80/2010 Sb.



The DECREE



of 18 July 2003. March 25, 2010



a State of emergency in the electricity sector and the substantive aspects of the

emergency plan



The Ministry of industry and trade shall determine under section 98a of paragraph 1. 1 (a). (f))

Act No. 458/2000 Coll., on conditions for business and public administration

in the energy sectors and on the amendment of certain laws (energy

Act), as amended by law No 158/2009 Coll., to implement sections 24, 25 and 54

Energy Bill:



Restrictions on the consumption of electricity and the supply of electricity to the change control

the electricity system



§ 1



(1) performance that is being removed from the electricity system, can be limited, or

the power that is supplied to the power system, you can change these

ways:



and by reducing the value to be removed) the performance of the electricity system in accordance with

consumption reduction plan (the "plan"), the use and

content requirements including the method of notification, advertising and

revoking the regulatory degrees are listed in Appendix 1 of this

the Decree,



(b) the total interruption of the power supply) customers disconnecting their

delivery of electrical equipment or transmission system operator

distribution system operator or by turning off parts of the device for

electricity transmission or distribution of electricity



1. under the power plan, whose use and content requirements are

listed in annex 2 of this order,



2. According to the frequency plan, of which the use, processing, issuing and

updates are listed in annex 3 of this order,



3. the operational parts of the transmission system by turning off the device, or

the distribution system to the extent necessary to compensate for power balance

the affected part of the electricity system,



(c)) by changing the value of the performance delivered by the manufacturer of electricity into the electricity

follow the instructions on the technical system of dispatching the transmission

system operator or distribution system operator.



(2) restrictions on the consumption of electricity in the territory, where there is the emergence of a State of emergency

or for which a State of emergency was declared, is determined by the application of the relevant

the degree of regulatory plan, operational plan, turning off the power parts

equipment or automatic exposure frequency relay in accordance with

the frequency plan, to the extent necessary to compensate for power balance

the affected part of the electricity system. These measures are applied to the

the basis of the assessment of the situation of the technical dispatch operator

the transmission system or the technical operators of the dispatching centres

distribution system operators. This restriction does not apply to electricity consumption

customers whose devices are connected only to foreign

the electricity grid and subject only to the limitations of this

Foreign electricity system.



(3) restrictions on the consumption of electricity by regulatory plan does not apply to

technology its own electricity consumption for the production of electricity and the production of

and the supply of heat.



§ 2



(1) the procedure for and extent of performance or changes to the subscription included

performance in the prevention or resolution of a State of emergency handles the technical

the dispatching of the transmission system operator, in partnership with technical

dispatching distribution system operators directly connected to

transmission system (hereinafter referred to as "regional distribution system"). On

procedure for distribution system operators, which are not directly

connected to the transmission system (hereinafter referred to as "local distribution

system "), is covered by section 7.



(2) the reduction Plan subscription performance of the shutdown of selected appliances

processed for the purposes of the regulatory plan is a separate part of the program

the broadcast signal of the remote control of the bulk of the processed

the operator of regional distribution networks.



(3) increasing the performance of the device to be removed, which was removed from the

operation or was in operation with reduced performance listings, it is not possible

launch of the publication and for the duration of the regulatory-related degrees

absorbed power from the electricity system and for their effectiveness, with

the exception of the imminent threat to the life or health of persons.



(4) the shut-off plan processed technical dispatch operator

the transmission system in cooperation with the technical operators of the dispatching centres

regional distribution networks, lays down the procedure and the values of the

vypínaných performance when disposing of significant system or local

failures in the electricity grid. On the procedure of local operators

distribution system operators are covered by section 7. Interruption of the power supply is

performs shutdown of selected parts of the transmission system operator or distribution

the system.



(5) Frequency plan of the processed technical dispatch operator

the transmission system and the technical operators of regional control centers

distribution system operators and manufacturers of electricity is the procedure for prevention and

solution of emergency associated with an unbalanced power balances in the

the electricity grid, and current by changing the frequency of the system, which

lies in the creation of the island's plants, in disrupting the supply of electricity

customers of electricity and disconnect electricity from electricity generating stations

system by frequency relays, which are installed in the

electricity generating stations, transmission system, distribution system, or

in the sampling locations of customers.



§ 3



(1) the amount of the interrupted performance, selection and fitting of frequency relay

the transmission system operator and the operators of regional

distribution system operators. On the process of operators of local distribution

systems covered by section 7.



(2) regional distribution system Operators shall transmit to the

each year before 30. September by transmission system updated

the value of the performance for each of the regulatory degree and the degree of power

the plan and the frequency plan. The operators of the local distribution

system operators shall transmit the following information each year to the 15. September operators

the distribution system, their system is connected. On the basis of the

These data technical dispatching of the transmission system operator in

cooperation with the technical dispatching distribution system operators

update their regulatory, tripping and frequency plans.



§ 4



The classification of customers into regulatory degrees



(1) for the reduction of electricity consumption in the prevention of a State of emergency and when

a State of emergency to customers classified in regulatory degrees according

the regulatory plan.



(2) the classification of customers into regulatory degrees No 1 and no 2 performed

the distribution system operator; This classification is not mentioned in the

the treaties whose subject is the transmission or distribution of electricity.



(3) the classification of customers into regulatory degrees No 3 to No 7 carried out



and) operator of the transmission system operator or distribution

system on the basis of the Treaty on the transit of electricity or the Treaty on

distribution of electricity,



(b)) electricity trader or producer of electricity, on the basis of the Treaty on

associated electricity supply services; electricity trader or

the manufacturer of electricity transmitted the necessary data, the competent operators

the system.



§ 5



Preventing emergencies



(1) in situations where there is a risk of the real risk of a State of emergency, may

the transmission system operator or distribution system operator

to declare a warning level, which is part of the regulatory plan.



(2) restrictions on the consumption of electricity and change the supply of electricity when

Prevention of emergencies are carried out



and according to the frequency plan automatically),



(b) the technical operator) Dispatcher system



1. in accordance with the regulatory degree No. 1,



2. under the power plan



3. turn off the device in the operative part of the extent necessary for the

power leveling the balance of power system,



4. using the available production capacities,



5. limitations of the supplied power.



(3) the transmission system operator to announce without undue delay it

applied limitation of consumption or changes in the supply of electricity in the prevention

emergency operators concerned regional distribution

system operators.



(4) the operator of a regional distribution system to announce without

undue delay, it applied restrictions on consumption or changes in delivery

electricity emergency prevention, transmission system operators

and local distribution systems operators concerned, who have

set up the technical control room.



(5) the operator of a local distribution system to announce without undue

delay it applied restrictions on the consumption of electricity or changes in the

Prevention of emergency regional distribution system operators,

that is its distribution system.



(6) the operator of a transmission system operator or distribution

the system announces the prevention of a State of emergency in a manner enabling remote

access.



§ 6



A State of emergency



(1) any restrictions on the consumption of electricity or changes in the supply of electricity when

emergency controls technical dispatching of the transmission system operator

or technical dispatching distribution system operator.



(2) a State of emergency is usually cited, and dismissed by the advance. In the case of

the rapid collapse of the electricity system may be a State of emergency declared

Additionally.



(3) restrictions on the consumption of electricity and the supply of electricity when the state change

emergencies are carried out



and according to the frequency plan automatically),



(b) according to the plan, the power key)



(c)) under the regulatory plan in the range of regulatory degrees No 1 to No 7,



(d) operational shutdown of equipment parts) to the extent necessary for the

power leveling the balance of power system,



(e)) using the free production capacity,



(f) limiting the power supplied).



(4) transmission system operator shall, without undue delay to announce it

Declaration of a State of emergency or revoked operators concerned

regional distribution networks.



(5) the operator of a regional distribution system without undue delay

announcing his declaration of a State of emergency or revoked by transmission

system operators concerned and local distribution systems,

who have set up a technical control room.



(6) the operator of a local distribution system without undue delay

announcing his declaration of a State of emergency or revoked operators

regional distribution system, which is its distribution system

attached.




(7) in the resolution of the State of emergency be forwarded to the transmission system operator,

the distribution system operator and electricity producers according to their

emergency plan, whose terms and the method of processing are given in

Annex No. 4 of this Ordinance.



section 7 of the



The procedure of operators of local distribution systems



Operators of local distribution systems in the prevention of State

and when the State of emergency in the event that the



and they have set up a technical control room) and shall notify this fact to the

regional distribution system operators, shall act as

regional operators, distribution system operators,



(b) have established a technical control room), are considered to be customers.



§ 8



Cancellation provisions



Shall be repealed:



1. Decree No. 219/2001 Coll., on the procedure in the case of imminent or

the current state of emergency in the electricity sector.



2. Decree No. 221/2001 Coll., on details of the granting State

authorization for the construction of direct lines.



3. Decree No. 222/2001 Coll., on details of the granting State

authorization for the construction of production plants of electricity.



4. Decree No 226/2001 Coll., on details of the granting State

authorization for the construction of the thermal energy sources.



§ 9



The effectiveness of the



This Decree shall take effect on 1 January 2005. April 2010.



Minister:



Ing. Tošovský in r.



Annex 1



The use of and the content requirements of the regulatory plan, including ways to

notification, announcing the removal of regulatory and degrees



I. classification of customers into regulatory degrees



(1) the customers are included in regulatory degrees according



and how to control the appliances using the) mass of the remote control,



(b) the nominal value of the voltage part) of the electricity system, which is

sampling the electrical equipment connected to a particular customer,



(c) the value of the reserved power) indicated in the contract.



(2) the classification of customers into regulatory degrees:



and in the regulatory level) No. 1 all customers are enrolled, which is

carried out with selected mass control remote

control, or using another technical system for

size control of consumption,



(b)) in the regulatory degree No 2 are placed customers for

electricity from the establishment of distribution networks with a voltage higher than 1 kV

the value of the reserved power to 100 kW and the customers for

electricity from the establishment of distribution networks with voltage up to 1 kV

the value of the circuit-breaker before the meter is less than 200 and,



(c)) in the regulatory stages 3 and 5 are enrolled customers for

electricity transmission system from the device or from the equipment distribution

systems with voltage higher than 1 kV and with the value of the reserved power 1

MW and higher,



(d)) in the regulatory stages 4 and 6 are enrolled customers for

electricity from the establishment of distribution networks with a voltage higher than 1 kV and

with the value of the reserved power from 100 kW to 1 MW and including customers

for electricity from the establishment of distribution networks with voltage up to 1

kV circuit breakers with a value before the 200 meter and higher,



(e)) in the regulatory stage no 7 are included all the customers.



II. Regulatory instance



(1) Basic degree does not reduce subscription performance and reflects the normal

the operating status of power system with balanced power balances,

the necessary power reserve, secured the required volume and

the structure of the support services for the transmission system operator and

secured transmission of electricity in compliance with the safety and

reliability criteria.



(2) the warning level does not diminish the absorbed power and



and the criteria of reliability) indicates failure in electric systems

for reasons of balance, transmission or other



(b)) draws attention to the restrictions of transmission or distribution capacity

or services of the transmission system or distribution

system operators,



(c)) draws attention to the need for increased attention to resource monitor

sent on the energy situation and the resources used for

the announcement of the regulatory steps.



(3) the regulation level no. 1 represents a decrease in the value of performance

to be removed from the power system shutdown and turn on blocking

selected appliances operated by using the remote control, the bulk

where appropriate, the other technical management system

the size of the consumption.



(4) the regulation level no. 2 represents a decrease in the value of performance

to be removed from the power system by using technical resources

system operator within 1 hour after the announcement of the regulatory degree,

If a longer period is not fixed.



(5) the regulation level no. 3 represents a decrease in the value of performance

to be removed from the power system of the values referred to in point (III). paragraph.

3 of this annex, and within 30 minutes after the publication of the regulatory level.



(6) the regulation level no. 4 represents a decrease in the value of performance

to be removed from the power system, the values referred to in point (III).

paragraph. 3 of this annex, and within 1 hour after the announcement of the regulatory degree,

If a longer period is not fixed.



(7) the Regulatory stage 5 represents a decrease in the value of performance

to be removed from the power system of the values referred to in point (III). paragraph.

3 of this annex, and within 1 hour after the announcement of the regulatory level.



(8) the Regulatory stage 6 represents a decrease in the value of performance

to be removed from the power system of the values referred to in point (III). paragraph.

3 of this annex, within 2 hours after the publication of the regulatory degree, if

There is no fixed time is longer.



(9) Regulation level no. 7 represents a decrease in the value of performance

to be removed from the power system for all customers on the value of the

the safety of the minimum to 1 hour after the publication of the regulatory level. U

sampling device, where up to one hour to reduce the value of the

removed power to the minimum security is determined by the time offset in

hours as the time necessary for the reduction in value of the security subscription

minima.



(10) the value of the performance to be removed from the electricity system means

the average value of the performance to be removed from the electricity system in business

an hour before the publication of the regulatory level.



(11) the Regulatory degree No. 1 to 6 may be announced at the same time.



(12) the Regulatory degree No. 2 to 7 do not apply to customers whose

the predominant activity is in health care, telecommunications and postal

services, in the management of water works and supply of drinking water,

the defence of the State in mining in deep mines, civil air transport, in

the operation of the public rail transport, public transport, in

buildings and facilities Office of the Government of the CZECH REPUBLIC, the Czech National Bank,

The Ministry of the Interior, the Ministry of Justice and police of the Czech

of the Republic. Furthermore, the regulatory degree No. 2 to 7 do not apply to folder

The integrated rescue system and on customers to ensure the delivery of

heat, electricity, and when could endanger the

nuclear safety, and on the bodies of the mobilization and

the supplier of the necessary supplies referred to in the crisis plan system

economic mobilization in the time of crisis stavů1).



III. The value of the performance degradation



(1) the selection and turn off appliances when the announcement of the regulatory groups of degree

No 1 is carried out by the technical control of the operator, the distribution

the system.



(2) decrease in performance for each individual customer, included in

the regulatory degree No 2, is carried out by the operator, the distribution

the system.



(3) the value of the reduction in each individual subscription performance to the regulatory

level 3 to 6 shall be as



and 15% of the value) of the performance, to be removed from the power system under the

(II). paragraph. 10 of this annex, or



(b) 15% of the value) of the reserved capacity in the relevant calendar month,

It is the sum of annual reserved capacity, and monthly reserved capacity

in a given calendar month.



(4) to reduce the value of the performance to be removed by the customer in accordance with the regulatory

grades 3 and 4 in the amount of 15% follow the regulatory degree No. 5 and 6, which

reduce the value of the performance to be removed by a further 15% of the maximum

the total amount of the 30% reduction in subscription performance while respecting the

safety minimum.



(5) the value of the decrease in performance for the grade No. 7 are laid down with regard to the

compliance with the minimum of electricity security for the customer, hereinafter referred to as

"minimum security".



(6) the value of the performance degradation for the regulatory degree No. 3 to 7, and the values

the minimum security with the possibility of a reduction to one hour.

time for which the value of the security will be achieved, the minimum

and contact details of the customer are part of the contract for the transmission of electricity

or the distribution of electricity or combined services delivery

electricity.



IV. Determining the value of the minimum security



(1) minimum Security means the minimum value of the subscription

the performance, which is after their production is strictly necessary to ensure the

safety technology of sampling device, the impact on the surrounding environment and

serving workers.



(2) minimum Security is provided for all customers with the value

reserved power 100 kW and above, or in the case of customers

taking electricity from the establishment of distribution networks with a voltage of up to

1 kV with a value before the 200 meter and circuit breakers and higher.



(3) safety minimum inventory is determined on the basis of the individual

appliances and their safety and technological analysis of the minimum

consumption without production. An inventory of the various appliances and analysis

their safety and technological minimum consumption to be compiled

individual customers.



(4) safety minimum for customers included in the regulatory degree

No. 2 is provided for in the rules of operation of the distribution system.



In a way, the promulgation and notification revoking the regulatory degrees



(1) the degree of the base, warning, and information about the use of the regulatory degree

No 1 are reported and revoked the transmission system operator

or the operators of distribution networks through technical

control and in the mass media on a regular

time-defined or extraordinary sessions.



(2) the regulatory degree No. 2 to 7 are announced and withdrawn


transmission system operator neboprovozovateli distribution

systems by means of technical control and in bulk

the media at regular time-defined or

extraordinary sessions.



(3) in the case of customers taking electricity from plants to distribution

systems with voltage higher than 1 kV with the value of the reserved power of 1 MW

and higher is also the publication of regulatory and appeals stages 3, 5 and 7

technical control performed by the transmission system operator

through the technical control of the operators of distribution

systems, or the technical operators of dispatching distribution

systems directly from the dispatching policy control, and it's by phone, SMS,

electronically, by fax, or other comparable and with customers

mutually agreed means.



Annex 2



The use of and content requirements the power plan



I Use the power plan



(1) turn off the device by the customer due to the plan and its recovery

turn on operator performs technical dispatch system

in accordance with the principles of the dispatching control.



(2) the Shutdown takes place after the publication of its degrees No 21 to 30.



(3) in each of its stages is a fixed percentage of the size of the

interrupted the performance related to the value of the annual peak load

the distribution system for a period of 12 months.



II. Switch-off degree



(1) the publication of the power of the degree No. 21 are off selected outlets

in the facilities of the transmission system or distribution system in this

the extent that the consumption does not exceed 2.5% of the annual maxima

load the appropriate distribution system. Each higher level to switch-off

the power of degree No. 25, including performance includes the value of the disabled

the equipment of the customers in the previous cut-off level increased by 2.5%

the annual peak load the relevant distribution system (12.5%).



(2) the publication of the power of degree No 26 are off selected outlets

in the facilities of the transmission system or distribution system in this

the range to limit electricity consumption does not exceed 17.5% of the annual

Maxima loads the appropriate distribution system. Every switch-off

the degree of the opening degree of no. 30 including includes the value of performance

disabled equipment customers in the previous cut-off level plus 5

% of annual maximum load the relevant distribution system (total 37.5

%).



(3) the Power of the individual filling its degrees are mutually

agreed between technical dispatching the transmission

technical dispatching system and distribution system operators.



(4) when the announcement of its degrees to indicate the area to which the

off applies and shall specify the duration of the performance. In cases,

When it is not possible at the same time when you issue a command to turn off the device to determine the

time constraints, this period will be determined later, but no later than two

hours after issuing an order to shut down the equipment customers.



(5) the Tripping of the degree No. 21 to 30, you cannot declare at the same time.



Annex 3



The use, processing, issuing and updating of the frequency plan



I. the use of the frequency plan



(1) the objective of the use of the frequency plan is timeliness, automatic interventions

to the operation of the electricity system to limit the formation of large system

disorders, back and keep the frequency of the electricity system after the occurrence of

disorders in the values, which is not jeopardised by the equipment manufacturers

electricity and customers and create the conditions for a quick return of the frequency

the electricity system in the range of values 49.8-50.2 Hz.



(2) in cases where, after the exhaustion of the measures on the part of electricity producers

and reducing consumption on the part of customers to maintain the frequency of the

the electricity system, its value varies, the goal is to

the frequency plan to preserve crucial blocks production of electricity in

traffic for their own consumption, and thus create conditions for speeding up the

recovery voltage and normal operation of the electricity system.



II. The use of a frequency plan for reducing the frequency



(1) in the zone drop rate below the value to a value of 49.0 49.8 Hz Hz

measures are being taken on the part of electricity generation facilities connected to the

the affected part of the electricity system. The regulation of the frequency is

provided by competent technical instruction dispatching

system operator or automatically by changing the operating performance

blocks production of electricity, přifázováním and load the prepared blocks

production of electricity and odepínáním blocks of pumped hydro power plants

from the čerpadlového service.



(2) in the zone drop rate below 49.8 Hz can be created

Island plant parts of the power system. The value of the frequency of the disconnection

the island is the determined by the technical service dispatch operator

the transmission system operator or dispatcher

the distribution system. The value of the frequency of the disconnection of the island in operation

regional distribution system is mutually agreed between the

technical control of the operator of regional distribution system, and

technical reliable transmission system operator. The value of the

frequency of the disconnection of the island's traffic in the local distribution system is

mutually agreed between the technical control of the operator of a local

the distribution system, the technical control of the operator of regional

distribution system, which is the local distribution system

attached, and technical reliable transmission system operator.



(3) in the zone drop rate below the value of 49.0 Hz are taken

measures in the area of the load on the electricity system. A predetermined

the amount of the performance are automatically disconnected in stages by using the frequency

the frequency of the relay. The number of degrees, their settings and the amount of the connected

the performance of transmission system operator are defined on the basis of the

system failure modes and calculation in accordance with agreements with the

neighbouring grids with grid

The Czech Republic synchronously connected.



(4) for the solution of failures the system nature of the system will be used

automatic frequency disconnecting power stepped in

49.0 Hz frequency band up to 48.1 Hz. To address the failures of local

the distribution system operator may range to the system

frequency converter automatically disconnecting the power further to implement local

automatic frequency disconnecting power and below 48.1 Hz.



(5) in the zone drop rate on 48.0 Hz and below are selected critical

blocks production of electricity automatically disconnected from the electricity supply system and

transferred to the traffic for their own consumption. Disconnecting the blocks production

electricity takes place in frequency of such values, not

exceeded the technical limitations of the blocks and the transition to electricity generating stations

traffic for their own consumption was reliable.



III. The use of frequency spectrum plan at increased frequency



(1) in zone of increased frequency of 50.2 Hz are taken measures on

producers of electricity. Frequency control is provided by

technical instruction dispatching the transmission system operator or

technical dispatching distribution system operator or

automatic change of power generating stations operated by the blocks of electricity and

disconnecting the power from the production blocks the affected part of the electricity

system and transforming them into operation for own consumption or

connection blocks pumped hydro power plants in the mode

čerpadlového operation either automatically or according to the instructions of the technical

dispatching of the relevant system operator.



(2) increase in frequency in the zone above 50.2 Hz can be created in the island

plant parts of the power system. The value of the frequency of the disconnection

the island is the determined by the technical service dispatch operator

the transmission system operator or dispatcher

the distribution system. The value of the frequency of the disconnection of the island in operation

regional distribution system is mutually agreed between the

technical control of the operator of regional distribution system, and

technical reliable transmission system operator. The value of the

frequency of the disconnection of the island's traffic in the local distribution system is

mutually agreed between the technical control of the operator of a local

the distribution system, the technical control of the operator of regional

distribution system, which is the local distribution system

attached, and technical reliable transmission system operator.



IV. Processing, issuing and updating of the frequency plan



(1) the Frequency plan is prepared and published in cooperation of the technical

dispatching the transmission system operator and technical control

distribution system operators and producers of electricity with respect for

the rules of international links.



(2) if in the electricity grid of the Czech Republic in the context of the link

with foreign systems to changes to the frequency plan

the effect is a transmission system operator, and the plan updated

in cooperation with the operators of distribution networks and producers

electricity. If the above does not change, it is always to 30. September

performed transmission system operator to check the freshness

the frequency of the plan and any updates.



(3) to the solution of failures of local scope with local auto

frequency reduction adopted technical dispatching of operators

distribution systems specific solutions that coordinate with the technical

reliable transmission system operator and shall be issued in the form of

dispatching the order.



Annex 4



Content Essentials emergency plan



I. Essentials emergency plan



(1) emergency plan contains the information about the licence holder, the devices

It involves, processing date, the date of approval, the date of acquisition

the effectiveness, validity period, data on the person of the processor, the data about the person

approver, and their signatures.



(2) the emergency plan contains a list of documents that it consists of giving

their place of storage. Individual documents are marked, numbered and

the persons referred to therein are written name, surname and functions.




(3) the information contained in the plan are concise, comprehensible and

well-organized. All the solutions provided for in the plan,

respect the local situation, practices and organizational structure.



II. The emergency plan of the transmission system operator and emergency plan

distribution system operator



The emergency plan of the transmission system operator and emergency plan

distribution system operator provides



1. directive activities in emergencies and in the prevention and elimination of

the effects of a State of emergency,



2. the notification of the schedule and connections, including connections with the external

bodies,



3. plan the convening of employees,



4. Description of the Organization of the material security (such as materials,

spare parts, transportation and mechanisation means),



5. the plan for evacuation,



6. Overview of contracts entered into between the licensee and other bodies

in order to ensure cooperation, synergy and bailout,



7. directive for the Declaration of a State of emergency, a State of emergency and prevention for

activities to eliminate the consequences of a State of emergency,



8. a brief description of the system, including the external links (the range defined by the

the territory of the State, in terms of reliability, ensuring the performance of backups

resources on your own defined territory, the possibility of bailout from the linked

system operators),



9. organizational chart describing the basic relationships and responsibilities,



10. Overview and characteristics of the main suppliers of electricity and

customers,



11. the use of the buffer and the power of the plan and the use of the frequency

the plan,



12. list of working capacities necessary for operation, maintenance and repair

the transmission system operator or distribution system operator,



13. the plan of Defense to prevent a State of emergency and recovery plan to rebuild

the operation of the electricity system.



III. Emergency Plan of electricity producers



Emergency plan of electricity the manufacturer contains the



1. directive activities in emergencies and in the prevention and elimination of

the effects of a State of emergency,



2. the notification of the schedule and connections, including connections with the external

bodies,



3. plan the convening of employees,



4. Description of the Organization of the material security (such as materials,

spare parts, transportation and mechanisation means),



5. the plan for evacuation,



6. Overview of contracts entered into between the licensee and other bodies

in order to ensure cooperation, synergy and bailout,



7. a brief description of the production plants, including external links (for example, the status of the device

in terms of reliability, ensuring the performance of the backup from your own

resources, participation in the frequency plan, the way of the outlet of the power system

the supply of the fuel, the fuel, the electrical scheme),



8. organizational chart describing the basic relationships and responsibilities,



9. Overview of working capacities necessary for operation, maintenance and repair

the production plants of electricity,



10. information concerning abnormal operating situations (for example,

Emergency fuel stocks, water level limit values, critical

the quantity of operating materials, technical minimum performance, frequency blocks

limitations, provide their own power when the breakup of the electricity system),



11. evaluation of options to downsizing of the operation in the island's mode,



12. the definition of the possible causes of the occurrence of the accident on the production equipment,



13. the flood plan of tailings dams,



14. activities during a crisis situation,



15. instructions for emergency discharges water tank,



16. guidelines and emergency plans for the objects, which can occur to leak

of dangerous substances,



17. recovery plan for the operation of the device.