimum traded quantity is one MWh.

(4) The TSO will evaluate the offer received
regulatory power as the deliveries of balancing energy and passes it
market operator settlement. Bids Received regulatory
supply energy for a given trading hours include the market operator system
evaluation and settlement of imbalances.

§ 12

Support services provided by the TSO

(1) The TSO buys the electricity grid
support services at the level of the transmission system mainly based on the contract
on the provision of support services. Offering provision of support services
a natural or legal person who qualifies for the provision of support services
set by the TSO.

(2) The extent demanded support services for the following calendar year
TSO publishes a manner allowing remote access
later than 30 November.

(3) The TSO evaluates bids received for each
support service separately and immediately inform each
bidder on the outcome of the evaluation of the bids. In the absence
tenders may be repeated demand. If even after repeated demands
secured enough support services demanded by the transmission system
support services directly to specific registered participants
electricity market.

(4) The transmission system operator can verify the capacity
provider of support services to provide the contracted services. For this purpose
may give instructions to activate the support services and delivery
regulatory power without reason to maintain power balance.

(5) The transmission system operator regularly evaluates the quantity and quality of delivered
support services on the basis of preparation of the operation
^ 3) and measuring delivered support services.

(6) TSO
manner allowing remote access for every business hour

A) the average cost of each ancillary services purchased in the business
hour on a contract basis, calculated as a weighted average of prices
support services under contracts signed, and

B) the price of the highest bid received any support services purchased in the
trading hour on the daily market for ancillary services.

§ 13

Cross-border trade in electricity

(1) Cross-border electricity trading takes place on the basis of a contract
cross-border transmission of electricity under the conditions set
directly applicable regulation of the European Union; 4) and the rules of the transmission
system and is funded by § 14 paragraph. 1st

(2) In case of insufficient financial security payments subject to clearing
TSO electricity transmission abroad or
transmission of electricity from outside the body rejects settlement.

§ 14

Financial security payments clearing entities

(1) Subject of Settlement will provide financial security to the market operator

Payments, which are used to hedge risks associated with the delivery and collection
electricity, bilateral trades, concluded on organized
electricity spot market and the balancing market with regulating energy and
cross-border trade. The amount of collateral required payments operator
market is reduced by obligations of the market operator to cleared entities.

(2) Unless a settlement entity sufficient funding payments
register the trade market operator such trade and
not register without undue delay of the settlement entity informs.
In the case of cross-border trade also inform the TSO.

(3) Unless a settlement entity sufficient financial security payments
can shorten market operator already registered shops. If no settlement entity
sufficient funding payments even after shortening
transactions proceed in accordance with § 58 to 60.
PART FOUR


REGISTRATION supply and delivery points

§ 15

Registration electricity market participants

(1) electricity market participants will be registered within 30 days from granting licenses
market operator. Supplier except electricity producer who
under contract does not supply electricity to the customer, concludes with the operator
market contract under which gains access to the information system
market operator.

(2) The market operator creates and manages the code lists of registered participants
electricity market and the registration process allocates market participants
electricity to thirteen-digit identification code (hereinafter
"registration number"). Furthermore, the market operator allocates the aforementioned
market participants identification number registered market participant
electricity.

(3) The customer is registered in the information system market operator
via its offtake point according to § 16 para. 2. Registration
customer number is identical with the identification code number of his
outlet.

Registration of transfer points and supply points

§ 16

(1) The market operator creates and manages dials supply and delivery
seats in the transmission system and distribution systems necessary to identify the individual
supply and delivery points, and allocates
individual operators of transmission or distribution system or || | local distribution system of numbers from code
supply and delivery points. When registering the electricity grid operator
transmission system or distribution system is an information system
market operator is registered and the place designated to record losses this
system.

(2) The operator of a transmission or distribution system assigns a
market participant tells his osmnáctimístný numeric code and registered with the market operator
individual consumption points connected to the transmission or distribution system
, which are held supplier change or u
which is a supplier of supplier of last resort, and various delivery points
plants connected to the transmission or distribution system
, with the exception of plants connected to customers' supply points
according to § 28 of the energy Act. The transmission system operator or distribution system tells
electricity market participants on request
identification code numbers relating to the sampling and delivery
points.

(3) In the event that the DSO operates part
distribution system unconnected to the electricity grid
Czech Republic registers with one market operator aggregate
transfer point for all delivery points with type A metering or B
connecting this part of the distribution system to foreign electrification system. For a summary
transfer point forwards market operator data on the extent and terms
specified for the type of measurement according to § 20 to 22

(4) In the event that it is connected to the grid foreign
distribution system that is not connected to the external electricity grid
distribution system operator shall register with the operator
market one aggregate transfer point for all handover
measurement points with type a or B connecting the grid to foreign
distribution system. For a comprehensive handover instead of giving the operator
market data on the extent and deadlines set for the type of measurement
according to § 20 to 22


(5) The superior distribution system operator registers
market all transfer points connecting the superior distribution system
with a subordinate distribution system as individual delivery points or summary
as transfer points in the resolution in voltage levels.

(6) The operator of a local distribution system operator registers all
market it operates the local distribution system and
individual consumption or delivery points of all market participants
electricity connected to the local distribution system except || | supply points, which is the local distribution operator
contractor under license to trade electricity and also for the offtake points
assumes responsibility for Deviations entity that accepts responsibility for any deviation
contractor's electricity supply at
cover losses at this local distribution system operator.

§ 17

(1) The sampling or delivery points of electricity market participants who are not registered
procedure according to § 16 para. 6 registers operator
local distribution network operator market as a summary of customers' supply
points or summary transfer points electricity producers
individually depending on the type of measurement. Under the offtake or delivery points
passes the local distribution operator market operator
data on the extent and deadlines set for the type of measurement according to §
20 to 22

(2) New Hub site electricity generating plant, which is being carried
supply and consumption of electricity, with the exception of electricity generating plants connected to
customer's supply point under § 28 par. 5 of the Energy Act, the operator registers
transmission or distribution system as two transfer points
electricity generating plants, especially for electricity supply and
separately for electricity consumption. Already registered delivery point
electricity plant, which is being carried out supply and consumption, registers
the transmission or distribution system as two transfer
place of production of electricity in the first sentence only on the request of the manufacturer
electricity.

(3) customer's supply point, which is connected to an electricity generating plant
according to § 28 para. 5 of the Energy Act, the distribution system
registers as a single supply point of a customer with a flag
mikrozdroj, which is equipped with continuous metering of the electricity generating and
market operator shall immediately inform the concerned
suppliers and settlement entity.

(4) In the event of a change supplier at customers' supply points
new supplier shall, together with the distribution system operator that
customer's supply point is registered in the information system operator
market throughout the period during which ensures Access to this offtake place
customer electricity supply and distribution system operator
this supply point customer sends the measurement data of electricity consumption
according to § 20 to 22 on the transmission of data and supply billing
electricity and related services .

(5) The distribution system does not unregistration offtake
customer sites, with the exception of cases where the supply point can not be
carry electricity consumption, and keeps up to date allocated status
outlet. Registered sampling site has an active status, which
DSO changed

A) in case of interruption at the supplier according to § 30 paragraph. 1
point. d) of the Energy Act and the status of suspended

B) in the case include the supply point in the sum of donations for the transfer
data on inactive status. Sampling points with status under subparagraph b)
not include market operator in the evaluation of imbalances and not to them
transmitted data according to § 20 to 22 change the status of the supply point registers
transmission or distribution system in the information system || | market operator no later than four working days from the date of change in status.

(6) If the customer's supply point is assigned to an entity clearing
market operator does not include a supply point to the evaluation of imbalances.
Unless the transfer point production assigned to the subject of settlement,
market operator does not include a transfer point to the evaluation of imbalances.
In the days following the completion of the assignment subject to the clearing
offtake or transmittal spot market operator cancels assignment

Contractor at the supply point in the information system market operator
in the event that the supply point is assigned a new accounting entity.
Market Operator shall inform
through the information system of the market operator of the transmission or the respective
distribution system and the supplier concerned and the original entity
settlement.

(7) An electricity for transmission of data in accordance with § 49 para. 1
registers an electricity generating plant, with the exception of power plants connected
supply points according to § 28 para. 5 of the Energy Act, the Information
system operator market appropriately by way of decree
registration procedures support the market operator and the implementation of certain
other provisions of the Act on supported energy sources, without
bank information and no data on investment costs and || | granted investment aid.
PART FIVE


Transferred and taking responsibility for deviation, evaluating CLEARING AND SETTLEMENT TOLERANCE


§ 18

Responsibility for deviation

(1) Responsibility for imbalance relates to each individual customer
supply point, single point of transmittal
production of electricity or the aggregate of delivery points electricity generating plant or place
transmission or distribution system intended to record || | losses of the system. The transmission system operator or distribution system operator
must have secured a vendor for losses
its distribution system, which is itself subject to clearing or
delegated responsibility for deviation to the different accounting entity.

(2) Responsibility for imbalance has only one settlement entity, with the exception of delivery points
electricity producers registered according to § 17 paragraph
. 2, which can be transferred responsibility for deviation to two different
settlement entities that for one delivery point are passed
true value of electricity supply, and second transfer point are passed
actual value of consumption of electricity. If the electricity generating plant
connected to the customer's supply point under § 28 para. 5
Energy Act can not delegate responsibility for deviation to the two entities
settlement.

(3) Registered electricity market participant submitting a delegation
responsibility for imbalances in the customer's supply point, the site
transmission or distribution system to record
losses of the system or the delivery point of production through
market operator. If the cleared entity approves the transfer of responsibility for deviation
market operator shall examine whether the financial
secure payment cleared entity sufficient, and up to 120 minutes of
approval of transferring the responsibility for deviation subject to clearing
informed market participant electricity, cleared entity and relevant
transmission or distribution system on the outcome of the assessment
assignment of responsibility for deviation. If a financial guarantee payment settlement entity
sufficient market operator registers
assignment of responsibility for imbalance settlement to the entity if the takeover
responsibility for deviation caused a lack of funding
payment settlement entity Accepting responsibility for imbalance,
market operator transferring the responsibility for deviation to register.
The effectiveness of the assignment of responsibility for imbalance occurs
first calendar day following registration by the market operator or
later date indicated in the application.
The transmission or distribution system determines this date status of the measuring device according to §
38 par. 2 and 3. When transferring the responsibility for deviation
more supply or delivery points, one subject of settlement shall proceed accordingly.

(4) Subject of Settlement may delegate responsibility for total imbalance on
different accounting entity. Along with the transfer of responsibility for deviation to
different accounting entity can also transfer responsibility for the difference in value
electricity consumption specified under § 25. 1. If the acquiring entity
clearing approves transfer of responsibility for deviation, the market operator || | proceeds similarly in the third sentence, and fourth paragraph 3. responsibility for
deviation cleared entity that has assumed responsibility for a deviation from
another cleared entity, can no longer be transferred to another entity
settlement.


(5) If a supply or delivery point for devolved
deviation ending supply of electricity and does not establish a new power supply with
transferring the responsibility for deviation or ends
transfer of responsibility for deviation to the subject of settlement,
market operator informs about this fact relevant transmission or distribution system and registered
electricity market participants who have at
market operator is registered or transferred ownership of the
imbalance at this offtake or transfer point and registered
electricity market participants supplying electricity to this offtake
place or taking electricity from the transmission point under
agreement pursuant to § 50 para. 1 of the energy Act, no later than 30 calendar days prior
the ending of responsibility for imbalances in the
offtake or delivery point. The Contractor shall inform the customer about
completion of delivery of transferring the responsibility for deviation or termination
transfer of responsibility for imbalance at this point of delivery or the transfer
place no later than 25 calendar days before the date of termination
responsibility for deviation respective supply or transfer point.

(6) electricity market participants, who entered into a contract pursuant to § 50 par. 1
Energy Act, may have one or more contractors
or electricity customers. Demand for more suppliers or customers served
electricity market operator jointly market participant
electricity, arranging more suppliers or purchasers of electricity, and
registered participant of the electricity market, which for offtake or delivery points
participant concerned market took responsibility for
deviation.

§ 19

Transmission of data transmission system operator for the settlement of imbalances


(1) The operator of the transmission system operator forwards the market every day
later than 11.00 hours actual value

A) the supply and consumption of electricity in various delivery points
of power plants equipped with type A metering in the transmission system,

B) consumption of electricity individual customers equipped with type A metering in
transmission system

C) electricity supply and take at delivery points between the transmission system and the distribution
systems equipped with measurement type A

D) the amount of electricity it bought in to deal with an imbalance in the division
according to § 10 paragraph. 2

E) electricity transmission abroad and foreign individual subjects
clearing electricity transmissions to or from abroad
calculated in the event organized short-term electricity market for the joint bid
zone Czech Republic and the surrounding area offering and
foreign individuals or legal entities; for real values ​​are considered
agreed values,

F) the amount it provided electricity for the needs and redispatching

G) the amount of uncollected electricity from electricity generating plants in dispatching
proceedings under § 26 par. 5 of the Energy Act, for each hour of trading
previous day.

(2) The TSO market operator transmits to 18.00 pm
fifth working day after the end of the calendar month
updated information pursuant to paragraph 1

§ 20

Transmission of data distribution system operator for the settlement of imbalances


(1) The distribution system giving the operator to market daily
11.00 hours for every grid operated by it

A) the actual value

First electricity supply and consumption in individual delivery points
of power plants equipped with measurement type A

Second donations electricity supply points of customers in
which has been made to change supplier or to such sampling points
supplies supplier of last resort and supply point is not
inactive status pursuant to § 17 para. 5 (hereinafter "the changing suppliers ")
equipped with measurement type A

Third supply and consumption of electricity in various transfer points between different regions
type diagrams or distribution systems
equipped with type A metering and

Fourth consumption of electricity for all customers' supply points, with the exception of donations
under point 2, the sum of the individual regions of typical
or local distribution system (hereinafter referred to as "unchanged
contractor") equipped with type A metering ,


B) Preliminary values ​​

First donations electricity supply points of customers switching suppliers
equipped with metering type B or M

Second supply and consumption of electricity in various transfer points between different regions
type diagrams or distribution systems
equipped with metering type B or M

Third consumption of electricity for all customers' supply points unchanged
measurement equipment suppliers type B or M in total for each type diagrams
regions or local distribution system

Fourth electricity supply and consumption in individual delivery points
of power plants equipped with metering type B or M

Fifth supply and consumption of electricity supply points with
electricity generating plant in accordance with § 28 para. 5 of the Energy Act for each
business hour on the previous day.

(2) If the operator does not receive the market value pursuant to paragraph 1. b) or
according to § 21 para. 1, used for settlement of imbalances values ​​calculated as the average
actual values ​​in the same business hours the same
calendar days during the last 4 weeks, stored in the system
market operator. If the market operator does not have data for that time period
used for the settlement of imbalances values ​​equal to zero.

(3) The distribution system giving the operator
preliminary market value of electricity supply and consumption for the next calendar month
individual delivery points between the regions of typical
or distribution systems with type C metering by the last || | working day of the calendar month to 18.00.

(4) If the operator does not receive the market value pursuant to paragraph 3, apply to the settlement of imbalances
last known actual value of your monthly subscription and
monthly supply of electricity delivery points between regions
typical diagrams or distribution systems equipped with measurement type C. If
market operator does not know the actual value or actual value
apply to the full month, the market operator settlement
deviation values ​​equal to zero.

(5) The distribution system giving the operator market
18.00 pm on the fifth working day after the end of the calendar month for each
it operated grid

A) the actual value

First supply and consumption of electricity in the delivery points between distribution systems
equipped with metering type B or M

Second donations electricity supply points of customers switching suppliers
equipped with metering type B or M

Third electricity supply and consumption in individual delivery points
of power plants equipped with metering type B or M

Fourth the sum of the consumption of electricity for all customers' supply points without changing supplier
equipped with metering type B or M

Fifth supply and consumption of electricity supply points with
electricity generating plant by 28 para. 5 of the Energy Act for each
business hour preceding month and

B) the actual value of electricity supply and consumption as the sum of the sum
delivered and consumed electricity for the previous month

First from individual delivery points of power plants equipped with metering type C
and

Second from delivery points between distribution systems equipped with type C metering


(6) The operator of a local distribution system giving the operator market
18.00 on the fifth working day after the end of the calendar month for each
it operates a distribution system in addition to the data referred to in paragraph 5
actual value of consumption of electricity supply points
customers with type C metering for the previous month for individual consumption points
customers changing supplier and in the aggregate for customers' supply points
unchanged supplier.

§ 21

Transmission of data subject to clearing

(1) Subject settlement giving the operator the market every day, no later than 11.00 hours
preliminary values ​​of electricity supply and consumption for each
trading hour the previous day in the various delivery points
of power plants equipped with metering type B or M for which the entity
settlement took responsibility for the error.

(2) Subject of Settlement giving the operator the latest market
last working day of a calendar month to 18.00 preliminary values

Monthly subscriptions and electricity supplies in the following calendar month
individual delivery points of power plants equipped with measuring
type C, for which the accounting entity is responsible for the imbalance.

(3) If the operator does not receive the market value pursuant to paragraph 2 shall apply for settlement of imbalances
last known actual value of your monthly subscription and
monthly supply of electricity delivery points of individual plants
equipped with electricity metering type C. If the market operator knows
actual values ​​or actual values ​​are not subject to the full moon, used
market operator for the settlement of imbalances values ​​equal to zero.

§ 22

Transmission of actual values ​​deliveries

(1) Transmission of real values ​​of electricity supply and consumption is covered

A) to a supply point customer or

B) to the transfer point of each individual power plant or the aggregate of delivery points
and

C) the aggregate of delivery points TSO or DSOs
.

(2) During the transmission of values ​​from measurements of type A, B or M denotes the operator
market based on data from a transmission or distribution system
transfer values ​​as follows:

A) a valid value is the value when it comes to the actual value, which received
market operator under § 19 and § 20 para. 1 point. a) § 20 para. 5 and 6
and appropriate measuring equipment showed signs of disorder

B) substitute a valid value is a value which is a substitute
value for the duration of the disturbance measuring device, which is considered
real value pursuant to § 19 and § 20 para. 1 point. a) § 20 para. 5 and 6;
Transmission or distribution system replacement
valid values ​​marked in the manner defined in business terms operator
market

C) interim replacement value is the value when advance
value that the market operator on the basis of information from the distribution system operator
received or provided by § 20 para. 1 point. b)
§ 20 paragraph. 2 and 3; DSO Marked
value to 18.00 on the fifth working day after the end of the month to replace
value, pursuant to paragraph 2. a) or paragraph 2. b) and

D) zero value is a value which is a zero sampling
electricity supply point from which the TSO
or distribution system operator to whose system is given
supply point is connected, temporarily not send actual values; on this
inform the operator of the market operator
manner defined in the business conditions of the market operator.

(3) On the basis of information provided by § 20 para. 5, the operator market
editing values ​​transmitted under § 20 para. 1 point. b) or
provided by § 20 par. 2 and 4 and § 21 para. 1 and 3, and the values ​​
hourly chart formed a linear distribution of preliminary values ​​
transmitted according to § 20 par. 3 and § 21 paragraph. 2nd

(4) If the court decides on bankruptcy the customer according to the Insolvency Act,
the transmission or distribution system minus
manner prescribed by law, which provides details of measurement
electricity and transmission of technical data, or provides
status of the measuring device, if it is a sampling or delivery point with type C metering,
within 3 working days of receipt of the application vendor for a reading
. To determine the condition of the measuring apparatus shall apply mutatis mutandis
provisions of this Decree governing the procedure for readings
measuring device or determine the status of the measuring device when changing
contractor under delegated responsibility for deviation.
Vendor request must include a list of supply and delivery points, at which
required to perform a reading, and information from the Insolvency Register
court decision on bankruptcy of the customer.

(5) market operator does not receive data sent in accordance with § 19, § 20 para. 1, 3 and 5
§ 21 para. 1 and 2 among

A) 18.00 third working day of the month and 6.00 pm
fourth working day of the month

B) 18.00 on the fifth working day of the month and 6.00 pm
sixth working day of the month,

C) 18.00 seventh working day of the month and 6.00 pm
eighth working day of the month and

D) 18.00 last calendar day of the month and 6.00 pm
first working day of the following month.


(6) The market operator receives and processes data sent during
according to paragraph 5. a) to d) until after that period.

§ 23

Variance analysis using typical in regions of typical


(1) The market operator created on the basis of data provided by the operators of regional distribution systems
standardized type
diagrams for each class for each calendar year. Standardized type
diagrams are applicable uniformly to all regions of typical, with the exception
type diagram class 5 according to Annex no. 6 hereto,
whose validity is determined by the appropriate region type diagram.

(2) Restated type diagrams are the standard type diagrams
converted to actual weather conditions on the day of delivery.

(3) For each delivery day market operator determines the residual diagram
burden on individual business hours for individual regions
defined market operator for the purpose of evaluating the residual profile
(hereinafter "region of typical"). The residual load diagram
determined as the difference between the sum of the actual values ​​of electricity supply from
supply and delivery points region type diagrams with measurements
type A, B, C and M, and the sum of the actual values ​​of electricity supply and
delivery points with measurements of type a, B and M and consumption of electricity generating
with type C metering in the regions of load profiles and values ​​
losses for the day of delivery. The value of losses is determined by multiplying the total losses
extent determined by the Authority and the quantity of electricity entering the region
load profiles. In the case of electricity supply measurement type
B, M or C and consumption of electricity metering with type B or M and the uptake of electricity
with type C metering in the regions of load profiles are used
values ​​and practices in accordance with § 19 and 20. Energy unmeasured
donations is considered to be zero.

(4) The market operator shall make available to the electricity market participants
manner enabling remote access via the information system market operator


) Data on normal climatic conditions force for the entire calendar
year and no later than three calendar months prior to the first day of delivery
calendar year

B) standardized type diagrams valid for the entire calendar year,
later than 3 calendar months prior to the first day of delivery
calendar year

C) the actual climatic conditions, no later than the day following the date
which they relate, and

D) The residual diagrams of various regions of type
diagrams and temperature coefficient, and no later than the day following the day on which
concern; details of the method of determining the coefficient of residual
diagram and temperature coefficient are presented in business terms
market operator.

(5) Assignment of individual classes of typical extraction points
customers with type C metering performed by the operator of the regional grid system
when connected customers or when changing nature of the supply
space and is based on the categorization of customers under Annex no. 7 to this
Decree and the nature of consumption of electricity in accordance with Annex no. 6 to this Decree
. Assigning a class of typical extraction points
effective upon registration of the assignment operator market. The market operator leads
records assigning classes of typical
least for the period of the last 3 years.

(6) A request to reassign the class of typical
sent to the regional distribution system operator market
no later than 18.00 on the fifth working day of the month following
date on which requires registration change the assignment of class type | || diagrams. The operator of the regional grid system makes the date of execution
change the assignment of the class of typical
metering of electricity and electricity consumption readings will send the market operator
within 10 working days from the date of registration changes
class assignment type diagrams.

§ 24

Update load profiles

(1) The operator of the regional grid system determines the procedure
according to Annex no. 5 hereto planned annual electricity consumption
customers with type C metering and sends operator market value of the planned annual electricity consumption


A) individually for customers' supply points with a change of supplier

Type C metering and

B) aggregate after each class load profiles for customers' supply points
unchanged supplier of measurement type C.

(2) The operator of the regional grid system regularly updates
value of planned annual electricity consumption. The update includes a newly
connected supply points canceled taps and accepted complaints
customers relating to the deduction, which on the basis of this complaint was
repaired readings from measurement type C. update values ​​in accordance with paragraph
1 point. a) send the DSO
market operator in the event that he was subjected to extraction point
accounting document, based on the reading and the previous update
values ​​projected annual electricity consumption of at least one hundred days have passed.
Update values ​​pursuant to paragraph 1. b) for all deliveries
days preceding calendar month sent to the distribution system operator market
18.00
fifth business day of a calendar month.

(3) The market operator determined on the basis of planned annual consumption of electricity and associated
converted load profiles for individual
trading hours on the delivery

A) the value of consumption of electricity at supply points of customers changing supplier
with type C metering in regions of load profiles and

B) sums of donations electricity supply points of customers without changing supplier
with type C metering for individual classes of type
diagrams of typical and regions.

(4) residual load diagram be allocated proportional to the size of the market operator
consumption of electricity in the trading hour, set out in paragraph 3
to customers' supply points with changing the measurement type C and summary after each
classes of load profiles on supply points of customers
unchanged supplier of measurement type C so determined
values ​​are considered value consumption of electricity customers with measurement
type C for settlement of imbalances.

(5) The market operator assigns the value of cleared entities donations
electricity pursuant to paragraph 4 after each class load profiles and regions
load profiles and communicate them to the competent bodies
settlement no later than 14.00 hours the following day. Values ​​so set
consumption of electricity market operator is used to calculate the deviation.

§ 25

Evaluation of the differences between the readings of consumption and consumption estimates by type diagrams


(1) Upon receipt of the readings in the consumption of electricity supply points
customers with type C metering in regional distribution systems, u
which was carried out by changing electricity supplier market operator
carry out an assessment of the difference between the real values
electricity consumption obtained from readings, and values ​​determined in accordance with § 24 para. 5
for the same period and settled the manner provided for in paragraph 3 to individual
cleared entities for a price pursuant to § 48 par. 3 point. and). In the event that
during the period covered by the evaluation of the difference, the price is changed
according to § 48 par. 3 point. i) assess the differences before and after the change
change this price separately. When the DSO does not pass
market operator distribution of energy in kWh to the amount before the change and after
price change, market operator determines the distribution of energy using typical
diagrams.

(2) The market operator adds the differences referred to in paragraph 1 for each region
load profiles and the total opposite in sign to settle the price
cache cleared entity that has assumed responsibility for deviation
losses in the region of load profiles . On request
cleared entity responsible for losses in the region
type chart, the market operator shall make this entity clearing
data on which settle differences.
Details are given in the business conditions of the market operator.

(3) Uodběrných customer sites with changing the measurement type C
regions of typical market operator carries out clearing the differences
under paragraphs 1 and 2 in two stages:

A) monthly assessment of the differences is the twelfth working day of the month
following the month to which they relate readings
consumption of electricity in these supply points; the value of these readings are sent
within 10 working days after completion of the reading and correction later

Eleventh working day of the month following the month to which they relate readings
and

B) of the final monthly assessment of the differences is the tenth working day
fourth month following the month to which they relate
readings of electricity consumption in these supply points; the value of these readings are
market operator sent within 10 working days after reading and
repair later than the ninth working day of the fourth month
following the month to which they relate readings;
subtract consumption according to § 41 paragraph. 2 and sent their repair market operator after
ninth working day of the fourth month following the month to which
readings relate, not the market operator included in the settlement of differences
under paragraphs 1 and 2; These values ​​
market operator transmits only competent contractors and cleared entity.

(4) Market Operator for the settlement of differences under paragraphs 1 and 2 exhibits
separate tax documents and carry out the financial settlement of differences.
Settlement of differences under paragraphs 1 and 2 is not part of the settlement
deviations.

§ 26

Evaluating variations in local distribution systems

(1) The market operator sets the load diagrams of connection points
local distribution system with type C metering and value losses in the system in case


A) The daily settlement of imbalances as the difference between the sum of the actual values ​​
electricity deliveries to delivery points with type A metering
local distribution system and preliminary values ​​of electricity supply to
delivery points with metering type B, M and C local distribution system and
sum of the actual values ​​of electricity supply points with type a metering
in the local distribution system and preliminary values ​​of consumption
electricity supply points with type B metering and M in the local distribution system
or

B) monthly and final monthly settlement of imbalances as the difference
sum of the actual values ​​of the supply of electricity to the local distribution system
and the sum of the actual values ​​of electricity supply points with
measurement type A, B and M in the local distribution system.

(2) The market operator determines the value of the losses in the local distribution system and
value consumption of electricity at supply points of customers with type C metering
at

A) the daily settlement of imbalances in the distribution system division
values ​​determined under paragraph 1. a) the ratio of the actual value
losses for the preceding calendar month in the local distribution system
determined under paragraph 4 and one-twelfth of the value
planned annual consumption in accordance with paragraph 5 of the supply points of customers with type A metering
C, or

B) monthly and final monthly settlement of imbalances in the distribution system
distribution of values ​​determined under paragraph 1. b) in relation
actual value of losses for the calendar month in the
local distribution system established under paragraph 4, and sizes
actual values ​​of electricity supply points of customers with type C metering
in the relevant month according to § 20 paragraph. 6th

(3) The market operator shall notify the competent bodies of the settlement value of donations
electricity pursuant to paragraph 2. a) for the previous day at the latest
14.00.

(4) The actual value of the loss of individual local distribution systems
preceding calendar month will determine the market operator as the difference
values ​​determined under paragraph 1. b)
for the previous calendar month and the sum of the actual values ​​of
electricity supply points with type C metering in the local distribution system.

(5) The planned annual electricity consumption of customers with measurement type
C provides local distribution operator of the value
last 12 monthly readings of consumption of these customers and thus
determined values ​​sent to the market operator

A) individually for customers' supply points with changing operator
with type C metering and

B) an aggregate basis for other customers unchanged suppliers with measurement type
C.

(6) The operator of a local distribution system regularly updates
value of planned annual electricity consumption of customers with type C metering
The update also includes the newly connected supply points canceled offtake

Place and accepted by customer complaints regarding the deduction when
on the basis of this complaint repair was performed readings of measurements
type C. updated values ​​sent to the market operator
once a month for the previous month after deductions.

(7) The market operator shall give details of the method of determining loss, the residual
load diagram and determine the values ​​of consumption of electricity customers
type C metering in local distribution systems in commercial
conditions.

§ 27

Calculation of deflections

(1) The market operator verifies the completeness of the information transmitted in accordance with § 19-26 and
if shortcomings prompt transmission or distribution system
to supplement them.

(2) In every hour, every business entity settlement provided
contracted quantity of electricity for the obligation to supply power to the electricity
system (hereinafter referred to as "total contracted power supply") and agreed
electricity for commitment to draw electricity from the electricity
system (hereinafter referred to as "total contracted electricity consumption") in MWh
rounded to three decimal places, as a sum agreed
supplies electricity subject to clearing on organized short-term market
electricity and agreed amount of electricity for
obligation to supply power to the grid through bilateral trades, and a summary of agreed
consumption of electricity subject to clearing on organized
electricity spot market and the agreed amount of electricity for
obligation to draw electricity from the electricity
system through bilateral trades, determined on the basis of data according to § 4 to 9

(3) The market operator determines the subject of settlement value of actual deliveries
electricity and actual consumption of electricity in each trading hour in MWh
rounded to three decimal places, and as a summary of the actual electricity supply
subject of settlement to the electricity grid and summary
actual consumption of electricity subject of settlement of the electricity grid
determined on the basis of data according to § 19 to 26
negotiated the supply of electricity and the actual supply of electricity to the grid are marked with a plus sign
and agreed electricity consumption and the actual consumption of electricity from the electricity grid
are labeled negative.
Values ​​for real subject of settlement shall be deemed measured values ​​of supplies and donations
adjusted for regulating energy.

(4) The consumption of electricity is considered cleared entity's own consumption
subject of settlement and collection of electricity market participants, from whom
settlement entity assumed an obligation to draw electricity from the electricity
system. For electricity supply cleared entity is deemed to own
van cleared entity and supply of electricity market participants
electricity, from which the settlement entity assumed an obligation to supply electricity to the grid
.

(5) Notwithstanding the subject of settlement for each trading hour
difference between actual delivery and the actual consumption of electricity on the one hand and agreed
total supply and total consumption of electricity agreed
on the other side.

(6) For electricity transmission from abroad under contract and transfer
electricity abroad on the basis of the agreement is subject to confirming
accuracy of the data from these contracts for the purposes of the variance analysis and which has responsibility for
deviation of net foreign exchange
realized on the basis of a contract, the TSO.
Balance of foreign exchange realized under the contract is the difference between the transfer
electricity from abroad and transferring electricity abroad;
balance is negative, if the transport of electricity abroad more than
transport electricity from abroad; Otherwise, the balance is positive.

(7) the amount of uncollected electricity at electricity plants
supervisory control according to § 26 par. 5 of the Energy Act passed
TSO for the purposes of evaluation of imbalances
treated as regulating energy with zero price .

§ 28

Rounding actual values ​​when calculating deviations

(1) Actual values ​​for the evaluation of variations and deviations subjects
clearing down in MWh and rounded to three decimal places.

(2) the sum of the difference of the actual daily values ​​for the electricity supply needs
evaluation and settlement of imbalances in the calendar month and

Actual monthly values ​​for the supply of electricity bill payments
transmission or distribution of electricity can vary by up to

A) 15 kWh per calendar month for supply or delivery points
equipped with metering type A, or

B) 2 kWh per calendar month for supply or delivery points
equipped with metering type B, or M.

(3) If supply or consumption of electricity measured on the secondary side of the transformer
, it is understood that the actual values ​​are measured values ​​
modified so that if electricity consumption is measured values ​​
increase the value of fixed price decision and the Office for the delivery of electricity
measured values ​​are reduced by the value of fixed price
Office's decision. Such modified values ​​passed
distribution system operator to the market operator for evaluation and settlement of imbalances and billing
supply or consumption of electricity.

§ 29


Imbalance settlement
(1) Clearing and financial settlement of imbalances conducted by the market operator provides
between subjects of settlement payment of electricity that was supplied to the grid
or removed from the power system over
framework of the agreed amount, or has not been delivered to
electricity grid or was removed from the electricity grid, despite being in
contracts negotiated.

(2) The settlement price and the settlement price variations for protiodchylky
individual trading hours provides market operator on the prices of electricity
according to § 10 paragraph. 2 and in accordance with Annex no. 8 of this Decree
. Total revenues from the settlement of imbalances is calculated as the sum of all payments
cleared entities under paragraph 5.

(3) The market operator determines for each trading hour
difference between total revenues from the settlement of imbalances and electricity costs
provided by an operator of the transmission system for dealing with states
imbalances. A summary of these differences, for the calendar month decreased by
payment for electricity provided to verify the capability of the provider of support services
market operator pays TSO
according to the contract for the settlement of differences arising from the settlement costs
deviations and electricity costs according to § 10 paragraph.
second

(4) Differences in paragraph 3, the Office into account when setting rates for
system services.

(5) Based on the settlement of imbalances conducted for each subject
settlement in each trading hour down the market operator
amount of the payment settlement entity for the imbalance. Payment cleared entity for a deviation
is determined by multiplying the amount of deviation and the relevant settlement price.
In addition, the market operator provides each operator settlement payment amount per
market operator's clearing activity under § 48 par. 3 point. f) 2.

(6) The market operator shall notify the cleared entity's imbalance evaluation
for every business hour of the previous day to 14.00. This evaluation includes


A) the amount of deviation in MWh with 3 decimal places and the direction
deviations

B) clearing price deviations in CZK / MWh and

C) the payment settlement entity in CZK.

§ 30

Financial settlement of imbalances

(1) Financial settlement of deviations means for payments between
accounting entity and the market operator to evaluate and cleared
deviations cleared entity. Market Operator carries out financial settlement
in 3 stages, and it

A) the daily settlement

B) monthly settlement and

C) of the final monthly settlement.

Procedure and the exact dates of the individual stages are listed in business conditions
market operator.

(2) Daily imbalance settlement is done in the form of advance payments.

(3) The monthly settlement is carried out after the market operator billing
period, which is 1 calendar month when cleared cleared entity
advances from the daily settlement and issue an invoice, if applicable added tax
the output value to the market operator, or issue a basis for
tax certificate, if applicable value added tax on output entity
settlement. Settlement payments ensures market operator
least once per calendar month.

(4) Final monthly settlement market operator performs all the stakeholders concerned
clearing the deadline for the submission of complaints
business conditions of the market operator.


(5) for the financial settlement of imbalances using typical in regions
typical profiles under paragraph 1. a)
market operator uses the last current value of planned annual electricity consumption
which the DSO has sent to the market operator. For
financial settlement of imbalances using typical in regions
typical profiles under paragraph 1. b) c) uses market operator
last current value of planned annual electricity consumption for each
settled days of supplies that the distribution system
sent to the market operator.

(6) for the financial settlement of imbalances in local distribution systems
pursuant to paragraph 1. a) uses the latest market operator
current value of planned annual electricity consumption, which
local distribution operator sent to the market operator. For
financial settlement of imbalances in local distribution systems
according to paragraph 1. b) and c) an operator uses the last current market value
planned annual electricity consumption for each settled
days of supplies that the local distribution operator sent
market operator.

(7) If the cleared entity does not pay the market operator
due obligations as they become due, the market operator will use their payment
means of financial security payments and the manner set out in
agreement on settlement of imbalances. If the cleared entity acting contrary
contract on settlement of imbalances, the market operator may cancel the registration.

(8) Cancellation of registration pursuant to paragraph 7 publishes market operator
manner enabling remote access, while this fact
inform all settlement that for the period, which
deregistration under paragraph 7 applies,
reported amounts of electricity contracted with the subject of settlement, which was unregistered.
The notification of cancellation of registration is the date when the registration
canceled. Diagrams of the agreed amount of electricity, which is on the supply side or
sampling identified an accounting entity is canceled registrations
market operator does not accept and does not include the quantities agreed
clearing entities.
PART SIX


ENERGY REGULATORY SETTLEMENT IN A STATE OF EMERGENCY IN PREVENTING THE STATE OF EMERGENCY


§ 31

(1) hour for which was declared a state of emergency in the electricity
system for the whole country or situation to prevent emergencies in
electrification system for the whole country carries out market operator
settlement of deviations for each business hour in a special mode.
Announcement and end the state of emergency or the prevention of emergency for the entire territory
announces TSO market operator
without undue delay. Special clearing regime will apply to the whole
electricity grid and all cleared entities.

(2) In the special mode of settlement does not market operator
clearing and financial settlement of imbalances pursuant to § 29 and 30. The agreed amount of electricity
obligation to supply electricity to the grid
registered in the information system operator by market § 9 and
agreed amount of electricity for the obligation to draw electricity from the electricity grid
registered in the information system operator
market pursuant to § 9 and contracted deliveries and withdrawals negotiated on an organized
electricity spot market in accordance with § 4,
provided including electricity transmission system operator pursuant to § 10 are deemed to be zero, with the exception of the final
flow between bidding zones on
organized short-term electricity market.
Clearing electricity market operator performs on the received actual values ​​
supply and consumption of electricity.

(3) The average price of electricity supply in the special mode of settlement for each hour sets
Market Operator as a weighted average of prices based on the price
by the Authority.

(4) Aggregation actual values ​​of supply and consumption of electricity market operator performs
individual subjects of settlement under the current transfer
responsibility for deviation.

(5) Rounding actual values ​​of electricity supply and consumption performed
market operator under rules which are applied in aggregating
actual values ​​of electricity supply and consumption for the settlement of imbalances
outside the special clearing regime.

§ 32


(1) Market Operator settles the actual electricity supply subject
settlement, including the actual amount of electricity provided abroad
at an average price of electricity supply specified under § 31 para. 3. When
pay the price for real electricity supply will proceed in accordance with paragraph
6th Entity clearing a claim against the market operator.

(2) Market Operator settles the actual consumption of electricity subject
settlement, including the actual amount of electricity supplied abroad,
average price of electricity supply specified under § 31 para. 3. When
payment for a real electricity consumption will proceed in accordance with paragraph 6
settlement entity incurred a liability to the market operator.

(3) The market operator rozúčtuje assets and liabilities arising from the difference in
income and expenditure settlement resulting stream between
bidding zones made on the organized spot market
electricity to the individual subjects of settlement in proportion to their actual
values ​​of supply and consumption.

(4) For the purposes of settlement of cross-border transmission of electricity in the special regime settlement
TSO market operator
forward to 11.00 am of the day following the date on which the information provided
concern, the actual amount of electricity transported
abroad or foreign individual entities chargeback for
every business hour, which is done imbalance settlement in a special
mode of settlement. If the TSO does not send
market operator the actual amount of electricity transferred to
abroad or foreign competent body settlement will
calculated deviation caused by these cross-border transfers in the period
subject to a special regime settlement settled against the operator | || transmission system. Evaluation and settlement of cross-border transmission of electricity
against individual subjects of settlement in a special mode
clearing is carried out based on the amount of electricity transferred
abroad or from abroad received from the transmission
system and is part of a financial settlement
imbalance settlement in a special mode of settlement.

(5) The financial settlement of special regime operator
clears the market.

(6) Settlement payments in a special mode clears operator
market. The market operator first receives payments from cleared entities
which made a commitment to the market operator. The market operator pays its
obligations of the special showdown against operators of settlement until
amount of payments received from the clearing entities on their obligations
to the market operator and received financial security bodies
settlement. Receivables from clearing entities paid by the market operator
proportional manner depending on the size of individual claims of clearing entities.
PART SEVEN


Elections and a change of electricity supplier

§ 33

Request for change of supplier

(1) The condition for filing an application for a change of supplier, the contract for the supply of electricity or
agreement on bundled electricity supply services
concluded between the electricity market participant and a new supplier.

(2) First four months before and no later than at 10.00
tenth working day before the date from which the supply is effected, given
new supplier market operator request for a change of supplier.

(3) An application for a change of supplier comprises

A) the registration number of the new supplier

B) the type of contract for the supply of electricity should be,

C) the effective date of the change of supplier,

D) the duration of the legal relationship established by treaty

E) the business name or name, registered office or place of business and registration number
cleared entity responsible for imbalance for
supply points for which the delivery was made,

F) the identification number codes consumption or delivery points and

G) whether the contract was for the supply of electricity or associated
electricity supply services concluded by consumers in shopping
premises license holder of a remote or off-premises license holder
.

(4) If the request for change of supplier filed with the market operator
later than 10.00 hours, the application has been lodged on the following working day.


(5) Market Operator allows an application to change supplier for the supply or transfer
place even in cases where the information system operator
market is not sampling or delivery point registered.

(6) The market operator informed no later than 12.00 the day on which
application was filed, the existing contractor, existing entity
settlement, a new supplier, the new cleared entity or other entities concerned
settlement of the transmission or distribution system
submitting a request for change of supplier.
Market operator, sending a new supplier and a new entrant clearing data
range under paragraph 3. The market operator will pass
existing supplier and the existing subject of settlement data in the scope
pursuant to paragraph 3. c), f) and g) as well as to the transmission or distribution system
data in the scope pursuant to paragraph 3. a) to d)
f) and g).

(7) If the offtake or delivery points in which to be a change
supplier, not registered in the information system market operator
the transmission or distribution system such offtake or delivery points
registers the information the system operator to market
12.00 hours on the fifth working day after the date of forwarding the information referred to in paragraph 6


§ 34

Request for a contract to ensure service transmission or distribution system


(1) Not later than the date of filing the request for change of supplier gives
electricity market participant concerned in the transmission or distribution system
request for closure or amendment of the provision of the service
transmission or distribution system
with requisites pursuant to Annex no. 1 or 3 hereto for withdrawal or transfer
place in these systems. Particulars of application for the service
transmission system or service distribution system in operation for
verification technologies are given in Annexes Nos. 2 and 4 to this decree.

(2) The application submitted

A) new supplier if the electricity supply is to be implemented on the basis of a contract
according to § 50 par. 2 of the Energy Act, or

B) other participant in the electricity market, if it is to supply electricity
implemented under other contracts.

(3) The operator of a transmission or distribution system operator
informs the market about the outcome of the assessment of an application to 14.00 hours
eighth working day following the date of transmission of information in accordance with § 33 para.
6. If the transmission or distribution system
operator informs the market about the outcome of the assessment of the application within the prescribed time, it is regarded as confirmation
request.

(4) The operator of a transmission or distribution system rejects the request and
specifying the grounds for the rejection of the message sent to the operator
market only if

A) the application is not possible to clearly identify the market participant

B) supply point at which it is to be a change of contractor
not included in the request for closure or to negotiate amendments to the framework agreement,

C) the request is not a billing address market participant in the
offtake point should be changed supplier,

D) is not a contract of connection or not renegotiated contractual relationships based
existing connection agreements, if such a change is required
,

E) the application is requested reserved capacity which is higher than the value
reserved capacity specified in the connection agreement, or

F) the application contains an earlier or later start date
transmission or distribution of electricity, before the effective date of the change of supplier at the request
supplier change.

(5) The operator of a transmission or distribution system informs
reasons for refusing the request for a new supplier information system through
market operator no later than 18.00
fifth business day following the date of transmission of information in accordance with § 33 para. 6th
The transmission or distribution system receives a request, if
new supplier deficiencies in the application pursuant to paragraph 4. a), c) through f)
removed until 14.00 pm on the seventh working day after the delivery
information according to § 33 paragraph. 6th

(6) If an application for a new supplier contains additional data different from
data referred to in Subsection 4. a) to c), which are in conflict with
data distribution system operator, used data on billing

At a market participant said the new supplier and confirm that the
market participant to regulatory levels, the current value of the main circuit breaker before
meter and the distribution rate above
distribution system operator. If the customer meets the conditions for granting
distribution rate specified in the request for a new supplier, used
is an indication of the distribution rate above a new supplier.

(7) The market operator shall immediately inform the current supplier, the new
suppliers and all stakeholders concerned about the outcome of the assessment settlement
request.

§ 35

Request to change the type of contract

(1) Request to change the type of contract according to § 33 par. 3 point. b) whose
for the supply of electricity served provider in the information system
market operator first four months and no later than 10.00
fifth business day prior to the requested effective date of the change. Request
change the type of contract contains

A) the registration number of the registered contractor at the supply point in
Information System Operator market

B) the registration number of the cleared entity registered at the supply point in
Information System Operator market

C) the type of contract for the supply of electricity should be,

D) the effective date of the change in the type of contract for the delivery is to be
electricity

E) identification of numerical codes, supply or transfer points, which are required
amendment and

F) whether the contract was for the supply of electricity or associated
electricity supply services concluded by consumers in areas
customary for business or outside the business premises.

(2) If the request to change the type of contract under paragraph 1 filed with
market operator no later than at 10.00, deemed to have been filed
next working day.

(3) The market operator informed no later than 12.00 the day on which
application was made under paragraphs 1 or 2, received a request to change the type of contract
transmission or distribution system to which
as sample or transfer points to which the request relates
connected, and passes the information to the extent under paragraph 1. a) and c) to f
).

(4) not later than the date referred to in paragraph 1 or 2 provides a market participant
electricity in the transmission or distribution system
request to change the type of contract for the supply of electricity, including evidence of relevant requirements
pursuant to Annex no. 1 or Annex no. 3 to
hereto, including any request for termination of a separate agreement on the distribution
between the customer and the respective distribution
system or a separate agreement on the transfer of electricity between the customer and || | relevant TSO.

(5) The operator of a transmission or distribution system operator
informs the market about the outcome of the assessment request for a change
agreement pursuant to paragraph 1 or 2 to 24.00 pm of the day preceding the date
efficiency required changes to the type of contract under paragraph 1 point. d).

(6) The market operator immediately upon receipt of the information referred to in paragraph 5
informs the current supplier of the result of the assessment of an application for a change
type of contract pursuant to paragraph 1 or 2. In the event of approval
transmission or distribution system change type
contract for the supply of electricity market operator
registers this change in the consumption or transfer point from
required effective date for registration of a contractor for the consumption or transfer point
information system operator market. In case
TSO or DSO
system refuses a request to change the type of contract, to change the type of contract for
offtake or transfer point occurs. For a refusal to change
type of contract under paragraph 1 or 2 is also considered when
market operator within the period referred to in paragraph 5 of the transmission or distribution system
receives the result of the assessment of an application for a change of type
contract pursuant to paragraph 1 or 2.

(7) The market operator enables sending a request to change the contract after the deadline
referred to in paragraph 1 and the acceptance or rejection of the request to initiate
supplies after the deadline specified in paragraph 5, no later than 24.00 hours
the last day prior to the desired effect changes in the type of agreement
if the change in the type of contract agreed upon by all stakeholders
market participants.


§ 36

Request to terminate and suspend or halt the process of changing supplier

(1) The new supplier may submit a request to terminate the process of changing
vendor to 14.00 hours the eighth working day after the delivery
information according to § 33 paragraph. 6th

(2) The current contractor may submit an application to suspend the process of changing supplier
18.00 on the fifth working day after the delivery
information pursuant to § 33 para. 6 as the date of the desired effect of the change
avoid vendor to terminate the contract with the current supplier, whose
for the supply of electricity, or if the entrant in writing
effect will stop the process of changing supplier.

(3) In the event that the request for change of supplier information is given
its closure outside business premises or distance
way, the customer withdrew from the contract according to § 11 paragraph. 2
energy Act and also calls for the continuation of supplies from
current supplier, current supplier is progressing according to § 39 par. 3 to 5


§ 37

Completion of the change of supplier

(1) If at 18.00 hours on the fifth working day after the information
according to § 33 para. 6 is not in the system of market operator is registered to
application pursuant to § 33 of the new entity clearing agreement with assigning responsibility for
variation in the withdrawal or delivery point, it is considered
for disagreement cleared entity with the assignment of responsibility for
imbalance at the supply or delivery point and the market operator informs
current supplier, the current cleared entity, the next question
subjects of settlement, a new supplier and operator concerned
transmission or distribution system to terminate the process of changing
supplier.

(2) The market operator informs the current supplier, the new supplier,
existing cleared entity, other stakeholders and clearing
transmission or distribution system for application
according to § 36 para. 1 or 2 in 20.00 hours working day in which the application was accepted
. If the new supplier submits a request for termination of the process
change of supplier, the market operator will end the process.

(3) If the existing contractor shall submit a request to suspend the changes
supplier, but new supplier on the basis of re-written statement
customer, from which it is clear that the customer wishes to change supplier
confirm the information system operator market change request
supplier, not later than 14.00 hours the eighth working day after
of transmission of information under § 33 par. 6, the market operator continues
process of changing supplier. Otherwise, the market operator
process of changing supplier and terminates immediately inform the current
suppliers, new suppliers, all the parties concerned and clearing
transmission system operator or the respective distribution system operator
.

(4) The market operator notifies the current supplier, the new supplier,
to organizations involved in clearing and transmission or distribution system
registration changes vendor to 8.00 hours
ninth working day following the date of transmission of information in accordance with § 33 paragraph. 6th

(5) Following notification of registration of change of supplier concludes a new supplier
contract or amendment of the provision of the service
transmission or distribution system including offtake or delivery points, which
the amendment. The affected transmission or distribution system
ensure the effective date of the change of supplier, transmission or distribution of electricity
to the supply or transfer point market participant
electricity in the first sentence and ends the transmission or distribution of electricity
for current supplier. In case that is passed on to the supply or
ing sites were interrupted electricity supply according to § 56 par. 1
ensure the transmission or distribution system within 2 working days after the effective date of the changes
supplier of electricity transmission or distribution
electricity to the supply or transfer point market participant
electricity in the first sentence and ends the transmission or distribution of electricity
for the existing supplier to the effective date of the change of supplier.

(6) Change in supplier is deemed to have taken place on the first trading hour
effective date of the change of contractor.

§ 38

Tasks associated with changing operator

(1) The market operator to the effective date of the change of supplier will cancel each

Individual offtake assignment or transfer point to those suppliers
whose deliveries are assigning the consumption or transfer point
new suppliers concerned, and shall immediately notify the supplier concerned,
body concerned clearing and transmission or distribution | || system to which the electricity supply or transfer point is connected.

(2) The effective date of the change of supplier or subject of settlement
performs the transmission or distribution system reading, in case
supply or delivery points with type C metering provides state
measuring device as described in paragraph 4 and the survey data will then send
market operator. The market operator such data without undue delay, transfer
previous cleared entity and suppliers for billing and settlement
obligations. When changing the subject of settlement does not billing the customer.
If the market operator receives an indication of the final status of the measuring device to
effective date of the change of supplier or subject of settlement, it also passes
new supplier and a new entrant in the settlement information system
market operator.

(3) The effective date of the change of supplier market operator shall make available to the new entity
clearing and new suppliers in its information system
details of the planned annual electricity consumption of individual consumption
points of customers with type C metering, which will be a new supplier of electricity supply
. After effectivities vendor forwards market operator
new cleared entity and the new supplier of data on actual
measured amounts of electricity.

(4) Determination of the status of the measuring equipment for supply or delivery points
with type C metering performs the distribution system operator
date of the change of supplier or subject of settlement by counting or estimating
associated with the use of adjusted type and chart last
current projected annual electricity consumption or on the basis of their self-
market participant delivered DSOs
directly or through existing or new vendor
within 5 working days from the effective date of the change of supplier.
So fixed value passes the distribution system operator to the market operator
10 working days from the effective date of the change of supplier or entity
settlement. When changing the subject of settlement does not
customer billing.

(5) Communication between the market operator and registered market participants
electricity in the process of changing supplier
takes the form of electronic messages in a communications environment defined by the operator
market. Messages are registered electricity market participant sent
format defined by the market operator.

(6) The market operator handles requests for execution of supplier change
in the order they were received by the market operator. Where the application for
making change suppliers for the same sampling or delivery point to the same
requested effective date of the change of supplier more suppliers
market operator will register a change supplier under request for execution
change supplier, he received last. In this case
market operator informed about the planned execution of supplier change and
announces the registration of the change of supplier all suppliers and operators
settlement who are changing the contractor under the second sentence offended.

Request for an extension and shortening the delivery

§ 39

(1) An application for reduction of electricity supply to the water outlet serves
supplier market operator no later than 10.00
last working day before the planned termination of the electricity supply in an offtake
place. The market operator in its system cancels the required date of termination of the electricity supply
assignment supply point for suppliers and concerned
cleared entity and shall immediately inform the
suppliers, entities concerned clearing and transmission or distribution system
. Shortening the supply of electricity means if
agreement on bundled electricity supply services
remove the connecting point of the framework agreement. Request for shortening the transfer of responsibility for deviation
at the supply point on the subject of settlement gives an accounting entity
market operator no later than 10.00 on the tenth day prior to the planned termination
take responsibility for imbalance at the supply point. Operator

Market its system cancels the required completion date of receipt
responsibility for deviation to a supply point for the subject of settlement and
immediately inform the contractor concerned entities
clearing and transmission or distribution system.

(2) An application for an extension of the electricity supply to the water outlet serves
supplier market operator no later than 10.00
fourth business day before the last day of electricity supply.
Market operator shall immediately inform the relevant bodies and clearing
transmission or distribution system. If the operator
transmission or distribution system operator and the settlement
request for the extension of electricity supply approve no later than 18.00
last day of electricity supply, extension of electricity supply
takes effect on the day following the last day of the electricity supply . For
approval procedure shall apply mutatis mutandis pursuant to § 34
market operator shall immediately inform the contractor concerned entities
clearing and transmission or distribution system.
Extension deliveries under this paragraph shall take effect only if the deadline
requested extension is not registered at the supply point
another supplier.

(3) In the event that a customer withdrew from the contract or resigned from multiple
contracts pursuant to § 11 paragraph. 2 of the Energy Act, a fact attested
suppliers, which is within the next change of supplier
replaced for another supplier (hereinafter referred to as the "original supplier"), and simultaneously
requests from this original supplier deliveries to continue
serves authentic supplier of application for extension of supply to the market operator
later than 12.00 working day before the date of completion of delivery .
By the same deadline given by the original supplier of the respective
DSOs request to conclude a contract on securing
service distribution system with the requisites pursuant to Annex no. 3
hereto, or a request to negotiate changes to the contract
relations based on an existing contract to provide services in the distribution system
for withdrawal or transfer points, if such treaty between
electricity market participants already closed.

(4) An application for extension of deliveries pursuant to paragraph 3 shall notify
market operator respective distribution system operator
and stakeholders settlement. If the cleared entity and operator of the distribution system
request for extension of deliveries approve the latest
23.00 am on the calendar day preceding the day on which
should take effect change in the system vendor market operator, will supply and extension
the market operator shall immediately inform the
informs the contractor competent body of the clearing and
DSOs.

(5) The market operator to the effective date of the extension of deliveries under paragraph 4
canceled each individual assignment supply point to the suppliers, in which the customer demonstrably
resigned in accordance with paragraph 11a.
2 of the Energy Act, and inform it shall immediately inform the contractor concerned
cleared entities and distribution system operator.

§ 40

(1) to change suppliers because of changes in the customer's supply point, the
provisions of the Decree of switching mode
transferred responsibility for deviation shall apply mutatis mutandis, with the exception of § 36 para. 2 and §
37 paragraph. third new supplier market operator request for change of supplier
showing changes in a customer's offtake point. If you
customer's change in supply point, there is no change supplier, must be at
new customer satisfied all conditions for the start of supply of
connection agreements and contracts for the provision of the service
transmission or distribution system. Activities in the process of changes in customer
withdrawal site are executed by the parties concerned
electricity market so as to guarantee an uninterrupted supply of electricity supply points
customer.

(2) To be a change of supplier of last resort for another
supplier, change in the number of suppliers, and changing suppliers at the delivery point
factory, supplier change the locus to register losses of transmission or distribution
system, shall apply mutatis mutandis to this
decree regulating the procedure for changing supplier under delegated

Responsibility for deviation.

(3) To cause to launch electricity supply to unauthorized consumption
according to § 51 paragraph. 1 point. g) of the Energy Act or sourcing by
§ 51 paragraph. 4 of the Energy Act shall apply mutatis mutandis to this
decree regulating the procedure for changing supplier mode
delegated responsibility for imbalances that

A) a request for change of supplier gives the supplier market operator
later than 10.00 on the fifth working day prior to the requested date of commencement
electricity supply,

B) the steps necessary to make a change of supplier and contract for services
secure distribution system are carried into the third
business day after the submission of the application; the deadline specified in hours
retained and

C) The operator shall notify the result of the examination of an application for supplier change
later than 12.00 on the fourth working day after the submission of this application
.
PART EIGHT


Transmission of data for billing supplies of electricity and related services

§ 41

(1) The distribution system notified via
operator's information system market after the end of the calendar month to 18.00 hours
seventh working day of the following month registered
electricity market participants for their customers who have exercised the right || | to change supplier and whose offtake points are fitted
measurement type a or type B metering or measurement of M, with the exception of supply points in
inactive status and supply points with type B metering or measurement of M connected
the low voltage level, the data needed to
billing of electricity and related services.
Distribution system operator sends such data as well as customers who have used
right to switch suppliers and their supply point is equipped with measuring
type B or type of measurement M and is connected to the low voltage level, and it
18.00 tenth working day of the following month.
Distribution system operator sends the information via
System Operator market after the end of the calendar month to 18.00
fifteenth business day of the following month to registered participants
electricity market for their customers with an output connected in the sampling site
who exercised the right to change supplier and whose offtake points
are equipped with metering type a, type B metering or measurement of M,
data needed for billing of electricity and related services.

(2) The distribution system operator sends via
market within 10 working days after a reading of electricity consumption
supply points of customers with type C metering who have exercised the right to change
suppliers registered market participants electricity for their customers
data necessary for billing of electricity and related services
.

(3) Deadlines for data transmission in accordance with paragraphs 1 and 2 shall be extended by 60 calendar days
in cases of complaints measuring electricity supply or exchange
measuring equipment and ensuring its examination.
Period is further extended for a period of investigation in cases where a supply point to ongoing investigations
unauthorized electricity supply, unauthorized consumption of electricity
or unauthorized distribution.

(4) The data referred to in paragraphs 1 and 2 also uses the registered
electricity market participant to determine the quantity of electricity supplied to its customers
.

(5) If the local distribution operator assumes prices
regional distribution system operator, to which its
device is connected, charge rates in accordance with the provisions of this Decree.

§ 42

(1) electricity market participants may calendar year
distribution system operators to send up to 10
Self-readers except their self-performed on the last day of the calendar year.
Participant in the electricity market can DSOs customers own readings
send to any day of the year, but no later than 30 calendar days after
their implementation. The DSO sent
customers own readings adopt or communicate to the electricity market participants
reasons for their rejection, within 15 calendar days after they are sent.
Self-reading by the DSO receives, will incorporate
data needed for billing according to § 41 paragraph. 1 and 2


(2) If you send electricity market participant before receiving a bill
electricity supply including the last day of the calendar year
DSOs customers own readings made at the last
day of the calendar year, but no later than 30 calendar days after
their implementation, the DSO sent to customers own readings
adopt or communicate to the electricity market participants' reasons for their rejection, and it
within 15 calendar days after they are sent. Self-readers that
DSO receives, will be used in the billing
service distribution system, except in the case where a
distribution system within one month after the end of the calendar year
ordinary or extraordinary reading.

(3) If readings of electricity consumption according to § 22 paragraph. 4 sends
DSO data on electricity consumption
market operator, which transmit this information without delay to the supplier.

(4) Customer taking off electricity from the transmission system or distribution system
with voltage between phases greater than 1 kV and who
during a calendar month change supplier, contractor charged the original price for the booked
capacity in proportion to the number of days from the beginning
calendar month until the supplier change to the total number of days
calendar month. Customer taking off electricity from the transmission
system or distribution system with voltage between phases greater than 1 kV and
which is in the course of a calendar month commenced delivery
electricity supplier of last resort, the price charged by the original supplier
for reserved capacity in proportion to the number of days from the beginning of the calendar month
to the start of the supply of electricity supplier
last instance to the total number of days in a calendar month.

(5) In cases where a manufacturer with a production registered according to § 17 paragraph.
7 does not pass a statement pursuant to Annex no. 9 hereto, it is assumed that
consumption of electricity in the plant's transfer point collection of customer.
In cases where a manufacturer with a production factory did not notice pursuant to § 17 paragraph
. 7, the consumption of electricity at the delivery point is the production
customer sampling.
PART NINE


CONDITIONS OF ACCESS TO transmission system and the distribution systems

§ 43

Dates for conclusion of agreements to secure the services of a transmission or distribution system


(1) Contract for the services of the transmission system or the contract
securing the services of the distribution system is concluded upon written request
. Request submitted by the applicant TSO or DSOs
least 30 calendar days prior to the requested date of commencement
service transmission system or service
distribution system, except in cases where the decree provides otherwise, and that for every
transfer or supply point separately. Requirements for application for the provision of services
transmission system or distribution system
services are listed in Annexes Nos. 1 and 3 hereto, if it is a
cases pursuant to paragraph 2. a) to c).

(2) Contract for the services of the transmission system or distribution system
services are contracted

A) for one or more supply points of customer

B) one or more delivery points or manufacturer

C) for the sum of delivery points DSOs
agreed in the connection agreement, or

D) the sum of consumption or delivery points of the grid, for which
trader agreed to provide services in the transmission or distribution system
under an agreement pursuant to § 50 par. 2
Energy Act (hereinafter the "framework agreement ").

(3) For a customer with type C metering in the region of typical
is part of the reinsurance contract service distribution system and putting
class diagram type for individual locations.

(4) The Contractor passes DSOs
proposals to amend the framework agreement under the provisions of this Decree governing
switching process when transferring the responsibility for deviation,
in other cases no later than the last day of the calendar month | || preceding the calendar month in which the change of the framework agreement
take effect, and in the structure pursuant to Annex no. 17 hereto.
Distribution system operator must provide within 5 working

Day of each calendar month List consumption or delivery points
included in the framework agreement on the first day of the calendar month,
in the scope and structure pursuant to Annex no. 17 hereto.

(5) If the distribution system operator and supplier
contract pursuant to paragraph 4, the DSO
at the request of the supplier electronic invoice passes through
market operator.

(6) If there is a change of a connection agreement in the part concerning
value of reserved capacity, the DSO
immediately inform the contractor in electronic form
structure pursuant to Annex no. 17 to this Decree and shall negotiate the new value
reserved capacity in the contract to ensure service
distribution system.

Requested service transmission system or distribution system
a request for initiation of delivery of the newly established supply points

§ 44

(1) Not later than the deadline under § 43 par. 1, the market participant
electricity, which has a contract for connection to the appropriate
transmission or distribution system request for electricity transmission or
distribution of electricity, and it

A) the supplier if the electricity supply realized on the basis
contract by 50 par. 2 of the Energy Act, or

B) other participant in the electricity market, where supply of electricity
held under a contract; while the market participant
inform the operator of the electricity transmission or distribution system
which vendor will supply the newly established outlet.

(2) No later than five working days before the electricity supply is closed
contractor with a participant of the electricity market electricity supply contract.

(3) In the event that new supply point will deliver supplier
which is not part of a vertically integrated company whose
part of the distribution system operator, which is new to the sampling site
gives, supplier no later than 10.00
fifth business day prior to the commencement of transmission or distribution of electricity in
market operator request to initiate supply to the consumption point
(hereinafter "the request for initiation of delivery"), which contains the following information:

A) the registration number of the supplier,

B) the type of contract for the supply of electricity should be,

C) the date from which the supply is effected,

D) the duration of the contract,

E) registration number cleared entity responsible for imbalance for
supply points for which the delivery was made, and

F) the identification code number of the consumption or transfer point.

(4) If a request for initiation of new supply deliveries and transfer
points made by the market operator no later than at 10.00
fifth business day prior to the commencement of transmission or distribution of electricity, applies, that
request for initiation of deliveries to new supply and transfer point
was lodged on the following working day.

(5) Market Operator allows an application to initiate delivery to the
supply point, even in cases where the information system market operator
supply point is not registered.
Identifier such a supply point is an identification code.

(6) No later than 12.00 noon on the day on which the application was submitted
start of supply, the market operator shall forward the request to initiate the delivery
suppliers, cleared entity that takes over for the sampling and transfer responsibility instead
for deviation, and the operator concerned
transmission or distribution system. The market operator simultaneously transmit data to the extent required by paragraph 3.


(7) The transmission or the respective distribution system closes with
market participant agreement on the transmission system or service
agreement on securing the services of the distribution system no later than 5 working
days before the date of commencement of supply.

§ 45

(1) Not later than 3 working days before the date of commencement of supply operator
transmission or distribution system accepts or rejects the application for commencement of delivery
informed of this fact via
market operator settlement entity and suppliers who initiate
deliveries demanded. Reject the application for commencement of delivery operator may
transmission or distribution system only if the transmitted data

According to § 44 are not complete or does not contract on connection or
service agreement distribution system. Wordless
transmission or distribution system is considered
disagreement with the request for the commencement of delivery.

(2) If the transmission or distribution system to which the supply point
electricity market participant is connected, received a request to initiate
supplies, and if the time limit under § 44 par. 7 is || | Information system market operator registered consent of the subject
showdown with the assignment of responsibility for imbalance, register operator
market launch of deliveries in the period referred to in paragraph 1, and assigning
supply point electricity market participant to suppliers with the date || | commencement of deliveries. Registration commencement of deliveries with the start date of delivery
market operator immediately report the relevant suppliers and also
cleared entity that took over the responsibility for supply point
deviation.

(3) Before agreeing to a request to commence deliveries under paragraph 1
transmission or distribution system registers concerned
supply point in the information system market operator, if it is not registered
.

(4) Registration of start of supply takes effect on the first trading
hour of the commencement of deliveries.

(5) Market Operator allows sending a request to commence deliveries
after the deadline specified in § 44 para. 4 and accepting or rejecting a request to initiate
supplies after the deadline specified in paragraph 1, but no later than || | 10.00 hours the day before the date of commencement of supply if the start of supply
agree all interested market participants.

§ 46

To transfer responsibility for imbalance at the newly established transfer
place of the electricity generating plant

(1) An electricity under contract for the supply of electricity
ask the market operator no later than 10.00
third business day before the effective date of the contract for the supply of electricity
assignment of responsibility for imbalance for handover place appropriate
electricity generating plant associated with the commencement of the supply of electricity from this plant
electricity.

(2) In the event that a contract with a mandatory vykupujícím,
indicate that electricity trader as part of the application information whether
it is the purchase of electricity through feed-in tariffs or purchase of electricity || | according to § 11 par. 7 of the Act on supported energy sources.

(3) Application for assignment of responsibility for imbalance for the supply of electricity from electricity generating plants
contains the following information:

A) the identification number of the transfer point electricity generating

B) the registration number of an electricity trader, who has a contract for the supply of electricity
,

C) the date from which the electricity supply takes place,

D) the duration of the contractual relationship established by the contract for the supply of electricity and


E) registration number cleared entity responsible for imbalance at transfer points
plants.

(4) Market Operator will enable application referred to in paragraph 1 for the transfer
instead of generating plants, even in cases where the information system
market operator the delivery point is not registered.

(5) No later than 12.00 noon on the day on which the application was made complete
under paragraph 1 shall forward the application, including market operator data to the extent
under paragraph 3 of the subject of settlement, which takes place for the transfer
electricity generating plant responsible for the deviation, and transmission
or distribution system to which the transfer point production
electricity connected.

(6) The transmission system operator or distribution system
registered with the market operator delivery point electricity generating
in which the application was submitted pursuant to paragraph 1 and which is not registered in the information system
market operator, to
12.00 hours the last business day before the effective date of the contract for the supply of electricity.
TSO or DSO
registration of a transfer point production does not, unless
concluded a contract for the connection of the plant and to meet the conditions specified therein.

(7) If the cleared entity approved a request for assignment of responsibility for imbalance
at the transfer point, the relevant production of electricity
within one business day of receipt, the register operator market launch

Deliveries in the period referred to in paragraph 6, and an assignment to a delivery point
production of electricity retailers and clearing from the date referred to in paragraph 3
point. C). Registration commencement of electricity supply to the date of commencement of deliveries
communicate without delay the relevant market operator
trader and also the subject of settlement, which took over the place
transfer responsibility for imbalance.

(8) when changing supplier or change of subject of settlement with
already existing delivery points of power plants is progressing reasonably
under the provisions of this Decree governing the process of changing supplier.
When you change supplier at the transfer point production for consumption of electricity from the power system
proceed appropriately according to the provisions of this Decree governing
supplier switching process and provide
transmission or distribution of electricity in the newly formed outlet.

(9) Market Operator will transform the subject of settlement for existing transfer points
generating electricity even after the deadline specified in paragraph 1
no later than 10.00 hours on the last working day before the date of commencement
electricity supply, if the change of subject of settlement agreed by all concerned
market participants.

§ 47

Procedures and conditions for transferring and taking responsibility for deviation
transformations of business corporations

(1) In the event that in connection with the transformation of business corporations
there is a change in an accounting entity or changing suppliers for supply and delivery points
electricity market participants (hereinafter referred to as "mass transfer
offtake and delivery points "), submitted a settlement entity or
contractor to whom be offtake and delivery points market participants
electricity transferred application for bulk transfer of supply and delivery
jobs market operator through the information system. The request contains


A) the date of the desired mass transfer supply or transfer points
electricity market participants,

B) identification of the accounting entity or vendor from which are to be
offtake and delivery points transferred

C) identification of the accounting entity or contractor to whom be
offtake and delivery points transferred

D) determining whether the subject of mass transfer supply and delivery
change jobs accounting entity or change supplier or both

E) the list of supply and delivery points of electricity market participants
in the event that there is a division of business corporations

F) written evidence of the transformation of business corporations and

G) a statement of the contract to ensure service
transmission system or distribution system between the transmission system or distribution system
, to which the offtake and delivery points are connected and
accepting entity or statement of fact that this agreement will
between the respective transmission system operator or distribution system and accepting
body closed on the day of the transfer
supply and delivery points.

(2) An application under paragraph 1 shall be cleared entity or contractor to whom
be offtake and delivery points of electricity market participants
transferred no later than 10 working days before the date referred to in paragraph 1
point. and).

(3) On receipt of an application for bulk transfer of supply and delivery points
market operator shall inform, through its information system
all interested suppliers, operators and clearing operator
DSOs or TSO.

(4) In the event that a settlement entity or contractor of which have to be
offtake and delivery points of electricity market participants transferred
expressed in the information system market operator agreement with the desired mass transfer
offtake and delivery points
based on data provided in the request under paragraph 1, the market operator performs in the day
pursuant to paragraph 1. a) in the information system market operator
change supplier or subject of settlement on the basis of a request under paragraph 1
point. d) all of the individual supply and delivery points
participants in the electricity market registered in the information system market operator
which the bulk transfer touches. Market Operator performs this change
with effect from the date referred to in paragraph 1. and).


(5) to make a change in an accounting entity or change of contractor
market operator shall inform, through its information system
all actors concerned with clearing and suppliers in case
changes made to suppliers as well as the relevant distribution system operator | || or TSO. This information will provide
market operator for each supply and delivery point market participant
electricity, which saw a change in accounting entity or change
supplier.

(6) The mass transfer supply and delivery points, the provisions of
change supplier under § 33-38 apply.
PART TEN


STRUCTURE CEN, TRANSMISSION, clearing and settling of regulated prices AMONG MARKET PARTICIPANTS


§ 48
Track
prices

(1) cost of service transmission system consists

A) securing the price of electricity transmission, which consists of a multicomponent
price for

First booked capacity, in CZK / month or CZK / MW / month

Second use of the transmission system in CZK / MWh,

Third exceeding booked input power in CZK / MW / month

Fourth exceeding booked capacity, in CZK / MW / month

Fifth exceeding booked power output in CZK / MW / month or CZK / kW / month

B) the price for system services in CZK / MWh,

C) the price of market operator, which includes

First Award for activities related to the settlement of deviations in CZK / sampling
/ month,

Second Award for activities related to the payment and administration support from
supported sources in CZK / sampling / month and

Third Fee for activities of the Energy Regulatory Office in CZK / sampling
/ month and

D) component prices to promote electricity generation from supported energy sources
under the Act on supported energy sources in CZK / MW / month or
CZK / MWh.

(2) The cost of the service distribution system consists

A) securing the price of electricity distribution, which is a multipart forms, and it


First price for booked capacity, in CZK / MW / month or CZK / month for
subscriber to the very high voltage and high voltage
price for capacity based on the rated current of the main circuit breaker before
meter in CZK / month or in CZK / A / month or the price of power in CZK / 10
W / month or fixed price CZK / sampling / month for customers at
voltage level low voltage

Second price for the use of the distribution system in CZK / MWh for
voltage level high and medium voltage or price for the amount of electricity distributed
in CZK / MWh at low voltage levels,

Third price for exceeding booked capacity for the collection of
distribution systems with voltages between phases above 1 kV, in CZK / MW / month

Fourth award for failure to factor in the CZK / month for customers on the voltage level
high and medium voltage

Fifth price for unsolicited supply of reactive power into the grid in
CZK / MVArh for customers at a voltage level of high and medium voltage
,

6th price for exceeding booked input power in CZK / MW / month

7th price for exceeding booked power output in CZK / MW / month or
CZK / kW / month

B) the price for system services in CZK / MWh,

C) the price of market operator, which includes

First Award for activities related to the settlement of deviations in CZK / sampling
/ month,

Second Award for activities related to the payment and administration support from
supported sources in CZK / sampling / month and

Third Fee for activities of the Energy Regulatory Office in CZK / sampling
/ month and

D) component prices to promote electricity generation from supported energy sources
under the Act on supported energy sources in CZK / MW / month CZK / A /
/ month or CZK / MWh.

(3) other regulated prices are

A) price for the market operator's clearing consisting

First Price per entity registration and settlement of CZK

Second price for clearing activity in CZK / month

B) the price for providing actual values ​​to electricity market participants in
CZK / month

C) the price for the actions of the CMO in CZK / MWh for the electricity quantity
traded on an organized block market, daily market and intraday
market

D) the price for the business of providing data from the records of business transactions
CZK / month

E) the price for issuing a guarantee of origin in CZK / MWh,

F) price for the transfer of guarantees of origin in the Czech Republic in CZK / MWh,


G) price for the transfer of guarantees of origin issued in another Member State coupled with
recognition of guarantees of origin in CZK / MWh,

H) the price for keeping account records GOs in CZK / month

I) the price for clearing the differences between the values ​​of the actual consumption obtained
readings, and values ​​determined using typical profiles
in CZK / MWh,

J) the price of electricity under the special clearing regime in states of emergency in
CZK / MWh

K) clearing price deviations or protiodchylky pursuant to Annex no. 8 of this Decree
in CZK / MWh,

L) the price for positive balancing energy in CZK / MWh,

M) price for negative regulating energy in CZK / MWh,

N) the price for redeeming activity mandatory in CZK / MWh and

O) the price of supply of last resort in CZK /
sampling or transfer / month or CZK / MWh.

(4) The price for reserved capacity for customers on the voltage level and high voltage
price for the use of the distribution system afloat
high voltage can be replaced by a mono cost per service networks
DSOs in CZK / MWh.

§ 49

Transmission of data between market participants

(1) An electricity market operator transmits the data for the previous calendar month
according to Annex no. 9 hereto, and no later than the tenth calendar day
following calendar month.
This is true even in the case where the electricity generating plant is connected to the supply point
customer with the exception of plants connected according to § 28 para. 4
Energy Act.

(2) Based on data reported by the manufacturer shall make available to the market operator
relevant operator of the transmission or distribution system to which the plant is connected
, calculating the payments for system services, activities
market operator and the support of electricity from supported sources
determined in the manner specified in Annex no. 10 hereto the eleventh
calendar days after the end of the calendar month. Electricity consumption, which is not
implemented to cover its own technological consumption
electricity producer, pumping pumped and
cover losses in the transmission or distribution system for the purposes of billing rates
Market Operator considered for collecting customer.

(3) The operator of a local distribution system giving the operator
market for the previous calendar month, according to Annex no. 11 hereto data
bill on it a number of system services, services for the activities
market operator and support electricity generation from supported sources
last calendar month not later than the fifteenth calendar day
after the end of the calendar month.

(4) Based on data reported by local distribution
system operator shall make available the relevant market operator
transmission or distribution system to which the local distribution system
connected, calculating the payments for system services, Operator,
market and to encourage electricity generation from supported sources
determined manner specified in Annex no. 12 hereto sixteenth
calendar days after the end of the calendar month and the DSO
values ​​made available by the market operator is used to bill
payments for system services, market operator, and the support of electricity from
supported sources.

§ 50

Accounting and settlement of regulated prices among market participants

(1) electricity market participants paid payments for related services
electricity transmission system operator or operators
respective distribution system to which the subscriber market
electricity connected directly or through its suppliers.
Distribution system operator, which is not connected to the transmission system
or other distribution system in the Czech Republic pays the price
Market Operator and component prices to promote electricity from
supported energy sources paid by other participants
electricity market operator of the regional grid system in which
distribution territory with this system is.

(2) Payment of fees for system services operator pays
local distribution system operators superior distribution system for
amount of electricity consumed for final consumption of electricity from this
local distribution system and system services billed

Distribution system operator, which is connected to the local distribution system
.

(3) Price per market operator is not applied to the transfer point for
backup power supply point. If carried out
consumption of electricity transmission or distribution system operator of that system for their own use
excluding losses in the transmission and distribution system is taking place
seen as the customer's supply point.

(4) Other regulated prices charged by the market operator market participants
electricity, with the exception of prices according to § 48 par. 3 point. l) am), which accounted
provider of balancing energy market operator prices according to § 48 paragraph
. 3 point. n), which accounted compulsorily redeeming operator
market prices pursuant to § 48 par. 3 point. o), charged by the supplier of last instance
customers or manufacturers and prices according to § 48 par. 3 point. p)
charged by the operator of the transmission or distribution system
customers, manufacturers or operators of the connected distribution system.

Transmission of data, clearing and settling of regulated prices between the operator
market and system operators

§ 51

(1) The operator of the regional grid system operator transmits
market no later than the twelfth day of the calendar month data
billing system services, market operator and support
electricity generation from supported sources for the previous month and the amount of the estimate for
has not accounted for the payment system services, market operator
and promote electricity generation from supported sources for the period from January 1
calendar year for which they are system services, operator activities
market and the promotion of electricity from supported sources accounted for by
No attachments. 13-15 hereto.

(2) The TSO market operator passes
later than the twelfth day of the calendar month, details of billing services for
market operator and support electricity generation from supported sources for
previous month for which the operator's activities
market and promoting electricity generation from supported sources accounted for in accordance with Annex no. 16 to this Decree
.

(3) Estimate has not accounted for the payment system services for
customers connected to low voltage is fixed at one hundred percent
monthly changes difference cumulative volume of the residual profile and
cumulative amount billed system services relating to
same range of customers for the period from January 1 of the calendar year for which they are
system services accounted for. Estimates for payment has not accounted
Market Operator for customers connected to low voltage
shall amount to one hundred percent of the monthly changes
difference in the cumulative number of still unsettled supply points
connected on 31 December of the previous year and the cumulative number
actually charged offtake points in the period from January 1
calendar year for which the payments market operator's activities accounted for.
Estimate for payment has not accounted to encourage electricity generation from supported
resources for customers on low voltage level is fixed at one hundred percent of the monthly changes
difference cumulative volume of residual
chart and the cumulative amount billed to support electricity from | || supported sources concerning the same range of customers for the period from January 1
calendar year for which the support of electricity from sources accounted
supported.

(4) On the basis of the data transmitted under paragraphs 1 and 2 account operators
market operator of the transmission system operator and regional
distribution system before the fifteenth day of the month award for Business
market operator and the support of electricity from supported sources.
Based on the data transmitted under paragraph 1
billed by the transmission system operator of the regional grid system
fifteenth day of the month price for system services taking into account the already
fees paid under subsection 9.

(5) No later than twenty-eighth day of the calendar month passes
market operator, the operator of the regional grid system
revised data in the statement according to Annexes no. 13-15 of this
decree for the previous month and the transmission
system updated data in the report pursuant to Annex no. 16 hereto for
previous month. Any deviations related to earlier

Period before the regional distribution system and
TSO immediately upon detection.

§ 52

(1) Based on the data according to § 51 paragraph. The market operator will charge 5
TSO and the regional distribution system
difference in payments for the market operator and support
electricity generated from supported sources on the basis of information supplied
according to § 51 paragraph. 1, 2 and 5.

(2) On the basis of the data transmitted according to § 51 paragraph. 5
billed by the transmission system operator of the regional grid system
difference in payments for system services generated on the basis of information supplied by
§ 51 paragraph. 1 and 5

(3) The transmission system operator and the operator of the regional grid system
market operator pays an amount according to § 51 paragraph. 4 and
any supplements according to § 51 paragraph. 5-5 working days from receipt of the document
vyúčtovacího . The market operator returns to the transmission system or
regional distribution system
any overpayment according to § 51 paragraph. 5 at the same time.

(4) Data according to § 51 paragraph. 1 and 5 for calculating the payments for system services
from each regional DSOs
make available to the market operator by the statement referred to in Annex no. 15 to this Decree
transmission system operators for billing rates for
system services. In the course of the calendar month
operator of the regional grid system shall be borne by the transmission system operator
same time four evenly spaced advance payments set out
eighty-five percent of the distribution system operator
estimated amount of your monthly subscription to customers connected to the regional || | distribution system multiplied by the price of system services
valid for the current year.
Reservation capacity


§ 53

(1) The manufacturer, whose assessment of production of electricity is connected to
transmission or distribution system, and that at least eighty percent
annual quantity of electricity produced in a factory it operates
electricity, reduced by its own technological consumption of electricity,
supplies to the transmission or distribution system, or producer
provides support services under a contract with the operator
transmission system, shall be deemed, for the purposes of this Decree for the manufacturer
first category. Other manufacturers are the second category.

(2) Reserved capacity is negotiated separately for each supply point
customer or delivery point production or distribution system
separately for voltage between phases

A) greater than 52 kV,

B) from 1 kV to 52 kV and

C) up to 1 kV.

(3) Reserved capacity agreed in the contract to ensure service
distribution system can not be higher than the amount reserved
power stipulated in the connection agreement.
Value of booked capacity is agreed for a period of one or more calendar months.
Reserved capacity distribution system operator negotiates
market participant by the last working day of the calendar
month preceding the month from which a new value
reserved capacity use.

(4) The manufacturer shall each year before 31 January
operator of the transmission system or the distribution system to which it is attached
electricity generating plant, including electricity production as a producer
first category or the second category based on data from measurements
identified in the preceding calendar year. If the manufacturer does not inform
including electricity generating plants in the category of producers in this period, the
factory is placed in the second category.

(5) In the case of electricity generating plants commissioned during the calendar year
transmission system operator or distribution system operator
decides to include the producer to the first or second
categories based on the ratio between the installed capacity and production
reserved input at the supply or delivery point.
Manufacturer for the first category in this case is considered to be the manufacturer with
ratio between the installed capacity and production in the reserved input
respective supply or delivery point equal to or greater than 5. When
end of the calendar year TSO
or DSO will reconsider the inclusion in the first manufacturer

Or second category for next year based on data from measurements
identified in the preceding calendar year. Provisions for electricity production
commissioned during the calendar year, while operating
authentication technologies apply mutatis mutandis.

(6) Categorize manufacturers
used by the transmission system operator or distribution system for determining payments for
electricity transmission or distribution of electricity and related services
from the beginning of the second quarter of the year to the end of the first
quarter of next year.

§ 54

(1) The manufacturer of the first category reserved capacity is not concluded and will not
payment for reserved capacity for generating electricity delivery points
or for delivery points designed for electricity consumption for technological
own electricity consumption, with the exception of electricity consumption
transmission system or distribution system shutdown in production of more than 30 days
(hereinafter referred to as "long term shutdown"). In long-term shutdown is
does not include subscription for putting factories into sleep mode, however
maximum of 72 hours after the generator phased out of the system, and
sampling for the purposes of re-approaching production of electricity from sleep mode when
termination of long-term shutdown, with a maximum sampling duration
72 hours before přifázováním generator to the system.

(2) For prolonged shutdown under paragraph 1, the manufacturer of the first category
notify the transmission system operator or distribution system to
which the plant is connected, launch date prolonged shutdown
within 5 working days after the generator phased out the system
or within 3 working days from the moment of downtime
become a long-term shutdown, and stopping long term outages within 5 working days after
přifázování generator to the system.

(3) During the long shutdown of a transmission system operator or
distribution system evaluates and recognizes manufacturers for an agreed payment
reserved capacity, or if no reserved capacity negotiated
payment for reserved capacity by the maximum measured values
quarter-hour electrical power taken
in each calendar month, the producer of the first category.
The transmission system or the distribution system does not charge payment for reservation
capacity for the first 30 days term outage.

(4) The second category

A) arranges and pays for payment for reserved capacity separately for each
electricity generating plant,

B) not concluded reserved capacity and will not charge for booked
capacity for delivery points designed for electricity consumption for technological
own consumption of electricity and

C) not concluded reserved capacity and is paid for a maximum payment
measured value quarter-hour of electrical power when
draws electricity from the transmission or distribution system in a continuous
maximum period of four weeks per calendar year and this fact
notify the transmission system operator or distribution system
least 2 weeks before the consumption of electricity.

(5) of the customer, who is one of the voltage levels
very high or high voltage one DSOs
multiple access points with continuous metering type A, B or M, which is taking
connected to its own power grid and which are powered
electric traction vehicles, for the purpose of evaluating and determining
payment for reserved capacity of the distribution
system provides real value for each performance level voltages
separately from the sum of maximum outputs measured in the sampling locations
time when this sum is the highest in any month.

(6) Energising means of transport electric traction means taking
electricity supply point whose monthly share of electricity consumption in vehicles
electric traction in the rail operation and
rail transport for transporting people and goods on track railway, tram and trolleybus
, including the consumption of auxiliary units of electric traction,
which are part of the technological power points and electric traction
directly relate to the operation of electric traction, is at least
eighty-five percent of the total electricity consumption.
PART ELEVEN


DISCLOSURE market operator

§ 55


(1) The market operator prepares and publishes monthly and annual market report
electricity in the Czech Republic. The report contains mainly

A) statistics on hourly electricity prices and payments for traded
amount of electricity in the daily market and intraday market and price statistics
electricity and payments for the amount of electricity traded on the block market
for days from Monday to Sunday | ||
B) development of the average daily price of electricity on the daily market

C) the volume of electricity traded on the block market, daily market and intraday
market

D) information on complaints raised by registered market participants with respect
electricity market operator

E) the number of changes of supplier at supply points of customers and consumers in the delivery points
electricity produced

F) the timing of the size of the system imbalance,

G) the timing cover costs incurred by the system deviation

H) statistics on hourly green bonus for each category
renewable sources.

(2) The market operator also publishes and updates with every change
manner allowing remote access a list of all registered
electricity market participants. This list contains

A) the company registered participant of the electricity market;
if a natural person does not have a business name, then the name, surname and
addition, in the case of a legal person not registered in the commercial register its
name

B) identification number registered participant of the electricity market
where allocated

C) assigned registration number

D) indication whether the settlement entity, and

E) the duration of the contract on settlement of imbalances concluded with
cleared entity.

(3) The published data show that the registered market participant
electricity for the time being subject to clearing.

(4) The market operator under the contract will provide registered participants
electricity market data specified in Annexes no. 18 and 19 of this Decree
through the information system market operator.

(5) Market Operator shall provide TSO

A) on the day preceding the delivery for the purpose of preparing traffic data
obligation to supply electricity to the grid and commitment to take electricity from the system
individual entities and clearing

B) the day following the date of delivery for the purpose of evaluating data on individual
deviation clearing entities if this deviation exceeds
in the subject of settlement of 50 MWh in a trading range.

(6) The market operator will provide mandatory vykupujícímu
calculated differences between purchase prices and green bonuses for individual categories
renewable sources.

(7) The market operator without undue delay
public in a manner allowing remote access, information on the implementation of the clearing and settlement of financial
deviations in a special mode of settlement. Information
define business hours for that to be a special way of clearing
executed.
PART TWELVE


INTERRUPTIONS, LIMITATIONS AND RECOVERY OF DELIVERY to unauthorized consumption, unauthorized distribution
A
unauthorized transfer
§ 56

Procedure interruption, restriction and restore electricity supply at
unauthorized consumption, unauthorized distribution and unauthorized transfer

(1) In case of unauthorized consumption of electricity passes supplier
transmission or distribution system to which they are attached
supply points, which are required electricity supply interruptions
application for the interruption of electricity supply, and
no later than 5 working days prior to interruption of electricity supply.

(2) The transmission system operator or distribution system informs
after receiving a request under paragraph 1, or in the case of unauthorized
transmission or distribution of electricity through the market operator
registered electricity market participants who have a market operator
registered or transferred responsible for imbalances in
supply points, which, for them, the interruption of electricity supply, and
no later than four working days before the date of interruption of electricity supply.

(3) The operator of a transmission or distribution system
discontinue the supply of electricity within the deadline specified in the request for electricity supply interruptions
. Unless in the case of customers' supply points for reasons worthy

Special consideration be done interruptions in
required deadline, informs the transmission or distribution system
inform the vendor, who asked about supply disruptions
electricity, and discontinue the supply of electricity within 3 | || working days from the date specified in the request.
Operator of a transmission or distribution system does not interrupt the electricity supply in
deadline specified in the request for interruption of electricity supply in the event that
is an information system market operator registered
change supplier at the beginning of efficacy within 5 working days including after the desired time
interruptions.

(4) In case of interruptions to a request under paragraph 1
or due to illegal consumption of electricity
unauthorized transmission or unauthorized distribution of electricity
informs the operator of a transmission or distribution system to which the
supply point is connected, this fact no later than the working day following
interruptions through the information system
market operator registered electricity market participants who have at
market operator is registered or transferred ownership of the | || deviation at this point of extraction. In the event that the electricity supply interruption
also leads to removal of the measuring device sends
the transmission or distribution system to which it is given
supply point is connected, the market operator also metering of the day interruption
the supply of electricity for the consumption point. Reading in the case
supply points with metering type A, B or M sent in terms
listed in § 19-22, and in the case of supply points with type C metering
within the deadlines specified in § 41 paragraph. 2 .

(5) Oobnovení electricity supply in order to eliminate the causes of unauthorized consumption
asks the electricity market participant
transmission system operator or distribution system to which the respective supply
point is connected, or supplier, at whose request
electricity supply was interrupted.

(6) Oobnovení electricity supply because of the elimination of the causes
unauthorized consumption of electricity, unauthorized transmission or unauthorized distribution
informs the operator of a transmission or distribution system
to which the supply point is connected, through information || | system operator market registered electricity market participants who have
market operator is registered or transferred own
responsible for imbalances in supply points that have been restored
electricity supply, by the next working day after the resumption | || electricity supply. In the same way, the transmission system operator or distribution system
followed in the case of electricity supply is restored
after interruption of electricity supply in accordance with § 17 para. 5 point. b).

(7) If the contract is for the supply of electricity or contract for the provision of the service
transmission system or distribution system closed for more
supply or transfer points can be done interruptions
electricity at any sampling or transfer place only
not specify where the supply or delivery points
occurs or there was unauthorized taking, unauthorized transmission or unauthorized distribution
.

§ 57

Procedure market operator in solving labors of delivery

(1) The customer's supply point, where at electricity consumption and
which is the day following the date of termination of the electricity supply from the current supplier
assigned a new contractor and the subject of settlement,
distribution system operator registers status active in the information system
market operator no later than the day following the date
which stops the supply of electricity to the supply point
customer's current supplier, the date from which there is no || | supply point customer is assigned contractor.

(2) If the customer's supply point for the market operator
assigned a new contractor and operator of settlement on the basis of a request for change of supplier
or application under § 40 par. 3 in the case of collection by 51.4§ 51 paragraph. 4
energy Act, filed with the market operator, the operator
clearing and new supplier market operator assigned to a supply point

Customer the effective date of the change of supplier and the period immediately preceding the date
assign a new supplier and cleared entity when
customer's supply point for the market operator registered without
assigned cleared entity, and if, that in this period is
supply point, the customer is registered with the market operator without the associated
subject of settlement for less than 10 working days and offtake
point is assigned a status pursuant to § 17 para. 5 point. b). The market operator for this assignment
informed of the new contractor, subject
settlement, TSO and DSO
system.

(3) Upon receipt of the information referred to in paragraph 2
transmission or distribution system giving the operator market value
consumption of electricity in the period in which the customer's supply point for the market operator
cleared entity assigned pursuant to paragraph 2 in the manner and within the time specified in §
19-22, or the date specified in § 41 paragraph. 2, if
this term assignment at the time of settlement subject to a supply point
customer has not elapsed, or without delay, otherwise
no later than 5 working days from receipt of the information by
paragraph 2. the transmission or distribution system transmits
market operator to a supply point customer data required for billing
electricity supply in time according to § 41 separately for the period
when the customer's supply point is registered with the market operator is
cleared entity assigned in accordance with paragraph 2, the market operator
subsequently transmits this data concerned suppliers and cleared entity.

(4) In the event that the new supplier has an agreement
associated electricity supply services, accounted for the transmission or distribution system
new supplier prices for the service
transmission or distribution system for the period when he was to a supply point customer
market operator is assigned a new contractor pursuant to paragraph 2. for
sampling sites on the surface of high and very high voltage charge distribution system operator
payment for the booking of capacity to the product
quarter-hour maximum performance collected the period and prices
monthly reserved capacity. At the supply point to low voltage charge
DSO payment for reservation
capacity under current of the main circuit breaker upstream from the electricity meter at
given period and the current tariffs of distributing electricity.

(5) The operator of a transmission or distribution system operator is obliged to send
market operator data necessary for billing
supply of electricity for the period when the market operator is not a supply point
customer is assigned a settlement entity.
PART THIRTEEN


To make the supplier of last resort

§ 58

(1) If the Contractor Office's decision to revoke the license trade
electricity or electricity, the Office shall inform the market operator
immediately. If the supplier also subject
settlement is concerned registered participant of the electricity market
date on which the decision to cancel the license, or if
this decision has already entered into force from the day following the day
when the market operator of such facts, the disabled
information system market operator registration data on bilateral
stores for supplies of electricity and barred from participation in the market operator
organized electricity markets. Similarly, the market operator shall proceed in
case when the contractor as an accounting entity complies with the financial conditions
imbalance settlement.

(2) withdraws Where the transmission or distribution system from
agreement on securing the services of transmission or distribution system, based on
which the contractor providing the service
transmission or distribution system operator informs the market about resignation this contract
least 2 working days prior to the anticipated effects of withdrawal.
Part of this information is vendor identification code, date of termination of the contract and
listing identification number codes of connection points, which this fact concerns
. If the cause extinguishment of debt based contract
securing the services of transmission or distribution system due to other legal
fact, the procedure under the first sentence appropriately.


(3) In cases where the market operator learns that a supplier that supplies electricity
customer disposes of or has lost its authorization to supply electricity
does not provide the service or transmission or distribution system in the case of electricity
under contract for composite services
electricity supply or as an accounting entity complies with the financial conditions
imbalance settlement, inform the market operator of urgency about this fact
operator for transmission or distribution system
competent contractor and supplier of last resort while
this information in a manner allowing remote access.
Market Operator also provide the supplier of last resort and
respective distribution system operator lists of customers who have
be launched under the Energy Act, the electricity supply
supplier of last resort, with their identification data enumeration
their consumption or delivery points, and the identification
barcode. The operator of the respective distribution system provides
supplier of last resort details of the offtake point in the structure of
Annex no. 17 hereto.

§ 59

(1) Based on the information pursuant to § 58 para. 3 suppliers and manufacturers, who
transferred responsibility for deviation to the subject of settlement, which
been registered data on bilateral trades for the supply of electricity or his
were barred from participation in electricity markets
organized by the market operator to 24.00 hours of the day, in which the
published information according to § 58 par. 3, filed through
information system market operator request to transfer the responsibility for || | deviation to the different accounting entity.

(2) Based on the information pursuant to § 58 para. 3, registered
electricity market participants who have their own
or delegated responsibility for imbalances, filed in conjunction with a customer, who has to be
energy Act commenced supply of electricity
supplier of last resort, and manufacturers to 24.00 hours of the day, which was
published information according to § 58 par. 3, through the information system
market operator request for accelerated change supplier. For
accelerated change supplier shall apply mutatis mutandis
provisions of this Decree governing the procedure for changing the vendor mode
transferred responsibility for deviation.

(3) If a request for transfer of responsibility for deviation pursuant to paragraph 1
or request for accelerated change supplier under paragraph 2
DSO request for accelerated change
contractor agrees to 10.00 day following the date on which the
published information according to § 58 par. 3, then such amendment becomes
efficiency from the first trading hours of the day following the day on which
information was published according to § 58 paragraph.
3. Where the distribution system operator requests for accelerated change
contractor pursuant to paragraph 2 does not respond within the afore
market operator rejects an application for accelerated change supplier.

(4) If the customer to transfer responsibility for deviation to another
cleared entity referred to in paragraph 1 or the accelerated change of supplier
pursuant to paragraph 3, the first trading hours of the day following the date || | in which the information was published according to § 58 par. 3, in place of the customer's supply
commenced supply of electricity supplier of last resort and
information system operator to the market concerned offtake
place assigned supplier of last resort for 6 months .
If there is subsequently a change of contractor covering periods when the
Information System Market Operator assigned to a supply point
supplier of last resort proceed in accordance with § 40 para. 2 and operator market
effective date changes in vendor cancels the assignment of supply point for
supplier of last resort. If after 6 months from the date of commencement
supplier of last resort is not at supply points
assigned to the contractor based on a request for change of supplier according to § 33
proceed in accordance with § 56. Unless the manufacturer to transfer
responsibility for different accounting entity referred to in paragraph 1 or to speed change
contractor pursuant to paragraph 2 is the first trading hours on that
following the day on which the information was published according to § 58 paragraph. || | 3, supply considered ineligible according to § 52 of the energy Act.


(5) The supplier of last resort forwarded to the concerned customers
within 2 working days after the start of supply of electricity supplier of last instance
message that contains

A) a notice of commencement of supply of electricity supplier of last resort
and the reason

B) a notice of the amount of regulated prices for electricity supply
supplier of last resort or the manner of determining

C) notice of the conditions of electricity supply
supplier of last resort, including in particular the conditions relating to the change of supplier of last resort
for another supplier and conditions of advance payments and payments for electricity supplies
supplier of last resort, and

D) notice of the fact that the supply of electricity supplier last
instances it can take longer than six months.

§ 60

The procedure for making the change over to a supplier of last resort

(1) In the case of the original contract pursuant to § 50 par. 2 of the Energy Act
closes the supplier of last resort with the distribution system
new contract for the provision of the service distribution system.

(2) The effective date of the change over to a supplier of last resort
performs DSO reading supply points with
measurement type A, B or M, in the case of supply points with type C metering provides state
measuring device as described in paragraph 3 and found
data if no previous contractor
part of vertically integrated businesses, which includes the distribution system operator, to whose system
supply points are connected, send the market operator;
Market operator such data without undue delay sends the previous
suppliers to re-calculate and compensate and also enable suppliers of last resort
data on the actual amount of electricity taken from the affected
supply points in the previous calendar year prior || | supply of last resort; After effectivities supplier for
supplier of last resort operator transmits market data on the actual quantities
electricity supplier of last resort.

(3) Determination of the status of the measuring equipment for supply points with type C metering
performed the DSO reading on the effective date
changes over to a supplier of last resort or estimated state
measuring device to the effective date of the change of supplier
as a supplier of last resort recalculated based on the assigned type diagram
and the last current projected annual electricity consumption or on the basis of mutually agreed
readings made by the supplier of last
instance, or the electricity market participant on the effective date change || | over to a supplier of last resort and supplied
distribution system operator within 5 working days from the date of commencement of supplies
supplier of last resort; thus determined values ​​passed
market operator within 15 working days from the effective date of the change
over to a supplier of last resort.
PART FOURTEEN


TECHNICAL REQUIREMENTS FOR OPERATION FOR VERIFICATION OF TECHNOLOGY

§ 61

Operation verification technology manufacturer

The maximum value of quarter the electrical power supply and consumption
measured at the delivery point during plant operation for verification
technology can not be higher than the value of the reserved power and power
agreed in the connection agreement.

§ 62

Operation verification technology customer

(1) Providing services of the transmission system or service
distribution system in operation for authentication technologies to ensure customer service
transmission system or service distribution system for verifying
technical parameters and operating values ​​and operational demonstration || | newly installed or renovated the consumption of electrical equipment
customers, whose consumption equipment is connected to the voltage levels
1 kV or higher.

(2) In the case of existing energy consuming equipment services
transmission system or service distribution system in operation for verification
technology enabled the customer in the event that power installed
newly installed or refurbished electrical equipment in the sampling | || site reaches at least ten percent of the value of reserved capacity
agreed in the connection agreement and will install new electrical equipment
with an installed power of at least 1 MW.


(3) An application for securing the services of the transmission system or service
distribution system in operation for customer authentication technology
applicant shall submit to the operator of the transmission or the respective distribution system
least 30 calendar days before the date of commencement
service transmission system or service distribution system in operation
authentication technology customer and for each transfer or
supply point separately. Particulars of application for the service
transmission system or service distribution system in operation for verification
technology customers are listed in Annexes Nos. 2 and 4 to this decree
.

(4) The operator of a transmission or distribution system based on
contract on securing the services of the transmission system or service
distribution system will start providing services of the transmission system or service
distribution system in operation for verifying the customer's technologies || | at the customer earlier than the date specified in the request and terminates on the date specified in the request
, but not later than the last day of the third calendar month
following the month in which the services of the transmission system or service
distribution system in operation for authentication technology
customer initiated.

(5) In evaluating the invoicing and payments for providing services
transmission system or distribution system operation verification technology
customer advances the transmission or distribution system
according to § 10 Payment for booking capacity in the transmission system
or distribution system is the sum

A) payments by the amount of the agreed booked capacity and

B) payments determined by multiplying the price for monthly capacity booking
transmission system or distribution system and the difference between the maximum value measured
quarter-hour of electric power taken
participant in the electricity market in operation for verification technology
customer and agreed booked capacity.

(6) In the event that the service transmission system or service
distribution system in operation for verification of technology customer service to continue
transmission system or service distribution system may operate during
customer authentication technology applicant may request an allocation
reserved capacity, and no later than 10 working days before the end
services of the transmission system operation verification technology
customer or at the latest one working day before the end of the service
distribution system in operation for verification technology customer.

(7) asks if the customer asks for verification of the operation of technology in customer
limited area of ​​the local distribution system and power
estimated offtake of electrical equipment in operation for
customer verification technology is higher than twenty percent agreed
power local distribution system operators, distribution system
to which this local distribution system is connected to
request to the local distribution system services
distribution system in operation for verification technologies in customer
the extent required by the customer.
PART FIFTEEN



SUPPORTED ENERGY SOURCES
§ 63

Information about achieving negative price and the situation where no
reconciliation of supply and demand of electricity

Compulsory redeeming or redeeming inform the manufacturer to achieve a negative
prices or the fact that no reconciliation of supply and demand of electricity
on the daily market, the day when such a situation in a manner that allows
remote access, making reference to the information published
market operator trading on the daily electricity market.

§ 64

Determining the difference between the hourly price and redemption price and its payment

(1) In determining the difference between the hourly price and the redemption price is
based on prices obtained on the day-ahead market organized by OTE.

(2) Compulsory redeeming paid by the market operator
payment resulting from the difference between hourly prices and the redemption price for the trading hours,
in which a reconciliation of supply and demand on the daily market
determined in accordance with Annex no. 21 hereto.

§ 65

Method of determining the hourly green bonus for electricity

Method of determining the hourly green bonus is given in Annex no. 22
hereto.
PART SIXTEEN


TRANSITIONAL PROVISIONS AND REVOCATION

§ 66



Transitional provisions
Data for invoicing of distribution services for customers' supply points
measurement type A or B, with the exception of supply points of customers with type B metering
connected from voltage to low voltage related to the reference period 1
12. 2015 - 31. 12. 2015 or earlier, sends
DSO to 31. 1. 2016 in the structure of
Decree no. 541/2005 Coll., as amended effective before the effective date || | hereof.

§ 67
Repealing provisions


Repealed:

First Decree no. 541/2005 Coll., On Electricity Market Rules and principles of pricing
Market Operator, electricity and execution
certain other provisions of the Energy Act.

Second Decree no. 552/2006 Coll., Amending Decree no. 541/2005 Coll., On
electricity market rules, principles of pricing the operator's activities
electricity market and the implementation of certain other provisions
energy Act.

Third Decree no. 365/2007 Coll., Amending Decree no. 541/2005 Coll., On
electricity market rules, principles of pricing the operator's activities
electricity market and the implementation of certain other provisions
energy Act, as amended by Decree no. 552/2006 Coll.

Fourth Decree no. 454/2008 Coll., Amending Decree no. 541/2005 Coll., On
electricity market rules, principles of pricing the operator's activities
electricity market and the implementation of certain other provisions
energy Act, as amended.

Fifth Decree no. 468/2009 Coll., Amending Decree no. 541/2005 Coll., On
electricity market rules, principles of pricing the operator's activities
electricity market and the implementation of certain other provisions
energy Act, as amended.

6th Decree no. 400/2010 Coll., Amending Decree no. 541/2005 Coll., On
electricity market rules, principles of pricing the operator's activities
electricity market and the implementation of certain other provisions
energy Act, as amended.

7th Decree no. 371/2011 Coll., Amending Decree no. 541/2005 Coll., On
electricity market rules, principles of pricing the operator's activities
electricity market and the implementation of certain other provisions
energy Act, as amended.

8th Decree no. 438/2012 Coll., Amending Decree no. 541/2005 Coll., On
electricity market rules, principles of pricing the operator's activities
electricity market and the implementation of certain other provisions
energy Act, as amended.

9th Decree no. 193/2014 Coll., On the ways and terms of clearing and settling
prices to cover costs associated with supporting and implementing electricity
certain other provisions of the Act on supported energy sources.

§ 68
Efficiency


This decree comes into force on 1 January 2016.

Chair:

Pp. Ing. Accident vr

First Vice
Appendix 1


Particulars of application for the service of the transmission system

Part A - information about the applicant

First Business name - if a person does not have a business name, and give
his name and surname legal entity unincorporated
give his name.

Second The legal form of legal entities.

Third Purpose of the collection.

Fourth Scope of business.

Fifth Head - only fills a legal entity in the following categories: state, county, municipality with
postcode, street and house number.

6th The person or persons who are the statutory body - only fills
legal entity - surname, first name and date of birth of all members of this body
.

7th Basic data - fills only a natural person - name, surname, date of birth
.

8th Address of permanent residence or domicile or place of business -
fills only a natural person in the following categories: state, county, municipality with postcode, street and house number
.

9th Connections - telephone, fax or e-mail.

10th Mailing Address into their own hands: name, surname, title,
full address.

11th Identification number, if assigned.

12th Tax identification number, if assigned.

Part B - Specifications

First Desired date and time of providing electricity transmission

Second The size of the reserved power (maximum transmission power required) at the delivery point



A. total reserved power at the delivery point covering all
expected agreement on electricity supply,

B. the manufacturer of the total reserved power at the delivery point
covering all of the expected agreement on electricity supply

Statement on the accuracy and truthfulness of the data.
Appendix 2


Particulars of application for the service of the transmission system operation
authentication technology or customer in the operation of authentication technology manufacturer


Part A - information about the applicant

First Business name - if a person does not have a business name, and give
your full name and the names of any legal person not registered in the commercial register
state the name / legal form of legal entities.

Second Purpose of the collection.

Third Scope of business.

Fourth Head - only fills a legal entity in the following categories: state, county, municipality with
postcode, street and house number.

Fifth The person or persons who are the statutory body - only fills
legal person - surname, first name, or the name and date of birth
all members of this body.

6th Basic data - fills only a natural person - first name, possibly
name, date of birth.

7th Address of permanent residence or domicile or place of business -
fills only a natural person in the following categories: state, county, municipality with postcode, street and house number
.

8th Connections - telephone, fax or e-mail.

9th Mailing Address into their own hands: surname, first name, or
name, title, address.

10th Identification number, if assigned.

11th Tax identification number, if assigned.

Part B - Specifications

First Desired date and time of service in the transmission system
test setup or operation verification technology.

Second Technical documentation newly connected
or refurbished equipment.
Appendix 3


Particulars of application for the service distribution system

Part A - information about the applicant

First Business name - if a person does not have a business name, and give
his surname and first name. Legal entity unincorporated
give his name.

Second The legal form of legal entities.

Third Purpose of the collection.

Fourth Scope of business.

Fifth Head - only fills a legal entity in the following categories: state, county, municipality with
postcode, street and house number.

6th The person or persons who are the statutory body - only fills
legal entity - surname, first name and date of birth of all members of this body
.

7th Basic data - fills only a natural person - name, surname, date of birth


8th Address of permanent residence or domicile or place of business -
fills only a natural person in the following categories: state, county, municipality with postcode, street and house number
.

9th Connections - telephone, fax or e-mail.

10th Mailing Address into their own hands: name, surname, title,
full address.

11th Identification number, if assigned.

12th Tax identification number, if assigned.

13th Bankers.

Part B - Specifications

First Desired date and time of the granting of distribution.

Second The size of the reserved capacity or power distribution at the delivery site


A. total reserved capacity at the delivery point covering all
expected agreement on electricity supply,

B. the manufacturer of the total reserved power at the delivery point
covering all of the expected contract for the supply of electricity to customers, suppliers
electricity and electricity dealers.

Third Expected amount of consumed electricity per year.

Fourth The required distribution rate.

Statement on the accuracy and truthfulness of the data.

Consent of the applicant with the text of the reinsurance contract distribution services
system published relevant distribution system operator
manner allowing remote access.
Appendix 4


Particulars of application for the service distribution system in operation
authentication technology or customer in the operation of authentication technology manufacturer


Part A - information about the applicant

First Business name - if a person does not have a business name, and give
his surname and the name or names. Legal person not registered in the commercial register
state the name / legal form of legal entities

Second Purpose of the collection.


Third Scope of business.

Fourth Head - only fills a legal entity in the following categories: state, county, municipality with
postcode, street and house number.

Fifth The person or persons who are the statutory body - only fills
legal person - surname, first name, or the name and date of birth
all members of this body.

6th Basic data - fills only a natural person - first name, possibly
name, date of birth.

7th Address of permanent residence or domicile or place of business -
fills only a natural person in the following categories: state, county, municipality with postcode, street and house number
.

8th Connections - telephone, fax or e-mail.

9th Mailing Address into their own hands: surname, first name, or
name, title, address.

10th Identification number, if assigned.

11th Tax identification number, if assigned.

12th Bankers.

Part B - Technical Specifications 1. Required timing and duration of service
distribution system in trial operation or operation to verify
technology.

Second Expected amount of electricity consumed per month.

Third The required distribution rate.

Fourth Technical documentation newly connected
or refurbished equipment.

Statement on the accuracy and truthfulness of the data.
Applicant's approval of the wording of the contract to ensure service distribution system published
DSO manner allowing remote access
.
Appendix 5


How to determine the planned annual electricity consumption of customers with type C metering


(1) Determination of the planned annual electricity consumption for supply points
metering type C, for which deductions were made involving the sum
period of less than one hundred days prior to and for which was made in this period
changed assignments class load profiles:

A) calculate the sum of the relative values ​​of the respective Kf converted
type diagram valid for the calendar year in duration from the date of
initial reading to the final day of reading the relation


DKO d = 24 h =
Kf = SUM SUM ktpTDD, d, h
d = FWD + 1 h = 1


Where Kf summary volume relative values ​​of the billing period, the DPO
day of the beginning of the reading period
DKO end of the day, the reading period
kTDDn, d, h, tp relative value of n-th converted type chart in the day d, in the hour h

B) calculate the sum of the relative values ​​of the respective Kr
standardized type diagram for the calendar year in which there is a day for which
will be conducted imbalance settlement, according to the relation


d = 31.32, h = 24 acre
Kf = SUM SUM knormTDD, d, h
d = 1.1, h = 1 acre


Where Kr summary volume relative values ​​for a complete calendar year, which is a day for which will
done clearing deviations
acre current calendar year,
kTDDn, d, h norm relative values ​​of n-type standardized chart in the day d, in the hour h

C) for the supply point, the value of electricity consumption
last readout period, designated as Efak.
Planned annual electricity consumption is valid for the supply point Eplan is then proportional
final value of the readings in the proportion of the sum of the relative values ​​of
typical profiles under the relation


Cr = ------
Kplan x Efak
kf


(2) The planned annual electricity consumption for customers' supply points with type C metering
for whose determination to apply the procedure referred to in paragraph 1
is equal to the average consumption of consumption of electricity of the same type and the same diagram
the size of the circuit breaker as the consumption of electricity.
The average consumption of electricity is determined on the basis of tariff
statistics prepared by the Office on the basis of documents submitted by operators
distribution systems. The values ​​of average consumption of electricity provided
Office, which applies throughout the calendar year, the market operator publishes
manner allowing for remote access not later than three calendar months
before the first day supply of the calendar year.

(3) In the event that the supply point is fitted with a measuring device with multiple dials
(vícetarifní measurement) is to estimate electricity consumption used
sum of the measured consumption of electricity of all classifiers.

(4) The planned annual electricity consumption of individual customers and determined

Converted to normal weather conditions is determined
DSO separately for premises
customers with measurement type C Market Operator are passed this information
individually for customers' supply points with type C metering, || | who have switched suppliers, and aggregated to other customers with type C metering
after classes load profiles.
Planned annual consumption of electricity is measured in kWh.
Annex 6


Classes typical supply


-----------------------------------------------------------------------------------------------------------------
Class Customer Type Fixed prices Features sampling distribution by
price decision Office
-----------------------------------------------------------------------------------------------------------------
1 Customer Category C - customer use of electricity without heat - C01D; C02d; C03d
2 Customer category C - sampling with storage appliance - C25D; C26d; C27d; C35d
- Taking a hybrid heating
3 Customer category C - taking a direct electric heating system - C45d; C55d; C56d
- Taking the heat pump
4 Customer Category D - taking the heat without the use of electricity - D01d; D02d; D61d
5 Customer Category D - sampling with storage appliance - D25D; D26d; D27d
6 Customer Category D - taking a hybrid heating - D35d
7 Customer Category D - taking a direct electric heating system - D45d; D55d; D56d
- Taking the heat pump
8 Customer category C - consumption for public lighting - C62d
-----------------------------------------------------------------------------------------------------------------


Assigning a class diagram type to the existing supply points
performed the DSO under the current tariff and the
Annex.
Annex 7

Categorization
customers

For the purposes of the organization of the electricity market, customers are divided into the following categories
:

A) Category A purchaser - customer whose supply point is connected to the transmission system
or customer whose supply point is connected to
distribution system with voltage between phases greater than 52 kV,

B) the buyer category B - customer whose supply point is connected
to the grid with voltage between phases from 1 kV up to 52 kV,

C) category C customer - the customer that the customer does not
category A, B or D

D) category D customer - an individual whose supply point is
connected to the grid with voltage between phases up to 1 kV and that
off electricity to meet her personal needs related to housing or
personal needs of members of his household;
per subscriber category D is regarded as a natural or legal person within the scope of the collection
electricity only for the management and operation of the building's common areas
used jointly by the owners or users of flats.
Appendix 8


Method of settlement of regulating energy

(1) Price per delivered positive energy or electricity regulatory provisions that
abroad pursuant to § 12 para. 2

A) for electricity supply according to § 12 para. 2 point. a) and c) equal to the bid price
positive regulating energy supplied to block
providing support services provided or from abroad (hereinafter referred to as "activated
positive regulating energy")

B) for electricity supply according to § 12 para. 2 point. b) equal

First of higher prices; bid price agreed on the balancing market or
weighted average price of activated positive regulating energy, if it is in the
trading hour the system imbalance is negative,

Second bid price, if the respective trading hour the system imbalance
positive.

(2) The price for negative regulating energy supplied or provided by an
electricity transmission system operator from abroad according to § 12 paragraph
. 2

A) for electricity supply according to § 12 para. 2 point. a) and c) equal to the bid price
negative regulating energy supplied to block
providing support services provided or from abroad (hereinafter
"activated negative regulating energy")

B) for electricity supply according to § 12 para. 2 point. b) equal

First from lower prices; bid price agreed on the balancing market or
weighted average price of the activated negative regulating energy, if it is in the

Trading hour the system imbalance is positive

Second bid price, if the respective trading hour the system imbalance
negative.

(3) Rate positive and negative regulating energy supplied by units in the
business hours within the activation of secondary regulation ancillary services are determined
Office's price decision.

(4) The market operator establishes for each trading hour
clearing price deviations as follows:

A) if the system imbalance is negative or zero, the settlement price
deviation in the direction of the system imbalance highest bid price of electricity
according to § 12 para. 2 supplied at this trading hour and paid by the operator
market providers of electricity; if so determined price lower than the price fixed
Office's price decision or was not in this business
hour delivery no electricity in accordance with § 12 para. 2, with the price
set by the

B) if the system imbalance is positive, the settlement price variations in the direction of the system imbalance
highest bid price of electricity according to § 12 paragraph
. 2 supplied at this trading hour to compensate for the positive system
deviations and paid providers of electricity market operator; if
thus fixed price lower than the price fixed by the Office's price decision
or was not in this business hour delivery no electricity according to § 12 paragraph
. 2, with the price fixed by the Office.

(5) market operator establishes for each trading hour clearing price
protiodchylky follows:

A) if the system imbalance is negative or zero, the settlement price
protiodchylky weighted average price of activated positive regulating energy
(including balancing market); If not in this business hour delivery
no electricity in accordance with § 12 para. 2, with the price set by the

B) if the system imbalance is positive, the settlement price protiodchylky
weighted average price of the activated negative regulating energy, including
balancing market; If not in this business hour delivery
no electricity according to § 12 para. 2, with the price fixed by the Office.

(6) In determining the clearing price deviations and protiodchylky be disregarded
regulating the prices of energy delivered through the activation of ancillary services
used to verify the capability of the provider of support services.
Appendix 9

MODEL


Monthly report on production and consumption of electricity producer

Annex 10

MODEL


Monthly statement of calculating the payments for system services and activities
market operator in the electricity industry and to promote electricity from
supported energy sources at the delivery point production



Annex 11

MODEL


Monthly statement of consumption of electricity in the local distribution system




Annex 12

MODEL


For calculating payments for system services market operator in
electricity and to encourage electricity generation from supported energy sources
in the local distribution system



Annex 13

MODEL


Statement DSOs for the settlement rates for the activities of the market operator



Annex 14

MODEL


Statement DSOs for clearing folders prices on
cover the costs of support for electricity


Annex 15

MODEL


Statement DSOs for the clearing price on the payment system services



Appendix 16

MODEL


Statement TSO clearing price to cover the cost of support
electricity prices and Market Operator


Annex 17

MODEL


Scope and structure of data on the supply or transfer points MV and HV





Annex 18


Data made available by the market operator for each region of typical


Annex 19


Data made available by the market operator for each local distribution system



Annex 20


Structure of data sent to a distribution system operator for the purpose of billing services
electricity distribution

A. Identification data

First The code number of the operator of regional or local distribution system
EAN (13)

Second Numeric code supply point EAN (18)

Third Billing period

Fourth Billing type (dial by OTE)

Fifth Identifier invoice

6th Type of contract.

B. The measurement data and the total payments


First For customers' supply points with measurement type A or B except for the measurement B
connected from the voltage level NN *

I. Total consumption of DS (kWh)

Ii. Measured load shedding (kW)

Iii. Date and time of the measured load shedding

Iv. Total consumption of DS VT (kWh); (Optional)

In. Total consumption of DS NT (kWh); (Optional)

Vi. Measured load shedding in the NT (kW); (Optional)

Vii. Date and time of the measured load shedding in the NT (kW);
(Optional)

Viii. Unsolicited supply of reactive energy (kVArh)

Ix. Tg_FI,

X. Invoice amount for regulated services in CZK without VAT.

Second For customers' supply points with type C metering or B connected from
voltage level NN **

I. Total consumption of DS VT (kWh)

Ii. Total consumption of DS NT (kWh)

Iii. VT total of CZK

Iv. NT total of CZK

In. Hl. Breaker payment for a total wattage of CZK

Vi. Support for electricity from energy sources supported a total payment of CZK

Vii. Total System Services payment of CZK

Viii. Business OTE payment of a total of CZK

Ix. Distribution services to a total of CZK

X. Fee for reading a total of CZK (when charged).

C. Data from the instrument

First For customers' supply points with measurement type A or B except for the measurement B
connected from the voltage level NN ***

I. Identification of the measuring site,

Ii. Name of measuring point,

Iii. Measured load shedding related to the measurement location (kW)

Iv. Date and time of the measured load shedding

In. Total consumption of DS measured at measuring point (kWh)

Vi. Tg_fi,

Vii. Unsolicited supply of reactive energy (kVArh).

Second For customers' supply points with type C metering or B connected from the voltage level NN


I. Beginning of period

Ii. End of period

Iii. Reason readings,

Iv. Number meter

In. Multiplier

Vi. Initial state VT

Vii. The final status VT

Viii. Total consumption of DS VT for the period (kWh)

Ix. NT initial state (in the case of 2T measurements)

X. The final status of the NT (in the case of 2T measurements)

Xi. Total consumption of NT DS for the period (kWh); (In the case of 2T measurements)

Xii. Re-calculate labor VT (kWh); (If performed)

Xiii. Re-calculate job NT (kWh); (If performed).

D. Data on partial payments and unit prices ****

First For customers' supply points with measurement type A or B except for the measurement B
connected from the voltage level NN

I. Single-component price for network use

First Beginning of period

Second End of period

Third Number of units (MWh)

Fourth Unit price for a mono cost of using the network (CZK / MWh)

Fifth The total price for the use of mono-cost networks (CZK).

Ii. Annual reserved capacity

First Beginning of period

Second End of period

Third The agreed annual booked capacity (MW)

Fourth Unit price agreed annual booked capacity (CZK / MW)

Fifth The total price agreed for annual booked capacity (CZK).

Iii. Monthly reserved capacity

First Beginning of period

Second End of period

Third The agreed monthly reserved capacity (MW)

Fourth The unit price of the agreed monthly booked capacity (CZK / MW)

Fifth Total price for an agreed monthly booked capacity (CZK).

Iv. Payment for exceeding booked capacity

First Beginning of period

Second End of period

Third Exceeding booked capacity (MW)

Fourth Unit price for exceeding booked capacity (CZK / MWh)

Fifth Total price for exceeding booked capacity (CZK).

In. The payment for unsolicited supply of reactive power

First Beginning of period

Second End of period

Third Number of Units unsolicited supply of reactive power (MVArh)

Fourth Unit price for unsolicited supply of reactive energy (CZK / MVArh)

Fifth Total price for unsolicited supply of reactive energy (CZK).

Vi. Payment for failure to factor

First Beginning of period

Second End of period

Third Tg_fi,

Fourth Percentage surcharge for failure factor (%)

Fifth Total price for the failure factor (CZK).

Vii. Payment for the use of

First Beginning of period

Second End of period

Third Number of units (MWh)

Fourth Unit price for network use (CZK / MWh)


Fifth The total price for network use (CZK).

Viii. Payment system services

First Beginning of period

Second End of period

Third Number of units (MWh)

Fourth Unit price for system services (CZK / MWh)

Fifth The total cost of system services (CZK).

Ix. Payment to encourage electricity generation from supported energy sources (according
collection of DS)

First Beginning of period

Second End of period

Third Number of units (MWh)

Fourth Unit price support for electricity from energy sources supported
(CZK / MWh)

Fifth The total price for the support of electricity from energy sources supported
(CZK).

X. Payment to encourage electricity generation from supported energy sources (according
reserved input)

First Beginning of period

Second End of period

Third Contracted reserved input (MW)

Fourth Unit to support electricity generation from supported energy sources
(CZK / MW)

Fifth The total price for the support of electricity from energy sources supported
(CZK).

Xi. Payment for exceeding booked input

First Beginning of period

Second End of period

Third Exceeding reserved capacity (MW)

Fourth Unit price for exceeding booked input power (CZK / MW)

Fifth Total price for exceeding booked input power (CZK).

Xii. Payment for the activities of OTE 31. 12. 2015

First Beginning of period

Second End of period

Third Number of units (MWh)

Fourth Unit price for OTE activities (CZK / MWh)

Fifth Total price for OTE activities (CZK).

Xiii. Payment for the activities of OTE from 1 1st 2016

First Beginning of period

Second End of period

Third The number of supply points for determining payments to OTE (ks)

Fourth Unit price for OTE activities (CZK / OM / month)

Fifth Total price for OTE activities (CZK).

Xiv. Other payments PDS / LDS

First
Beginning of the period,

Second End of period

Third Number of Units

Fourth Unit price for other payments (CZK)

Fifth Total price for other payments (CZK).

Second For customers' supply points with type C metering or B connected from the voltage level NN

*****
I. Distribution rate according to the price list ERO

Ii. The size of the main circuit breaker (A)

Iii. Number of phases

Iv. Beginning of period

In. End of period

Vi. Payment for the use of VT

First Beginning of period

Second End of period

Third VT collection of DS (MWh)

Fourth Unit price for VT (CZK / MWh)

Fifth The total price for network use VT (CZK).

Vii. Payment for the use of the NT (in the case of 2T measurements)

First Beginning of period

Second End of period

Third NT collection of DS (MWh)

Fourth Unit price for NT (CZK / MWh)

Fifth The total price for the use of the NT (CZK).

Viii. Lump sum payment for the main circuit breaker

First Beginning of period

Second End of period

Third Number of fixed salaries for the period

Fourth Unit price for a flat fee (CZK / hl size. Breaker / month)

Fifth Total price per hl. breaker (CZK).

Ix. Pay per hl. breaker according to the size (A)

First Beginning of period

Second End of period

Third Number of fixed salaries for the period

Fourth Unit price for A (CZK)

Fifth The total cost of the circuit breaker (CZK).

X. Payment system services

First Beginning of period

Second End of period

Third News of the DS (MWh)

Fourth Unit price for system services (CZK / MWh)

Fifth The total cost of system services (CZK).

Xi. Payment for the activities of OTE 31. 12. 2015

First Beginning of period

Second End of period

Third News of the DS (MWh)

Fourth Unit price for OTE activities (CZK / MWh)

Fifth Total price for OTE activities (CZK).

Xii. Payment for the activities of OTE from 01. 01. 2016

First Beginning of period

Second End of period

Third Number of fixed salaries for the period

Fourth Unit price for OTE activities (CZK / OM / month)

Fifth Total price for OTE activities (CZK).

Xiii. Payment to encourage electricity generation from supported sources of energy (according
collection of DS)

First Beginning of period

Second End of period

Third News of the DS (MWh)

Fourth The unit price for the support of electricity from
supported sources of energy (CZK / MWh)

Fifth The total price for the support of electricity from energy sources supported
(CZK).

Xiv. Payment to encourage electricity generation from supported sources of energy (by
main circuit breaker)

First Beginning of period

Second End of period

Third Number of fixed salaries for the period

Fourth Unit to support electricity generation from supported sources of energy

(CZK / size. Hl. Breaker / month)

Fifth The total price for the support of electricity from energy sources supported
(CZK).

Xv. Other payments PDS / LDS

First Beginning of period

Second End of period

Third Number of Units

Fourth Unit price for other payments (CZK)

Fifth Total price for other payments (CZK).

Xvi. Payment for exceeding booked power output

First Beginning of period

Second End of period

Third Exceeding booked power

Fourth Unit price for exceeding booked capacity (CZK / kW)

Fifth Total price for řekročení reserved power (CZK).

Rules for filling

First Part of the basis for invoicing distribution services are the results of calculation
component prices to promote electricity generation from supported sources of energy
sampling of the distribution system from the main circuit breaker or
reserved capacity. Component prices to promote electricity generation from supported
energy sources from the main circuit breaker is calculated by multiplying
number of phases, rated current of the main circuit breaker in the A and prices
according to the valid price decision.

Second Data for invoicing of distribution services includes
charged items. Within the billing calculated, but uncharged
items are referred to as accounting irrelevant. Part of the basis for billing
distribution services may be items that are not included in the calculation
billing.

Third If re-calculate labor, then into the base for invoicing
distribution services at a block containing the total consumption of
distribution system, the distributor fills in the item taken from a distribution system
high tariff and low tariff collection increased by re-calculate work
and block-level electricity distributor also fills in the item
high tariff and low tariff collection increased by re-calculate work while re-calculate data
work items re-calculate and re-calculate labor VT NT
works are informative.

Fourth The basis for invoicing distribution services for customers with measurement
type C or B is connected to the voltage level low voltage breakdown
done in the relevant parts into separate intervals
depending on when there is a change in unit price billed | || breaker, number of phases, the distribution rate or reading.

Fifth Data for invoicing of distribution services for consumer parts manufacturing
has reduced overall consumption from the grid by the manufacturer indicated
own technological consumption in items for system services and
component prices to promote electricity generation from supported sources of energy || | if the reduction is part of the bill.

6th In the case of a separate contract for the supply, the operator does
distribution system documentation for billing distribution services
data relating to the distribution of payments and the agreed data.

7th Technical details of data for invoicing of distribution services
provides electricity market operator's documentation standard
used for communication through its system.

* Item ii. to x. They do not appear in the case of a separate agreement for the supply of electricity

**
Items iii. to x. They do not appear in the case of a separate agreement for the supply of electricity


*** Is provided in case of multiple access points

**** Item not mentioned in the case of a separate contract for the supply of electricity


***** Item vi. to xv. They are listed in the case of a separate contract for the supply of electricity

Annex 21


Determining the amount of monthly payments resulting from differences between the hourly
price and the redemption price

Monthly payment amount P, resulting from differences between the hourly
price and the redemption price is calculated according to the formula:

nom
P = SUM (x HCl MEI) - SUM SUM (x vcst city)
i = 1 s = 1 t = 1
Where


N is the number of hours in a calendar month
HCl is reconciled hourly price of the daily market electricity per hour and; if reconciled hour
the daily market price is negative, used for calculating the payments value P 0
MEI is the amount of electricity supplied from renewable sources of applying for feed
prices per hour in a calendar month,
by a number of sources of renewable energy,
m is the number of categories and feed-in tariffs by date of commissioning, possibly by

the amount of installed power and fuel used in the above price decision of the Energy
Regulatory Office for support through purchase prices of renewable sources,
vcst the purchase price of renewable sources in the purchase price t
town is the amount of electricity supplied from renewable sources in the purchase price t per calendar month
hours, in which a reconciliation of supply and demand on the daily market.
Annex 22


Method of determining the hourly green bonus for electricity produced from renewable sources


(1) The hourly green bonus cpzbhis in CZK / MWh for electricity
produced from renewable sources in the hour h and regulated year,
by the market operator paid by producers is fixed by a regulatory formula

cpzbhis = (cvcozis - cskuthi) + cpodchis if cskuthi> = 0

cpzbhis = cvcozis + cpodchis if cskuthi <0

(2) If a producer has offered to purchase compulsorily vykupujícímu
least part of the electricity produced, the amount of hourly green bonus cpzbhis in CZK / MWh
for electricity produced from renewable sources in the hour h regulated
year and that market operator paid by producers is fixed by a regulatory formula


cpzbhis = (cvcozis - cskuthi) when cskuthi> = 0

cpzbhis = cvcozis if cskuthi <0


Where cvcozis [CZK / MWh] is the price of electricity generated from the ith type of renewable resources, set by the
cskuthi [CZK / MWh] is the hourly price of electricity reached the daily market in the regulated hodiněh year i
published by the market operator in a manner enabling remote access,
cpodchis [CZK / MWh] is the average expected price variations with th type of renewable resources, determined to
Based on evaluation of the submitted hourly charts daily predictions and achievements of the Company
production supported energy sources for already completed calendar year.

1) Art. 2 point 23 of Regulation (EU) 2015/1222 of 24 July 2015
establishing a framework guideline for capacity allocation and congestion management
.

2) Regulation (EU) 2015/1222 of 24 July 2015 laying down
framework guideline for capacity allocation and congestion management.

3) Decree no. 79/2010 Coll., On dispatch
power system management and data transmission for supervisory control, as amended
regulations.

4) Regulation of the European Parliament and Council Regulation (EU) no. 714/2009 of 13
July 2009 on conditions for access to the network for cross-border exchanges
electricity and repealing Regulation (EC) no. 1228 / 2,003th