18/1979 Sb.
The DECREE
The Czech Office of work safety and the Czech Mining Authority
of 22 March. January 1979,
you will specify the reserved pressure equipment, and provides for certain conditions
to ensure their safety
Change: 97/1982 Coll.
Change: 551/1990 Coll.
Change: 352/2000 Sb.
Change: 118/2003 Coll.
Change: 393/2003 Coll.
The Czech Office of work safety according to § 5 (3). 1 (a). (d)), and (f)) of law No.
174/1968 Coll., on State specialized supervision of work safety (hereinafter referred to as
the "law") and the Czech mining Office under section 57, paragraph. 1 (a). (d)) of law No.
41/1957 Coll. on use of mineral wealth (the top Act) and under section 10
(a). and (c)) and the Czech National Council) Act No 24/1972 Coll. on the organisation and
on the extension of the supervision of the State Mining Authority, in agreement with the competent
the central authorities shall:
§ 1
The range of validity of the
(1) the Ordinance is binding on the Organization, covered by the scope of the
public vocational safeguards work, ^ 1) and for the
legal and natural persons carrying out business activity
According to the special regulations of 6) (hereinafter referred to as "the Organization").
(2) this Ordinance shall not apply to products prescribed for conformity assessment
under the special law ^ 2a) and Government Regulation ^ 2b) before placing them
on the market and the technical equipment, subject to the supervision of the authorities referred to in section
3 (3). 2 (a). and (b)) of the Act).
§ 2
Reserved pressure equipment
(1) reserved pressure equipment within the meaning of article 4 (a). (d) to (g) of the Act))
(hereinafter referred to as "facilities") are:
and steam boilers) and liquid (hereinafter referred to as "the cauldron"), whose design
exceeding 0.07 MPa and temperature of fluids exceeds the boiling point when
This overpressure,
(b)) a stable pressure vessels (hereinafter referred to as "pressure vessels"), whose
the maximum working pressure exceeding 0.07 MPa and that contain gases,
steam or corrosive, poisonous and explosive liquids of any temperature or
any liquid at a temperature above their boiling point when overpressure
0.07 MPa,
c) metal pressure receptacles for the transport of gases (hereinafter referred to as "containers for gases),
the critical temperature is lower than + 50 ° C, or gases, which
at a temperature of + 50 degrees C is the absolute pressure (vapor tension) higher than 0.3
MPA.
(2) the boiler is divided into 4 classes:
and) 1. class-steam boilers with a nominal quantity of produced steam over 115
t/h,
(b)) 2. class-steam boilers with a nominal quantity of steam produced over 50
t/h to 115 t/h (including) or hot-water boiler with a heat output of over 35
MW,
(c)) 3. class-steam boilers with a nominal quantity of steam produced over 8
t/h up to 50 t/h (including) or hot-water boilers with heat output over 5.8
MW to 35 MW (inclusive),
(d)) 4. class-steam boilers with a nominal quantity of produced steam to 8 t/h
(including) or hot-water boiler with the thermal power up to 5.8 MW (including) and
all other liquid boilers.
(3) pressure vessels are divided into groups according to the maximum allowable
excess pressure (p) in the MPa and the product of the maximum allowable gauge pressure and volume
(v) in litres (hereinafter referred to as "safety product") as follows:
and the Group and form A) pressure vessels with a maximum allowable pressure
exceeding 0.2 MPa, whose security product has a value higher than the
third, 10na
(b)) Group B consists of other pressure vessels.
(4) if the device has several pressure zones, it security
the product of each area separately, and the establishment is classified to the group, which
corresponds to the maximum security of the product.
(5) Volume in litres is the total space provided for the working substance
(or substance), which is in the device under pressure. Part of the pressure
the space that you occupy the internals, linings, paddings, and similarly, when
the calculation of the volume of the neodpočítává.
§ 3
Devices in accordance with this order are:
and working with boilers) radioactive substances or boiler located in the
environment with neutronovým flow,
(b) the volume of the boiler) 10 l (inclusive), for which security product from
structural overpressure in the MPa and the volume does not exceed 10 litres,
(c)) pressure vessels working with radioactive substances or pressure
the containers are placed in an environment with neutronovým flow,
(d) pressure vessels up to 10) litres (inclusive), for which security product
does not exceed 10,
(e) a pressure vessel of the tubes) and nekruhových cross sections of the highest internal
dimension into 100 mm (inclusive) without the collectors, or pickers, if
from the collector pipes and nekruhového cross section does not have the internal dimension greater than 150
mm (inclusive),
f) heating elements for steam and water (liquid) heating,
(g)) pipe, its expanded parts and pressure vessels to the built-in
(for example, to release the pressure or containers), whose
the inside diameter (D) does not exceed three times the internal diameter (d)
the largest connected pipe (D is less 3d), as well as all advanced
part of the pipes and pressure vessels to the built-in if you serve only to
transport of fluids (such as distributors, separators, collectors),
h) pressure parts of machinery and technical devices, which are not
separate pressure vessels (for example, the cylinder piston machines,
the Cabinet of steam turbines, windmills of piston pumps, fluid
cooler compressors, pressure casing encapsulated transformer stations),
I) air heaters, anthers, blast furnaces, gas cleaners
j) inflatable metal-free device, in which the internal pressure of the compressed
gas ensures their shape and stiffness (such as tires, pneumatic
beams, boards),
for gases of containers) pressure volume to 0.22 litre (inclusive),
l) irreversible pressure vessels for aerosols and similar use
m) transportable pressure equipment if you are covered by a special
legislation. ^ 2 c)
§ 4
Organisation approvals
(1) to produce, assemble, repair, reconstruct the device and perform
revisions and tests of the boilers and pressure vessels supplying the manner and
periodic tests of gas containers are permitted only on the basis of organization
permission (hereinafter referred to as "authorized enterprise").
(2) Permission is issued by the Inspectorate of labour safety (hereinafter "the authority of the
supervision "), in whose district the Organization has its seat, where appropriate, permanent residence, and
on the basis of a written application of the organization.
(3) Organization in the application shall contain:
and) your exact name and address,
(b) the name and address of the plant) (the establishment), for which permission is sought, if
It is not in the headquarters of the organisation,
(c) the nature and scope of the requested) permission,
(d) ensure enforcement activities) for which permission is requested after the page
technical equipment and professional qualifications of the workers.
(4) where the supervisory authority of non-compliance with the conditions or violations of
regulations to ensure the safety of work and technical equipment in the
activities according to the permissions, limits the range of permissions, or is your organization
be withdrawn.
§ 5
Individual trial
(1) Every boiler and pressure vessel finished with the exception of the products
laid down to conformity assessment according to a special law ^ 2a) and regulation
Government ^ 2b), the manufacturer must submit to the building and the first pressure test. These
the test provides and performs the manufacturer, if the writing was their
performing organization that is entitled to the Assembly of the boiler or pressure
of the container. To each boiler or pressure vessel, the manufacturer must draw up a
accompanying documents including passport (book review)
set technical standards.
(2) after the successful construction and pressure test the first revision techniques
the manufacturer, where applicable, the organization that carries out the Assembly, marks the rivets
factory label round razidlem 10 mm in diameter with a tag or
abbreviated name of your organization. The imprint of the same marks and stamps
the Passport (a review of the book).
(3) the producers or organisations carrying out Assembly, are required to
notify the supervisory authority in writing at least 15 days in advance the time and place
testing of boilers with the design pressure exceeding 1.6 MPa
and pressure vessels and the group with the highest working pressure
exceeding 2.5 MPa.
(4) Each container produced gases, the manufacturer must submit to the first
the test.
(5) after the successful test marks the first test of the authority of the gases
razidlem ^ 3) and the date of the test.
(6) production and Assembly, the organisation may deliver to the customer
and the design of the boiler pressure) exceeding 1.6 MPa,
(b)) a pressure vessel of the Group and with the highest working pressure
exceeding 2.5 MPa
only after successful first pressure test equipment certified by the supervisory authority.
(7) in the case of imported equipment ensures compliance with the obligations referred to in paragraphs
3 and 6 of the user organization.
§ 6
Tests after repairs and reconstructions
(1) after the repair or reconstruction of the boiler or pressure vessel is authorized
the Organization shall perform construction and pressure strength test prescribed by the
overpressure. The value of the overpressure is listed in the documentation accompanying the device.
(2) the Organization shall be the beneficiary of the test protocol, which becomes
an integral part of the documentation accompanying the device, together with the technical
documentation of repair or reconstruction.
(3) the beneficiary organisation shall notify in writing 15 days in advance
the supervisory authority, in whose area of competence, the facility is located, the date of
testing of boilers with the design pressure exceeding 1.6 MPa and
pressure vessels and the group with the highest working pressure exceeding
2.5 MPa.
section 7 of the
Revisions and tests of operating boilers and pressure vessels
(1) revisions and tests of operating boilers and pressure containers may only be performed
only audit techniques (section 8). The way terms and cases review
and tests tightness lays down technical standards.
(2) a pressure test carried out a review of the techniques usually water, or
oil or other appliance, nejedovatou, and nevýbušnou liquid.
The result of the tests recorded in the audit trail. The value of the test
the overpressure is listed in the documentation accompanying the device.
(3) If, as a result of the new valve adjustment to change the
set values, corrects the revision techniques relevant data in the Passport
(book review).
(4) the pressure test shall be carried out
and determine if it is), the supervisory authority,
(b)) no later than 9 years since the implementation of the previous pressure test the test
If the pressure in the accompanying documentation is not provided for a shorter period.
(5) except in the cases referred to in paragraph 4 must be pressure test for
boilers stable made their move after before
the start of operation and for all boilers after longer operating break of two
years.
(6) in each of the technically justified cases, the supervisory authority may
deadline pressure tests to extend, where appropriate, suggest instead of pressure
tests of a different way of testing.
(7) the organization operating the boiler (hereinafter referred to as the "operator") is required to
notify the supervisory authority at least 30 days in advance of the date of its pressure
of the test.
§ 8
The audit techniques and testing authority
(1) a review of the techniques a must have for the implementation of the revisions and tests of boilers and
pressure vessels the certificate of professional competence issued by the supervisory authority
on the basis of the performed tests.
(2) the Applicant for a certificate of audit technique must have completed a full
secondary vocational education of mechanical engineering and a minimum of five years ' experience in the field of
pressure equipment. For applicants for a certificate of audit technique of boilers
4. classes of apprenticeship in machinery is sufficient scope and at least seven years '
professional practice in the field of pressure equipment.
(3) the test authority conducting the first tests have completed full
secondary vocational education of mechanical engineering and at least five years ' professional experience in the
scope of pressure equipment and the certificate issued by the supervisory authority, on the basis of the
the tests carried out.
(4) the test authority conducting the periodic tests must have at least
apprenticeship in the field of machine and at least five years ' professional experience in the field
pressure equipment.
(5) if the applicant Has professional engineering education higher than those prescribed in the
paragraphs 2 and 4, a two-year professional experience will suffice. If the applicant has other
professional education, shall decide on the necessary length of the practice of the supervisory authority.
(6) the review of techniques and test authority for conducting these tests are
obliged to place in the records of the action, which made the registration number
your certificate.
Visits and tests
§ 9
(1) for the purposes of the national vocational supervision is the operator shall be obliged to
prepare the boiler and pressure vessel inspection to the inspection or test in
the agreed date and under the conditions laid down by the supervisory authority.
(2) technical tasks necessary for the proper execution of the inspections or tests
manages and conducts the audit techniques or other professionally qualified worker
designated by the operator.
§ 10
(1) the Construction and the first pressure test produced, assembled,
repaired or reconstructed boilers and pressure vessels may exercise the
only revision techniques authorized organization (section 8).
(2) the first test and periodic tests of gas containers may only exercise
only authorized organization test authority (section 8).
§ 11
Boilers heaters
(1) the boiler is allowed to operate only if the operator is responsible for
professionally qualified worker (hereinafter referred to as "Fireman"), which was successfully
performed basic test topičský card issued by the competent
work safety Inspectorate (hereinafter referred to as the "Inspectorate"). Basic
test to separate operating boilers 4. class.
(2) to the separate manual of the boilers 1. and (3). class or boilers, other than in
topičském packages referred to fuel it is necessary to pass the supplementary
exam.
(3) if the engineer fails seriously his duties, he may
Inspectorate of topičský license withdrawn.
(4) if the driver is not for a period of 5 years the boiler, shall cease its topičský
the validity of the licence.
(5) recovery of the card is subject to the issuing of a new basic
of the test.
(6) the Topičského ID card does not need to operate boilers 4. class
and fully automated) with a nominal quantity of produced steam to 0.5
t/h,
(b)) fully automated fluid with heat output up to 0.35 MW,
(c)) with a design pressure of up to 0.3 MPa and with a capacity of up to 100 litres,
(d) of the volume flow) 100 liters.
Such boilers heaters must be instructed about their operation manual and zacvičeni,
which the operator must edit registration.
§ 12
Basic tests
(1) the basic topičské of the test (proficiency tests the Stoker)
they perform at the inspectorates.
(2) the application of the basic tests of candidates shall be submitted on the prescribed
form through the operator at the Inspectorate, in the place where the
the boiler is located.
(3) to the basic test may be an exam candidates
and) 18 years or older,
b) physically or mentally fit to perform the work of the firemen, ^ 4)
(c) confirmation of the operator) who according to the boiler to a six-month professional
on-the-job training in operating boilers at least 4. class under the supervision of the Stoker with a valid
topičským card
(d)) who show proof of graduation from a vocational course of operation and
operation of boilers of at least 20 teaching hours, including done
the tests,
e) who demonstrate qualifications required in the case of a special regulation,
they have operated with gas otopem. ^ 5)
(4) Relief from the prescribed training referred to in paragraph 3 (b). (c)) may, in the
in exceptional cases at the request of the Inspectorate.
(5) the Inspectorate shall inform the operator about the date and venue of the test
at least 15 days in advance. The operator shall inform the relevant applicant
and ensure its participation.
(6) After successfully performed the basic test of the Inspectorate shall issue to the applicant
topičský card.
section 13
Additional tests
(1) the Applicant for a supplemental examination must complete six-month professional
on-the-job training in the relevant class under the supervision of boiler Stoker with a valid
topičským card and professional course, and it in length of 30 hours for boiler 3.
a class of 50 hours for boilers 2. class and 100 hours for the boiler 1. class. In
If additional tests for the operation of boilers, the next higher class or
boilers for other fuels within the same class, decide on the length of the boiler
vocational training and vocational course, the operator on the basis of
observations the audit technique, but professional job training must last at least two
of the month.
(2) Additional tests shall be carried out at the topičské inspectorates.
(3) the application for the additional tests shall be submitted on the prescribed candidates
form through the operator at the Inspectorate, in the place where the
the scope of the boiler is located. The candidate shall, before commencing tests
proof that it meets the requirements.
(4) the Inspectorate shall inform the operator about the date and venue of the test
at least 15 days in advance. The operator shall inform the tenderer and shall ensure
his participation.
Transitional and final provisions
§ 14
(1) the operator shall, within one year from the date of effectiveness of the
of this order, in writing, notify the supervisory authority in the registration numbers
operating equipment in the distribution according to § 2 (2). 2 and 3 and the way
ensure their revisions and tests.
(2) the organization engaged in an activity referred to in section 4 yet without permission
are required to apply for them, within six months from the effectiveness of this Ordinance.
(3) the Permission issued by the certificates issued by the audit organizations and technicians
and the test authorities before 1. 7. applies to 30, 1979. 6.1983.
(4) the Topičské ID cards issued before the effect of this order shall remain in
If they correspond to the new classification of boilers. In other cases, the
the driver must pass the prescribed examination no later than one year from the
the date when the Decree takes effect.
(5) the Organization shall be obliged to issue a new request or permission
the certificate for its staff to submit to the competent supervisory authority
not later than 31 December 2006. 12.1982.
§ 15
Shall be deleted:
1 of Regulation No. 212/1910 ř.z., guiding the business of manufacture of soda water binds
the concessions,
2 the Government Regulation No 435/1941, about the instruments used in the
small bar and beer,
3 Regulation No 334/1945 Ú.l., amending Regulation No 176/1944 Sb.
which are issued regulations for the material and the construction of steam boilers,
4 of Decree No. 55/1960 Coll., regulating certain obligations
manufacturers and operators of steam boilers (steam generators) and other
pressure vessels and amending some of the provisions on security and the economy
such technical equipment, as amended by Decree No 121/1961 Coll.
5 the provisions of section 1 (b). and) Decree No. 151/1969 Coll., which determine the
dedicated technical equipment.
section 16 of the
This Decree shall take effect on 1 January 2005. July 1979.
The President of the
The Czech Mining Authority:
Sprocket v.r.
The President of the
The Czech Office of work safety:
Dr. v.r. Bartík
1) § 3 (3). 1 Act No. 174/1968 Coll., on State specialized supervision of
safety work.
2) section 39 of the Act of the Czech National Council No. 61/1988 Coll. on mining activities,
explosives and the State Mining Administration.
2A) Law No. 22/1997 Coll., on technical requirements for products and on the
changing and supplementing certain acts, as amended by law No 71/2000 Sb.
2B) Government Decree No. 175/1997 Coll., laying down the technical
requirements for simple pressure vessels, as amended by Decree-Law No.
80/1999 Coll., Regulation of the Government No. 177/1997 Coll., laying down the technical
requirements for gas appliances. Regulation of the Government No. 182/1999 Coll.
laying down technical requirements for pressure equipment.
2 c) Government Regulation No. 42/2003 Coll., laying down the technical
requirements for the transportable pressure equipment.
3) ČSN 07 8305 Metal pressure receptacles for the transport of gas. Technical
the rules.
4) Ministry of health Directive on the assessment of health
eligibility to work no 49/1967, Journal of the Ministry of health, in
the text of the directive of the Ministry of health no. 17/1970 Journal
the Ministry of health of the CSR about changes in health assessment
eligibility to work, and methodological measures no. 19/1970 Journal
the Ministry of health on the assessment of temporary inability of the CSR to
the work.
5) Decree No. 21/1979, which determined the dedicated gas equipment
and lays down certain conditions to ensure their safety.
6) Eg. Law No. 105/1990 Coll., on citizens ' private business, law No.
104/1990 Coll., on public limited liability companies Act No. 173/1988 Coll., on
the enterprise with foreign participation, in the wording of Act No. 112/1990
SB.