80/2010 Sb.
The DECREE
of 18 July 2003. March 25, 2010
a State of emergency in the electricity sector and the substantive aspects of the
emergency plan
The Ministry of industry and trade shall determine under section 98a of paragraph 1. 1 (a). (f))
Act No. 458/2000 Coll., on conditions for business and public administration
in the energy sectors and on the amendment of certain laws (energy
Act), as amended by law No 158/2009 Coll., to implement sections 24, 25 and 54
Energy Bill:
Restrictions on the consumption of electricity and the supply of electricity to the change control
the electricity system
§ 1
(1) performance that is being removed from the electricity system, can be limited, or
the power that is supplied to the power system, you can change these
ways:
and by reducing the value to be removed) the performance of the electricity system in accordance with
consumption reduction plan (the "plan"), the use and
content requirements including the method of notification, advertising and
revoking the regulatory degrees are listed in Appendix 1 of this
the Decree,
(b) the total interruption of the power supply) customers disconnecting their
delivery of electrical equipment or transmission system operator
distribution system operator or by turning off parts of the device for
electricity transmission or distribution of electricity
1. under the power plan, whose use and content requirements are
listed in annex 2 of this order,
2. According to the frequency plan, of which the use, processing, issuing and
updates are listed in annex 3 of this order,
3. the operational parts of the transmission system by turning off the device, or
the distribution system to the extent necessary to compensate for power balance
the affected part of the electricity system,
(c)) by changing the value of the performance delivered by the manufacturer of electricity into the electricity
follow the instructions on the technical system of dispatching the transmission
system operator or distribution system operator.
(2) restrictions on the consumption of electricity in the territory, where there is the emergence of a State of emergency
or for which a State of emergency was declared, is determined by the application of the relevant
the degree of regulatory plan, operational plan, turning off the power parts
equipment or automatic exposure frequency relay in accordance with
the frequency plan, to the extent necessary to compensate for power balance
the affected part of the electricity system. These measures are applied to the
the basis of the assessment of the situation of the technical dispatch operator
the transmission system or the technical operators of the dispatching centres
distribution system operators. This restriction does not apply to electricity consumption
customers whose devices are connected only to foreign
the electricity grid and subject only to the limitations of this
Foreign electricity system.
(3) restrictions on the consumption of electricity by regulatory plan does not apply to
technology its own electricity consumption for the production of electricity and the production of
and the supply of heat.
§ 2
(1) the procedure for and extent of performance or changes to the subscription included
performance in the prevention or resolution of a State of emergency handles the technical
the dispatching of the transmission system operator, in partnership with technical
dispatching distribution system operators directly connected to
transmission system (hereinafter referred to as "regional distribution system"). On
procedure for distribution system operators, which are not directly
connected to the transmission system (hereinafter referred to as "local distribution
system "), is covered by section 7.
(2) the reduction Plan subscription performance of the shutdown of selected appliances
processed for the purposes of the regulatory plan is a separate part of the program
the broadcast signal of the remote control of the bulk of the processed
the operator of regional distribution networks.
(3) increasing the performance of the device to be removed, which was removed from the
operation or was in operation with reduced performance listings, it is not possible
launch of the publication and for the duration of the regulatory-related degrees
absorbed power from the electricity system and for their effectiveness, with
the exception of the imminent threat to the life or health of persons.
(4) the shut-off plan processed technical dispatch operator
the transmission system in cooperation with the technical operators of the dispatching centres
regional distribution networks, lays down the procedure and the values of the
vypínaných performance when disposing of significant system or local
failures in the electricity grid. On the procedure of local operators
distribution system operators are covered by section 7. Interruption of the power supply is
performs shutdown of selected parts of the transmission system operator or distribution
the system.
(5) Frequency plan of the processed technical dispatch operator
the transmission system and the technical operators of regional control centers
distribution system operators and manufacturers of electricity is the procedure for prevention and
solution of emergency associated with an unbalanced power balances in the
the electricity grid, and current by changing the frequency of the system, which
lies in the creation of the island's plants, in disrupting the supply of electricity
customers of electricity and disconnect electricity from electricity generating stations
system by frequency relays, which are installed in the
electricity generating stations, transmission system, distribution system, or
in the sampling locations of customers.
§ 3
(1) the amount of the interrupted performance, selection and fitting of frequency relay
the transmission system operator and the operators of regional
distribution system operators. On the process of operators of local distribution
systems covered by section 7.
(2) regional distribution system Operators shall transmit to the
each year before 30. September by transmission system updated
the value of the performance for each of the regulatory degree and the degree of power
the plan and the frequency plan. The operators of the local distribution
system operators shall transmit the following information each year to the 15. September operators
the distribution system, their system is connected. On the basis of the
These data technical dispatching of the transmission system operator in
cooperation with the technical dispatching distribution system operators
update their regulatory, tripping and frequency plans.
§ 4
The classification of customers into regulatory degrees
(1) for the reduction of electricity consumption in the prevention of a State of emergency and when
a State of emergency to customers classified in regulatory degrees according
the regulatory plan.
(2) the classification of customers into regulatory degrees No 1 and no 2 performed
the distribution system operator; This classification is not mentioned in the
the treaties whose subject is the transmission or distribution of electricity.
(3) the classification of customers into regulatory degrees No 3 to No 7 carried out
and) operator of the transmission system operator or distribution
system on the basis of the Treaty on the transit of electricity or the Treaty on
distribution of electricity,
(b)) electricity trader or producer of electricity, on the basis of the Treaty on
associated electricity supply services; electricity trader or
the manufacturer of electricity transmitted the necessary data, the competent operators
the system.
§ 5
Preventing emergencies
(1) in situations where there is a risk of the real risk of a State of emergency, may
the transmission system operator or distribution system operator
to declare a warning level, which is part of the regulatory plan.
(2) restrictions on the consumption of electricity and change the supply of electricity when
Prevention of emergencies are carried out
and according to the frequency plan automatically),
(b) the technical operator) Dispatcher system
1. in accordance with the regulatory degree No. 1,
2. under the power plan
3. turn off the device in the operative part of the extent necessary for the
power leveling the balance of power system,
4. using the available production capacities,
5. limitations of the supplied power.
(3) the transmission system operator to announce without undue delay it
applied limitation of consumption or changes in the supply of electricity in the prevention
emergency operators concerned regional distribution
system operators.
(4) the operator of a regional distribution system to announce without
undue delay, it applied restrictions on consumption or changes in delivery
electricity emergency prevention, transmission system operators
and local distribution systems operators concerned, who have
set up the technical control room.
(5) the operator of a local distribution system to announce without undue
delay it applied restrictions on the consumption of electricity or changes in the
Prevention of emergency regional distribution system operators,
that is its distribution system.
(6) the operator of a transmission system operator or distribution
the system announces the prevention of a State of emergency in a manner enabling remote
access.
§ 6
A State of emergency
(1) any restrictions on the consumption of electricity or changes in the supply of electricity when
emergency controls technical dispatching of the transmission system operator
or technical dispatching distribution system operator.
(2) a State of emergency is usually cited, and dismissed by the advance. In the case of
the rapid collapse of the electricity system may be a State of emergency declared
Additionally.
(3) restrictions on the consumption of electricity and the supply of electricity when the state change
emergencies are carried out
and according to the frequency plan automatically),
(b) according to the plan, the power key)
(c)) under the regulatory plan in the range of regulatory degrees No 1 to No 7,
(d) operational shutdown of equipment parts) to the extent necessary for the
power leveling the balance of power system,
(e)) using the free production capacity,
(f) limiting the power supplied).
(4) transmission system operator shall, without undue delay to announce it
Declaration of a State of emergency or revoked operators concerned
regional distribution networks.
(5) the operator of a regional distribution system without undue delay
announcing his declaration of a State of emergency or revoked by transmission
system operators concerned and local distribution systems,
who have set up a technical control room.
(6) the operator of a local distribution system without undue delay
announcing his declaration of a State of emergency or revoked operators
regional distribution system, which is its distribution system
attached.
(7) in the resolution of the State of emergency be forwarded to the transmission system operator,
the distribution system operator and electricity producers according to their
emergency plan, whose terms and the method of processing are given in
Annex No. 4 of this Ordinance.
section 7 of the
The procedure of operators of local distribution systems
Operators of local distribution systems in the prevention of State
and when the State of emergency in the event that the
and they have set up a technical control room) and shall notify this fact to the
regional distribution system operators, shall act as
regional operators, distribution system operators,
(b) have established a technical control room), are considered to be customers.
§ 8
Cancellation provisions
Shall be repealed:
1. Decree No. 219/2001 Coll., on the procedure in the case of imminent or
the current state of emergency in the electricity sector.
2. Decree No. 221/2001 Coll., on details of the granting State
authorization for the construction of direct lines.
3. Decree No. 222/2001 Coll., on details of the granting State
authorization for the construction of production plants of electricity.
4. Decree No 226/2001 Coll., on details of the granting State
authorization for the construction of the thermal energy sources.
§ 9
The effectiveness of the
This Decree shall take effect on 1 January 2005. April 2010.
Minister:
Ing. Tošovský in r.
Annex 1
The use of and the content requirements of the regulatory plan, including ways to
notification, announcing the removal of regulatory and degrees
I. classification of customers into regulatory degrees
(1) the customers are included in regulatory degrees according
and how to control the appliances using the) mass of the remote control,
(b) the nominal value of the voltage part) of the electricity system, which is
sampling the electrical equipment connected to a particular customer,
(c) the value of the reserved power) indicated in the contract.
(2) the classification of customers into regulatory degrees:
and in the regulatory level) No. 1 all customers are enrolled, which is
carried out with selected mass control remote
control, or using another technical system for
size control of consumption,
(b)) in the regulatory degree No 2 are placed customers for
electricity from the establishment of distribution networks with a voltage higher than 1 kV
the value of the reserved power to 100 kW and the customers for
electricity from the establishment of distribution networks with voltage up to 1 kV
the value of the circuit-breaker before the meter is less than 200 and,
(c)) in the regulatory stages 3 and 5 are enrolled customers for
electricity transmission system from the device or from the equipment distribution
systems with voltage higher than 1 kV and with the value of the reserved power 1
MW and higher,
(d)) in the regulatory stages 4 and 6 are enrolled customers for
electricity from the establishment of distribution networks with a voltage higher than 1 kV and
with the value of the reserved power from 100 kW to 1 MW and including customers
for electricity from the establishment of distribution networks with voltage up to 1
kV circuit breakers with a value before the 200 meter and higher,
(e)) in the regulatory stage no 7 are included all the customers.
II. Regulatory instance
(1) Basic degree does not reduce subscription performance and reflects the normal
the operating status of power system with balanced power balances,
the necessary power reserve, secured the required volume and
the structure of the support services for the transmission system operator and
secured transmission of electricity in compliance with the safety and
reliability criteria.
(2) the warning level does not diminish the absorbed power and
and the criteria of reliability) indicates failure in electric systems
for reasons of balance, transmission or other
(b)) draws attention to the restrictions of transmission or distribution capacity
or services of the transmission system or distribution
system operators,
(c)) draws attention to the need for increased attention to resource monitor
sent on the energy situation and the resources used for
the announcement of the regulatory steps.
(3) the regulation level no. 1 represents a decrease in the value of performance
to be removed from the power system shutdown and turn on blocking
selected appliances operated by using the remote control, the bulk
where appropriate, the other technical management system
the size of the consumption.
(4) the regulation level no. 2 represents a decrease in the value of performance
to be removed from the power system by using technical resources
system operator within 1 hour after the announcement of the regulatory degree,
If a longer period is not fixed.
(5) the regulation level no. 3 represents a decrease in the value of performance
to be removed from the power system of the values referred to in point (III). paragraph.
3 of this annex, and within 30 minutes after the publication of the regulatory level.
(6) the regulation level no. 4 represents a decrease in the value of performance
to be removed from the power system, the values referred to in point (III).
paragraph. 3 of this annex, and within 1 hour after the announcement of the regulatory degree,
If a longer period is not fixed.
(7) the Regulatory stage 5 represents a decrease in the value of performance
to be removed from the power system of the values referred to in point (III). paragraph.
3 of this annex, and within 1 hour after the announcement of the regulatory level.
(8) the Regulatory stage 6 represents a decrease in the value of performance
to be removed from the power system of the values referred to in point (III). paragraph.
3 of this annex, within 2 hours after the publication of the regulatory degree, if
There is no fixed time is longer.
(9) Regulation level no. 7 represents a decrease in the value of performance
to be removed from the power system for all customers on the value of the
the safety of the minimum to 1 hour after the publication of the regulatory level. U
sampling device, where up to one hour to reduce the value of the
removed power to the minimum security is determined by the time offset in
hours as the time necessary for the reduction in value of the security subscription
minima.
(10) the value of the performance to be removed from the electricity system means
the average value of the performance to be removed from the electricity system in business
an hour before the publication of the regulatory level.
(11) the Regulatory degree No. 1 to 6 may be announced at the same time.
(12) the Regulatory degree No. 2 to 7 do not apply to customers whose
the predominant activity is in health care, telecommunications and postal
services, in the management of water works and supply of drinking water,
the defence of the State in mining in deep mines, civil air transport, in
the operation of the public rail transport, public transport, in
buildings and facilities Office of the Government of the CZECH REPUBLIC, the Czech National Bank,
The Ministry of the Interior, the Ministry of Justice and police of the Czech
of the Republic. Furthermore, the regulatory degree No. 2 to 7 do not apply to folder
The integrated rescue system and on customers to ensure the delivery of
heat, electricity, and when could endanger the
nuclear safety, and on the bodies of the mobilization and
the supplier of the necessary supplies referred to in the crisis plan system
economic mobilization in the time of crisis stavů1).
III. The value of the performance degradation
(1) the selection and turn off appliances when the announcement of the regulatory groups of degree
No 1 is carried out by the technical control of the operator, the distribution
the system.
(2) decrease in performance for each individual customer, included in
the regulatory degree No 2, is carried out by the operator, the distribution
the system.
(3) the value of the reduction in each individual subscription performance to the regulatory
level 3 to 6 shall be as
and 15% of the value) of the performance, to be removed from the power system under the
(II). paragraph. 10 of this annex, or
(b) 15% of the value) of the reserved capacity in the relevant calendar month,
It is the sum of annual reserved capacity, and monthly reserved capacity
in a given calendar month.
(4) to reduce the value of the performance to be removed by the customer in accordance with the regulatory
grades 3 and 4 in the amount of 15% follow the regulatory degree No. 5 and 6, which
reduce the value of the performance to be removed by a further 15% of the maximum
the total amount of the 30% reduction in subscription performance while respecting the
safety minimum.
(5) the value of the decrease in performance for the grade No. 7 are laid down with regard to the
compliance with the minimum of electricity security for the customer, hereinafter referred to as
"minimum security".
(6) the value of the performance degradation for the regulatory degree No. 3 to 7, and the values
the minimum security with the possibility of a reduction to one hour.
time for which the value of the security will be achieved, the minimum
and contact details of the customer are part of the contract for the transmission of electricity
or the distribution of electricity or combined services delivery
electricity.
IV. Determining the value of the minimum security
(1) minimum Security means the minimum value of the subscription
the performance, which is after their production is strictly necessary to ensure the
safety technology of sampling device, the impact on the surrounding environment and
serving workers.
(2) minimum Security is provided for all customers with the value
reserved power 100 kW and above, or in the case of customers
taking electricity from the establishment of distribution networks with a voltage of up to
1 kV with a value before the 200 meter and circuit breakers and higher.
(3) safety minimum inventory is determined on the basis of the individual
appliances and their safety and technological analysis of the minimum
consumption without production. An inventory of the various appliances and analysis
their safety and technological minimum consumption to be compiled
individual customers.
(4) safety minimum for customers included in the regulatory degree
No. 2 is provided for in the rules of operation of the distribution system.
In a way, the promulgation and notification revoking the regulatory degrees
(1) the degree of the base, warning, and information about the use of the regulatory degree
No 1 are reported and revoked the transmission system operator
or the operators of distribution networks through technical
control and in the mass media on a regular
time-defined or extraordinary sessions.
(2) the regulatory degree No. 2 to 7 are announced and withdrawn
transmission system operator neboprovozovateli distribution
systems by means of technical control and in bulk
the media at regular time-defined or
extraordinary sessions.
(3) in the case of customers taking electricity from plants to distribution
systems with voltage higher than 1 kV with the value of the reserved power of 1 MW
and higher is also the publication of regulatory and appeals stages 3, 5 and 7
technical control performed by the transmission system operator
through the technical control of the operators of distribution
systems, or the technical operators of dispatching distribution
systems directly from the dispatching policy control, and it's by phone, SMS,
electronically, by fax, or other comparable and with customers
mutually agreed means.
Annex 2
The use of and content requirements the power plan
I Use the power plan
(1) turn off the device by the customer due to the plan and its recovery
turn on operator performs technical dispatch system
in accordance with the principles of the dispatching control.
(2) the Shutdown takes place after the publication of its degrees No 21 to 30.
(3) in each of its stages is a fixed percentage of the size of the
interrupted the performance related to the value of the annual peak load
the distribution system for a period of 12 months.
II. Switch-off degree
(1) the publication of the power of the degree No. 21 are off selected outlets
in the facilities of the transmission system or distribution system in this
the extent that the consumption does not exceed 2.5% of the annual maxima
load the appropriate distribution system. Each higher level to switch-off
the power of degree No. 25, including performance includes the value of the disabled
the equipment of the customers in the previous cut-off level increased by 2.5%
the annual peak load the relevant distribution system (12.5%).
(2) the publication of the power of degree No 26 are off selected outlets
in the facilities of the transmission system or distribution system in this
the range to limit electricity consumption does not exceed 17.5% of the annual
Maxima loads the appropriate distribution system. Every switch-off
the degree of the opening degree of no. 30 including includes the value of performance
disabled equipment customers in the previous cut-off level plus 5
% of annual maximum load the relevant distribution system (total 37.5
%).
(3) the Power of the individual filling its degrees are mutually
agreed between technical dispatching the transmission
technical dispatching system and distribution system operators.
(4) when the announcement of its degrees to indicate the area to which the
off applies and shall specify the duration of the performance. In cases,
When it is not possible at the same time when you issue a command to turn off the device to determine the
time constraints, this period will be determined later, but no later than two
hours after issuing an order to shut down the equipment customers.
(5) the Tripping of the degree No. 21 to 30, you cannot declare at the same time.
Annex 3
The use, processing, issuing and updating of the frequency plan
I. the use of the frequency plan
(1) the objective of the use of the frequency plan is timeliness, automatic interventions
to the operation of the electricity system to limit the formation of large system
disorders, back and keep the frequency of the electricity system after the occurrence of
disorders in the values, which is not jeopardised by the equipment manufacturers
electricity and customers and create the conditions for a quick return of the frequency
the electricity system in the range of values 49.8-50.2 Hz.
(2) in cases where, after the exhaustion of the measures on the part of electricity producers
and reducing consumption on the part of customers to maintain the frequency of the
the electricity system, its value varies, the goal is to
the frequency plan to preserve crucial blocks production of electricity in
traffic for their own consumption, and thus create conditions for speeding up the
recovery voltage and normal operation of the electricity system.
II. The use of a frequency plan for reducing the frequency
(1) in the zone drop rate below the value to a value of 49.0 49.8 Hz Hz
measures are being taken on the part of electricity generation facilities connected to the
the affected part of the electricity system. The regulation of the frequency is
provided by competent technical instruction dispatching
system operator or automatically by changing the operating performance
blocks production of electricity, přifázováním and load the prepared blocks
production of electricity and odepínáním blocks of pumped hydro power plants
from the čerpadlového service.
(2) in the zone drop rate below 49.8 Hz can be created
Island plant parts of the power system. The value of the frequency of the disconnection
the island is the determined by the technical service dispatch operator
the transmission system operator or dispatcher
the distribution system. The value of the frequency of the disconnection of the island in operation
regional distribution system is mutually agreed between the
technical control of the operator of regional distribution system, and
technical reliable transmission system operator. The value of the
frequency of the disconnection of the island's traffic in the local distribution system is
mutually agreed between the technical control of the operator of a local
the distribution system, the technical control of the operator of regional
distribution system, which is the local distribution system
attached, and technical reliable transmission system operator.
(3) in the zone drop rate below the value of 49.0 Hz are taken
measures in the area of the load on the electricity system. A predetermined
the amount of the performance are automatically disconnected in stages by using the frequency
the frequency of the relay. The number of degrees, their settings and the amount of the connected
the performance of transmission system operator are defined on the basis of the
system failure modes and calculation in accordance with agreements with the
neighbouring grids with grid
The Czech Republic synchronously connected.
(4) for the solution of failures the system nature of the system will be used
automatic frequency disconnecting power stepped in
49.0 Hz frequency band up to 48.1 Hz. To address the failures of local
the distribution system operator may range to the system
frequency converter automatically disconnecting the power further to implement local
automatic frequency disconnecting power and below 48.1 Hz.
(5) in the zone drop rate on 48.0 Hz and below are selected critical
blocks production of electricity automatically disconnected from the electricity supply system and
transferred to the traffic for their own consumption. Disconnecting the blocks production
electricity takes place in frequency of such values, not
exceeded the technical limitations of the blocks and the transition to electricity generating stations
traffic for their own consumption was reliable.
III. The use of frequency spectrum plan at increased frequency
(1) in zone of increased frequency of 50.2 Hz are taken measures on
producers of electricity. Frequency control is provided by
technical instruction dispatching the transmission system operator or
technical dispatching distribution system operator or
automatic change of power generating stations operated by the blocks of electricity and
disconnecting the power from the production blocks the affected part of the electricity
system and transforming them into operation for own consumption or
connection blocks pumped hydro power plants in the mode
čerpadlového operation either automatically or according to the instructions of the technical
dispatching of the relevant system operator.
(2) increase in frequency in the zone above 50.2 Hz can be created in the island
plant parts of the power system. The value of the frequency of the disconnection
the island is the determined by the technical service dispatch operator
the transmission system operator or dispatcher
the distribution system. The value of the frequency of the disconnection of the island in operation
regional distribution system is mutually agreed between the
technical control of the operator of regional distribution system, and
technical reliable transmission system operator. The value of the
frequency of the disconnection of the island's traffic in the local distribution system is
mutually agreed between the technical control of the operator of a local
the distribution system, the technical control of the operator of regional
distribution system, which is the local distribution system
attached, and technical reliable transmission system operator.
IV. Processing, issuing and updating of the frequency plan
(1) the Frequency plan is prepared and published in cooperation of the technical
dispatching the transmission system operator and technical control
distribution system operators and producers of electricity with respect for
the rules of international links.
(2) if in the electricity grid of the Czech Republic in the context of the link
with foreign systems to changes to the frequency plan
the effect is a transmission system operator, and the plan updated
in cooperation with the operators of distribution networks and producers
electricity. If the above does not change, it is always to 30. September
performed transmission system operator to check the freshness
the frequency of the plan and any updates.
(3) to the solution of failures of local scope with local auto
frequency reduction adopted technical dispatching of operators
distribution systems specific solutions that coordinate with the technical
reliable transmission system operator and shall be issued in the form of
dispatching the order.
Annex 4
Content Essentials emergency plan
I. Essentials emergency plan
(1) emergency plan contains the information about the licence holder, the devices
It involves, processing date, the date of approval, the date of acquisition
the effectiveness, validity period, data on the person of the processor, the data about the person
approver, and their signatures.
(2) the emergency plan contains a list of documents that it consists of giving
their place of storage. Individual documents are marked, numbered and
the persons referred to therein are written name, surname and functions.
(3) the information contained in the plan are concise, comprehensible and
well-organized. All the solutions provided for in the plan,
respect the local situation, practices and organizational structure.
II. The emergency plan of the transmission system operator and emergency plan
distribution system operator
The emergency plan of the transmission system operator and emergency plan
distribution system operator provides
1. directive activities in emergencies and in the prevention and elimination of
the effects of a State of emergency,
2. the notification of the schedule and connections, including connections with the external
bodies,
3. plan the convening of employees,
4. Description of the Organization of the material security (such as materials,
spare parts, transportation and mechanisation means),
5. the plan for evacuation,
6. Overview of contracts entered into between the licensee and other bodies
in order to ensure cooperation, synergy and bailout,
7. directive for the Declaration of a State of emergency, a State of emergency and prevention for
activities to eliminate the consequences of a State of emergency,
8. a brief description of the system, including the external links (the range defined by the
the territory of the State, in terms of reliability, ensuring the performance of backups
resources on your own defined territory, the possibility of bailout from the linked
system operators),
9. organizational chart describing the basic relationships and responsibilities,
10. Overview and characteristics of the main suppliers of electricity and
customers,
11. the use of the buffer and the power of the plan and the use of the frequency
the plan,
12. list of working capacities necessary for operation, maintenance and repair
the transmission system operator or distribution system operator,
13. the plan of Defense to prevent a State of emergency and recovery plan to rebuild
the operation of the electricity system.
III. Emergency Plan of electricity producers
Emergency plan of electricity the manufacturer contains the
1. directive activities in emergencies and in the prevention and elimination of
the effects of a State of emergency,
2. the notification of the schedule and connections, including connections with the external
bodies,
3. plan the convening of employees,
4. Description of the Organization of the material security (such as materials,
spare parts, transportation and mechanisation means),
5. the plan for evacuation,
6. Overview of contracts entered into between the licensee and other bodies
in order to ensure cooperation, synergy and bailout,
7. a brief description of the production plants, including external links (for example, the status of the device
in terms of reliability, ensuring the performance of the backup from your own
resources, participation in the frequency plan, the way of the outlet of the power system
the supply of the fuel, the fuel, the electrical scheme),
8. organizational chart describing the basic relationships and responsibilities,
9. Overview of working capacities necessary for operation, maintenance and repair
the production plants of electricity,
10. information concerning abnormal operating situations (for example,
Emergency fuel stocks, water level limit values, critical
the quantity of operating materials, technical minimum performance, frequency blocks
limitations, provide their own power when the breakup of the electricity system),
11. evaluation of options to downsizing of the operation in the island's mode,
12. the definition of the possible causes of the occurrence of the accident on the production equipment,
13. the flood plan of tailings dams,
14. activities during a crisis situation,
15. instructions for emergency discharges water tank,
16. guidelines and emergency plans for the objects, which can occur to leak
of dangerous substances,
17. recovery plan for the operation of the device.