349/2015 Sb.
The DECREE
of 8 June. December 2015
on the rules of the gas market
The Energy Regulatory Office shall determine under section 98a of paragraph 1. 2 (a). I) Act
No. 458/2000 Coll., on conditions for business and the public administration in
energy sectors and on the amendment of certain laws (Energy Act),
as amended by law no 131/2015:
PART THE FIRST
INTRODUCTORY PROVISIONS
§ 1
The subject of the edit
(1) this Ordinance in connection with the applicable provisions of the European
Union ^ 1) modifies the
and) rules on access to transmission system to the distribution system and to
the storage tank, the range of published information to allow access
to the transmission system, distribution system and gas storage, and ways
address the lack of capacity in the gas system,
(b) deadlines for the submission of applications) on the conclusion of the contracts on gas market and the
the terms of concluding contracts,
(c)) the procedures and conditions for migration and the transfer of responsibility for
the derogation,
(d) the scope and terms of the transfer) data for the evaluation of imbalances and
billing of gas supply and other services, the procedures for the assessment,
clearing and leveling of the derogations, and clearing and settlement
the balancing of gas in a State of emergency and a State of emergency prevention,
(e)) the procedures and deadlines for the submission of nominations and renominací,
(f)) of the operator stack gas when sold series gas
gas from the stack after the demise of the Treaty on gas storage,
g) types of spot markets, short-term markets and organization
ways of their settlement,
(h)) rules, the assignment and use of load profiles of gas supply,
I) the terms and procedure for choosing and changing supplier of gas, including
registration and transfer of the sampling points,
j) procedure for interruption, restriction and restore the supply of gas to
unauthorized gas sampling distribution, unjust and unjustified
transport,
to ensure the supply of) gas supplier of last resort,
l) track the prices of transport services, distribution services, prices
system and other regulated prices in the gas industry, and the method and
terms of the transfer of data between the participants in the gas market for billing
administered prices and the way and the terms regulated accounting and payment
prices between the participants in the gas market,
m) technical requirements for the operation of the authentication technology
n) procedure for determining advance payments.
§ 2
The basic concepts
(1) For the purposes of this Ordinance means
and the allocation rule-way) the allocation of the amount of gas the body
the showdown at the border point, the point of the stack gas, gas point production plants
or the point of a cross-border pipeline,
(b)) the auction platform-platform for booking the border point
the selected transmission system operator in accordance with the
the transmission system operator, which occurs in a manner that allows
remote access to reservation of transport capacity,
c) auction calendar-schedule of auctions of products standard
capacity by another legal regulation governing the allocation rules
capacities ^ 2)
(d) gas production plants)-a pass-through space or transfer summary posts
between the transmission system and gas-processing, or between distribution
system and gas processing,
e) distribution network-distribution system, or part of the distribution
the system, which was in the period before the 1. a separate January 2014
the licence and that the market operator has assigned a unique numeric
identifier,
f) home-zone defined territory of the distribution system operator
connected to the transmission system and is connected to at least 90 000
consumption points of the customers
EIC-code g) identification number code uniquely identifying a participant
the gas market and the various sampling and pass-through space,
h) flexibility-flexibility through service accumulation
provided by the transmission system operator,
I) financial security – ensuring claims of financial character
natural or legal persons arising from the business relationship with the
the market operator, operator of the transmission system operator
stack gas or the distribution system operator,
j) border-summary of transfer points between the transmission system
on the territory of the Czech Republic and foreign transmission or distribution
systems,
to the account operator)-registration account transmission
system with the market operator, and debited in whose favour they are
registered by the amount of gas that is related to countervailing actions
the transmission system operator and the daily compensation amounts
the subjects of settlement and foreign participants,
l) coordinated capacity-coordinated capacity within the meaning of
other legislation relating to the rules for the allocation of
capacities ^ 2)
m) adjusted supply-type chart, calculated type diagram
supply correction to the value of the participation of the remaining diagram
n) nominations distribution-announcement clearing body Announces
the distribution system operator, the quantity of gas which it intends to
distribute point of cross-border gas pipeline or the place of delivery or
the sum of transfer seats to downsizing of the gas,
about transport-nominations), the clearing operator announces the
the transmission system operator of the quantity of gas plans to carry
over the point of the transmission system,
p) nominations warehousing-announcement clearing body Announces
the operators of the gas quantity of gas plans to inject or
extract,
q) nominations and the obligation to remove the obligation to deliver-business announcement
body clearing the market operator announces the amount of gas that you
with another entity intends to clearing pass at the virtual trading point,
r) standard type chart supplies-sequence of relative
the shares of each of the daily gas customer groups defined
class diagram of the type of delivery on the planned annual consumption in the
calendar year assuming normal climatic conditions,
with normal climatic conditions)-average daily temperatures from the years
1971-2000 designed for the Czech gas industry hydrometeorologickým
the Institute, calculated from the data of all measuring stations, the Czech
Hydrometeorological Institute lying at an altitude of 700 m to n.
m.,
t) new storage capacity-first reserve storage capacity
referred to the use of the following 1. January 2010,
u) responsibility for a deviation-obligation to subject the clearing and
deal that arises as the difference between the quantity of gas
entering into the gas system and the quantity of gas protruding from the
the gas system; the quantity of gas is expressed in energy
units,
in the short-term the market with organised) gas-intraday market with gas
organized by the market operator, which will participate in the settlement, bodies
w) planned monthly fuel consumption-monthly value gas consumption
agreed in the contract of providing services to the distribution system,
x) planned the annual consumption of gas-gas consumption value obtained from the
historical actual gas, corrected by the effect of temperature,
determined in accordance with Annex 15 to this Decree,
y) gas date-time from 06:00:00 pm
calendar day to 06:00:00 hours of the following day,
of the month-natural gas) time period starting with the first natural gas
on the day of a calendar month and ending on the expiry of the last gas
day of the calendar month.
(2) For the purposes of this Ordinance means
and natural gas year-) time period within the meaning of other legislation
adjusting the rules for the allocation of transmission capacities of ^ 2)
(b)) přepočtenou annual consumption-value gas consumption obtained from the
the actual gas converted, for a period of one year referred to in the annex to the
No. 15 of this Decree,
(c) the delivery type diagram) recalculated-standard type chart
the supply, calculated on actual weather conditions for the gas day
(d)) the cross-border pipeline linking the gas pipeline distribution system-and
Foreign transmission or distribution system,
e) registered participant in the gas market-participant of the gas market,
which the market operator on the basis of registration allows you to access your
the information system,
(f)) renominací distribution-the value of the quantity of gas supplied after the deadline for
submission of nomination of the distribution,
(g)) renominací transport-the value of the quantity of gas supplied after the deadline for
submission of nomination of the transport,
h) renominací storage-the value of the quantity of gas supplied after the deadline
for the submission of nominations, storage
I) renominací the obligation to deliver and the obligation to remove-the value of the quantity of gas
After the deadline specified for the submission of nominations the obligation to deliver and remove,
j) storage capacity-operational volume of part or all of the virtual
stack gas specified in m3 or in kWh, mining or injection capacity in
kWh/day or production or injection curve in kWh/day
the year-to) the storage time, which starts with the first natural gas
on the day of the month of April and ends on the expiry of the last day of the month in the gas
March of the following calendar year,
l) the actual weather conditions-the average of the actual daily
air temperatures on the territory of the Czech Republic for the individual business days,
that is calculated from the data of all measuring stations, the Czech
Hydrometeorological Institute lying at an altitude of 700 m to n.
m.,
m) the system of derogation-the sum of the positive and negative daily deviations
all of the subjects of settlement and foreign participants in the gas day
n) class type-chart-summary of characters offtake points,
that is assigned to the same diagram type supply,
about) closed parts of the distribution system-part of the distribution system,
the technical arrangement does not allow the transmission of gas from this part of the
distribution system to other parts of the distribution system or, in the
other distribution system,
p) virtual trading point-the place, where the nomination is made a commitment
to deliver the gas to the gas system and the commitment to remove the gas from the gas
system,
q) virtual reservoir-a summary of all gas storage one
the operator of the storage tank,
r) settlement of deviations-financial settlement between the body of the settlement
and the market operator for the daily compensation amounts and the differences between the
monthly and daily variations, and between corrective monthly and monthly
deviations,
with foreign-foreign) participant in the natural or legal person,
which is not a entity that uses a border settlement and transport points
system and the virtual gas storage points,
t) commitment to deliver-obligation to subject-based clearing contract to deliver
the gas system gas quantity nominated body clearing
for natural gas the day on virtual trading point,
remove the obligation for)-obligation to subject-based contract settlement
remove from the gas system gas quantity nominated body
reckoning day for gas on a virtual trading point.
§ 3
Gas market
(1) in the framework of the gas market are all the time data recorded in the time
valid on the territory of the Czech Republic.
(2) gas market shall be carried out with the use of numeric codes and dials
managed by the market operator. The numeric codes are used to indicate
offtake points customers to transfer jobs to cross-border gas pipelines,
points of production of gas, transfer seats, or a summary of transfer points between
transmission and distribution networks, the transfer of posts between the distribution
networks, transfer points between the reservoir and the transport system and the
participants in the gas market, with the exception of customers.
(3) the place of consumption of the customer, item, production plants and a gas pass-through space
cross-border gas pipeline are assigned only to the distribution network or
the transmission system in the place of connection.
(4) the transmission system operator, the distribution system operator
and operator of the storage tank shall be considered as customers in the range of losses
and private consumption.
(5) the distribution system operator, which is divided into multiple
distribution networks, is considered one of the customer with multiple virtual
sampling points representing the loss or Unassigned subscription
distribution system operator in each of the distribution network.
(6) the quantity of gas at the outlet of the gas distribution network for the day
equal to the quantity of gas at the entry to the distribution network and the change of accumulation in the
the distribution network.
§ 4
Points of the gas system
(1) entry points to the gas system are the border points, points
virtual gas storage, gas works, points a pass-through space
cross-border gas pipelines and virtual points transmission
the system.
(2) the exit points of the gas system are the border points, points
virtual gas storage, sampling the place customers, pass-through space
cross-border gas pipelines, virtual sampling locations representing the loss
or Unassigned subscription distribution system operator in
each of the distribution networks and virtual points of the operator
the transmission system.
(3) among all the input and output points of the gas system is
is a virtual trading point.
§ 5
Designation of participants in the gas market, transfer points and offtake points
(1) the market operator records the registered market participants with spinners
gas, anonymous codes of foreign participants, and manages the dials
pass-through and offtake points and other information necessary to identify the
gas market players and individual consumption and transfer points.
For dials used EIC code. The market operator also manages a number
the identifiers of the distribution networks.
(2) the distribution system operator shall ensure that the market operator designation
by assigning numeric codes
and the delivery points of cross-border gas pipelines),
(b)), the gas production plants in conformity with the manufacturer of gas,
c) pass-through points between adjacent systems in conformity with the
distribution system operator,
d) delivery points between adjacent distribution networks,
(e) the delivery of the sampling points) or connected to the operated
distribution system including virtual.
(3) the transmission system operator shall ensure that the market operator designation
by assigning numeric codes
and gas production plants), in conformity with the manufacturer of gas,
(b)) or pass-through pass-through points summaries of places between the transport
system and in conformity with the distribution network operator of the distribution
system,
(c)) the border points of the transmission system,
(d) the delivery points between) storage and transport system in
conformity with the operator of the storage tank,
e) delivery points consumption points are connected to the transmission system
including virtual.
(4) the transmission system operator shall ensure that the transport user
the system, which is a foreign participant, anonymous code allocation
referred to in paragraph 1 in the case of the market operator.
(5) the operator of a transmission or distribution system operator shall ensure that the following
create a numeric code for the new pass-through space or summary
transfer jobs or new delivery point with the measurement of type A or B ^ 3)
his immediate transfer to the information system of the market operator in
following the procedure at the start of gas deliveries in accordance with § 113 paragraph. 5.
PART THE SECOND
TRANSPORT OF GAS
§ 6
The participants in the transport
(1) the gas transport arranged or foreign body clearing participant
for the border point, or virtual point of the stack gas.
(2) gas transport arranged for a customer or supplier of gas sampling
instead of the customer's directly connected to the transmission system.
(3) transport of gas distribution system operator arranges for
a summary of the transfer between transmission and distribution system.
(4) transport of gas for the virtual points of a transmission system operator
with the nesjednává. Virtual points of a transmission system operator is used
exclusively for the needs of the transmission system operator and to the physical and
business fluctuations.
(5) gas transport is arranged by the manufacturer of the gas or the gas dealer for
the point of the gas production plants attached to the transmission system.
section 7 of the
(1) the transport of gas transported through the entry point of the transmission system,
which is a border point, point gas production plants attached to the transmission
system, the virtual gas storage and virtual point operator
the transmission system.
(2) transport of gas transported through the exit point of the transmission system,
which is a border point, point a virtual stack gas supply point
the customer is directly connected to the transmission system, pass-through space or
a summary of the transfer between transmission and distribution system, and
virtual point of the transmission system operator.
(3) the entry point of a virtual gas storage is the entrance to the transmission
the system. The output of the virtual gas storage is the output from the
the transmission system.
(4) the transmission system operator specifies the points of the transmission system
in particular, used the name, in the direction of the flow of gas, and the size of the technical
capacity.
§ 8
Conclusion of a contract for the provision of transport services
(1) the application for conclusion of a contract for the provision of transport services of gas is
served by the subject of settlement or a foreign participant at the latest 10
working days 10:00:00 pm prior to the shipment on or before
reservation of transport capacity or before the auction on the auction
booking platform.
(2) the transmission system operator shall evaluate the application for conclusion of a contract
for the provision of transport services referred to in paragraph 1 and in the case of
the positive evaluation of the proposal sends a contracts for the provision of transport services
gas to the conclusion of the contract until 16:00:00 p.m. 5th working
the date of submission of the application.
(3) an applicant for the conclusion of contracts for the provision of transport services of gas
adopt the draft Treaty on the provision of transport services referred to in paragraph
2, so that a contract for the provision of transport services has been closed
no later than two business days by 12:00:00 pm prior to the
transport or transport before booking or before the auction on the auction
booking platform.
§ 9
Types of transport capacity on the individual input and output points
the transmission system
(1) on the basis of a contract for the provision of transport service allows you to
the transmission system operator or the foreign clearing body
the participant for the virtual stack gas reserve monthly
transport capacity, the daily transport capacity, the transport capacity in the
mode on the following day and intra-day transmission capacity.
(2) on the basis of a contract for the provision of transport service allows you to
the transmission system operator body for downsizing of the clearing point
the gas reserve monthly transport capacity, the daily transport capacity,
transport capacity in the mode on the following day and intra-day transmission
capacity.
(3) on the basis of a contract for the provision of transport service allows you to
the transmission system operator or the foreign clearing body
the participant for the border point of the annual standard capacity reservation,
Quarterly, monthly capacity standard capacity, daily
standard capacity, intraday capacity. Transport
the capacity can be reserved as a coordinated or nekoordinovanou.
Booked for the border point is served by the auction reservation
the platform. The capacity of the reserves by auction according to another legal
the rules relating to the rules for the allocation of transmission capacities of ^ 2).
For participation in the auction shall be the subject of settlement or a foreign participant
registered in the auction of the reservation platform. The publication of the results of the auction
the capacity is reserved.
(4) a contract for the supply of services transport gas under section 6 (1). 3
with effect from the first day of the calendar year of the gas.
(5) on the basis of a contract for the provision of transport service allows you to
the transmission system operator to the supplier or the customer reservation
transport capacity for the customer's consumption location directly connected to the
a transmission system, and that as the capacity for supply point on the
for an indefinite period, the monthly shipping capacity for the sampling location, flexible
shipping capacity for the sampling location, daily transport capacity for the
consumption location, shipping capacity for the sampling place in the arrangements for the
the following day and Intraday capacity for supply point.
(6) Transport capacity referred to in paragraphs 1, 2 and 5 can be booked as a
a firm or interruptible basis.
(7) the reservation of transport capacity referred to in paragraphs 1, 2 and 5 are served
through the information system of the transmission system operator.
Procedures and terms for booking capacities for points of virtual stack
gas and gas generating stations for points
§ 10
(1) the transport of gas when booking the monthly transport capacity is initiated
the first natural gas on the day of the calendar month to which the transport
reserved capacity.
(2) the clearing or foreign participant can reserve
the transmission capacity from other gas month, than natural gas
the month immediately following the month in which the reservation
monthly transportation capacity, however, asks the first 24 calendar months
before the shipment starts.
(3) the monthly capacity reserves on one or more
the following gas for months.
(4) the monthly shipping capacity for the virtual gas storage points can be
to book for a maximum period of 60 consecutive gas
months following the month in which the request was made on the
booking a monthly fixed or interruptible transportation capacity.
§ 11
(1) the transport of gas when booking daily transport capacity is initiated
the first day of the period, a natural gas which is carrying capacity
reserved, and ends with the last day of the period, a natural gas which is
transport capacity reserved.
(2) the clearing or foreign participant can reserve
the transmission capacity from other gas day, than is natural gas
the day immediately following the day on which the gas on
reservation of transport capacity.
(3) the daily transport capacity is reserved for one or more consecutive
the following gas days.
(4) Daily transportation capacity it is possible to book for a maximum of 31
gas days of the date of the request on the booking day or
interruptible transportation capacity.
§ 12
(1) the transport of gas in the reserve capacity in the mode of the following day
Opens the following day after the date on which the natural gas natural gas, in which
the transport capacity in the mode on the following day the body of the settlement, or
Foreign participant reserves.
(2) transport of gas when the use of transport capacity in the mode
the following day takes place for a gas day.
(3) the transport capacity in the mode on the following day can be booked as a
a firm or interruptible basis.
section 13
(1) the transport of gas when booking the intraday capacity are
launches in the gas day intraday transport capacity
reserves.
(2) transport of gas when using the intraday capacity are
takes place after the period of one gas day or its parts, always
However, by the end of the day for which the gas was shipping
reserved capacity.
(3) the Intraday capacity can be reserved as a fixed or
interruptible.
§ 14
Interruptible capacity for the transport of gas under section 10, 11, 12
and 13 checks out the transmission system operator shall, in cases where it
body clearing or foreign participant so requests, or if you cannot
to reserve a fixed capacity due, that is no longer available
free standard shipping capacity.
§ 15
(1) the request for the reservation of transport capacity under sections 10 and 11 shall
Clearing or foreign entity the participant no later than 8:00:00 pm
the calendar day preceding the date from which the gas is to be
transport by booking transport capacity launched electronically
in the information system of the transmission system operator with the necessities
listed in annex 1 to this notice.
(2) the transmission system operator shall evaluate the request for reservation
transport capacity have been filed in accordance with paragraph 1, no later than 8:30:00 pm
gas day, in which the request for the reservation of transport capacity
is made.
(3) Electronic confirmation of compliance with the request referred to in paragraph 1 is
transport capacity for clearing or from a foreign entity Subscriber
checked out.
(4) in the case of a request referred to in paragraph 1 is made later, shall evaluate the
the transmission system operator and the transmission of this request reserves
capacity by 8:30 p.m. the next gas day.
section 16 of the
(1) the request for the reservation of transport capacity in accordance with § 12 shall subject
Clearing or foreign participant first from 9:00:00 pm
the calendar day preceding the date from which the gas is to be
transport by booking transport capacity started, and no later than
4:00:00 hours of the day, in which the gas is to be transport by
reservation of transport capacity.
(2) the request for the reservation of transport capacity in accordance with paragraph 1 shall
clearing body or foreign participant in the information electronically
of the transmission system operator with the formalities referred to in
Annex No 1 to this notice.
(3) the transmission system operator shall immediately, but not later than
15 minutes after receipt of the request for reservation of capacity referred to in paragraph 1
performs the evaluation of the application and the capacity in the case of free shipping
the capacity of the reserves.
§ 17
(1) the request for the reservation of transport capacity according to § 13 serves the body
Clearing or foreign participant at the earliest 2 hours before the beginning of the
gas day, in which transport by transport reservation
capacity.
(2) the request for the reservation of transport capacity in accordance with paragraph 1 shall
clearing body or foreign participant in the information electronically
of the transmission system operator with the formalities referred to in
Annex No 1 to this notice.
(3) the transmission system operator shall immediately, but not later than
15 minutes after receipt of the request for reservation of capacity referred to in paragraph 1
performs the evaluation of the application and the capacity in the case of free shipping
the capacity of the reserves.
Procedures and terms for booking capacities for border points
section 18
(1) on the border points can be booked only standard products
capacity under section 9 (2). 3, which is reserved by means of auctions on the auction
booking platform.
(2) the dates of the venue for the annual standard capacity auctions, quarterly
the standard capacity and monthly standard capacity are set out
Auction calendar and posted on the auction of the reservation platform. Terms
the venue for auctions daily and Intraday capacity standard standard
capacity are set out under a special legal regulation governing the
the rules for the allocation of transmission capacities ^ 4).
(3) the transmission system operator shall make public in a way that allows
remote access to the size of the technical capacity free coordinated
capacity, free capacity, uncoordinated dates holding auctions and links
on the auction platform for individual reservation border points. Further
publish the size of the technical capacity of the neighbouring transmission
system in the connection point if the transmission system operator
known.
(4) when the publication of free capacity the operator shall take into account the volumes of
allocated capacity under special legislation governing
the rules for the allocation of transmission capacities ^ 5), dedicated capacity for
standard products with a shorter time than the reservation product offered in the
the auction, to the spare capacity not counted.
(5) in the auction is for the border point of soutěžena floating price. Floating
the price consists of the price for booking transport capacity, which is the energy
regulatory authority (hereinafter referred to as "the authority"), established in the price decision in
the time when the transport capacity can be used, plus the auction premium.
§ 19
(1) the transport of gas when booking a standard annual transportation capacity will
launches the first natural gas on the day of the gas year and ends with the expiry of the
the last day of the gas of the gas, which is shipping
reserved capacity.
(2) the annual transportation capacity of the standard Booking is done for each
natural gas year and no more than the following 15 years.
(3) transport of gas when booking a standard quarterly transport
capacity launches the first day of the quarter of the natural gas
natural gas year, which begins on 1 July, natural gas. October, 1. January,
on April 1, and 1. of July and ends on the expiry of the last gas day
the quarter for which the transport capacity reserved. Reservation
the standard quarterly transport capacity shall be carried out for each quarter
separately, and for all quarters in the gas in one year
the term referred to in the auction calendar.
Procedures and deadlines for the capacity to take the place of customers
directly connected to the transmission system
section 20
(1) the request for the reservation of transport capacity for the sampling space customers
directly connected to the transmission system serving the customer or new
supplier of gas in the event that the customer has entered into a contract for the
associated gas supply services, and, in the cases referred to in § 110, paragraph. 1
and § 113 paragraph. 5, on the dates under section 110, paragraph. 3 or § 113 paragraph. 5.
(2) the transmission system operator shall notify the participant of the gas market of the
options for booking transport capacity in term according to § 111 paragraph. 1.
Reservation of transport capacity in the case of registered standard
changes made in the term gas supplier under section 112, paragraph. 6.
(3) the reservation of transport capacity is arranged:
and for booking transport capacity) for a supply point for an indefinite period
the reserves for an indefinite period with the option to change the amount of transport capacity
According to § 21. 3,
(b)) for the reservation the monthly transport capacity for supply point on the
a minimum of 1 calendar month and a maximum of 11 calendar months always
with effect from the first day of the calendar month, the gas
(c)) for booking transport capacity flexible for the sampling location on the number of
gas days number of calendar days in the month in which the
launched gas under this reservation, or to the end of the last
gas gas November the month following the month in the
which was launched by transport of gas under this reservation,
(d)) for the reservation the daily transport capacity for supply point on the number of
gas days which is the transport capacity reserved; daily
transport capacity is reserved for one or more consecutive
the following gas days for a maximum of 31 days from the date of submission of the
reservation request,
(e)) for booking transport capacity for the sampling place in mode on
the following day on a gas day
(f)) for intra-day capacity reservation for place of consumption on the
the natural gas a day, or on the part of the ongoing gas day, always
by the end of the day for which the gas was carrying capacity
checked out.
(4) the Interruptible capacity can be reserved for the sampling location
the customer is directly connected to the transmission system in the case that is no longer
available free fixed carrying capacity.
section 21
(1) the request for the reservation of transport capacity for the customer's consumption location
directly connected to the transmission system for an indefinite period and monthly
shipping capacity for the customer's consumption location directly connected to the
a transmission system shall submit to the customer or supplier of gas, no later than
the fifth working day until 10:00:00 hours, and the first 4 calendar months prior to the
the beginning of the first gas on which has the effect of the reservations occur
transport capacity, or in the case of supply to delivery point
new connecting customer and to start deliveries to the sampling
space after unauthorized gas sampling or unauthorized transport of gas
no later than 10:00:00 of the working day preceding the day of
the earliest possible commencement of gas contracted with an operator
the transmission system.
(2) the transmission system operator shall evaluate the request for reservation
the transport capacity, submitted pursuant to paragraph 1 and shall notify the results of
booking capacities to all applicants of the transport
capacity by the third working day before 12:00:00 a.m. of the date on
which the request was made of the transport capacity. Confirmation of the
request transport capacity is reserved. If it is not between the customer or
supplier of gas and transmission system operator contract
the provision of services for the transport of gas sampling places customers agreed,
extending the deadline for the submission of applications and for the latest announcements
the result of the booking capacities of 5 working days.
(3) For the reduction and increase in booking transport capacity for the sampling
the place for an indefinite period shall apply section 37. The activities of the operator
distribution system examination of the request for an increase or decrease
the distribution of the capacity for an indefinite period shall be exercised by the transport operator
the system.
section 22
(1) the request for the reservation of transport capacity flexible for the sampling location
the customer is directly connected to the transmission system or the customer shall submit to the
supplier of gas first 4 calendar months before the beginning of the initiation of the
transport under this reservation.
(2) the transmission system operator shall evaluate the request and reservation
electronically notify the result of the booked transportation capacity of the applicant
within 24 hours after receipt of the request.
(3) Electronic confirmation of compliance with the request is the capacity
checked out.
section 23
(1) the request for the reservation of the daily transport capacity for the sampling location
the customer is directly connected to the transmission system, the customer shall submit to the
or electronically to the supplier of gas in the information system of the operator
the transmission system no later than 8:00:00 pm calendar day
preceding the date from which the gas is to be initiated.
(2) the transmission system operator shall evaluate the request for reservation daily
transport capacity for the sampling location and reserve shipping capacity
by 8:30:00 pm the calendar day on which the request was
Booking daily transport capacity for the sampling location.
(3) Electronic confirmation of compliance with the request is the capacity
checked out. In the event that the application is submitted after 8:00 pm,
the transmission system operator shall evaluate the request and checks out the transmission
the capacity of the next calendar day by 8:30:00 pm.
section 24
(1) the request for the reservation of transport capacity for the customer's consumption location
directly connected to the transmission system in a mode on the following day
submit a customer or a supplier of gas in the first 9:00:00 a.m. of the day
preceding the date from which the gas is to be initiated,
and no later than 4:00:00 hours of the day, in which the gas is to be
transport by booking transport capacity is made, and
electronically in the information system of the transmission system operator.
(2) the transmission system operator shall immediately, but not later than
15 minutes after receipt of the request for reservation of capacity evaluation performs
the application and the capacity of the transport capacity in the case of free reserves.
(3) Electronic confirmation of compliance with the request is the capacity
checked out.
§ 25
(1) the request for the reservation of the intraday capacity for supply point
the customer is directly connected to the transmission system, the customer shall submit to the
or supplier of gas, no later than two hours before the start of transport
electronically in the information system of the transmission system operator.
(2) the transmission system operator shall immediately, but not later than
15 minutes after receipt of the request for reservation of capacity evaluation performs
the application and the capacity of the transport capacity in the case of free reserves.
(3) Electronic confirmation of compliance with the request is the capacity
checked out.
section 26
(1) the transmission system operator rejects the request for reservation
transport capacity under section 22, 23, 24, 25, in the event that it is not for the
the sampling place agreed capacity reservation pursuant to § 21.
(2) the transmission system operator receives a request for a reservation pursuant to section
23, 24, 25, in the event that the place of consumption, which satisfies the condition
submission of nominations in accordance with section 63, paragraph. 4.
section 27 of the
The transport of gas to take place in test operation
The transport of the gas in the test operation is arranged by the procedures in section
47. The activities of the distribution system operator referred to in § 47 exercises
the transmission system operator.
section 28
The solution to the lack of capacities for points of virtual stack
gas and gas production points
(1) in the event that cannot be satisfied in the assessment of applications for the reservation
monthly fixed transportation capacity at one point, all applicants for
booking a monthly fixed transportation capacity, split operator
the transmission system free shipping capacity in proportion to the size
individual booking requests monthly fixed transportation capacity with
that, if the applicant's request for monthly fixed-capacity
exceeds free shipping capacity, reduce the transmission
system before the split of the free transport capacity of the applicant to request
the amount of free transport capacity.
(2) in the event that the reservation requests after the satisfaction of daily transportation
capacity cannot be satisfied in the assessment of the applications in one time
all applicants for reservation daily fixed capacity, split
the transmission system operator free shipping capacity in relation
the size of the individual requirements of the daily fixed shipping
capacity with the fact that if the applicant's request on the day of the transmission
capacity exceeds the free shipping capacity, reducing operator
the transmission system before the split of the free transport capacity requirement
the applicant, on the amount of remaining free capacity.
(3) the transmission system operator shall provisionally reserve the interruptible
capacity in the range demanded by the lack of capacity
paragraphs 1 and 2. The transmission system operator reserves the transport
capacity only when the electronic booking confirmation body
in 8:45:00 pm calendar day in which the operator
the transmission system capacity tentatively booked.
(4) transmission system operator shall reserve the interruptible transportation
unlimited capacity.
The solution to the lack of capacities for border points
section 29
(1) in the absence of transport capacity for the annual standard capacity
quarterly and monthly a standard capacity of standard capacity
English auction algorithm proceeds in accordance with other legislation
adjusting the rules for the allocation of transmission capacities ^ 6).
(2) in the absence of transport capacity for the daily standard capacity and
Intraday capacity standard proceed with the auction algorithm
uniform price by other legislation governing rules
for the allocation of transmission capacities ^ 7).
(3) the size offered by the standard daily interruptible capacity
and interruptible capacity standard intraday is not limited.
Standard annual, quarterly and monthly shipping capacity
interruptible does not provide. All offered interruptible transportation
capacity is allocated a starting price, which shall be set in the price
decision.
(4) in the event that there is a reduction of the standard daily interruptible
transport capacity and the standard intraday interruptible transportation
capacity, proceed under another piece of legislation governing
the rules for the allocation of transmission capacities ^ 8).
section 30
(1) in the case of natural gas, for the day in the input or output
the border point is not available free hard daily standard shipping
the capacity of the transmission system operator shall be notified in the information system
the transmission system operator and market operator in the system restrictions
renominací transport for the border point, both for the input,
so for the exit point of the relevant border point for a coordinated and
nekoordinovanou shipping capacity.
(2) the clearing or foreign participant using this item
the transmission system filing nominations can transport pursuant to § 63 paragraph. 1
(a). and § 63) or paragraph. 2 (a). and, where appropriate, under section), paragraph 63. 6
renominovat fixed nekoordinové fixed capacity and coordinated
so, that makes renominaci a maximum of 10% of your reserved capacity
compared with the submitted nomination under section 66 paragraph. 1.
(3) clearing or foreign body Renominations participant increased
or reduced by more than 10% of the reserved capacity at a given point is not
the transmission system operator.
(4) information about limitations renominací served transmission
system no later than 9:00:00 hours of the calendar day preceding the
gas day in which to limit the renominací transport occurs.
section 31
(1) the transmission system operator shall, in the daily standard menu
fixed capacity and Intraday capacity standard hard spare
a fixed capacity and nomination fixed capacity in the opposite direction to the flow of gas
According to § 30 as additional capacity in accordance with other legislation
governing rules for the allocation of transmission capacities ^ 9).
(2) in the event that it is for the gas day condition constraints
renominací transport for the border point under section 30, or in the
If it is not on the border point no
the standard fixed carrying capacity, intra-day body may showdown
or a foreign participant using this item to submit after the deadline referred to in §
paragraph 66. 1 nadnominaci ^ 10).
(3) Nadnominací body clearing or foreign party serves
the reservation request standard intraday interruptible capacity.
(4) for the nadnominace the provisions of renominaci of transport under section
69 and 70.
§ 32
For information about the transport capacities and related services
(1) transmission system operator shall publish in a manner enabling
remote access to the following information:
and the annual plan) per month shutdowns of parts of the transmission system and the
the maintenance plan, which may have an impact on the size and capacities
effect on the quality of the services provided,
(b)) a month long term plan the expansion of the transmission system, which
means increasing the capacities or the improvement of the quality of
services,
c) daily figures the size of technical, total fixed
capacity, total interruptible capacity and free shipping
the capacity for each input and output points on gas storage
the following 24 months,
d) daily figures the size of technical, total fixed
capacity, total interruptible capacity and free shipping
the capacity for each input and output transmission border points
system on the following 15 years,
(e) annual technical forecast) a month, the reserved and free hard
transport capacity on the following ten-year period for each
the entry and exit points of the transmission system, in this predictions
the operator shall take into account the expected technical changes on the transport system and the
expected booking transport capacity,
f) historical monthly minimum and maximum monthly usage coefficient
transport capacity and annual average flow rates for each of the input and
the output points of the transmission system, and it's always in the last 3 years,
g) per day the actual amount of accumulation of the transmission system at the beginning of
gas day after each day for the last 12 months,
(h)) a day a real change of accumulation after each transmission system
days in the last 12 months,
I) daily gas quantity allocated for the various border points, points
gas generating stations are connected to the transmission system and virtual points
gas storage for the past 12 months, if there has been no transmission of data
pursuant to section 96 paragraph. 2, the quantity allocated shall be used in accordance with the provisional gas
section 96 paragraph. 1,
j) daily actual values the past nominations, or registered
renominací for each of the border points, points of gas production plants attached to the
transmission system and points of virtual gas storage for the last 12
months,
to the actual values) daily flow of gas for each border points, points
gas generating stations are connected to the transmission system and virtual points
gas storage for the past 12 months.
(2) Information provided pursuant to paragraph 1 (b). and) to) with daily
periodicity exposes the transmission system operator shall not later than the
15:00:00 hours of the gas day with the fact that the data from the ongoing
gas day referred to in paragraph 1 (b). (h)) are updated
hourly. Information provided pursuant to paragraph 1 (b). (j)), and)
exposes the transmission system operator shall, not later than at 12:00:00 pm
of the next gas day. Information provided pursuant to paragraph 1
with monthly periodicity exposes the transmission system operator
no later than the ninth calendar day of that month.
(3) in the event that the date is not in the gas at the border or on the
virtual point of the stack gas free daily transport capacity,
exposes the transmission system operator every hour, always
no later than 60 minutes after the deadline of submission of nominations or renominací,
information about the sum of the submitted nominations and renominacích including available
interruptible capacity, and this for both flow directions.
PART THE THIRD
DISTRIBUTION OF GAS
section 33
(1) the distribution of gas shall be negotiated settlement for cross-border body point
the gas pipeline.
(2) the distribution of gas customer or vendor negotiates gas sampling
instead of the customer.
(3) distribution of gas distribution system operator arranges for
pass-through space between the distribution systems on the territory of the Czech Republic.
(4) distribution of gas shall be negotiated with the dealer, the manufacturer of gas or gas for
the point of the gas production plants.
(5) by arranging for the distribution of gas supply point customer
the distribution system operator undertakes to provide transport
gas from the point of view of the flow of gas immediately parent distribution
System.
§ 34
(1) the distribution of gas transported through the entry point of a distribution network,
which is the point of a cross-border pipeline, gas production plants, transfer point
Instead, or a summary of the transfer between the transport system and the
distribution networks, pass-through space between the distribution network and distribution
the network, which is in terms of the flow of gas to the parent.
(2) the distribution of gas transported through the exit point of the distribution network,
which is the place of consumption of the customer, the pass-through space between the distribution
network and the distribution network, that is, in terms of the flow of gas to the child, and
the point of the cross-border pipeline.
section 35
(1) For each sampling site the customer shall be concluded a contract of reinsurance
distribution system services with only one participant in the gas market.
(2) For each submission site, where appropriate, a summary of the transfer points of the production plants
gas shall be concluded a contract of providing services to the gas distribution system
with each participant in the gas market using point gas production plants.
(3) the submission site for cross-border gas pipeline shall be concluded a contract of
ensure the service distribution system with each body clearing
using a pass-through place cross-border gas pipeline.
(4) For a pass-through space between the distribution networks of the different
distribution system operators shall conclude a contract on providing services
distribution system operators of distribution networks.
section 36
(1) in the case of sampling points with the measurement of type A or B, in the Treaty of
ensure services distribution system gives reserved distribution
capacity.
(2) for the sampling sites with more measuring points is reinsurance treaty
distribution system services included reserved distribution capacity for
measuring points with the measurement of type A and B and the calculated distribution capacity for
measuring point measurement type C or CM ^ 3).
(3) the distribution capacity for measuring points with the measurement of type C or CM for the
customers with gas over 630 MWh/year is laid down the procedure for
the calculation of the daily fixed capacity allocated for the annual subscription of the gas in the zone
over 630 MWh, which the authority indicated in the pricing decision.
(4) the distribution capacity for customers with gas to 630 MWh/year
annual periodicity laid down the procedure for the billing is the calculation of the daily
booked solid capacity for annual subscription of the gas in the zone above the 63 MWh in
630 MWh, which the authority indicated in the pricing decision.
(5) for the purposes of the evaluation of the distribution of the capacity being exceeded shall apply
only the values agreed and measured at measuring points with the measurement of type A and B.
§ 37
Contract about providing service distribution system
(1) in the contract to provide services for the sampling distribution system
instead of the customer or for the item the production plants, gas or the submission site
among distribution networks reserved the distribution capacity as:
and fixed distribution capacity) for an indefinite period with the possibility of changes to the above
reserved capacity pursuant to section 38 to 43,
(b) interruptible capacity) distribution for an indefinite period with the possibility of changes
the amount of reserved capacity pursuant to section 38 to 43; in the contract to provide the
distribution system services are arranged by the way, the time and conditions of restriction
or disrupting the distribution of gas, the method and conditions of reporting restrictions
or interruption and the frequency limitation or interruption for 12 consecutive
following months of gas,
(c) the fixed monthly distribution capacity); reserves at 1 month with
effect on the first day of the calendar month, gas
(d) a monthly capacity of interruptible) distribution; reserves for 1 month
with effect from the first day of the calendar month of gas; in
the contract is arranged the way time and conditions for restriction or interruption of the
distribution of gas, the method and conditions of restriction or interruption of the notification and
the frequency limitation or interruption for the duration of the contract, or
e) fixed sliding distribution capacity; the number of reserves
gas days number of calendar days in the month in which the
started distribution of gas, or natural gas by the end of the last day
the natural gas of the month following the month in which was launched
gas distribution in the framework of the negotiation of flexible distribution capacity.
(2) for the negotiation of the Treaty of ensuring services and distribution system
application of distribution capacity for the point
cross-border gas pipeline shall apply the procedures referred to in section 42 and under section
10, 11 and 15, while the activities of the transmission system operator referred to
in section 15, shall be exercised by the distribution system operator.
(3) the Interruptible distribution capacity can be reserved only for sampling
instead of the customer with the measurement of type A or B and for the downsizing of the gas at the point
When you cannot reserve a fixed distribution capacity because of that
is no longer available free fixed distribution capacity, or for sampling
instead of a customer with a scheduled annual collection of over 630 MWh, with the option
the total or partial transition to alternative fuel, according to another
the law governing the way of ensuring the security
standard gas supply ^ 11).
Procedure when booking distribution capacity
section 38
(1) the request for the reservation of the distribution capacity and the conclusion of the Treaty on the
ensure the service distribution system for customer pick-up places
served electronically in cases under section 110, paragraph. 1 and § 113 paragraph. 5, and
in terms under section 110, paragraph. 3 or § 113 paragraph. 5, the customer, if
with him to the place of consumption is no longer a contract of reinsurance services
the distribution system is closed, or a new supplier of gas in the event that the
concluded the contract with the customer on the associated gas supply services.
(2) the distribution system operator shall notify the participant of the gas market
about reservation options distribution capacity in term according to § 111 paragraph.
1.
(3) in the case of distribution capacity register
standard gas supplier changes made in the term under section 112, paragraph.
5.
(4) the request for the reservation of the distribution capacity to delivery point
the customer contains the elements listed in annex 2 to this Decree.
(5) the distribution is not possible reserve capacity in low
financial collateral arrangements the applicant if the reservation request distribution
capacity does not meet the established requirements, has not been submitted within the specified
the term or the applicant has not nedoplnil or modify requests to
14:00:00 hours of the following working day after notification
distribution system operator with an indication of incorrect data.
section 39
(1) the request for the reservation of the distribution capacity and the conclusion of the Treaty on the
ensure the service distribution system for sampling locations of customers,
In addition to the application under section 38, 40 and 43, customer or vendor
gas not later than the fifth working day until 10:00:00 hours, and the first 4
calendar months before the beginning of the first gas on which has
the effect of the distribution of the capacity reservation occur, or in the case of the initiation of the
deliveries to the delivery point newly connecting the customer and for the
start of deliveries to the sampling space after unauthorized gas sampling or
unauthorized distribution of gas no later than 10:00:00 pm work
the day preceding the date of the earliest possible start of gas supplies
agreed with the distribution system operator.
(2) the request for the reservation of the distribution capacity for supply point
the customer, in addition to the application under section 38, 40 and 43, contains the elements
referred to in annex 2 to this Decree.
(3) the distribution system operator shall evaluate the request on the
booking distribution capacity and shall notify the results of reservation
distribution capacity to all applicants of the distribution capacity
no later than the third working day before 12:00:00 hours of the date on which the
the distribution capacity of the reservation request is made.
(4) Electronic confirmation of compliance with the request is a distribution capacity
checked out.
(5) if it is not between the customer or supplier of gas, and the operator
distribution system contract for ensuring the service distribution system
for sampling places customers negotiated, the deadline for
the latest submission of applications and for the notification of the result of the reservation
distribution of capacity of 5 working days.
section 40
(1) the request for the reservation of the distribution capacity and the conclusion of the Treaty on the
ensure the service distribution system for sampling places customers at the
Quick change gas supplier under section 116 shall be presented by the customer or
supplier of gas in the term under section 116 or gas trader in the mode
supplier of last resort not later than 14:00:00 pm after the transfer
information under section 116.
(2) the request may be submitted only to the customer or supplier of gas, which already
He negotiated a treaty with the distribution system operator to provide the
distribution system services for the sampling space customers.
(3) the application shall be submitted electronically and the distribution system operator
evaluates the request for reservation distribution capacity in the rapid
change gas supplier and notify the results distribution capacity reservations
applicants for reservation distribution capacity no later than the date referred to in section
117.
(4) Booking distribution capacity is in the case of registering rapid
changes made in the term gas supplier under section 118.
(5) For the distribution of the capacity of the reservation request to be filed with
gas in the mode of supplier of last resort is the distribution capacity
reserved automatically.
(6) the request for the reservation of the distribution capacity in the rapid change of the supplier
gas to the delivery point of the customer contains the elements referred to in
Annex No 2 to this Decree.
§ 41
(1) the request for the reservation of the distribution capacity and the conclusion of the Treaty on the
ensure the service distribution system for a pass-through space between the
distribution networks presents the distribution system operator in
the term pursuant to section 38. For the request to change the distribution capacity reserved
the terms shall apply under section 39.
(2) the request for the reservation of the distribution capacity and the conclusion of the Treaty on the
ensure the service distribution system for gas production plants point presents
manufacturer of gas or gas trader in the term under section 38. For the request
on the change of distribution capacity reserved Terms shall apply under section 39.
section 42
(1) the request for the reservation of the distribution capacity and the conclusion of the Treaty on the
ensure the service distribution system for the point of cross-border gas pipeline
submit body clearing the distribution system operator
no later than 10:00:00 of the working day preceding the day of
the earliest possible start of distribution of gas agreed with
distribution system operator.
(2) the distribution system operator shall evaluate the request on the
booking distribution capacity for the cross-border pipeline and to the point
the reservation shall notify the results of distribution capacity to all applicants for
booking distribution capacity for the cross-border point of gas pipeline
no later than the third working day before 12:00:00 hours of the date on which the
application for reservation of capacity for cross-border distribution point
the pipeline is made.
(3) Electronic confirmation of compliance with the request is the capacity
checked out.
§ 43
(1) the request for the reservation of the distribution capacity and the conclusion of the Treaty on the
ensure the service distribution system under section 37, paragraph. 1 (a). (e))
the sampling site the customer shall submit to the customer or the supplier of the gas
first 4 calendar months before the beginning of the first gas day,
When the effect of the reservation is to occur the distribution capacity.
(2) the request may be submitted only to the customer or supplier of gas, which already
He negotiated a treaty with the distribution system operator to provide the
services and distribution system for the sampling location has reserved
distribution capacity pursuant to section 37, paragraph. 1 (a). and) or (b)).
(3) the maximum size of the required capacity for the sliding of the Treaty on
ensure the service distribution system shall not exceed in the aggregate with
the other checked-out distribution capacity for responsible sampling
Instead the customer the size of dvacetičtyřnásobku secured hourly capacity
specified in the contract for the relevant place of consumption.
(4) the distribution system operator shall evaluate the request for reservation
distribution capacity and electronically notifies the result of booking
the distribution of the capacity of the distribution capacity of the applicant
within 24 hours after receipt of the request.
(5) Electronic confirmation of compliance with the request is a distribution capacity
checked out.
(6) the request for the reservation of the distribution capacity to delivery point
the customer contains the elements listed in annex 2 to this Decree.
Change the reserved distribution capacity
§ 44
(1) if the place of consumption of the customer with the measurement of type A or B, for which the
proper readings are carried out monthly, or for pass-through space between the
distribution networks asks the participant to reduce the gas market
distribution capacity reserved on the basis of the distribution capacity
reserved under section 37, paragraph. 1 (a). and (b)) or) operator
distribution system operators shall carry out a reduction of the distribution capacity reserved
for the period following a minimum of 12 months.
(2) the distribution system operator does not reduce the reserved
the distribution of the capacity, if it is within the time limit under section 110, paragraph. 3 from the date of
referred to in the application for reduction for sampling or submission site
a higher distribution capacity reserved under section 37, paragraph. 1 (a). and) or
(b)) than the reserved distribution capacity referred to in the application for
the reduction.
(3) if the place of consumption of the customer with the measurement of type A or B, for which the
proper readings are carried out monthly, or for pass-through space between the
distribution networks will ask the participant the gas market to increase
distribution capacity reserved under section 37, paragraph. 1 (a). and (b)), or)
the distribution system operator shall examine the possibility of increasing the reserved
in the case of distribution capacity and sufficient distribution capacity be increased
reserved distribution capacity for the period following a minimum of 12
months, if there has been no reduction in the distribution capacity reserved
the distribution capacity reserved under section 37, paragraph. 1 (a). and) or
(b)) in the previous 12 months.
section 45
(1) when applying for an amendment reserved the distribution capacity
proceed mutatis mutandis under section 39. Change the reserved distribution capacity
It is maybe on the first day of the calendar month of the gas.
(2) the distribution system operator makes the change reserved
the distribution of the capacity for a pass-through space between the distribution networks also
in the event that the distribution system operator shall request and need
changes to the reservation of the distribution capacity.
(3) the distribution system operator shall carry out a reduction of the reserved
the distribution capacity of the gas production plants, connected to the closed portion of the
distribution network, reserved under section 37, paragraph. 1 (a). and (c))), or (e))
If the above hourly subscriptions of customers connected to this
the closed part of the distribution network falls below the value of hourly output
gas production plants.
(4) in the event that it is on the closed part of the distribution network more
production of gas and the distribution system operator shall carry out reduction
distribution capacity reserved under paragraph 3, the operator
distribution system free distribution capacity in proportion to the size
each generation of gas distribution capacity reserved.
(5) the distribution system operator shall carry out a reduction of the reserved
distribution capacity referred to in paragraph 3 for the period strictly necessary to
ensure the safe and reliable operation of the closed part of the distribution
According to another legal regulation governing the conditions for doing business in
energy sectors ^ 12).
section 46
(1) if the sampling place the customer has changed the measurement of type (C)
Type A or B, the customer or the supplier of the gas request
booking distribution capacity to the first gas day calendar
the month in dates under section 39 so that the effect of the reservation of the distribution
the capacity of the not yet come later than 2 months from the change of the type of measurement.
(2) in the absence of the customer or the supplier of the gas reservation request
the distribution capacity of the procedure and within the time referred to in paragraph 1,
the distribution system operator reserves to consumption location
distribution capacity pursuant to section 37, paragraph. 1 (a). and) of the allocated
the distribution of the capacity established for purposes of determining the payments for the distribution of
the gas, which the authority indicated in the pricing decision.
section 47
Gas distribution in test operation
(1) the distribution of gas in the test operation of the gas distribution for
verification of technical parameters, operating values and demonstrate
the operability of the newly installed or refurbished sampling
gas equipment of the customer, while the reconstruction is for the purposes of this
the Decree means the interventions in the delivery of the gas equipment which are
in a change of its purpose or technical parameters, or to change
measurement type in the place of the supply of the customer. The distribution of the gas in the test
the operation can be initiated only:
and) for newly connecting the customer with the measurement of type A or B,
(b)) for the customer with the measurement of type A or B, which reconstructed the whole or
part of the sampling of gas installations and restored the sampling gas
the device has at least 20% of the daily maximum gas sampling in
the sampling place the customer, or
(c)) for the place of consumption of the customer, in which there was a change from the type of measurement
(C) the type and or (B).
(2) in place of consumption of the customer with the character collection, technologist
deems such place of consumption of the customer for which the sum of the actual
the values of consumption for the last quarter of the previous year and the first quarter of
the year is less than 70% of the total consumption for the period from 1. April
the previous year to 31. in March of that year. In the event that they are not to
present value of actual consumption, replace the operator is
planned monthly consumption distribution system referred to in the Treaty on
ensure the service distribution system. Other sampling points,
consider the sampling place customers with the character of the collection of the otop.
(3) the application for distribution of gas in test operation for gas sampling
Instead the customer serves the applicant of distribution capacity in the
test the operation of the distribution system operator. The application includes:
and start date) distribution in test operation,
(b)) end date of the distribution in test operation,
(c) the reasons for the initiation of the distribution) of the test operation.
(4) the distribution system operator shall initiate the distribution of gas in
test operation at the customer's subscription as soon as possible with the character of a technologist
the date referred to in the request and terminates on the day referred to in the request, no later than
However, the last day of the third calendar month following the
the month in which the gas distribution started. In other cases, the
the distribution system operator shall initiate the distribution of gas in the test
the operation of the date referred to in the request and terminates on the date specified in the request,
but not later than the last day of the month of February. The maximum duration of
gas distribution in trial operation at newly connecting customer
with the character of the collection of the otop is the 6 calendar months.
(5) the maximum daily discharge gas in place of the customer during the
the distribution of the gas in the test operation must not exceed dvacetičtyřnásobek
secured hourly capacity for appropriate supply point agreed in the
the Treaty on the connection.
(6) the request for the reservation of the distribution capacity in test operation
submit a customer or a supplier of gas in terms under section 39.
The distribution system operator for the duration of the test operation
referred to in paragraph 1 (b). (c)) for customer sampling place reserves
the assigned distribution capacity required for the purposes of determining payment for
distribution of gas, which the authority indicated in the pricing decision.
(7) in the event that a customer or a supplier of gas in the absence of the term according to the
§ 39 before the end of the distribution in the test service reservation request
distribution capacity pursuant to section 37, paragraph. 1, operator of the distribution
the system reserves space for the sampling distribution capacity under section 37
paragraph. 1 (a). and) of highest daily gas consumption in
during the trial operation.
section 48
The solution to the lack of distribution capacity
In case of lack of capacity in the cross-border distribution point
the gas pipeline or gas production plants point shall apply the procedures referred to in section 28.
The activities of the transmission system operator referred to in section 28 shall exercise
the distribution system operator.
section 49
Information about the distribution system
(1) the distribution system operator exposes the way enabling the
remote access and updates to the 15th day of each calendar month
the following information:
and the annual plan shutdowns) the various parts of the distribution system and plan
maintenance, which may have an impact on the size of the distribution capacity and impact
on the quality of the services provided,
(b)) a long-term plan of expanding the distribution system, which means
increase distribution capacity or improve the quality of
services,
(c)), the total size of the numerical form of the technical capacity of the solid, reserved
total interruptible capacity and free distribution capacity
for each entry and exit points of cross-border gas pipelines,
(d) the availability of monthly figures) the indicative distribution capacity for
each entry and exit points of forward points of cross-border
gas pipelines,
(e)) the annual predictions of the free entry and exit capacity for the individual
entry and exit points of cross-border gas pipelines to transfer seats
the following ten-year period.
(2) the distribution system operator exposes a day way
enabling remote access to 12:00:00 pm change accumulation
the distribution network after each day for the past 12 months.
(3) the distribution system operator exposes the way enabling the
remote access daily gas consumption in their distribution networks after
each of the hours of the current gas day within two hours after
the end of the appropriate hours.
(4) the distribution system operator exposes the way enabling the
remote access to the 12:00:00 pm 9th calendar day, not later than
However, until 12:00:00 hours of the sixth working day of the month, gas
the value of the gross calorific value of gas per day for the
the previous natural gas a month.
PART THE FOURTH
GAS STORAGE
section 50
(1) Access to trays of gas in which the operator of a tank of gas
provides storage capacity and storage services for the body
Clearing or from a foreign participant is conducted on the principle of
virtual stack gas.
(2) the operator of a storage tank always full storage offers free
the capacity for all of its gas to the point of virtual
the stack gas. The virtual stack gas transmission system
is a place where storage capacity is provided and on which occurs
a business looking to transfer and reception of gas injection into the reservoir, the
the extraction of gas and gas from the gas tank, and regardless of the actual
pass-through space.
(3) the virtual gas storage is specified the name of the operator
gas storage and storage capacity.
(4) on the basis of the Treaty on gas storage operator reserves
stack gas body clearing or foreign participant in the annual
storage capacity with a solid performance, the annual storage capacity with
solid performance on a new storage capacity, the monthly storage
capacity with a solid performance, daily storage capacity with a solid performance,
daily storage capacity with přerušitelným performance. Storage capacity
with the reserves as a
and) annual storage capacity with a fixed performance; minimum booking period
storage capacity is 1 year and a maximum storage period of reservation
capacity is 5 years,
(b)) the annual storage capacity with a solid performance on the new storage
capacity; minimum booking period and annual storage capacity) with
fixed performance; minimum booking duration of storage capacity is 1 year and
the maximum duration of the reservation of storage capacity is 5 years, storage
the capacity is 1 year and a maximum time of reservation of storage capacity is 15
years,
(c)) the monthly storage capacity with a fixed performance; the minimum time
reserve storage capacity is 1 month and the maximum time the natural gas
reserve storage capacity is 24 months, gas
d) daily storage capacity with a fixed performance; minimum booking period
storage capacity is 1 day and the maximum time the natural gas reserve
storage capacity is 90 days of gas,
e) daily storage capacity with přerušitelným performance; time of booking
storage capacity is 1 the natural gas a day.
(5) the capacity of the reserves with the effect to the first gas day
the period for which the storage capacity is reserved. Reservation
storage capacity is terminated by the end of the last gas day
the period for which the storage capacity was reserved.
(6) the operator of a tank of gas, operating gas connected
the transmission system through more than one pass-through
the Division shall consult the space exploration and injection into individual pass-through
the place of storage of the gas with the transmission system operator.
Procedure when booking annual storage capacity with a solid performance
section 51
(1) the operator of a tank of gas reserves with an annual storage capacity
fixed performance issues on the principle of vícekolové of the electronic auction.
(2) the operator of a storage tank exposes to
remote access no later than 10 working days before the beginning of the vícekolové
the electronic auction the auction conditions on storage capacity.
Terms and conditions of auction shall be proportionate, non-discriminatory and transparent.
Conditions for auction shall contain the particulars in accordance with point 2 of annex 3 to the
This Decree.
(3) the clearing or foreign participant requesting reservation
storage capacity serves a request to reserve storage capacity in
the auction in the form of round numbers referred to within two
decimal places, expressing the desired amount of free storage
capacity. The applicant for a reserve storage capacity enters at the same time with
the requirement to reserve storage capacity and the required length
reserve storage capacity, which can be divided into several parts with
different length duration. Request to reserve storage capacity and
the desired length of the reservation, made at the auction round cannot be over
the auction of the wheel change.
(4) the supplier of the gas, which forms with the operator of the storage tank
concern or is part of the same group or other business
the grouping, and alone or in conjunction with other gas suppliers, who make up the
with the stack gas concern or are part of the same
group or another group, the operator has
storage tank checked out with storage capacity of at least 80% of the
the capacity of the virtual stack gas operated by it, you may as
the applicant to participate in the auctions on storage capacity only if
the minimum price for storage capacity in accordance with point 2 (b). Annex No.)
3 this notice lower or equal to the market price of storage capacity
the same or similar parameters for booking annual storage
capacity in the Czech Republic.
(5) the size of the reserved storage capacity referred to in paragraph 4, the
It assesses the first day of the first year of storage, which is
storage capacity offered. If multiple gas suppliers, who
form with the operator stack gas concern or are
the operator of the storage tank or in another part of the same group
the group, the requirements to reserve storage capacity in
the cumulative excess amount of free storage capacity,
the operator of a tank of gas storage capacity reservation requirements
such suppliers of gas relatively reduced, so that in the aggregate amount of
match the size of the available storage capacity.
(6) the requirement, where appropriate, the gas supplier gas suppliers by
paragraph 5 on the reserve storage capacity the operator stack
the gas will be reduced by the requirements to reserve storage capacity of other
of the applicants, but not more than the difference between the free storage capacity and
the requirements on the reservation of storage capacity of the other applicants.
section 52
(1) the applicant shall lodge a financial collateral at the latest 3 working days before the
published date of the auction. The provision of a financial collateral shall be subject
Clearing or foreign participant becomes the applicant, which may
actively participate in electronic auctions (hereinafter referred to as "active applicant").
Active, the applicant may lodge a request to reserve storage capacity in
auction up to the corresponding composite financial collateral. For
composition of financial collateral is also considered the submission of the irrevocable
the bank guarantees.
(2) active applicant may submit a request to reserve storage
capacity in the following auction round, only up to the amount of the request on the
reserve storage capacity in the previous auction round. In the event that the
in one auction round will not introduce active applicant request for reservation
storage capacity or submits a request to reserve storage
capacity or the desired length of the reservation with the value 0, it cannot
submit reservation requests to the storage capacity at any
following the auction round.
(3) in the event that occurs in the auction round in the sum of all the requirements for the
reserve storage capacity of active applicants to exceed the value of the
the size of the storage capacity offered, followed by another auction round. In
the next auction round auction price for a unit of storage capacity
increases the way under the terms of the auction.
(4) the individual auction round are limited to 10 minutes. If you with it
all applicants agree, the operator of a tank of gas
the auction round to truncate.
(5) during the auction the operator stack gas active applicants
announce the sum of all requests for reservation of storage capacity in the
previous auction round, and the time remaining until the end of the auction round.
(6) the operator of a tank of gas will end the auction, if the auction bike
the sum of the requirements to reserve storage capacity for all active
the applicants is less than or equal to the size of the storage offered
capacity. The operator of a tank of gas reserves storage capacity
rounded to whole m3 or kWh or kWh/day according to the requirements of the
reserve storage capacity of active applicants in the last auction
bike. If it remains part of the storage capacity is nerezervována, this part of the
storage capacity reserved active applicants from the penultimate
wheels in their requests to the above reservation, storage
capacity in the penultimate round of the auction, saying that the request for reservation
the active storage capacity of the applicant is to calculate the reduced reservation
about the storage capacity that is reserved to the active applicants in the last
auction round.
(7) in the event that the sum of all the requirements on the booking
storage capacity of active applicants in the first auction round to
exceeding the value of the size of the storage capacity offered, is the price for
storage of gas intended for the value of the minimum price referred to in point 2 (a).
and no. 3) of the annex to this Decree. In other cases, the price for
gas storage fixed at the value of auction prices in the last auction
where the sum of all the requirements to reserve storage capacity
Active applicants was higher than or equal to the size of the offered
storage capacity.
section 53
(1) the operator of a tank of gas to be sent to the confirmation of reservation
storage capacity electronically without undue delay after their
the auction along with the final price for a unit of storage capacity.
(2) the operator of a tank of gas, which returns the active applicants
not reserved storage capacity, financial collateral to a 10
calendar days after the end of the auction. Active to the applicant, which was
reserved storage capacity, the operator returns the stack gas
financial collateral within 10 calendar days after the conclusion of the Treaty on
gas storage.
§ 54
Procedure when booking a monthly storage capacity with a solid performance
(1) the operator of a tank of gas reserves a monthly storage capacity
with a solid performance on the basis of the outcome of the vícekolové of the electronic auction.
(2) the operator of a storage tank exposes to
remote access conditions auctions free monthly storage
capacity with a solid performance at the latest 10 working days before the beginning of the
auction. Terms and conditions of auction shall be proportionate, non-discriminatory and
transparent. The terms of the auction must contain the same elements as the
the terms of the auction when booking annual storage capacity with a solid performance
with this, the price per unit of storage capacity is all the time
reserve storage capacity constant. The terms of the auction also include
determine the number of calendar months for use of storage capacity.
(3) For the holding of the auction section, paragraph 51. 3 and section 52 shall apply mutatis mutandis. Request
the length of reserve storage capacity is expressed as a whole number
expressing the number of months of the duration of the contract in the range of specified
According to the last sentence of paragraph 2.
(4) the operator of a tank of gas to be sent to the confirmation of reservation
storage capacity electronically without undue delay after their
the auction along with the final price for a unit of storage capacity.
(5) For the return and the pumping of the financial collateral, § 53 paragraph. 2 apply
Similarly.
section 55
Procedure when booking daily storage capacity with a solid performance
(1) the application for reservation daily storage capacity with a solid performance
submit body clearing or foreign party electronically
the operators of the gas storage not later than 1 calendar day until 8:00:00
hours and the first 90 calendar days before the start of the first
gas day, from which the reservation is required. The operator
stack gas shall evaluate the applications received and notify the results booked
storage capacity to all applicants to the 9:00:00 pm calendar day,
in which the request for the reservation of storage capacity.
(2) Electronic confirmation of compliance with the request is a daily storage
capacity with a solid performance.
section 56
Procedure when booking daily storage capacity with přerušitelným performance
(1) the application for reservation daily storage capacity with přerušitelným
the performance of the operators of the gas serves the body of settlement or
Foreign participant with a reserved storage capacity for this
the operator of the storage tank or with the law with this capacity.
(2) the request for the reservation of the daily storage capacity with přerušitelným
the performance presents a body of clearing or foreign participant
electronically no later than 16:00:00 hours of the previous natural gas
of the day. The price for the storage capacity with the přerušitelným power is covered by
only part of the allocated for an uninterrupted daily storage capacity with
přerušitelným performance. The operator shall evaluate the request and gas storage
electronically notify the reservation no later than 10 minutes after each full
the hour in which the request for the reservation of the daily storage capacity with
přerušitelným performance received. Service of notice of the
considers the daily storage capacity with přerušitelným performance
reserved. The operator of a tank of gas could allow the body
Clearing or foreign participant lodging reservation request
storage capacity with přerušitelným performance later after the deadline referred to in
the first sentence, and even during the gas day.
Procedure when booking annual storage capacity with a solid performance at the
a new storage capacity
§ 57
(1) in accordance with paragraphs 2 to 5 and § 58 checks out the operator stack
gas, planning the construction of new storage capacity, up to 90% of this
storage capacity. The remaining part of the new storage capacity reserves
the operator of a tank of gas the procedure under sections 51 to 53 or 54. According to the
paragraphs 2 to 5 and § 58 gas storage operator does not flow when
reservation of such new storage capacity, which the operator
stack gas offered under the rules for the allocation and management, and
management of new storage capacity exceeded the approved Authority ^ 13).
(2) the operator of a tank of gas reserves with an annual storage capacity
solid performance on a new storage capacity on the principle of vícekolové
electronic auctions. The operator of gas storage launches auction
first 7 years before the beginning of the year, from which the storage system is possible
start gas storage with the use of new storage capacity in the whole
the size of the.
(3) the maximum length of the reservation to reserve the annual storage capacity
storage capacity with a solid performance to a new storage capacity is 15
years. The length of the reservation, the operator determines the storage capacity of the stack
of gas in the announcement of the terms and conditions of the auction.
(4) in the case where the construction of new storage capacity to the
the gradual increase in storage capacity or its
parameters and operator of stack gas increase in storage capacity
or individual parameters for each year shall be specified in the terms of
the auction in accordance with point 3 (b). (b)) of annex 3 to this Decree, then this
increase storage capacity or the individual parameters by the operator
stack gas split proportionally among all bodies
clearing and foreign participants, which was a new storage capacity
checked out.
(5) the operator of the storage tank type exposes no later than 60 days before the
the planned start of the auction conditions of the auction on a new storage capacity.
If this is a auction for new storage capacity, which was already in the
the auction offered, but has not been checked out, the operator shall publish the
gas storage conditions of the auction, no later than 30 days prior to the scheduled
the start of the auction. Terms and conditions of auction shall be proportionate, non-discriminatory and
transparent. Conditions for auction shall contain the particulars in accordance with the annex to
No. 3 to this notice.
section 58
(1) the supplier of the gas, which forms with the operator of the storage tank
concern or is part of the same group or other business
the grouping, and alone or in conjunction with other gas suppliers, who make up the
with the stack gas concern or are part of the same
group or another group, the operator has
storage tank checked out with storage capacity of at least 80% of the
the capacity of the virtual stack gas operated by it, you may as
the applicant to participate in the auction on a new storage capacity only if
the minimum price for storage capacity in accordance with point 2 (b). Annex No.)
3 this notice lower or equal to the market price of storage capacity
the same or similar parameters for booking annual storage
capacity with a solid performance in the Czech Republic.
(2) the supplier of the gas that meets the condition specified in paragraph 1 may request the
storage capacity up to the amount of storage capacity, which must be in accordance with
the terms of the auction in the auction reserved not to auction the operator
the stack is canceled.
(3) Request the supplier of gas, or gas suppliers by
paragraph 1 to reserve storage capacity the operator stack
the gas will be reduced by the requirements to reserve storage capacity of other
of the applicants, but not more than the difference between the minimum amount referred to in point 3
(a). and no. 3) of the annex to this Decree and reservation requirements
storage capacity of the other applicants.
(4) For the holding of the auction section, paragraph 51. 3, § 52 and 53 shall apply mutatis mutandis.
Financial collateral, the applicant must lodge no later than 5 calendar days before
the term holding the auction. The minimum price per unit of storage capacity
It is established in accordance with point 2 (b). and no. 3) of the annex to this Decree.
(5) in the event that will be possible after booking an annual storage capacity with
solid performance on a new storage capacity make this a new
storage capacity before the efficiency booked annual storage
capacity with a fixed power on a new storage capacity, it can
the operator of a tank of gas to offer to the participants of the gas market in the form of
booked monthly storage capacity with a solid performance, even
repeatedly. For the reservation of this storage capacity is used to section 54
Similarly. The following reserved storage capacity is still considered
a new storage capacity.
section 59
The procedure for the sale of a series of gas
(1) in the event that after the reserve storage capacity on the basis of
gas storage contracts prevent the extraction of the gas in the ownership
the subject of settlement or a foreign participant, and this gas is not possible
convert within a virtual stack gas on the basis of other
existing reservations, the storage capacity of the subject of settlement
or foreign participant using the virtual gas storage,
the operator performs the stack gas driven selloff on gas
Intraday organised gas market.
(2) the Controlled sale of gas gas storage operator each
the natural gas a day, according to their available mining capacity. The operator
stack gas for the purpose of the controlled sale of gas reserves the transport
the capacity for the entry point of a virtual gas storage.
(3) the operator of the storage tank serves within the intraday
organised gas market an offer for sale of gas at a price of € 1/MWh.
The operator of the storage tank in a manner enabling remote publishes
access the volume of gas each day, which will be offered in the framework of intra-day
organised gas market.
(4) the operator of a tank of gas to be sent to the subject of settlement or
Foreign participant in proceeds from the sale of gas by series
paragraph 1, the less legitimate costs directly associated with the sale of
gas within 15 calendar days after the completion of the sale of two series of gas.
section 60
Reduction of storage capacity at the restriction or interruption of storage
gas
(1) the operator of a tank of gas in the restriction or interruption of the
storage of gas running out soon as the reserved storage capacity with
přerušitelným performance and subsequently reserved storage capacity with
fixed performance.
(2) the operator of a tank of gas running out of storage capacity reserved
with přerušitelným performance on the basis of price per unit přerušitelného
vtláčecího or extractive performance in order from lowest to highest price
with the fact that the reserved storage capacity with the same price per unit
přerušitelného running out to the same level of performance against agreed
přerušitelnému performance. If the nominated body clearing or
Foreign participant under the maximum level of reduction is not applied
his nomination of warehousing. Otherwise, the operator
stack gas will confirm the nomination of warehousing in abbreviated
the amount of.
(3) the operator of a tank of gas running out during the planned restrictions or
break storage capacity reserved storage capacity with a fixed
storage capacity so that the same shall be reduced proportionally to the storage
capacity reserved for the days on which the interruption is planned, all
operators of clearing foreign participants. If the nominated
Clearing or from a foreign body under the maximum level participant
the applied reduction does not affect the storage of his nomination.
The operator shall notify the gas tank, how much will be booked solid
storage capacity reduced, and also notify the planned interruption of
storage capacity.
(4) in the event that all or part of as the reasons for the restriction or
the interruption of gas storage, gas tank, the operator shall immediately
inform stakeholders of clearing or foreign participants, which
may submit to the renominaci storage.
(5) in the case of sudden failure of injection or extraction progresses
the operator of a tank of gas in the reduction of the reserved storage
capacity and confirmation of the nomination of the storage referred to in paragraphs 1 to 4
Similarly.
section 61
For information on storage capacities
(1) the operator of a storage tank exposes to
remote access and updates immediately, but not later than on the 15th
day of the calendar month, the following information:
and the size of the reduction plan) annual production volume or reduce the quality of
of services provided by the virtual stack gas from the reasons for stoppages or
planned maintenance of the individual gas storage,
(b)) five-year plan size adjustments of the operational capacity, the daily
the maximum performance of the relevant vtláčecího and mining virtual
gas tank for each storage year
(c)), the total size of the numerical form technical reserved and available storage
the capacity of the relevant virtual gas storage,
(d)) size adjustments of the operational capacity, the daily maximum, and vtláčecího
the performance of the relevant virtual stack of extractive gas over the last
three years of storage for each storage year.
(2) the operator of a storage tank exposes to
remote access and daily at 9:00:00 pm updates at least the following information:
and the total amount of available mining) and vtláčecího performance
the following day, natural gas
(b) the total contract size) of the hard coal and vtláčecího performance
calculated on the basis of the sum of the mining or injection capacity entities
Clearing or foreign participants on the following day, natural gas
(c)) the current status of stocks in a virtual stack gas energy
units,
(d)) the size of the broken přerušitelného performance and the highest price for
Unit přerušitelného, to which the power interruption applied for
preceding day gas,
(e)) the size of the broken fixed storage capacity in distribution on injection
and the upstream performance for the preceding day gas,
(f)) of the actual daily injection and extraction for the previous natural gas
the day.
(3) the operator of the storage tank type exposes the data referred to in paragraph 2 for
the last 3 calendar years.
(4) the operator of a storage tank exposes to
remote access cost and the size of the reserved storage
capacity in each of the auctions for the last 3 calendar years.
PART THE FIFTH
NOMINATIONS AND RENOMINATIONS
section 62
Procedures and deadlines for the submission of nominations the obligation to deliver and the commitment
Remove
(1) the nomination of the obligation to deliver and the obligation to remove the settlement served the body
as the day the nomination of the obligation to deliver and remove the obligation electronically in
a standardized protocol defined in business terms
the market operator as the nomination under a bilateral trade treaty when the
the body registers the transfer posting with clearing the gas by an entity other
at the virtual trading point.
(2) in the event that the deadline submission of nominations under section 68, paragraph.
1 served the bodies is not reconciliation posting nominations of trade
referred to in paragraph 1, the market operator registers the smaller of the values entered
the nominations.
(3) the nomination of the obligation to deliver and the obligation to remove the market operator shall for the
clearing bodies or foreign participants, for which it is responsible for the
the transmission system operator is assigned to the variance, as the daily
the nomination of the obligation to deliver and remove the obligation electronically in
a standardized protocol defined in business terms
the market operator as follows:
and applicability of the gas on the nomination) intraday organized market
When the market operator registers made trades on the organized
intraday market between the market operator and the various bodies
clearing,
(b) the daily amount of countervailing nominations), when the market operator
registers the size of daily balancing quantity between the market operator
and individual entrepreneurs or foreign participants; in
If the daily amount of the compensatory body clearing or
as for the external subscriber's registration, when on the side of the obligation to deliver
performs clearing body or foreign party and on the side of the
the obligation to remove the market operator, in the case of a negative natural
the balancing amount of body or foreign participant in the clearing
as for the registration, when on the side of the obligation to deliver the market operator acts and
on the side of the body to remove the obligation of settlement or a foreign participant.
(4) the market operator to sum all the registered nominations
the daily amount of the compensatory in accordance with paragraph 3 (b). (b)), so that
obligations to deliver the subjects of settlement or the foreign participants, for which it is
responsibility for deviation is assigned to the transmission system operator,
have the plus sign and minus sign to remove obligations they have. The market operator
registers a nomination to the transmission system operator on the account
the operator, such as
and the commitment to deliver the market operator) and a commitment to remove the operator
the transmission system operator for the account in the event that the sum is
a positive,
(b) a commitment to remove the market operator) and the commitment to deliver operator
the transmission system operator for the account in the event that the sum is
negative.
section 63
The nomination of the transport
(1) the nomination of transport serves the body clearing on entry points
the transmission system
and the amount of the reserved capacity) at the border points of the transmission system;
the nomination of the transport on the entry point is served by the cathode
gas, indicating their markings in such a form that the operator
the transmission system operators of neighbouring transmission system operators were
able to perform reconciliation
(b)) to the amount of reserved capacity at points of the stack gas; nomination
transport to the input point is served so that the transmission
the operator of a storage tank system, and were able to perform
reconciliation,
(c)) to the amount of reserved capacity at production plants.
(2) the nomination serves to transport the body of clearing output points
the transmission system
and the amount of the reserved capacity) at the border points of the transmission system;
the nomination of the transport is served by individual customers of the gas with the
their designation in such a form that the transmission
system operators of neighbouring transmission system operators were able to
perform reconciliation
(b)) to the amount of reserved capacity at points of the stack gas; nomination
transport is served so that the transmission system operator and
the operator of the storage tank were able to perform the reconciliation
(c)) to the amount of reserved capacity at the delivery point of the customer directly
connected to the transmission system in the distribution by hours
gas day.
(3) for the coordinated and uncoordinated transport capacity on the border
points of the transmission system operator may submit the nominations showdown
transport and in the information system of the neighboring transmission operators
the system. The transmission system operator shall ensure that the following applications submitted
nomination of transport have been recorded in the information system without
undue delay were forwarded to the market operator.
(4) the Nominated transport serves only for sampling places customers directly
connected to the transmission system with the reserved capacity greater than or
straight 5 000 MWh/day.
(5) the transmission system operator shall transport in nomination
the distribution of these input and output points of the transmission system:
and the point of action for compensation), the transmission system operator in
the transport of gas associated with the change of account operators,
(b)) virtual technical point of the transmission system operator for the transport of
gas associated in particular with the coverage of the loss of the transmission
system and own gas consumption,
(c)) virtual production point of the transmission system operator for the transport of
gas associated in particular with the sale of the gas.
(6) a foreign participant, serves the transport nominations referred to in paragraph 1 (b).
and (b)) and paragraph 2 (a)). and (b))) and in the information system of the operator
the transmission system. The provisions of paragraph 3 shall apply mutatis mutandis.
(7) transmission system operator shall without undue delay ensure that
Exchange identification codes used to identify the individual importers
and customers of gas between the operator and the transmission system operator
the market.
section 64
The nomination of the distribution
(1) the nomination of distribution serves the body in the above reserved
capacity at the entry points of the distribution system
and cross-border gas pipeline) at the points after each of the cathode gas in
such form of the operator and the distribution system operators
the adjacent distribution or transmission system operators were able to perform
reconciliation,
(b)) to the amount of reserved capacity at production plants.
(2) the nomination serves to distribute body clearing the above reserved
the capacity of the distribution in the output point of cross-border gas pipeline after
the individual subscriber to the distribution system operator and
operators of neighbouring distribution or transmission system operators were
able to perform the reconciliation.
(3) to take the place of customers and for pass-through space between the
distribution systems, distribution of nominations.
(4) the distribution system operator shall without undue delay ensure that
Exchange identification codes used to identify the individual importers
and customers of gas between the distribution system operator and
the market operator.
section 65
The nomination of warehousing
(1) the nomination of the storage serves the body in clearing information
the system operator of the storage tank after the individual codes
reserved storage capacity up to the amount available in the mining and
vtláčecího performance in such a form, to the operator of a tank of gas and
the transmission system operator to perform the reconciliation.
(2) the nomination serves foreign participant in the storage of information
the system operator of the storage tank after the individual codes
reserved storage capacity up to the amount available in the mining and
vtláčecího performance in such a form, to the operator of a tank of gas and
the transmission system operator to perform the reconciliation.
(3) the operator of a tank of gas without undue delay shall ensure the exchange of
identification codes used to identify the individual reserved
storage capacity between the operator and the operator of gas storage
the market.
Procedures and deadlines for the submission of nominations, transportation, distribution
the storage and the obligation to deliver and the obligation to remove
section 66
(1) the settlement served the nomination of transport, distribution and
storage not later than 14:00:00 hours on the day of the gas
the following natural gas a day.
(2) the nomination of transport at border points, the market operator accepts or
the transmission system operator or a transmission operator of an adjacent
system as the total daily nomination for the gas day or in
breakdown on the individual hours of natural gas a day. In the case that brought
the nomination of the transport is not included in the breakdown on each clock
gas day, the market operator or transmission
system of uniform distribution on each clock gas day.
The resulting values of the distribution of hourly are rounded down to the
the whole kWh, while the difference arising from rounding is added to the
the value of the natural gas in the last hour of the day.
(3) a foreign participant in the term transport is served by the nomination
paragraph 1 in the system, the transmission system operator or
coordinated and uncoordinated transport capacity on border points
the transmission system at the neighbouring transmission system operators.
The foreign party shall transport the nominations referred to in paragraph 1 in the system
the transmission system operator and the nomination procedure of the term
referred to in paragraph 1 in the system operator of the storage tank. The operator
stack gas passes the market operator summary of nominations warehousing
submitted for each foreign participant.
(4) the transmission system operator shall verify the equality of the nominations of the transport
for a foreign participant. In the event that the nominated transport on the entry and
the output of the transmission system to and from a foreign participant yourself
do not match, the transmission system operator of reduction of nominations
According to the priorities, so that the foreign participant in the condition of equality of nominations
transport must meet. Within a priority in the case of multiple nominations
the reduction carried out evenly. Priorities for reduction are the following:
and the nominations are initially shortened) transport in the input or output
the point of the stack gas
(b) transport in the nomination) Consequently, the entry or exit of the border
point.
(5) the market operator shall examine the financial security of all nominations
the subjects of settlement in accordance with the terms and conditions of the market operator and the
the latest in 14:20:00 pm sent to relevant operators of nomination,
that are financially secured and adjusted in accordance with paragraph 6.
(6) in the event that the subject of settlement has submitted the nomination of a financial
ensure for the market operator the market operator, the reduction of nominations
According to the priorities, so that the body meets the financial settlement. In
one priority is the reduction in the case of more nominations done
evenly. Priorities for reduction are the following:
and the nominations are initially shortened) transport stack in the output point
gas,
(b) transport in the nomination) then output the border point and nominations
distribution in the output point of the cross-border pipeline,
(c)) finally nominated the obligation to deliver to trade under a bilateral treaty.
§ 67
(1) the transmission system operator shall carry out the verification of the values of the nominated
and their reconciliation. Through its information system and
the information system of the market operator shall be notified within 16:00:00 hours of the body
Clearing or foreign participant, whether they accepted the nomination and
registered.
(2) if the body or clearing foreign participant shall submit a nomination
as the total daily nomination for the gas day, she splits
the transmission system operator evenly on each clock
gas day. The resulting hourly values shall be rounded
down, and the rest is added to the value in the last hour
gas day. Hourly values shall not exceed the amount of the nomination
transport capacity reserved for the gas day divided by the number of hours
gas day; for the last hour of the day is this the gas
restrictions increased the rest of rounding of values for the previous hour
gas day.
section 68
(1) the subject of settlement shall deliver the commitments and obligations of nomination to remove
not later than 14:00:00 a.m. of the day following the gas on
gas day.
(2) the settlement served the nomination of distribution and warehousing
not later than 14:00:00 a.m. of the day following the gas on
gas day.
(3) the distribution system operators and operators of gas storage
carry out the verification and reconciliation of the values of the nominated, and through
their information systems and the information system of the market operator shall notify the
16:00:00 pm clearing body, whether he accepted their nomination and
registered.
(4) the Operator of the market served the nomination under section 62, paragraph. 4 to 14:20:00 pm.
(5) the Operator of the market served as the clearing of the revised nomination
the obligation to deliver and remove the obligation under section 62, paragraph. 3 (b). and ten)
minutes after the matching of supply and demand made on the organized
Intraday gas market.
Procedures and deadlines for the submission of renominací transport, distribution,
customs warehousing
§ 69
(1) For transport shall be any renominations nominated transport
the subject of settlement and foreign participant at the natural gas a day made
After the deadline referred to in section 66 paragraph. 1.
(2) the clearing and foreign participants can operators
the transmission system operator to submit renominaci.
(3) the market operator shall examine the financial collateral in the market operator to
all submitted renominations body clearing in accordance with the business
the conditions of the market operator, and be sent to the competent operators
renominations that are financially secured. In the event that the body
the showdown has made the financial collateral, the renominations
the market operator of reduction or renominací nominations in the order under section 66
paragraph. 6 to ensure it meets the body of the financial settlement. In the framework of the
one of the priorities in the case of multiple renominací in one priority level
the reduction carried out evenly.
(4) the Renominations of transport referred to in paragraph 2 shall be filed within two hours after
the term pursuant to section 66 paragraph. 1 and each whole hours but not
to 3:00:00 pm gas day, which occurs when two gas days ago
After the gas day, which serves the nominations under section 66 paragraph. 1.
(5) the market operator shall examine the financial collateral referred to in paragraph renominací
3 to 20 minutes after each hour of the following after an hour in which the
was filed. renominations
section 70
(1) the transmission system operator renominaci, if it is brought
in accordance with Annex No 4 to this notice.
(2) the transmission system operator shall notify to the Agency the clearing and
Foreign participant received and registered renominations in two
hours after the deadline the submission under section 69, paragraph renominací. 4. The body
clearing serves as the transmission system operator of the notification of the sentence
the first of this paragraph also through the information system
the market operator.
(3) Renominaci transport at border points, the market operator accepts or
the transmission system operator or a transmission operator of an adjacent
system as the daily renominaci for natural gas a day, or in the
Each clock gas day remaining until the end of the natural gas
of the day.
(4) a foreign participant serves transport in term of renominations pursuant to § 69
paragraph. 4 in the system, the transmission system operator, or
transport capacity at border points in the transmission system at the next
the transmission system operator.
section 71
(1) For renominaci storage and distribution shall be all
the nomination of the storage and distribution of body clearing on natural gas
day made after the deadline under section 68, paragraph. 3.
(2) the accounting of the distribution system operator may
submit to the renominaci distribution and the operators of the gas tank
renominaci storage. Foreign participant the operator may
stack gas present renominaci.
(3) warehousing and distribution of Renominations referred to in paragraph 2 shall be submitted to the
each full hour of the day following the date referred to in section 68, paragraph. 3 and
no later than 3:00:00 pm gas day, which occurs when two
days after the date of the gas, which serves the nominations under section 68, paragraph.
2.
section 72
(1) the operator of a tank of gas and the distribution system operator
renominaci, if it is brought in accordance with Annex No 4 to this
the Decree.
(2) the distribution system operator, or the operator of a tank of gas
the body shall notify the clearing, and also through the information
the system of the market operator, received and registered renominations in two
hours after hours, in the framework of which was filed. renominations
(3) a foreign participant in the term served by renominations
§ 71 paragraph. 3 in the system operator of the storage tank. The operator
stack gas passes the market operator summary renominací storage
submitted for each foreign participant.
section 73
Linking the information systems of the various operators and operator
market
(1) the market operator, operator of the transmission system operators
distribution system operators, and the operators of the gas storage will link its
information systems so that all nominations and renominations transport
the transmission system operator or at the neighbouring
the transmission system operator in case of coordinated or
uncoordinated transport capacity at the border points of the transmission
system, nominations and renominations of the distribution of the operator
the distribution system and the nominations and renominations of the storage
gas storage operator without undue delay, were referred to the
the market operator.
(2) the market operator will allow in its information system to submit nominations and
nominations and renominations of the transport, distribution and nominations and renominations
renominations. Nominations and renominations body clearing
submitted to the information system of the market operator, and duly passed
the market operator competent operators shall be deemed nominated and
renominations transport, distribution or storage of the body
clearing lodged directly by the individual operators.
§ 74
The obligation to deliver and the commitment of renominations remove
(1) the obligation to deliver For renominations and the obligation to remove any
the nomination of the obligation to deliver and the obligation to remove the subject of settlement on the
gas day submitted after the deadline in accordance with section 68, paragraph. 1, no later than
5:00:00 pm calendar day, which occurs two days after the date on which the
the subject of settlement is served under section 68, paragraph nominations. 1.
(2) in the event that the submission deadline to deliver the commitments renominací
and commitments to remove the bodies will not be administered settlement reconciliation
renominací trade under a bilateral treaty, the market operator, filed
renominations does not register.
(3) after the end of each hour, the market operator shall carry out an examination of the financial
ensure all commitments to deliver and remove renominací entities
the showdown. In the event that the subject of settlement has made renominations
financial collateral, the market operator renominations.
(4) the market operator no later than 20 minutes after the end of each hour
shall inform the competent bodies of the accounting information
the system of adoption and registration or rejection of the renominací obligations to deliver and
Remove.
PART SIX
BUSINESS FLUCTUATIONS
Assignment of responsibility for deviation
§ 75
(1) responsibility for the derogation applies to each individual
supply the place of the customer. Responsibility for deviation in sampling locations
You can migrate only one entity accounting, and it directly or
through another registered participant in the gas market.
(2) if it is not to supply the place of the customer assigned to the body of the settlement
responsible for the deviation, the market operator of the market participant
gas referred to in paragraph 1 to redress. In the absence of the assignment
the entity responsible for the clearing of the variance for the customer's consumption location,
the market operator shall proceed in accordance with section 78.
(3) Transfer of responsibility for the derogation provided for in paragraph 1 shall be subject to
consent of the market operator. Application for transfer of responsibility for deviation
referred to in paragraph 1, the Party transferring the gas market
through the information system of the market operator and the accepting
the subject of settlement approved assignment to liability for deviation in
individual sampling site the customer through the information
the system of the market operator. After the approval of the assignment of responsibility for deviation
accepting body clearing and in case sufficient financial
ensure the accepting agency clearing the market operator transfers
responsibility for deviation of body clearing on the accepting entity
the showdown.
(4) Assignment of the responsibility for deviation of the assessed market operator within 60
minutes after the hour, in which the application for the assignment of responsibility for
deviation approved by accepting body clearing through a
the information system of the market operator. The market operator shall immediately inform the
transferring the participant's gas market and the clearing of the accepting entity
the result of the assessment of the assignment of responsibility for deviation. The effectiveness of the
assignment of responsibility for deviation occurs as soon as possible following
the natural gas market the day after the approval of the operator.
§ 76
(1) the responsibility for the imbalance on the input and output point of the virtual
the storage tank shall be borne by the competent body clearing using this item
the transmission system operator or a foreign participant through
the transmission system operator.
(2) the responsibility for the imbalance on the border point of entry and of exit shall be borne by
the competent body clearing using this point of the transmission system operator or
Foreign participant through the transmission system operator.
(3) the responsibility for the imbalance on the input and output point of cross-border
the pipeline or on the point of the downsizing of the gas shall be borne by the competent body of the clearing,
who uses this item or place a distribution or transmission system.
(4) the distribution system operator exposes the way enabling the
remote access and communicate to the market operator allocation rules
individual points of cross-border gas pipelines and gas production points.
The market operator exposes without undue delay to the allocation rules
individual points of cross-border gas pipelines and gas production points
in a manner enabling remote access.
(5) the transmission system operator exposes the way enabling the
remote access and communicate to the market operator allocation rules
the various border points and points of virtual stack gas.
The market operator allocation rules to immediately publish the individual
border points and points of virtual stack gas way
enabling remote access.
§ 77
(1) the total deviation of body clearing can be contractually transferred to another
the subject of settlement. Total transfer derogations subject to settlement
other body clearing is referred to also value the flexibility and
the balance of the account of deviations of the transferring body.
(2) a request for the transfer of the total variance of the transferring body shall
clearing through the information system of the market operator and the
the accepting entity accepts migration settlement total deviation
through the information system of the market operator. After the adoption of the
transfer the total deviation accepting body clearing operator
market shall be assessed within 60 minutes after the hour, in which the application for
transfer the total tolerance adopted accepting body clearing
through the information system of the market operator, the sufficiency of
financial in the accepting entity.
(3) the market operator shall immediately inform the transferring and accepting
the body of the outcome of the assessment of migration settlement total liability
for the variance. In the case of sufficient financial in the accepting
body clearing the market operator transfer the total variance of the body
approves the settlement. If you do not specify a later date settlement bodies
the migration of the total variance, the efficiency of the transfer of the total deviation occurs
the subject of settlement as soon as possible following the natural gas the day after the approval of the
the market operator.
(4) the total deviation of a body which has assumed total
derogation from the other body clearing, cannot be transferred to another
the subject of settlement. Their migration to the total variance between
transferring and accepting the body performs the clearing operator market
at the request of the subject of settlement on the last day of the month, the gas
with the exception of cases related to the termination of activity of the subject of settlement.
§ 78
(1) the expiry of the duration of gas supply as referred to in the sampling points
registered in the information system of the market operator, or on the basis of
request to shorten the supply of gas under section 114 shall cancel the market operator to
requested date of delivery point assignment to suppliers of gas and
the subject of settlement.
(2) in the case of sampling points of the customer, which is not registered in the
the market operator's information system and which will not, after the date of their
the contract of associated gas supply services or a contract for the supply of
the gas for the existing gas supplier is assigned to a new supplier of gas and
clearing body, except in the cases referred to in section 119 paragraph. 4 and request
the customer on the dismantling of the measuring device, the operator
distribution system operator or a transmission system operator to the 23:00:00
hours of the 10th working day before the date on which the termination occurs
the supply of gas to the delivery point of the customer from the current
gas supplier, the registration of the sampling points in the information
the system of the market operator of the date from which it will supply the place
the customer is assigned to any supplier of gas.
(3) in the case of a request for their supplies due to a withdrawal from the contract
According to the § 11a paragraph. 2, 5 and 6 of the Energy Act, the operator shall carry out
distribution system operator or a transmission system operator registration
a sampling of the place referred to in paragraph 2 to 23:00:00 hours of the last
the working day before the date on which the termination occurs in the supply of gas to the
delivery point of the customer from the existing gas supplier.
(4) in the case of identification of the delivery point of the customer, which will be in the
the information system of the market operator for at least one day without
assigned to the contracting entity accounting, market operator in its
information system of this place of consumption a symptom indicating the date, from the
which is not to supply the place of the customer assigned to the supplier of gas and
the contracting entity clearing, if for the sampling site at the same time there is in
the information system of the market operator of the downstream change of supplier.
The assignment of this flag makes the market operator to the end of the tenth
the working day before the date on which the termination occurs in the supply of gas to the
delivery point of the customer from the current vendor. In the case of
shortening the supply requests pursuant to § 114, paragraph. 4 the market operator performs
the assignment of this flag to the end of the last working day before the date of
in which their supply of gas to the delivery point of the customer from the
the parties to the existing gas supplier.
(5) after the assignment of the flag referred to in paragraph 4, inform the operator market
the assignment of a flag to supply the place of the existing
the supplier, an existing body clearing and distribution
system operator or a transmission system operator, which is the place of consumption
the customer is connected.
(6) the distribution system operator or a transmission operator
system of the possibility of unauthorized subscription immediately
a proven way to inform the customer, if for the sampling location
at the same time there is in the market operator's information system change
vendor.
(7) in the event that is to supply the place marked by the flag
paragraph 4 is assigned to the gas supplier and the contracting entity at the date of settlement
named in the flag referred to in paragraph 4, delete the market operator in
the information system of the market operator flag that is assigned to the
supply the place referred to in paragraph 4.
section 79
Assignment of the subject of settlement
(1) the date from which it is not to supply the place of the customer assigned
supplier of gas and the clearing of the contracting entity, supplier of gas for
a sampling of the place designated by a sign under section 78, paragraph. 4, in which the
There is a change of the supplier under section 110, the application for commencement at
the prevention of unauthorized sampling pursuant to § 113 paragraph. 5.
(2) in the event that the change of supplier process under section 110 or process
the start of delivery for the prevention of unauthorized sampling referred to in paragraph 1
successfully completed and the change of supplier is effective no later than the following
the day after the expiry of 10 working days from the date specified in the flag under section
paragraph 78. 4, assigns the market operator to supply the place of the customer's new
gas supplier and a new body of settlement referred to in the application for the change
the vendor or application for the initiation of the supplies in the prevention
unauthorized collection, and this on the day named in the flag, which was
assigned to the place of supply under section 78, paragraph. 4. The market operator
performs the assignment of gas supplier and the operator of settlement only
If the gas is a registered participant in the market with
gas and has to ensure the financial period for the market operator.
The market operator on this assignment shall inform the new vendor, new
body clearing and distribution system operator or
the transmission system operator, and removes the flag that is assigned to the
the place of supply under section 78, paragraph. 4.
(3) the distribution system operator or a transmission operator
system to which it is connected, place of consumption may make on the basis of
for information about assigning body clearing and gas supplier by
paragraph 2 booking distribution or transport capacity for the new
gas supplier in the case of a contract for the supply or hunt
the customer in the case of a separate supply contracts and contracts to ensure
distribution system services or transport of gas from the date when the
assigned to a new supplier of gas and the new body of settlement referred to in paragraph
2. The size of the reserved distribution or transmission capacity is equal to the
the size of the reserved distribution or transportation capacity according to the application
new gas supplier or customer. After the effective date of change
vendor to determine the status of the meter pursuant to § 113 paragraph. 2 and 3 shall be deemed to
day, to which he was assigned to a new supplier of gas and new body clearing
in accordance with paragraph 2.
(4) in the event that there is no change of supplier process under section 110 or process
the start of delivery for the prevention of unauthorized sampling referred to in paragraph 1
successfully completed and the assignment of the subjects of settlement is effective no later than
the next day after the expiry of 10 working days from the date referred to in
flag under section 78, paragraph. 4, the market operator changes in the information system
the market operator flag under section 78, paragraph. 4 on a flag indicating
unauthorized subscription in the sampling site. The market operator on this
really inform the operator of distribution or
the transmission system.
Balance sheet account imbalances and flexibility
§ 80
(1) the deviation clearing body or foreign participant is the difference
between the sum of the quantity of gas allocation to all entry points
the gas system and the sum of the allocations to all output points
the gas system, taking into account the obligation to deliver and remove body
the showdown. The deviation of a body is determined as of the day of reckoning
variance, the variance in the distribution of monthly after each gas
days and monthly variance in the distribution of repair after each
gas days.
(2) the Operator of the market leads for each body clearing or foreign
the participant's account balance. The preliminary value of the balance of the account
derogations for the gas day is the sum of the final value of the balance sheet
account of deviations from the previous gas day and daily deviations
the subject of settlement for the gas day. The final value of the balance sheet
account the derogations for the gas day is the sum of the final value
the balance of the account of deviations from the previous gas day, daily
derogations to the body for the natural gas clearing day and daily
the compensatory amount of body clearing for the gas day.
(3) Each operator of settlement or the transmission system operator in
Foreign participant is provided by the flexibility, the size of
sets the market operator each day for each gas input and
the output point of the gas system in the following way:
and for the customer's consumption location) where the entity is attached to the settlement
responsibility for the imbalance, with flexibility for the relevant gas day
be determined according to annex 5 to this Decree,
(b) point gas production plants), where the entity is attached to the settlement
responsibility for the imbalance, with flexibility for the relevant gas day
be determined according to annex 5 to this Decree,
(c)) for the input point for the border entry point and cross-border gas pipeline
for the entry point of the stack gas for the gas day
the flexibility of body clearing provides in annex 5 to this
the Decree,
(d)) at the border point, output the output point of the cross-border pipeline and
for the exit point of the stack gas for the gas day
the flexibility of body clearing provides in annex 5 to this
the Decree.
(4) if at the border point, the point of the gas at the point
cross-border gas pipeline or gas in the gas production plants point day
allocation rule is used when the value of the nomination or nominations
the distribution is considered to be the value of the delivered, flexibility in the
point in the gas day. For virtual points
the transmission system operator of the virtual body
distribution system and virtual trading point with flexibility
does not provide.
(5) the Allocated value of the flexibility of the body and the foreign settlement
the participant for the gas day is the sum of the individual
parts of the flexibility for individual input and output points
gas system provided in accordance with paragraphs 3 and 4.
§ 81
(1) Each gas shall make available the day the market operator in the term under section
paragraph 102. 2 for each subject, the size of the settlement day derogation
the preliminary allocation of the use of the flexibility, the preliminary value of the balance sheet
account of deviations, the preliminary value of the daily balancing quantity
the allocated value of the flexibility and size flexibility, you can
the subject of settlement flows under section 89. The preliminary value of the daily
the compensatory amount is equal to zero, in the case that the absolute size of the
the preliminary value of the balance of the account of deviations is less than or equal to
the absolute value of the allocated value of flexibility; in other cases, the
the daily value is the amount of provisional countervailing difference
the preliminary value of the balance of the account of deviations and assigned values
the flexibility of the Convention while respecting the dead.
(2) Every day after notification of the results of the natural gas market with spare
flexibility in the term under section 89, paragraph. 3, make available to the market operator for the
the daily amount of compensation each body and the final value of the balance sheet
account of deviations.
(3) Positive daily amount of compensation is the difference between the preliminary
the balancing account imbalances and a maximum value of flexibility; in the case of
that this difference is less than or equal to zero, then it is a positive day
the compensatory amount equal to zero.
(4) the daily amount of Negative compensation is the difference between the preliminary
the balancing account of deviations and the minimum value of flexibility; in the case of
that this difference is greater than or equal to zero, then the negative daily
the compensatory amount equal to zero.
(5) the value of the last registered and confirmed the nomination or
the obligation to deliver or remove renominations on virtual trading point or
the value of the registered and confirmed the nominations or renominations to transport
virtual points of the transmission system operator, is considered
the value of the supplied or removed.
section 82
Business fluctuations in the prevention of a State of emergency throughout
the territory of the Czech Republic because of a lack or surplus of gas in
the gas system
(1) pursuant to this provision, from the following natural gas
the day after the date on which the transmission system operator declared
Prevention of a State of emergency because of a lack or surplus of gas in
the gas system of the Czech Republic.
(2) the transmission system operator shall, in cooperation with the market operator
immediately announces to all entities electronically clearing, foreign
participants through the transmission system operator,
registered participants in the gas market, operators of the distribution
system operators and the operators of gas storage, the following gas
the day will begin daily balancing of trade imbalances in the prevention
a State of emergency.
(3) If on the whole territory of the Czech Republic the State emergency prevention from the
because of the lack of gas in the gas system, not bodies
clearing and foreign participants in the gas day provided by
flexibility over the level in the preceding day gas status in
direction, which should result in an increase to the lack of gas in the gas
the system. All the negative deviation of the day clearing body or
Foreign participant is the daily amount of the adjustment. In the case of
daily deviation clearing in positive body allocates the flexibility and
the daily amount of compensation determined under section 80 and 81.
(4) in the event that it is on the whole territory of the Czech Republic the State of prevention
a State of emergency because of a surplus of gas in the gas system is not
operators of clearing and foreign participants in the gas day
above the level of flexibility provided by the State in the previous gas
the date in the direction that would result in an increase in the surplus of gas in
the gas system. All positive daily deviation clearing body
or a foreign participant is the daily amount of the adjustment. In the case of
negative daily deviations of the entity is assigned by the flexibility and
the daily amount of compensation determined under section 80 and 81.
section 83
Business fluctuations in States of emergency on the whole territory of the Czech
the Republic because of a lack or surplus of gas in gas
System
(1) pursuant to this provision, from gas day, in
where the transmission system operator declared a State of emergency because of the
lack or excess of gas in the gas system of the Czech Republic.
(2) the transmission system operator shall, in cooperation with the market operator
immediately announces to all entities electronically clearing, foreign
participants through the transmission system operator,
registered participants in the gas market, operators of the distribution
system operators and the operators of gas storage that is declared a State of emergency from the
because of lack or excess of gas in the gas system.
(3) in the event that it is on the whole territory of the Czech Republic, a State of emergency because of the
the lack of gas in the gas system
and clearing and foreign entities) the participants in a given gas
the date does not provide the flexibility,
(b)) body clearing and foreign participant, who have a negative
the initial value of the balance of the account of deviations, have the obligation to compensate
the value of the balance of the account of deviations in the gas a day to zero;
about this application increases the value of the obligation to deliver gas to the body
clearing and external participant; all of the resulting daily deviations are
daily balancing quantity and financial compensation are dealt with
the market operator,
(c)) body clearing and foreign participant, who have a positive
the initial value of the balance of the account of deviations, have the obligation to comply with the
equality of supply and consumption of the gas system, i.e., zero day
the derogation; all of the resulting daily deviations are the daily balancing
the amount of financial compensation and are treated with the market operator; the status of the
the balance of the account will be subject to the derogations of clearing or foreign
the following day the participant restored natural gas after the end of State of emergency
due to the lack of gas in the gas system.
(4) in the event that it is on the whole territory of the Czech Republic, a State of emergency because of the
surplus gas in gas system
and clearing and foreign entities) the participants in a given gas
the date does not provide the flexibility,
(b)) body clearing and foreign participant, who have a positive
the initial value of the balance of the account of deviations, have the obligation to compensate
the value of the balance of the account of deviations in the gas a day to zero;
about this application increases the value of the commitment to remove the throttle body
clearing and external participant; all of the resulting daily deviations are
daily balancing quantity and financial compensation are dealt with
the market operator,
(c)) body clearing and foreign participant, who have a negative
the initial value of the balance of the account of deviations, have the obligation to comply with the
equality of supply and consumption of the gas system, i.e., zero day
the derogation; all of the resulting daily deviations are the daily balancing
the amount of financial compensation and are treated with the market operator; the status of the
the balance of the account will be subject to the derogations of clearing or foreign
the following day the participant restored natural gas after the end of State of emergency
due to a surplus of gas in the gas system.
§ 84
The delivery of two or more suppliers of gas to one delivery point
(1) the customer may have one or more of the contracting of suppliers of gas.
(2) a body which is not in the sampling point assigned as
the entity responsible for the clearing of the derogation is to supply
customer delivery point by passing gas clearing body responsible
for the imbalance in the sampling site at the virtual trading point on the basis of the
the mutual contractual arrangement between the gas suppliers and the customer.
§ 85
Financial payment settlement entities
(1) the operator shall provide the market clearing financial collateral
payments to cover the foreseeable risks associated with
the activities of the subject of settlement. Financial collateral payments uses operator
the market to cover the risks associated with the delivery and collection of gas, settlement
derogations to the commitments to deliver at the virtual trading point, with shops
concluded on the organized short-term market, and in addition MEPs debated with the transport and
the distribution of the output points of the gas system. To the above
financial collateral payments are included also the obligations of the market operator to
the subject of settlement.
(2) if the entity does not have sufficient financial settlement payment for
Register of trade, the market operator does not register such a trade.
Refusal to register a trade, the market operator shall notify without undue
delay the subject of settlement.
(3) in the case of a refusal to register the trade referred to in paragraph 2 or in the
the case of the reduction of transport and distribution of nominations to the output points
gas system under section 66 paragraph. 6 the operator shall inform the market about this
the fact that the subject of settlement.
PART SEVEN
SHORT-TERM MARKET
§ 86
The short-term market, its organization and its settlement
(1) the market operator organizes short-term market in the form of intraday market
with gas and unused flexibility.
(2) short-term market can participate in the accounting entity only.
(3) the Shops on short-term market referred to in paragraph 1 are to each
anonymous.
§ 87
Intraday gas market
(1) intra-day market is organized within the gas day and can be
to enter and receive bids for the supply of gas for the basic subscription or
product ^ 14). Place of delivery and place of gas sampling is a virtual business
point. As a result of trades on the intraday market is the destination of the agreed
supplies, subscriptions and gas prices.
(2) the intraday market for natural gas the day is organized by 9:00:00 pm
the previous calendar day until 5:00:00 hours of the following
the calendar day.
(3) the Demand of a body means clearing the required quantity to purchase
the gas for the gas day. Range of body clearing means
the required amount for the sale of gas for the gas day.
(4) the minimum quantities of gas to
Intraday gas market is 0.1 MWh. Quantities or
push the gas to the gas market intraday served body clearing
in MWh with resolution to 1 decimal place.
(5) the market operator registers the data of the agreed quantities of gas
the individual subjects of settlement as the nominated gas trading on
intraday market.
(6) within 10 minutes after the conclusion of the trade in the framework of intra-day market adjusts the
the market operator total agreed quantity of gas for the obligation to deliver and
remove the obligation under the nominated gas trading on intraday
the organized market for the relevant gas day. Remove the obligation to
means the portion of the settlement satisfied the demand of the body referred to in paragraph 3
the first sentence, the obligation to deliver the means satisfied part of the offer of the body
the clearing referred to in paragraph 3, second sentence.
(7) to the 13:00:00 a.m. of the day following the date on which the gas operator
the market shall publish in a way that allows remote access from the quantity of gas
made by the shops and the weighted average of the price of gas for the
the natural gas a day to the intra-day market, where the weights are quantities
applicability of gas.
section 88
The index of the short-term market
The market operator every day not later than on the date the natural gas under section 102
paragraph. 2 publish, in a manner enabling remote access index
the short-term market for the previous natural gas a day. Procedure for determining the index
the short-term market is given in annex 6 to this Ordinance.
§ 89
The market for unused flexibility
(1) the market operator organizes the market with unused flexibility for each
the preceding day gas.
(2) the market for unused flexibility every day from natural gas
13:00:00 to 13:45:00 pm. In the event that the operator is
disagreement with the results of the daily market evaluation of the derogations referred to in § 102
paragraph. 6, the market operator shall notify the individual subjects of settlement new
the deadline for the opening of the market in spare flexibility, but not later than
16:00:00 hours the same day.
(3) the market operator shall notify the results of market with unused flexibility
13:55:00 pm, in the event of a delayed opening the market with spare
flexibility within 10 minutes after the end of untapped market flexibility. After
the announcement of the results of the market with unused flexibility to each participant
the market operator shall publish in a way that allows remote access to the offer and
demand curves, the amount of made deals on the market with spare
flexibility and achieved the award for the unused flexibility in the gas
the date.
§ 90
Financial settlement of trades on the intraday market with gas
The market operator to announce in terms under section 87, paragraph. 7 each participant
Intraday gas market the following information:
and the obligation to deliver and the size) of the commitment to remove the resulting from the
applicability of the quantity of gas in MWh with resolution to 1 decimal place,
(b)) formal price in EUR/MWh for individual stores,
(c) payment for the agreed volumes) subscriptions to gas and gas supply contracted in
€.
PART EIGHT
NATURAL FLUCTUATIONS
§ 91
(1) transmission system operator shall, in cooperation with the operators
distribution system provides natural gas balancing
the system.
(2) the activities of the transmission system operator relating to the actual
or the expected imbalances of the subjects of settlement netting shall be construed as
countervailing actions.
(3) the transmission system operator to the physical balancing of deviations
uses compensatory action. Countervailing actions carried out by the operator
the transmission system buying and selling gas on the intraday market
gas or using compensatory services.
(4) for the purpose of physical settlement of fluctuations, the market operator
establishes and leads the account operator. The size of the account operator
keeps track of the market operator. The market operator exposes the current state of the account
the operator within 10 minutes after his change.
(5) the market operator adjusts the account operator for the nomination of the undertaking
Add and remove the obligation under section 62, paragraph. 4 and the nomination of the compensatory actions
on the virtual point of the transmission system operator.
section 92
The level of the account of the operator and the remedial action
(1) in the event that it allows the current operational state of the gas
system, the transmission system operator does not perform any balancing
the action, if the size is greater than the value of the account of the operator referred to in
Annex 7, point 1 and less than the value referred to in point 7 of Annex No. 2 to the
This Decree.
(2) in the event that after filing nominations under section 62, paragraph. 4 does not reach
the value of the account value of the operator referred to in annex 7, point 1, to the
This Decree, the transmission system operator can perform buffer
Try buying gas on the intraday market, and the procedure referred to in
Annex No. 7 of section 3 of this Decree.
(3) in the event that after filing nominations under section 62, paragraph. 4 exceeds the
the value of the account of the operator specified in annex 7, point 2 to
This Decree, the transmission system operator can perform buffer
action by selling gas to the intra-day market, and the procedure referred to in
Annex 7, point 4 of this Decree.
(4) in the event that after filing nominations under section 62, paragraph. 4 does not reach
the value of the account of the operator specified in annex 8, point 1, to the
This decree or, in the case that the expectations of the transmission
system are such that the value of the account operator will not achieve
the values specified in annex 8, point 1 to this notice, the operator
the transmission system operator shall make compensatory action by buying gas on the
intraday market. In the event that you cannot perform the remedial action
through organized intraday gas market, is the priority
countervailing actions set out in annex 8 paragraph 6 of this Decree.
(5) in the event that after filing nominations under section 62, paragraph. 4 exceeds the
the value of the account value of the operator referred to in point 8 of Annex No. 2 to the
This decree or, in the case that the expectations of the transmission
system are such that the value of the account operator exceeds the value
referred to in annex 8, point 2 to this Decree, the operator of a trucking
the system executes the compensatory action by selling gas to the intra-day market.
In the event that you cannot perform the remedial action through the
organized intraday gas market, is the priority of the compensatory
the actions set out in annex 8 paragraph 6 of this Decree.
(6) the transmission system operator shall publish within 60 minutes from the implementation of the
countervailing actions through the information system of the market operator
information about the buffer action in the scope specified in the annex
No 9 to this Decree.
§ 93
The procedures for establishing the unit price for the daily amount of compensation
(1) the unit price for a positive amount in the buffer of the day
gas day shall be determined under the procedure referred to in annex 10 to this
the Decree.
(2) the unit price for the negative amount in the buffer of the day
gas day shall be determined under the procedure referred to in annex 10 to this
the Decree.
(3) For the unit prices referred to in paragraphs 1 and 2 shall in case of need
their transfer to the CZK/MWh rate uses the Czech vyhlašovaný
the National Bank for the day, to which the unit price of the set; If
the daily rate is not available, the value in the
immediately preceding the date when the value of the daily rate
published.
§ 94
Account of neutrality
(1) the market operator records the account of neutrality as a separate revenue and
expenses associated with the settlement of the daily balancing the amount of bodies
clearing and the revenue and expenditure connected with the transmission system operator
countervailing actions on the basis of the information referred to in section 92, paragraph. 6.
(2) the transmission system operator shall make the last day of the year
procedure in accordance with article 92, paragraph. 2 or 3 buffer action
balances as of the last day of the calendar year of the gas account
operator to zero. The compensatory action shall be carried out in
If the condition is satisfied in accordance with § 92 paragraph. 1.
PART NINE
RANGE, DATA TRANSMISSION AND PUBLICATION DATES AND BILLING OF SUPPLIES
GAS AND OTHER SERVICES
section 95
Transmission distribution system operator
(1) each calendar day no later than 12:00:00 pm passes
the distribution system operator by the market operator
the information system of the market operator for the preceding day gas
and the daily gas supply allocation) on points of cross-border gas pipelines after
each of the entry points, the individual subjects of settlement in
the distribution of individual importers with their designation,
(b) the daily gas supply allocation) from the production of gas in the distribution points after the
each of the points and after gas generating stations of the individual bodies
clearing,
(c) the daily supply and value) of gas in transfer between locations
distribution networks; the data sent by the distribution system operator,
who runs the measuring device,
(d) the allocation of gas daily) on the points of cross-border gas pipelines after
each output points of individual subjects of settlement in
the distribution of individual customers with details of their designation,
e) daily gas consumption in places customers with measurement
Type A,
(f) a distribution capacity reserved) values in the sampling areas
customers with the measurement of type A and B,
(g) the value of the custom of the day) of gas consumption,
h) daily value changes of accumulation,
I checked out the distribution capacity) value of manufactured gas, points
each of the points and after gas generating stations of the individual bodies
clearing,
j) values reserved fixed and interruptible capacity in distribution
points of cross-border gas pipelines after each input and output
points and individual subjects of settlement.
(2) not later than 12:00:00 pm 9th calendar day, not later than
However, until 12:00:00 hours of the sixth working day of the month, gas
the distribution system operator shall send the market operator in the distribution for
the individual days of the previous month's gas natural gas
and gas supply allocation) monthly on the points of cross-border gas pipelines after
each of the entry points, the individual subjects of settlement in
the distribution of individual importers with their designation,
(b) the allocation of gas supply) monthly from the production of gas in the distribution points after the
each of the points and after gas generating stations of the individual bodies
clearing,
(c) the supply and value) with monthly donations of gas transfer places between
distribution networks; the data sent by the distribution system operator,
who runs the measuring device,
(d) the allocation of gas) monthly on the points of cross-border gas pipelines after
each output points of individual subjects of settlement in
the distribution of individual customers with details of their designation,
(e)) the monthly value gas offtake customer in places with the measurement
Type A and B,
(f) a distribution capacity reserved) values in the sampling areas
customers with the measurement of type A and B,
(g) the value of the custom) monthly gas consumption,
h) monthly value of changes of accumulation,
I checked out the distribution capacity) value of manufactured gas, points
each of the points and after gas generating stations of the individual bodies
clearing,
j) values reserved fixed and interruptible capacity in distribution
points of cross-border gas pipelines after each input and output
points and individual subjects of settlement,
the monthly value of the gross calorific value) in the distribution system.
(3) Correction data values passed in accordance with paragraph 2 shall forward
the distribution system operator the market operator no later than three
calendar months after the deadline referred to in paragraph 2.
(4) not later than the fourth calendar day before the beginning of the following
calendar month to 12:00:00 hours, the operator sends the distribution
the market operator system
and the projected values reserved) distribution capacities in
the sampling locations with the measurement of type A and B,
(b)) the values planned monthly gas consumption in the sampling locations
customers with the measurement of type B, valid from the first day of the following month
for the following 3 months in all sampling locations of customers.
(5) the information referred to in paragraphs 1, 2 and 3 shall make available to the market operator operator
the showdown, which the data refer, no later than 60 minutes after their
receipt. The subject of settlement may be in the information system of the market operator
make these data and another registered market participant with
gas.
(6) If there has been a change in the distribution network of the supplier in any
sampling place customer, paragraphs 1 to 5 shall not apply.
section 96
Transmission and publication of the data transmission system
(1) each calendar day no later than 12:00:00 pm passes
the transmission system operator the market operator for the previous
gas day
and the daily gas supply allocation) at border points after each
input and output points of individual subjects of settlement and
foreign participants in the breakdown by individual importers and
customers with an indication of their designation,
(b) the daily gas supply allocation) of individual subjects of settlement and
foreign participants on the points after each of the gas storage
entry and exit points and each of the reserved codes
storage capacity,
(c) the daily gas supply allocation) from the production of gas attached to points
a transmission system in the distribution of individual production of gas and points
After each settlement, bodies
d) daily gas in pass-through or summary
transfer points between the transmission and distribution networks,
e) daily gas consumption in places customers with measurement
type and directly connected to the transmission system
(f) the daily average value) of the gross calorific value on entry to each
the distribution network is connected to the transmission system
g) daily gas supply allocation for the action of the operator
the transmission system in a virtual point of the transmission system operator
for compensatory action,
h) daily gas supply allocation, the transmission system operator in
virtual technical point of the transmission system operator,
I) daily gas supply allocation, the transmission system operator in
virtual production point of the transmission system operator,
j) reserved a fixed capacity reserved interruptible capacity on
border points after each entry and exit points,
the individual subjects of settlement and foreign participants
the amount of the allocation mode) border points after each
input and output points
l) reserved fixed reserved capacity, interruptible capacity
the individual subjects of settlement and foreign participants at the points
gas storage after each entry and exit points,
m) allocation regime followed on the points after each of the gas storage
input and output points
n) reserved capacity in the collecting places customers directly connected
to the transmission system
about the reserved values) transport capacity of gas generating stations, points
each of the points and after gas generating stations of the individual bodies
the showdown.
(2) not later than 12:00:00 pm 9th calendar day, not later than
However, until 12:00:00 hours of the sixth working day of the month, gas
passes to the transmission system operator the market operator in the distribution for
the individual days of the previous month's gas natural gas
and gas supply allocation) monthly on the border points after each
input and output points of individual subjects of settlement and
foreign participants in the breakdown by individual importers and
customers with an indication of their designation,
(b) the allocation of gas supply) the monthly individual subjects of settlement and
foreign participants on the points after each of the gas storage
entry and exit points and each of the reserved codes
storage capacity,
(c) the monthly gas values) in the forward points or summary
transfer points between the transmission and distribution networks,
(d) the monthly gas values) in the collecting places customers directly
connected to the transmission system
(e) the allocation of gas supply) monthly from the production of gas attached to points
a transmission system in the distribution of individual production of gas and points
After each settlement, bodies
f) average value of gross calorific value in a transmission system,
g) monthly allocation of gas supply for the compensatory
the action by the transmission system operator on the virtual point
the transmission system for compensatory action,
h) monthly allocation of gas transmission system operator in
virtual technical point of the transmission system operator,
I) monthly allocation of gas transmission system operator in
virtual production point of the transmission system operator,
j) reserved a fixed capacity reserved interruptible capacity on
border points after each entry and exit points,
the individual subjects of settlement and foreign participants
l) reserved fixed reserved capacity, interruptible capacity
the individual subjects of settlement and foreign participants at the points
gas storage after each entry and exit points,
n) reserved capacity in the collecting places customers directly connected
to the transmission system
about the reserved values) transport capacity of gas generating stations, points
each of the points and after gas generating stations of the individual bodies
the showdown.
(3) Correction data values passed in accordance with paragraph 2 shall forward
the transmission system operator the market operator no later than three
calendar months after the deadline referred to in paragraph 2.
(4) not later than the third day before the beginning of the following calendar
calendar month to 12:00:00 pm passes the transmission
the system operator of the market implied values reserved transmission
capacity in all sampling locations of customers directly connected to the
transmission system valid from the first day of the following month.
(5) each calendar day no later than 12:00:00 pm passes
the distribution system operator transmission system operator for
the preceding day gas accumulation value changes.
(6) the information referred to in paragraphs 1, 2 and 3 shall make available to the market operator operator
the showdown, which the data refer, no later than 60 minutes after their
receipt. The subject of settlement may be in the information system of the market operator
make these data and another registered market participant with
gas.
§ 97
The transmission of data for the sampling space with the measurement of type C or CM
(1) no later than 12:00:00 pm 9th calendar day, not later than
However, until 12:00:00 hours of the sixth working day of the month, gas
the distribution system operator shall send the market operator for the
the previous natural gas a month
and the actual value of the gas) in the collecting places customers with
the measurement of type C or CM, who changed gas supplier, was
They executed and verified in the previous months reading gas and natural gas
the date of deduction of gas, class diagram, a type of delivery and the value of the planned
annual gas consumption,
(b)) change the diagram type class supplies and planned annual consumption
gas for those customers who have changed gas supplier, if they
There has been a change in the nature of the sampling space or change the planned annual
gas consumption and gas reading has not been performed,
(c)) the value of the total planned annual consumption for each class
load profiles for all deliveries take place customers with measurement
type C or CM in competent distribution network, who changed the vendor
gas, valid on the last day of the relevant natural gas calendar
of the month.
(2) the distribution system operator shall communicate by 15. December
the market operator of the planned percentage of loss in the following calendar
the year after each of the distribution networks. Distribution operator
system may planned percentage of losses in the current calendar year
Update, and not later than the fifteenth calendar day of the month
the previous month, from which to pay for updated planned
the percentage of the loss. Operator of the market value of the planned percentages of losses without
undue delay, publish, in a manner enabling remote access.
(3) to 12:00:00 pm 9th calendar day, but no later than
12:00:00 hours of the sixth working day, the gas month passes
the distribution system operator the market operator for the previous
the natural gas a month all the particulars referred to in annex 11 of this Decree for
the previous natural gas a month for sampling the place where change has occurred
gas supplier.
(4) the market operator shall make available the information submitted by the operator, the distribution
system referred to in paragraph 3 for the sampling location no later than 24 hours after the
their receipt of the suppliers of gas and all the parties concerned.
(5) the Operator of the market every day, no later than 13:00:00 pm makes in
its information system the daily values of the gas sampling in the sampling site
a customer who changed gas supplier, suppliers of gas and all
settlement to the parties concerned. At the consumption points with the measurement type, and the
make available the values sent in accordance with section 95, paragraph. 1 (a). e) or section 96 paragraph.
1 (a). (e)) at the consumption points with the measurement of type B, the market operator shall publish the
replacement value determined in accordance with § 101 paragraph. 2. At the consumption points with
the measurement of type C or CM are published daily summary values for groups
offtake points body posting in the appropriate network classification and class
type of supply diagram. For the daily value of the gas shall be considered
the value specified by the market operator under § 99 paragraph. 6.
(6) the Operator of the market no later than the 11th day of each calendar month to the
12:00:00 pm available in the information system for the consumption location
a customer who changed gas supplier, suppliers of gas and all
the parties concerned of the actual value of the measurement of the settlement for the previous
month for each individual gas day.
(7) If not in the distribution network to change gas supplier on the
no sampling place customer, paragraphs 1 to 6 shall not apply.
§ 98
(1) Correction data values sent pursuant to § 97 paragraph. 1, § 95 paragraph. 2 and section
paragraph 96. 2 sends the distribution system operator, and the operator
the transmission system operator to market no later than three calendar
months after the deadline referred to in § 97 paragraph. 1.
(2) the provisions of § 97 paragraph. 3 and 4, shall apply for the correction data values
mutatis mutandis.
(3) If not in the distribution network to change gas supplier on the
no sampling place customer, paragraphs 1 and 2 shall not apply.
Evaluation subscriptions with the use of load profiles in collecting supplies
locations of customers with the measurement of type C or CM
§ 99
(1) Type supply diagrams are used as a replacement method
gas sampling in collecting customer locations with the measurement of type C or CM.
(2) the Operator of the market based on the data provided by the operators of the
distribution system supplies the diagrams normalized type valid for
the whole gas system for each class of load profiles
delivery and throughout the calendar year.
(3) the shipment of type Class diagrams are listed in annex 12 to this
the Decree.
(4) the distribution system operator assigns individual class
load profiles to customer deliveries of the sampling points with the measurement type (C)
or CM when connecting the sampling gas equipment of the customer, when you change the
the nature of the sampling space and change the planned annual gas consumption.
Each supply is set for a given period only one
type supply diagram. The assignment of a class diagram to supply a type
the place of supply shall be carried out in accordance with annex 12 to this Decree.
Characters of offtake points for these purposes are listed in annex 13 to the No.
This Decree. The distribution system operator keeps records
assigning classes to load profiles supplies at least for the period of the past
3 years.
(5) the Operator calculates the gas market referred to in paragraph 6 for the sampling
instead of the customer with the measurement of type C or CM for gas a day for determination of the
daily values of the gas sampling, the monthly values of the gas in the distribution
on each of the days of the monthly gas and adjusting the values of the gas sampling
in the distribution of the individual gas days ago.
(6) calculation of gas sampling for the place of consumption of the customer with the measurement type (C)
performed by the market operator or CM of the size of the planned annual consumption in the
sampling location, the daily value of the equivalised type
diagram of the supply and correction for residual sampling in the relevant diagram
the gas network in accordance with annex 14 to this Decree. The calculation of the subscription
the gas is carried out separately for the determination of the daily values of the gas sampling,
the monthly values of the gas in the gas distribution to individual days
and the adjustment of the monthly values of the gas in the distribution to individual
natural gas for days. Set values are treated as values
gas customers with type C or CM measurements for the determination of the
daily deviations, the monthly deviations and corrective monthly deviations
the individual subjects of settlement.
§ 100
(1) the planned annual gas consumption in the sampling locations of customers with
the measurement of type C or CM establishes the distribution system operator
the procedure referred to in annex 15 to this Decree.
(2) the residual graph in the appropriate distribution network provides
the market operator for each gas a day in accordance with annex 14 to
This Decree.
(3) the residual sampling for each diagram gas day rozpočítává
the market operator to take the place of the customer with the measurement of type C or CM after
individual classes of load profiles by using correction supplies
the residual subscription in the relevant diagram gas network according to annex No.
14 to this Decree. Correction of the shared at all sampling sites with
the measurement of type C or CM in competent distribution network.
(4) the Adjusted type diagram provides the market operator of the normal
a type of diagram according to the current climatic conditions. If not for the
calculated type diagram supply available values of the actual
the climatic conditions, the value of the last known predictions
climatic conditions for the relevant gas day.
§ 101
Evaluation subscriptions using the replacement values for measurement type (B)
(1) the replacement value for the measurement of type (B) applies, the market operator for the
determination of gas sampling in collecting customer locations with the measurement type (B)
for a daily evaluation of deviations and the determination of the daily value of the subscription
gas. For the monthly assessment of the derogations and monthly values of collection
gas in the distribution of gas and on the individual days of the monthly adjustments
the values of the gas in the gas distribution to individual days
use the actually measured value of gas sampling in the sampling site.
(2) for a daily assessment of the derogations apply to delivery locations
customers with the measurement of type B, the market operator for the determination of the allocation of the day
for the settlement of imbalances estimate daily gas consumption determined as a proportion of
planned monthly gas consumption and the number of days in the calendar month. In
If the planned monthly gas consumption is not available, the
the market operator estimate computed as the average of the actual values for the
the last known 4 gas days of the same name that is stored in the system
the market operator. If the market operator in the system has not saved any
the actual value, the market operator shall determine the allocation of the value of the day
calculated as the 66% distribution capacity reserved converted to
the energy unit of the value of the gross calorific value of 10.647 kWh/m3.
Publication of the data by the market operator
§ 102
(1) the market operator exposes no later than 1 calendar month before the first
natural gas on the day of the calendar year:
and the normalized type supply diagrams) valid throughout the calendar year,
(b)) normal climatic conditions valid for the entire calendar year.
(2) the market operator exposes no later than 13:00:00 hours of the gas
of the day:
and supply diagrams), calculated type valid for previous gas
day,
(b) the residual value of the day) individual diagrams of distribution networks
for the previous natural gas a day,
c) daily rates of residual individual distribution diagrams
networks for the previous natural gas a day,
(d)) of the actual climate conditions for previous gas day
provided by the Czech Institute of hydrometeorologickým; in the event that the actual
the climatic conditions are not known, the value of the last known
predictions of climate conditions for the relevant gas day,
(e)), calculated on the following type diagrams 7 delivery of natural gas
days on the basis of predictions of climatic conditions,
(f)) the first updated values passenger load profiles supplies
on the ongoing natural gas a day, on the basis of the updated predictions
climatic conditions provided by the Czech Institute of hydrometeorologickým; in
If the first updated the climatic conditions are not known,
uses the value of the last known predictions of climatic conditions for
the relevant gas day,
g) estimated consumption measurement type (B) in each of the distribution
networks the following 3 gas days ago
(h)), the total allocation of donations focus type and gas networks
the previous day, natural gas
I) size and direction of the system imbalance.
(3) the market operator exposes no later than 23:00:00 hours of the gas
the other day the updated value passenger load profiles
the natural gas supply for the current day on the basis of the updated
predictions of climatic conditions provided by Czech hydrometeorologickým
the Institute; in the case that the second updated the climatic conditions are not
known, the value of the last known climate predictions
the conditions for the relevant gas day.
(4) the Operator market exposes no later than 12:00:00 pm on the 11th
the calendar day of the month:
and the monthly residual value) of each distribution network diagrams
After each of the previous days of gas gas
of the month
(b)) the monthly residual coefficients of individual distribution diagrams
networks for individual days of the previous natural gas natural gas
of the month
(c) adjustments to residual value) of the monthly individual diagrams.
After each distribution networks of gas days of the gas
the month preceding the month 4 gas
(d) adjustments to residual coefficients) monthly individual diagrams.
After each distribution networks of gas days of the gas
the month preceding the month 4 gas.
(5) the market operator shall make available the results of the daily assessment of the derogations
each body clearing and foreign participant through
the transmission system operator and, where appropriate, other bodies of the clearing
to familiarize yourself with the following information, that makes each
the natural gas the day before 13:00:00 for the gas day
previous gas day:
and the daily deviation)
(b) allocation and daily difference) nominations at the border point, and the point
cross-border gas pipeline with the resolution of the individual gas importers,
(c) the allocation and daily difference) nominations to the point of virtual stack gas
with a resolution of individual codes reserved storage capacity,
(d) the allocation and daily difference) nominations for the delivery point or the summary
transfer seats to downsizing of the gas,
e) allocated to value flexibility,
(f) the provisional allocation of use flexibility),
(g) the balance of the account value) provisional derogations,
(h) the preliminary value of the daily balancing) quantity
and flexibility, the size) may subject the clearing or foreign
the participant through the transmission system flows
on the market with untapped flexibility under section 89.
(6) every day until 13:30:00 pm clearing or foreign body may
the participant through the transmission system operator to send
the market operator disagreement with the results of the daily assessment of the derogations for
preceding day gas referred to in paragraph 5. The market operator shall take
disagreement with the results of the daily evaluation of imbalances from the body only
Clearing or from a foreign participant through the operator
the transmission system, which on the basis of the notification referred to in paragraph 5 has been
set preliminary countervailing value of the daily quantity different from
zero, or whose daily deviation pursuant to paragraph 5 (a). and) is greater than the
3 000 MWh. In the event that the market operator evaluates brought on disagreement with the
the results of the daily evaluation of imbalances as a legitimate, shall notify not later than
16:00:00 hours the same day, the individual subjects of settlement and
foreign participants through the transmission system operator
the new deadline for the publication of the data referred to in paragraph 5.
section 103
(1) the Operator of the market reversed and addressing financially clearing body
or a foreign participant through transmission
the daily amount of compensation system. The market operator settles with clear and
transmission system operator revenue and expenditure for compensatory day
the amount received from the subjects of settlement or foreign participants
through the transmission system operator or paid
operators of clearing foreign participants through
the transmission system operator.
(2) the Operator shall make available to each body market clearing and foreign
the participant through the transmission system operator and, where applicable,
other subjects of settlement to familiarize yourself with the following information
each gas a day by 13:55:00 pm gas day
the previous day the replacement gas, where appropriate, the term, if the
the sending of disagreeing with the results of the daily assessment of the derogations referred to in § 102
paragraph. 6:
and the allocation of the use of flexibility)
(b) the balance of the account value) the derogations,
(c) the daily amount of the countervailing value).
(3) the market operator shall make available the results of the monthly assessment of the derogations
each body clearing and foreign participant through
the transmission system operator and, where appropriate, other bodies of the clearing
to familiarize yourself with the following information, no later than 12:00:00 pm
on the 11th day of the month following gas natural gas:
and monthly deviation in the Division) for each gas days ago
(b) allocation and difference) the monthly nominations at the border point, and the point
cross-border gas pipeline with a resolution after the individual importers or
gas gas customers and the individual days,
(c) the monthly difference and allocation) nominations to the point of virtual stack
After the resolution of the individual gas codes reserved storage
capacities and individual gas days
(d) the monthly difference and allocation) nominations for the production of gas after points
the individual points of the production of gas.
(4) on the day of the notification referred to in paragraph 3 not later than 15:00:00 a.m. of may
body clearing or foreign participant through
the transmission system operator the market operator to send the object to the
the results of the monthly assessment of the derogations for the previous natural gas
month pursuant to paragraph 3. The market operator accepts the disagree with the results of the
monthly evaluation of imbalances from the body only clearing or
Foreign participant through transmission
the system, which is in the gas day difference between the variances in
daily and monthly evaluation of deviations of more than 3 000 MWh.
the operator evaluates the market brought on disagreement with the results of the monthly
evaluation of deviations as legitimate, shall be notified by no later than 18:00:00
hours of the same day, the individual subjects of settlement and foreign
participants through the transmission system operator, the new term
for the publication of the data referred to in paragraph 3.
(5) the market operator shall make available the results of the correction of the monthly assessment
deviations of each body clearing and foreign participant
through the transmission system operator and, where applicable, other
participants in the gas market to familiarize yourself with the following information by
make available no later than 12:00:00 am on the 11th of the gas
the following day, three months after the date of the gas referred to in paragraph 3:
and monthly deviation in repair) for each gas days ago
(b) the monthly difference) allocation and nomination at the border point, and the point
cross-border gas pipeline with a resolution after the individual importers or
gas gas customers and the individual days,
(c) the monthly difference) allocation and nomination to the point of virtual
the gas tank with a resolution of one of the reserved codes
storage capacity and individual gas days
(d) the monthly difference) allocation and nomination points after gas generating stations
the individual points of the production of gas.
section 104
The evaluation and settlement of the differences between values according to the type
diagrams of power supply and the actual values
(1) when the use of load profiles supply arises, the difference between the value of the
specified by this method and the true value of consumption in the
the sampling location. Evaluation and accounting for these differences, the subjects
clearing the market operator carries out in monthly cycles.
(2) the actual value of the consumption in the sampling spot measurement
type C or CM divide the market operator to each gas days
in the period, to which the real value of consumption by the procedure
in accordance with Annex 17 to this Decree.
(3) the market operator carries out the evaluation of the differences between the values of the actual
gas consumption divided in accordance with paragraph 2 and calculated values
gas sampling in accordance with § 99 paragraph. 6 for the monthly values of the gas sampling in
the distribution of individual gas days.
(4) the market operator sums the differences referred to in paragraph 3 for all customers
the competent body clearing and these differences will be charged body
the showdown for the arithmetic average of the daily values of the index of short-term market
established in accordance with annex 6 to this Ordinance for gas a month,
which are the differences.
(5) for the relevant calendar month are charged the differences referred to in paragraph 4
in the distribution of individual distribution networks to charge with the opposite
the subject of settlement on the integer, which in the relevant distribution network
has been delegated responsibility for deviation for customers who have not changed
gas supplier.
(6) each calendar month, not later than the fourteenth calendar day of the
12:00:00 hours, the market operator makes available in the information system operators
clearing, settlement, where appropriate, other entities authorized to
with these data, the evaluation of the statement of the differences between the values of the
the actual gas consumption in the distribution referred to in paragraph 2 and the calculated
the values of the gas sampling in accordance with § 99 paragraph. 6.
(7) if the sampling points for the measurement of the customers with type C or CM
sent to the distribution system operator corrective value deduction
gas under section 98, the market operator no later than the fourteenth calendar
day 12:00:00 of the fourth month following the month in the
which was made for the deduction under § 97 paragraph gas. 1 (a). (c)), the clearing
the differences referred to in paragraphs 2 to 5 and these values shall be published in the information
the system.
(8) the financial settlement of the differences referred to in paragraphs 2 to 7 performs operator
the market. The market operator shall take into account when determining financial eligibility
clearing the body assigned to the responsibility for deviation of the virtual
a sampling of space distribution system operator the amount of possible
deviations arising in accordance with paragraphs 1 to 7.
§ 105
(1) the distribution system operator shall send once a year at the latest,
to date, 30. June, the actual value of the losses in the relevant distribution network
for the previous calendar year. The market operator will be charged the difference operator
the showdown, which in the relevant distribution system assumed responsibility
a derogation for the losses for the arithmetic average of the daily values of the index
short-term market established in accordance with annex 6 to this Ordinance for
the natural gas a month, which are the differences.
(2) following evaluation of the losses, the differences referred to in paragraph 1 must be applied
with the opposite sign to the body which, in the relevant distribution
the system has assumed responsibility for a deviation for customers who have not changed
gas supplier.
(3) the financial settlement of the differences referred to in paragraphs 1 and 2 done by operator
the market. The market operator shall take into account when determining financial eligibility
clearing the body assigned to the responsibility for deviation of the virtual
a sampling of space distribution system operator the amount of possible
deviations arising under paragraphs 1 and 2.
Section 106
Evaluation and accounting differences between daily and monthly allocations and
between monthly and corrective monthly locations after the sending of the derogations
the monthly values of the allowance and deduction values after the correction
(1) the market operator establishes for each body and each clearing
Foreign participant:
and the daily deviation on the basis of) the daily allocations and donations
(b) the monthly breakdown of deviation) after each gas days on
the basis of monthly allocations and donations
(c)) in the distribution of monthly deviation a corrective after the individual gas
days on the basis of the provisions of the monthly allocation at the input and
output points, where to send the correction values of the allocation or
gas sampling.
(2) the market operator carries out the evaluation of the differences between the values of the daily
derogations and monthly variations in the distribution of individual gas
days for each subject of settlement for the index value short-term market
established in accordance with annex 6 to this Ordinance for each individual
gas day.
(3) the settlement referred to in paragraph 2, the operator of the market not later than
the thirteenth calendar day until 17:00:00 pm after the calendar month in which the
the settlement referred to in paragraph 2 applies. At the same time make available to the market operator
in the information system operators, or other subjects of settlement
clearing to get familiar with these data, the settlement by
paragraph 2 in the Division after the individual gas days.
(4) the market operator carries out the evaluation of the differences between the values of the month
variations in the distribution of individual gas days and repair
monthly variations in the distribution of natural gas for days after each
each subject of settlement for the index value short-term market established
in accordance with annex 6 to this Ordinance for each individual gas day
separately.
(5) Settlement referred to in paragraph 4 shall give the operator the market no later than
16th calendar day until 17:00:00 pm four calendar months after the
the calendar month to which the settlement referred to in paragraph 4 applies. At the same time
shall make available to the market operator in the information system of settlement, bodies
where appropriate, other entities entitled to settlement to familiarize yourself with the following
data, the settlement referred to in paragraph 4 in the Division after each
gas days.
(6) the financial settlement of the differences referred to in paragraphs 2 to 5 are performed by the operator
the market.
§ 107
The use of the load profiles of gas supply for the purposes of billing for supplies
gas
(1) the consumption of gas and its distribution in each period shall be determined
in accordance with annex 18 to this Decree, taking into account the
readings made by the distribution system operator and samoodečty
of the customer.
(2) in the case of unavailability of the data recorded by the measuring device for
the period laid down by the other law, which regulates the measurement
plynu15), the distribution system operator shall apply for the establishment of
consumption of the customer with the measurement of type C or CM readings made by
distribution system operator and duly adopted samoodečty this
the customer or the supplier of gas from the last statement of the gas supply.
For the determination of the estimate, the gas consumption for the remaining period of the operator
the distribution system in accordance with annex 18 paragraph 2 to this
the Decree.
section 108
Track prices of related services in the gas industry
Prices for related service in the gas industry are the price of transport services
gas, the price of the service and the price for distribution system operator's activities
the market. The composition of the price of transport of gas, the price of distribution service
system and the prices for market operator's activities is provided in annex No. 19
to this Decree.
section 109
The procedure for the determination of advance payments
(1) a trader with gas or producer gas provides for advance payments
no more than the planned annual gas consumption in the sampling site
the customer with the measurement of type C or CM in accordance with Annex 15 to this
the Decree.
(2) a trader with gas or producer gas provides for advance payments
maximum in the range of contracted gas consumption in the sampling site
the customer with the measurement of type A or B.
PART TEN
CHANGE GAS SUPPLIER
Standard change gas supplier
section 110
(1) the standard by changing the gas supplier gas market participant is
and change gas supplier) for another gas supplier,
(b)) change of supplier of gas from the supplier of last resort.
(2) before submitting an application for a standard change gas supplier in accordance with
paragraph 3 concludes the customer with a new supplier of gas supply contract
gas or associated gas supply services.
(3) the first 4 months before changing the gas supplier and not later than the tenth
working day until 10:00:00 pm prior to the required date changes
gas supplier delivers a new supplier of gas request for a standard change
supplier of gas to the market operator. In the event that a new supplier of gas
ensures delivery according to the contract of associated gas supply services
makes a request for the reservation of the distribution capacity pursuant to section 39 at the latest in
the date of filing of the application for a standard change gas supplier and the first 10
working days prior to the application of a standard change of the supplier
gas. The application for a standard change gas supplier must contain
the following data:
and the identification of new gas supplier) in the form of the code assigned according to §
5 (3). 1,
(b)) the type of contract for the supply of gas and the date from which the shipment of gas
take place, and the duration of the contract,
(c) identification of the body in the form of showdown) code assigned according to § 5
paragraph. 1, to be assigned responsibility for a deviation in sampling
the spot, which is changing the gas supplier,
(d) the place of consumption and its) identification in the form of the code assigned according to § 5
paragraph. 1,
e) whether the contract was for the supply of gas or associated services
gas supply to the consumer within the premises of the usual closed for business
or outside of the normal business of the premises to a new supplier of gas, or whether
closed distance way.
(4) every working day at the latest 12:00:00 hours, if the request was
referred to in paragraph 3 taken in 10:00:00 of the working day,
the operator shall inform the market through its information system
the existing gas supplier, the existing body of reckoning, the new
gas supplier, new body clearing, operator of the distribution
or the transmission system, which is the place of consumption, and other connected
the bodies concerned, to which the request for change of the supplier concerned, standard
about planned changes by sending a standard gas supplier identification
sampling locations in the form of the code assigned according to § 5 (3). 1 deadline, from the
the delivery of a new supplier of gas to take place, and the indication referred to in
paragraph 3 (b). (e)). The application of paragraph 3, which was adopted after
10:00:00 of the working day, shall be deemed to be accepted
the following working day.
(5) in the fifth working day until 18:00:00 hours after transmission of the information
in accordance with paragraph 4 of the distribution or transmission system operator
the operator shall inform the market about the possibility or impossibility of reservation
distribution or transmission capacity to the delivery point of the customer under the
paragraph 3, if this is a standard change of the supplier, when new
supplier contract for the combined services of gas supplies.
(6) the distribution or transmission capacity to the delivery point of the customer
It is not possible to book when insufficient collateral, if
application has not been filed in due time or if it does not meet the
particulars of a reservation request distribution or transmission capacity. For
failure to comply with the formalities of the application shall, if the application is not possible
uniquely identify a subscriber of the gas market, and by assigning the EIC
code, name, surname and date of birth of the gas market participant or
business name, if applicable, the name of the market participant and identification
the number of the person, if it has been assigned, the sampling site, in which must be
to change the vendor, was not included in the request for reservation
distribution capacity or if a new supplier of gas application attaches
or it does not adjust to the 14:00:00 of the working day following the date on
When the operator of a distribution or transmission system called for
Elimination of deficiencies in applications designating the erroneous data.
section 111
(1) in the event that the operator of a distribution or transmission system
does not inform the market operator under section 110, paragraph. 5 to the fourth working
the day until 18:00:00 hours after transmission of the information referred to in section paragraph 110. 4,
the market operator notifies this fact to the distribution
or the transmission system. If the operator of a distribution or transmission
the system then fails to comply with information requirements under section 110, paragraph. 5, but
registers the place of consumption of the customer in accordance with section 112, paragraph. 4, it is considered that,
It informed the market operator of book distribution options, or
shipping capacity.
(2) the Operator of the market without delay after the date referred to in section paragraph 110. 5 inform the
the existing gas supplier, new gas supplier, all interested
operators of clearing and distribution or transmission system operator,
that is the place of consumption of the customer connected, about reservation options
distribution or transmission capacity to the delivery point of the customer under the
§ 110, paragraph. 3. In the event that it is not possible to book distribution or
the transport capacity to the delivery point of the customer according to § 110, paragraph. 3,
the market operator informs through the information system
existing and new gas supplier, the existing and the new entity
clearing, operator of the transmission or distribution system, to which the
consumption location is connected, and other interested entities, to which the application
a standard change of the supplier concerned about stopping the standard changes
gas supplier.
(3) to the fifth working day until 18:00:00 hours after transmission of the information
under section 110, paragraph. 4 can the existing supplier of gas through the
the information system of the market operator to request the suspension of the standard
change gas supplier, if the effective date of the change of supplier has not
to the termination of the contract with the current gas supplier, whose subject is
the supply of gas, or if the customer in writing to take effect will change
gas supplier not to implement.
(4) within 14:00:00 a.m. on the eighth working day following the submission of information in accordance with
§ 110, paragraph. 4 can a new supplier of gas through the information
the market operator system standard request change of the supplier to take back.
(5) not later than the fifth working day until 18:00:00 pm after the transfer
information according to § 110, paragraph. 4 the subject of settlement shall communicate, whether they agree with the
by assigning responsibility for the imbalance. Immediately after the expression of consent
entity assigning the responsibility for clearing with the deviation in the
the sampling point shall inform the operator of the market through the information
the existing gas system, the existing body of reckoning,
other interested bodies of the clearing and transmission or
the distribution system, to which it is attached, the sampling place of assignment
the subject of settlement.
(6) If, on the fifth working day until 18:00:00 pm after the transfer
information according to § 110, paragraph. 4 is not in the information system of the market operator
the consent of the subject of settlement with the assignment of responsibility for a deviation in the
the sampling location, the operator shall inform the market through
the information system of the existing and new gas supplier, existing and
a new body of clearing and settlement operators concerned and
the transmission or distribution system, to which the sampling
the place is connected by their standard change gas supplier.
section 112
(1) not later than 15:00:00 of the working day, in which it was adopted
the request referred to in section 111, paragraph. 4, the operator shall inform the market through
the information system of the existing gas supplier, the existing body of
clearing, operator of the transmission or distribution system, to which the
consumption location is connected, and other interested entities, to which the application
a standard change of the supplier concerned, about their process changes
vendor.
(2) no later than 20:00:00 of the working day, in which it was adopted
the request referred to in section 111, paragraph. 3, the operator shall inform the market through
the information system of the new gas supplier, all interested entities
clearing and transmission or distribution system, to which the
consumption location is connected, that the existing gas supplier asked for
stop the standard changes to the gas supplier.
(3) If the existing gas supplier asked to stop standard
change gas supplier according to § 111 paragraph. 3, but a new supplier of gas
on the basis of the written submissions of the customer, from which it is clear that
the customer intends to change the vendor will confirm in the information system
the market operator submitted a request for change of the supplier, and not later than
the eighth working day from the date of submission of the information by the market operator under section
paragraph 110. 4-14:00:00 hours, the market operator continues to process changes
vendor.
(4) in the fifth working day before 12:00:00 hours after transmission of the information
under section 110, paragraph. 4 the distribution or transmission system operator
register at the place of consumption of the market operator of the customer, where the
standard change gas supplier, and passes information about the sampling point
According to annex No. 20 of this Decree.
(5) not later than the ninth working day before 8:00:00 hours of the date of
information by the market operator under section 110, paragraph. 4 the market operator shall notify the
distribution or transmission system operators, to which the sampling
Instead, the existing suppliers connected gas, new gas suppliers
and all the parties concerned the outcome of the assessment of applications for settlement
standard change of the supplier of the gas.
(6) the distribution or transmission capacity for supply point under section
paragraph 110. 3 the notice of registration of a standard change of supplier
gas referred to in paragraph 5.
(7) in the event that the request for change of the supplier was given information about
its conclusion outside of normal business or distance
in a way, and resigned from the contract, the customer according to § 11a paragraph. 2
the Energy Act ^ 12) and at the same time calls for the continuation of the supply from the
the current vendor, the vendor may change the existing stop
the vendor in time according to § 111 paragraph. 4.
§ 113
(1) Registered standard change gas supplier shall take effect to the
gas date referred to in the application for a standard change of the supplier
gas under section 110, paragraph. 3 (b). (b)).
(2) the effective date of the changes to the standard gas supplier performs
distribution or transmission system operator reading the status of the meter,
in the case of sampling points with the measurement of type C or CM establishes the status of the measuring
with the procedure referred to in paragraph 3 of the device, and data operator
the distribution system operator shall send the market subsequently. The market operator
This information without undue delay transmit the previous and new suppliers
gas and the previous and the new entity to the showdown.
(3) the determination of the status of the measuring device for the offtake points with the measurement type (C)
or CM performs the distribution system operator reading to date
the efficiency of a standard change gas supplier, or reading
the State of the measuring equipment brought on by the customer, the operators of the distribution
system directly or through existing or new vendor
gas. If it is filed by the end of the fifth business day after the date of the change
gas supplier, or in the case that the reading State of the measuring equipment
is not filed before the end of the fifth business day after the date of change of the supplier
gas, determine the status of the measuring device the estimated gas consumption to date
the effectiveness of the change of the supplier of the gas referred to in annex 18 to this Decree.
If the deduction was made for distribution system operator and
at the same time the reading has been filed by the customer, for the Bill of distribution of gas
to apply the reading detected by the distribution system operator.
(4) when the standard change gas supplier in the sampling site the customer with
the measurement of type A and B the distribution or transmission system operator, to the
that is the place of consumption of the customer connected, sent to the market operator
no later than the date referred to in section 112, paragraph. 4 real daily subscription
the gas in the discharge point of the customer for the past 17 known calendar
months and the actual daily gas supply point for the customer
in the term under section 95 paragraph. 2 or section 96 paragraph. 2 for natural gas of the month
in which the standard change gas supplier is approved under section 112
paragraph. 5, but was not effective.
(5) If a change of the customer in the sampling point and at the same time to change the
gas supplier, the provisions of the standard change of the supplier
gas, mutatis mutandis, with the exception of § 111 paragraph. 3. The reason for the inability to reserve
distribution or transmission capacity to the delivery point of the customer under the
§ 110, paragraph. 5 it is also dispatched on the conclusion of the Treaty on
connection. To start deliveries to the newly connected consumption points
When the customer is a merchant supplier of gas with gas, which is
the supplier of last resort in the relevant home zone, for the initiation of the
deliveries to the delivery point, which is not registered in the information
the system of the market operator, after the unauthorized gas sampling or unauthorized
the distribution of new gas supplier, who is not a supplier of the last
instance in the relevant home zone, for the start of delivery for sampling
the place of the registered in the information system of the market operator after
unauthorized gas sampling or unauthorized distribution of new supplier
gas, and for the start of delivery for preventing unauthorised removal
the provisions of the standard change gas supplier, by analogy with the
that:
and standard change request) gas supplier under section 110, paragraph. 3
delivers the market operator of the gas supplier no later than 10:00:00 pm
working day preceding working day earliest possible
start of delivery of gas contracted with the distribution system operator,
(b) the application for a standard change) gas supplier under section 110, paragraph. 3 (b).
(b)) must contain the type of contract, the object of which is the supply of gas, the date
the earliest possible start of supply of gas to the agreed with the operator
the distribution system and the duration of the contract,
(c) the acts for the implementation of the changes) to the supplier in accordance with section 110, paragraph. 5 and 6, section 111
paragraph. 1, 2 and 5, and section 112, paragraph. 4 shall be carried out until 18:00:00 pm
working day preceding working day earliest possible
start of delivery of gas contracted with the distribution system operator.
The provisions of § 111 paragraph. 3 and 4 and section 112, paragraph. 1 to 3 shall not apply,
(d) the operator shall notify the result of the assessment) request for a standard change
gas supplier under section 112, paragraph. 5 immediately after all
the acts referred to in § 113 paragraph. 5 (a). (c) the effectiveness of the supplier changes.) occurs in the
the day of the earliest possible commencement of gas contracted with
distribution system operator.
(6) the market operator to the requests to make changes to the vendor in
the order in which they were received by the market operator. If the request referred to in
the first sentence more participants in the gas market for the same sampling location is
the same required the effective date of the change of the supplier, it is considered
the active change of supplier, which the market operator has registered as a
the last. In this case the operator shall inform the market about the planned
the implementation of changes to the supplier and the supplier shall notify the registration changes all
vendors and operators, who are clearing the change of supplier
concerned.
(7) the market operator to the effective date of the change of the supplier cancels any
individual assignment of sampling or a pass-through space for those suppliers
gas, whose period of delivery are assigning sampling or
a pass-through space new gas suppliers, and shall inform the
without delay of the gas supplier, clearing and the entity concerned
the transmission or distribution system, to which the sampling
or a pass-through space is connected.
section 114
Shortening the supply of gas to
(1) a request for the supply of gas to the truncation of the sampling space sends the supplier
gas market operator the operator through the information system
market no later than 10:00:00 pm 10th working day before the
the planned termination of the delivery.
(2) by reducing the supply of gas occurs in the information system of the operator
the market to shift the deadline their existing supplier of gas supply.
Shortening the supply of gas in the event the contract is associated services
gas supply to their booked capacity into the sampling distribution
space.
(3) the market operator cancels the requested date, the assignment on your system
delivery point for suppliers of gas and the concerned body clearing and
It shall immediately inform the supplier of the gas, the
operators of clearing and distribution or transmission system operator,
to which is appended to the place of consumption.
(4) a request for the supply of gas to the truncation of the sampling points in the case of
withdrawal from the contract pursuant to § 11a paragraph. 2, 5 and 6 of the energy
the law ^ 12) or in the case of termination of the contract pursuant to § 11a paragraph. 3
the Energy Act ^ 12) sends the supplier of gas to the market operator
through the information system of the market operator no later than
00:00:00 of the working day preceding the day on which should take
the effectiveness of the change of supplier in the market operator's system, or should take
the effectiveness of the withdrawal from the contract pursuant to § 11a paragraph. 2, 5 and 6
the Energy Act ^ 12) or rescission should take effect
According to the § 11a paragraph. the Energy Act 3 ^ 12).
(5) the market operator cancels the requested date, the assignment on your system
delivery point for suppliers of gas and the concerned body clearing and
It shall immediately inform the supplier of the gas, the
operators of clearing and distribution or transmission system operator,
to which is appended to the place of consumption.
section 115
The extension of the supply of gas to
(1) an application for the extension of the supply of gas to the delivery point sends
supplier of gas to the market operator by means of the information system
the market operator no later than 23:00:00 hours of the last calendar day
the supply of gas. The original supplier of gas in the request shall indicate the new term
their gas supplies. The subject of settlement shall communicate, whether they agree with the
by assigning responsibility for deviation, no later than 23:30:00 pm
the last calendar day supply of gas.
(2) the Operator shall immediately inform the market about the extension of the supply of gas to
stakeholders, vendors, and clearing the gas transmission
system or the appropriate distribution system operator, which
consumption location is connected. The extension of the supply of gas is in the case
the contract of associated gas supply services continued booking
distribution capacity to delivery point. The extension of the supply of gas to
referred to in paragraph 1 shall take effect only if in the term
the desired extension is not to supply place in the information system
the market operator is assigned a different gas supplier.
(3) in the event that the customer has resigned from the contract or several contracts under section
11A paragraph. 2 ^ 12) of the Energy Act and this fact was shown by
the supplier of the gas, which is within the nearest vendor changes
replaced by a different gas supplier (hereinafter referred to as "the original supplier
gas "), and at the same time requires the continued supply of gas from the original
gas supplier, sends the original gas supplier request for extension
supply of gas to the market operator by means of the information system
operator of the market on the date referred to in paragraph 1.
(4) the Operator shall immediately inform the market about the request for the extension of the supply
the gas involved clearing and transport operator
or distribution system, to which it is connected, and the place of consumption
gas supplier. The original supplier of gas in the application stating the new term
their gas supply and clearly indicate that it is an extension of the
supply of gas on the basis of the customer's withdrawal from the contract pursuant to § 11a
paragraph. 2 the Energy Act ^ 12). The subject of settlement shall notify whether they agree
with the assignment of responsibility for a deviation in the term referred to in paragraph 1.
The extension of the gas supply means in the case of the Treaty on the joint
gas supply services continued booking distribution capacity to
the sampling locations.
(5) the market operator shall notify the result of the assessment of applications for renewal
gas supply referred to in paragraph 4 shall immediately after sending the approval body
clearing, assuming responsibility for deviation.
(6) the market operator to the effective date of the extension of the supply of gas according to the
paragraph 4 of each individual assignment cancels the delivery point for suppliers
gas, for which the customer according to § 11a paragraph. 2 the Energy Act ^ 12)
resigned from the contract, and shall forthwith inform the
the original gas supplier, the concerned entities of the clearing and the operator
distribution or transmission system, which is the place of consumption
attached.
Quick change gas supplier
section 116
(1) in the event that the subject of settlement, even after the reduction of nominations under section 66
paragraph. 6 does not have the necessary financial security, the market operator in
17:30:00 pm through an information system that
the body does not have the necessary financial security clearance for the cover of supply
to the consumption points of the customers. At the same time, the market operator of this fact
shall inform the concerned bodies, the gas supplier settlement, and
distribution or transmission system operators, to which the sampling
instead of appended.
(2) If the subject of settlement referred to in paragraph 1 the following calendar day
at 7:00:00 pm still does not have the necessary financial provision for cover
deliveries to the consumption points customers to the market operator shall suspend option
nominate, transmit and take responsibility for the imbalance and to participate in the
Intraday gas market. The market operator shall promptly provide this
information to all registered participants in the gas market, and publish it
in a manner enabling remote access.
(3) in the collecting places where customer is assigned responsibility for
deviation, or forward the responsibility for deviation of the body which
It has suspended the right to nominate, transmit and take responsibility for the
the derogation and to participate in the intra-day gas market referred to in paragraph 2, the
in the period referred to in paragraph 2, the responsibility for deviation is assigned to the vendor
gas. If the body is clearing at the supplier of gas to the
delivery point of the customer, the operator of a distribution or transmission
system to which it is connected instead of the customer's consumption, be sent to the
without delay, by electronic means to the customer, for which he is known, electronic
address to that date are not secured to supply its sampling
the place of supply will be ensured by the supplier or the last instance.
(4) in the event that within 14:00:00 hours to supply the place referred to in paragraph 3
the first sentence is not assigned to the body with sufficient financial clearing
ensuring the market operator shall inform all
registered participants in the gas market and shall publish this information in a manner
enabling remote access. Distribution or transmission operator
system to which it is connected instead of the customer's consumption, be sent to the
without delay, by electronic means to the customer, for which he is known, electronic
address to that date are not secured to supply its sampling
the place of supply will be ensured by the supplier or the last instance.
(5) for the sampling sites customers, whose body the clearing operator
the market has suspended the ability to nominate, transmit and take responsibility for the
the derogation and to participate in the intra-day market with gas due to
the lack of financial security, makes a request for rapid change
new gas gas supplier the supplier through the information
the system of the market operator, and no later than two calendar days to
8:00:00 pm after the time limit referred to in paragraph 3 or 4. In the event that the new
supplier of gas supply under the contract of associated services
gas supplies, serving the reservation request distribution capacity pursuant to section
40 no later than the deadline for the submission of applications for a quick change of the supplier
gas. Request for quick change gas supplier must contain
the following data:
and the identification of new gas supplier) in the form of the code assigned according to §
5 (3). 1,
(b)) the type of contract for the supply of gas and the duration of the contract,
(c) identification of the body in the form of showdown) code assigned according to § 5
paragraph. 1, to be assigned responsibility for a deviation in sampling
the spot, which is changing the gas supplier,
(d) the place of consumption and its) identification in the form of the code assigned according to § 5
paragraph. 1.
section 117
(1) in the absence of the submission of the application for a quick change of the supplier of the gas referred to in
§ 116, paragraph. 5, not the third day following the date referred to in section 116, paragraph. 3 or 4
ensure the supply of gas to the delivery point of the customer, if the customer
not under the regime of supplier of last resort.
(2) in the absence of the submission of the application for a quick change of the supplier of the gas referred to in
§ 116, paragraph. 5, is the third day following the date referred to in section 116, paragraph. 3 or 4
ensure the supply of gas to the delivery point of the customer by the supplier
the last instance, if a customer falls under the vendor last mode
an instance of the.
(3) no later than 60 minutes after receipt of the request under section 116, paragraph. 5
the operator shall inform the market through its information system
new gas, new body clearance, or other interested
operators of clearing and distribution or transmission system operator,
that is the supply point is connected, that the request has been made under section 116
paragraph. 5. Quick change gas supplier shall enter into force on the third day after the
the term under section 116, paragraph. 3 or 4.
(4) no later than two calendar days until 12:00:00 pm after the deadline
under section 116, paragraph. 3 or 4 operator distribution or transport
the system operator shall inform the market about the impossibility of booking distribution
or transportation capacity to the delivery point of the customer in accordance with paragraph 3 of
due to the lack of financial security. The market operator shall, without delay after the
the receipt of information from the distribution or transmission system operator
inform the new supplier of gas and the clearing of all stakeholders
about reservation options distribution or transmission capacity into the sampling
the place of the customer under section 116, paragraph. 5. In case of impossibility of reservation
the distribution capacity of the operator shall inform the market through
the information system of the new gas, new body clearing and
other interested bodies of the clearing and transmission or
the distribution system, to which it is attached, the sampling place to stop
Quick change of the supplier of the gas.
§ 118
(1) no later than two calendar days until 12:00:00 pm after the deadline
under section 116, paragraph. 3 or 4 shall notify the clearing entity that agrees with the
by assigning responsibility for the imbalance to the delivery point of the customer under the
§ 117 paragraph. 3. immediately after the expression of consent of the clearing with the body
by assigning responsibility for the imbalance in the sampling point shall inform the
the market operator through the new supplier information system
gas and other concerned bodies of the clearing and transmission or
the distribution system, to which it is attached, the sampling place of assignment
the subject of settlement. If no later than two calendar days to
12:00:00 pm after the time limit referred to in section 116, paragraph. 3 or 4 is not in the information
the market operator system, consent of the subject of settlement with the assignment
responsibility for the imbalance in the sampling site, inform the operator
market through the information system of the new gas, new
the body of clearing and settlement operators concerned and operators
a transmission or distribution system, which is the place of consumption
connected, to halt the rapid changes of the supplier of the gas.
(2) no later than two calendar days until 12:10:00 pm after the deadline
under section 116, paragraph. 3 or 4 shall notify the operator the market operator
distribution or transmission system, which is the place of consumption
connected to the new gas suppliers and all the parties concerned clearing
the results of the examination of the application for a quick change of the supplier of the gas and
a trader with gas in the mode of supplier of last resort, which
the sampling points will be supplied by the supplier of last resort.
(3) the distribution or transmission capacity is the announcement of the register
Quick change of the supplier of the gas referred to in paragraph 2.
(4) the effective date of the changes rapid gas supplier shall give the operator
distribution or transmission system of determining the status of the meter pursuant to § 113
paragraph. 2.
(5) the quick change gas supplier under section 116, paragraph. 3 to 5 and § 117,
used for sampling space customers where the gas supplier ceased
permissions or the ability to deliver. In these cases, the operator shall suspend the
market supplier of gas, which ceased to be a privilege, or the possibility of gas
supply, the ability to nominate, transmit and take responsibility for deviation
and to participate in the intra-day market with gas. The market operator shall immediately
provide this information to all registered participants in the gas market and the
publish it in a manner enabling remote access. Procedure provided for in § 116
paragraph. 2 does not apply.
Procedure for interruption, restriction and restore gas supply when unauthorized
sampling distribution, unjust and unlawful transport of
section 119
(1) the supplier of the gas serves a request for suspension or termination of the supply of
gas for distribution system operator no later than the last
calendar day before the desired date of termination or interruption of the delivery
gas.
(2) the supplier of the gas may take the request referred to in paragraph 1, in writing,
or through the information system distribution
system back in time until 16:00:00 pm one business day before the date of
the required suspension or termination of the supply of gas without the consent of the
distribution system operator. After this deadline can take
supplier of gas back to the request referred to in paragraph 1, in writing, or
through the information system of the distribution system operator
only with the consent of the distribution system operator.
(3) the distribution system operator shall, upon request of the vendor
gas interruption of gas supply in the unauthorized gas sampling
and customer delivery point) for the category of central subscriber, and
a large buyer within three working days from the date of the desired interruption
gas supplies, when the period of three working days begins to run on the date of
the desired interruption of gas supplies. In the event that the
the distribution system operator fails to interrupt the supply of gas from the
because impervious to gauge and non-cooperation of the customer in the
the interruption of gas supplies within three working days from the date of the desired
the interruption of gas supplies including, that the effect of interruption of the supply
gas was the end of the third business day after the date of the desired
the interruption of gas supplies including,
(b)) at the customer's place of consumption and to the categories of residential home
ten working days from the date of the desired interruption of gas supplies, when
the period of 10 working days begins to run on the date of the desired interruption
gas supplies including. In the event that the operators of the distribution
system fails to interrupt the gas supply due to inaccessible gauge
and the non-cooperation of the customer when the interruption of gas supply to the
the 10th working day following the date of the desired interruption of gas supply
including, the effect of interruption of supplies came from the fifteenth
working day from the date of the desired interruption of gas supplies.
(4) the distribution system operator shall, upon request of the vendor
gas their gas supply when the unauthorized gas sampling
and customer delivery point) for the category of central subscriber, and
a large buyer within three working days from the date of the desired end
gas supplies, when the period of three working days begins to run on the date of
the requested termination of the supply of gas. In the event that it fails to
the distribution system operator to terminate the supply of gas, due
inaccessible meter and the non-cooperation of the customer when their
gas supply, it is considered that effect their supply of gas
the expiry of the third business day after the date of the desired their supply
gas, including. In the event that occurs when the effect of their delivery in accordance with
the preceding sentence, the distribution system operator to this
the date of the calculation of the expected amount of gas consumption in accordance with the law,
which regulates gas measurement ^ 15), and this calculation passes gas suppliers
and the market operator for the offtake points, which was through code
marked for each sending data, the market operator
(b)) at the customer's place of consumption and to the categories of residential home
ten working days from the date of the desired their gas supplies, when
the period of 10 working days begins to run on the date of the desired end
gas supplies including. In the event that it fails the operator
close the gas supply distribution system due to inaccessible
the gauge and the non-cooperation of the customer when their supply
gas, it is considered that effect their supply from the fifteenth
working day from the date of the requested termination of the supply of gas. In
If that occurs, the effect of their delivery in accordance with the preceding sentence,
performs the distribution system operator to this date calculation
the expected amount of gas consumption by legal regulation, which
Adjusts the measurement gas ^ 15), and this calculation passes gas suppliers and
the market operator for the offtake points, which was through code
marked for each sending data the market operator.
§ 120
(1) the distribution system operator shall inform no later than four
working days from the date of suspension or termination of the supply of gas to the affected
participants in the gas market and the market operator on suspension or termination
the supply of gas to the delivery point of the customer.
(2) in the event that there is no interruption of gas supply referred to in section 119 paragraph.
3, the distribution system operator shall inform without
undue delay, the party making the request for interruption of gas supplies.
(3) the distribution system operator shall give the restriction or interruption of the
the distribution of gas to the delivery point of the customer category, residential and
home to five working days from the date of the detection of unauthorized
distribution under section 73, paragraph. 4 the Energy Act ^ 12).
(4) in the event that as the reasons the restriction, suspension or termination of
gas distribution in accordance with paragraph 3 or section 119 paragraph. 3 and 4, or in the
If the customer or the supplier of gas to start or request
to restore gas supplies to a customer after the previous delivery point
the restriction, suspension or termination of gas supply referred to in paragraph 3 or section
paragraph 119. 3 and 4, the distribution system operator shall initiate or resume
the supply or distribution of gas, according to the legal rules relating to the
the quality of the supply of gas and related services ^ 16).
(5) For the application of the restriction, suspension or termination of the supply of gas in the
unauthorized collection and unauthorized shipments and request for the initiation or
restoring gas supplies after the unauthorized collection and unauthorized carriage in the
sampling site the customer directly connected to the transmission system
Similarly, the transmission system operator shall proceed in accordance with paragraphs 1 to 4
and under section 119.
(6) the categorization of customer set out in annex 16 to this Decree.
The procedures and conditions for the delegation of responsibility for deviation
When transformations of commercial companies
§ 121
(1) the Operator shall inform the clearing or gas supplier through
applications made in the information system of the market operator of the decision
to perform a mass conversion of consumption points of the market operator in connection with the
by transfer or transformation of a commercial company.
(2) the subject of mass transfer is a change in the body, or clearing
change gas supplier on the collecting places customers in connection with the
the transformation of a commercial company. Provisions for change of the supplier of the gas
pursuant to section 110 and shall not apply.
(3) the trader with the gas, which will go or will be transferred to the sampling
place the customer, served in the information system of the market operator
request for bulk transition or transfer of consumption points of the
transferring to the accepting entity, which shall contain the following
information:
and the required transition) a day or a transfer of consumption points of the customers
(b) identification of the accepting merchant) with gas in the form of code
assigned under section 5 (3). 1,
(c) identification of the transferring dealer) gas in the form of code
assigned under section 5 (3). 1,
(d)) to determine whether it is the subject of mass transfer under paragraph 2 change
the subject of settlement or the change of supplier,
(e) a list of the customer's consumption points) in the event that the distribution of
the business of the company,
f) written proof of the transformation of a commercial company,
g) Declaration on the conclusion of the contract about providing service distribution
system between the distribution system operator, which are the reports of the
the place is attached to, and accepting a body or a declaration of
the fact that this contract will be between the operator concerned,
the distribution system and the accepting entity concluded to date of transfer
offtake points.
(4) the request referred to in paragraph 3 is lodged with a gas trader, on which
they will take the place of the customer, not later than 10 working days
before the date referred to in paragraph 3 (b). and).
(5) the Operator shall inform the market about the submission of the request referred to in paragraph 3, all
gas supplier concerned, operators of clearing and the operator
distribution system operator or a transmission system operator.
(6) in the event that the transmitting gas trader expressed in the information
the system of the market operator with the required consent of the mass transfer
offtake points on the basis of the data referred to in the request in accordance with paragraph 3,
the market operator performs on the day referred to in paragraph 3 (b). and in the information)
the market operator system bulk change gas supplier or agency
settlement on the basis of the request referred to in paragraph 3 (b). (d)) for all
individual consumption points are registered in the information system
the market operator, which is a blanket change. The market operator performs
This change with effect from the date referred to in paragraph 3 (b). and).
§ 122
(1) a change to the subject of settlement made pursuant to § 121 paragraph. 6 operator
the market shall inform, through its information system
all interested suppliers of gas and the clearing of bodies. This information
the market operator shall provide, for each supply point of the customer for which the
There has been a change in the subject of settlement.
(2) a change of the supplier of the gas made in accordance with § 121 paragraph. 6 operator
the market shall inform, through its information system
all interested suppliers of gas, operators of clearing and the operator
distribution system operator or a transmission system operator. This
the market operator will provide information for each customer at the place of consumption,
which there was a change of the supplier of the gas.
(3) in the case of the amendments referred to in § 121 paragraph. 6 does the operator
distribution system operator through the information system
the market status of the gauge in the sampling place the customer on the date specified under section
paragraph 121. 3 (b). and the procedure laid down in section 113) of paragraph 1. 2, and
related data needed for billing of gas supplies and related
services by other legal rules relating to the formalities and
the billing terms for gas supply ^ 17).
PART ELEVEN
THE PROVISIONS OF THE COMMON, TRANSITIONAL AND FINAL
section 123
Common provisions
(1) the value of the transmitted or published under this Ordinance shall be
in 1/1000ths of MWh in addition to the values of the distribution capacity reserved
that appear in the m3, and values according to § 95 paragraph. 1 (a). and)
(e)), g) and (h)), which shall be transmitted in the m3.
(2) transport capacity for border point, point a virtual stack
gas sampling places customers directly connected to the transmission system and the
the point of the production plants, the gas is reserved in 1/1000ths of MWh/day.
(3) the Nomination and allocation of transport at the border point, the point of the virtual
stack gas sampling places customers directly connected to the transmission
system and gas production plants is done in 1/1000ths of MWh.
(4) the distribution capacity for cross-border gas pipeline and the point the point production plants
gas is reserved in 1/1000ths of MWh/day.
(5) the Nomination of the distribution and allocation of cross-border gas pipeline and the point
for point gas production plants is done in 1/1000ths of MWh.
(6) the sending of a request for change of the supplier of the gas or
confirmation or rejection of amendments to the gas supplier and data necessary for the
registration of delivery or transfer jobs takes the form
electronic messages in the communications environment of the defined operator
the market. Messages are sent to the market participant of the gas in the format
defined by the market operator.
(7) the reservation request the distribution of the capacity and the conclusion of the Treaty on the
providing services to the distribution system shall be submitted in paper form
or electronically in the format defined by the operator, the distribution
the system.
Transitional provisions
section 124
(1) for the nominations and renominations the obligation to deliver and the obligation to remove the
period to 30. June 2016 shall apply the provisions of Decree No. 365/2009 Sb.
in the texts of the effective to date of the entry into force of this order. For nominations
the obligation to deliver and remove the natural gas commitment on day 1. July 2016
the provisions of Decree No. 365/2009 Coll., as amended, effective the day
the entry into force of this order.
(2) for business fluctuations in the period up to 30. June 2016
the provisions of Decree No. 365/2009 Coll., as amended, effective the day
the entry into force of this order.
(3) for the natural fluctuations in the period up to 30. June 2016
the provisions of Decree No. 365/2009 Coll., as amended, effective the day
the entry into force of this order.
(4) preliminary total deviation clearing body of gas day
29 and 30. June 2016 balances in accordance with Decree No. 365/2009 Coll., in
the texts of the effective to date of the entry into force of this order.
(5) the sum of the actual total anomalies for the month of June 2016
copes by Decree No. 365/2009 Coll., as amended, effective the day
the entry into force of this order.
section 125
(1) for a range of dates, transmission and publication of data and billing
gas supply and other services in the period up to 30. June 2016 shall apply
provisions laid down in Decree No. 365/2009 Coll., as amended, effective the day
the entry into force of this Decree, with the exception of the provisions on prices
related services in the gas industry and the procedure for the determination of the imprest
the payments, which shall apply from the 1. January 2016.
(2) in accordance with Decree No. 365/2009 Coll., as amended effective prior to the date
the effectiveness of this Ordinance, is to assess all end
processes, deadlines and time for change of the supplier of the gas, which started to run
before the 1. January 2016, even if the change of supplier will be terminated after 1.
January 2016.
(3) an estimate of the gas consumption to the effective date of the change of the supplier of the gas referred to in
§ 113 paragraph. 3, in the period up to 30. June 2016 shall make the procedure referred to in
Decree No. 365/2009 Coll., as amended, effective the day of the entry into force of this
the Decree.
(4) the initial state of the balance of the account of deviations of each body's clearing
or a foreign participant is equal to zero.
(5) the effective date of this Ordinance is the initial account size
of the operator is equal to zero.
(6) the distribution system operator shall carry out registration of the consumption points
with the measurement of type A and B in the information system of the market operator to 31.
January 2016.
§ 126
Cancellation provisions
Shall be repealed:
1. Decree No. 365/2009 Coll., on rules of the gas market.
2. Decree No. 370/2010 Coll., amending Decree No. 365/2009 Coll., on
Gas market rules.
3. Decree No 442/2011 Coll., amending Decree No. 365/2009 Coll., on
Gas market rules, as amended by Decree No. 370/2010 Sb.
4. Decree No. 436/2012 Coll., amending Decree No. 365/2009 Coll., on
Gas market rules, in wording of later regulations.
5. Decree No 291/2014 Coll., amending Decree No. 365/2009 Coll., on
Gas market rules, in wording of later regulations.
§ 127
The effectiveness of the
This Decree shall take effect on 1 January 2005. January 2016 with the exception of the provisions of the
§ 62, 68, 71, 72, 74, § 80 to 83, § 86 to 107, annexes 5 to 15, 17 and
18 to this Decree, which shall take effect on 1 January 2005. July 2016.
Chair:
Ing. Vaghela in r.
Annex 1
Request for reservation of transport capacity
Technical data
1. The required input or output point of the transmission system
2. The date and time of provision of transport of gas
3. The type of reserved capacity
4. The nature of the transport capacity (fixed, interruptible,
coordinated, uncoordinated)
5. The size of the required capacity in MWh/day or in a given input
the output point of the transmission system or in m3/day for the sampling location
the customer is directly connected to the transmission system
6. A statement of the accuracy and veracity of the information given.
Annex 2
Particulars of a reservation request distribution capacity
Technical data
1. identification of the applicant in the form of the distribution capacity of the EIC
code
2. The term of the reservation of the distribution capacity of the from-to
3. The type of distribution capacity reserved
4. the reason for the request
5. identification of sampling or a pass-through space, where appropriate, a summary of
transfer points in the form of the EIC code
6. The identification of the customer in the form of
and, where appropriate, names names, surname and date of birth for the category
household
(b). when allocated IDENTIFICATION NUMBER, and the names, forenames and, where appropriate, Appendix, or
business name or the name in other cases
c. the EIC code distribution system operator or the manufacturer of the gas
7. The address of the delivery point
8. The nature of the distribution capacity reserved (fixed,
interruptible)
9. The size of the distribution capacity in the supply or
delivery place, where appropriate, a summary of transfer points with the measurement type, and
or (B). The consumption points with more measuring points for size
the distribution capacity is considered the value of the capacity for measuring
type posts and (B)
10. Estimated annual gas sampling
11. At the consumption points customers a large buyer and Central
the Subscriber or at the consumption points category maloodběr with monthly periodic rate
deduction of the annual diagram projected monthly gas
12. the customer's electronic mail address and telephone number of the customer,
If you are available
13. Declaration of correctness and veracity of the information given.
Annex 3
The terms of the auction on the free storage capacity
1. Terms and conditions of auction shall be proportionate, non-discriminatory and transparent.
2. conditions for auction shall contain
and) minimum price or a way to determine the minimum price per unit
storage capacity for the first year or first 12 months period, for
that is, the storage capacity reserved
(b)) start auction,
(c)) the way to secure electronic communications, including
an alternative method of communication when the failure of electronic communications
on the side of the applicant,
(d)) and the procedure how to determine the composition of the financial collateral,
e) size offered free storage capacity,
f) model gas storage or the definition of the scope of content changes
the existing contract for gas storage, if the modification of the Treaty on
gas storage reserves of storage capacity, which will be enforced by the
concluded with participants in the auction, which will be reserved storage
capacity,
(g) the size of the increase in the price for) a unit of storage capacity between auction
wheels and the method of allocation of storage capacity,
(h) minimum and Max time) reservation of storage capacity,
I) method of calculating the price per unit of storage capacity for other years
or months, after which the storage capacity reserved,
j) model application for the first access to the information system of the operator
the stack gas.
3. the conditions of auctions for new storage capacity also contain
and the minimum amount of storage capacity), which must be at the auction
reserved not to auction the operator stack gas cancelled
(b)), the total storage capacity offered in the first year of storage
gas and in other years, when the new storage capacity or
individual parameters gradually navyšovány.
Annex 4
Rules for the assessment of the feasibility of renominations transport, distribution
and gas storage
The transmission system operator, the distribution system operator or
the operator of a tank of gas on the input renominaci or refuses to
the output point of the gas system, if
(and) are not mutually approved nominations for input or output
the point of the gas system,
(b) the entry or exit point of the transmission system are met
some of the following inequalities (1) and (2)
1
NRJ > Ecps +----Ksj (24-T) (1)
24
NRJ < Ecps (2)
where
j is the input or the output point of the gas system,
T is the hour of the day, from which the gas is effective renominations; T = 1 for 7:00 pm, June natural gas T = 2 to 8:00 pm
gas day up to T = 24 for 6:00 pm of the next gas day,
NRJ is a settlement on the body of renominations of entry or exit point of the gas system to the gas day
Ksj is the sum of all daily interruptible capacity reserved hard or the body's settlement negotiated in
the Treaty (treaties) in the input or the output point of the gas soustavyj to the gas day
ECPS is nominations and renominations adopted and registered in time t set as
NJ (t-1)-Ecps (t-1)
ECPS (t) =---------------------+ Ecps (t-1)
24-t + 2
for t = 1, Ecps (t) = 0
where
Njt nominations or renominations is the subject of settlement at the point of entry or exit of the gas system effective in the hour t gas day
t is the hour of the day, from which the gas is effective renominations; t = 1 for interval < 6:00:00, 7:00:00) up to t = 24 for interval < 5:00:00, 6:00:00) the next gas day.
Annex 5
Flexibility through the accumulation of the gas system provided for
the market operator for the gas day
and Flexibility for the consumption location) of the customer with the measurement of type A and B FOPMA
for the gas day
FOPMA = [KOPM1 x RKOPM x KOPM2 x Spt + (RKOPM x Spt-AlOPM)],
where
KOPM1 is the coefficient laid down on the value of the 0.04979,
KOPM2 is set to 0,
RKOPM is the sum of all the reserved capacity of the body in place of the customer on the discharge gas
the day of the m3 passed pursuant to § 95 paragraph. 1 (a). (f)) or section 96 paragraph. 1 (a). n)
SPT average gross calorific value passed under section 96 paragraph. 1 (a). (f)) vtisícinách MWh/m3
AlOPM is a daily allocation of the body in the place of the supply of the customer passed under section 96 paragraph. 1 (a). (e))
or § 95 paragraph. 1 (a). (e)) or the procedure provided for in § 101 paragraph. 2
For the sampling place the customer attached to the transmission system is the product of the
RKOPM x Spt replaces the sum of all the reserved capacity of the body
clearing in the sampling place the customer on the day the gas in MWh
(b) Flexibility in place of consumption) of the customer with the measurement of type C or CM
FOPMC for the gas day
Cy Cy
FOPMC = [KOPM1 x------x KOPM2 + (-------DHOPM)],
1171 1171
where
CY is the value of the planned annual consumption referred to for the natural gas a day for the daily variation in the information
the market operator system
DHOPM is a daily value of gas sampling according to § 95 paragraph. 6
(c) Flexibility in point production plants) gas FVP = [KVP x RKVP], where the KVP is
the coefficient laid down to 0, the sum of all the RKVP is reserved
the capacity of the body in the production plants to the point of gas
gas day in MWh passed under section 96 paragraph. 1 (a). (c)) or by
section 95 paragraph. 1 (a). I),
(d)) for the input Flexibility border point, the entry point for the cross-border
pipeline and gas storage entry point,
FVB = [RKVB + KVB1 x KVB2 x (RKVB-AlVB)],
where
KVB1 and KVB2 are the coefficients set out in the following table
------------------------------------------------------------
The name of the entry point KVB1 KVB2
------------------------------------------------------------
The border point of 0.00567 0
------------------------------------------------------------
The virtual gas storage 0.00567 0
------------------------------------------------------------
The point of a cross-border gas pipeline 00 00
------------------------------------------------------------
where
RKVB is the sum of all the reserved capacity of the subject of settlement on the gas entry point
system in 1/1000ths of MWh according to section 96 paragraph. 1 (a). (j)) or § 95 paragraph. 1 (a). (j)).
AlVB is a daily allocation of body clearing on the entry point of the gas system of the passed
the market operator under section 96 paragraph. 1 (a). and (b))) or § 95 paragraph. 1 (a). and the.
e) Flexibility in the output point of the border exit point for cross-border
the gas pipeline,
FVyB = [RKVyB + KVyB1 x KVyB2 x (RKVyB-AlVyB)],
where
KVyB1 and KVyB2 are the coefficients set out in the following table
------------------------------------------------------------
The name of the output section KVyB1 KVyB2
------------------------------------------------------------
The border point of 0.00567 0
------------------------------------------------------------
The virtual gas storage 0.00567 0
------------------------------------------------------------
The point of a cross-border gas pipeline 0.04309 0
------------------------------------------------------------
where
RKVyP is the sum of all the reserved capacity of the subject of settlement on the output point of the gas
system in 1/1000ths of MWh according to section 96 paragraph. 1 (a). (j)) or § 95 paragraph. 1 (a). (j)).
AlVyB is a daily allocation of body clearing on the relevant output point of the gas system of the passed
the market operator under section 96 paragraph. 1 (a). and (b))) or § 95 paragraph. 1 (a). (d)).
Annex 6
The procedure for the determination of the index of short-term market
Annex 7
How the compensatory actions to short the market when exceeding the first level
1. If the status of the account of the operator after the filing of nominations under section 62
paragraph. 4 lower than 3372 MWh transmission system operator can
no later than 1 hour after the deadline of submission of nominations under section 62, paragraph. 4 to enter the
the requirement to purchase gas at the intraday market with gas on the following
the day a minimum of 0.5 times the absolute value of the status of the account
the operator and a maximum of 1.5 times the absolute value of the State
the account operator.
2. If the status of the account of the operator after the filing of nominations under section 62
paragraph. 4 higher than 3372 MWh transmission system operator can
no later than 1 hour after the deadline of submission of nominations under section 62, paragraph. 4 to enter the
the requirement for the sale of gas to intraday market with gas on the following
the day a minimum of 0.5 times the absolute value of the status of the account
the operator and a maximum of 1.5 times the absolute value of the State
the account operator.
3. The request for the purchase of the gas referred to in paragraph 1 enters the operator
the transmission system for the last known price on the intraday market
reduced by 0.5 EUR/MWh. in the case where there is no requirement to store
implemented in 5 minutes, will increase the price of the transmission system operator of 0.1
EUR/MWh, even repeatedly, up to a maximum of 3 EUR/MWh compared to the initial
the value of the. Transmission system operator shall, in agreement with the market operator
the market operator may ask about setting up information system operator
the market, in the case of instruction for the purchase of gas under this paragraph
demand was increasing prices automatically. The last known price
intraday market means one realized on the intraday trade
the market of the market operator, in which at least 50 zobchodovalo MWh, and
made no later than before the beginning of the hour in which the
the request is made.
4. the requirement for the sale of the gas referred to in paragraph 2, the operator enters the
the transmission system for the last known price intraday market increased
about 0.5 EUR/MWh. in the case where there is no requirement for trade implemented in 5
minutes of the transmission system operator shall reduce the price of 0.1 EUR/MWh, and even
repeatedly, up to a maximum of 3 EUR/MWh compared to the initial value.
Transmission system operator shall, in agreement with the market operator may
request of the market operator of the market operator's information system settings,
in the case of the order for sale of gas under this paragraph was
raising demand price automatically. The last known price
intraday market means one realized on the intraday trade
the market of the market operator, in which at least 50 zobchodovalo MWh, and
made no later than before the beginning of the hour in which the
the request is made.
5. the guidelines referred to in paragraph 3 and 4 shall be specified so that it can be
even after parts of the flows.
6. the transmission system operator shall, in cooperation with the market operator
inform the subjects of settlement (participants in the gas market) way
enabling remote access on the filing of the order on the purchase or sale of gas
and it's at least 15 minutes before entering such a guideline, while the submission of
such instruction must occur no later than 60 minutes after registration
nominations under section 62, paragraph. 4. the obligation to inform the submission guideline will
the automatic adjustment of the prices referred to in paragraphs 3 and 4 shall not apply.
Annex 8
How the compensatory actions to short the market when crossing or
the expected crossing of the second level and the compensatory action, priority that
is not realized on the short-term market
1. If the status of the account of the operator after the filing of nominations under section 62
paragraph. 4 lower than-5058 MWh, or if the expectations of the operator
the transmission system such that this value is exceeded, the
transmission system operator shall submit a request to purchase the gas on
Intraday gas market on the ongoing natural gas a day, at least in the
the amount of the difference between (i) the absolute value of the actual or expected
the status of the account of the operator, and (ii) the absolute value of one half of the
the values referred to in annex 5, paragraph. 1 and a maximum of the sum of (i)
the absolute value of the actual or expected status of account operator
and (ii) the absolute value of one half of the values listed in annex 5
paragraph. 1.
2. If the status of the account of the operator after the filing of nominations under section 62
paragraph. 4 higher than 5058 kWh or if expectations are operator
the transmission system such that this value is exceeded, the
transmission system operator shall submit a request for the sale of gas to
Intraday gas market on the ongoing natural gas a day, at least in the
the amount of the difference between (i) the absolute value of the actual or expected
the status of the account of the operator, and (ii) the absolute value of one half of the
the values referred to in annex 5, paragraph. 2 and up to a maximum of the sum of (i)
the absolute value of the actual or expected status of account operator
and (ii) the absolute value of one half of the values listed in annex 5
paragraph. 1.
3. The request for the purchase of the gas referred to in paragraph 1 shall be made in the last
intra-day market price reduced known about 0.5 EUR/MWh. In case when the
There is no requirement on trade carried out within 3 minutes, the operator will increase
the transmission system the price of about 0.1 EUR/MWh, even repeatedly, up to a maximum
about € 5/MWh compared to the initial value. The transmission system operator
in agreement with the market operator the market operator may ask about setting
the information system of the market operator, in the case of instruction for the purchase of
gas under this paragraph was raising demand price
automatically. The last known price intraday market means such
the realized trade on intraday market operator the market in which the
zobchodovalo at least 50 MWh, and was before the beginning of the
for hours, in which the request is made.
4. the requirement for the sale of the gas referred to in paragraph 2 shall be made in the last
intra-day market price increased known about 0.1 EUR/MWh. In case when the
There is no requirement on trade carried out within 3 minutes, the operator shall reduce the
the transmission system the price of about 0.5 EUR/MWh, even repeatedly, up to a maximum
about € 5/MWh compared to the initial value. The transmission system operator
in agreement with the market operator the market operator may ask about setting
the information system of the market operator, in the case of instruction for the purchase of
gas under this paragraph was raising demand price
automatically. The last known price intraday market means such
the realized trade on intraday market operator the market in which the
zobchodovalo at least 50 MWh, and was before the beginning of the
for hours, in which the request is made.
5. the transmission system operator shall, in cooperation with the market operator
inform the subjects of settlement (participants in the gas market) on the filing of the order
the purchase or sale of gas and at least 15 minutes prior to the filing
such a guideline. Information about the filing of the order on the
automatic adjustment of the prices referred to in paragraphs 3 and 4 shall not apply.
6. in the event that a request for the sale of the gas referred to in paragraph 4 is not
satisfied even after 150 minutes, the operator may transport
system to use other tools the compensatory services. In the event that the
the request for the purchase of the gas referred to in paragraph 3 is not satisfied even after
expiry of 150 minutes, the transmission system operator can take advantage of additional
service compensation tools.
7. Before using the tool with a lower priority ^ 18) waits for an operator
the transmission system at least 60 minutes for the eventual realization of the buffer
the action in the current priority. The instructions referred to in paragraphs 3 and 4 shall be specified so
in order to be capable of trading in both parts.
Annex 9
Information published by the transmission system operator in case of
implementation of the remedial action
1. the quantities of gas in MWh for compensatory action
2. the price of the compensatory actions realized in EUR/MWh or in CZK/MWh
3. the type of market, on which the countervailing action
4. the operator of a market in which there was a countervailing action
5. type of product demanded or offered
6. place of delivery
7. the time of the supply or demand
8. time of realization
9. the rationale for compensatory actions undertaken
10. the justification of the use of compensation services.
Annex 10
The determination of the amount of the applicable price for the daily amount of compensation
The unit price is applicable I for a positive day of compensatory amounts
For a positive day for the compensatory amount of gas a day will determine the
the unit price is applicable as the lower of the two prices
1. Lowest price for compensatory action, the transmission system operator and
under section 92, paragraph. 3 and 5, that has to pass gas in the
gas day
2. Replacement Pnáhr price in EUR/MWh, determined by the formula
Pnáhr = Ptrh * kkDVM
Where:
Ptrh is the index of short-term market for the relevant gas day fixed podlepřílohy No 6 to this Ordinance
kkDVM is the coefficient of reduction in short-term market index for positive daily amount of compensation specified in the interval
0.95 to 0.98 as follows
and the value of the system imbalance) less than or equal to 0 MWh
kkDVM = 0.98
(b)) for the value of the system imbalance in the interval (0, 74470 MWh)
kkDVM = 0.98-0.03 * SAT/, 74470
where
SO is the value system of the derogation for the relevant gas day in MWh
(c)) for the value of the system imbalance is greater or equal 74470 MWh
kkDVM = 0.95
II. the unit price applicable for a negative day buffer quantity
The daily amount of compensation for the negative for the gas day determines
the unit price is applicable as the higher of the following two prices
1. The highest price for a compensatory action, the transmission system operator
under section 92, paragraph. 2 and 4, that has to pass gas in the
gas day
2. Replacement Pnáhr price in CZK/MWh, determined by the formula
Pnáhr = Ptrh * kzDVM
where
Ptrh is the index of short-term market for the relevant gas day determined in accordance with annex 6 to this Ordinance
kzDVM is the coefficient of reduction of the negative short-term market index for daily quantities of buffer specified
in 1.05 1.02 to interval as follows
and the value of the system imbalance) greater or equal to 0 MWh
kzDVM = 1.02
(b)) for the value of the system imbalance in the interval (-74470 MWh; 0)
kzDVM = 1.02 + 0.03 * SAT/74470
Where
SO is the value system of the derogation for the relevant gas day in MWh.
For a value less than or equal to the system imbalance-74470 MWh
kzDVM = 1.05
Annex 11
Data for the distribution or transport gas bill
Distribution or transmission system operator shall be sent to the vendor
the gas through the information system of the market operator for the
the Bill of distribution of gas in place of consumption of the customer at least these
information:
A. identification data
I. numeric code distribution or transmission system operator
II. the code number of the sampling space (EIC)
III. identification of the measuring points, the number and type of measuring device
IV. the invoice period
The reason of the patch (for corrective invoices)
(B). The data from the measurement
I. for the supply point of the customer category large buyer or medium
the Subscriber with the measurement of type A or B
1. the calculated gas consumption in each gas in m3
2. the calorific value of gas volume in the individual days in kWh/m3
3. the distributed amount of gas in each gas days in
kWh
4. the unit is a fixed price for the removed gas in €/kWh
5. the unit is a fixed price for the work of clearing the market operator in €/kWh
6. the initial state of the gauge in m3
7. the final status in the m3
II. the place of consumption with the measurement of type C or CM
1. the initial state of the gauge in m3
2. the final status in the m3
3. the distribution of measured consumption on the gauge to the individual gas
months in m3
4. the distribution of measured consumption on the gauge to the individual gas
months in kWh
5. the distribution of the measured gas consumption in each months in
kWh
6. the conversion rate of the gauge to standard conditions
7. the unit is a fixed price for the removed gas in each gas
months in €/kWh
8. the unit is a fixed price for the work of clearing the market operator in €/kWh
9. the value of gas consumption used for the classification of the sampling locations
a customer with a full meter reading for a period longer than 1 month into the sampling
band for billing purposes according to the distribution of gas consumption of gas in
sampling place the customer,
10. doúčtované the amount of consumed gas in case of a failure of the measuring
the device.
(C) the agreed values.
I. for the supply point of the customer category large buyer or medium
the Subscriber with the measurement of type A or B
1. reserved capacity for an indefinite period
and the size of the reserved capacity in) m3
(b)) the percentage of the period to the price per unit
(c) a fixed annual price per unit) for the daily reserved capacity in the
CZK/1 000 m3
2. interruptible capacity reserved for an indefinite period
and the size of the reserved capacity in) m3
(b)) the percentage of the period to the price per unit
(c) a fixed annual price per unit) for the daily reserved capacity in the
CZK/1 000 m3
3. reserved monthly capacity
and the size of the reserved capacity in) m3
(b) the beginning of the validity of the reserved capacity)
(c)) of the reserved capacity
(d)) the percentage of the period to the price per unit
e) unit is a fixed price per day reserved capacity in CZK/1 000 m3
4. interruptible capacity reserved monthly
and the size of the reserved capacity in) m3
(b) the beginning of the validity of the reserved capacity)
(c)) of the reserved capacity
(d)) the percentage of the period to the price per unit
e) unit is a fixed price per day reserved capacity in CZK/1 000 m3
5. reserved daily fixed capacity for an indefinite period of
historically reached the daily maximum
and the size of the reserved capacity in) m3
(b)) the percentage of the period to the price per unit
(c)), the unit price for the fixed daily reserved capacity in CZK/1 000 m3
6. reserved sliding capacity
and the size of the reserved capacity in) m3
(b) the beginning of the validity of the reserved capacity)
(c)) of the reserved capacity
(d) the period for the share) price per unit
e) unit is a fixed price per day reserved capacity in CZK/1 000 m3
7. exceeding the reserved capacity
and maximum size exceeded) the reserved capacity in m3
(b)) the unit fixed price for exceeding the daily reserved capacity in the
CZK/1 000 m3
II. the place of consumption with the measurement of type C or CM
1. reserved distribution capacity
and distribution capacity reserved size) in the m3 calculation fixed
(b)) share of the period to the price per unit
(c) a fixed annual price per unit) for the daily reserved capacity in the
CZK/1 000 m3
2. the permanent monthly salary
and the beginning of the period considered)
(b) the end of the period)
(c) the market share of the period) the unit price
(d)) the unit fixed monthly payment for the přistavenou capacity
(D) other charges and discounts
Annex 12
Class type-delivery diagrams
Class load profiles for the categories of household gas supplies,
maloodběr and medium Subscriber are assigned to the operator in the distribution
system on the basis of the nature of the sampling point and frequency readout,
While the class name does not reflect the customer category, TDD. The assignment of classes
to the sampling points is the following.
1. Customers with the use of the delivery point code R01
--------------------------------------------------------------
CLASS TDD: DOM1
--------------------------------------------------------------
Annual consumption (cooking) S01 S02 S03 (TUV) (otop)
--------------------------------------------------------------
by 7.56 MWh 1 00 00
by 7.56 MWh 00 1 00
by 7.56 MWh 00 00 1
by 7.56 MWh 1 1 00
by 7.56 MWh 1 00 1
by 7.56 MWh 00 1 1
by 7.56 MWh 1 1 1
--------------------------------------------------------------
DOM1 Customers with the use of the sampling space code R01 with gas
less than 7.56 MWh/year.
--------------------------------------------------------------
CLASS TDD: DOM2
--------------------------------------------------------------
Annual consumption (cooking) S01 S02 S03 (TUV) (otop)
--------------------------------------------------------------
over 7.56 MWh 1 00 00
over 7.56 MWh 00 1 00
over 7.56 MWh 1 1 00
over 7.56 MWh 1 00 1
over 7.56 MWh 00 1 1
--------------------------------------------------------------
DOM2 Customers with the use of the sampling space code R01 with gas
greater or equal 7.56 MWh/year, without gas heating (only cooking or
preparation of hot water, or both at the same time). Additionally, customers with
using delivery point code R01 with gas more or equal
7.56 MWh/year, a combination of cooking and heating gas or preparing hot
water and heating gas.
--------------------------------------------------------------
CLASS TDD: DOM3
--------------------------------------------------------------
Annual consumption (cooking) S01 S02 S03 (TUV) (otop)
--------------------------------------------------------------
over 7.56 MWh 1 1 1
--------------------------------------------------------------
DOM3 Customers with the use of the sampling space code R01 with plynuvětším or equal 7.56 MWh/year, while cooking and heating gas and hot water preparation.
--------------------------------------------------------------
CLASS TDD: DOM4
--------------------------------------------------------------
Annual consumption (cooking) S01 S02 S03 (TUV) (otop)
--------------------------------------------------------------
over 7.56 MWh 00 00 1
--------------------------------------------------------------
DOM4 Customers with the use of the sampling space code R01 with gas
greater or equal 7.56 MWh/year only heating gas
2. Customers with the use of the delivery point code other than R01 with measurements
type C with regular readings over a period of more than 1 month
------------------------------------------------------------------
CLASS TDD: MO1
------------------------------------------------------------------
use code S01 S02 S03 S04
OM (cooking) (TUV) (otop) (technology)
------------------------------------------------------------------
R02 1 0 0 x
R02 0 1 0 x
R03 1 0 0 0
R03 0 1 0 0
R03 0 0 0 1
R03 1 1 0 0
R03 1 0 1 0
R03 1 0 0 1
R03 0 1 1 0
R03 0 1 0 1
R03 0 0 1 1
R03 1 1 1 0
R03 1 1 0 1
R03 1 0 1 1
R03 0 1 1 1
R03 1 1 1 1
R04 1 0 0 0
R04 0 1 0 0
R04 0 0 0 1
R04 1 1 0 0
R04 1 0 0 1
R04 0 1 0 1
R04 0 0 1 1
R04 1 1 0 1
R04 1 0 1 1
R04 0 1 1 1
R04 1 1 1 1
R05 1 0 0 0
R05 0 1 0 0
R06 1 0 0 0
R07 1 0 0 0
R07 0 1 0 0
R07 0 0 1 0
R07 0 0 0 1
R07 1 1 0 0
R07 1 0 1 0
R07 1 0 0 1
R07 0 1 1 0
R07 0 1 0 1
R07 0 0 1 1
R07 1 1 1 0
R07 1 1 0 1
R07 1 0 1 1
R07 0 1 1 1
R07 1 1 1 1
R08 x x x 1
R09 x x x 1
R10 x x 0 1
R11 1 0 x x
R11 0 1 x x
R11 1 1 x x
R12 x x x 1
------------------------------------------------------------------
Mo1 Customers with delivery point code to use with sicknesses of R12 and all
permitted combinations of parameters S01 S04 to, who are not included in the
Mo2 to MO4.
------------------------------------------------------------------
CLASS TDD: MO2
------------------------------------------------------------------
use code S01 S02 S03 S04
OM (cooking) (TUV) (otop) (technology)
------------------------------------------------------------------
R02 1 1 0 x
R04 1 0 1 0
R04 0 1 1 0
R05 0 0 0 1
R05 1 1 0 0
R05 1 0 0 1
R05 0 1 0 1
R05 0 0 1 1
R05 1 1 0 1
R05 1 0 1 1
R05 0 1 1 1
R05 1 1 1 1
R06 0 1 0 0
R06 0 0 0 1
R06 1 1 0 0
R06 1 0 1 0
R06 1 0 0 1
R06 0 1 0 1
R06 0 0 1 1
R06 1 1 0 1
R06 1 0 1 1
R06 0 1 1 1
R06 1 1 1 1
R10 x x 1 0
R10 x x 1 1
------------------------------------------------------------------
Mo2 Customers with delivery point code use with sicknesses of subscription for
the combination of cooking and preparation of hot water, with the use of the delivery point code
With the collection for the combination of R04 for heating and preparing hot water or
heating and cooking, use code from the delivery point to the collection only
for technology or for a combination of cooking and preparing hot water,
technology and cooking, technology and preparation of hot water, technology and
heating and for the combination of technology and preparation of hot water and
cooking, heating and cooking technology, technology and heating and
preparation of hot water and for the combination of technology and heating and preparation
hot water and cooking, with the use of the delivery point code R06 with the collection
only for the preparation of hot water, or only for the technology, or for
the combination of cooking and preparing hot water, heating and cooking technology
and cooking, technology and preparation of hot water, heating technology and
In addition to the combination of technology and preparation of hot water and cooking,
technology and heating and cooking technology and heating and preparation
hot water and for the combination of technology and heating and hot water preparation
and cooking, with the use of the delivery point code R10 with the collection only for the
heating or for a combination of technology and heating.
------------------------------------------------------------------
CLASS TDD: MO3
------------------------------------------------------------------
use code S01 S02 S03 S04
OM (cooking) (TUV) (otop) (technology)
------------------------------------------------------------------
R02 1 0 1 x
R02 0 1 1 x
R02 1 1 1 x
R03 0 0 1 0
R04 1 1 1 0
R05 1 0 1 0
R05 1 1 1 0
R06 0 1 1 0
R06 1 1 1 0
------------------------------------------------------------------
Mo3 Customers with delivery point code use with sicknesses of subscription for
the combination of heating and cooking or heating and preparing hot water or
heating and hot water preparation and cooking, with the use of the code of consumption
the place with the collection only for the compartment heating system, with the use of the delivery point code
With the collection for the combination of R04 heating and hot water preparation and cooking, with
use code from the delivery point to the collection for the combination of heating and
cooking or heating and hot water preparation and cooking, with the use of the code
the sampling sites for the combination with the R06 heating and preparing hot
water or space heating and hot water preparation and cooking.
------------------------------------------------------------------
CLASS TDD: MO4
------------------------------------------------------------------
use code S01 S02 S03 S04
OM (cooking) (TUV) (otop) (technology)
------------------------------------------------------------------
R02 0 0 1 0
R04 0 0 1 0
R05 0 0 1 0
R05 0 1 1 0
R06 0 0 1 0
------------------------------------------------------------------
MO4 Customers with delivery point code, use with sicknesses of R04 R06 or with
collection only for heating with the use of the delivery point code From with
collection only for heating or combination heating and preparing hot
water.
3. Customers with the use of the delivery point code other than R01 with measurements
type C with ordinary monthly readings
------------------------------------------------------------------
CLASS TDD: SO1
------------------------------------------------------------------
use code S01 S02 S03 S04
OM (cooking) (TUV) (otop) (technology)
------------------------------------------------------------------
R02 1 0 0 x
R02 0 1 0 x
R03 1 0 0 0
R03 0 1 0 0
R03 0 0 0 1
R03 1 1 0 0
R03 1 0 1 0
R03 1 0 0 1
R03 0 1 1 0
R03 0 1 0 1
R03 0 0 1 1
R03 1 1 1 0
R03 1 1 0 1
R03 1 0 1 1
R03 0 1 1 1
R03 1 1 1 1
R04 1 0 0 0
R04 0 1 0 0
R04 0 0 0 1
R04 1 1 0 0
R04 1 0 0 1
R04 0 1 0 1
R04 0 0 1 1
R04 1 1 0 1
R04 1 0 1 1
R04 0 1 1 1
R04 1 1 1 1
R05 1 0 0 0
R05 0 1 0 0
R06 1 0 0 0
R07 1 0 0 0
R07 0 1 0 0
R07 0 0 1 0
R07 0 0 0 1
R07 1 1 0 0
R07 1 0 1 0
R07 1 0 0 1
R07 0 1 1 0
R07 0 1 0 1
R07 0 0 1 1
R07 1 1 1 0
R07 1 1 0 1
R07 1 0 1 1
R07 0 1 1 1
R07 1 1 1 1
R08 x x x 1
R09 x x x 1
R10 x x 0 1
R11 1 0 x x
R11 0 1 x x
R11 1 1 x x
R12 x x x 1
------------------------------------------------------------------
SO1 all customers with delivery point code to use with sicknesses of R12 and
all permitted combinations of parameters to S01 S04, who are not
included in the SO2 to SO4.
------------------------------------------------------------------
CLASS TDD: SO2
------------------------------------------------------------------
use code S01 S02 S03 S04
OM (cooking) (TUV) (otop) (technology)
------------------------------------------------------------------
R02 1 1 0 x
R04 1 0 1 0
R04 0 1 1 0
R05 0 0 0 1
R05 1 1 0 0
R05 1 0 0 1
R05 0 1 0 1
R05 0 0 1 1
R05 1 1 0 1
R05 1 0 1 1
R05 0 1 1 1
R05 1 1 1 1
R06 0 1 0 0
R06 0 0 0 1
R06 1 1 0 0
R06 1 0 1 0
R06 1 0 0 1
R06 0 1 0 1
R06 0 0 1 1
R06 1 1 0 1
R06 1 0 1 1
R06 0 1 1 1
R06 1 1 1 1
R10 x x 1 0
R10 x x 1 1
------------------------------------------------------------------
Customers with the use of SO2 code delivery point with sicknesses of subscription for
the combination of cooking and preparation of hot water, with the use of the delivery point code
With the collection for the combination of R04 for heating and preparing hot water or
heating and cooking, use code from the delivery point to the collection only
for technology or for a combination of cooking and preparing hot water,
technology and cooking, technology and preparation of hot water, technology and
heating and for the combination of technology and preparation of hot water and
cooking, heating and cooking technology, technology and heating and
preparation of hot water and for the combination of technology and heating and preparation
hot water and cooking, with the use of the delivery point code R06 with the collection
only for the preparation of hot water, or only for the technology, or for
the combination of cooking and preparing hot water, heating and cooking technology
and cooking, technology and preparation of hot water, heating technology and
In addition to the combination of technology and preparation of hot water and cooking,
technology and heating and cooking technology and heating and preparation
hot water and for the combination of technology and heating and hot water preparation
and cooking, with the use of the delivery point code R10 with the collection only for the
heating or for a combination of technology and heating.
------------------------------------------------------------------
CLASS TDD: SO3
------------------------------------------------------------------
use code S01 S02 S03 S04
OM (cooking) (TUV) (otop) (technology)
------------------------------------------------------------------
R02 1 0 1 x
R02 0 1 1 x
R02 1 1 1 x
R03 0 0 1 0
R04 1 1 1 0
R05 1 0 1 0
R05 1 1 1 0
R06 0 1 1 0
R06 1 1 1 0
------------------------------------------------------------------
SO3 Customers with delivery point code use with sicknesses of subscription for
the combination of heating and cooking or heating and preparing hot water or
heating and hot water preparation and cooking, with the use of the code of consumption
the place with the collection only for the compartment heating system, with the use of the delivery point code
With the collection for the combination of R04 heating and hot water preparation and cooking, with
use code from the delivery point to the collection for the combination of heating and
cooking or heating and hot water preparation and cooking, with the use of the code
the sampling sites for the combination with the R06 heating and preparing hot
water or space heating and hot water preparation and cooking.
------------------------------------------------------------------
CLASS TDD: SO4
------------------------------------------------------------------
use code S01 S02 S03 S04
OM (cooking) (TUV) (otop) (technology)
------------------------------------------------------------------
R02 0 0 1 0
R04 0 0 1 0
R05 0 0 1 0
R05 0 1 1 0
R06 0 0 1 0
------------------------------------------------------------------
Customers use code SO4 delivery point with sicknesses of R04 R06, or with
collection only for heating with the use of the delivery point code From with
collection only for heating or combination heating and preparing hot
water.
Note: for customers with the use of the delivery point code R08 and R09
(seasonal technological subscriptions) will be type-delivery diagrams
individually adjusted on the basis of the distribution system operator
the assessment of a particular period of gas the customer.
Annex 13
The nature of the sampling locations for the assignment of a type-supply diagram
The nature of the sampling space describes the properties of the sampling points,
the basis is to supply the place of the supply of the type assigned to the diagram.
The nature of the sampling sites is intended for this purpose using sampling
places, časovostí and character of the collection. On the basis of specific assignments
the values of individual characteristics and the amount of the annual consumption will be
supply the place of the supply of the type assigned to the diagram.
Description of the table to determine the nature of the sampling locations
The table lists the individual characteristics of the consumption points and
their allowed combinations
----------------------------------------------------------------------------------------------------------------
The NATURE of the SAMPLING SPACE Časovost the nature of the subscription
C01 C02 S01S02 S03 S04
The code for the Use of the sampling space SATURDAY PRAC. DAY vařeníTUV-heating technology
SUNDAY
----------------------------------------------------------------------------------------------------------------
R01 Flat, family house, a recreational object + + +
With sicknesses of administrative facilities
(Office space, cultural
zařízení) + + +
R03 Accommodation and catering facilities
(hotel, pension, lodging house,
Restaurant, cafeteria, snack bar, bar,
game room, S04 = mass cooking) + + + +
R04 production facilities (Hall, workshop) + + + +
From School and sports equipment + + + +
R06 Sale equipment (construction for
trade, construction, with sales flat) + + + +
R07 hospital and medical equipment + + + +
R08 Seasonal technological subscriptions-winter +
R09 Seasonal technological subscriptions-summer +
Boiler Room + R10 +
R11 + subscriptions + Other minor
(7, 56MWh