18/1979 Sb.



The DECREE



The Czech Office of work safety and the Czech Mining Authority



of 22 March. January 1979,



you will specify the reserved pressure equipment, and provides for certain conditions

to ensure their safety



Change: 97/1982 Coll.



Change: 551/1990 Coll.



Change: 352/2000 Sb.



Change: 118/2003 Coll.



Change: 393/2003 Coll.



The Czech Office of work safety according to § 5 (3). 1 (a). (d)), and (f)) of law No.

174/1968 Coll., on State specialized supervision of work safety (hereinafter referred to as

the "law") and the Czech mining Office under section 57, paragraph. 1 (a). (d)) of law No.

41/1957 Coll. on use of mineral wealth (the top Act) and under section 10

(a). and (c)) and the Czech National Council) Act No 24/1972 Coll. on the organisation and

on the extension of the supervision of the State Mining Authority, in agreement with the competent

the central authorities shall:



§ 1



The range of validity of the



(1) the Ordinance is binding on the Organization, covered by the scope of the

public vocational safeguards work, ^ 1) and for the

legal and natural persons carrying out business activity

According to the special regulations of 6) (hereinafter referred to as "the Organization").



(2) this Ordinance shall not apply to products prescribed for conformity assessment

under the special law ^ 2a) and Government Regulation ^ 2b) before placing them

on the market and the technical equipment, subject to the supervision of the authorities referred to in section

3 (3). 2 (a). and (b)) of the Act).



§ 2



Reserved pressure equipment



(1) reserved pressure equipment within the meaning of article 4 (a). (d) to (g) of the Act))

(hereinafter referred to as "facilities") are:



and steam boilers) and liquid (hereinafter referred to as "the cauldron"), whose design

exceeding 0.07 MPa and temperature of fluids exceeds the boiling point when

This overpressure,



(b)) a stable pressure vessels (hereinafter referred to as "pressure vessels"), whose

the maximum working pressure exceeding 0.07 MPa and that contain gases,

steam or corrosive, poisonous and explosive liquids of any temperature or

any liquid at a temperature above their boiling point when overpressure

0.07 MPa,



c) metal pressure receptacles for the transport of gases (hereinafter referred to as "containers for gases),

the critical temperature is lower than + 50 ° C, or gases, which

at a temperature of + 50 degrees C is the absolute pressure (vapor tension) higher than 0.3

MPA.



(2) the boiler is divided into 4 classes:



and) 1. class-steam boilers with a nominal quantity of produced steam over 115

t/h,



(b)) 2. class-steam boilers with a nominal quantity of steam produced over 50

t/h to 115 t/h (including) or hot-water boiler with a heat output of over 35

MW,



(c)) 3. class-steam boilers with a nominal quantity of steam produced over 8

t/h up to 50 t/h (including) or hot-water boilers with heat output over 5.8

MW to 35 MW (inclusive),



(d)) 4. class-steam boilers with a nominal quantity of produced steam to 8 t/h

(including) or hot-water boiler with the thermal power up to 5.8 MW (including) and

all other liquid boilers.



(3) pressure vessels are divided into groups according to the maximum allowable

excess pressure (p) in the MPa and the product of the maximum allowable gauge pressure and volume

(v) in litres (hereinafter referred to as "safety product") as follows:



and the Group and form A) pressure vessels with a maximum allowable pressure

exceeding 0.2 MPa, whose security product has a value higher than the

third, 10na



(b)) Group B consists of other pressure vessels.



(4) if the device has several pressure zones, it security

the product of each area separately, and the establishment is classified to the group, which

corresponds to the maximum security of the product.



(5) Volume in litres is the total space provided for the working substance

(or substance), which is in the device under pressure. Part of the pressure

the space that you occupy the internals, linings, paddings, and similarly, when

the calculation of the volume of the neodpočítává.



§ 3



Devices in accordance with this order are:



and working with boilers) radioactive substances or boiler located in the

environment with neutronovým flow,



(b) the volume of the boiler) 10 l (inclusive), for which security product from

structural overpressure in the MPa and the volume does not exceed 10 litres,



(c)) pressure vessels working with radioactive substances or pressure

the containers are placed in an environment with neutronovým flow,



(d) pressure vessels up to 10) litres (inclusive), for which security product

does not exceed 10,



(e) a pressure vessel of the tubes) and nekruhových cross sections of the highest internal

dimension into 100 mm (inclusive) without the collectors, or pickers, if

from the collector pipes and nekruhového cross section does not have the internal dimension greater than 150

mm (inclusive),



f) heating elements for steam and water (liquid) heating,



(g)) pipe, its expanded parts and pressure vessels to the built-in

(for example, to release the pressure or containers), whose

the inside diameter (D) does not exceed three times the internal diameter (d)

the largest connected pipe (D is less 3d), as well as all advanced

part of the pipes and pressure vessels to the built-in if you serve only to

transport of fluids (such as distributors, separators, collectors),



h) pressure parts of machinery and technical devices, which are not

separate pressure vessels (for example, the cylinder piston machines,

the Cabinet of steam turbines, windmills of piston pumps, fluid

cooler compressors, pressure casing encapsulated transformer stations),



I) air heaters, anthers, blast furnaces, gas cleaners



j) inflatable metal-free device, in which the internal pressure of the compressed

gas ensures their shape and stiffness (such as tires, pneumatic

beams, boards),



for gases of containers) pressure volume to 0.22 litre (inclusive),



l) irreversible pressure vessels for aerosols and similar use



m) transportable pressure equipment if you are covered by a special

legislation. ^ 2 c)



§ 4



Organisation approvals



(1) to produce, assemble, repair, reconstruct the device and perform

revisions and tests of the boilers and pressure vessels supplying the manner and

periodic tests of gas containers are permitted only on the basis of organization

permission (hereinafter referred to as "authorized enterprise").



(2) Permission is issued by the Inspectorate of labour safety (hereinafter "the authority of the

supervision "), in whose district the Organization has its seat, where appropriate, permanent residence, and

on the basis of a written application of the organization.



(3) Organization in the application shall contain:



and) your exact name and address,



(b) the name and address of the plant) (the establishment), for which permission is sought, if

It is not in the headquarters of the organisation,



(c) the nature and scope of the requested) permission,



(d) ensure enforcement activities) for which permission is requested after the page

technical equipment and professional qualifications of the workers.



(4) where the supervisory authority of non-compliance with the conditions or violations of

regulations to ensure the safety of work and technical equipment in the

activities according to the permissions, limits the range of permissions, or is your organization

be withdrawn.



§ 5



Individual trial



(1) Every boiler and pressure vessel finished with the exception of the products

laid down to conformity assessment according to a special law ^ 2a) and regulation

Government ^ 2b), the manufacturer must submit to the building and the first pressure test. These

the test provides and performs the manufacturer, if the writing was their

performing organization that is entitled to the Assembly of the boiler or pressure

of the container. To each boiler or pressure vessel, the manufacturer must draw up a

accompanying documents including passport (book review)

set technical standards.



(2) after the successful construction and pressure test the first revision techniques

the manufacturer, where applicable, the organization that carries out the Assembly, marks the rivets

factory label round razidlem 10 mm in diameter with a tag or

abbreviated name of your organization. The imprint of the same marks and stamps

the Passport (a review of the book).



(3) the producers or organisations carrying out Assembly, are required to

notify the supervisory authority in writing at least 15 days in advance the time and place

testing of boilers with the design pressure exceeding 1.6 MPa

and pressure vessels and the group with the highest working pressure

exceeding 2.5 MPa.



(4) Each container produced gases, the manufacturer must submit to the first

the test.



(5) after the successful test marks the first test of the authority of the gases

razidlem ^ 3) and the date of the test.



(6) production and Assembly, the organisation may deliver to the customer



and the design of the boiler pressure) exceeding 1.6 MPa,



(b)) a pressure vessel of the Group and with the highest working pressure

exceeding 2.5 MPa



only after successful first pressure test equipment certified by the supervisory authority.



(7) in the case of imported equipment ensures compliance with the obligations referred to in paragraphs

3 and 6 of the user organization.



§ 6



Tests after repairs and reconstructions



(1) after the repair or reconstruction of the boiler or pressure vessel is authorized

the Organization shall perform construction and pressure strength test prescribed by the

overpressure. The value of the overpressure is listed in the documentation accompanying the device.



(2) the Organization shall be the beneficiary of the test protocol, which becomes

an integral part of the documentation accompanying the device, together with the technical

documentation of repair or reconstruction.



(3) the beneficiary organisation shall notify in writing 15 days in advance

the supervisory authority, in whose area of competence, the facility is located, the date of

testing of boilers with the design pressure exceeding 1.6 MPa and

pressure vessels and the group with the highest working pressure exceeding

2.5 MPa.



section 7 of the



Revisions and tests of operating boilers and pressure vessels



(1) revisions and tests of operating boilers and pressure containers may only be performed

only audit techniques (section 8). The way terms and cases review

and tests tightness lays down technical standards.



(2) a pressure test carried out a review of the techniques usually water, or

oil or other appliance, nejedovatou, and nevýbušnou liquid.

The result of the tests recorded in the audit trail. The value of the test

the overpressure is listed in the documentation accompanying the device.



(3) If, as a result of the new valve adjustment to change the

set values, corrects the revision techniques relevant data in the Passport

(book review).



(4) the pressure test shall be carried out



and determine if it is), the supervisory authority,



(b)) no later than 9 years since the implementation of the previous pressure test the test

If the pressure in the accompanying documentation is not provided for a shorter period.



(5) except in the cases referred to in paragraph 4 must be pressure test for


boilers stable made their move after before

the start of operation and for all boilers after longer operating break of two

years.



(6) in each of the technically justified cases, the supervisory authority may

deadline pressure tests to extend, where appropriate, suggest instead of pressure

tests of a different way of testing.



(7) the organization operating the boiler (hereinafter referred to as the "operator") is required to

notify the supervisory authority at least 30 days in advance of the date of its pressure

of the test.



§ 8



The audit techniques and testing authority



(1) a review of the techniques a must have for the implementation of the revisions and tests of boilers and

pressure vessels the certificate of professional competence issued by the supervisory authority

on the basis of the performed tests.



(2) the Applicant for a certificate of audit technique must have completed a full

secondary vocational education of mechanical engineering and a minimum of five years ' experience in the field of

pressure equipment. For applicants for a certificate of audit technique of boilers

4. classes of apprenticeship in machinery is sufficient scope and at least seven years '

professional practice in the field of pressure equipment.



(3) the test authority conducting the first tests have completed full

secondary vocational education of mechanical engineering and at least five years ' professional experience in the

scope of pressure equipment and the certificate issued by the supervisory authority, on the basis of the

the tests carried out.



(4) the test authority conducting the periodic tests must have at least

apprenticeship in the field of machine and at least five years ' professional experience in the field

pressure equipment.



(5) if the applicant Has professional engineering education higher than those prescribed in the

paragraphs 2 and 4, a two-year professional experience will suffice. If the applicant has other

professional education, shall decide on the necessary length of the practice of the supervisory authority.



(6) the review of techniques and test authority for conducting these tests are

obliged to place in the records of the action, which made the registration number

your certificate.



Visits and tests



§ 9



(1) for the purposes of the national vocational supervision is the operator shall be obliged to

prepare the boiler and pressure vessel inspection to the inspection or test in

the agreed date and under the conditions laid down by the supervisory authority.



(2) technical tasks necessary for the proper execution of the inspections or tests

manages and conducts the audit techniques or other professionally qualified worker

designated by the operator.



§ 10



(1) the Construction and the first pressure test produced, assembled,

repaired or reconstructed boilers and pressure vessels may exercise the

only revision techniques authorized organization (section 8).



(2) the first test and periodic tests of gas containers may only exercise

only authorized organization test authority (section 8).



§ 11



Boilers heaters



(1) the boiler is allowed to operate only if the operator is responsible for

professionally qualified worker (hereinafter referred to as "Fireman"), which was successfully

performed basic test topičský card issued by the competent

work safety Inspectorate (hereinafter referred to as the "Inspectorate"). Basic

test to separate operating boilers 4. class.



(2) to the separate manual of the boilers 1. and (3). class or boilers, other than in

topičském packages referred to fuel it is necessary to pass the supplementary

exam.



(3) if the engineer fails seriously his duties, he may

Inspectorate of topičský license withdrawn.



(4) if the driver is not for a period of 5 years the boiler, shall cease its topičský

the validity of the licence.



(5) recovery of the card is subject to the issuing of a new basic

of the test.



(6) the Topičského ID card does not need to operate boilers 4. class



and fully automated) with a nominal quantity of produced steam to 0.5

t/h,



(b)) fully automated fluid with heat output up to 0.35 MW,



(c)) with a design pressure of up to 0.3 MPa and with a capacity of up to 100 litres,



(d) of the volume flow) 100 liters.



Such boilers heaters must be instructed about their operation manual and zacvičeni,

which the operator must edit registration.



§ 12



Basic tests



(1) the basic topičské of the test (proficiency tests the Stoker)

they perform at the inspectorates.



(2) the application of the basic tests of candidates shall be submitted on the prescribed

form through the operator at the Inspectorate, in the place where the

the boiler is located.



(3) to the basic test may be an exam candidates



and) 18 years or older,



b) physically or mentally fit to perform the work of the firemen, ^ 4)



(c) confirmation of the operator) who according to the boiler to a six-month professional

on-the-job training in operating boilers at least 4. class under the supervision of the Stoker with a valid

topičským card



(d)) who show proof of graduation from a vocational course of operation and

operation of boilers of at least 20 teaching hours, including done

the tests,



e) who demonstrate qualifications required in the case of a special regulation,

they have operated with gas otopem. ^ 5)



(4) Relief from the prescribed training referred to in paragraph 3 (b). (c)) may, in the

in exceptional cases at the request of the Inspectorate.



(5) the Inspectorate shall inform the operator about the date and venue of the test

at least 15 days in advance. The operator shall inform the relevant applicant

and ensure its participation.



(6) After successfully performed the basic test of the Inspectorate shall issue to the applicant

topičský card.



section 13



Additional tests



(1) the Applicant for a supplemental examination must complete six-month professional

on-the-job training in the relevant class under the supervision of boiler Stoker with a valid

topičským card and professional course, and it in length of 30 hours for boiler 3.

a class of 50 hours for boilers 2. class and 100 hours for the boiler 1. class. In

If additional tests for the operation of boilers, the next higher class or

boilers for other fuels within the same class, decide on the length of the boiler

vocational training and vocational course, the operator on the basis of

observations the audit technique, but professional job training must last at least two

of the month.



(2) Additional tests shall be carried out at the topičské inspectorates.



(3) the application for the additional tests shall be submitted on the prescribed candidates

form through the operator at the Inspectorate, in the place where the

the scope of the boiler is located. The candidate shall, before commencing tests

proof that it meets the requirements.



(4) the Inspectorate shall inform the operator about the date and venue of the test

at least 15 days in advance. The operator shall inform the tenderer and shall ensure

his participation.



Transitional and final provisions



§ 14



(1) the operator shall, within one year from the date of effectiveness of the

of this order, in writing, notify the supervisory authority in the registration numbers

operating equipment in the distribution according to § 2 (2). 2 and 3 and the way

ensure their revisions and tests.



(2) the organization engaged in an activity referred to in section 4 yet without permission

are required to apply for them, within six months from the effectiveness of this Ordinance.



(3) the Permission issued by the certificates issued by the audit organizations and technicians

and the test authorities before 1. 7. applies to 30, 1979. 6.1983.



(4) the Topičské ID cards issued before the effect of this order shall remain in

If they correspond to the new classification of boilers. In other cases, the

the driver must pass the prescribed examination no later than one year from the

the date when the Decree takes effect.



(5) the Organization shall be obliged to issue a new request or permission

the certificate for its staff to submit to the competent supervisory authority

not later than 31 December 2006. 12.1982.



§ 15



Shall be deleted:



1 of Regulation No. 212/1910 ř.z., guiding the business of manufacture of soda water binds

the concessions,



2 the Government Regulation No 435/1941, about the instruments used in the

small bar and beer,



3 Regulation No 334/1945 Ú.l., amending Regulation No 176/1944 Sb.

which are issued regulations for the material and the construction of steam boilers,



4 of Decree No. 55/1960 Coll., regulating certain obligations

manufacturers and operators of steam boilers (steam generators) and other

pressure vessels and amending some of the provisions on security and the economy

such technical equipment, as amended by Decree No 121/1961 Coll.



5 the provisions of section 1 (b). and) Decree No. 151/1969 Coll., which determine the

dedicated technical equipment.



section 16 of the



This Decree shall take effect on 1 January 2005. July 1979.



The President of the



The Czech Mining Authority:



Sprocket v.r.



The President of the



The Czech Office of work safety:



Dr. v.r. Bartík



1) § 3 (3). 1 Act No. 174/1968 Coll., on State specialized supervision of

safety work.



2) section 39 of the Act of the Czech National Council No. 61/1988 Coll. on mining activities,

explosives and the State Mining Administration.



2A) Law No. 22/1997 Coll., on technical requirements for products and on the

changing and supplementing certain acts, as amended by law No 71/2000 Sb.



2B) Government Decree No. 175/1997 Coll., laying down the technical

requirements for simple pressure vessels, as amended by Decree-Law No.

80/1999 Coll., Regulation of the Government No. 177/1997 Coll., laying down the technical

requirements for gas appliances. Regulation of the Government No. 182/1999 Coll.

laying down technical requirements for pressure equipment.



2 c) Government Regulation No. 42/2003 Coll., laying down the technical

requirements for the transportable pressure equipment.



3) ČSN 07 8305 Metal pressure receptacles for the transport of gas. Technical

the rules.



4) Ministry of health Directive on the assessment of health

eligibility to work no 49/1967, Journal of the Ministry of health, in

the text of the directive of the Ministry of health no. 17/1970 Journal

the Ministry of health of the CSR about changes in health assessment

eligibility to work, and methodological measures no. 19/1970 Journal

the Ministry of health on the assessment of temporary inability of the CSR to

the work.



5) Decree No. 21/1979, which determined the dedicated gas equipment

and lays down certain conditions to ensure their safety.



6) Eg. Law No. 105/1990 Coll., on citizens ' private business, law No.

104/1990 Coll., on public limited liability companies Act No. 173/1988 Coll., on

the enterprise with foreign participation, in the wording of Act No. 112/1990

SB.