Advanced Search

On The Rules Of The Gas Market

Original Language Title: o Pravidlech trhu s plynem

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
349/2015 Sb.



The DECREE



of 8 June. December 2015



on the rules of the gas market



The Energy Regulatory Office shall determine under section 98a of paragraph 1. 2 (a). I) Act

No. 458/2000 Coll., on conditions for business and the public administration in

energy sectors and on the amendment of certain laws (Energy Act),

as amended by law no 131/2015:



PART THE FIRST



INTRODUCTORY PROVISIONS



§ 1



The subject of the edit



(1) this Ordinance in connection with the applicable provisions of the European

Union ^ 1) modifies the



and) rules on access to transmission system to the distribution system and to

the storage tank, the range of published information to allow access

to the transmission system, distribution system and gas storage, and ways

address the lack of capacity in the gas system,



(b) deadlines for the submission of applications) on the conclusion of the contracts on gas market and the

the terms of concluding contracts,



(c)) the procedures and conditions for migration and the transfer of responsibility for

the derogation,



(d) the scope and terms of the transfer) data for the evaluation of imbalances and

billing of gas supply and other services, the procedures for the assessment,

clearing and leveling of the derogations, and clearing and settlement

the balancing of gas in a State of emergency and a State of emergency prevention,



(e)) the procedures and deadlines for the submission of nominations and renominací,



(f)) of the operator stack gas when sold series gas

gas from the stack after the demise of the Treaty on gas storage,



g) types of spot markets, short-term markets and organization

ways of their settlement,



(h)) rules, the assignment and use of load profiles of gas supply,



I) the terms and procedure for choosing and changing supplier of gas, including

registration and transfer of the sampling points,



j) procedure for interruption, restriction and restore the supply of gas to

unauthorized gas sampling distribution, unjust and unjustified

transport,



to ensure the supply of) gas supplier of last resort,



l) track the prices of transport services, distribution services, prices

system and other regulated prices in the gas industry, and the method and

terms of the transfer of data between the participants in the gas market for billing

administered prices and the way and the terms regulated accounting and payment

prices between the participants in the gas market,



m) technical requirements for the operation of the authentication technology



n) procedure for determining advance payments.



§ 2



The basic concepts



(1) For the purposes of this Ordinance means



and the allocation rule-way) the allocation of the amount of gas the body

the showdown at the border point, the point of the stack gas, gas point production plants

or the point of a cross-border pipeline,



(b)) the auction platform-platform for booking the border point

the selected transmission system operator in accordance with the

the transmission system operator, which occurs in a manner that allows

remote access to reservation of transport capacity,



c) auction calendar-schedule of auctions of products standard

capacity by another legal regulation governing the allocation rules

capacities ^ 2)



(d) gas production plants)-a pass-through space or transfer summary posts

between the transmission system and gas-processing, or between distribution

system and gas processing,



e) distribution network-distribution system, or part of the distribution

the system, which was in the period before the 1. a separate January 2014

the licence and that the market operator has assigned a unique numeric

identifier,



f) home-zone defined territory of the distribution system operator

connected to the transmission system and is connected to at least 90 000

consumption points of the customers



EIC-code g) identification number code uniquely identifying a participant

the gas market and the various sampling and pass-through space,



h) flexibility-flexibility through service accumulation

provided by the transmission system operator,



I) financial security – ensuring claims of financial character

natural or legal persons arising from the business relationship with the

the market operator, operator of the transmission system operator

stack gas or the distribution system operator,



j) border-summary of transfer points between the transmission system

on the territory of the Czech Republic and foreign transmission or distribution

systems,



to the account operator)-registration account transmission

system with the market operator, and debited in whose favour they are

registered by the amount of gas that is related to countervailing actions

the transmission system operator and the daily compensation amounts

the subjects of settlement and foreign participants,



l) coordinated capacity-coordinated capacity within the meaning of

other legislation relating to the rules for the allocation of

capacities ^ 2)



m) adjusted supply-type chart, calculated type diagram

supply correction to the value of the participation of the remaining diagram



n) nominations distribution-announcement clearing body Announces

the distribution system operator, the quantity of gas which it intends to

distribute point of cross-border gas pipeline or the place of delivery or

the sum of transfer seats to downsizing of the gas,



about transport-nominations), the clearing operator announces the

the transmission system operator of the quantity of gas plans to carry

over the point of the transmission system,



p) nominations warehousing-announcement clearing body Announces

the operators of the gas quantity of gas plans to inject or

extract,



q) nominations and the obligation to remove the obligation to deliver-business announcement

body clearing the market operator announces the amount of gas that you

with another entity intends to clearing pass at the virtual trading point,



r) standard type chart supplies-sequence of relative

the shares of each of the daily gas customer groups defined

class diagram of the type of delivery on the planned annual consumption in the

calendar year assuming normal climatic conditions,



with normal climatic conditions)-average daily temperatures from the years

1971-2000 designed for the Czech gas industry hydrometeorologickým

the Institute, calculated from the data of all measuring stations, the Czech

Hydrometeorological Institute lying at an altitude of 700 m to n.

m.,



t) new storage capacity-first reserve storage capacity

referred to the use of the following 1. January 2010,



u) responsibility for a deviation-obligation to subject the clearing and

deal that arises as the difference between the quantity of gas

entering into the gas system and the quantity of gas protruding from the

the gas system; the quantity of gas is expressed in energy

units,



in the short-term the market with organised) gas-intraday market with gas

organized by the market operator, which will participate in the settlement, bodies



w) planned monthly fuel consumption-monthly value gas consumption

agreed in the contract of providing services to the distribution system,



x) planned the annual consumption of gas-gas consumption value obtained from the

historical actual gas, corrected by the effect of temperature,

determined in accordance with Annex 15 to this Decree,



y) gas date-time from 06:00:00 pm

calendar day to 06:00:00 hours of the following day,



of the month-natural gas) time period starting with the first natural gas

on the day of a calendar month and ending on the expiry of the last gas

day of the calendar month.



(2) For the purposes of this Ordinance means



and natural gas year-) time period within the meaning of other legislation

adjusting the rules for the allocation of transmission capacities of ^ 2)



(b)) přepočtenou annual consumption-value gas consumption obtained from the

the actual gas converted, for a period of one year referred to in the annex to the

No. 15 of this Decree,



(c) the delivery type diagram) recalculated-standard type chart

the supply, calculated on actual weather conditions for the gas day



(d)) the cross-border pipeline linking the gas pipeline distribution system-and

Foreign transmission or distribution system,



e) registered participant in the gas market-participant of the gas market,

which the market operator on the basis of registration allows you to access your

the information system,



(f)) renominací distribution-the value of the quantity of gas supplied after the deadline for

submission of nomination of the distribution,



(g)) renominací transport-the value of the quantity of gas supplied after the deadline for

submission of nomination of the transport,



h) renominací storage-the value of the quantity of gas supplied after the deadline

for the submission of nominations, storage



I) renominací the obligation to deliver and the obligation to remove-the value of the quantity of gas

After the deadline specified for the submission of nominations the obligation to deliver and remove,



j) storage capacity-operational volume of part or all of the virtual

stack gas specified in m3 or in kWh, mining or injection capacity in

kWh/day or production or injection curve in kWh/day



the year-to) the storage time, which starts with the first natural gas

on the day of the month of April and ends on the expiry of the last day of the month in the gas

March of the following calendar year,



l) the actual weather conditions-the average of the actual daily

air temperatures on the territory of the Czech Republic for the individual business days,

that is calculated from the data of all measuring stations, the Czech

Hydrometeorological Institute lying at an altitude of 700 m to n.

m.,



m) the system of derogation-the sum of the positive and negative daily deviations

all of the subjects of settlement and foreign participants in the gas day



n) class type-chart-summary of characters offtake points,

that is assigned to the same diagram type supply,



about) closed parts of the distribution system-part of the distribution system,

the technical arrangement does not allow the transmission of gas from this part of the

distribution system to other parts of the distribution system or, in the

other distribution system,



p) virtual trading point-the place, where the nomination is made a commitment

to deliver the gas to the gas system and the commitment to remove the gas from the gas

system,




q) virtual reservoir-a summary of all gas storage one

the operator of the storage tank,



r) settlement of deviations-financial settlement between the body of the settlement

and the market operator for the daily compensation amounts and the differences between the

monthly and daily variations, and between corrective monthly and monthly

deviations,



with foreign-foreign) participant in the natural or legal person,

which is not a entity that uses a border settlement and transport points

system and the virtual gas storage points,



t) commitment to deliver-obligation to subject-based clearing contract to deliver

the gas system gas quantity nominated body clearing

for natural gas the day on virtual trading point,



remove the obligation for)-obligation to subject-based contract settlement

remove from the gas system gas quantity nominated body

reckoning day for gas on a virtual trading point.



§ 3



Gas market



(1) in the framework of the gas market are all the time data recorded in the time

valid on the territory of the Czech Republic.



(2) gas market shall be carried out with the use of numeric codes and dials

managed by the market operator. The numeric codes are used to indicate

offtake points customers to transfer jobs to cross-border gas pipelines,

points of production of gas, transfer seats, or a summary of transfer points between

transmission and distribution networks, the transfer of posts between the distribution

networks, transfer points between the reservoir and the transport system and the

participants in the gas market, with the exception of customers.



(3) the place of consumption of the customer, item, production plants and a gas pass-through space

cross-border gas pipeline are assigned only to the distribution network or

the transmission system in the place of connection.



(4) the transmission system operator, the distribution system operator

and operator of the storage tank shall be considered as customers in the range of losses

and private consumption.



(5) the distribution system operator, which is divided into multiple

distribution networks, is considered one of the customer with multiple virtual

sampling points representing the loss or Unassigned subscription

distribution system operator in each of the distribution network.



(6) the quantity of gas at the outlet of the gas distribution network for the day

equal to the quantity of gas at the entry to the distribution network and the change of accumulation in the

the distribution network.



§ 4



Points of the gas system



(1) entry points to the gas system are the border points, points

virtual gas storage, gas works, points a pass-through space

cross-border gas pipelines and virtual points transmission

the system.



(2) the exit points of the gas system are the border points, points

virtual gas storage, sampling the place customers, pass-through space

cross-border gas pipelines, virtual sampling locations representing the loss

or Unassigned subscription distribution system operator in

each of the distribution networks and virtual points of the operator

the transmission system.



(3) among all the input and output points of the gas system is

is a virtual trading point.



§ 5



Designation of participants in the gas market, transfer points and offtake points



(1) the market operator records the registered market participants with spinners

gas, anonymous codes of foreign participants, and manages the dials

pass-through and offtake points and other information necessary to identify the

gas market players and individual consumption and transfer points.

For dials used EIC code. The market operator also manages a number

the identifiers of the distribution networks.



(2) the distribution system operator shall ensure that the market operator designation

by assigning numeric codes



and the delivery points of cross-border gas pipelines),



(b)), the gas production plants in conformity with the manufacturer of gas,



c) pass-through points between adjacent systems in conformity with the

distribution system operator,



d) delivery points between adjacent distribution networks,



(e) the delivery of the sampling points) or connected to the operated

distribution system including virtual.



(3) the transmission system operator shall ensure that the market operator designation

by assigning numeric codes



and gas production plants), in conformity with the manufacturer of gas,



(b)) or pass-through pass-through points summaries of places between the transport

system and in conformity with the distribution network operator of the distribution

system,



(c)) the border points of the transmission system,



(d) the delivery points between) storage and transport system in

conformity with the operator of the storage tank,



e) delivery points consumption points are connected to the transmission system

including virtual.



(4) the transmission system operator shall ensure that the transport user

the system, which is a foreign participant, anonymous code allocation

referred to in paragraph 1 in the case of the market operator.



(5) the operator of a transmission or distribution system operator shall ensure that the following

create a numeric code for the new pass-through space or summary

transfer jobs or new delivery point with the measurement of type A or B ^ 3)

his immediate transfer to the information system of the market operator in

following the procedure at the start of gas deliveries in accordance with § 113 paragraph. 5.



PART THE SECOND



TRANSPORT OF GAS



§ 6



The participants in the transport



(1) the gas transport arranged or foreign body clearing participant

for the border point, or virtual point of the stack gas.



(2) gas transport arranged for a customer or supplier of gas sampling

instead of the customer's directly connected to the transmission system.



(3) transport of gas distribution system operator arranges for

a summary of the transfer between transmission and distribution system.



(4) transport of gas for the virtual points of a transmission system operator

with the nesjednává. Virtual points of a transmission system operator is used

exclusively for the needs of the transmission system operator and to the physical and

business fluctuations.



(5) gas transport is arranged by the manufacturer of the gas or the gas dealer for

the point of the gas production plants attached to the transmission system.



section 7 of the



(1) the transport of gas transported through the entry point of the transmission system,

which is a border point, point gas production plants attached to the transmission

system, the virtual gas storage and virtual point operator

the transmission system.



(2) transport of gas transported through the exit point of the transmission system,

which is a border point, point a virtual stack gas supply point

the customer is directly connected to the transmission system, pass-through space or

a summary of the transfer between transmission and distribution system, and

virtual point of the transmission system operator.



(3) the entry point of a virtual gas storage is the entrance to the transmission

the system. The output of the virtual gas storage is the output from the

the transmission system.



(4) the transmission system operator specifies the points of the transmission system

in particular, used the name, in the direction of the flow of gas, and the size of the technical

capacity.



§ 8



Conclusion of a contract for the provision of transport services



(1) the application for conclusion of a contract for the provision of transport services of gas is

served by the subject of settlement or a foreign participant at the latest 10

working days 10:00:00 pm prior to the shipment on or before

reservation of transport capacity or before the auction on the auction

booking platform.



(2) the transmission system operator shall evaluate the application for conclusion of a contract

for the provision of transport services referred to in paragraph 1 and in the case of

the positive evaluation of the proposal sends a contracts for the provision of transport services

gas to the conclusion of the contract until 16:00:00 p.m. 5th working

the date of submission of the application.



(3) an applicant for the conclusion of contracts for the provision of transport services of gas

adopt the draft Treaty on the provision of transport services referred to in paragraph

2, so that a contract for the provision of transport services has been closed

no later than two business days by 12:00:00 pm prior to the

transport or transport before booking or before the auction on the auction

booking platform.



§ 9



Types of transport capacity on the individual input and output points

the transmission system



(1) on the basis of a contract for the provision of transport service allows you to

the transmission system operator or the foreign clearing body

the participant for the virtual stack gas reserve monthly

transport capacity, the daily transport capacity, the transport capacity in the

mode on the following day and intra-day transmission capacity.



(2) on the basis of a contract for the provision of transport service allows you to

the transmission system operator body for downsizing of the clearing point

the gas reserve monthly transport capacity, the daily transport capacity,

transport capacity in the mode on the following day and intra-day transmission

capacity.



(3) on the basis of a contract for the provision of transport service allows you to

the transmission system operator or the foreign clearing body

the participant for the border point of the annual standard capacity reservation,

Quarterly, monthly capacity standard capacity, daily

standard capacity, intraday capacity. Transport

the capacity can be reserved as a coordinated or nekoordinovanou.

Booked for the border point is served by the auction reservation

the platform. The capacity of the reserves by auction according to another legal

the rules relating to the rules for the allocation of transmission capacities of ^ 2).

For participation in the auction shall be the subject of settlement or a foreign participant

registered in the auction of the reservation platform. The publication of the results of the auction

the capacity is reserved.



(4) a contract for the supply of services transport gas under section 6 (1). 3

with effect from the first day of the calendar year of the gas.



(5) on the basis of a contract for the provision of transport service allows you to

the transmission system operator to the supplier or the customer reservation

transport capacity for the customer's consumption location directly connected to the

a transmission system, and that as the capacity for supply point on the

for an indefinite period, the monthly shipping capacity for the sampling location, flexible

shipping capacity for the sampling location, daily transport capacity for the

consumption location, shipping capacity for the sampling place in the arrangements for the


the following day and Intraday capacity for supply point.



(6) Transport capacity referred to in paragraphs 1, 2 and 5 can be booked as a

a firm or interruptible basis.



(7) the reservation of transport capacity referred to in paragraphs 1, 2 and 5 are served

through the information system of the transmission system operator.



Procedures and terms for booking capacities for points of virtual stack

gas and gas generating stations for points



§ 10



(1) the transport of gas when booking the monthly transport capacity is initiated

the first natural gas on the day of the calendar month to which the transport

reserved capacity.



(2) the clearing or foreign participant can reserve

the transmission capacity from other gas month, than natural gas

the month immediately following the month in which the reservation

monthly transportation capacity, however, asks the first 24 calendar months

before the shipment starts.



(3) the monthly capacity reserves on one or more

the following gas for months.



(4) the monthly shipping capacity for the virtual gas storage points can be

to book for a maximum period of 60 consecutive gas

months following the month in which the request was made on the

booking a monthly fixed or interruptible transportation capacity.



§ 11



(1) the transport of gas when booking daily transport capacity is initiated

the first day of the period, a natural gas which is carrying capacity

reserved, and ends with the last day of the period, a natural gas which is

transport capacity reserved.



(2) the clearing or foreign participant can reserve

the transmission capacity from other gas day, than is natural gas

the day immediately following the day on which the gas on

reservation of transport capacity.



(3) the daily transport capacity is reserved for one or more consecutive

the following gas days.



(4) Daily transportation capacity it is possible to book for a maximum of 31

gas days of the date of the request on the booking day or

interruptible transportation capacity.



§ 12



(1) the transport of gas in the reserve capacity in the mode of the following day

Opens the following day after the date on which the natural gas natural gas, in which

the transport capacity in the mode on the following day the body of the settlement, or

Foreign participant reserves.



(2) transport of gas when the use of transport capacity in the mode

the following day takes place for a gas day.



(3) the transport capacity in the mode on the following day can be booked as a

a firm or interruptible basis.



section 13



(1) the transport of gas when booking the intraday capacity are

launches in the gas day intraday transport capacity

reserves.



(2) transport of gas when using the intraday capacity are

takes place after the period of one gas day or its parts, always

However, by the end of the day for which the gas was shipping

reserved capacity.



(3) the Intraday capacity can be reserved as a fixed or

interruptible.



§ 14



Interruptible capacity for the transport of gas under section 10, 11, 12

and 13 checks out the transmission system operator shall, in cases where it

body clearing or foreign participant so requests, or if you cannot

to reserve a fixed capacity due, that is no longer available

free standard shipping capacity.



§ 15



(1) the request for the reservation of transport capacity under sections 10 and 11 shall

Clearing or foreign entity the participant no later than 8:00:00 pm

the calendar day preceding the date from which the gas is to be

transport by booking transport capacity launched electronically

in the information system of the transmission system operator with the necessities

listed in annex 1 to this notice.



(2) the transmission system operator shall evaluate the request for reservation

transport capacity have been filed in accordance with paragraph 1, no later than 8:30:00 pm

gas day, in which the request for the reservation of transport capacity

is made.



(3) Electronic confirmation of compliance with the request referred to in paragraph 1 is

transport capacity for clearing or from a foreign entity Subscriber

checked out.



(4) in the case of a request referred to in paragraph 1 is made later, shall evaluate the

the transmission system operator and the transmission of this request reserves

capacity by 8:30 p.m. the next gas day.



section 16 of the



(1) the request for the reservation of transport capacity in accordance with § 12 shall subject

Clearing or foreign participant first from 9:00:00 pm

the calendar day preceding the date from which the gas is to be

transport by booking transport capacity started, and no later than

4:00:00 hours of the day, in which the gas is to be transport by

reservation of transport capacity.



(2) the request for the reservation of transport capacity in accordance with paragraph 1 shall

clearing body or foreign participant in the information electronically

of the transmission system operator with the formalities referred to in

Annex No 1 to this notice.



(3) the transmission system operator shall immediately, but not later than

15 minutes after receipt of the request for reservation of capacity referred to in paragraph 1

performs the evaluation of the application and the capacity in the case of free shipping

the capacity of the reserves.



§ 17



(1) the request for the reservation of transport capacity according to § 13 serves the body

Clearing or foreign participant at the earliest 2 hours before the beginning of the

gas day, in which transport by transport reservation

capacity.



(2) the request for the reservation of transport capacity in accordance with paragraph 1 shall

clearing body or foreign participant in the information electronically

of the transmission system operator with the formalities referred to in

Annex No 1 to this notice.



(3) the transmission system operator shall immediately, but not later than

15 minutes after receipt of the request for reservation of capacity referred to in paragraph 1

performs the evaluation of the application and the capacity in the case of free shipping

the capacity of the reserves.



Procedures and terms for booking capacities for border points



section 18



(1) on the border points can be booked only standard products

capacity under section 9 (2). 3, which is reserved by means of auctions on the auction

booking platform.



(2) the dates of the venue for the annual standard capacity auctions, quarterly

the standard capacity and monthly standard capacity are set out

Auction calendar and posted on the auction of the reservation platform. Terms

the venue for auctions daily and Intraday capacity standard standard

capacity are set out under a special legal regulation governing the

the rules for the allocation of transmission capacities ^ 4).



(3) the transmission system operator shall make public in a way that allows

remote access to the size of the technical capacity free coordinated

capacity, free capacity, uncoordinated dates holding auctions and links

on the auction platform for individual reservation border points. Further

publish the size of the technical capacity of the neighbouring transmission

system in the connection point if the transmission system operator

known.



(4) when the publication of free capacity the operator shall take into account the volumes of

allocated capacity under special legislation governing

the rules for the allocation of transmission capacities ^ 5), dedicated capacity for

standard products with a shorter time than the reservation product offered in the

the auction, to the spare capacity not counted.



(5) in the auction is for the border point of soutěžena floating price. Floating

the price consists of the price for booking transport capacity, which is the energy

regulatory authority (hereinafter referred to as "the authority"), established in the price decision in

the time when the transport capacity can be used, plus the auction premium.



§ 19



(1) the transport of gas when booking a standard annual transportation capacity will

launches the first natural gas on the day of the gas year and ends with the expiry of the

the last day of the gas of the gas, which is shipping

reserved capacity.



(2) the annual transportation capacity of the standard Booking is done for each

natural gas year and no more than the following 15 years.



(3) transport of gas when booking a standard quarterly transport

capacity launches the first day of the quarter of the natural gas

natural gas year, which begins on 1 July, natural gas. October, 1. January,

on April 1, and 1. of July and ends on the expiry of the last gas day

the quarter for which the transport capacity reserved. Reservation

the standard quarterly transport capacity shall be carried out for each quarter

separately, and for all quarters in the gas in one year

the term referred to in the auction calendar.



Procedures and deadlines for the capacity to take the place of customers

directly connected to the transmission system



section 20



(1) the request for the reservation of transport capacity for the sampling space customers

directly connected to the transmission system serving the customer or new

supplier of gas in the event that the customer has entered into a contract for the

associated gas supply services, and, in the cases referred to in § 110, paragraph. 1

and § 113 paragraph. 5, on the dates under section 110, paragraph. 3 or § 113 paragraph. 5.



(2) the transmission system operator shall notify the participant of the gas market of the

options for booking transport capacity in term according to § 111 paragraph. 1.

Reservation of transport capacity in the case of registered standard

changes made in the term gas supplier under section 112, paragraph. 6.



(3) the reservation of transport capacity is arranged:



and for booking transport capacity) for a supply point for an indefinite period

the reserves for an indefinite period with the option to change the amount of transport capacity

According to § 21. 3,



(b)) for the reservation the monthly transport capacity for supply point on the

a minimum of 1 calendar month and a maximum of 11 calendar months always

with effect from the first day of the calendar month, the gas



(c)) for booking transport capacity flexible for the sampling location on the number of

gas days number of calendar days in the month in which the

launched gas under this reservation, or to the end of the last

gas gas November the month following the month in the

which was launched by transport of gas under this reservation,




(d)) for the reservation the daily transport capacity for supply point on the number of

gas days which is the transport capacity reserved; daily

transport capacity is reserved for one or more consecutive

the following gas days for a maximum of 31 days from the date of submission of the

reservation request,



(e)) for booking transport capacity for the sampling place in mode on

the following day on a gas day



(f)) for intra-day capacity reservation for place of consumption on the

the natural gas a day, or on the part of the ongoing gas day, always

by the end of the day for which the gas was carrying capacity

checked out.



(4) the Interruptible capacity can be reserved for the sampling location

the customer is directly connected to the transmission system in the case that is no longer

available free fixed carrying capacity.



section 21



(1) the request for the reservation of transport capacity for the customer's consumption location

directly connected to the transmission system for an indefinite period and monthly

shipping capacity for the customer's consumption location directly connected to the

a transmission system shall submit to the customer or supplier of gas, no later than

the fifth working day until 10:00:00 hours, and the first 4 calendar months prior to the

the beginning of the first gas on which has the effect of the reservations occur

transport capacity, or in the case of supply to delivery point

new connecting customer and to start deliveries to the sampling

space after unauthorized gas sampling or unauthorized transport of gas

no later than 10:00:00 of the working day preceding the day of

the earliest possible commencement of gas contracted with an operator

the transmission system.



(2) the transmission system operator shall evaluate the request for reservation

the transport capacity, submitted pursuant to paragraph 1 and shall notify the results of

booking capacities to all applicants of the transport

capacity by the third working day before 12:00:00 a.m. of the date on

which the request was made of the transport capacity. Confirmation of the

request transport capacity is reserved. If it is not between the customer or

supplier of gas and transmission system operator contract

the provision of services for the transport of gas sampling places customers agreed,

extending the deadline for the submission of applications and for the latest announcements

the result of the booking capacities of 5 working days.



(3) For the reduction and increase in booking transport capacity for the sampling

the place for an indefinite period shall apply section 37. The activities of the operator

distribution system examination of the request for an increase or decrease

the distribution of the capacity for an indefinite period shall be exercised by the transport operator

the system.



section 22



(1) the request for the reservation of transport capacity flexible for the sampling location

the customer is directly connected to the transmission system or the customer shall submit to the

supplier of gas first 4 calendar months before the beginning of the initiation of the

transport under this reservation.



(2) the transmission system operator shall evaluate the request and reservation

electronically notify the result of the booked transportation capacity of the applicant

within 24 hours after receipt of the request.



(3) Electronic confirmation of compliance with the request is the capacity

checked out.



section 23



(1) the request for the reservation of the daily transport capacity for the sampling location

the customer is directly connected to the transmission system, the customer shall submit to the

or electronically to the supplier of gas in the information system of the operator

the transmission system no later than 8:00:00 pm calendar day

preceding the date from which the gas is to be initiated.



(2) the transmission system operator shall evaluate the request for reservation daily

transport capacity for the sampling location and reserve shipping capacity

by 8:30:00 pm the calendar day on which the request was

Booking daily transport capacity for the sampling location.



(3) Electronic confirmation of compliance with the request is the capacity

checked out. In the event that the application is submitted after 8:00 pm,

the transmission system operator shall evaluate the request and checks out the transmission

the capacity of the next calendar day by 8:30:00 pm.



section 24



(1) the request for the reservation of transport capacity for the customer's consumption location

directly connected to the transmission system in a mode on the following day

submit a customer or a supplier of gas in the first 9:00:00 a.m. of the day

preceding the date from which the gas is to be initiated,

and no later than 4:00:00 hours of the day, in which the gas is to be

transport by booking transport capacity is made, and

electronically in the information system of the transmission system operator.



(2) the transmission system operator shall immediately, but not later than

15 minutes after receipt of the request for reservation of capacity evaluation performs

the application and the capacity of the transport capacity in the case of free reserves.



(3) Electronic confirmation of compliance with the request is the capacity

checked out.



§ 25



(1) the request for the reservation of the intraday capacity for supply point

the customer is directly connected to the transmission system, the customer shall submit to the

or supplier of gas, no later than two hours before the start of transport

electronically in the information system of the transmission system operator.



(2) the transmission system operator shall immediately, but not later than

15 minutes after receipt of the request for reservation of capacity evaluation performs

the application and the capacity of the transport capacity in the case of free reserves.



(3) Electronic confirmation of compliance with the request is the capacity

checked out.



section 26



(1) the transmission system operator rejects the request for reservation

transport capacity under section 22, 23, 24, 25, in the event that it is not for the

the sampling place agreed capacity reservation pursuant to § 21.



(2) the transmission system operator receives a request for a reservation pursuant to section

23, 24, 25, in the event that the place of consumption, which satisfies the condition

submission of nominations in accordance with section 63, paragraph. 4.



section 27 of the



The transport of gas to take place in test operation



The transport of the gas in the test operation is arranged by the procedures in section

47. The activities of the distribution system operator referred to in § 47 exercises

the transmission system operator.



section 28



The solution to the lack of capacities for points of virtual stack

gas and gas production points



(1) in the event that cannot be satisfied in the assessment of applications for the reservation

monthly fixed transportation capacity at one point, all applicants for

booking a monthly fixed transportation capacity, split operator

the transmission system free shipping capacity in proportion to the size

individual booking requests monthly fixed transportation capacity with

that, if the applicant's request for monthly fixed-capacity

exceeds free shipping capacity, reduce the transmission

system before the split of the free transport capacity of the applicant to request

the amount of free transport capacity.



(2) in the event that the reservation requests after the satisfaction of daily transportation

capacity cannot be satisfied in the assessment of the applications in one time

all applicants for reservation daily fixed capacity, split

the transmission system operator free shipping capacity in relation

the size of the individual requirements of the daily fixed shipping

capacity with the fact that if the applicant's request on the day of the transmission

capacity exceeds the free shipping capacity, reducing operator

the transmission system before the split of the free transport capacity requirement

the applicant, on the amount of remaining free capacity.



(3) the transmission system operator shall provisionally reserve the interruptible

capacity in the range demanded by the lack of capacity

paragraphs 1 and 2. The transmission system operator reserves the transport

capacity only when the electronic booking confirmation body

in 8:45:00 pm calendar day in which the operator

the transmission system capacity tentatively booked.



(4) transmission system operator shall reserve the interruptible transportation

unlimited capacity.



The solution to the lack of capacities for border points



section 29



(1) in the absence of transport capacity for the annual standard capacity

quarterly and monthly a standard capacity of standard capacity

English auction algorithm proceeds in accordance with other legislation

adjusting the rules for the allocation of transmission capacities ^ 6).



(2) in the absence of transport capacity for the daily standard capacity and

Intraday capacity standard proceed with the auction algorithm

uniform price by other legislation governing rules

for the allocation of transmission capacities ^ 7).



(3) the size offered by the standard daily interruptible capacity

and interruptible capacity standard intraday is not limited.

Standard annual, quarterly and monthly shipping capacity

interruptible does not provide. All offered interruptible transportation

capacity is allocated a starting price, which shall be set in the price

decision.



(4) in the event that there is a reduction of the standard daily interruptible

transport capacity and the standard intraday interruptible transportation

capacity, proceed under another piece of legislation governing

the rules for the allocation of transmission capacities ^ 8).



section 30



(1) in the case of natural gas, for the day in the input or output

the border point is not available free hard daily standard shipping

the capacity of the transmission system operator shall be notified in the information system

the transmission system operator and market operator in the system restrictions

renominací transport for the border point, both for the input,

so for the exit point of the relevant border point for a coordinated and

nekoordinovanou shipping capacity.



(2) the clearing or foreign participant using this item

the transmission system filing nominations can transport pursuant to § 63 paragraph. 1

(a). and § 63) or paragraph. 2 (a). and, where appropriate, under section), paragraph 63. 6

renominovat fixed nekoordinové fixed capacity and coordinated

so, that makes renominaci a maximum of 10% of your reserved capacity

compared with the submitted nomination under section 66 paragraph. 1.



(3) clearing or foreign body Renominations participant increased


or reduced by more than 10% of the reserved capacity at a given point is not

the transmission system operator.



(4) information about limitations renominací served transmission

system no later than 9:00:00 hours of the calendar day preceding the

gas day in which to limit the renominací transport occurs.



section 31



(1) the transmission system operator shall, in the daily standard menu

fixed capacity and Intraday capacity standard hard spare

a fixed capacity and nomination fixed capacity in the opposite direction to the flow of gas

According to § 30 as additional capacity in accordance with other legislation

governing rules for the allocation of transmission capacities ^ 9).



(2) in the event that it is for the gas day condition constraints

renominací transport for the border point under section 30, or in the

If it is not on the border point no

the standard fixed carrying capacity, intra-day body may showdown

or a foreign participant using this item to submit after the deadline referred to in §

paragraph 66. 1 nadnominaci ^ 10).



(3) Nadnominací body clearing or foreign party serves

the reservation request standard intraday interruptible capacity.



(4) for the nadnominace the provisions of renominaci of transport under section

69 and 70.



§ 32



For information about the transport capacities and related services



(1) transmission system operator shall publish in a manner enabling

remote access to the following information:



and the annual plan) per month shutdowns of parts of the transmission system and the

the maintenance plan, which may have an impact on the size and capacities

effect on the quality of the services provided,



(b)) a month long term plan the expansion of the transmission system, which

means increasing the capacities or the improvement of the quality of

services,



c) daily figures the size of technical, total fixed

capacity, total interruptible capacity and free shipping

the capacity for each input and output points on gas storage

the following 24 months,



d) daily figures the size of technical, total fixed

capacity, total interruptible capacity and free shipping

the capacity for each input and output transmission border points

system on the following 15 years,



(e) annual technical forecast) a month, the reserved and free hard

transport capacity on the following ten-year period for each

the entry and exit points of the transmission system, in this predictions

the operator shall take into account the expected technical changes on the transport system and the

expected booking transport capacity,



f) historical monthly minimum and maximum monthly usage coefficient

transport capacity and annual average flow rates for each of the input and

the output points of the transmission system, and it's always in the last 3 years,



g) per day the actual amount of accumulation of the transmission system at the beginning of

gas day after each day for the last 12 months,



(h)) a day a real change of accumulation after each transmission system

days in the last 12 months,



I) daily gas quantity allocated for the various border points, points

gas generating stations are connected to the transmission system and virtual points

gas storage for the past 12 months, if there has been no transmission of data

pursuant to section 96 paragraph. 2, the quantity allocated shall be used in accordance with the provisional gas

section 96 paragraph. 1,



j) daily actual values the past nominations, or registered

renominací for each of the border points, points of gas production plants attached to the

transmission system and points of virtual gas storage for the last 12

months,



to the actual values) daily flow of gas for each border points, points

gas generating stations are connected to the transmission system and virtual points

gas storage for the past 12 months.



(2) Information provided pursuant to paragraph 1 (b). and) to) with daily

periodicity exposes the transmission system operator shall not later than the

15:00:00 hours of the gas day with the fact that the data from the ongoing

gas day referred to in paragraph 1 (b). (h)) are updated

hourly. Information provided pursuant to paragraph 1 (b). (j)), and)

exposes the transmission system operator shall, not later than at 12:00:00 pm

of the next gas day. Information provided pursuant to paragraph 1

with monthly periodicity exposes the transmission system operator

no later than the ninth calendar day of that month.



(3) in the event that the date is not in the gas at the border or on the

virtual point of the stack gas free daily transport capacity,

exposes the transmission system operator every hour, always

no later than 60 minutes after the deadline of submission of nominations or renominací,

information about the sum of the submitted nominations and renominacích including available

interruptible capacity, and this for both flow directions.



PART THE THIRD



DISTRIBUTION OF GAS



section 33



(1) the distribution of gas shall be negotiated settlement for cross-border body point

the gas pipeline.



(2) the distribution of gas customer or vendor negotiates gas sampling

instead of the customer.



(3) distribution of gas distribution system operator arranges for

pass-through space between the distribution systems on the territory of the Czech Republic.



(4) distribution of gas shall be negotiated with the dealer, the manufacturer of gas or gas for

the point of the gas production plants.



(5) by arranging for the distribution of gas supply point customer

the distribution system operator undertakes to provide transport

gas from the point of view of the flow of gas immediately parent distribution

System.



§ 34



(1) the distribution of gas transported through the entry point of a distribution network,

which is the point of a cross-border pipeline, gas production plants, transfer point

Instead, or a summary of the transfer between the transport system and the

distribution networks, pass-through space between the distribution network and distribution

the network, which is in terms of the flow of gas to the parent.



(2) the distribution of gas transported through the exit point of the distribution network,

which is the place of consumption of the customer, the pass-through space between the distribution

network and the distribution network, that is, in terms of the flow of gas to the child, and

the point of the cross-border pipeline.



section 35



(1) For each sampling site the customer shall be concluded a contract of reinsurance

distribution system services with only one participant in the gas market.



(2) For each submission site, where appropriate, a summary of the transfer points of the production plants

gas shall be concluded a contract of providing services to the gas distribution system

with each participant in the gas market using point gas production plants.



(3) the submission site for cross-border gas pipeline shall be concluded a contract of

ensure the service distribution system with each body clearing

using a pass-through place cross-border gas pipeline.



(4) For a pass-through space between the distribution networks of the different

distribution system operators shall conclude a contract on providing services

distribution system operators of distribution networks.



section 36



(1) in the case of sampling points with the measurement of type A or B, in the Treaty of

ensure services distribution system gives reserved distribution

capacity.



(2) for the sampling sites with more measuring points is reinsurance treaty

distribution system services included reserved distribution capacity for

measuring points with the measurement of type A and B and the calculated distribution capacity for

measuring point measurement type C or CM ^ 3).



(3) the distribution capacity for measuring points with the measurement of type C or CM for the

customers with gas over 630 MWh/year is laid down the procedure for

the calculation of the daily fixed capacity allocated for the annual subscription of the gas in the zone

over 630 MWh, which the authority indicated in the pricing decision.



(4) the distribution capacity for customers with gas to 630 MWh/year

annual periodicity laid down the procedure for the billing is the calculation of the daily

booked solid capacity for annual subscription of the gas in the zone above the 63 MWh in

630 MWh, which the authority indicated in the pricing decision.



(5) for the purposes of the evaluation of the distribution of the capacity being exceeded shall apply

only the values agreed and measured at measuring points with the measurement of type A and B.



§ 37



Contract about providing service distribution system



(1) in the contract to provide services for the sampling distribution system

instead of the customer or for the item the production plants, gas or the submission site

among distribution networks reserved the distribution capacity as:



and fixed distribution capacity) for an indefinite period with the possibility of changes to the above

reserved capacity pursuant to section 38 to 43,



(b) interruptible capacity) distribution for an indefinite period with the possibility of changes

the amount of reserved capacity pursuant to section 38 to 43; in the contract to provide the

distribution system services are arranged by the way, the time and conditions of restriction

or disrupting the distribution of gas, the method and conditions of reporting restrictions

or interruption and the frequency limitation or interruption for 12 consecutive

following months of gas,



(c) the fixed monthly distribution capacity); reserves at 1 month with

effect on the first day of the calendar month, gas



(d) a monthly capacity of interruptible) distribution; reserves for 1 month

with effect from the first day of the calendar month of gas; in

the contract is arranged the way time and conditions for restriction or interruption of the

distribution of gas, the method and conditions of restriction or interruption of the notification and

the frequency limitation or interruption for the duration of the contract, or



e) fixed sliding distribution capacity; the number of reserves

gas days number of calendar days in the month in which the

started distribution of gas, or natural gas by the end of the last day

the natural gas of the month following the month in which was launched

gas distribution in the framework of the negotiation of flexible distribution capacity.



(2) for the negotiation of the Treaty of ensuring services and distribution system

application of distribution capacity for the point

cross-border gas pipeline shall apply the procedures referred to in section 42 and under section

10, 11 and 15, while the activities of the transmission system operator referred to

in section 15, shall be exercised by the distribution system operator.



(3) the Interruptible distribution capacity can be reserved only for sampling

instead of the customer with the measurement of type A or B and for the downsizing of the gas at the point

When you cannot reserve a fixed distribution capacity because of that


is no longer available free fixed distribution capacity, or for sampling

instead of a customer with a scheduled annual collection of over 630 MWh, with the option

the total or partial transition to alternative fuel, according to another

the law governing the way of ensuring the security

standard gas supply ^ 11).



Procedure when booking distribution capacity



section 38



(1) the request for the reservation of the distribution capacity and the conclusion of the Treaty on the

ensure the service distribution system for customer pick-up places

served electronically in cases under section 110, paragraph. 1 and § 113 paragraph. 5, and

in terms under section 110, paragraph. 3 or § 113 paragraph. 5, the customer, if

with him to the place of consumption is no longer a contract of reinsurance services

the distribution system is closed, or a new supplier of gas in the event that the

concluded the contract with the customer on the associated gas supply services.



(2) the distribution system operator shall notify the participant of the gas market

about reservation options distribution capacity in term according to § 111 paragraph.

1.



(3) in the case of distribution capacity register

standard gas supplier changes made in the term under section 112, paragraph.

5.



(4) the request for the reservation of the distribution capacity to delivery point

the customer contains the elements listed in annex 2 to this Decree.



(5) the distribution is not possible reserve capacity in low

financial collateral arrangements the applicant if the reservation request distribution

capacity does not meet the established requirements, has not been submitted within the specified

the term or the applicant has not nedoplnil or modify requests to

14:00:00 hours of the following working day after notification

distribution system operator with an indication of incorrect data.



section 39



(1) the request for the reservation of the distribution capacity and the conclusion of the Treaty on the

ensure the service distribution system for sampling locations of customers,

In addition to the application under section 38, 40 and 43, customer or vendor

gas not later than the fifth working day until 10:00:00 hours, and the first 4

calendar months before the beginning of the first gas on which has

the effect of the distribution of the capacity reservation occur, or in the case of the initiation of the

deliveries to the delivery point newly connecting the customer and for the

start of deliveries to the sampling space after unauthorized gas sampling or

unauthorized distribution of gas no later than 10:00:00 pm work

the day preceding the date of the earliest possible start of gas supplies

agreed with the distribution system operator.



(2) the request for the reservation of the distribution capacity for supply point

the customer, in addition to the application under section 38, 40 and 43, contains the elements

referred to in annex 2 to this Decree.



(3) the distribution system operator shall evaluate the request on the

booking distribution capacity and shall notify the results of reservation

distribution capacity to all applicants of the distribution capacity

no later than the third working day before 12:00:00 hours of the date on which the

the distribution capacity of the reservation request is made.



(4) Electronic confirmation of compliance with the request is a distribution capacity

checked out.



(5) if it is not between the customer or supplier of gas, and the operator

distribution system contract for ensuring the service distribution system

for sampling places customers negotiated, the deadline for

the latest submission of applications and for the notification of the result of the reservation

distribution of capacity of 5 working days.



section 40



(1) the request for the reservation of the distribution capacity and the conclusion of the Treaty on the

ensure the service distribution system for sampling places customers at the

Quick change gas supplier under section 116 shall be presented by the customer or

supplier of gas in the term under section 116 or gas trader in the mode

supplier of last resort not later than 14:00:00 pm after the transfer

information under section 116.



(2) the request may be submitted only to the customer or supplier of gas, which already

He negotiated a treaty with the distribution system operator to provide the

distribution system services for the sampling space customers.



(3) the application shall be submitted electronically and the distribution system operator

evaluates the request for reservation distribution capacity in the rapid

change gas supplier and notify the results distribution capacity reservations

applicants for reservation distribution capacity no later than the date referred to in section

117.



(4) Booking distribution capacity is in the case of registering rapid

changes made in the term gas supplier under section 118.



(5) For the distribution of the capacity of the reservation request to be filed with

gas in the mode of supplier of last resort is the distribution capacity

reserved automatically.



(6) the request for the reservation of the distribution capacity in the rapid change of the supplier

gas to the delivery point of the customer contains the elements referred to in

Annex No 2 to this Decree.



§ 41



(1) the request for the reservation of the distribution capacity and the conclusion of the Treaty on the

ensure the service distribution system for a pass-through space between the

distribution networks presents the distribution system operator in

the term pursuant to section 38. For the request to change the distribution capacity reserved

the terms shall apply under section 39.



(2) the request for the reservation of the distribution capacity and the conclusion of the Treaty on the

ensure the service distribution system for gas production plants point presents

manufacturer of gas or gas trader in the term under section 38. For the request

on the change of distribution capacity reserved Terms shall apply under section 39.



section 42



(1) the request for the reservation of the distribution capacity and the conclusion of the Treaty on the

ensure the service distribution system for the point of cross-border gas pipeline

submit body clearing the distribution system operator

no later than 10:00:00 of the working day preceding the day of

the earliest possible start of distribution of gas agreed with

distribution system operator.



(2) the distribution system operator shall evaluate the request on the

booking distribution capacity for the cross-border pipeline and to the point

the reservation shall notify the results of distribution capacity to all applicants for

booking distribution capacity for the cross-border point of gas pipeline

no later than the third working day before 12:00:00 hours of the date on which the

application for reservation of capacity for cross-border distribution point

the pipeline is made.



(3) Electronic confirmation of compliance with the request is the capacity

checked out.



§ 43



(1) the request for the reservation of the distribution capacity and the conclusion of the Treaty on the

ensure the service distribution system under section 37, paragraph. 1 (a). (e))

the sampling site the customer shall submit to the customer or the supplier of the gas

first 4 calendar months before the beginning of the first gas day,

When the effect of the reservation is to occur the distribution capacity.



(2) the request may be submitted only to the customer or supplier of gas, which already

He negotiated a treaty with the distribution system operator to provide the

services and distribution system for the sampling location has reserved

distribution capacity pursuant to section 37, paragraph. 1 (a). and) or (b)).



(3) the maximum size of the required capacity for the sliding of the Treaty on

ensure the service distribution system shall not exceed in the aggregate with

the other checked-out distribution capacity for responsible sampling

Instead the customer the size of dvacetičtyřnásobku secured hourly capacity

specified in the contract for the relevant place of consumption.



(4) the distribution system operator shall evaluate the request for reservation

distribution capacity and electronically notifies the result of booking

the distribution of the capacity of the distribution capacity of the applicant

within 24 hours after receipt of the request.



(5) Electronic confirmation of compliance with the request is a distribution capacity

checked out.



(6) the request for the reservation of the distribution capacity to delivery point

the customer contains the elements listed in annex 2 to this Decree.



Change the reserved distribution capacity



§ 44



(1) if the place of consumption of the customer with the measurement of type A or B, for which the

proper readings are carried out monthly, or for pass-through space between the

distribution networks asks the participant to reduce the gas market

distribution capacity reserved on the basis of the distribution capacity

reserved under section 37, paragraph. 1 (a). and (b)) or) operator

distribution system operators shall carry out a reduction of the distribution capacity reserved

for the period following a minimum of 12 months.



(2) the distribution system operator does not reduce the reserved

the distribution of the capacity, if it is within the time limit under section 110, paragraph. 3 from the date of

referred to in the application for reduction for sampling or submission site

a higher distribution capacity reserved under section 37, paragraph. 1 (a). and) or

(b)) than the reserved distribution capacity referred to in the application for

the reduction.



(3) if the place of consumption of the customer with the measurement of type A or B, for which the

proper readings are carried out monthly, or for pass-through space between the

distribution networks will ask the participant the gas market to increase

distribution capacity reserved under section 37, paragraph. 1 (a). and (b)), or)

the distribution system operator shall examine the possibility of increasing the reserved

in the case of distribution capacity and sufficient distribution capacity be increased

reserved distribution capacity for the period following a minimum of 12

months, if there has been no reduction in the distribution capacity reserved

the distribution capacity reserved under section 37, paragraph. 1 (a). and) or

(b)) in the previous 12 months.



section 45



(1) when applying for an amendment reserved the distribution capacity

proceed mutatis mutandis under section 39. Change the reserved distribution capacity

It is maybe on the first day of the calendar month of the gas.



(2) the distribution system operator makes the change reserved

the distribution of the capacity for a pass-through space between the distribution networks also

in the event that the distribution system operator shall request and need

changes to the reservation of the distribution capacity.



(3) the distribution system operator shall carry out a reduction of the reserved

the distribution capacity of the gas production plants, connected to the closed portion of the

distribution network, reserved under section 37, paragraph. 1 (a). and (c))), or (e))

If the above hourly subscriptions of customers connected to this

the closed part of the distribution network falls below the value of hourly output

gas production plants.




(4) in the event that it is on the closed part of the distribution network more

production of gas and the distribution system operator shall carry out reduction

distribution capacity reserved under paragraph 3, the operator

distribution system free distribution capacity in proportion to the size

each generation of gas distribution capacity reserved.



(5) the distribution system operator shall carry out a reduction of the reserved

distribution capacity referred to in paragraph 3 for the period strictly necessary to

ensure the safe and reliable operation of the closed part of the distribution

According to another legal regulation governing the conditions for doing business in

energy sectors ^ 12).



section 46



(1) if the sampling place the customer has changed the measurement of type (C)

Type A or B, the customer or the supplier of the gas request

booking distribution capacity to the first gas day calendar

the month in dates under section 39 so that the effect of the reservation of the distribution

the capacity of the not yet come later than 2 months from the change of the type of measurement.



(2) in the absence of the customer or the supplier of the gas reservation request

the distribution capacity of the procedure and within the time referred to in paragraph 1,

the distribution system operator reserves to consumption location

distribution capacity pursuant to section 37, paragraph. 1 (a). and) of the allocated

the distribution of the capacity established for purposes of determining the payments for the distribution of

the gas, which the authority indicated in the pricing decision.



section 47



Gas distribution in test operation



(1) the distribution of gas in the test operation of the gas distribution for

verification of technical parameters, operating values and demonstrate

the operability of the newly installed or refurbished sampling

gas equipment of the customer, while the reconstruction is for the purposes of this

the Decree means the interventions in the delivery of the gas equipment which are

in a change of its purpose or technical parameters, or to change

measurement type in the place of the supply of the customer. The distribution of the gas in the test

the operation can be initiated only:



and) for newly connecting the customer with the measurement of type A or B,



(b)) for the customer with the measurement of type A or B, which reconstructed the whole or

part of the sampling of gas installations and restored the sampling gas

the device has at least 20% of the daily maximum gas sampling in

the sampling place the customer, or



(c)) for the place of consumption of the customer, in which there was a change from the type of measurement

(C) the type and or (B).



(2) in place of consumption of the customer with the character collection, technologist

deems such place of consumption of the customer for which the sum of the actual

the values of consumption for the last quarter of the previous year and the first quarter of

the year is less than 70% of the total consumption for the period from 1. April

the previous year to 31. in March of that year. In the event that they are not to

present value of actual consumption, replace the operator is

planned monthly consumption distribution system referred to in the Treaty on

ensure the service distribution system. Other sampling points,

consider the sampling place customers with the character of the collection of the otop.



(3) the application for distribution of gas in test operation for gas sampling

Instead the customer serves the applicant of distribution capacity in the

test the operation of the distribution system operator. The application includes:



and start date) distribution in test operation,



(b)) end date of the distribution in test operation,



(c) the reasons for the initiation of the distribution) of the test operation.



(4) the distribution system operator shall initiate the distribution of gas in

test operation at the customer's subscription as soon as possible with the character of a technologist

the date referred to in the request and terminates on the day referred to in the request, no later than

However, the last day of the third calendar month following the

the month in which the gas distribution started. In other cases, the

the distribution system operator shall initiate the distribution of gas in the test

the operation of the date referred to in the request and terminates on the date specified in the request,

but not later than the last day of the month of February. The maximum duration of

gas distribution in trial operation at newly connecting customer

with the character of the collection of the otop is the 6 calendar months.



(5) the maximum daily discharge gas in place of the customer during the

the distribution of the gas in the test operation must not exceed dvacetičtyřnásobek

secured hourly capacity for appropriate supply point agreed in the

the Treaty on the connection.



(6) the request for the reservation of the distribution capacity in test operation

submit a customer or a supplier of gas in terms under section 39.

The distribution system operator for the duration of the test operation

referred to in paragraph 1 (b). (c)) for customer sampling place reserves

the assigned distribution capacity required for the purposes of determining payment for

distribution of gas, which the authority indicated in the pricing decision.



(7) in the event that a customer or a supplier of gas in the absence of the term according to the

§ 39 before the end of the distribution in the test service reservation request

distribution capacity pursuant to section 37, paragraph. 1, operator of the distribution

the system reserves space for the sampling distribution capacity under section 37

paragraph. 1 (a). and) of highest daily gas consumption in

during the trial operation.



section 48



The solution to the lack of distribution capacity



In case of lack of capacity in the cross-border distribution point

the gas pipeline or gas production plants point shall apply the procedures referred to in section 28.

The activities of the transmission system operator referred to in section 28 shall exercise

the distribution system operator.



section 49



Information about the distribution system



(1) the distribution system operator exposes the way enabling the

remote access and updates to the 15th day of each calendar month

the following information:



and the annual plan shutdowns) the various parts of the distribution system and plan

maintenance, which may have an impact on the size of the distribution capacity and impact

on the quality of the services provided,



(b)) a long-term plan of expanding the distribution system, which means

increase distribution capacity or improve the quality of

services,



(c)), the total size of the numerical form of the technical capacity of the solid, reserved

total interruptible capacity and free distribution capacity

for each entry and exit points of cross-border gas pipelines,



(d) the availability of monthly figures) the indicative distribution capacity for

each entry and exit points of forward points of cross-border

gas pipelines,



(e)) the annual predictions of the free entry and exit capacity for the individual

entry and exit points of cross-border gas pipelines to transfer seats

the following ten-year period.



(2) the distribution system operator exposes a day way

enabling remote access to 12:00:00 pm change accumulation

the distribution network after each day for the past 12 months.



(3) the distribution system operator exposes the way enabling the

remote access daily gas consumption in their distribution networks after

each of the hours of the current gas day within two hours after

the end of the appropriate hours.



(4) the distribution system operator exposes the way enabling the

remote access to the 12:00:00 pm 9th calendar day, not later than

However, until 12:00:00 hours of the sixth working day of the month, gas

the value of the gross calorific value of gas per day for the

the previous natural gas a month.



PART THE FOURTH



GAS STORAGE



section 50



(1) Access to trays of gas in which the operator of a tank of gas

provides storage capacity and storage services for the body

Clearing or from a foreign participant is conducted on the principle of

virtual stack gas.



(2) the operator of a storage tank always full storage offers free

the capacity for all of its gas to the point of virtual

the stack gas. The virtual stack gas transmission system

is a place where storage capacity is provided and on which occurs

a business looking to transfer and reception of gas injection into the reservoir, the

the extraction of gas and gas from the gas tank, and regardless of the actual

pass-through space.



(3) the virtual gas storage is specified the name of the operator

gas storage and storage capacity.



(4) on the basis of the Treaty on gas storage operator reserves

stack gas body clearing or foreign participant in the annual

storage capacity with a solid performance, the annual storage capacity with

solid performance on a new storage capacity, the monthly storage

capacity with a solid performance, daily storage capacity with a solid performance,

daily storage capacity with přerušitelným performance. Storage capacity

with the reserves as a



and) annual storage capacity with a fixed performance; minimum booking period

storage capacity is 1 year and a maximum storage period of reservation

capacity is 5 years,



(b)) the annual storage capacity with a solid performance on the new storage

capacity; minimum booking period and annual storage capacity) with

fixed performance; minimum booking duration of storage capacity is 1 year and

the maximum duration of the reservation of storage capacity is 5 years, storage

the capacity is 1 year and a maximum time of reservation of storage capacity is 15

years,



(c)) the monthly storage capacity with a fixed performance; the minimum time

reserve storage capacity is 1 month and the maximum time the natural gas

reserve storage capacity is 24 months, gas



d) daily storage capacity with a fixed performance; minimum booking period

storage capacity is 1 day and the maximum time the natural gas reserve

storage capacity is 90 days of gas,



e) daily storage capacity with přerušitelným performance; time of booking

storage capacity is 1 the natural gas a day.



(5) the capacity of the reserves with the effect to the first gas day

the period for which the storage capacity is reserved. Reservation

storage capacity is terminated by the end of the last gas day

the period for which the storage capacity was reserved.



(6) the operator of a tank of gas, operating gas connected

the transmission system through more than one pass-through

the Division shall consult the space exploration and injection into individual pass-through


the place of storage of the gas with the transmission system operator.



Procedure when booking annual storage capacity with a solid performance



section 51



(1) the operator of a tank of gas reserves with an annual storage capacity

fixed performance issues on the principle of vícekolové of the electronic auction.



(2) the operator of a storage tank exposes to

remote access no later than 10 working days before the beginning of the vícekolové

the electronic auction the auction conditions on storage capacity.

Terms and conditions of auction shall be proportionate, non-discriminatory and transparent.

Conditions for auction shall contain the particulars in accordance with point 2 of annex 3 to the

This Decree.



(3) the clearing or foreign participant requesting reservation

storage capacity serves a request to reserve storage capacity in

the auction in the form of round numbers referred to within two

decimal places, expressing the desired amount of free storage

capacity. The applicant for a reserve storage capacity enters at the same time with

the requirement to reserve storage capacity and the required length

reserve storage capacity, which can be divided into several parts with

different length duration. Request to reserve storage capacity and

the desired length of the reservation, made at the auction round cannot be over

the auction of the wheel change.



(4) the supplier of the gas, which forms with the operator of the storage tank

concern or is part of the same group or other business

the grouping, and alone or in conjunction with other gas suppliers, who make up the

with the stack gas concern or are part of the same

group or another group, the operator has

storage tank checked out with storage capacity of at least 80% of the

the capacity of the virtual stack gas operated by it, you may as

the applicant to participate in the auctions on storage capacity only if

the minimum price for storage capacity in accordance with point 2 (b). Annex No.)

3 this notice lower or equal to the market price of storage capacity

the same or similar parameters for booking annual storage

capacity in the Czech Republic.



(5) the size of the reserved storage capacity referred to in paragraph 4, the

It assesses the first day of the first year of storage, which is

storage capacity offered. If multiple gas suppliers, who

form with the operator stack gas concern or are

the operator of the storage tank or in another part of the same group

the group, the requirements to reserve storage capacity in

the cumulative excess amount of free storage capacity,

the operator of a tank of gas storage capacity reservation requirements

such suppliers of gas relatively reduced, so that in the aggregate amount of

match the size of the available storage capacity.



(6) the requirement, where appropriate, the gas supplier gas suppliers by

paragraph 5 on the reserve storage capacity the operator stack

the gas will be reduced by the requirements to reserve storage capacity of other

of the applicants, but not more than the difference between the free storage capacity and

the requirements on the reservation of storage capacity of the other applicants.



section 52



(1) the applicant shall lodge a financial collateral at the latest 3 working days before the

published date of the auction. The provision of a financial collateral shall be subject

Clearing or foreign participant becomes the applicant, which may

actively participate in electronic auctions (hereinafter referred to as "active applicant").

Active, the applicant may lodge a request to reserve storage capacity in

auction up to the corresponding composite financial collateral. For

composition of financial collateral is also considered the submission of the irrevocable

the bank guarantees.



(2) active applicant may submit a request to reserve storage

capacity in the following auction round, only up to the amount of the request on the

reserve storage capacity in the previous auction round. In the event that the

in one auction round will not introduce active applicant request for reservation

storage capacity or submits a request to reserve storage

capacity or the desired length of the reservation with the value 0, it cannot

submit reservation requests to the storage capacity at any

following the auction round.



(3) in the event that occurs in the auction round in the sum of all the requirements for the

reserve storage capacity of active applicants to exceed the value of the

the size of the storage capacity offered, followed by another auction round. In

the next auction round auction price for a unit of storage capacity

increases the way under the terms of the auction.



(4) the individual auction round are limited to 10 minutes. If you with it

all applicants agree, the operator of a tank of gas

the auction round to truncate.



(5) during the auction the operator stack gas active applicants

announce the sum of all requests for reservation of storage capacity in the

previous auction round, and the time remaining until the end of the auction round.



(6) the operator of a tank of gas will end the auction, if the auction bike

the sum of the requirements to reserve storage capacity for all active

the applicants is less than or equal to the size of the storage offered

capacity. The operator of a tank of gas reserves storage capacity

rounded to whole m3 or kWh or kWh/day according to the requirements of the

reserve storage capacity of active applicants in the last auction

bike. If it remains part of the storage capacity is nerezervována, this part of the

storage capacity reserved active applicants from the penultimate

wheels in their requests to the above reservation, storage

capacity in the penultimate round of the auction, saying that the request for reservation

the active storage capacity of the applicant is to calculate the reduced reservation

about the storage capacity that is reserved to the active applicants in the last

auction round.



(7) in the event that the sum of all the requirements on the booking

storage capacity of active applicants in the first auction round to

exceeding the value of the size of the storage capacity offered, is the price for

storage of gas intended for the value of the minimum price referred to in point 2 (a).

and no. 3) of the annex to this Decree. In other cases, the price for

gas storage fixed at the value of auction prices in the last auction

where the sum of all the requirements to reserve storage capacity

Active applicants was higher than or equal to the size of the offered

storage capacity.



section 53



(1) the operator of a tank of gas to be sent to the confirmation of reservation

storage capacity electronically without undue delay after their

the auction along with the final price for a unit of storage capacity.



(2) the operator of a tank of gas, which returns the active applicants

not reserved storage capacity, financial collateral to a 10

calendar days after the end of the auction. Active to the applicant, which was

reserved storage capacity, the operator returns the stack gas

financial collateral within 10 calendar days after the conclusion of the Treaty on

gas storage.



§ 54



Procedure when booking a monthly storage capacity with a solid performance



(1) the operator of a tank of gas reserves a monthly storage capacity

with a solid performance on the basis of the outcome of the vícekolové of the electronic auction.



(2) the operator of a storage tank exposes to

remote access conditions auctions free monthly storage

capacity with a solid performance at the latest 10 working days before the beginning of the

auction. Terms and conditions of auction shall be proportionate, non-discriminatory and

transparent. The terms of the auction must contain the same elements as the

the terms of the auction when booking annual storage capacity with a solid performance

with this, the price per unit of storage capacity is all the time

reserve storage capacity constant. The terms of the auction also include

determine the number of calendar months for use of storage capacity.



(3) For the holding of the auction section, paragraph 51. 3 and section 52 shall apply mutatis mutandis. Request

the length of reserve storage capacity is expressed as a whole number

expressing the number of months of the duration of the contract in the range of specified

According to the last sentence of paragraph 2.



(4) the operator of a tank of gas to be sent to the confirmation of reservation

storage capacity electronically without undue delay after their

the auction along with the final price for a unit of storage capacity.



(5) For the return and the pumping of the financial collateral, § 53 paragraph. 2 apply

Similarly.



section 55



Procedure when booking daily storage capacity with a solid performance



(1) the application for reservation daily storage capacity with a solid performance

submit body clearing or foreign party electronically

the operators of the gas storage not later than 1 calendar day until 8:00:00

hours and the first 90 calendar days before the start of the first

gas day, from which the reservation is required. The operator

stack gas shall evaluate the applications received and notify the results booked

storage capacity to all applicants to the 9:00:00 pm calendar day,

in which the request for the reservation of storage capacity.



(2) Electronic confirmation of compliance with the request is a daily storage

capacity with a solid performance.



section 56



Procedure when booking daily storage capacity with přerušitelným performance



(1) the application for reservation daily storage capacity with přerušitelným

the performance of the operators of the gas serves the body of settlement or

Foreign participant with a reserved storage capacity for this

the operator of the storage tank or with the law with this capacity.



(2) the request for the reservation of the daily storage capacity with přerušitelným

the performance presents a body of clearing or foreign participant

electronically no later than 16:00:00 hours of the previous natural gas

of the day. The price for the storage capacity with the přerušitelným power is covered by

only part of the allocated for an uninterrupted daily storage capacity with

přerušitelným performance. The operator shall evaluate the request and gas storage

electronically notify the reservation no later than 10 minutes after each full

the hour in which the request for the reservation of the daily storage capacity with

přerušitelným performance received. Service of notice of the

considers the daily storage capacity with přerušitelným performance

reserved. The operator of a tank of gas could allow the body


Clearing or foreign participant lodging reservation request

storage capacity with přerušitelným performance later after the deadline referred to in

the first sentence, and even during the gas day.



Procedure when booking annual storage capacity with a solid performance at the

a new storage capacity



§ 57



(1) in accordance with paragraphs 2 to 5 and § 58 checks out the operator stack

gas, planning the construction of new storage capacity, up to 90% of this

storage capacity. The remaining part of the new storage capacity reserves

the operator of a tank of gas the procedure under sections 51 to 53 or 54. According to the

paragraphs 2 to 5 and § 58 gas storage operator does not flow when

reservation of such new storage capacity, which the operator

stack gas offered under the rules for the allocation and management, and

management of new storage capacity exceeded the approved Authority ^ 13).



(2) the operator of a tank of gas reserves with an annual storage capacity

solid performance on a new storage capacity on the principle of vícekolové

electronic auctions. The operator of gas storage launches auction

first 7 years before the beginning of the year, from which the storage system is possible

start gas storage with the use of new storage capacity in the whole

the size of the.



(3) the maximum length of the reservation to reserve the annual storage capacity

storage capacity with a solid performance to a new storage capacity is 15

years. The length of the reservation, the operator determines the storage capacity of the stack

of gas in the announcement of the terms and conditions of the auction.



(4) in the case where the construction of new storage capacity to the

the gradual increase in storage capacity or its

parameters and operator of stack gas increase in storage capacity

or individual parameters for each year shall be specified in the terms of

the auction in accordance with point 3 (b). (b)) of annex 3 to this Decree, then this

increase storage capacity or the individual parameters by the operator

stack gas split proportionally among all bodies

clearing and foreign participants, which was a new storage capacity

checked out.



(5) the operator of the storage tank type exposes no later than 60 days before the

the planned start of the auction conditions of the auction on a new storage capacity.

If this is a auction for new storage capacity, which was already in the

the auction offered, but has not been checked out, the operator shall publish the

gas storage conditions of the auction, no later than 30 days prior to the scheduled

the start of the auction. Terms and conditions of auction shall be proportionate, non-discriminatory and

transparent. Conditions for auction shall contain the particulars in accordance with the annex to

No. 3 to this notice.



section 58



(1) the supplier of the gas, which forms with the operator of the storage tank

concern or is part of the same group or other business

the grouping, and alone or in conjunction with other gas suppliers, who make up the

with the stack gas concern or are part of the same

group or another group, the operator has

storage tank checked out with storage capacity of at least 80% of the

the capacity of the virtual stack gas operated by it, you may as

the applicant to participate in the auction on a new storage capacity only if

the minimum price for storage capacity in accordance with point 2 (b). Annex No.)

3 this notice lower or equal to the market price of storage capacity

the same or similar parameters for booking annual storage

capacity with a solid performance in the Czech Republic.



(2) the supplier of the gas that meets the condition specified in paragraph 1 may request the

storage capacity up to the amount of storage capacity, which must be in accordance with

the terms of the auction in the auction reserved not to auction the operator

the stack is canceled.



(3) Request the supplier of gas, or gas suppliers by

paragraph 1 to reserve storage capacity the operator stack

the gas will be reduced by the requirements to reserve storage capacity of other

of the applicants, but not more than the difference between the minimum amount referred to in point 3

(a). and no. 3) of the annex to this Decree and reservation requirements

storage capacity of the other applicants.



(4) For the holding of the auction section, paragraph 51. 3, § 52 and 53 shall apply mutatis mutandis.

Financial collateral, the applicant must lodge no later than 5 calendar days before

the term holding the auction. The minimum price per unit of storage capacity

It is established in accordance with point 2 (b). and no. 3) of the annex to this Decree.



(5) in the event that will be possible after booking an annual storage capacity with

solid performance on a new storage capacity make this a new

storage capacity before the efficiency booked annual storage

capacity with a fixed power on a new storage capacity, it can

the operator of a tank of gas to offer to the participants of the gas market in the form of

booked monthly storage capacity with a solid performance, even

repeatedly. For the reservation of this storage capacity is used to section 54

Similarly. The following reserved storage capacity is still considered

a new storage capacity.



section 59



The procedure for the sale of a series of gas



(1) in the event that after the reserve storage capacity on the basis of

gas storage contracts prevent the extraction of the gas in the ownership

the subject of settlement or a foreign participant, and this gas is not possible

convert within a virtual stack gas on the basis of other

existing reservations, the storage capacity of the subject of settlement

or foreign participant using the virtual gas storage,

the operator performs the stack gas driven selloff on gas

Intraday organised gas market.



(2) the Controlled sale of gas gas storage operator each

the natural gas a day, according to their available mining capacity. The operator

stack gas for the purpose of the controlled sale of gas reserves the transport

the capacity for the entry point of a virtual gas storage.



(3) the operator of the storage tank serves within the intraday

organised gas market an offer for sale of gas at a price of € 1/MWh.

The operator of the storage tank in a manner enabling remote publishes

access the volume of gas each day, which will be offered in the framework of intra-day

organised gas market.



(4) the operator of a tank of gas to be sent to the subject of settlement or

Foreign participant in proceeds from the sale of gas by series

paragraph 1, the less legitimate costs directly associated with the sale of

gas within 15 calendar days after the completion of the sale of two series of gas.



section 60



Reduction of storage capacity at the restriction or interruption of storage

gas



(1) the operator of a tank of gas in the restriction or interruption of the

storage of gas running out soon as the reserved storage capacity with

přerušitelným performance and subsequently reserved storage capacity with

fixed performance.



(2) the operator of a tank of gas running out of storage capacity reserved

with přerušitelným performance on the basis of price per unit přerušitelného

vtláčecího or extractive performance in order from lowest to highest price

with the fact that the reserved storage capacity with the same price per unit

přerušitelného running out to the same level of performance against agreed

přerušitelnému performance. If the nominated body clearing or

Foreign participant under the maximum level of reduction is not applied

his nomination of warehousing. Otherwise, the operator

stack gas will confirm the nomination of warehousing in abbreviated

the amount of.



(3) the operator of a tank of gas running out during the planned restrictions or

break storage capacity reserved storage capacity with a fixed

storage capacity so that the same shall be reduced proportionally to the storage

capacity reserved for the days on which the interruption is planned, all

operators of clearing foreign participants. If the nominated

Clearing or from a foreign body under the maximum level participant

the applied reduction does not affect the storage of his nomination.

The operator shall notify the gas tank, how much will be booked solid

storage capacity reduced, and also notify the planned interruption of

storage capacity.



(4) in the event that all or part of as the reasons for the restriction or

the interruption of gas storage, gas tank, the operator shall immediately

inform stakeholders of clearing or foreign participants, which

may submit to the renominaci storage.



(5) in the case of sudden failure of injection or extraction progresses

the operator of a tank of gas in the reduction of the reserved storage

capacity and confirmation of the nomination of the storage referred to in paragraphs 1 to 4

Similarly.



section 61



For information on storage capacities



(1) the operator of a storage tank exposes to

remote access and updates immediately, but not later than on the 15th

day of the calendar month, the following information:



and the size of the reduction plan) annual production volume or reduce the quality of

of services provided by the virtual stack gas from the reasons for stoppages or

planned maintenance of the individual gas storage,



(b)) five-year plan size adjustments of the operational capacity, the daily

the maximum performance of the relevant vtláčecího and mining virtual

gas tank for each storage year



(c)), the total size of the numerical form technical reserved and available storage

the capacity of the relevant virtual gas storage,



(d)) size adjustments of the operational capacity, the daily maximum, and vtláčecího

the performance of the relevant virtual stack of extractive gas over the last

three years of storage for each storage year.



(2) the operator of a storage tank exposes to

remote access and daily at 9:00:00 pm updates at least the following information:



and the total amount of available mining) and vtláčecího performance

the following day, natural gas



(b) the total contract size) of the hard coal and vtláčecího performance

calculated on the basis of the sum of the mining or injection capacity entities

Clearing or foreign participants on the following day, natural gas



(c)) the current status of stocks in a virtual stack gas energy

units,



(d)) the size of the broken přerušitelného performance and the highest price for

Unit přerušitelného, to which the power interruption applied for

preceding day gas,




(e)) the size of the broken fixed storage capacity in distribution on injection

and the upstream performance for the preceding day gas,



(f)) of the actual daily injection and extraction for the previous natural gas

the day.



(3) the operator of the storage tank type exposes the data referred to in paragraph 2 for

the last 3 calendar years.



(4) the operator of a storage tank exposes to

remote access cost and the size of the reserved storage

capacity in each of the auctions for the last 3 calendar years.



PART THE FIFTH



NOMINATIONS AND RENOMINATIONS



section 62



Procedures and deadlines for the submission of nominations the obligation to deliver and the commitment

Remove



(1) the nomination of the obligation to deliver and the obligation to remove the settlement served the body

as the day the nomination of the obligation to deliver and remove the obligation electronically in

a standardized protocol defined in business terms

the market operator as the nomination under a bilateral trade treaty when the

the body registers the transfer posting with clearing the gas by an entity other

at the virtual trading point.



(2) in the event that the deadline submission of nominations under section 68, paragraph.

1 served the bodies is not reconciliation posting nominations of trade

referred to in paragraph 1, the market operator registers the smaller of the values entered

the nominations.



(3) the nomination of the obligation to deliver and the obligation to remove the market operator shall for the

clearing bodies or foreign participants, for which it is responsible for the

the transmission system operator is assigned to the variance, as the daily

the nomination of the obligation to deliver and remove the obligation electronically in

a standardized protocol defined in business terms

the market operator as follows:



and applicability of the gas on the nomination) intraday organized market

When the market operator registers made trades on the organized

intraday market between the market operator and the various bodies

clearing,



(b) the daily amount of countervailing nominations), when the market operator

registers the size of daily balancing quantity between the market operator

and individual entrepreneurs or foreign participants; in

If the daily amount of the compensatory body clearing or

as for the external subscriber's registration, when on the side of the obligation to deliver

performs clearing body or foreign party and on the side of the

the obligation to remove the market operator, in the case of a negative natural

the balancing amount of body or foreign participant in the clearing

as for the registration, when on the side of the obligation to deliver the market operator acts and

on the side of the body to remove the obligation of settlement or a foreign participant.



(4) the market operator to sum all the registered nominations

the daily amount of the compensatory in accordance with paragraph 3 (b). (b)), so that

obligations to deliver the subjects of settlement or the foreign participants, for which it is

responsibility for deviation is assigned to the transmission system operator,

have the plus sign and minus sign to remove obligations they have. The market operator

registers a nomination to the transmission system operator on the account

the operator, such as



and the commitment to deliver the market operator) and a commitment to remove the operator

the transmission system operator for the account in the event that the sum is

a positive,



(b) a commitment to remove the market operator) and the commitment to deliver operator

the transmission system operator for the account in the event that the sum is

negative.



section 63



The nomination of the transport



(1) the nomination of transport serves the body clearing on entry points

the transmission system



and the amount of the reserved capacity) at the border points of the transmission system;

the nomination of the transport on the entry point is served by the cathode

gas, indicating their markings in such a form that the operator

the transmission system operators of neighbouring transmission system operators were

able to perform reconciliation



(b)) to the amount of reserved capacity at points of the stack gas; nomination

transport to the input point is served so that the transmission

the operator of a storage tank system, and were able to perform

reconciliation,



(c)) to the amount of reserved capacity at production plants.



(2) the nomination serves to transport the body of clearing output points

the transmission system



and the amount of the reserved capacity) at the border points of the transmission system;

the nomination of the transport is served by individual customers of the gas with the

their designation in such a form that the transmission

system operators of neighbouring transmission system operators were able to

perform reconciliation



(b)) to the amount of reserved capacity at points of the stack gas; nomination

transport is served so that the transmission system operator and

the operator of the storage tank were able to perform the reconciliation



(c)) to the amount of reserved capacity at the delivery point of the customer directly

connected to the transmission system in the distribution by hours

gas day.



(3) for the coordinated and uncoordinated transport capacity on the border

points of the transmission system operator may submit the nominations showdown

transport and in the information system of the neighboring transmission operators

the system. The transmission system operator shall ensure that the following applications submitted

nomination of transport have been recorded in the information system without

undue delay were forwarded to the market operator.



(4) the Nominated transport serves only for sampling places customers directly

connected to the transmission system with the reserved capacity greater than or

straight 5 000 MWh/day.



(5) the transmission system operator shall transport in nomination

the distribution of these input and output points of the transmission system:



and the point of action for compensation), the transmission system operator in

the transport of gas associated with the change of account operators,



(b)) virtual technical point of the transmission system operator for the transport of

gas associated in particular with the coverage of the loss of the transmission

system and own gas consumption,



(c)) virtual production point of the transmission system operator for the transport of

gas associated in particular with the sale of the gas.



(6) a foreign participant, serves the transport nominations referred to in paragraph 1 (b).

and (b)) and paragraph 2 (a)). and (b))) and in the information system of the operator

the transmission system. The provisions of paragraph 3 shall apply mutatis mutandis.



(7) transmission system operator shall without undue delay ensure that

Exchange identification codes used to identify the individual importers

and customers of gas between the operator and the transmission system operator

the market.



section 64



The nomination of the distribution



(1) the nomination of distribution serves the body in the above reserved

capacity at the entry points of the distribution system



and cross-border gas pipeline) at the points after each of the cathode gas in

such form of the operator and the distribution system operators

the adjacent distribution or transmission system operators were able to perform

reconciliation,



(b)) to the amount of reserved capacity at production plants.



(2) the nomination serves to distribute body clearing the above reserved

the capacity of the distribution in the output point of cross-border gas pipeline after

the individual subscriber to the distribution system operator and

operators of neighbouring distribution or transmission system operators were

able to perform the reconciliation.



(3) to take the place of customers and for pass-through space between the

distribution systems, distribution of nominations.



(4) the distribution system operator shall without undue delay ensure that

Exchange identification codes used to identify the individual importers

and customers of gas between the distribution system operator and

the market operator.



section 65



The nomination of warehousing



(1) the nomination of the storage serves the body in clearing information

the system operator of the storage tank after the individual codes

reserved storage capacity up to the amount available in the mining and

vtláčecího performance in such a form, to the operator of a tank of gas and

the transmission system operator to perform the reconciliation.



(2) the nomination serves foreign participant in the storage of information

the system operator of the storage tank after the individual codes

reserved storage capacity up to the amount available in the mining and

vtláčecího performance in such a form, to the operator of a tank of gas and

the transmission system operator to perform the reconciliation.



(3) the operator of a tank of gas without undue delay shall ensure the exchange of

identification codes used to identify the individual reserved

storage capacity between the operator and the operator of gas storage

the market.



Procedures and deadlines for the submission of nominations, transportation, distribution

the storage and the obligation to deliver and the obligation to remove



section 66



(1) the settlement served the nomination of transport, distribution and

storage not later than 14:00:00 hours on the day of the gas

the following natural gas a day.



(2) the nomination of transport at border points, the market operator accepts or

the transmission system operator or a transmission operator of an adjacent

system as the total daily nomination for the gas day or in

breakdown on the individual hours of natural gas a day. In the case that brought

the nomination of the transport is not included in the breakdown on each clock

gas day, the market operator or transmission

system of uniform distribution on each clock gas day.

The resulting values of the distribution of hourly are rounded down to the

the whole kWh, while the difference arising from rounding is added to the

the value of the natural gas in the last hour of the day.



(3) a foreign participant in the term transport is served by the nomination

paragraph 1 in the system, the transmission system operator or

coordinated and uncoordinated transport capacity on border points

the transmission system at the neighbouring transmission system operators.

The foreign party shall transport the nominations referred to in paragraph 1 in the system

the transmission system operator and the nomination procedure of the term

referred to in paragraph 1 in the system operator of the storage tank. The operator

stack gas passes the market operator summary of nominations warehousing

submitted for each foreign participant.



(4) the transmission system operator shall verify the equality of the nominations of the transport

for a foreign participant. In the event that the nominated transport on the entry and


the output of the transmission system to and from a foreign participant yourself

do not match, the transmission system operator of reduction of nominations

According to the priorities, so that the foreign participant in the condition of equality of nominations

transport must meet. Within a priority in the case of multiple nominations

the reduction carried out evenly. Priorities for reduction are the following:



and the nominations are initially shortened) transport in the input or output

the point of the stack gas



(b) transport in the nomination) Consequently, the entry or exit of the border

point.



(5) the market operator shall examine the financial security of all nominations

the subjects of settlement in accordance with the terms and conditions of the market operator and the

the latest in 14:20:00 pm sent to relevant operators of nomination,

that are financially secured and adjusted in accordance with paragraph 6.



(6) in the event that the subject of settlement has submitted the nomination of a financial

ensure for the market operator the market operator, the reduction of nominations

According to the priorities, so that the body meets the financial settlement. In

one priority is the reduction in the case of more nominations done

evenly. Priorities for reduction are the following:



and the nominations are initially shortened) transport stack in the output point

gas,



(b) transport in the nomination) then output the border point and nominations

distribution in the output point of the cross-border pipeline,



(c)) finally nominated the obligation to deliver to trade under a bilateral treaty.



§ 67



(1) the transmission system operator shall carry out the verification of the values of the nominated

and their reconciliation. Through its information system and

the information system of the market operator shall be notified within 16:00:00 hours of the body

Clearing or foreign participant, whether they accepted the nomination and

registered.



(2) if the body or clearing foreign participant shall submit a nomination

as the total daily nomination for the gas day, she splits

the transmission system operator evenly on each clock

gas day. The resulting hourly values shall be rounded

down, and the rest is added to the value in the last hour

gas day. Hourly values shall not exceed the amount of the nomination

transport capacity reserved for the gas day divided by the number of hours

gas day; for the last hour of the day is this the gas

restrictions increased the rest of rounding of values for the previous hour

gas day.



section 68



(1) the subject of settlement shall deliver the commitments and obligations of nomination to remove

not later than 14:00:00 a.m. of the day following the gas on

gas day.



(2) the settlement served the nomination of distribution and warehousing

not later than 14:00:00 a.m. of the day following the gas on

gas day.



(3) the distribution system operators and operators of gas storage

carry out the verification and reconciliation of the values of the nominated, and through

their information systems and the information system of the market operator shall notify the

16:00:00 pm clearing body, whether he accepted their nomination and

registered.



(4) the Operator of the market served the nomination under section 62, paragraph. 4 to 14:20:00 pm.



(5) the Operator of the market served as the clearing of the revised nomination

the obligation to deliver and remove the obligation under section 62, paragraph. 3 (b). and ten)

minutes after the matching of supply and demand made on the organized

Intraday gas market.



Procedures and deadlines for the submission of renominací transport, distribution,

customs warehousing



§ 69



(1) For transport shall be any renominations nominated transport

the subject of settlement and foreign participant at the natural gas a day made

After the deadline referred to in section 66 paragraph. 1.



(2) the clearing and foreign participants can operators

the transmission system operator to submit renominaci.



(3) the market operator shall examine the financial collateral in the market operator to

all submitted renominations body clearing in accordance with the business

the conditions of the market operator, and be sent to the competent operators

renominations that are financially secured. In the event that the body

the showdown has made the financial collateral, the renominations

the market operator of reduction or renominací nominations in the order under section 66

paragraph. 6 to ensure it meets the body of the financial settlement. In the framework of the

one of the priorities in the case of multiple renominací in one priority level

the reduction carried out evenly.



(4) the Renominations of transport referred to in paragraph 2 shall be filed within two hours after

the term pursuant to section 66 paragraph. 1 and each whole hours but not

to 3:00:00 pm gas day, which occurs when two gas days ago

After the gas day, which serves the nominations under section 66 paragraph. 1.



(5) the market operator shall examine the financial collateral referred to in paragraph renominací

3 to 20 minutes after each hour of the following after an hour in which the

was filed. renominations



section 70



(1) the transmission system operator renominaci, if it is brought

in accordance with Annex No 4 to this notice.



(2) the transmission system operator shall notify to the Agency the clearing and

Foreign participant received and registered renominations in two

hours after the deadline the submission under section 69, paragraph renominací. 4. The body

clearing serves as the transmission system operator of the notification of the sentence

the first of this paragraph also through the information system

the market operator.



(3) Renominaci transport at border points, the market operator accepts or

the transmission system operator or a transmission operator of an adjacent

system as the daily renominaci for natural gas a day, or in the

Each clock gas day remaining until the end of the natural gas

of the day.



(4) a foreign participant serves transport in term of renominations pursuant to § 69

paragraph. 4 in the system, the transmission system operator, or

transport capacity at border points in the transmission system at the next

the transmission system operator.



section 71



(1) For renominaci storage and distribution shall be all

the nomination of the storage and distribution of body clearing on natural gas

day made after the deadline under section 68, paragraph. 3.



(2) the accounting of the distribution system operator may

submit to the renominaci distribution and the operators of the gas tank

renominaci storage. Foreign participant the operator may

stack gas present renominaci.



(3) warehousing and distribution of Renominations referred to in paragraph 2 shall be submitted to the

each full hour of the day following the date referred to in section 68, paragraph. 3 and

no later than 3:00:00 pm gas day, which occurs when two

days after the date of the gas, which serves the nominations under section 68, paragraph.

2.



section 72



(1) the operator of a tank of gas and the distribution system operator

renominaci, if it is brought in accordance with Annex No 4 to this

the Decree.



(2) the distribution system operator, or the operator of a tank of gas

the body shall notify the clearing, and also through the information

the system of the market operator, received and registered renominations in two

hours after hours, in the framework of which was filed. renominations



(3) a foreign participant in the term served by renominations

§ 71 paragraph. 3 in the system operator of the storage tank. The operator

stack gas passes the market operator summary renominací storage

submitted for each foreign participant.



section 73



Linking the information systems of the various operators and operator

market



(1) the market operator, operator of the transmission system operators

distribution system operators, and the operators of the gas storage will link its

information systems so that all nominations and renominations transport

the transmission system operator or at the neighbouring

the transmission system operator in case of coordinated or

uncoordinated transport capacity at the border points of the transmission

system, nominations and renominations of the distribution of the operator

the distribution system and the nominations and renominations of the storage

gas storage operator without undue delay, were referred to the

the market operator.



(2) the market operator will allow in its information system to submit nominations and

nominations and renominations of the transport, distribution and nominations and renominations

renominations. Nominations and renominations body clearing

submitted to the information system of the market operator, and duly passed

the market operator competent operators shall be deemed nominated and

renominations transport, distribution or storage of the body

clearing lodged directly by the individual operators.



§ 74



The obligation to deliver and the commitment of renominations remove



(1) the obligation to deliver For renominations and the obligation to remove any

the nomination of the obligation to deliver and the obligation to remove the subject of settlement on the

gas day submitted after the deadline in accordance with section 68, paragraph. 1, no later than

5:00:00 pm calendar day, which occurs two days after the date on which the

the subject of settlement is served under section 68, paragraph nominations. 1.



(2) in the event that the submission deadline to deliver the commitments renominací

and commitments to remove the bodies will not be administered settlement reconciliation

renominací trade under a bilateral treaty, the market operator, filed

renominations does not register.



(3) after the end of each hour, the market operator shall carry out an examination of the financial

ensure all commitments to deliver and remove renominací entities

the showdown. In the event that the subject of settlement has made renominations

financial collateral, the market operator renominations.



(4) the market operator no later than 20 minutes after the end of each hour

shall inform the competent bodies of the accounting information

the system of adoption and registration or rejection of the renominací obligations to deliver and

Remove.



PART SIX



BUSINESS FLUCTUATIONS



Assignment of responsibility for deviation



§ 75



(1) responsibility for the derogation applies to each individual

supply the place of the customer. Responsibility for deviation in sampling locations

You can migrate only one entity accounting, and it directly or

through another registered participant in the gas market.



(2) if it is not to supply the place of the customer assigned to the body of the settlement

responsible for the deviation, the market operator of the market participant


gas referred to in paragraph 1 to redress. In the absence of the assignment

the entity responsible for the clearing of the variance for the customer's consumption location,

the market operator shall proceed in accordance with section 78.



(3) Transfer of responsibility for the derogation provided for in paragraph 1 shall be subject to

consent of the market operator. Application for transfer of responsibility for deviation

referred to in paragraph 1, the Party transferring the gas market

through the information system of the market operator and the accepting

the subject of settlement approved assignment to liability for deviation in

individual sampling site the customer through the information

the system of the market operator. After the approval of the assignment of responsibility for deviation

accepting body clearing and in case sufficient financial

ensure the accepting agency clearing the market operator transfers

responsibility for deviation of body clearing on the accepting entity

the showdown.



(4) Assignment of the responsibility for deviation of the assessed market operator within 60

minutes after the hour, in which the application for the assignment of responsibility for

deviation approved by accepting body clearing through a

the information system of the market operator. The market operator shall immediately inform the

transferring the participant's gas market and the clearing of the accepting entity

the result of the assessment of the assignment of responsibility for deviation. The effectiveness of the

assignment of responsibility for deviation occurs as soon as possible following

the natural gas market the day after the approval of the operator.



§ 76



(1) the responsibility for the imbalance on the input and output point of the virtual

the storage tank shall be borne by the competent body clearing using this item

the transmission system operator or a foreign participant through

the transmission system operator.



(2) the responsibility for the imbalance on the border point of entry and of exit shall be borne by

the competent body clearing using this point of the transmission system operator or

Foreign participant through the transmission system operator.



(3) the responsibility for the imbalance on the input and output point of cross-border

the pipeline or on the point of the downsizing of the gas shall be borne by the competent body of the clearing,

who uses this item or place a distribution or transmission system.



(4) the distribution system operator exposes the way enabling the

remote access and communicate to the market operator allocation rules

individual points of cross-border gas pipelines and gas production points.

The market operator exposes without undue delay to the allocation rules

individual points of cross-border gas pipelines and gas production points

in a manner enabling remote access.



(5) the transmission system operator exposes the way enabling the

remote access and communicate to the market operator allocation rules

the various border points and points of virtual stack gas.

The market operator allocation rules to immediately publish the individual

border points and points of virtual stack gas way

enabling remote access.



§ 77



(1) the total deviation of body clearing can be contractually transferred to another

the subject of settlement. Total transfer derogations subject to settlement

other body clearing is referred to also value the flexibility and

the balance of the account of deviations of the transferring body.



(2) a request for the transfer of the total variance of the transferring body shall

clearing through the information system of the market operator and the

the accepting entity accepts migration settlement total deviation

through the information system of the market operator. After the adoption of the

transfer the total deviation accepting body clearing operator

market shall be assessed within 60 minutes after the hour, in which the application for

transfer the total tolerance adopted accepting body clearing

through the information system of the market operator, the sufficiency of

financial in the accepting entity.



(3) the market operator shall immediately inform the transferring and accepting

the body of the outcome of the assessment of migration settlement total liability

for the variance. In the case of sufficient financial in the accepting

body clearing the market operator transfer the total variance of the body

approves the settlement. If you do not specify a later date settlement bodies

the migration of the total variance, the efficiency of the transfer of the total deviation occurs

the subject of settlement as soon as possible following the natural gas the day after the approval of the

the market operator.



(4) the total deviation of a body which has assumed total

derogation from the other body clearing, cannot be transferred to another

the subject of settlement. Their migration to the total variance between

transferring and accepting the body performs the clearing operator market

at the request of the subject of settlement on the last day of the month, the gas

with the exception of cases related to the termination of activity of the subject of settlement.



§ 78



(1) the expiry of the duration of gas supply as referred to in the sampling points

registered in the information system of the market operator, or on the basis of

request to shorten the supply of gas under section 114 shall cancel the market operator to

requested date of delivery point assignment to suppliers of gas and

the subject of settlement.



(2) in the case of sampling points of the customer, which is not registered in the

the market operator's information system and which will not, after the date of their

the contract of associated gas supply services or a contract for the supply of

the gas for the existing gas supplier is assigned to a new supplier of gas and

clearing body, except in the cases referred to in section 119 paragraph. 4 and request

the customer on the dismantling of the measuring device, the operator

distribution system operator or a transmission system operator to the 23:00:00

hours of the 10th working day before the date on which the termination occurs

the supply of gas to the delivery point of the customer from the current

gas supplier, the registration of the sampling points in the information

the system of the market operator of the date from which it will supply the place

the customer is assigned to any supplier of gas.



(3) in the case of a request for their supplies due to a withdrawal from the contract

According to the § 11a paragraph. 2, 5 and 6 of the Energy Act, the operator shall carry out

distribution system operator or a transmission system operator registration

a sampling of the place referred to in paragraph 2 to 23:00:00 hours of the last

the working day before the date on which the termination occurs in the supply of gas to the

delivery point of the customer from the existing gas supplier.



(4) in the case of identification of the delivery point of the customer, which will be in the

the information system of the market operator for at least one day without

assigned to the contracting entity accounting, market operator in its

information system of this place of consumption a symptom indicating the date, from the

which is not to supply the place of the customer assigned to the supplier of gas and

the contracting entity clearing, if for the sampling site at the same time there is in

the information system of the market operator of the downstream change of supplier.

The assignment of this flag makes the market operator to the end of the tenth

the working day before the date on which the termination occurs in the supply of gas to the

delivery point of the customer from the current vendor. In the case of

shortening the supply requests pursuant to § 114, paragraph. 4 the market operator performs

the assignment of this flag to the end of the last working day before the date of

in which their supply of gas to the delivery point of the customer from the

the parties to the existing gas supplier.



(5) after the assignment of the flag referred to in paragraph 4, inform the operator market

the assignment of a flag to supply the place of the existing

the supplier, an existing body clearing and distribution

system operator or a transmission system operator, which is the place of consumption

the customer is connected.



(6) the distribution system operator or a transmission operator

system of the possibility of unauthorized subscription immediately

a proven way to inform the customer, if for the sampling location

at the same time there is in the market operator's information system change

vendor.



(7) in the event that is to supply the place marked by the flag

paragraph 4 is assigned to the gas supplier and the contracting entity at the date of settlement

named in the flag referred to in paragraph 4, delete the market operator in

the information system of the market operator flag that is assigned to the

supply the place referred to in paragraph 4.



section 79



Assignment of the subject of settlement



(1) the date from which it is not to supply the place of the customer assigned

supplier of gas and the clearing of the contracting entity, supplier of gas for

a sampling of the place designated by a sign under section 78, paragraph. 4, in which the

There is a change of the supplier under section 110, the application for commencement at

the prevention of unauthorized sampling pursuant to § 113 paragraph. 5.



(2) in the event that the change of supplier process under section 110 or process

the start of delivery for the prevention of unauthorized sampling referred to in paragraph 1

successfully completed and the change of supplier is effective no later than the following

the day after the expiry of 10 working days from the date specified in the flag under section

paragraph 78. 4, assigns the market operator to supply the place of the customer's new

gas supplier and a new body of settlement referred to in the application for the change

the vendor or application for the initiation of the supplies in the prevention

unauthorized collection, and this on the day named in the flag, which was

assigned to the place of supply under section 78, paragraph. 4. The market operator

performs the assignment of gas supplier and the operator of settlement only

If the gas is a registered participant in the market with

gas and has to ensure the financial period for the market operator.

The market operator on this assignment shall inform the new vendor, new

body clearing and distribution system operator or

the transmission system operator, and removes the flag that is assigned to the

the place of supply under section 78, paragraph. 4.



(3) the distribution system operator or a transmission operator

system to which it is connected, place of consumption may make on the basis of

for information about assigning body clearing and gas supplier by

paragraph 2 booking distribution or transport capacity for the new

gas supplier in the case of a contract for the supply or hunt

the customer in the case of a separate supply contracts and contracts to ensure

distribution system services or transport of gas from the date when the

assigned to a new supplier of gas and the new body of settlement referred to in paragraph


2. The size of the reserved distribution or transmission capacity is equal to the

the size of the reserved distribution or transportation capacity according to the application

new gas supplier or customer. After the effective date of change

vendor to determine the status of the meter pursuant to § 113 paragraph. 2 and 3 shall be deemed to

day, to which he was assigned to a new supplier of gas and new body clearing

in accordance with paragraph 2.



(4) in the event that there is no change of supplier process under section 110 or process

the start of delivery for the prevention of unauthorized sampling referred to in paragraph 1

successfully completed and the assignment of the subjects of settlement is effective no later than

the next day after the expiry of 10 working days from the date referred to in

flag under section 78, paragraph. 4, the market operator changes in the information system

the market operator flag under section 78, paragraph. 4 on a flag indicating

unauthorized subscription in the sampling site. The market operator on this

really inform the operator of distribution or

the transmission system.



Balance sheet account imbalances and flexibility



§ 80



(1) the deviation clearing body or foreign participant is the difference

between the sum of the quantity of gas allocation to all entry points

the gas system and the sum of the allocations to all output points

the gas system, taking into account the obligation to deliver and remove body

the showdown. The deviation of a body is determined as of the day of reckoning

variance, the variance in the distribution of monthly after each gas

days and monthly variance in the distribution of repair after each

gas days.



(2) the Operator of the market leads for each body clearing or foreign

the participant's account balance. The preliminary value of the balance of the account

derogations for the gas day is the sum of the final value of the balance sheet

account of deviations from the previous gas day and daily deviations

the subject of settlement for the gas day. The final value of the balance sheet

account the derogations for the gas day is the sum of the final value

the balance of the account of deviations from the previous gas day, daily

derogations to the body for the natural gas clearing day and daily

the compensatory amount of body clearing for the gas day.



(3) Each operator of settlement or the transmission system operator in

Foreign participant is provided by the flexibility, the size of

sets the market operator each day for each gas input and

the output point of the gas system in the following way:



and for the customer's consumption location) where the entity is attached to the settlement

responsibility for the imbalance, with flexibility for the relevant gas day

be determined according to annex 5 to this Decree,



(b) point gas production plants), where the entity is attached to the settlement

responsibility for the imbalance, with flexibility for the relevant gas day

be determined according to annex 5 to this Decree,



(c)) for the input point for the border entry point and cross-border gas pipeline

for the entry point of the stack gas for the gas day

the flexibility of body clearing provides in annex 5 to this

the Decree,



(d)) at the border point, output the output point of the cross-border pipeline and

for the exit point of the stack gas for the gas day

the flexibility of body clearing provides in annex 5 to this

the Decree.



(4) if at the border point, the point of the gas at the point

cross-border gas pipeline or gas in the gas production plants point day

allocation rule is used when the value of the nomination or nominations

the distribution is considered to be the value of the delivered, flexibility in the

point in the gas day. For virtual points

the transmission system operator of the virtual body

distribution system and virtual trading point with flexibility

does not provide.



(5) the Allocated value of the flexibility of the body and the foreign settlement

the participant for the gas day is the sum of the individual

parts of the flexibility for individual input and output points

gas system provided in accordance with paragraphs 3 and 4.



§ 81



(1) Each gas shall make available the day the market operator in the term under section

paragraph 102. 2 for each subject, the size of the settlement day derogation

the preliminary allocation of the use of the flexibility, the preliminary value of the balance sheet

account of deviations, the preliminary value of the daily balancing quantity

the allocated value of the flexibility and size flexibility, you can

the subject of settlement flows under section 89. The preliminary value of the daily

the compensatory amount is equal to zero, in the case that the absolute size of the

the preliminary value of the balance of the account of deviations is less than or equal to

the absolute value of the allocated value of flexibility; in other cases, the

the daily value is the amount of provisional countervailing difference

the preliminary value of the balance of the account of deviations and assigned values

the flexibility of the Convention while respecting the dead.



(2) Every day after notification of the results of the natural gas market with spare

flexibility in the term under section 89, paragraph. 3, make available to the market operator for the

the daily amount of compensation each body and the final value of the balance sheet

account of deviations.



(3) Positive daily amount of compensation is the difference between the preliminary

the balancing account imbalances and a maximum value of flexibility; in the case of

that this difference is less than or equal to zero, then it is a positive day

the compensatory amount equal to zero.



(4) the daily amount of Negative compensation is the difference between the preliminary

the balancing account of deviations and the minimum value of flexibility; in the case of

that this difference is greater than or equal to zero, then the negative daily

the compensatory amount equal to zero.



(5) the value of the last registered and confirmed the nomination or

the obligation to deliver or remove renominations on virtual trading point or

the value of the registered and confirmed the nominations or renominations to transport

virtual points of the transmission system operator, is considered

the value of the supplied or removed.



section 82



Business fluctuations in the prevention of a State of emergency throughout

the territory of the Czech Republic because of a lack or surplus of gas in

the gas system



(1) pursuant to this provision, from the following natural gas

the day after the date on which the transmission system operator declared

Prevention of a State of emergency because of a lack or surplus of gas in

the gas system of the Czech Republic.



(2) the transmission system operator shall, in cooperation with the market operator

immediately announces to all entities electronically clearing, foreign

participants through the transmission system operator,

registered participants in the gas market, operators of the distribution

system operators and the operators of gas storage, the following gas

the day will begin daily balancing of trade imbalances in the prevention

a State of emergency.



(3) If on the whole territory of the Czech Republic the State emergency prevention from the

because of the lack of gas in the gas system, not bodies

clearing and foreign participants in the gas day provided by

flexibility over the level in the preceding day gas status in

direction, which should result in an increase to the lack of gas in the gas

the system. All the negative deviation of the day clearing body or

Foreign participant is the daily amount of the adjustment. In the case of

daily deviation clearing in positive body allocates the flexibility and

the daily amount of compensation determined under section 80 and 81.



(4) in the event that it is on the whole territory of the Czech Republic the State of prevention

a State of emergency because of a surplus of gas in the gas system is not

operators of clearing and foreign participants in the gas day

above the level of flexibility provided by the State in the previous gas

the date in the direction that would result in an increase in the surplus of gas in

the gas system. All positive daily deviation clearing body

or a foreign participant is the daily amount of the adjustment. In the case of

negative daily deviations of the entity is assigned by the flexibility and

the daily amount of compensation determined under section 80 and 81.



section 83



Business fluctuations in States of emergency on the whole territory of the Czech

the Republic because of a lack or surplus of gas in gas

System



(1) pursuant to this provision, from gas day, in

where the transmission system operator declared a State of emergency because of the

lack or excess of gas in the gas system of the Czech Republic.



(2) the transmission system operator shall, in cooperation with the market operator

immediately announces to all entities electronically clearing, foreign

participants through the transmission system operator,

registered participants in the gas market, operators of the distribution

system operators and the operators of gas storage that is declared a State of emergency from the

because of lack or excess of gas in the gas system.



(3) in the event that it is on the whole territory of the Czech Republic, a State of emergency because of the

the lack of gas in the gas system



and clearing and foreign entities) the participants in a given gas

the date does not provide the flexibility,



(b)) body clearing and foreign participant, who have a negative

the initial value of the balance of the account of deviations, have the obligation to compensate

the value of the balance of the account of deviations in the gas a day to zero;

about this application increases the value of the obligation to deliver gas to the body

clearing and external participant; all of the resulting daily deviations are

daily balancing quantity and financial compensation are dealt with

the market operator,



(c)) body clearing and foreign participant, who have a positive

the initial value of the balance of the account of deviations, have the obligation to comply with the

equality of supply and consumption of the gas system, i.e., zero day

the derogation; all of the resulting daily deviations are the daily balancing

the amount of financial compensation and are treated with the market operator; the status of the

the balance of the account will be subject to the derogations of clearing or foreign

the following day the participant restored natural gas after the end of State of emergency

due to the lack of gas in the gas system.



(4) in the event that it is on the whole territory of the Czech Republic, a State of emergency because of the

surplus gas in gas system



and clearing and foreign entities) the participants in a given gas


the date does not provide the flexibility,



(b)) body clearing and foreign participant, who have a positive

the initial value of the balance of the account of deviations, have the obligation to compensate

the value of the balance of the account of deviations in the gas a day to zero;

about this application increases the value of the commitment to remove the throttle body

clearing and external participant; all of the resulting daily deviations are

daily balancing quantity and financial compensation are dealt with

the market operator,



(c)) body clearing and foreign participant, who have a negative

the initial value of the balance of the account of deviations, have the obligation to comply with the

equality of supply and consumption of the gas system, i.e., zero day

the derogation; all of the resulting daily deviations are the daily balancing

the amount of financial compensation and are treated with the market operator; the status of the

the balance of the account will be subject to the derogations of clearing or foreign

the following day the participant restored natural gas after the end of State of emergency

due to a surplus of gas in the gas system.



§ 84



The delivery of two or more suppliers of gas to one delivery point



(1) the customer may have one or more of the contracting of suppliers of gas.



(2) a body which is not in the sampling point assigned as

the entity responsible for the clearing of the derogation is to supply

customer delivery point by passing gas clearing body responsible

for the imbalance in the sampling site at the virtual trading point on the basis of the

the mutual contractual arrangement between the gas suppliers and the customer.



§ 85



Financial payment settlement entities



(1) the operator shall provide the market clearing financial collateral

payments to cover the foreseeable risks associated with

the activities of the subject of settlement. Financial collateral payments uses operator

the market to cover the risks associated with the delivery and collection of gas, settlement

derogations to the commitments to deliver at the virtual trading point, with shops

concluded on the organized short-term market, and in addition MEPs debated with the transport and

the distribution of the output points of the gas system. To the above

financial collateral payments are included also the obligations of the market operator to

the subject of settlement.



(2) if the entity does not have sufficient financial settlement payment for

Register of trade, the market operator does not register such a trade.

Refusal to register a trade, the market operator shall notify without undue

delay the subject of settlement.



(3) in the case of a refusal to register the trade referred to in paragraph 2 or in the

the case of the reduction of transport and distribution of nominations to the output points

gas system under section 66 paragraph. 6 the operator shall inform the market about this

the fact that the subject of settlement.



PART SEVEN



SHORT-TERM MARKET



§ 86



The short-term market, its organization and its settlement



(1) the market operator organizes short-term market in the form of intraday market

with gas and unused flexibility.



(2) short-term market can participate in the accounting entity only.



(3) the Shops on short-term market referred to in paragraph 1 are to each

anonymous.



§ 87



Intraday gas market



(1) intra-day market is organized within the gas day and can be

to enter and receive bids for the supply of gas for the basic subscription or

product ^ 14). Place of delivery and place of gas sampling is a virtual business

point. As a result of trades on the intraday market is the destination of the agreed

supplies, subscriptions and gas prices.



(2) the intraday market for natural gas the day is organized by 9:00:00 pm

the previous calendar day until 5:00:00 hours of the following

the calendar day.



(3) the Demand of a body means clearing the required quantity to purchase

the gas for the gas day. Range of body clearing means

the required amount for the sale of gas for the gas day.



(4) the minimum quantities of gas to

Intraday gas market is 0.1 MWh. Quantities or

push the gas to the gas market intraday served body clearing

in MWh with resolution to 1 decimal place.



(5) the market operator registers the data of the agreed quantities of gas

the individual subjects of settlement as the nominated gas trading on

intraday market.



(6) within 10 minutes after the conclusion of the trade in the framework of intra-day market adjusts the

the market operator total agreed quantity of gas for the obligation to deliver and

remove the obligation under the nominated gas trading on intraday

the organized market for the relevant gas day. Remove the obligation to

means the portion of the settlement satisfied the demand of the body referred to in paragraph 3

the first sentence, the obligation to deliver the means satisfied part of the offer of the body

the clearing referred to in paragraph 3, second sentence.



(7) to the 13:00:00 a.m. of the day following the date on which the gas operator

the market shall publish in a way that allows remote access from the quantity of gas

made by the shops and the weighted average of the price of gas for the

the natural gas a day to the intra-day market, where the weights are quantities

applicability of gas.



section 88



The index of the short-term market



The market operator every day not later than on the date the natural gas under section 102

paragraph. 2 publish, in a manner enabling remote access index

the short-term market for the previous natural gas a day. Procedure for determining the index

the short-term market is given in annex 6 to this Ordinance.



§ 89



The market for unused flexibility



(1) the market operator organizes the market with unused flexibility for each

the preceding day gas.



(2) the market for unused flexibility every day from natural gas

13:00:00 to 13:45:00 pm. In the event that the operator is

disagreement with the results of the daily market evaluation of the derogations referred to in § 102

paragraph. 6, the market operator shall notify the individual subjects of settlement new

the deadline for the opening of the market in spare flexibility, but not later than

16:00:00 hours the same day.



(3) the market operator shall notify the results of market with unused flexibility

13:55:00 pm, in the event of a delayed opening the market with spare

flexibility within 10 minutes after the end of untapped market flexibility. After

the announcement of the results of the market with unused flexibility to each participant

the market operator shall publish in a way that allows remote access to the offer and

demand curves, the amount of made deals on the market with spare

flexibility and achieved the award for the unused flexibility in the gas

the date.



§ 90



Financial settlement of trades on the intraday market with gas



The market operator to announce in terms under section 87, paragraph. 7 each participant

Intraday gas market the following information:



and the obligation to deliver and the size) of the commitment to remove the resulting from the

applicability of the quantity of gas in MWh with resolution to 1 decimal place,



(b)) formal price in EUR/MWh for individual stores,



(c) payment for the agreed volumes) subscriptions to gas and gas supply contracted in

€.



PART EIGHT



NATURAL FLUCTUATIONS



§ 91



(1) transmission system operator shall, in cooperation with the operators

distribution system provides natural gas balancing

the system.



(2) the activities of the transmission system operator relating to the actual

or the expected imbalances of the subjects of settlement netting shall be construed as

countervailing actions.



(3) the transmission system operator to the physical balancing of deviations

uses compensatory action. Countervailing actions carried out by the operator

the transmission system buying and selling gas on the intraday market

gas or using compensatory services.



(4) for the purpose of physical settlement of fluctuations, the market operator

establishes and leads the account operator. The size of the account operator

keeps track of the market operator. The market operator exposes the current state of the account

the operator within 10 minutes after his change.



(5) the market operator adjusts the account operator for the nomination of the undertaking

Add and remove the obligation under section 62, paragraph. 4 and the nomination of the compensatory actions

on the virtual point of the transmission system operator.



section 92



The level of the account of the operator and the remedial action



(1) in the event that it allows the current operational state of the gas

system, the transmission system operator does not perform any balancing

the action, if the size is greater than the value of the account of the operator referred to in

Annex 7, point 1 and less than the value referred to in point 7 of Annex No. 2 to the

This Decree.



(2) in the event that after filing nominations under section 62, paragraph. 4 does not reach

the value of the account value of the operator referred to in annex 7, point 1, to the

This Decree, the transmission system operator can perform buffer

Try buying gas on the intraday market, and the procedure referred to in

Annex No. 7 of section 3 of this Decree.



(3) in the event that after filing nominations under section 62, paragraph. 4 exceeds the

the value of the account of the operator specified in annex 7, point 2 to

This Decree, the transmission system operator can perform buffer

action by selling gas to the intra-day market, and the procedure referred to in

Annex 7, point 4 of this Decree.



(4) in the event that after filing nominations under section 62, paragraph. 4 does not reach

the value of the account of the operator specified in annex 8, point 1, to the

This decree or, in the case that the expectations of the transmission

system are such that the value of the account operator will not achieve

the values specified in annex 8, point 1 to this notice, the operator

the transmission system operator shall make compensatory action by buying gas on the

intraday market. In the event that you cannot perform the remedial action

through organized intraday gas market, is the priority

countervailing actions set out in annex 8 paragraph 6 of this Decree.



(5) in the event that after filing nominations under section 62, paragraph. 4 exceeds the

the value of the account value of the operator referred to in point 8 of Annex No. 2 to the

This decree or, in the case that the expectations of the transmission

system are such that the value of the account operator exceeds the value

referred to in annex 8, point 2 to this Decree, the operator of a trucking

the system executes the compensatory action by selling gas to the intra-day market.

In the event that you cannot perform the remedial action through the

organized intraday gas market, is the priority of the compensatory

the actions set out in annex 8 paragraph 6 of this Decree.




(6) the transmission system operator shall publish within 60 minutes from the implementation of the

countervailing actions through the information system of the market operator

information about the buffer action in the scope specified in the annex

No 9 to this Decree.



§ 93



The procedures for establishing the unit price for the daily amount of compensation



(1) the unit price for a positive amount in the buffer of the day

gas day shall be determined under the procedure referred to in annex 10 to this

the Decree.



(2) the unit price for the negative amount in the buffer of the day

gas day shall be determined under the procedure referred to in annex 10 to this

the Decree.



(3) For the unit prices referred to in paragraphs 1 and 2 shall in case of need

their transfer to the CZK/MWh rate uses the Czech vyhlašovaný

the National Bank for the day, to which the unit price of the set; If

the daily rate is not available, the value in the

immediately preceding the date when the value of the daily rate

published.



§ 94



Account of neutrality



(1) the market operator records the account of neutrality as a separate revenue and

expenses associated with the settlement of the daily balancing the amount of bodies

clearing and the revenue and expenditure connected with the transmission system operator

countervailing actions on the basis of the information referred to in section 92, paragraph. 6.



(2) the transmission system operator shall make the last day of the year

procedure in accordance with article 92, paragraph. 2 or 3 buffer action

balances as of the last day of the calendar year of the gas account

operator to zero. The compensatory action shall be carried out in

If the condition is satisfied in accordance with § 92 paragraph. 1.



PART NINE



RANGE, DATA TRANSMISSION AND PUBLICATION DATES AND BILLING OF SUPPLIES

GAS AND OTHER SERVICES



section 95



Transmission distribution system operator



(1) each calendar day no later than 12:00:00 pm passes

the distribution system operator by the market operator

the information system of the market operator for the preceding day gas



and the daily gas supply allocation) on points of cross-border gas pipelines after

each of the entry points, the individual subjects of settlement in

the distribution of individual importers with their designation,



(b) the daily gas supply allocation) from the production of gas in the distribution points after the

each of the points and after gas generating stations of the individual bodies

clearing,



(c) the daily supply and value) of gas in transfer between locations

distribution networks; the data sent by the distribution system operator,

who runs the measuring device,



(d) the allocation of gas daily) on the points of cross-border gas pipelines after

each output points of individual subjects of settlement in

the distribution of individual customers with details of their designation,



e) daily gas consumption in places customers with measurement

Type A,



(f) a distribution capacity reserved) values in the sampling areas

customers with the measurement of type A and B,



(g) the value of the custom of the day) of gas consumption,



h) daily value changes of accumulation,



I checked out the distribution capacity) value of manufactured gas, points

each of the points and after gas generating stations of the individual bodies

clearing,



j) values reserved fixed and interruptible capacity in distribution

points of cross-border gas pipelines after each input and output

points and individual subjects of settlement.



(2) not later than 12:00:00 pm 9th calendar day, not later than

However, until 12:00:00 hours of the sixth working day of the month, gas

the distribution system operator shall send the market operator in the distribution for

the individual days of the previous month's gas natural gas



and gas supply allocation) monthly on the points of cross-border gas pipelines after

each of the entry points, the individual subjects of settlement in

the distribution of individual importers with their designation,



(b) the allocation of gas supply) monthly from the production of gas in the distribution points after the

each of the points and after gas generating stations of the individual bodies

clearing,



(c) the supply and value) with monthly donations of gas transfer places between

distribution networks; the data sent by the distribution system operator,

who runs the measuring device,



(d) the allocation of gas) monthly on the points of cross-border gas pipelines after

each output points of individual subjects of settlement in

the distribution of individual customers with details of their designation,



(e)) the monthly value gas offtake customer in places with the measurement

Type A and B,



(f) a distribution capacity reserved) values in the sampling areas

customers with the measurement of type A and B,



(g) the value of the custom) monthly gas consumption,



h) monthly value of changes of accumulation,



I checked out the distribution capacity) value of manufactured gas, points

each of the points and after gas generating stations of the individual bodies

clearing,



j) values reserved fixed and interruptible capacity in distribution

points of cross-border gas pipelines after each input and output

points and individual subjects of settlement,



the monthly value of the gross calorific value) in the distribution system.



(3) Correction data values passed in accordance with paragraph 2 shall forward

the distribution system operator the market operator no later than three

calendar months after the deadline referred to in paragraph 2.



(4) not later than the fourth calendar day before the beginning of the following

calendar month to 12:00:00 hours, the operator sends the distribution

the market operator system



and the projected values reserved) distribution capacities in

the sampling locations with the measurement of type A and B,



(b)) the values planned monthly gas consumption in the sampling locations

customers with the measurement of type B, valid from the first day of the following month

for the following 3 months in all sampling locations of customers.



(5) the information referred to in paragraphs 1, 2 and 3 shall make available to the market operator operator

the showdown, which the data refer, no later than 60 minutes after their

receipt. The subject of settlement may be in the information system of the market operator

make these data and another registered market participant with

gas.



(6) If there has been a change in the distribution network of the supplier in any

sampling place customer, paragraphs 1 to 5 shall not apply.



section 96



Transmission and publication of the data transmission system



(1) each calendar day no later than 12:00:00 pm passes

the transmission system operator the market operator for the previous

gas day



and the daily gas supply allocation) at border points after each

input and output points of individual subjects of settlement and

foreign participants in the breakdown by individual importers and

customers with an indication of their designation,



(b) the daily gas supply allocation) of individual subjects of settlement and

foreign participants on the points after each of the gas storage

entry and exit points and each of the reserved codes

storage capacity,



(c) the daily gas supply allocation) from the production of gas attached to points

a transmission system in the distribution of individual production of gas and points

After each settlement, bodies



d) daily gas in pass-through or summary

transfer points between the transmission and distribution networks,



e) daily gas consumption in places customers with measurement

type and directly connected to the transmission system



(f) the daily average value) of the gross calorific value on entry to each

the distribution network is connected to the transmission system



g) daily gas supply allocation for the action of the operator

the transmission system in a virtual point of the transmission system operator

for compensatory action,



h) daily gas supply allocation, the transmission system operator in

virtual technical point of the transmission system operator,



I) daily gas supply allocation, the transmission system operator in

virtual production point of the transmission system operator,



j) reserved a fixed capacity reserved interruptible capacity on

border points after each entry and exit points,

the individual subjects of settlement and foreign participants



the amount of the allocation mode) border points after each

input and output points



l) reserved fixed reserved capacity, interruptible capacity

the individual subjects of settlement and foreign participants at the points

gas storage after each entry and exit points,



m) allocation regime followed on the points after each of the gas storage

input and output points



n) reserved capacity in the collecting places customers directly connected

to the transmission system



about the reserved values) transport capacity of gas generating stations, points

each of the points and after gas generating stations of the individual bodies

the showdown.



(2) not later than 12:00:00 pm 9th calendar day, not later than

However, until 12:00:00 hours of the sixth working day of the month, gas

passes to the transmission system operator the market operator in the distribution for

the individual days of the previous month's gas natural gas



and gas supply allocation) monthly on the border points after each

input and output points of individual subjects of settlement and

foreign participants in the breakdown by individual importers and

customers with an indication of their designation,



(b) the allocation of gas supply) the monthly individual subjects of settlement and

foreign participants on the points after each of the gas storage

entry and exit points and each of the reserved codes

storage capacity,



(c) the monthly gas values) in the forward points or summary

transfer points between the transmission and distribution networks,



(d) the monthly gas values) in the collecting places customers directly

connected to the transmission system



(e) the allocation of gas supply) monthly from the production of gas attached to points

a transmission system in the distribution of individual production of gas and points

After each settlement, bodies



f) average value of gross calorific value in a transmission system,

g) monthly allocation of gas supply for the compensatory



the action by the transmission system operator on the virtual point

the transmission system for compensatory action,




h) monthly allocation of gas transmission system operator in

virtual technical point of the transmission system operator,



I) monthly allocation of gas transmission system operator in

virtual production point of the transmission system operator,



j) reserved a fixed capacity reserved interruptible capacity on

border points after each entry and exit points,

the individual subjects of settlement and foreign participants



l) reserved fixed reserved capacity, interruptible capacity

the individual subjects of settlement and foreign participants at the points

gas storage after each entry and exit points,



n) reserved capacity in the collecting places customers directly connected

to the transmission system



about the reserved values) transport capacity of gas generating stations, points

each of the points and after gas generating stations of the individual bodies

the showdown.



(3) Correction data values passed in accordance with paragraph 2 shall forward

the transmission system operator the market operator no later than three

calendar months after the deadline referred to in paragraph 2.



(4) not later than the third day before the beginning of the following calendar

calendar month to 12:00:00 pm passes the transmission

the system operator of the market implied values reserved transmission

capacity in all sampling locations of customers directly connected to the

transmission system valid from the first day of the following month.



(5) each calendar day no later than 12:00:00 pm passes

the distribution system operator transmission system operator for

the preceding day gas accumulation value changes.



(6) the information referred to in paragraphs 1, 2 and 3 shall make available to the market operator operator

the showdown, which the data refer, no later than 60 minutes after their

receipt. The subject of settlement may be in the information system of the market operator

make these data and another registered market participant with

gas.



§ 97



The transmission of data for the sampling space with the measurement of type C or CM



(1) no later than 12:00:00 pm 9th calendar day, not later than

However, until 12:00:00 hours of the sixth working day of the month, gas

the distribution system operator shall send the market operator for the

the previous natural gas a month



and the actual value of the gas) in the collecting places customers with

the measurement of type C or CM, who changed gas supplier, was

They executed and verified in the previous months reading gas and natural gas

the date of deduction of gas, class diagram, a type of delivery and the value of the planned

annual gas consumption,



(b)) change the diagram type class supplies and planned annual consumption

gas for those customers who have changed gas supplier, if they

There has been a change in the nature of the sampling space or change the planned annual

gas consumption and gas reading has not been performed,



(c)) the value of the total planned annual consumption for each class

load profiles for all deliveries take place customers with measurement

type C or CM in competent distribution network, who changed the vendor

gas, valid on the last day of the relevant natural gas calendar

of the month.



(2) the distribution system operator shall communicate by 15. December

the market operator of the planned percentage of loss in the following calendar

the year after each of the distribution networks. Distribution operator

system may planned percentage of losses in the current calendar year

Update, and not later than the fifteenth calendar day of the month

the previous month, from which to pay for updated planned

the percentage of the loss. Operator of the market value of the planned percentages of losses without

undue delay, publish, in a manner enabling remote access.



(3) to 12:00:00 pm 9th calendar day, but no later than

12:00:00 hours of the sixth working day, the gas month passes

the distribution system operator the market operator for the previous

the natural gas a month all the particulars referred to in annex 11 of this Decree for

the previous natural gas a month for sampling the place where change has occurred

gas supplier.



(4) the market operator shall make available the information submitted by the operator, the distribution

system referred to in paragraph 3 for the sampling location no later than 24 hours after the

their receipt of the suppliers of gas and all the parties concerned.



(5) the Operator of the market every day, no later than 13:00:00 pm makes in

its information system the daily values of the gas sampling in the sampling site

a customer who changed gas supplier, suppliers of gas and all

settlement to the parties concerned. At the consumption points with the measurement type, and the

make available the values sent in accordance with section 95, paragraph. 1 (a). e) or section 96 paragraph.

1 (a). (e)) at the consumption points with the measurement of type B, the market operator shall publish the

replacement value determined in accordance with § 101 paragraph. 2. At the consumption points with

the measurement of type C or CM are published daily summary values for groups

offtake points body posting in the appropriate network classification and class

type of supply diagram. For the daily value of the gas shall be considered

the value specified by the market operator under § 99 paragraph. 6.



(6) the Operator of the market no later than the 11th day of each calendar month to the

12:00:00 pm available in the information system for the consumption location

a customer who changed gas supplier, suppliers of gas and all

the parties concerned of the actual value of the measurement of the settlement for the previous

month for each individual gas day.



(7) If not in the distribution network to change gas supplier on the

no sampling place customer, paragraphs 1 to 6 shall not apply.



§ 98



(1) Correction data values sent pursuant to § 97 paragraph. 1, § 95 paragraph. 2 and section

paragraph 96. 2 sends the distribution system operator, and the operator

the transmission system operator to market no later than three calendar

months after the deadline referred to in § 97 paragraph. 1.



(2) the provisions of § 97 paragraph. 3 and 4, shall apply for the correction data values

mutatis mutandis.



(3) If not in the distribution network to change gas supplier on the

no sampling place customer, paragraphs 1 and 2 shall not apply.



Evaluation subscriptions with the use of load profiles in collecting supplies

locations of customers with the measurement of type C or CM



§ 99



(1) Type supply diagrams are used as a replacement method

gas sampling in collecting customer locations with the measurement of type C or CM.



(2) the Operator of the market based on the data provided by the operators of the

distribution system supplies the diagrams normalized type valid for

the whole gas system for each class of load profiles

delivery and throughout the calendar year.



(3) the shipment of type Class diagrams are listed in annex 12 to this

the Decree.



(4) the distribution system operator assigns individual class

load profiles to customer deliveries of the sampling points with the measurement type (C)

or CM when connecting the sampling gas equipment of the customer, when you change the

the nature of the sampling space and change the planned annual gas consumption.

Each supply is set for a given period only one

type supply diagram. The assignment of a class diagram to supply a type

the place of supply shall be carried out in accordance with annex 12 to this Decree.

Characters of offtake points for these purposes are listed in annex 13 to the No.

This Decree. The distribution system operator keeps records

assigning classes to load profiles supplies at least for the period of the past

3 years.



(5) the Operator calculates the gas market referred to in paragraph 6 for the sampling

instead of the customer with the measurement of type C or CM for gas a day for determination of the

daily values of the gas sampling, the monthly values of the gas in the distribution

on each of the days of the monthly gas and adjusting the values of the gas sampling

in the distribution of the individual gas days ago.



(6) calculation of gas sampling for the place of consumption of the customer with the measurement type (C)

performed by the market operator or CM of the size of the planned annual consumption in the

sampling location, the daily value of the equivalised type

diagram of the supply and correction for residual sampling in the relevant diagram

the gas network in accordance with annex 14 to this Decree. The calculation of the subscription

the gas is carried out separately for the determination of the daily values of the gas sampling,

the monthly values of the gas in the gas distribution to individual days

and the adjustment of the monthly values of the gas in the distribution to individual

natural gas for days. Set values are treated as values

gas customers with type C or CM measurements for the determination of the

daily deviations, the monthly deviations and corrective monthly deviations

the individual subjects of settlement.



§ 100



(1) the planned annual gas consumption in the sampling locations of customers with

the measurement of type C or CM establishes the distribution system operator

the procedure referred to in annex 15 to this Decree.



(2) the residual graph in the appropriate distribution network provides

the market operator for each gas a day in accordance with annex 14 to

This Decree.



(3) the residual sampling for each diagram gas day rozpočítává

the market operator to take the place of the customer with the measurement of type C or CM after

individual classes of load profiles by using correction supplies

the residual subscription in the relevant diagram gas network according to annex No.

14 to this Decree. Correction of the shared at all sampling sites with

the measurement of type C or CM in competent distribution network.



(4) the Adjusted type diagram provides the market operator of the normal

a type of diagram according to the current climatic conditions. If not for the

calculated type diagram supply available values of the actual

the climatic conditions, the value of the last known predictions

climatic conditions for the relevant gas day.



§ 101



Evaluation subscriptions using the replacement values for measurement type (B)



(1) the replacement value for the measurement of type (B) applies, the market operator for the

determination of gas sampling in collecting customer locations with the measurement type (B)

for a daily evaluation of deviations and the determination of the daily value of the subscription

gas. For the monthly assessment of the derogations and monthly values of collection

gas in the distribution of gas and on the individual days of the monthly adjustments

the values of the gas in the gas distribution to individual days


use the actually measured value of gas sampling in the sampling site.



(2) for a daily assessment of the derogations apply to delivery locations

customers with the measurement of type B, the market operator for the determination of the allocation of the day

for the settlement of imbalances estimate daily gas consumption determined as a proportion of

planned monthly gas consumption and the number of days in the calendar month. In

If the planned monthly gas consumption is not available, the

the market operator estimate computed as the average of the actual values for the

the last known 4 gas days of the same name that is stored in the system

the market operator. If the market operator in the system has not saved any

the actual value, the market operator shall determine the allocation of the value of the day

calculated as the 66% distribution capacity reserved converted to

the energy unit of the value of the gross calorific value of 10.647 kWh/m3.



Publication of the data by the market operator



§ 102



(1) the market operator exposes no later than 1 calendar month before the first

natural gas on the day of the calendar year:



and the normalized type supply diagrams) valid throughout the calendar year,



(b)) normal climatic conditions valid for the entire calendar year.



(2) the market operator exposes no later than 13:00:00 hours of the gas

of the day:



and supply diagrams), calculated type valid for previous gas

day,



(b) the residual value of the day) individual diagrams of distribution networks

for the previous natural gas a day,



c) daily rates of residual individual distribution diagrams

networks for the previous natural gas a day,



(d)) of the actual climate conditions for previous gas day

provided by the Czech Institute of hydrometeorologickým; in the event that the actual

the climatic conditions are not known, the value of the last known

predictions of climate conditions for the relevant gas day,



(e)), calculated on the following type diagrams 7 delivery of natural gas

days on the basis of predictions of climatic conditions,



(f)) the first updated values passenger load profiles supplies

on the ongoing natural gas a day, on the basis of the updated predictions

climatic conditions provided by the Czech Institute of hydrometeorologickým; in

If the first updated the climatic conditions are not known,

uses the value of the last known predictions of climatic conditions for

the relevant gas day,



g) estimated consumption measurement type (B) in each of the distribution

networks the following 3 gas days ago



(h)), the total allocation of donations focus type and gas networks

the previous day, natural gas



I) size and direction of the system imbalance.



(3) the market operator exposes no later than 23:00:00 hours of the gas

the other day the updated value passenger load profiles

the natural gas supply for the current day on the basis of the updated

predictions of climatic conditions provided by Czech hydrometeorologickým

the Institute; in the case that the second updated the climatic conditions are not

known, the value of the last known climate predictions

the conditions for the relevant gas day.



(4) the Operator market exposes no later than 12:00:00 pm on the 11th

the calendar day of the month:



and the monthly residual value) of each distribution network diagrams

After each of the previous days of gas gas

of the month



(b)) the monthly residual coefficients of individual distribution diagrams

networks for individual days of the previous natural gas natural gas

of the month



(c) adjustments to residual value) of the monthly individual diagrams.

After each distribution networks of gas days of the gas

the month preceding the month 4 gas



(d) adjustments to residual coefficients) monthly individual diagrams.

After each distribution networks of gas days of the gas

the month preceding the month 4 gas.



(5) the market operator shall make available the results of the daily assessment of the derogations

each body clearing and foreign participant through

the transmission system operator and, where appropriate, other bodies of the clearing

to familiarize yourself with the following information, that makes each

the natural gas the day before 13:00:00 for the gas day

previous gas day:



and the daily deviation)



(b) allocation and daily difference) nominations at the border point, and the point

cross-border gas pipeline with the resolution of the individual gas importers,



(c) the allocation and daily difference) nominations to the point of virtual stack gas

with a resolution of individual codes reserved storage capacity,



(d) the allocation and daily difference) nominations for the delivery point or the summary

transfer seats to downsizing of the gas,



e) allocated to value flexibility,



(f) the provisional allocation of use flexibility),



(g) the balance of the account value) provisional derogations,



(h) the preliminary value of the daily balancing) quantity



and flexibility, the size) may subject the clearing or foreign

the participant through the transmission system flows

on the market with untapped flexibility under section 89.



(6) every day until 13:30:00 pm clearing or foreign body may

the participant through the transmission system operator to send

the market operator disagreement with the results of the daily assessment of the derogations for

preceding day gas referred to in paragraph 5. The market operator shall take

disagreement with the results of the daily evaluation of imbalances from the body only

Clearing or from a foreign participant through the operator

the transmission system, which on the basis of the notification referred to in paragraph 5 has been

set preliminary countervailing value of the daily quantity different from

zero, or whose daily deviation pursuant to paragraph 5 (a). and) is greater than the

3 000 MWh. In the event that the market operator evaluates brought on disagreement with the

the results of the daily evaluation of imbalances as a legitimate, shall notify not later than

16:00:00 hours the same day, the individual subjects of settlement and

foreign participants through the transmission system operator

the new deadline for the publication of the data referred to in paragraph 5.



section 103



(1) the Operator of the market reversed and addressing financially clearing body

or a foreign participant through transmission

the daily amount of compensation system. The market operator settles with clear and

transmission system operator revenue and expenditure for compensatory day

the amount received from the subjects of settlement or foreign participants

through the transmission system operator or paid

operators of clearing foreign participants through

the transmission system operator.



(2) the Operator shall make available to each body market clearing and foreign

the participant through the transmission system operator and, where applicable,

other subjects of settlement to familiarize yourself with the following information

each gas a day by 13:55:00 pm gas day

the previous day the replacement gas, where appropriate, the term, if the

the sending of disagreeing with the results of the daily assessment of the derogations referred to in § 102

paragraph. 6:



and the allocation of the use of flexibility)



(b) the balance of the account value) the derogations,



(c) the daily amount of the countervailing value).



(3) the market operator shall make available the results of the monthly assessment of the derogations

each body clearing and foreign participant through

the transmission system operator and, where appropriate, other bodies of the clearing

to familiarize yourself with the following information, no later than 12:00:00 pm

on the 11th day of the month following gas natural gas:



and monthly deviation in the Division) for each gas days ago



(b) allocation and difference) the monthly nominations at the border point, and the point

cross-border gas pipeline with a resolution after the individual importers or

gas gas customers and the individual days,



(c) the monthly difference and allocation) nominations to the point of virtual stack

After the resolution of the individual gas codes reserved storage

capacities and individual gas days



(d) the monthly difference and allocation) nominations for the production of gas after points

the individual points of the production of gas.



(4) on the day of the notification referred to in paragraph 3 not later than 15:00:00 a.m. of may

body clearing or foreign participant through

the transmission system operator the market operator to send the object to the

the results of the monthly assessment of the derogations for the previous natural gas

month pursuant to paragraph 3. The market operator accepts the disagree with the results of the

monthly evaluation of imbalances from the body only clearing or

Foreign participant through transmission

the system, which is in the gas day difference between the variances in

daily and monthly evaluation of deviations of more than 3 000 MWh.

the operator evaluates the market brought on disagreement with the results of the monthly

evaluation of deviations as legitimate, shall be notified by no later than 18:00:00

hours of the same day, the individual subjects of settlement and foreign

participants through the transmission system operator, the new term

for the publication of the data referred to in paragraph 3.



(5) the market operator shall make available the results of the correction of the monthly assessment

deviations of each body clearing and foreign participant

through the transmission system operator and, where applicable, other

participants in the gas market to familiarize yourself with the following information by

make available no later than 12:00:00 am on the 11th of the gas

the following day, three months after the date of the gas referred to in paragraph 3:



and monthly deviation in repair) for each gas days ago



(b) the monthly difference) allocation and nomination at the border point, and the point

cross-border gas pipeline with a resolution after the individual importers or

gas gas customers and the individual days,



(c) the monthly difference) allocation and nomination to the point of virtual

the gas tank with a resolution of one of the reserved codes

storage capacity and individual gas days



(d) the monthly difference) allocation and nomination points after gas generating stations

the individual points of the production of gas.



section 104



The evaluation and settlement of the differences between values according to the type

diagrams of power supply and the actual values




(1) when the use of load profiles supply arises, the difference between the value of the

specified by this method and the true value of consumption in the

the sampling location. Evaluation and accounting for these differences, the subjects

clearing the market operator carries out in monthly cycles.



(2) the actual value of the consumption in the sampling spot measurement

type C or CM divide the market operator to each gas days

in the period, to which the real value of consumption by the procedure

in accordance with Annex 17 to this Decree.



(3) the market operator carries out the evaluation of the differences between the values of the actual

gas consumption divided in accordance with paragraph 2 and calculated values

gas sampling in accordance with § 99 paragraph. 6 for the monthly values of the gas sampling in

the distribution of individual gas days.



(4) the market operator sums the differences referred to in paragraph 3 for all customers

the competent body clearing and these differences will be charged body

the showdown for the arithmetic average of the daily values of the index of short-term market

established in accordance with annex 6 to this Ordinance for gas a month,

which are the differences.



(5) for the relevant calendar month are charged the differences referred to in paragraph 4

in the distribution of individual distribution networks to charge with the opposite

the subject of settlement on the integer, which in the relevant distribution network

has been delegated responsibility for deviation for customers who have not changed

gas supplier.



(6) each calendar month, not later than the fourteenth calendar day of the

12:00:00 hours, the market operator makes available in the information system operators

clearing, settlement, where appropriate, other entities authorized to

with these data, the evaluation of the statement of the differences between the values of the

the actual gas consumption in the distribution referred to in paragraph 2 and the calculated

the values of the gas sampling in accordance with § 99 paragraph. 6.



(7) if the sampling points for the measurement of the customers with type C or CM

sent to the distribution system operator corrective value deduction

gas under section 98, the market operator no later than the fourteenth calendar

day 12:00:00 of the fourth month following the month in the

which was made for the deduction under § 97 paragraph gas. 1 (a). (c)), the clearing

the differences referred to in paragraphs 2 to 5 and these values shall be published in the information

the system.



(8) the financial settlement of the differences referred to in paragraphs 2 to 7 performs operator

the market. The market operator shall take into account when determining financial eligibility

clearing the body assigned to the responsibility for deviation of the virtual

a sampling of space distribution system operator the amount of possible

deviations arising in accordance with paragraphs 1 to 7.



§ 105



(1) the distribution system operator shall send once a year at the latest,

to date, 30. June, the actual value of the losses in the relevant distribution network

for the previous calendar year. The market operator will be charged the difference operator

the showdown, which in the relevant distribution system assumed responsibility

a derogation for the losses for the arithmetic average of the daily values of the index

short-term market established in accordance with annex 6 to this Ordinance for

the natural gas a month, which are the differences.



(2) following evaluation of the losses, the differences referred to in paragraph 1 must be applied

with the opposite sign to the body which, in the relevant distribution

the system has assumed responsibility for a deviation for customers who have not changed

gas supplier.



(3) the financial settlement of the differences referred to in paragraphs 1 and 2 done by operator

the market. The market operator shall take into account when determining financial eligibility

clearing the body assigned to the responsibility for deviation of the virtual

a sampling of space distribution system operator the amount of possible

deviations arising under paragraphs 1 and 2.



Section 106



Evaluation and accounting differences between daily and monthly allocations and

between monthly and corrective monthly locations after the sending of the derogations

the monthly values of the allowance and deduction values after the correction



(1) the market operator establishes for each body and each clearing

Foreign participant:



and the daily deviation on the basis of) the daily allocations and donations



(b) the monthly breakdown of deviation) after each gas days on

the basis of monthly allocations and donations



(c)) in the distribution of monthly deviation a corrective after the individual gas

days on the basis of the provisions of the monthly allocation at the input and

output points, where to send the correction values of the allocation or

gas sampling.



(2) the market operator carries out the evaluation of the differences between the values of the daily

derogations and monthly variations in the distribution of individual gas

days for each subject of settlement for the index value short-term market

established in accordance with annex 6 to this Ordinance for each individual

gas day.



(3) the settlement referred to in paragraph 2, the operator of the market not later than

the thirteenth calendar day until 17:00:00 pm after the calendar month in which the

the settlement referred to in paragraph 2 applies. At the same time make available to the market operator

in the information system operators, or other subjects of settlement

clearing to get familiar with these data, the settlement by

paragraph 2 in the Division after the individual gas days.



(4) the market operator carries out the evaluation of the differences between the values of the month

variations in the distribution of individual gas days and repair

monthly variations in the distribution of natural gas for days after each

each subject of settlement for the index value short-term market established

in accordance with annex 6 to this Ordinance for each individual gas day

separately.



(5) Settlement referred to in paragraph 4 shall give the operator the market no later than

16th calendar day until 17:00:00 pm four calendar months after the

the calendar month to which the settlement referred to in paragraph 4 applies. At the same time

shall make available to the market operator in the information system of settlement, bodies

where appropriate, other entities entitled to settlement to familiarize yourself with the following

data, the settlement referred to in paragraph 4 in the Division after each

gas days.



(6) the financial settlement of the differences referred to in paragraphs 2 to 5 are performed by the operator

the market.



§ 107



The use of the load profiles of gas supply for the purposes of billing for supplies

gas



(1) the consumption of gas and its distribution in each period shall be determined

in accordance with annex 18 to this Decree, taking into account the

readings made by the distribution system operator and samoodečty

of the customer.



(2) in the case of unavailability of the data recorded by the measuring device for

the period laid down by the other law, which regulates the measurement

plynu15), the distribution system operator shall apply for the establishment of

consumption of the customer with the measurement of type C or CM readings made by

distribution system operator and duly adopted samoodečty this

the customer or the supplier of gas from the last statement of the gas supply.

For the determination of the estimate, the gas consumption for the remaining period of the operator

the distribution system in accordance with annex 18 paragraph 2 to this

the Decree.



section 108



Track prices of related services in the gas industry



Prices for related service in the gas industry are the price of transport services

gas, the price of the service and the price for distribution system operator's activities

the market. The composition of the price of transport of gas, the price of distribution service

system and the prices for market operator's activities is provided in annex No. 19

to this Decree.



section 109



The procedure for the determination of advance payments



(1) a trader with gas or producer gas provides for advance payments

no more than the planned annual gas consumption in the sampling site

the customer with the measurement of type C or CM in accordance with Annex 15 to this

the Decree.



(2) a trader with gas or producer gas provides for advance payments

maximum in the range of contracted gas consumption in the sampling site

the customer with the measurement of type A or B.



PART TEN



CHANGE GAS SUPPLIER



Standard change gas supplier



section 110



(1) the standard by changing the gas supplier gas market participant is



and change gas supplier) for another gas supplier,



(b)) change of supplier of gas from the supplier of last resort.



(2) before submitting an application for a standard change gas supplier in accordance with

paragraph 3 concludes the customer with a new supplier of gas supply contract

gas or associated gas supply services.



(3) the first 4 months before changing the gas supplier and not later than the tenth

working day until 10:00:00 pm prior to the required date changes

gas supplier delivers a new supplier of gas request for a standard change

supplier of gas to the market operator. In the event that a new supplier of gas

ensures delivery according to the contract of associated gas supply services

makes a request for the reservation of the distribution capacity pursuant to section 39 at the latest in

the date of filing of the application for a standard change gas supplier and the first 10

working days prior to the application of a standard change of the supplier

gas. The application for a standard change gas supplier must contain

the following data:



and the identification of new gas supplier) in the form of the code assigned according to §

5 (3). 1,



(b)) the type of contract for the supply of gas and the date from which the shipment of gas

take place, and the duration of the contract,



(c) identification of the body in the form of showdown) code assigned according to § 5

paragraph. 1, to be assigned responsibility for a deviation in sampling

the spot, which is changing the gas supplier,



(d) the place of consumption and its) identification in the form of the code assigned according to § 5

paragraph. 1,



e) whether the contract was for the supply of gas or associated services

gas supply to the consumer within the premises of the usual closed for business

or outside of the normal business of the premises to a new supplier of gas, or whether

closed distance way.



(4) every working day at the latest 12:00:00 hours, if the request was

referred to in paragraph 3 taken in 10:00:00 of the working day,

the operator shall inform the market through its information system

the existing gas supplier, the existing body of reckoning, the new

gas supplier, new body clearing, operator of the distribution

or the transmission system, which is the place of consumption, and other connected

the bodies concerned, to which the request for change of the supplier concerned, standard

about planned changes by sending a standard gas supplier identification


sampling locations in the form of the code assigned according to § 5 (3). 1 deadline, from the

the delivery of a new supplier of gas to take place, and the indication referred to in

paragraph 3 (b). (e)). The application of paragraph 3, which was adopted after

10:00:00 of the working day, shall be deemed to be accepted

the following working day.



(5) in the fifth working day until 18:00:00 hours after transmission of the information

in accordance with paragraph 4 of the distribution or transmission system operator

the operator shall inform the market about the possibility or impossibility of reservation

distribution or transmission capacity to the delivery point of the customer under the

paragraph 3, if this is a standard change of the supplier, when new

supplier contract for the combined services of gas supplies.



(6) the distribution or transmission capacity to the delivery point of the customer

It is not possible to book when insufficient collateral, if

application has not been filed in due time or if it does not meet the

particulars of a reservation request distribution or transmission capacity. For

failure to comply with the formalities of the application shall, if the application is not possible

uniquely identify a subscriber of the gas market, and by assigning the EIC

code, name, surname and date of birth of the gas market participant or

business name, if applicable, the name of the market participant and identification

the number of the person, if it has been assigned, the sampling site, in which must be

to change the vendor, was not included in the request for reservation

distribution capacity or if a new supplier of gas application attaches

or it does not adjust to the 14:00:00 of the working day following the date on

When the operator of a distribution or transmission system called for

Elimination of deficiencies in applications designating the erroneous data.



section 111



(1) in the event that the operator of a distribution or transmission system

does not inform the market operator under section 110, paragraph. 5 to the fourth working

the day until 18:00:00 hours after transmission of the information referred to in section paragraph 110. 4,

the market operator notifies this fact to the distribution

or the transmission system. If the operator of a distribution or transmission

the system then fails to comply with information requirements under section 110, paragraph. 5, but

registers the place of consumption of the customer in accordance with section 112, paragraph. 4, it is considered that,

It informed the market operator of book distribution options, or

shipping capacity.



(2) the Operator of the market without delay after the date referred to in section paragraph 110. 5 inform the

the existing gas supplier, new gas supplier, all interested

operators of clearing and distribution or transmission system operator,

that is the place of consumption of the customer connected, about reservation options

distribution or transmission capacity to the delivery point of the customer under the

§ 110, paragraph. 3. In the event that it is not possible to book distribution or

the transport capacity to the delivery point of the customer according to § 110, paragraph. 3,

the market operator informs through the information system

existing and new gas supplier, the existing and the new entity

clearing, operator of the transmission or distribution system, to which the

consumption location is connected, and other interested entities, to which the application

a standard change of the supplier concerned about stopping the standard changes

gas supplier.



(3) to the fifth working day until 18:00:00 hours after transmission of the information

under section 110, paragraph. 4 can the existing supplier of gas through the

the information system of the market operator to request the suspension of the standard

change gas supplier, if the effective date of the change of supplier has not

to the termination of the contract with the current gas supplier, whose subject is

the supply of gas, or if the customer in writing to take effect will change

gas supplier not to implement.



(4) within 14:00:00 a.m. on the eighth working day following the submission of information in accordance with

§ 110, paragraph. 4 can a new supplier of gas through the information

the market operator system standard request change of the supplier to take back.



(5) not later than the fifth working day until 18:00:00 pm after the transfer

information according to § 110, paragraph. 4 the subject of settlement shall communicate, whether they agree with the

by assigning responsibility for the imbalance. Immediately after the expression of consent

entity assigning the responsibility for clearing with the deviation in the

the sampling point shall inform the operator of the market through the information

the existing gas system, the existing body of reckoning,

other interested bodies of the clearing and transmission or

the distribution system, to which it is attached, the sampling place of assignment

the subject of settlement.



(6) If, on the fifth working day until 18:00:00 pm after the transfer

information according to § 110, paragraph. 4 is not in the information system of the market operator

the consent of the subject of settlement with the assignment of responsibility for a deviation in the

the sampling location, the operator shall inform the market through

the information system of the existing and new gas supplier, existing and

a new body of clearing and settlement operators concerned and

the transmission or distribution system, to which the sampling

the place is connected by their standard change gas supplier.



section 112



(1) not later than 15:00:00 of the working day, in which it was adopted

the request referred to in section 111, paragraph. 4, the operator shall inform the market through

the information system of the existing gas supplier, the existing body of

clearing, operator of the transmission or distribution system, to which the

consumption location is connected, and other interested entities, to which the application

a standard change of the supplier concerned, about their process changes

vendor.



(2) no later than 20:00:00 of the working day, in which it was adopted

the request referred to in section 111, paragraph. 3, the operator shall inform the market through

the information system of the new gas supplier, all interested entities

clearing and transmission or distribution system, to which the

consumption location is connected, that the existing gas supplier asked for

stop the standard changes to the gas supplier.



(3) If the existing gas supplier asked to stop standard

change gas supplier according to § 111 paragraph. 3, but a new supplier of gas

on the basis of the written submissions of the customer, from which it is clear that

the customer intends to change the vendor will confirm in the information system

the market operator submitted a request for change of the supplier, and not later than

the eighth working day from the date of submission of the information by the market operator under section

paragraph 110. 4-14:00:00 hours, the market operator continues to process changes

vendor.



(4) in the fifth working day before 12:00:00 hours after transmission of the information

under section 110, paragraph. 4 the distribution or transmission system operator

register at the place of consumption of the market operator of the customer, where the

standard change gas supplier, and passes information about the sampling point

According to annex No. 20 of this Decree.



(5) not later than the ninth working day before 8:00:00 hours of the date of

information by the market operator under section 110, paragraph. 4 the market operator shall notify the

distribution or transmission system operators, to which the sampling

Instead, the existing suppliers connected gas, new gas suppliers

and all the parties concerned the outcome of the assessment of applications for settlement

standard change of the supplier of the gas.



(6) the distribution or transmission capacity for supply point under section

paragraph 110. 3 the notice of registration of a standard change of supplier

gas referred to in paragraph 5.



(7) in the event that the request for change of the supplier was given information about

its conclusion outside of normal business or distance

in a way, and resigned from the contract, the customer according to § 11a paragraph. 2

the Energy Act ^ 12) and at the same time calls for the continuation of the supply from the

the current vendor, the vendor may change the existing stop

the vendor in time according to § 111 paragraph. 4.



§ 113



(1) Registered standard change gas supplier shall take effect to the

gas date referred to in the application for a standard change of the supplier

gas under section 110, paragraph. 3 (b). (b)).



(2) the effective date of the changes to the standard gas supplier performs

distribution or transmission system operator reading the status of the meter,

in the case of sampling points with the measurement of type C or CM establishes the status of the measuring

with the procedure referred to in paragraph 3 of the device, and data operator

the distribution system operator shall send the market subsequently. The market operator

This information without undue delay transmit the previous and new suppliers

gas and the previous and the new entity to the showdown.



(3) the determination of the status of the measuring device for the offtake points with the measurement type (C)

or CM performs the distribution system operator reading to date

the efficiency of a standard change gas supplier, or reading

the State of the measuring equipment brought on by the customer, the operators of the distribution

system directly or through existing or new vendor

gas. If it is filed by the end of the fifth business day after the date of the change

gas supplier, or in the case that the reading State of the measuring equipment

is not filed before the end of the fifth business day after the date of change of the supplier

gas, determine the status of the measuring device the estimated gas consumption to date

the effectiveness of the change of the supplier of the gas referred to in annex 18 to this Decree.

If the deduction was made for distribution system operator and

at the same time the reading has been filed by the customer, for the Bill of distribution of gas

to apply the reading detected by the distribution system operator.



(4) when the standard change gas supplier in the sampling site the customer with

the measurement of type A and B the distribution or transmission system operator, to the

that is the place of consumption of the customer connected, sent to the market operator

no later than the date referred to in section 112, paragraph. 4 real daily subscription

the gas in the discharge point of the customer for the past 17 known calendar

months and the actual daily gas supply point for the customer

in the term under section 95 paragraph. 2 or section 96 paragraph. 2 for natural gas of the month

in which the standard change gas supplier is approved under section 112

paragraph. 5, but was not effective.



(5) If a change of the customer in the sampling point and at the same time to change the

gas supplier, the provisions of the standard change of the supplier

gas, mutatis mutandis, with the exception of § 111 paragraph. 3. The reason for the inability to reserve

distribution or transmission capacity to the delivery point of the customer under the


§ 110, paragraph. 5 it is also dispatched on the conclusion of the Treaty on

connection. To start deliveries to the newly connected consumption points

When the customer is a merchant supplier of gas with gas, which is

the supplier of last resort in the relevant home zone, for the initiation of the

deliveries to the delivery point, which is not registered in the information

the system of the market operator, after the unauthorized gas sampling or unauthorized

the distribution of new gas supplier, who is not a supplier of the last

instance in the relevant home zone, for the start of delivery for sampling

the place of the registered in the information system of the market operator after

unauthorized gas sampling or unauthorized distribution of new supplier

gas, and for the start of delivery for preventing unauthorised removal

the provisions of the standard change gas supplier, by analogy with the

that:



and standard change request) gas supplier under section 110, paragraph. 3

delivers the market operator of the gas supplier no later than 10:00:00 pm

working day preceding working day earliest possible

start of delivery of gas contracted with the distribution system operator,



(b) the application for a standard change) gas supplier under section 110, paragraph. 3 (b).

(b)) must contain the type of contract, the object of which is the supply of gas, the date

the earliest possible start of supply of gas to the agreed with the operator

the distribution system and the duration of the contract,



(c) the acts for the implementation of the changes) to the supplier in accordance with section 110, paragraph. 5 and 6, section 111

paragraph. 1, 2 and 5, and section 112, paragraph. 4 shall be carried out until 18:00:00 pm

working day preceding working day earliest possible

start of delivery of gas contracted with the distribution system operator.

The provisions of § 111 paragraph. 3 and 4 and section 112, paragraph. 1 to 3 shall not apply,



(d) the operator shall notify the result of the assessment) request for a standard change

gas supplier under section 112, paragraph. 5 immediately after all

the acts referred to in § 113 paragraph. 5 (a). (c) the effectiveness of the supplier changes.) occurs in the

the day of the earliest possible commencement of gas contracted with

distribution system operator.



(6) the market operator to the requests to make changes to the vendor in

the order in which they were received by the market operator. If the request referred to in

the first sentence more participants in the gas market for the same sampling location is

the same required the effective date of the change of the supplier, it is considered

the active change of supplier, which the market operator has registered as a

the last. In this case the operator shall inform the market about the planned

the implementation of changes to the supplier and the supplier shall notify the registration changes all

vendors and operators, who are clearing the change of supplier

concerned.



(7) the market operator to the effective date of the change of the supplier cancels any

individual assignment of sampling or a pass-through space for those suppliers

gas, whose period of delivery are assigning sampling or

a pass-through space new gas suppliers, and shall inform the

without delay of the gas supplier, clearing and the entity concerned

the transmission or distribution system, to which the sampling

or a pass-through space is connected.



section 114



Shortening the supply of gas to



(1) a request for the supply of gas to the truncation of the sampling space sends the supplier

gas market operator the operator through the information system

market no later than 10:00:00 pm 10th working day before the

the planned termination of the delivery.



(2) by reducing the supply of gas occurs in the information system of the operator

the market to shift the deadline their existing supplier of gas supply.

Shortening the supply of gas in the event the contract is associated services

gas supply to their booked capacity into the sampling distribution

space.



(3) the market operator cancels the requested date, the assignment on your system

delivery point for suppliers of gas and the concerned body clearing and

It shall immediately inform the supplier of the gas, the

operators of clearing and distribution or transmission system operator,

to which is appended to the place of consumption.



(4) a request for the supply of gas to the truncation of the sampling points in the case of

withdrawal from the contract pursuant to § 11a paragraph. 2, 5 and 6 of the energy

the law ^ 12) or in the case of termination of the contract pursuant to § 11a paragraph. 3

the Energy Act ^ 12) sends the supplier of gas to the market operator

through the information system of the market operator no later than

00:00:00 of the working day preceding the day on which should take

the effectiveness of the change of supplier in the market operator's system, or should take

the effectiveness of the withdrawal from the contract pursuant to § 11a paragraph. 2, 5 and 6

the Energy Act ^ 12) or rescission should take effect

According to the § 11a paragraph. the Energy Act 3 ^ 12).



(5) the market operator cancels the requested date, the assignment on your system

delivery point for suppliers of gas and the concerned body clearing and

It shall immediately inform the supplier of the gas, the

operators of clearing and distribution or transmission system operator,

to which is appended to the place of consumption.



section 115



The extension of the supply of gas to



(1) an application for the extension of the supply of gas to the delivery point sends

supplier of gas to the market operator by means of the information system

the market operator no later than 23:00:00 hours of the last calendar day

the supply of gas. The original supplier of gas in the request shall indicate the new term

their gas supplies. The subject of settlement shall communicate, whether they agree with the

by assigning responsibility for deviation, no later than 23:30:00 pm

the last calendar day supply of gas.



(2) the Operator shall immediately inform the market about the extension of the supply of gas to

stakeholders, vendors, and clearing the gas transmission

system or the appropriate distribution system operator, which

consumption location is connected. The extension of the supply of gas is in the case

the contract of associated gas supply services continued booking

distribution capacity to delivery point. The extension of the supply of gas to

referred to in paragraph 1 shall take effect only if in the term

the desired extension is not to supply place in the information system

the market operator is assigned a different gas supplier.



(3) in the event that the customer has resigned from the contract or several contracts under section

11A paragraph. 2 ^ 12) of the Energy Act and this fact was shown by

the supplier of the gas, which is within the nearest vendor changes

replaced by a different gas supplier (hereinafter referred to as "the original supplier

gas "), and at the same time requires the continued supply of gas from the original

gas supplier, sends the original gas supplier request for extension

supply of gas to the market operator by means of the information system

operator of the market on the date referred to in paragraph 1.



(4) the Operator shall immediately inform the market about the request for the extension of the supply

the gas involved clearing and transport operator

or distribution system, to which it is connected, and the place of consumption

gas supplier. The original supplier of gas in the application stating the new term

their gas supply and clearly indicate that it is an extension of the

supply of gas on the basis of the customer's withdrawal from the contract pursuant to § 11a

paragraph. 2 the Energy Act ^ 12). The subject of settlement shall notify whether they agree

with the assignment of responsibility for a deviation in the term referred to in paragraph 1.

The extension of the gas supply means in the case of the Treaty on the joint

gas supply services continued booking distribution capacity to

the sampling locations.



(5) the market operator shall notify the result of the assessment of applications for renewal

gas supply referred to in paragraph 4 shall immediately after sending the approval body

clearing, assuming responsibility for deviation.



(6) the market operator to the effective date of the extension of the supply of gas according to the

paragraph 4 of each individual assignment cancels the delivery point for suppliers

gas, for which the customer according to § 11a paragraph. 2 the Energy Act ^ 12)

resigned from the contract, and shall forthwith inform the

the original gas supplier, the concerned entities of the clearing and the operator

distribution or transmission system, which is the place of consumption

attached.



Quick change gas supplier



section 116



(1) in the event that the subject of settlement, even after the reduction of nominations under section 66

paragraph. 6 does not have the necessary financial security, the market operator in

17:30:00 pm through an information system that

the body does not have the necessary financial security clearance for the cover of supply

to the consumption points of the customers. At the same time, the market operator of this fact

shall inform the concerned bodies, the gas supplier settlement, and

distribution or transmission system operators, to which the sampling

instead of appended.



(2) If the subject of settlement referred to in paragraph 1 the following calendar day

at 7:00:00 pm still does not have the necessary financial provision for cover

deliveries to the consumption points customers to the market operator shall suspend option

nominate, transmit and take responsibility for the imbalance and to participate in the

Intraday gas market. The market operator shall promptly provide this

information to all registered participants in the gas market, and publish it

in a manner enabling remote access.



(3) in the collecting places where customer is assigned responsibility for

deviation, or forward the responsibility for deviation of the body which

It has suspended the right to nominate, transmit and take responsibility for the

the derogation and to participate in the intra-day gas market referred to in paragraph 2, the

in the period referred to in paragraph 2, the responsibility for deviation is assigned to the vendor

gas. If the body is clearing at the supplier of gas to the

delivery point of the customer, the operator of a distribution or transmission

system to which it is connected instead of the customer's consumption, be sent to the

without delay, by electronic means to the customer, for which he is known, electronic

address to that date are not secured to supply its sampling

the place of supply will be ensured by the supplier or the last instance.



(4) in the event that within 14:00:00 hours to supply the place referred to in paragraph 3

the first sentence is not assigned to the body with sufficient financial clearing

ensuring the market operator shall inform all

registered participants in the gas market and shall publish this information in a manner

enabling remote access. Distribution or transmission operator


system to which it is connected instead of the customer's consumption, be sent to the

without delay, by electronic means to the customer, for which he is known, electronic

address to that date are not secured to supply its sampling

the place of supply will be ensured by the supplier or the last instance.



(5) for the sampling sites customers, whose body the clearing operator

the market has suspended the ability to nominate, transmit and take responsibility for the

the derogation and to participate in the intra-day market with gas due to

the lack of financial security, makes a request for rapid change

new gas gas supplier the supplier through the information

the system of the market operator, and no later than two calendar days to

8:00:00 pm after the time limit referred to in paragraph 3 or 4. In the event that the new

supplier of gas supply under the contract of associated services

gas supplies, serving the reservation request distribution capacity pursuant to section

40 no later than the deadline for the submission of applications for a quick change of the supplier

gas. Request for quick change gas supplier must contain

the following data:



and the identification of new gas supplier) in the form of the code assigned according to §

5 (3). 1,



(b)) the type of contract for the supply of gas and the duration of the contract,



(c) identification of the body in the form of showdown) code assigned according to § 5

paragraph. 1, to be assigned responsibility for a deviation in sampling

the spot, which is changing the gas supplier,



(d) the place of consumption and its) identification in the form of the code assigned according to § 5

paragraph. 1.



section 117



(1) in the absence of the submission of the application for a quick change of the supplier of the gas referred to in

§ 116, paragraph. 5, not the third day following the date referred to in section 116, paragraph. 3 or 4

ensure the supply of gas to the delivery point of the customer, if the customer

not under the regime of supplier of last resort.



(2) in the absence of the submission of the application for a quick change of the supplier of the gas referred to in

§ 116, paragraph. 5, is the third day following the date referred to in section 116, paragraph. 3 or 4

ensure the supply of gas to the delivery point of the customer by the supplier

the last instance, if a customer falls under the vendor last mode

an instance of the.



(3) no later than 60 minutes after receipt of the request under section 116, paragraph. 5

the operator shall inform the market through its information system

new gas, new body clearance, or other interested

operators of clearing and distribution or transmission system operator,

that is the supply point is connected, that the request has been made under section 116

paragraph. 5. Quick change gas supplier shall enter into force on the third day after the

the term under section 116, paragraph. 3 or 4.



(4) no later than two calendar days until 12:00:00 pm after the deadline

under section 116, paragraph. 3 or 4 operator distribution or transport

the system operator shall inform the market about the impossibility of booking distribution

or transportation capacity to the delivery point of the customer in accordance with paragraph 3 of

due to the lack of financial security. The market operator shall, without delay after the

the receipt of information from the distribution or transmission system operator

inform the new supplier of gas and the clearing of all stakeholders

about reservation options distribution or transmission capacity into the sampling

the place of the customer under section 116, paragraph. 5. In case of impossibility of reservation

the distribution capacity of the operator shall inform the market through

the information system of the new gas, new body clearing and

other interested bodies of the clearing and transmission or

the distribution system, to which it is attached, the sampling place to stop

Quick change of the supplier of the gas.



§ 118



(1) no later than two calendar days until 12:00:00 pm after the deadline

under section 116, paragraph. 3 or 4 shall notify the clearing entity that agrees with the

by assigning responsibility for the imbalance to the delivery point of the customer under the

§ 117 paragraph. 3. immediately after the expression of consent of the clearing with the body

by assigning responsibility for the imbalance in the sampling point shall inform the

the market operator through the new supplier information system

gas and other concerned bodies of the clearing and transmission or

the distribution system, to which it is attached, the sampling place of assignment

the subject of settlement. If no later than two calendar days to

12:00:00 pm after the time limit referred to in section 116, paragraph. 3 or 4 is not in the information

the market operator system, consent of the subject of settlement with the assignment

responsibility for the imbalance in the sampling site, inform the operator

market through the information system of the new gas, new

the body of clearing and settlement operators concerned and operators

a transmission or distribution system, which is the place of consumption

connected, to halt the rapid changes of the supplier of the gas.



(2) no later than two calendar days until 12:10:00 pm after the deadline

under section 116, paragraph. 3 or 4 shall notify the operator the market operator

distribution or transmission system, which is the place of consumption

connected to the new gas suppliers and all the parties concerned clearing

the results of the examination of the application for a quick change of the supplier of the gas and

a trader with gas in the mode of supplier of last resort, which

the sampling points will be supplied by the supplier of last resort.



(3) the distribution or transmission capacity is the announcement of the register

Quick change of the supplier of the gas referred to in paragraph 2.



(4) the effective date of the changes rapid gas supplier shall give the operator

distribution or transmission system of determining the status of the meter pursuant to § 113

paragraph. 2.



(5) the quick change gas supplier under section 116, paragraph. 3 to 5 and § 117,

used for sampling space customers where the gas supplier ceased

permissions or the ability to deliver. In these cases, the operator shall suspend the

market supplier of gas, which ceased to be a privilege, or the possibility of gas

supply, the ability to nominate, transmit and take responsibility for deviation

and to participate in the intra-day market with gas. The market operator shall immediately

provide this information to all registered participants in the gas market and the

publish it in a manner enabling remote access. Procedure provided for in § 116

paragraph. 2 does not apply.



Procedure for interruption, restriction and restore gas supply when unauthorized

sampling distribution, unjust and unlawful transport of



section 119



(1) the supplier of the gas serves a request for suspension or termination of the supply of

gas for distribution system operator no later than the last

calendar day before the desired date of termination or interruption of the delivery

gas.



(2) the supplier of the gas may take the request referred to in paragraph 1, in writing,

or through the information system distribution

system back in time until 16:00:00 pm one business day before the date of

the required suspension or termination of the supply of gas without the consent of the

distribution system operator. After this deadline can take

supplier of gas back to the request referred to in paragraph 1, in writing, or

through the information system of the distribution system operator

only with the consent of the distribution system operator.



(3) the distribution system operator shall, upon request of the vendor

gas interruption of gas supply in the unauthorized gas sampling



and customer delivery point) for the category of central subscriber, and

a large buyer within three working days from the date of the desired interruption

gas supplies, when the period of three working days begins to run on the date of

the desired interruption of gas supplies. In the event that the

the distribution system operator fails to interrupt the supply of gas from the

because impervious to gauge and non-cooperation of the customer in the

the interruption of gas supplies within three working days from the date of the desired

the interruption of gas supplies including, that the effect of interruption of the supply

gas was the end of the third business day after the date of the desired

the interruption of gas supplies including,



(b)) at the customer's place of consumption and to the categories of residential home

ten working days from the date of the desired interruption of gas supplies, when

the period of 10 working days begins to run on the date of the desired interruption

gas supplies including. In the event that the operators of the distribution

system fails to interrupt the gas supply due to inaccessible gauge

and the non-cooperation of the customer when the interruption of gas supply to the

the 10th working day following the date of the desired interruption of gas supply

including, the effect of interruption of supplies came from the fifteenth

working day from the date of the desired interruption of gas supplies.



(4) the distribution system operator shall, upon request of the vendor

gas their gas supply when the unauthorized gas sampling



and customer delivery point) for the category of central subscriber, and

a large buyer within three working days from the date of the desired end

gas supplies, when the period of three working days begins to run on the date of

the requested termination of the supply of gas. In the event that it fails to

the distribution system operator to terminate the supply of gas, due

inaccessible meter and the non-cooperation of the customer when their

gas supply, it is considered that effect their supply of gas

the expiry of the third business day after the date of the desired their supply

gas, including. In the event that occurs when the effect of their delivery in accordance with

the preceding sentence, the distribution system operator to this

the date of the calculation of the expected amount of gas consumption in accordance with the law,

which regulates gas measurement ^ 15), and this calculation passes gas suppliers

and the market operator for the offtake points, which was through code

marked for each sending data, the market operator



(b)) at the customer's place of consumption and to the categories of residential home

ten working days from the date of the desired their gas supplies, when

the period of 10 working days begins to run on the date of the desired end

gas supplies including. In the event that it fails the operator

close the gas supply distribution system due to inaccessible

the gauge and the non-cooperation of the customer when their supply

gas, it is considered that effect their supply from the fifteenth

working day from the date of the requested termination of the supply of gas. In

If that occurs, the effect of their delivery in accordance with the preceding sentence,

performs the distribution system operator to this date calculation


the expected amount of gas consumption by legal regulation, which

Adjusts the measurement gas ^ 15), and this calculation passes gas suppliers and

the market operator for the offtake points, which was through code

marked for each sending data the market operator.



§ 120



(1) the distribution system operator shall inform no later than four

working days from the date of suspension or termination of the supply of gas to the affected

participants in the gas market and the market operator on suspension or termination

the supply of gas to the delivery point of the customer.



(2) in the event that there is no interruption of gas supply referred to in section 119 paragraph.

3, the distribution system operator shall inform without

undue delay, the party making the request for interruption of gas supplies.



(3) the distribution system operator shall give the restriction or interruption of the

the distribution of gas to the delivery point of the customer category, residential and

home to five working days from the date of the detection of unauthorized

distribution under section 73, paragraph. 4 the Energy Act ^ 12).



(4) in the event that as the reasons the restriction, suspension or termination of

gas distribution in accordance with paragraph 3 or section 119 paragraph. 3 and 4, or in the

If the customer or the supplier of gas to start or request

to restore gas supplies to a customer after the previous delivery point

the restriction, suspension or termination of gas supply referred to in paragraph 3 or section

paragraph 119. 3 and 4, the distribution system operator shall initiate or resume

the supply or distribution of gas, according to the legal rules relating to the

the quality of the supply of gas and related services ^ 16).



(5) For the application of the restriction, suspension or termination of the supply of gas in the

unauthorized collection and unauthorized shipments and request for the initiation or

restoring gas supplies after the unauthorized collection and unauthorized carriage in the

sampling site the customer directly connected to the transmission system

Similarly, the transmission system operator shall proceed in accordance with paragraphs 1 to 4

and under section 119.



(6) the categorization of customer set out in annex 16 to this Decree.



The procedures and conditions for the delegation of responsibility for deviation

When transformations of commercial companies



§ 121



(1) the Operator shall inform the clearing or gas supplier through

applications made in the information system of the market operator of the decision

to perform a mass conversion of consumption points of the market operator in connection with the

by transfer or transformation of a commercial company.



(2) the subject of mass transfer is a change in the body, or clearing

change gas supplier on the collecting places customers in connection with the

the transformation of a commercial company. Provisions for change of the supplier of the gas

pursuant to section 110 and shall not apply.



(3) the trader with the gas, which will go or will be transferred to the sampling

place the customer, served in the information system of the market operator

request for bulk transition or transfer of consumption points of the

transferring to the accepting entity, which shall contain the following

information:



and the required transition) a day or a transfer of consumption points of the customers



(b) identification of the accepting merchant) with gas in the form of code

assigned under section 5 (3). 1,



(c) identification of the transferring dealer) gas in the form of code

assigned under section 5 (3). 1,



(d)) to determine whether it is the subject of mass transfer under paragraph 2 change

the subject of settlement or the change of supplier,



(e) a list of the customer's consumption points) in the event that the distribution of

the business of the company,



f) written proof of the transformation of a commercial company,



g) Declaration on the conclusion of the contract about providing service distribution

system between the distribution system operator, which are the reports of the

the place is attached to, and accepting a body or a declaration of

the fact that this contract will be between the operator concerned,

the distribution system and the accepting entity concluded to date of transfer

offtake points.



(4) the request referred to in paragraph 3 is lodged with a gas trader, on which

they will take the place of the customer, not later than 10 working days

before the date referred to in paragraph 3 (b). and).



(5) the Operator shall inform the market about the submission of the request referred to in paragraph 3, all

gas supplier concerned, operators of clearing and the operator

distribution system operator or a transmission system operator.



(6) in the event that the transmitting gas trader expressed in the information

the system of the market operator with the required consent of the mass transfer

offtake points on the basis of the data referred to in the request in accordance with paragraph 3,

the market operator performs on the day referred to in paragraph 3 (b). and in the information)

the market operator system bulk change gas supplier or agency

settlement on the basis of the request referred to in paragraph 3 (b). (d)) for all

individual consumption points are registered in the information system

the market operator, which is a blanket change. The market operator performs

This change with effect from the date referred to in paragraph 3 (b). and).



§ 122



(1) a change to the subject of settlement made pursuant to § 121 paragraph. 6 operator

the market shall inform, through its information system

all interested suppliers of gas and the clearing of bodies. This information

the market operator shall provide, for each supply point of the customer for which the

There has been a change in the subject of settlement.



(2) a change of the supplier of the gas made in accordance with § 121 paragraph. 6 operator

the market shall inform, through its information system

all interested suppliers of gas, operators of clearing and the operator

distribution system operator or a transmission system operator. This

the market operator will provide information for each customer at the place of consumption,

which there was a change of the supplier of the gas.



(3) in the case of the amendments referred to in § 121 paragraph. 6 does the operator

distribution system operator through the information system

the market status of the gauge in the sampling place the customer on the date specified under section

paragraph 121. 3 (b). and the procedure laid down in section 113) of paragraph 1. 2, and

related data needed for billing of gas supplies and related

services by other legal rules relating to the formalities and

the billing terms for gas supply ^ 17).



PART ELEVEN



THE PROVISIONS OF THE COMMON, TRANSITIONAL AND FINAL



section 123



Common provisions



(1) the value of the transmitted or published under this Ordinance shall be

in 1/1000ths of MWh in addition to the values of the distribution capacity reserved

that appear in the m3, and values according to § 95 paragraph. 1 (a). and)

(e)), g) and (h)), which shall be transmitted in the m3.



(2) transport capacity for border point, point a virtual stack

gas sampling places customers directly connected to the transmission system and the

the point of the production plants, the gas is reserved in 1/1000ths of MWh/day.



(3) the Nomination and allocation of transport at the border point, the point of the virtual

stack gas sampling places customers directly connected to the transmission

system and gas production plants is done in 1/1000ths of MWh.



(4) the distribution capacity for cross-border gas pipeline and the point the point production plants

gas is reserved in 1/1000ths of MWh/day.



(5) the Nomination of the distribution and allocation of cross-border gas pipeline and the point

for point gas production plants is done in 1/1000ths of MWh.



(6) the sending of a request for change of the supplier of the gas or

confirmation or rejection of amendments to the gas supplier and data necessary for the

registration of delivery or transfer jobs takes the form

electronic messages in the communications environment of the defined operator

the market. Messages are sent to the market participant of the gas in the format

defined by the market operator.



(7) the reservation request the distribution of the capacity and the conclusion of the Treaty on the

providing services to the distribution system shall be submitted in paper form

or electronically in the format defined by the operator, the distribution

the system.



Transitional provisions



section 124



(1) for the nominations and renominations the obligation to deliver and the obligation to remove the

period to 30. June 2016 shall apply the provisions of Decree No. 365/2009 Sb.

in the texts of the effective to date of the entry into force of this order. For nominations

the obligation to deliver and remove the natural gas commitment on day 1. July 2016

the provisions of Decree No. 365/2009 Coll., as amended, effective the day

the entry into force of this order.



(2) for business fluctuations in the period up to 30. June 2016

the provisions of Decree No. 365/2009 Coll., as amended, effective the day

the entry into force of this order.



(3) for the natural fluctuations in the period up to 30. June 2016

the provisions of Decree No. 365/2009 Coll., as amended, effective the day

the entry into force of this order.



(4) preliminary total deviation clearing body of gas day

29 and 30. June 2016 balances in accordance with Decree No. 365/2009 Coll., in

the texts of the effective to date of the entry into force of this order.



(5) the sum of the actual total anomalies for the month of June 2016

copes by Decree No. 365/2009 Coll., as amended, effective the day

the entry into force of this order.



section 125



(1) for a range of dates, transmission and publication of data and billing

gas supply and other services in the period up to 30. June 2016 shall apply

provisions laid down in Decree No. 365/2009 Coll., as amended, effective the day

the entry into force of this Decree, with the exception of the provisions on prices

related services in the gas industry and the procedure for the determination of the imprest

the payments, which shall apply from the 1. January 2016.



(2) in accordance with Decree No. 365/2009 Coll., as amended effective prior to the date

the effectiveness of this Ordinance, is to assess all end

processes, deadlines and time for change of the supplier of the gas, which started to run

before the 1. January 2016, even if the change of supplier will be terminated after 1.

January 2016.



(3) an estimate of the gas consumption to the effective date of the change of the supplier of the gas referred to in

§ 113 paragraph. 3, in the period up to 30. June 2016 shall make the procedure referred to in

Decree No. 365/2009 Coll., as amended, effective the day of the entry into force of this

the Decree.



(4) the initial state of the balance of the account of deviations of each body's clearing

or a foreign participant is equal to zero.



(5) the effective date of this Ordinance is the initial account size

of the operator is equal to zero.



(6) the distribution system operator shall carry out registration of the consumption points

with the measurement of type A and B in the information system of the market operator to 31.

January 2016.



§ 126



Cancellation provisions



Shall be repealed:




1. Decree No. 365/2009 Coll., on rules of the gas market.



2. Decree No. 370/2010 Coll., amending Decree No. 365/2009 Coll., on

Gas market rules.



3. Decree No 442/2011 Coll., amending Decree No. 365/2009 Coll., on

Gas market rules, as amended by Decree No. 370/2010 Sb.



4. Decree No. 436/2012 Coll., amending Decree No. 365/2009 Coll., on

Gas market rules, in wording of later regulations.



5. Decree No 291/2014 Coll., amending Decree No. 365/2009 Coll., on

Gas market rules, in wording of later regulations.



§ 127



The effectiveness of the



This Decree shall take effect on 1 January 2005. January 2016 with the exception of the provisions of the

§ 62, 68, 71, 72, 74, § 80 to 83, § 86 to 107, annexes 5 to 15, 17 and

18 to this Decree, which shall take effect on 1 January 2005. July 2016.



Chair:



Ing. Vaghela in r.



Annex 1



Request for reservation of transport capacity



Technical data



1. The required input or output point of the transmission system



2. The date and time of provision of transport of gas



3. The type of reserved capacity



4. The nature of the transport capacity (fixed, interruptible,

coordinated, uncoordinated)



5. The size of the required capacity in MWh/day or in a given input

the output point of the transmission system or in m3/day for the sampling location

the customer is directly connected to the transmission system



6. A statement of the accuracy and veracity of the information given.



Annex 2



Particulars of a reservation request distribution capacity



Technical data



1. identification of the applicant in the form of the distribution capacity of the EIC

code



2. The term of the reservation of the distribution capacity of the from-to



3. The type of distribution capacity reserved



4. the reason for the request



5. identification of sampling or a pass-through space, where appropriate, a summary of

transfer points in the form of the EIC code



6. The identification of the customer in the form of



and, where appropriate, names names, surname and date of birth for the category

household



(b). when allocated IDENTIFICATION NUMBER, and the names, forenames and, where appropriate, Appendix, or

business name or the name in other cases



c. the EIC code distribution system operator or the manufacturer of the gas



7. The address of the delivery point



8. The nature of the distribution capacity reserved (fixed,

interruptible)



9. The size of the distribution capacity in the supply or

delivery place, where appropriate, a summary of transfer points with the measurement type, and

or (B). The consumption points with more measuring points for size

the distribution capacity is considered the value of the capacity for measuring

type posts and (B)



10. Estimated annual gas sampling



11. At the consumption points customers a large buyer and Central

the Subscriber or at the consumption points category maloodběr with monthly periodic rate

deduction of the annual diagram projected monthly gas



12. the customer's electronic mail address and telephone number of the customer,

If you are available



13. Declaration of correctness and veracity of the information given.



Annex 3



The terms of the auction on the free storage capacity



1. Terms and conditions of auction shall be proportionate, non-discriminatory and transparent.



2. conditions for auction shall contain



and) minimum price or a way to determine the minimum price per unit

storage capacity for the first year or first 12 months period, for

that is, the storage capacity reserved



(b)) start auction,



(c)) the way to secure electronic communications, including

an alternative method of communication when the failure of electronic communications

on the side of the applicant,



(d)) and the procedure how to determine the composition of the financial collateral,



e) size offered free storage capacity,



f) model gas storage or the definition of the scope of content changes

the existing contract for gas storage, if the modification of the Treaty on

gas storage reserves of storage capacity, which will be enforced by the

concluded with participants in the auction, which will be reserved storage

capacity,



(g) the size of the increase in the price for) a unit of storage capacity between auction

wheels and the method of allocation of storage capacity,



(h) minimum and Max time) reservation of storage capacity,



I) method of calculating the price per unit of storage capacity for other years

or months, after which the storage capacity reserved,



j) model application for the first access to the information system of the operator

the stack gas.



3. the conditions of auctions for new storage capacity also contain



and the minimum amount of storage capacity), which must be at the auction

reserved not to auction the operator stack gas cancelled



(b)), the total storage capacity offered in the first year of storage

gas and in other years, when the new storage capacity or

individual parameters gradually navyšovány.



Annex 4



Rules for the assessment of the feasibility of renominations transport, distribution

and gas storage



The transmission system operator, the distribution system operator or

the operator of a tank of gas on the input renominaci or refuses to

the output point of the gas system, if



(and) are not mutually approved nominations for input or output

the point of the gas system,



(b) the entry or exit point of the transmission system are met

some of the following inequalities (1) and (2)



1

NRJ > Ecps +----Ksj (24-T) (1)

24



NRJ < Ecps (2)



where



j is the input or the output point of the gas system,

T is the hour of the day, from which the gas is effective renominations; T = 1 for 7:00 pm, June natural gas T = 2 to 8:00 pm

gas day up to T = 24 for 6:00 pm of the next gas day,

NRJ is a settlement on the body of renominations of entry or exit point of the gas system to the gas day

Ksj is the sum of all daily interruptible capacity reserved hard or the body's settlement negotiated in

the Treaty (treaties) in the input or the output point of the gas soustavyj to the gas day

ECPS is nominations and renominations adopted and registered in time t set as



NJ (t-1)-Ecps (t-1)

ECPS (t) =---------------------+ Ecps (t-1)

24-t + 2



for t = 1, Ecps (t) = 0



where

Njt nominations or renominations is the subject of settlement at the point of entry or exit of the gas system effective in the hour t gas day



t is the hour of the day, from which the gas is effective renominations; t = 1 for interval < 6:00:00, 7:00:00) up to t = 24 for interval < 5:00:00, 6:00:00) the next gas day.



Annex 5



Flexibility through the accumulation of the gas system provided for

the market operator for the gas day



and Flexibility for the consumption location) of the customer with the measurement of type A and B FOPMA

for the gas day



FOPMA = [KOPM1 x RKOPM x KOPM2 x Spt + (RKOPM x Spt-AlOPM)],



where



KOPM1 is the coefficient laid down on the value of the 0.04979,

KOPM2 is set to 0,

RKOPM is the sum of all the reserved capacity of the body in place of the customer on the discharge gas

the day of the m3 passed pursuant to § 95 paragraph. 1 (a). (f)) or section 96 paragraph. 1 (a). n)

SPT average gross calorific value passed under section 96 paragraph. 1 (a). (f)) vtisícinách MWh/m3

AlOPM is a daily allocation of the body in the place of the supply of the customer passed under section 96 paragraph. 1 (a). (e))

or § 95 paragraph. 1 (a). (e)) or the procedure provided for in § 101 paragraph. 2



For the sampling place the customer attached to the transmission system is the product of the

RKOPM x Spt replaces the sum of all the reserved capacity of the body

clearing in the sampling place the customer on the day the gas in MWh



(b) Flexibility in place of consumption) of the customer with the measurement of type C or CM

FOPMC for the gas day



Cy Cy

FOPMC = [KOPM1 x------x KOPM2 + (-------DHOPM)],

1171 1171



where



CY is the value of the planned annual consumption referred to for the natural gas a day for the daily variation in the information

the market operator system

DHOPM is a daily value of gas sampling according to § 95 paragraph. 6



(c) Flexibility in point production plants) gas FVP = [KVP x RKVP], where the KVP is

the coefficient laid down to 0, the sum of all the RKVP is reserved

the capacity of the body in the production plants to the point of gas

gas day in MWh passed under section 96 paragraph. 1 (a). (c)) or by

section 95 paragraph. 1 (a). I),



(d)) for the input Flexibility border point, the entry point for the cross-border

pipeline and gas storage entry point,



FVB = [RKVB + KVB1 x KVB2 x (RKVB-AlVB)],



where



KVB1 and KVB2 are the coefficients set out in the following table



------------------------------------------------------------

The name of the entry point KVB1 KVB2

------------------------------------------------------------

The border point of 0.00567 0

------------------------------------------------------------

The virtual gas storage 0.00567 0

------------------------------------------------------------

The point of a cross-border gas pipeline 00 00

------------------------------------------------------------



where



RKVB is the sum of all the reserved capacity of the subject of settlement on the gas entry point

system in 1/1000ths of MWh according to section 96 paragraph. 1 (a). (j)) or § 95 paragraph. 1 (a). (j)).

AlVB is a daily allocation of body clearing on the entry point of the gas system of the passed

the market operator under section 96 paragraph. 1 (a). and (b))) or § 95 paragraph. 1 (a). and the.



e) Flexibility in the output point of the border exit point for cross-border

the gas pipeline,



FVyB = [RKVyB + KVyB1 x KVyB2 x (RKVyB-AlVyB)],



where



KVyB1 and KVyB2 are the coefficients set out in the following table



------------------------------------------------------------

The name of the output section KVyB1 KVyB2

------------------------------------------------------------

The border point of 0.00567 0

------------------------------------------------------------

The virtual gas storage 0.00567 0


------------------------------------------------------------

The point of a cross-border gas pipeline 0.04309 0

------------------------------------------------------------

where



RKVyP is the sum of all the reserved capacity of the subject of settlement on the output point of the gas

system in 1/1000ths of MWh according to section 96 paragraph. 1 (a). (j)) or § 95 paragraph. 1 (a). (j)).

AlVyB is a daily allocation of body clearing on the relevant output point of the gas system of the passed

the market operator under section 96 paragraph. 1 (a). and (b))) or § 95 paragraph. 1 (a). (d)).



Annex 6



The procedure for the determination of the index of short-term market



Annex 7



How the compensatory actions to short the market when exceeding the first level



1. If the status of the account of the operator after the filing of nominations under section 62

paragraph. 4 lower than 3372 MWh transmission system operator can

no later than 1 hour after the deadline of submission of nominations under section 62, paragraph. 4 to enter the

the requirement to purchase gas at the intraday market with gas on the following

the day a minimum of 0.5 times the absolute value of the status of the account

the operator and a maximum of 1.5 times the absolute value of the State

the account operator.



2. If the status of the account of the operator after the filing of nominations under section 62

paragraph. 4 higher than 3372 MWh transmission system operator can

no later than 1 hour after the deadline of submission of nominations under section 62, paragraph. 4 to enter the

the requirement for the sale of gas to intraday market with gas on the following

the day a minimum of 0.5 times the absolute value of the status of the account

the operator and a maximum of 1.5 times the absolute value of the State

the account operator.



3. The request for the purchase of the gas referred to in paragraph 1 enters the operator

the transmission system for the last known price on the intraday market

reduced by 0.5 EUR/MWh. in the case where there is no requirement to store

implemented in 5 minutes, will increase the price of the transmission system operator of 0.1

EUR/MWh, even repeatedly, up to a maximum of 3 EUR/MWh compared to the initial

the value of the. Transmission system operator shall, in agreement with the market operator

the market operator may ask about setting up information system operator

the market, in the case of instruction for the purchase of gas under this paragraph

demand was increasing prices automatically. The last known price

intraday market means one realized on the intraday trade

the market of the market operator, in which at least 50 zobchodovalo MWh, and

made no later than before the beginning of the hour in which the

the request is made.



4. the requirement for the sale of the gas referred to in paragraph 2, the operator enters the

the transmission system for the last known price intraday market increased

about 0.5 EUR/MWh. in the case where there is no requirement for trade implemented in 5

minutes of the transmission system operator shall reduce the price of 0.1 EUR/MWh, and even

repeatedly, up to a maximum of 3 EUR/MWh compared to the initial value.

Transmission system operator shall, in agreement with the market operator may

request of the market operator of the market operator's information system settings,

in the case of the order for sale of gas under this paragraph was

raising demand price automatically. The last known price

intraday market means one realized on the intraday trade

the market of the market operator, in which at least 50 zobchodovalo MWh, and

made no later than before the beginning of the hour in which the

the request is made.



5. the guidelines referred to in paragraph 3 and 4 shall be specified so that it can be

even after parts of the flows.



6. the transmission system operator shall, in cooperation with the market operator

inform the subjects of settlement (participants in the gas market) way

enabling remote access on the filing of the order on the purchase or sale of gas

and it's at least 15 minutes before entering such a guideline, while the submission of

such instruction must occur no later than 60 minutes after registration

nominations under section 62, paragraph. 4. the obligation to inform the submission guideline will

the automatic adjustment of the prices referred to in paragraphs 3 and 4 shall not apply.



Annex 8



How the compensatory actions to short the market when crossing or

the expected crossing of the second level and the compensatory action, priority that

is not realized on the short-term market



1. If the status of the account of the operator after the filing of nominations under section 62

paragraph. 4 lower than-5058 MWh, or if the expectations of the operator

the transmission system such that this value is exceeded, the

transmission system operator shall submit a request to purchase the gas on

Intraday gas market on the ongoing natural gas a day, at least in the

the amount of the difference between (i) the absolute value of the actual or expected

the status of the account of the operator, and (ii) the absolute value of one half of the

the values referred to in annex 5, paragraph. 1 and a maximum of the sum of (i)

the absolute value of the actual or expected status of account operator

and (ii) the absolute value of one half of the values listed in annex 5

paragraph. 1.



2. If the status of the account of the operator after the filing of nominations under section 62

paragraph. 4 higher than 5058 kWh or if expectations are operator

the transmission system such that this value is exceeded, the

transmission system operator shall submit a request for the sale of gas to

Intraday gas market on the ongoing natural gas a day, at least in the

the amount of the difference between (i) the absolute value of the actual or expected

the status of the account of the operator, and (ii) the absolute value of one half of the

the values referred to in annex 5, paragraph. 2 and up to a maximum of the sum of (i)

the absolute value of the actual or expected status of account operator

and (ii) the absolute value of one half of the values listed in annex 5

paragraph. 1.



3. The request for the purchase of the gas referred to in paragraph 1 shall be made in the last

intra-day market price reduced known about 0.5 EUR/MWh. In case when the

There is no requirement on trade carried out within 3 minutes, the operator will increase

the transmission system the price of about 0.1 EUR/MWh, even repeatedly, up to a maximum

about € 5/MWh compared to the initial value. The transmission system operator

in agreement with the market operator the market operator may ask about setting

the information system of the market operator, in the case of instruction for the purchase of

gas under this paragraph was raising demand price

automatically. The last known price intraday market means such

the realized trade on intraday market operator the market in which the

zobchodovalo at least 50 MWh, and was before the beginning of the

for hours, in which the request is made.



4. the requirement for the sale of the gas referred to in paragraph 2 shall be made in the last

intra-day market price increased known about 0.1 EUR/MWh. In case when the

There is no requirement on trade carried out within 3 minutes, the operator shall reduce the

the transmission system the price of about 0.5 EUR/MWh, even repeatedly, up to a maximum

about € 5/MWh compared to the initial value. The transmission system operator

in agreement with the market operator the market operator may ask about setting

the information system of the market operator, in the case of instruction for the purchase of

gas under this paragraph was raising demand price

automatically. The last known price intraday market means such

the realized trade on intraday market operator the market in which the

zobchodovalo at least 50 MWh, and was before the beginning of the

for hours, in which the request is made.



5. the transmission system operator shall, in cooperation with the market operator

inform the subjects of settlement (participants in the gas market) on the filing of the order

the purchase or sale of gas and at least 15 minutes prior to the filing

such a guideline. Information about the filing of the order on the

automatic adjustment of the prices referred to in paragraphs 3 and 4 shall not apply.



6. in the event that a request for the sale of the gas referred to in paragraph 4 is not

satisfied even after 150 minutes, the operator may transport

system to use other tools the compensatory services. In the event that the

the request for the purchase of the gas referred to in paragraph 3 is not satisfied even after

expiry of 150 minutes, the transmission system operator can take advantage of additional

service compensation tools.



7. Before using the tool with a lower priority ^ 18) waits for an operator

the transmission system at least 60 minutes for the eventual realization of the buffer

the action in the current priority. The instructions referred to in paragraphs 3 and 4 shall be specified so

in order to be capable of trading in both parts.



Annex 9



Information published by the transmission system operator in case of

implementation of the remedial action



1. the quantities of gas in MWh for compensatory action



2. the price of the compensatory actions realized in EUR/MWh or in CZK/MWh



3. the type of market, on which the countervailing action



4. the operator of a market in which there was a countervailing action



5. type of product demanded or offered



6. place of delivery



7. the time of the supply or demand



8. time of realization



9. the rationale for compensatory actions undertaken



10. the justification of the use of compensation services.



Annex 10



The determination of the amount of the applicable price for the daily amount of compensation



The unit price is applicable I for a positive day of compensatory amounts



For a positive day for the compensatory amount of gas a day will determine the

the unit price is applicable as the lower of the two prices



1. Lowest price for compensatory action, the transmission system operator and

under section 92, paragraph. 3 and 5, that has to pass gas in the

gas day



2. Replacement Pnáhr price in EUR/MWh, determined by the formula



Pnáhr = Ptrh * kkDVM



Where:

Ptrh is the index of short-term market for the relevant gas day fixed podlepřílohy No 6 to this Ordinance

kkDVM is the coefficient of reduction in short-term market index for positive daily amount of compensation specified in the interval

0.95 to 0.98 as follows

and the value of the system imbalance) less than or equal to 0 MWh



kkDVM = 0.98



(b)) for the value of the system imbalance in the interval (0, 74470 MWh)



kkDVM = 0.98-0.03 * SAT/, 74470



where



SO is the value system of the derogation for the relevant gas day in MWh



(c)) for the value of the system imbalance is greater or equal 74470 MWh



kkDVM = 0.95



II. the unit price applicable for a negative day buffer quantity



The daily amount of compensation for the negative for the gas day determines

the unit price is applicable as the higher of the following two prices



1. The highest price for a compensatory action, the transmission system operator


under section 92, paragraph. 2 and 4, that has to pass gas in the

gas day



2. Replacement Pnáhr price in CZK/MWh, determined by the formula



Pnáhr = Ptrh * kzDVM



where



Ptrh is the index of short-term market for the relevant gas day determined in accordance with annex 6 to this Ordinance

kzDVM is the coefficient of reduction of the negative short-term market index for daily quantities of buffer specified

in 1.05 1.02 to interval as follows



and the value of the system imbalance) greater or equal to 0 MWh



kzDVM = 1.02



(b)) for the value of the system imbalance in the interval (-74470 MWh; 0)



kzDVM = 1.02 + 0.03 * SAT/74470



Where



SO is the value system of the derogation for the relevant gas day in MWh.



For a value less than or equal to the system imbalance-74470 MWh



kzDVM = 1.05



Annex 11



Data for the distribution or transport gas bill



Distribution or transmission system operator shall be sent to the vendor

the gas through the information system of the market operator for the

the Bill of distribution of gas in place of consumption of the customer at least these

information:



A. identification data



I. numeric code distribution or transmission system operator



II. the code number of the sampling space (EIC)



III. identification of the measuring points, the number and type of measuring device



IV. the invoice period



The reason of the patch (for corrective invoices)



(B). The data from the measurement



I. for the supply point of the customer category large buyer or medium

the Subscriber with the measurement of type A or B



1. the calculated gas consumption in each gas in m3



2. the calorific value of gas volume in the individual days in kWh/m3



3. the distributed amount of gas in each gas days in

kWh



4. the unit is a fixed price for the removed gas in €/kWh



5. the unit is a fixed price for the work of clearing the market operator in €/kWh



6. the initial state of the gauge in m3



7. the final status in the m3



II. the place of consumption with the measurement of type C or CM



1. the initial state of the gauge in m3



2. the final status in the m3



3. the distribution of measured consumption on the gauge to the individual gas

months in m3



4. the distribution of measured consumption on the gauge to the individual gas

months in kWh



5. the distribution of the measured gas consumption in each months in

kWh



6. the conversion rate of the gauge to standard conditions



7. the unit is a fixed price for the removed gas in each gas

months in €/kWh



8. the unit is a fixed price for the work of clearing the market operator in €/kWh



9. the value of gas consumption used for the classification of the sampling locations

a customer with a full meter reading for a period longer than 1 month into the sampling

band for billing purposes according to the distribution of gas consumption of gas in

sampling place the customer,



10. doúčtované the amount of consumed gas in case of a failure of the measuring

the device.



(C) the agreed values.



I. for the supply point of the customer category large buyer or medium

the Subscriber with the measurement of type A or B



1. reserved capacity for an indefinite period



and the size of the reserved capacity in) m3



(b)) the percentage of the period to the price per unit



(c) a fixed annual price per unit) for the daily reserved capacity in the

CZK/1 000 m3



2. interruptible capacity reserved for an indefinite period



and the size of the reserved capacity in) m3



(b)) the percentage of the period to the price per unit



(c) a fixed annual price per unit) for the daily reserved capacity in the

CZK/1 000 m3



3. reserved monthly capacity



and the size of the reserved capacity in) m3



(b) the beginning of the validity of the reserved capacity)



(c)) of the reserved capacity



(d)) the percentage of the period to the price per unit



e) unit is a fixed price per day reserved capacity in CZK/1 000 m3



4. interruptible capacity reserved monthly



and the size of the reserved capacity in) m3



(b) the beginning of the validity of the reserved capacity)



(c)) of the reserved capacity



(d)) the percentage of the period to the price per unit



e) unit is a fixed price per day reserved capacity in CZK/1 000 m3



5. reserved daily fixed capacity for an indefinite period of

historically reached the daily maximum



and the size of the reserved capacity in) m3



(b)) the percentage of the period to the price per unit



(c)), the unit price for the fixed daily reserved capacity in CZK/1 000 m3



6. reserved sliding capacity



and the size of the reserved capacity in) m3



(b) the beginning of the validity of the reserved capacity)



(c)) of the reserved capacity



(d) the period for the share) price per unit



e) unit is a fixed price per day reserved capacity in CZK/1 000 m3



7. exceeding the reserved capacity



and maximum size exceeded) the reserved capacity in m3



(b)) the unit fixed price for exceeding the daily reserved capacity in the

CZK/1 000 m3



II. the place of consumption with the measurement of type C or CM



1. reserved distribution capacity



and distribution capacity reserved size) in the m3 calculation fixed



(b)) share of the period to the price per unit



(c) a fixed annual price per unit) for the daily reserved capacity in the

CZK/1 000 m3



2. the permanent monthly salary



and the beginning of the period considered)



(b) the end of the period)



(c) the market share of the period) the unit price



(d)) the unit fixed monthly payment for the přistavenou capacity



(D) other charges and discounts



Annex 12



Class type-delivery diagrams



Class load profiles for the categories of household gas supplies,

maloodběr and medium Subscriber are assigned to the operator in the distribution

system on the basis of the nature of the sampling point and frequency readout,

While the class name does not reflect the customer category, TDD. The assignment of classes

to the sampling points is the following.



1. Customers with the use of the delivery point code R01



--------------------------------------------------------------

CLASS TDD: DOM1

--------------------------------------------------------------

Annual consumption (cooking) S01 S02 S03 (TUV) (otop)

--------------------------------------------------------------

by 7.56 MWh 1 00 00

by 7.56 MWh 00 1 00

by 7.56 MWh 00 00 1

by 7.56 MWh 1 1 00

by 7.56 MWh 1 00 1

by 7.56 MWh 00 1 1

by 7.56 MWh 1 1 1

--------------------------------------------------------------



DOM1 Customers with the use of the sampling space code R01 with gas

less than 7.56 MWh/year.



--------------------------------------------------------------

CLASS TDD: DOM2

--------------------------------------------------------------

Annual consumption (cooking) S01 S02 S03 (TUV) (otop)

--------------------------------------------------------------

over 7.56 MWh 1 00 00

over 7.56 MWh 00 1 00

over 7.56 MWh 1 1 00

over 7.56 MWh 1 00 1

over 7.56 MWh 00 1 1

--------------------------------------------------------------



DOM2 Customers with the use of the sampling space code R01 with gas

greater or equal 7.56 MWh/year, without gas heating (only cooking or

preparation of hot water, or both at the same time). Additionally, customers with

using delivery point code R01 with gas more or equal

7.56 MWh/year, a combination of cooking and heating gas or preparing hot

water and heating gas.



--------------------------------------------------------------

CLASS TDD: DOM3

--------------------------------------------------------------

Annual consumption (cooking) S01 S02 S03 (TUV) (otop)

--------------------------------------------------------------

over 7.56 MWh 1 1 1

--------------------------------------------------------------



DOM3 Customers with the use of the sampling space code R01 with plynuvětším or equal 7.56 MWh/year, while cooking and heating gas and hot water preparation.



--------------------------------------------------------------

CLASS TDD: DOM4

--------------------------------------------------------------

Annual consumption (cooking) S01 S02 S03 (TUV) (otop)

--------------------------------------------------------------

over 7.56 MWh 00 00 1

--------------------------------------------------------------



DOM4 Customers with the use of the sampling space code R01 with gas

greater or equal 7.56 MWh/year only heating gas



2. Customers with the use of the delivery point code other than R01 with measurements

type C with regular readings over a period of more than 1 month



------------------------------------------------------------------

CLASS TDD: MO1

------------------------------------------------------------------

use code S01 S02 S03 S04

OM (cooking) (TUV) (otop) (technology)

------------------------------------------------------------------

R02 1 0 0 x

R02 0 1 0 x

R03 1 0 0 0

R03 0 1 0 0

R03 0 0 0 1

R03 1 1 0 0

R03 1 0 1 0

R03 1 0 0 1

R03 0 1 1 0

R03 0 1 0 1

R03 0 0 1 1

R03 1 1 1 0

R03 1 1 0 1

R03 1 0 1 1

R03 0 1 1 1

R03 1 1 1 1

R04 1 0 0 0

R04 0 1 0 0

R04 0 0 0 1

R04 1 1 0 0

R04 1 0 0 1

R04 0 1 0 1

R04 0 0 1 1

R04 1 1 0 1

R04 1 0 1 1

R04 0 1 1 1

R04 1 1 1 1

R05 1 0 0 0

R05 0 1 0 0

R06 1 0 0 0

R07 1 0 0 0

R07 0 1 0 0


R07 0 0 1 0

R07 0 0 0 1

R07 1 1 0 0

R07 1 0 1 0

R07 1 0 0 1

R07 0 1 1 0

R07 0 1 0 1

R07 0 0 1 1

R07 1 1 1 0

R07 1 1 0 1

R07 1 0 1 1

R07 0 1 1 1

R07 1 1 1 1

R08 x x x 1

R09 x x x 1

R10 x x 0 1

R11 1 0 x x

R11 0 1 x x

R11 1 1 x x

R12 x x x 1

------------------------------------------------------------------



Mo1 Customers with delivery point code to use with sicknesses of R12 and all

permitted combinations of parameters S01 S04 to, who are not included in the

Mo2 to MO4.



------------------------------------------------------------------

CLASS TDD: MO2

------------------------------------------------------------------

use code S01 S02 S03 S04

OM (cooking) (TUV) (otop) (technology)

------------------------------------------------------------------

R02 1 1 0 x

R04 1 0 1 0

R04 0 1 1 0

R05 0 0 0 1

R05 1 1 0 0

R05 1 0 0 1

R05 0 1 0 1

R05 0 0 1 1

R05 1 1 0 1

R05 1 0 1 1

R05 0 1 1 1

R05 1 1 1 1

R06 0 1 0 0

R06 0 0 0 1

R06 1 1 0 0

R06 1 0 1 0

R06 1 0 0 1

R06 0 1 0 1

R06 0 0 1 1

R06 1 1 0 1

R06 1 0 1 1

R06 0 1 1 1

R06 1 1 1 1

R10 x x 1 0

R10 x x 1 1

------------------------------------------------------------------



Mo2 Customers with delivery point code use with sicknesses of subscription for

the combination of cooking and preparation of hot water, with the use of the delivery point code

With the collection for the combination of R04 for heating and preparing hot water or

heating and cooking, use code from the delivery point to the collection only

for technology or for a combination of cooking and preparing hot water,

technology and cooking, technology and preparation of hot water, technology and

heating and for the combination of technology and preparation of hot water and

cooking, heating and cooking technology, technology and heating and

preparation of hot water and for the combination of technology and heating and preparation

hot water and cooking, with the use of the delivery point code R06 with the collection

only for the preparation of hot water, or only for the technology, or for

the combination of cooking and preparing hot water, heating and cooking technology

and cooking, technology and preparation of hot water, heating technology and

In addition to the combination of technology and preparation of hot water and cooking,

technology and heating and cooking technology and heating and preparation

hot water and for the combination of technology and heating and hot water preparation

and cooking, with the use of the delivery point code R10 with the collection only for the

heating or for a combination of technology and heating.



------------------------------------------------------------------

CLASS TDD: MO3

------------------------------------------------------------------

use code S01 S02 S03 S04

OM (cooking) (TUV) (otop) (technology)

------------------------------------------------------------------

R02 1 0 1 x

R02 0 1 1 x

R02 1 1 1 x

R03 0 0 1 0

R04 1 1 1 0

R05 1 0 1 0

R05 1 1 1 0

R06 0 1 1 0

R06 1 1 1 0

------------------------------------------------------------------



Mo3 Customers with delivery point code use with sicknesses of subscription for

the combination of heating and cooking or heating and preparing hot water or

heating and hot water preparation and cooking, with the use of the code of consumption

the place with the collection only for the compartment heating system, with the use of the delivery point code

With the collection for the combination of R04 heating and hot water preparation and cooking, with

use code from the delivery point to the collection for the combination of heating and

cooking or heating and hot water preparation and cooking, with the use of the code

the sampling sites for the combination with the R06 heating and preparing hot

water or space heating and hot water preparation and cooking.



------------------------------------------------------------------

CLASS TDD: MO4

------------------------------------------------------------------

use code S01 S02 S03 S04

OM (cooking) (TUV) (otop) (technology)

------------------------------------------------------------------

R02 0 0 1 0

R04 0 0 1 0

R05 0 0 1 0

R05 0 1 1 0

R06 0 0 1 0

------------------------------------------------------------------



MO4 Customers with delivery point code, use with sicknesses of R04 R06 or with

collection only for heating with the use of the delivery point code From with

collection only for heating or combination heating and preparing hot

water.



3. Customers with the use of the delivery point code other than R01 with measurements

type C with ordinary monthly readings



------------------------------------------------------------------

CLASS TDD: SO1

------------------------------------------------------------------

use code S01 S02 S03 S04

OM (cooking) (TUV) (otop) (technology)

------------------------------------------------------------------

R02 1 0 0 x

R02 0 1 0 x

R03 1 0 0 0

R03 0 1 0 0

R03 0 0 0 1

R03 1 1 0 0

R03 1 0 1 0

R03 1 0 0 1

R03 0 1 1 0

R03 0 1 0 1

R03 0 0 1 1

R03 1 1 1 0

R03 1 1 0 1

R03 1 0 1 1

R03 0 1 1 1

R03 1 1 1 1

R04 1 0 0 0

R04 0 1 0 0

R04 0 0 0 1

R04 1 1 0 0

R04 1 0 0 1

R04 0 1 0 1

R04 0 0 1 1

R04 1 1 0 1

R04 1 0 1 1

R04 0 1 1 1

R04 1 1 1 1

R05 1 0 0 0

R05 0 1 0 0

R06 1 0 0 0

R07 1 0 0 0

R07 0 1 0 0

R07 0 0 1 0

R07 0 0 0 1

R07 1 1 0 0

R07 1 0 1 0

R07 1 0 0 1

R07 0 1 1 0

R07 0 1 0 1

R07 0 0 1 1

R07 1 1 1 0

R07 1 1 0 1

R07 1 0 1 1

R07 0 1 1 1

R07 1 1 1 1

R08 x x x 1

R09 x x x 1

R10 x x 0 1

R11 1 0 x x

R11 0 1 x x

R11 1 1 x x

R12 x x x 1

------------------------------------------------------------------



SO1 all customers with delivery point code to use with sicknesses of R12 and

all permitted combinations of parameters to S01 S04, who are not

included in the SO2 to SO4.



------------------------------------------------------------------

CLASS TDD: SO2

------------------------------------------------------------------

use code S01 S02 S03 S04

OM (cooking) (TUV) (otop) (technology)

------------------------------------------------------------------

R02 1 1 0 x

R04 1 0 1 0

R04 0 1 1 0

R05 0 0 0 1

R05 1 1 0 0

R05 1 0 0 1

R05 0 1 0 1

R05 0 0 1 1

R05 1 1 0 1

R05 1 0 1 1

R05 0 1 1 1

R05 1 1 1 1

R06 0 1 0 0

R06 0 0 0 1

R06 1 1 0 0

R06 1 0 1 0

R06 1 0 0 1

R06 0 1 0 1

R06 0 0 1 1

R06 1 1 0 1

R06 1 0 1 1

R06 0 1 1 1

R06 1 1 1 1

R10 x x 1 0

R10 x x 1 1

------------------------------------------------------------------



Customers with the use of SO2 code delivery point with sicknesses of subscription for

the combination of cooking and preparation of hot water, with the use of the delivery point code

With the collection for the combination of R04 for heating and preparing hot water or

heating and cooking, use code from the delivery point to the collection only

for technology or for a combination of cooking and preparing hot water,

technology and cooking, technology and preparation of hot water, technology and


heating and for the combination of technology and preparation of hot water and

cooking, heating and cooking technology, technology and heating and

preparation of hot water and for the combination of technology and heating and preparation

hot water and cooking, with the use of the delivery point code R06 with the collection

only for the preparation of hot water, or only for the technology, or for

the combination of cooking and preparing hot water, heating and cooking technology

and cooking, technology and preparation of hot water, heating technology and

In addition to the combination of technology and preparation of hot water and cooking,

technology and heating and cooking technology and heating and preparation

hot water and for the combination of technology and heating and hot water preparation

and cooking, with the use of the delivery point code R10 with the collection only for the

heating or for a combination of technology and heating.



------------------------------------------------------------------

CLASS TDD: SO3

------------------------------------------------------------------

use code S01 S02 S03 S04

OM (cooking) (TUV) (otop) (technology)

------------------------------------------------------------------

R02 1 0 1 x

R02 0 1 1 x

R02 1 1 1 x

R03 0 0 1 0

R04 1 1 1 0

R05 1 0 1 0

R05 1 1 1 0

R06 0 1 1 0

R06 1 1 1 0

------------------------------------------------------------------



SO3 Customers with delivery point code use with sicknesses of subscription for

the combination of heating and cooking or heating and preparing hot water or

heating and hot water preparation and cooking, with the use of the code of consumption

the place with the collection only for the compartment heating system, with the use of the delivery point code

With the collection for the combination of R04 heating and hot water preparation and cooking, with

use code from the delivery point to the collection for the combination of heating and

cooking or heating and hot water preparation and cooking, with the use of the code

the sampling sites for the combination with the R06 heating and preparing hot

water or space heating and hot water preparation and cooking.



------------------------------------------------------------------

CLASS TDD: SO4

------------------------------------------------------------------

use code S01 S02 S03 S04

OM (cooking) (TUV) (otop) (technology)

------------------------------------------------------------------

R02 0 0 1 0

R04 0 0 1 0

R05 0 0 1 0

R05 0 1 1 0

R06 0 0 1 0

------------------------------------------------------------------



Customers use code SO4 delivery point with sicknesses of R04 R06, or with

collection only for heating with the use of the delivery point code From with

collection only for heating or combination heating and preparing hot

water.



Note: for customers with the use of the delivery point code R08 and R09

(seasonal technological subscriptions) will be type-delivery diagrams

individually adjusted on the basis of the distribution system operator

the assessment of a particular period of gas the customer.



Annex 13



The nature of the sampling locations for the assignment of a type-supply diagram



The nature of the sampling space describes the properties of the sampling points,

the basis is to supply the place of the supply of the type assigned to the diagram.

The nature of the sampling sites is intended for this purpose using sampling

places, časovostí and character of the collection. On the basis of specific assignments

the values of individual characteristics and the amount of the annual consumption will be

supply the place of the supply of the type assigned to the diagram.



Description of the table to determine the nature of the sampling locations



The table lists the individual characteristics of the consumption points and

their allowed combinations



----------------------------------------------------------------------------------------------------------------

The NATURE of the SAMPLING SPACE Časovost the nature of the subscription

C01 C02 S01S02 S03 S04

The code for the Use of the sampling space SATURDAY PRAC. DAY vařeníTUV-heating technology

SUNDAY

----------------------------------------------------------------------------------------------------------------

R01 Flat, family house, a recreational object + + +

With sicknesses of administrative facilities

(Office space, cultural

zařízení) + + +

R03 Accommodation and catering facilities

(hotel, pension, lodging house,

Restaurant, cafeteria, snack bar, bar,

game room, S04 = mass cooking) + + + +

R04 production facilities (Hall, workshop) + + + +

From School and sports equipment + + + +

R06 Sale equipment (construction for

trade, construction, with sales flat) + + + +

R07 hospital and medical equipment + + + +

R08 Seasonal technological subscriptions-winter +

R09 Seasonal technological subscriptions-summer +

Boiler Room + R10 +

R11 + subscriptions + Other minor

(7, 56MWh