Advanced Search

On The Implementation Of Certain Provisions Of The Law On Integrated Pollution Prevention

Original Language Title: o provedení některých ustanovení zákona o integrované prevenci

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
288/Sb.



DECREE



of 6 May 1999. September 2013



on the implementation of certain provisions of the law on integrated pollution prevention



Ministry of the environment shall determine pursuant to section 47 of Act No. 76/2002

Coll., concerning integrated pollution prevention and control, on an integrated

registry of pollution and on amendments to certain acts (the Act on integrated

Prevention), as amended by Act No. 222/2006 Coll., Act No. 25/2008 Coll., and

Act No. 69/2013 Coll. (hereinafter the "Act") to implement section 4, paragraph 4. 3, § 4a

paragraph. 2, § 14 para. 5 and § 16a para. 4 of the Act:



§ 1



The subject of the edit



This Decree incorporates the relevant provisions of the European Union ^ 1) and

It lays down the



and the release request) model of the integrated permit (hereinafter referred to as "the application"),

the scope and method of filling,



(b)) the details of the base message,



(c)) the details of the content of vocational assessment for exemption of the levels

emissions associated with best available techniques (hereinafter referred to as "professional

the assessment "),



d) pattern reports on implementation of the integrated permit conditions.



§ 2



Model application, scope and method of filling



Model application, the manner and extent of the filling are laid down in annex

No 1 to this notice.



§ 3



The basic message



The details to the basic messages are set out in annex 2 to this

the Decree.



§ 4



Expert assessment



The elements of the content of vocational assessment are set out in annex 3 to the

This Decree.



§ 5



The pattern of reports on the implementation of the integrated permit conditions



The pattern of reports on the implementation of the integrated permit conditions are set out in

Annex No 4 to this notice.



§ 6



Regulation (EEC)



Shall be repealed:



1. Decree No. 554/2002 Coll., laying down a pattern of requests for extradition

the integrated permit, the scope and method of filling.



2. Decree No. 363/2010 Coll., amending Decree No 560/2002 Coll.,

laying down the model for the application for the issuance of the integrated permit, the range of

and the way it is.



§ 7



The effectiveness of the



This Decree shall enter into force on the fifteenth day following the date of its publication.



Minister:



Mgr. Geeky in r.



Annex 1



MODEL APPLICATION FOR THE ISSUE OF THE INTEGRATED PERMIT, THE SCOPE AND THE WAY IT

FILLING in the



1. General INSTRUCTIONS on HOW to complete the application



1. in the case of an application for the issue of the integrated permit, the specimen application

complete in its entirety. The operator fills in the application scope,

that corresponds to the nature of the povolovaného device.



2. in the case of a request for amendment of the integrated permit operator fills in

the request to the extent corresponding to the change of device and follow the instructions

Administrative Office, which has territorial jurisdiction for the issue of an integrated

authorisation (hereinafter referred to as "the authority"), which the Office may, in accordance with the law

determine the requirements for an application is not required.



3. the operator has already operated by the device fills the data required

relating to the device for the latest completed calendar year. If

It's for the procedure for issuing integrated permit important, and if they are

such data is available, the operator will fill the device in cases

required in the model application data for the last three calendar years.



4. the operator of a device that is before construction begins and in the

the construction, to be completed by the data coming from the projected values.

the projected data.



5. In the preparation of the different chapters of the request it is necessary to follow the

the instructions below to chapters of the request.



6. Individual tables that are included in the model application, you need to

to the extent necessary to customize the data (add lines;

When you need to fill out multiple times, the prescribed tables for example. the same table

For more parts of the device, you must copy the necessary number of),

button is clicked. in the corresponding box to refer to the attached documents. How-to texts

used in some tables (for example, "year") have an operator

highlight the device that you need to fill in. These texts, the operator

the device will overwrite the corresponding details.



7. the application should always be placed on all the figures of their source

(registration, information system, logs analysis, records of measurement)

and the way to determine the value (measured, calculated, etc.).



8. the operator's request must indicate all sources of information

(documents, documents) that have been used in the preparation of the application.



9. The prescribed chapter numbering in the model, the application cannot be modified.



10. The information required in the individual chapters of the model application must

fill in interdependence. The information presented in the chapters and

in the annexes to the application must establish and provide justification for

the proposed binding conditions of operation of the device. Coherence of the chapters is

appropriate support and reciprocal links to the appropriate data to be placed in other

chapters.



11. If the operator of a list the information protected under

specific legislation (the Act defines information from the request,

that could not be marked), shall include the following information in a special separate

Annex to the application, which will be labelled as an attachment that contains the protected

details. Protected data does not indicate in the appropriate sections of the application, but

where reference is made to the appropriate attachment that contains protected information.



2. the CHAPTER of the application and instructions for FILLING IT OUT



The numeric designation of the guidelines corresponds to the marking of each chapter and

marking individual items the model application.



Application cover sheet



I-------------------------------I--------------------------------------------I

I 1. The name of the document and

I-------------------------------I--------------------------------------------I

2. The name of the device and I

I-------------------------------I--------------------------------------------I

3. Address of the device (I)

I-------------------------------I--------------------------------------------I

4. The competent authority and

I-------------------------------I--------------------------------------------I

I-------------------------------I--------------------------------------------I

(I) 5. Business name or name, I I

And or title, name, or. I I

And the names, first and last name and also

Even operators of I I

I-------------------------------I--------------------------------------------I

6. Business name or name, I I

And or title, name, or. I I

And the names and surnames of the authorized I I

The representative of the operator I I

And I I

I-------------------------------I--------------------------------------------I

7. The signature of the operator I I

(I) the establishment or authorized I I

The representative of the operator I I

And I I

I-------------------------------I--------------------------------------------I

8. Datum I I

I-------------------------------I--------------------------------------------I



I----------------------------------------------------------------------------I

I 9. Processor (if different from your device) and

I-------------------------------I--------------------------------------------I

And 9a. Business name or I I

Even the name/title, name, or. I I

And the names, first and last name and also

I-------------------------------I--------------------------------------------I

Even 9b. Address of the registered office or place of I I

And business and even

I-------------------------------I--------------------------------------------I

And 9 c. COMPANY REGISTRATION NUMBER, if it has been assigned a I I

I-------------------------------I--------------------------------------------I

And 9 d. Telephone (or fax) I I

I-------------------------------I--------------------------------------------I

And 9e. E-mail I I

I-------------------------------I--------------------------------------------I



Home (cover) page contains basic data: name of the document, the name of the

the device address of the device (the place where the device is, or will be

be located), the indication of the locally competent authority to which the request

serves, the identification of the operator, the date of processing of the application

(the date that the information in the request are valid) and identify

application processor.



Point 5. -Fill out a business name Legibly, or the name or title, name,

button is clicked. name, and last name of the operator of the device. If the operator is

the device is a legal person and does not have an authorised representative, to indicate whether or not

title, name, or. name and surname of the natural person authorized to sign

the request for the operator.



Point 6. -Authorized representative of operator means the person

who is entitled to submit an application on the basis of the power of attorney granted by the

the operator of the device. If it is an agent of the operator of equipment

legal person, indicate whether or not the title, name, or. name and surname of the natural

the person authorized to sign the request for the agent.



Point 7. -Attach the signature device, the operator or the representative of the


operators of authorized on the basis of power of attorney to submit an application.

If the operator or the operator's authorized representative

the device is a legal person, this is a physical signature of the person authorized

sign the request for the operator or authorized

the representative of the operator.



Section 8. -The date is the date of filling in the data in the request, i.e.. the information referred to in

the request is accurate and valid as of this date.



Point 9. -To be completed if the processor is different from

the operator of the device. To identify the application processor must be

indicate the business name, business name or name. name and surname,

address, company registration number (if assigned), phone, email.



1. the content of the request



The content must specify the list of the names of all chapters, sub-chapters and attachments

the application, indicating the side of the document.



2. identification of the operator and the owner of the device



2.1. The operator of a (legal person or natural person-entrepreneur

a person)

I-------------------------------I--------------------------------------------I

I 1. Business name or I I

Even the name/title, name, or. I I

And the names, first and last name and also

I-------------------------------I--------------------------------------------I

2. Legal form and

I-------------------------------I--------------------------------------------I

3. Address of the registered office or place of I I

And business and even

I-------------------------------I--------------------------------------------I

4. Address for service I I

And documents (if they are different I I

And from the address of the seat or place of I I

And business) I I

I-------------------------------I--------------------------------------------I

(I) 5. COMPANY REGISTRATION NUMBER (if assigned) I I

I-------------------------------I--------------------------------------------I

6. VAT NUMBER (if assigned) I I

I-------------------------------I--------------------------------------------I

7. Contact person: I

I-------------------------------I--------------------------------------------I

And 7a. Title, name, or. I I

And the names, first and last name and also

I-------------------------------I--------------------------------------------I

And 7b. Phone (or fax) I I

I-------------------------------I--------------------------------------------I

And 7 c. E-mail I I

I-------------------------------I--------------------------------------------I



Point 3. -Data by business or trade register.



Point 7. -As contact person provide the operator of the device, if the

entrepreneurial natural person or a natural person authorized under the

procedure for issuing integrated permit do obligations on behalf of the operator

the device, which is a legal person, natural person or business

natural person representing the operator in control of the release

the integrated permit on the basis of power of Attorney, or a natural person,

who is entitled, in the procedure for issuing integrated permit do

acts on behalf of an agent of the operator of the device, which is a legal

person.



2.2. the operator of equipment (nonentrepreneurial natural person)



Only the operator of a chapter that is a natural person,

that is not an entrepreneur.

I-------------------------------I--------------------------------------------I

I 1. Title, name, or. names, and even

(I) first and last name and also

I-------------------------------I--------------------------------------------I

2. ID card number and I

I or another document that I I

Even replacing it I I

I-------------------------------I--------------------------------------------I

3. Permanent residence I I

I-------------------------------I--------------------------------------------I

4. Address for service I I

And documents (if different from (I)

Also the places of permanent residence) I I

I-------------------------------I--------------------------------------------I

(I) 5. Contact person I I

I-------------------------------I--------------------------------------------I

6. Phone (or fax) I I

I-------------------------------I--------------------------------------------I

7. E-mail I I

I-------------------------------I--------------------------------------------I



Point 5. -As contact person provide the operator of the device, or

entrepreneurial natural person or the natural person representing the

operator in proceedings for the issue of the integrated permit on

the basis of power of attorney or a natural person authorized under the

the release of the integrated permit do obligations on behalf of an agent

the operator of the device, which is a legal person.



Points 6. and 7. -To reset your phone (or fax) and email of the contact person.



2.3. The owner of the device (if the device operator)



Section contains information about the owner of the device (in the case that is not

at the same time the operator of equipment).

I-------------------------------I--------------------------------------------I

I 1. Business name or I I

Even the name/title, name, or. I I

And the names, first and last name and also

I-------------------------------I--------------------------------------------I

2. Legal form and

I-------------------------------I--------------------------------------------I

3. Address of the registered office or place of I I

And business and even

I-------------------------------I--------------------------------------------I

4. Address for service I I

And documents (if different from (I)

Even addresses, location or place of I I

And business) I I

I-------------------------------I--------------------------------------------I

(I) 5. COMPANY REGISTRATION NUMBER (if assigned) I I

I-------------------------------I--------------------------------------------I

6. VAT NUMBER (if assigned) I I

I-------------------------------I--------------------------------------------I

7. Phone (or fax) I I

I-------------------------------I--------------------------------------------I

8. E-mail I I

I-------------------------------I--------------------------------------------I



Point 3. -Data by business or trade register, if

available.



3. identification of the device



Information to accurately identify the device-the device name, address

the device, device location and geographical coordinates.

I----------------------------------------------------------------------------I

I 1. The name of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. Address of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

3. The location of the device and the

I-------------------------I--------------------------------------------------I

And 3a. Kraj I I

I-------------------------I--------------------------------------------------I

And 3b. Obec I I

I-------------------------I--------------------------------------------------I

And 3 c. Cadastral territory I I

I-------------------------I--------------------------------------------------I

And 3d. The numbers of the parcels I I

I-------------------------I--------------------------------------------------I

I I I

I-------------------------I--------------------------------------------------I

4. The geographical coordinates of the facilities (S-JTSK)

I-------------------------I--------------------------------------------------I

I X: I I

I-------------------------I--------------------------------------------------I

I Y: I I

I-------------------------I--------------------------------------------------I



Point 1. -Indicate the descriptive name of the device for the purpose of proceedings for the issue of

the integrated permit, which should exactly identify the main

activity/activities (in the case of the integrated permit for more activities

According to the annex to the law, for example. Foundry and the energy source), for

which/that applies for the issue of the integrated permit. Marking of the equipment

the name is identical with the trade name of the operator is not suitable.



Point 2. -In the case of the still neprovozovaného devices shall indicate the place where

the device will be placed.



3d point. -When a larger number of plots can be attached to a list of them


the annex to the application. On request of the Office into the graphics of the annex to the application

attach a valid copy of the cadastral map showing the land on

where the device is installed (it will be placed).



Section 4. -Geographical coordinates (coordinate system S-JTSK) apply

to the center of the device.



4. basic information to the application for issue/modification of the integrated permit

I--------------------------------------------I-------------------------------I

I 1. Application for the issue of the integrated permit and yes/no and

I--------------------------------------------I-------------------------------I

2. Request for change of the integrated permit and yes/no and

I--------------------------------------------I-------------------------------I

3. Legal force of the changing and even

And the integrated permit (I)

I--------------------------------------------I-------------------------------I

4. Identification of the changing of the integrated I I

And I I

I--------------------------------------------I-------------------------------I

And 4a. Device identification (PID) I I

And the information system of the integrated prevention and

I--------------------------------------------I-------------------------------I

(I) 5. Justification the change requests of the integrated permit and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

6. The decisions necessary for the implementation of/operation of equipment acquired under legal and

I edit on a stretch of land-use planning and building law and

I-----------------------------------------------------I----------------------I

And 6a. Name, identification and description of the decision and 6b. Reference to annex I,

I-----------------------------------------------------I----------------------I

I I I

I-----------------------------------------------------I----------------------I

7. The process of assessment of the effects on the environment and equipment

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

8. Overview of the replaced administrative acts under other legislation and

I-----------------------------------------------------I----------------------I

And 8a. Name, identification and description of the administrative act and 8b. Reference to annex I,

I-----------------------------------------------------I----------------------I

I I I

I-----------------------------------------------------I----------------------I

I 9. Project documentation and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

10. Cross-border effects of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



Point 1. -Indicate (Yes or no) whether the request is for an integrated permit.



Point 2. -Indicate (yes/no) whether it is an integrated change request

the authorization.



Point 3. -The date of acquisition of legal power of the changing of the integrated

the authorization.



Section 4. -Indicate the reference number of the changing of the integrated permit.



Section 4a-Include device identification (PID) in the information system

integrated prevention (http://www.mzp.cz/ippc). It is reported that the

Displays each document on the device in the

"device ID" in the format of a 12-character code from the capitalization and

numbers. PID is expressed in the case of a request for amendment of the integrated permit.



Point 5. -Fill in the case of the integrated permit change requests. In

the justification for the request capture the essence of the changes in service that

leads to the submission of the application.



Point 6. -Include all decisions of the obtained for the establishment in the legal

editing in the field of planning and building law. In the case of an application

a change of the integrated permit particulars of decisions according to the legal

editing in the field of planning and building law relating

the subject changes.



-Section 6a-give the name, reference number, the date of acquisition of legal power

the decision and the authority that issued the decision. If you have not yet been released

building permits, indicate here the date of submission of the building

authorisation, if it has already been submitted (certificate of filing an application for the issue of

the building permit to demonstrate in the annex).



-Section 6b-a reference to the annex to the application. The relevant final decisions

According to the legislation in the field of planning and building law

attached in the annex to the application.



Point 7. -To the process of assessment of the effects on the environment include:



-whether legislation in the field of environmental impact assessment

on the device or its modification (including the inclusion of intent referred to in

the law on the assessment of the effects on the environment),



-whether the process was or is, IE. at what stage is the process of assessing the

(indicate also whether the investigation is in progress). whether it has been

the process of assessment based on the results of the fact-finding terminated the proceedings.

Indicate also the identification documents of the environmental impact assessment

environment.



Section 8-provide all administrative acts (decisions, approvals, permits,

opinion) under other legislation necessary for devices that

integrated authorization is replaced by, and not including the provisions of other

the legislation under which they are issued, if they are released

It was not replaced by the procedure laid down in the law. Overview of all administrative acts

under other legislation replaced the integrated permit is

published through the information system of integrated prevention and

in the journal of the Ministry of the environment. Operator

obliged to submit all applicable administrative acts that can be integrated

by enabling the replace.



-Section 8a-to which acts of the Administration, which has already been released, are

valid and should be replaced by the integrated permit, or cancelled,

include: name, reference number, the date of acquisition of legal power and authority, that

issued the administrative act.



-Paragraph 8b-a reference to the annex to the application. Valid superseded administrative acts

attached in the annex to the application.



Section 9-the name, processors and other personally identifiable information to

the project documentation for the appropriate degree of control by law

in the field of planning and building law in the case of the device before

the start of construction, under construction, or when a change in the operation of facilities

subject to control pursuant to the legislation in the field of spatial planning and

building law. To identify a processor design documentation is

should be noted, business name, business name or name. name and surname,

address, identification number, if assigned. In cases where the submission of the

project documentation required by other legislation, shall submit to the

the operator of project documentation in the annex to the application.



Section 10-indicate whether the operation of the device (or change the operation of the device) may

significantly affect the environment of another State. If Yes,

specify here the essence of this influence. Confirm or exclude the

cross-border effects of the operation of the device must be based on information about

emissions and other environmental effects from the establishments listed in Chapter 9 of the application and

the data characterizing the status and influence of the territories referred to in

Chapter 14 of the request.



5. A brief summary of the data from the request

I----------------------------------------------------------------------------I

I 1. The identification of the operator and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. The name of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

3. Description and definition of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

4. Category of activity/activities pursuant to annex 1 to the law and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

(I) 5. Description of raw materials, auxiliary materials and other substances and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

6. Description of energy and fuels and

I----------------------------------------------------------------------------I

I I


I----------------------------------------------------------------------------I

7. Description of the sources and emissions

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

8. The amount of emissions to individual components of the environment and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

I 9. Description of the sources of noise, vibrations, radiation and non-ionizing

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

10. Description of other effects on the environment and equipment

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

11. A description of the technologies and techniques intended to prevent or limit emissions and

From your device and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

12. Description of the prevention measures, for the preparation of reuse, and

Even the recycling and recovery of waste and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

13. Description of the measures to the measurement and monitoring of emissions discharged into life and

And the environment and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

I 14. Comparison of devices with the best available techniques (BAT) and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

15. The request for derogation from the emission levels associated with the best available and

And techniques and

I----------------------------------------------------------------------------I

I ANO/NE I

I----------------------------------------------------------------------------I

Even 16. A description of the measures to ensure the fulfilment of the obligations of a precautionary nature and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

I 17. An overview of the possible alternatives to the proposed techniques and even

And measures and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

18. Characteristics of the territory of the State and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

Even 19. The basic message I

I----------------------------------------------------------------------------I

I ANO/NE I

I----------------------------------------------------------------------------I



Chapter to the publication of the selected data from the request for the purposes of

Introduction to the public with the subject of the authorisation process. The purpose of the summary

is putting the basic information about the device or operation

the device and on the impacts of the operation of a device or the planned changes to the

environment and human health in a non-technical format. The summary should

Therefore, it should not contain the technical details, highly professional concepts, or

refer to other parts of the application.



Brief summary includes information in the extent specified in the Act.



All the data specified in a short summary must be in accordance with the data

referred to in other sections of the application.



Point 1. -The identification of the operator in accordance with Chapter 2 of

request.



Point 2. -Indicate the name of the device in accordance with Chapter 3 of the application.



Point 3. -To provide a brief description of the device in accordance with chapters 3 and 6

the application, IE. the location of the device, the device purpose, a brief characterization of the

technical units and activities that make up the device, the base capacitance

parameters.



Section 4. -Indicate the category/categories of industrial activities referred to in annex

# 1 to the Act.



Point 5. -Provide a brief overview of raw materials, auxiliary materials,

intermediate products and products that are in use or are

produced, in accordance with Chapter 7 of the request.



Point 6. -To provide a brief overview of the used fuel and energy in accordance with the

Chapter 8 of the application.



Point 7. -Provide an overview and description of the sources of emissions from the equipment in accordance with the

Chapter 9 of the application.



Section 8. -Indicate the amount of emissions to individual components of the

environment and their effects in accordance with Chapter 9 of the application.



Point 9. -Provide an overview and description of the sources of noise, vibrations and non-ionizing

radiation in accordance with Chapter 10 of the request.



Point 10. -Indicate the potential effects on the environment and equipment

the health of the population in accordance with Chapter 9 of the application.



Point 11. -Provide an overview of the technologies and other techniques intended to

prevent or limit emissions from installations in accordance with Chapter 9

request.



Item 12. -Provide an overview of the measures to prevent the generation of waste, to

preparation of reuse, recycling and recovery of waste in accordance with the

Chapter 11 of the request.



Section 13. -Provide an overview of the measures for the measurement and monitoring of emissions

discharged to the environment in accordance with Chapter 12 of the application.



Item 14. -Compared to best available techniques and levels

emissions associated with best available techniques in accordance with the

Chapters 6 through 12 of the application.



Paragraph 15. -Indicate (yes/no) exception is required, from the emission levels

associated with best available techniques.



Paragraph 16. -Provide an overview of the measures to carry out the duties of the precautionary

the nature of such as. rational use of energy, the prevention of

accidents and limiting their consequences, if any, the Elimination of risk

possible pollution of the environment and threaten human health

originating from establishments after the cessation of its activities to the greatest possible

extent, in relevant cases about the security program

and the safety report.



Paragraph 17. -Provide an overview of possible alternatives to the proposed

techniques and measures in accordance with Chapter 6 of the application.



Paragraph 18. -Provide a brief characterization of the status of the territory (in particular, a description of the

the current values of the situation), or device is to be located, including the

definition of the fundamental conflicts in the territories in accordance with Chapter 14 of the request.



Paragraph 19. -Indicate (yes/no), whether it is part of the request for extradition

the basic message of the integrated permit.



6. Description of the device

I----------------------------------------------------------------------------I

I 1. Definition of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. Definition of the device changes and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



Point 1. -The subject of the definition of the equipment or changes (s) of the device is a brief

the description of the subject of the request, i.e.. the entire device (all of its principal

technical and technological components and related activities in them

or outside the ongoing), in the case of changes to the device (s) are subject to

the description of these changes. Indicate also the whole manufacturing process description (use

and the involvement of the technical units and activities that make up the device). When

defining the operating device shall be based on the actual situation at the time

submission of the application and of the actual (real) material flows. The definition of

the appliance and its individual parts display in the graphics the annex within a

Chapter 13.1 request.



The establishment of the facility, the operator takes account of the following points

following the definition of the device under the Act:



-In device with one or more of the industrial activities referred to in

Annex No. 1 of the Act.



-The device is the technical unit, i.e. entity (entity, object)

consisting of one or more functional components together to allow

the operation of listed/specified activities/activity. The device is

designed to operate a listed activity/activities listed and

directly related activities or in the case of another of the original destination

modified in order to accomplish the required functions. Included with the device are


all technical requirements and equipment needed to operate the device

(buildings, structures, machinery, etc.). The device is normally composed

from separate technical units (e.g. large combustion plants,

composed of multiple energy sources). For the purposes of the detailed description

the structure of the device is introduced in the application partition on stand-alone devices

part of the technical unit.



-Equipment (technical unit) must be stationary, i.e. as a whole.

as a rule, firmly United with the Earth, or it cannot be commonly move (to the

the move would be for example. significant technical and administrative

measures). From the integrated permitting, of course, are not excluded activities

involving movement carried out within devices (movements of material belt

conveyors, trucks, etc.).



-The place is to be understood, in particular, as a geographic location

device. Question (various) ownership of land is not in this case

relevant (the operator can have land or a technical unit

forming equipment leased). Also the presence of the fence, the wall range

communication or other obstructions of the boundary does not automatically

space (facilities), the decisive factor is the reciprocal technical, functional and

material consistency of units and activities that constitute as a whole one

device.



-For one device should be understood as more technical units,

If consists of the following steps in a single industrial activity, if

other activity referred to in annex No. 1 of the law serves the main purpose of production-

also the activities referred to in annex No. 1. If more of the activities referred to in

Annex No. 1 of the law directly associated activities related, etc. This is

for example, when they are supplied with raw materials of the production input

common pipe lines, using a common operating

equipment for energy supply, or use a common stack to

the output materials or finished products. This is so even if the

the unit serves the same operational purpose. The use of common

means of communications or storage areas, as well as the

a common external energy supply or disposal of waste are usually

the lack of a reason to make such a complex was considered

one device.



-Directly associated activities are technically related activities

with the main activity in the place, which may have an effect on emissions and

pollution. A technical unit, including the activities referred to in annex No. 1

the Act therefore assigns all those parts of the device, which, together

space-, operating-technically and through material flows

and related activities that are not bound to a specific unit

(part of), but with the operation of the device relate to and affect

emissions (examples are the various movements of materials, internal transport,

cleaning and handling areas). Directly associated activities related

with a production order to the main activity, typically they are ancillary activities

serving the main activity (e.g., storage of raw materials, auxiliary input

substances) that were not operated on the site without the presence of

the main activities. Effect on emissions and pollution can be directly related

activities alone or in interaction with the main povolovanou activities.



6.1. technical units with the activities referred to in annex No. 1 of the law



Specify the units in which the activities referred to in annex No.

1 of the law. The device may be composed of one or more separate

complete technical units, in which the activities

classifiable within the categories listed in annex 1 of the law (for example,

one or more industrial chemical productions category 4.1,

internal combustion units, etc., in one operation). For each such

technical unit (a separate piece of equipment) given the entire

the scope of the required data (note prescribed table with items 1 to 9 is

for this purpose, copy must be in the exact number). If the device was

the categories of industrial activities referred to in annex No. 1 of the law

classified on the basis of the sum of the capacities of the more technical units (in the

accordance with the comment to annex No. 1 of the Act), are the appropriate drive

the subject of this chapter, the application, even if the threshold values in annex No. 1.

the law in and of themselves do not reach.



A description of the various parts must be sufficiently detailed to

meet the requirements of the other chapters of the request, that the description of the device

follow the information on emissions, fuels, energy consumptions for, waste,

other effects of equipment, etc.



6.1.1. the main activity according to the annex No. 1 of the law

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. The main categories of activities specified in annex No. 1 of the Act and

I----------------------------------------------------------------------------I

I I

I-------------------------------------I--------------------------------------I

3. Design capacity I I

I-------------------------------------I------------I------------I------------I

4. Operating capacity I year I year I year I

I I------------I------------I------------I

I I I I I

I-------------------------------------I------------I------------I------------I

(I) 5. Production and the year I year I year I

I I------------I------------I------------I

I I I I I

I-------------------------------------I------------I------------I------------I

6. The purpose and the detailed technical characteristics and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

7. Other operating data

I----------------------------------------------------------------------------I

I I

I----------------------------------I-----------------------------------------I

8. Month and year of entry into I I

I and I

I----------------------------------I-----------------------------------------I

I 9. The year the expected termination of the I I

I use/life/estimated I I

And recovery time I I

I----------------------------------I-----------------------------------------I



The operator shall include the activities, which it considers a principal in the case that it is

multiple activities listed in Schedule 1 of the Act. If it is in

only one device operation referred to in annex No. 1, then it is always

the main activity.



Point 1. -Indicate the name or description of a technical unit, for example. boiler K1.



Point 2. -Indicate the numerical designation of the main categories of industrial activity

According to the annex No. 1 of the Act.



Point 3. -Projected capacity described parts of the devices (activities)

is the capacity of the manufacturer. referred to in the project construction

or in the documentation for a building permit or building permits,

If you have already been released (e.g. the design capacity of the landfill

275 thousand tons, the design capacity of melting 95 tonnes of mineral materials

day, designed the space for 600 thousand birds). This is a

nominal capacity (value) parameter in annex No. 1 of the Act in

If it is in the category of industrial activities listed and decides

on the inclusion or non inclusion activities in that category (for example,

design capacity production, the contents of the spa for surface treatment,

the capacity of the landfill space for animals, etc.).



Section 4. -For the unit in operation include the capacity for the period operated

the last three calendar years concluded, if possible, in the

other cases operated for the last completed the capacity

calendar year. In the case of a seasonal or šaržovitého operation, to take into account

When you put the character of the operating capacity and operated in greater detail to indicate

what capacity operated by derive and to what it applies (specific

the product, operating time, etc.). Before the construction of the units or

the construction of this information does not. In the event that data are provided for

more years of age, you need to justify the significant annual differences. Justification

inter-annual differences always refers to the downstream emission values,

waste and under, i.e.. It should provide the basis for justification

drop or increase in values, etc. referred to in other parts of the

request.



Point 5. -Production of indicating, in particular operators of equipment for intensive

rearing of poultry and pigs. In poultry production is expressed in tonnes live

weight or number of pieces of eggs. In finishing pigs breeding is

production, expressed in tonnes live weight and breeding sows is

production of live piglets, Gilts and kanečků is expressed also in tonnes

live weight. For the unit in operation include the production for the period.

the last three calendar years concluded, if possible, in the


other cases, the production for the last completed calendar year. U

units before construction or under construction, this information does not. In

If they are given the data for multiple years, you need to justify the significant

annual differences. Justification of the inter-annual differences always refers to the

the downstream values of emissions, waste, etc., IE. It should

provide the basis for the justification of the decline or increase of emission values, etc.

referred to in other parts of the application.



Point 6. -Purpose and detailed technical characteristics includes description

production (production, etc.) the purpose of technical and technological description and

technical parameters of the separate parts of the equipment, methods, materials, and

energy consumption, etc. In the case of a larger description can be

This connect to the annex to the application and the request to provide a brief summary. U

units under construction, you can attach a summary technical report to

construction documentation to the annex to the application.



Point 7. -Other operating data are mainly details about how

the operation of the described equipment parts, IE. for example. the number of operating days and

hours, shift rate and seasonality of operations, maintenance and time required for the necessary

maintenance.



Section 8. -In the case of the unit before commissioning State

expected month and year of entry into service, in other cases

provide real data.



Point 9. -An indication of the expected year end of operation/lifetime

the unit, if necessary. estimated time of restoration. Editor's note. This information should

MJ. indicate a period of recovery units (technology), and in particular, there is a significant

in the case where an existing technology does not show parameters for the best

available techniques.



6.1.2. other activities referred to in annex No. 1 of the law

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. Categories of activities referred to in annex No. 1 of the Act and

I----------------------------------------------------------------------------I

I I

I------------------------------------I---------------------------------------I

3. Design capacity I I

I------------------------------------I------------I------------I-------------I

4. Operating capacity I year I year I year I

I I------------I------------I-------------I

I I I I I

I------------------------------------I------------I------------I-------------I

(I) 5. Production and the year I year I year I

I I------------I------------I-------------I

I I I I I

I------------------------------------I------------I------------I-------------I

6. The purpose and the detailed technical characteristics and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

7. Other operating data

I----------------------------------------------------------------------------I

I I

I------------------------------------I---------------------------------------I

8. Month and year of entry into service I I

I------------------------------------I---------------------------------------I

I 9. The year the expected termination of the I I

I use/life/estimated I I

And recovery time I I

I------------------------------------I---------------------------------------I



The individual points to fill in as in section 6.1.1.



6.2. technical units with activity/activities outside the framework of Annex No. 1

Act (request for release of the integrated permit)

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. Description of the activity and

I----------------------------------------------------------------------------I

I I

I---------------------------------------I------------------------------------I

3. Design capacity I I

I---------------------------------------I-----------I-----------I------------I

4. Operating capacity I year I year I year I

I I-----------I-----------I------------I

I I I I I

I---------------------------------------I-----------I-----------I------------I

(I) 5. Production and the year I year I year I

I I-----------I-----------I------------I

I I I I I

I---------------------------------------I-----------I-----------I------------I

6. The purpose and the detailed technical characteristics and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

7. Other operating data

I----------------------------------------------------------------------------I

I I

I---------------------------------------I------------------------------------I

8. Month and year of entry into service I I

I---------------------------------------I------------------------------------I

I 9. The year the expected termination of the I I

I use/lifetime/estimated time I I

Renewal I I

I---------------------------------------I------------------------------------I



This section of the application to be completed by the operator of a volunteer

applying for the issue of permits for the operation of the integrated device out of range

categories listed in annex No. 1 of the Act. (This is, e.g., the technical

the units in which they are carried out industrial activities referred to in

Annex No. 1 of the law that does not meet the thresholds listed here,

activities subject to the obligation to issue any administrative act according to

other legislation replaced the integrated permit, etc.).



The other information shall be completed as in section 6.1.1.



6.3. Directly associated activities

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. Brief description of the activities and

I----------------------------------------------------------------------------I

I I

I--------------------------------------I-------------------------------------I

3. Design capacity I I

I--------------------------------------I-----------I------------I------------I

4. Operating capacity I year I year I year I

I I-----------I------------I------------I

I I I I I

I--------------------------------------I-----------I------------I------------I

(I) 5. Production and the year I year I year I

I I-----------I------------I------------I

I I I I I

I--------------------------------------I-----------I------------I------------I

6. The purpose and the detailed technical characteristics and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

7. Other operating data

I----------------------------------------------------------------------------I

I I

I--------------------------------------I-------------------------------------I

8. Month and year of entry into service I I

I--------------------------------------I-------------------------------------I

I 9. The year the expected termination of the I I

I use/lifetime/estimated time I I

I obnovy I I

I--------------------------------------I-------------------------------------I



Specify the technical units not listed in section 6.1.1. and 6.1.2.,

that are part of the device. The device may be created, outside parts

identified in section 6.1.1 and 6.1.2, and one or more

separate units, in which the activity is taking place outside the framework of

categories of industrial activities referred to in annex No. 1 of the Act, or

below the needed capacity for inclusion in these categories, and it

even in total (in accordance with the note to annex 1 of the law), see above

definition of the device (which may be, e.g., the less energy resources,

cooling towers, sewage treatment plants, flour mill, dryers, ovens, warehouses,

tailings impoundments, landfills, cogeneration units, special production, end

technology).




Additionally, this chapter bridges the operator requesting a change

the integrated permit, which touches directly associated activities

an identifiable technical units.



For each such unit-a separate piece of equipment-it should be noted

especially the whole range of the required data (note prescribed table with points

1 to 9 should be used for this purpose in the required number of copy).



A description of the various parts must be sufficiently detailed to

meet the requirements of the other chapters of the request, that the description of the device

directly linked data on emissions, waste, etc. consumptions for



Point 2. -Bring a brief characterization of the activity that takes place within the

the described devices.



Point 6. -Purpose and detailed technical characteristics includes description

technical, functional and material connection between this technical

Unit and technical units referred to in Chapter 6.1, the description of the

production (production, etc.) the purpose of technical and technological description and

technical parameters of the separate parts of the equipment, methods, materials, and

energy consumption, etc. In the case of a larger description can be

connect to the annex to the application and the request to provide a brief summary. U

units under construction, you can attach a summary technical report to

construction documentation to the annex to the application.



To the other points apply the instructions in Chapter 6.1.



6.4. Other related activities

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. Characteristics, purpose and a detailed description of the activities and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

3. Binding activity of the above part of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



Specify other activities in progress within the device (in relation to the

its operation), the realized outside the technical units described in chapters

6.1 and 6.3. There may be a material handling operations

(raw materials, ingredients, products), the preparatory processes,

internal transport, the cleaning of the roads, the exit from the machine and

handling areas in relation to the prevention of secondary dust

etc.



In the case of internal transport describe and illustrate in a graphical annex

request (within Chapter 13.1 request) her solution and specify

entrances and exits into the space associated with the system including the daily

the number of entrances and exits. In the case of a device to use, disposal,

collection or purchase of waste, described and represented in a graphical annex requests

(within Chapter 13.1 request) access routes to the device in relation to the

the individual modes of transport of waste to the device.



For each activity listed here should be given the full range

the required data (note prescribed table with points 1 to 3 should be

for this purpose, copy the required number).



A description of the various parts must be sufficiently detailed to

meet the requirements of the other chapters of the request, that the description of the device

directly linked data on emissions, waste, etc. consumptions for



Point 2.



-In case of operation of the unit the intensive rearing of poultry or pigs

where is the related activities on the lands the operator, fertilization

attach to the annex to the application, and fertilization plan in this chapter application

include a link to this plan.



-In the case of incineration plants include information on the management of

by-products of combustion, if not already listed in chapters

application 6.1 or 6.3.



Point 3. -Include a description of the technical, functional and material connection between

This activity and technical units referred to in chapters 6.1 and

6.3.



6.5. Use of best available techniques

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. The source of information and

I----------------------------------------------------------------------------I

I I

I--------------------I--------------I--------------------I-------------------I

3. Rated I 4. Parameter 5. Parameter 6. Justification And

And a pointer and BAT and even differences even

I--------------------I--------------I--------------------I-------------------I

I I I I I

I--------------------I--------------I--------------------I-------------------I



Point 1. -Indicate what part of the device comparing with the best

available techniques (hereinafter also the BAT) applies.



Point 2. -Indicate the specification of sources of information, which was used for the

reviews of the BAT. To the evaluation of the application of the BAT will primarily apply to the conclusions on

BAT or reference documents on best available techniques (the so-called.

BREF) approved by the European Commission. It was only when it is not possible to use the

rating information from the BREF (e.g. industrial activity or specific

technology or equipment is not included in the BREF), used for more

sources of information on BAT (e.g. in accordance with point 12 of Annex No. 3 to the Act-

information about the State and development of the BAT and their monitoring published

international organisations). In the case of use of other sources of information

on the best available techniques is necessary to provide a way to specify the

the best available techniques. If you used multiple sources for the evaluation

information (e.g. more BREF), you must complete the evaluation for each

used separately, i.e. the source of the information. the table you want to copy in the

the required number of times.



Point 3. -In this section reviews the use of the BAT shall be assessed by the selection

specific techniques or technologies, i.e.. to determine whether the selected

techniques based on available indicators (in particular, according to information from the BREF

or conclusions about the BAT) be considered as BAT. Compared to the parameters of the BAT

(the values of indicators, where appropriate, the particulars referred to in the BREF or conclusions about

Bat) with parameters (parametric values for devices). The differences is

need to be justified. All parts of the device are described in chapters

6.1 to 6.4.



Section 4. -To specific information from the BREF mention also the name and the number

Chapter designation. subplots and side of the document to which the

the information is located.



4.1. Overview of possible alternatives

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. A description of the possible replacement solutions

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

3. The parameters of a possible alternate solution

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



In the case of new equipment, changes in equipment and in relevant cases

also for existing equipment to provide a brief overview of the potential

alternatives tested by the operator. Alternatives considered

may relate to our own manufacturing technologies as well as other components of the

device (e.g. technology designed to remove the end of pollution)

or procedures for operating the device. Alternatives should be described

provide sufficient information on the possible options proposed

technology, techniques, or procedural practices.



Point 1. -Indicate the designation of parts of the device to which it is considered replacement

the solution applies.



Point 2. -Include a description of the replacement, and the characteristics of the replacement solution

(differences compared to the current solution).



Point 3. -Indicate the main parameters of the surrogate solution (capacity, inputs,

outputs, emissions, effects on environment and human health, compared with the current

the solution, etc.).



4.2. other technical unit/activities outside the establishments defined

in the request (operated by the same operator at the point of operation of the equipment)



I--------------------------I---------------I---------------------------------I

I 1. The drive and 2. Justification and 3. Integrated permit/other

I (activities) and also the authorisation and the

I--------------------------I---------------I---------------------------------I

I I I I

I--------------------------I---------------I---------------------------------I





The operator fills in this chapter in the case that at the point of operation

the device operates other technical units, activity or facility

with the issued integrated permit, which are not listed in chapters 6.1

-6.4.



Place (location), where the equipment referred to in chapters 6.1 to 6.4, and

other technical units listed here, or activities. other devices

with the issued integrated permit, must be represented in a graphical annex

request (within Chapter 13.1).



Point 2. -Detail why other technical units or activities

on the technical side is unrelated to the subject of the application as described in the

Chapters 6.1 to 6.4 (ESP. that is not related to industrial activities

set out in Schedule 1 of the Act).



Point 3. -If this is a technical unit or activity permitted

other integrated permit, give the name of the device according to the current

the integrated permit and identify integrated permit (i.e. the date of the

with legal force, the reference number and the authority issuing the decision).

If there are other technical units or activities operated on

the basis of an authorisation pursuant to other legislation include the identification of

such authorisations/.



7. raw materials, intermediates, products



List the information of all incoming raw materials in the facility (including water,

auxiliary materials and other substances), handling (e.g..

their storage) and the measures for their effective use.

Part of the chapter are also data on products, intermediates and their

storage. Additionally, a special chapter refers to the waste side

products of animal origin.



In the case that are presented data for more years, to justify the significant

annual differences. Justification of the inter-annual differences always refers to the

the downstream values of emissions, waste, etc., IE. It should

provide the basis for the justification of the decline or increase of emission values, etc.

referred to in other parts of the application.



7.1. the raw materials, auxiliary materials, other substances

I-------------I--------------I-----------------I-----------------I-----------------I

I 1. The designation I 2. The raw material, and 3. Total 4. Even consumption 5. Quantity And

I, part I and the consumption of auxiliary and related to and used as well as the

And device and material I (t/year) and a unit of production and product (%) (I)

I I or the next I I (Simp.) I I

I I I-fabric-a-I---------and-I---------and-I---------and-I---------I-I

I I I year I year I year I year I year I year I year I year I year I

I-------------I--------------I-----I-----I-----I-----I-----I-----I-----I-----I-----I

I I I I I I I I I I I I

I-------------I--------------I-----I-----I-----I-----I-----I-----I-----I-----I-----I

6. The description of chemical composition and properties as well as

I----------------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------------I

7. The use and description of the waste and

I----------------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------------I



I----------------------------------------------------------------------------------I

8. In the case of a refund of an administrative act in accordance with the legislation in the field of air protection and

In relation to changes in raw materials or waste, indicate also any other data and

(I) required under this legislation. (I)

I----------------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------------I



Include in particular:



-all the raw materials and auxiliary materials, other substances, excluding fuels (see

Chapter 8),



-feed, feed supplements, DDDD (disinfection, desinsekční and exterminating,

deodorizing) products, etc. agricultural equipment (category

devices referred to in annex No. 6.6 of the Act),



-dangerous substances and preparations in accordance with the legislation in the field of the management of

chemicals, objectionable substances according to the legislation in the field of

waste waters,



-volatile organic compounds (in the annex to the annual mass balance of

processes with organic solvents),



-ozone depleting substances of the Earth,



-additional risk from the perspective of environmental protection, or

human health,



-wastes if they are in the technological procedure used as a raw material.



Point 2. -Wastes that enter as a raw material to identify the name and

catalog number according to the valid waste catalogue.



Point 3. -Indicate the total consumption of the various raw materials and auxiliary

materials, other substances per calendar year.



Section 4. -In the consumption per unit of production-related States such as.

the consumption of raw materials on the product t production (for category 6.6 of annex

No. 1 of the Act), on the m2 of the area for being edited 1000 SC products.



Point 5. -The quantity of substances used as the input product is not mentioned, if

the substance in the product does not occur (e.g. leave with emission or in

waste) or if the amount is insignificant and does not have a negative

effect on the environment or human health. In the case that the input

a substance present in emissions or waste, noted in chapters 9 and 11

the relevant data.



Point 6. -For raw materials, auxiliary materials and other substances to indicate their

properties in terms of the impact on the environment and human health.

If the application is in the annex accompanied by the appropriate material safety data sheet, then

is not applicable for example. properties and chemical composition (it is sufficient to

reference to the annex). For waste entering as a raw material to indicate category

waste and hazardous waste refer to the identification sheets

hazardous wastes that will be attached to the application, if they are to

available.



Point 7. -The use and the treatment of the raw material, auxiliary

material or substance must be indicated in compliance with the actual status. U

device before the construction or under construction, or in the case of the relevant

changes in the operation of the device indicate the expected data. In the case of operation

units of intensive rearing of poultry or pigs bring recipe feed

(complete feed mixtures).



Section 8. -In the case of a refund of an administrative act in accordance with the legislation in the field of

air protection in relation to changes in raw materials or waste, indicate here

also any other information required by that legislation. If

model application on another site requires placing the same data that are

necessary in the context of applications for the issue of an administrative act, these being replaced

the same information is not repeated here, the only reference to the relevant

Chapter applications (typically this is, e.g., the identification and descriptive

data).



7.1.1. The water for technological purposes, and for the operation of the device (in addition to drinking

water)

I--------------------I-------------------------------------------------------I

I 1. The source of the water and the 2. Quantity and vodv

I I----------------------------I--------I--------I--------I

And I Figure I year I year I year I

I--------------------I----------------------------I--------I--------I--------I

(I) 2a. the average value (l/s) I I I I

I I----------------------------I--------I--------I--------I

And 2b. Max. (l/s) I I I I

I I----------------------------I--------I--------I--------I

I I 2 c. m3/year I I I I

I I----------------------------I--------I--------I--------I

And 2d. Consumption related to I I I I

(I) unit of production (Simp.) I I I I

I-------------------------------------------------I--------I--------I--------I

3. Použití I

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

4. Description of the resource, taking surface water and groundwater quality, subscribed and

Water, water purification and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

(I) 5. Description of the solution of water supply and wastewater treatment systems and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

6. In the case of compensation of administrative acts in accordance with legislation on waste and

Even with the waters associated with the collection of water, indicate here any more and

(I) the information required by that legislation. (I)

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



In this chapter, shall indicate the water entering the facility, which is designed

for commercial or technological purposes and that its parameters does not meet the

the requirements for potable water. Sources of water (sampling points) represented in the

a graphical annex requests (within Chapter 13.1).



Point 1. -Specify the source and the water intake.



Point 2. -For category 6.4 c) Annex No. 1 of the Act, it is possible


indicate the water consumption per unit of raw material is received.



Point 3. -Use of water means in what parts of the device and

technological steps, the water is used and for what purposes (in the

the technological procedure, such as coolant, cleaning, etc.). Indicate the

the percentage of use of the product, and for other purposes, and the percentage of the water used,

that goes with the waste water. In the case of a closed cycle, describe

This system.



Point 6. -In the case of compensation of administrative acts in accordance with legislation in the field of

management of water related to the collection of water, indicate here also

any other information required by that legislation. If the pattern

the application on another site requires entry of the same data that are

necessary in the context of applications for the issue of an administrative act, these being replaced

the same information is not repeated here, the only reference to the relevant

Chapter applications (e.g. identification and descriptive data).



7.1.2. Drinking water

I---------------------I------------------------------------------------------I

I 1. Source of drinking water and 2. The amount of water and

I I------------------------------I-------I-------I-------I

And I Figure I year I year I year I

I---------------------I------------------------------I-------I-------I-------I

(I) 2a. the average value (l/s) I I I I

I I------------------------------I-------I-------I-------I

And 2b. Max. (l/s) I I I I

I I------------------------------I-------I-------I-------I

I I 2 c. m3/year I I I I

I I------------------------------I-------I-------I-------I

And 2d. Consumption related to I I I I

(I) unit of production (Simp.) I I I I

I----------------------------------------------------I-------I-------I-------I

3. Použití I

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

4. Description of the resource and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

(I) 5. Description of the solution of water supply and wastewater treatment systems and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



In this chapter, shall indicate the drinking water entering the facility, which is

used for its operation.



Section 1-specify the source and location of the abstraction of drinking water.



Point 2. -For category 6.4 c) indicate the consumption per

the Unit received raw materials.



Section 3., 4. -In the case of sampling of surface and groundwater and their

editing on the drinking water quality include a description of the subscription, subscription vod

(if not already listed in section 7.1.1) and method of water treatment.



7.1.3. The realized and planned measures to conserve and improve the use of

raw materials (including water, auxiliary materials and other substances)

I--------------------------------------I-------------------------------------I

I 1. General characteristics of the measures and even

I--------------------------------------I-------------------------------------I

2. The term and the status of implementation of measures and even

I--------------------------------------I-------------------------------------I

3. A brief justification of measures and its benefits in terms of environmental protection and

And the environment and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

4. Technical description of the measures and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



Noted current and planned measures-sparing raw materials, auxiliary substances,

water (for example, the closed technological systems, covering of water tanks,

the installation of water meters, etc.), improving their use, reducing

the use of certain chemical substances, replacing materials used with the

the light of the improved security and under the protection of the environment.



Section 4. -Technical description of the measures should include a detailed description of the

(for example, marking, technical description, parameters, methods, materials

and energy consumption, year of production, life, etc.). If there is a

the corresponding technical description already listed elsewhere in the application, just

include a link to a description of that chapter.

| 1. Marking of equipment parts |

| |

| 2. Source of information |

| |

| 3. Investigational | 4. Parameter of the BAT | 5. Parameter | 6. Justification |

| pointer | |zařízení |rozdílů I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. The source of information and

I----------------------------------------------------------------------------I

I I

I--------------------I-----------------I-----------------I-------------------I

3. Rated I 4. BAT and 5 parameter. Parameter 6. Justification And

And a pointer to the device as well as differences, and even

I--------------------I-----------------I-----------------I-------------------I

I I I I I

I--------------------I-----------------I-----------------I-------------------I



Compare the device parameters (relevant parts) in the consumption

raw materials, water, materials, auxiliary and other substances, the use of less

dangerous, etc., with the parameters of the BAT and detail to justify any

deviations.



Point 2. -Indicate the sources of information used and in the case of a source outside the BREF

or conclusions of the BAT and the way of determining the best available techniques.



Section 4. -To specific information from the BREF (BAT conclusions) also indicate

the name and badge number of the chapter. subplots and side

the document to which the information is located.



7.2. the intermediate products

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I-------------------------I-------------------------I------------------------I

2. The name of the intermediate 3. The total production of 4. The amount of space used and

Even I (t/year) as well as the product or

I I I the amount of processed and

I I I the device (%) (I)

I I--------I--------I-------I-------I--------I-------I

I I year I year I year I year I year I year I

I-------------------------I--------I--------I-------I-------I--------I-------I

I I I I I I I I

I-------------------------I--------I--------I-------I-------I--------I-------I

(I) 5. Description of an intermediate product:

I-------------------------I--------------------------------------------------I

And 5a. The Properties I I

I-------------------------I--------------------------------------------------I

And 5b. The chemical composition of I I

I-------------------------I--------------------------------------------------I

And 5 c. Use I I

I-------------------------I--------------------------------------------------I

And 5 d. The management of I I

(I) intermediate (I)

I-------------------------I--------------------------------------------------I



Indicate the major intermediates (in the case of the chemical state

information, in particular ktzv. "isolated" intermediate products in accordance with legislation

in the field of chemicals-REACH regulation) or groups intermediates,

their properties in terms of the impact on the environment and health

man, handling and how to use them. Intermediate products shall be indicated

especially in the case are stored, distributed, are part of the

emissions or exhibit negative characteristics in terms of protection of the

environment or human health. Indicate also the following substances, if

they are intermediate products or their ingredients:



-dangerous substances and mixtures according to the rules in the handling of

chemical substances,



-objectionable substances according to the rules in the handling of waters,



-volatile organic compounds (in the annex to the annual mass balance of

processes with organic solvents, see also Chapter 8.1

the application),



-ozone depleting substances of the Earth,



-additional risk from the perspective of environmental protection, or

a person's health.



Section 4. -The quantity of intermediate product used as a product is not mentioned, if

is not present in the product (intermediate-e.g., a by-product of the main


production-odprodává, etc.) or if its amount is negligible and

does not have a negative effect on the environment or human health. In

If the intermediate occurs in emissions, respectively. in waste, indicate the

in chapters 9 and 11 of the relevant data.



Point 5. -In the case of intermediate products to make their properties in terms of the impact on

the environment and human health. If the application is in the annex attached

the safety data sheet, then it is not necessary to mention for example. properties and

chemical composition (just include a link to an attachment). Use and management of

competent intermediate must be in conformity with the actual status. U

device before the construction or under construction, or in the case of the relevant

changes in the operation of the device indicate the expected data.



7.2.1. The use of best available techniques

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. The source of information and

I----------------------------------------------------------------------------I

I I

I------------------I-----------------I------------------I--------------------I

3. Rated I 4. BAT and 5 parameter. Parameter 6. Justification And

And a pointer to the device as well as differences, and even

I------------------I-----------------I------------------I--------------------I

I I I I I

I------------------I-----------------I------------------I--------------------I



Compare the device parameters (relevant parts), where

treatment of intermediate products with parameters in detail to justify all the BAT and

deviations.



Point 2. -Indicate the sources of information used and in the case of a source outside the BREF

or conclusions of the BAT and the way of determining the best available techniques.



Section 4. -To specific information from the BREF (BAT conclusions) also indicate

the name and badge number of the chapter. subplots and side

the document to which the information is located.



7.3. Products

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------I-----------------------I

2. The name of the product, and 3. The total production and

I I (t/rok) I

I I-------I-------I-------I

I I year I year I year I

I----------------------------------------------------I-------I-------I-------I

I I I I I

I----------------------------------------------------I-------I-------I-------I

4. Product description: I

I-------------------------------------I--------------------------------------I

And 4a. The Properties I I

I-------------------------------------I--------------------------------------I

(I) 4b. The chemical composition of I I

I-------------------------------------I--------------------------------------I

And 4 c. Use I I

I-------------------------------------I--------------------------------------I

And 4 d. With the product management and

I-------------------------------------I--------------------------------------I



I----------------------------------------------------------------------------I

(I) 5. In the case of compensation of administrative acts in accordance with legislation on the protection and

Even the air in relation to the construction of equipment, materials and products that pollute and

I or pollute the air, or to the production of new technologies, products and

I and the equipment used to protect the air, noted here also all the others and

(I) the information required by that legislation. (I)

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



List all the products or groups of products; by-products and products

of waste, both within the meaning of the legislation in the field of waste; their

properties in terms of the impact on the environment and human health,

dealing with them and their use.



Indicate also the following substances unless they are products or their ingredients:



-dangerous substances and mixtures according to the rules in the handling of

chemical substances,



-objectionable substances according to the rules in the handling of waters,



-volatile organic compounds (in the annex to the annual mass balance of

processes with organic solvents),



-ozone depleting substances of the Earth,



-additional risk from the perspective of environmental protection, or

a person's health.



Section 4. -For products to make their properties in terms of environmental impact

environment and human health. If the application is in the annex attached

the safety data sheet, then it is not necessary to mention for example. properties and

chemical composition (just include a link to an attachment). Use and management of

competent intermediate or product must be in conformity with the

the actual status. For installations prior to construction or under construction or in the

the case of the relevant changes in the operation of the device indicate the expected data.

In the case of by-products and waste products, both in the sense of

legislation in the field of waste, to demonstrate compliance with the conditions provided for in this

of the legislation.



Section 4b. -Indicate the main chemical parameters. If it is available

the safety data sheet of the product, it is possible to include a link to the attachment.



Point 5. -In the case of compensation of administrative acts in accordance with legislation in the field of

air protection in relation to the manufacture of equipment, materials and products

pollute or pollute the air, or to the production of new

technologies, products and equipment to protect the air, noted here

other information required by that legislation. If the pattern

the application on another site requires entry of the same data that are

necessary in the context of applications for the issue of an administrative act, these being replaced

the same information is not repeated here, the only reference to the relevant

Chapter applications (typically this is, e.g., the identification and descriptive

data).



7.3.1. The use of best available techniques

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. The source of information and

I----------------------------------------------------------------------------I

I I

I--------------------I--------------I-------------------I--------------------I

3. Rated I 4. Parameter 5. Parameter 6. Justification And

And a pointer and BAT and even differences even

I--------------------I--------------I-------------------I--------------------I

I I I I I

I--------------------I--------------I-------------------I--------------------I



Compare the device parameters (relevant parts), where

the handling of products with parameters in detail to justify all the BAT and

deviations.



Point 2. -Indicate the sources of information used and in the case of a source outside the BREF

or conclusions of the BAT and the way of determining the best available techniques.



Section 4. -To specific information from the BREF (BAT conclusions) also indicate

the name and badge number of the chapter. subplots and side

the document to which the information is located.



7.4. The animal by-products

I----------------------------------------------------------------------------I

I 1. The source of the by-products and

I----------------------------------------------------------------------------I

I I

I-------------------------------------------------------I--------------------I

2. A kind of by-product of animal origin 3. The quantity in the I

I I tunách I

I I------I------I------I

I I year I year I year I

I-------------------------------------------------------I------I------I------I

I I I I I

I-------------------------------------------------------I------I------I------I

4. Description of the measures to limit the amount of by-product of animal and

I původu I

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

(I) 5. Description of the collection, removal, storage, disposal and processing of secondary and

(I) the product of animal origin, and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I




I----------------------------------------------------------------------------I

6. In the case of compensation of administrative acts in accordance with legislation in the field and

Even veterinary care-binding opinion for buildings and installations for the treatment and

And animal products (if it is on by-products and

And origin) or to store, collect, collection, disposal, and further I

And the processing of animal by-products, noted here also all other (I)

(I) the information required by that legislation. (I)

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



The chapter to be completed by the operator, which disposes of the collateral

products of animal origin in accordance with the legislation in the field of veterinary

care.



Identify sources of animal by-products, These

sources, if they are within the plant or the joint industrial complex

(see Chapter 6), represented in a graphical annex requests (within the

Chapter 13.1 request) including the storage, collection, removal, removal

and the processing of animal by-products. To make reference to

diagram showing the disposal of by-products

of animal origin and products of this waste. In the case of operation

units of intensive rearing of poultry or pigs, whose operator has

a contract for the transfer of waste and by-products

of animal origin, the authority may request a copy of this agreement and, where appropriate,

other relevant information relating to the disposal of excrements and

animal by-products.



Point 6. -In the case of compensation of administrative acts in accordance with legislation in the field of

veterinary care-binding opinion for buildings and installations for the treatment of

animal products (if it is on by-products of animal

origin), or to store the collection, removal, disposal and

further processing of animal by-products, indicate here

also any other information required by that legislation. If

model application on another site requires placing the same data that are

necessary in the context of applications for the issue of an administrative act, these being replaced

the same information is not repeated here, the only reference to the relevant

Chapter applications (e.g. identification and descriptive data).



7.4.1. the application of best available techniques

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. The source of information and

I----------------------------------------------------------------------------I

I I

I--------------------I-----------------I------------------I------------------I

3. Rated I 4. BAT and 5 parameter. Parameter 6. Justification And

And a pointer to the device as well as differences, and even

I--------------------I-----------------I------------------I------------------I

I I I I I

I--------------------I-----------------I------------------I------------------I



Compare the device parameters (relevant parts), where

disposal of animal by-products with BAT and parameters

justify any deviations in detail.



Point 2. -Indicate the sources of information used and in the case of a source outside the BREF

or conclusions of the BAT and the way of determining the best available techniques.



Section 4. -To specific information from the BREF (BAT conclusions) also indicate

the name and badge number of the chapter. subplots and side

the document to which the information is located.



7.5. Warehouses and intermediate storage

I----------------------------I-----------------------------------------------I

I 1. (I) identification of warehouse

I----------------------------I-----------------------------------------------I

2. The total capacity of the warehouse I I

I----------------------------I-----------------------I-----------------------I

3. Stocked items and 3a. Quantity in tonnes and

I----------------------------------------------------I-----------------------I

I I I

I----------------------------------------------------I-----------------------I

4. Description of the method of storage and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



List the information of all warehouses and checks the device (storage warehouses

raw materials, fuel, auxiliary materials, other substances, intermediates,

products, etc., with the exception of data concerning waste storage-see Chapter 11

the request). All warehouses represented in a graphical annex requests (within the

Chapter 13.1).



Point. 2-the total capacity of the warehouse to specify in tonnes, respectively. in vol.

units.



Section 4. -In the description of the method of storage include, in particular, a description of the technical

solutions, and security in terms of environmental protection and health

man, technical information about the cooling warehouses, compared to the best

available techniques.



7.5.1. The use of best available techniques

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. The source of information and

I----------------------------------------------------------------------------I

I I

I--------------------I-----------------I-----------------I-------------------I

3. Rated I 4. BAT and 5 parameter. Parameter 6. Justification And

And a pointer to the device as well as differences, and even

I--------------------I-----------------I-----------------I-------------------I

I I I I I

I--------------------I-----------------I-----------------I-------------------I



Compare storage device parameters with the parameters of the BAT and in detail

justify any derogation.



Point 2. -Indicate the sources of information used and in the case of a source outside the BREF

or conclusions of the BAT and the way of determining the best available techniques.



Section 4. -To specific information from the BREF (BAT conclusions) also indicate

the name and badge number of the chapter. subplots and side

the document to which the information is located.



8. Fuel and energy



The reported data pertain to the entire device, as defined in Chapter 6

the application, IE. even parts of the device, where the directly related and more

related activities (e.g., if the source or major

appliance energy).



8.1. Energy audit

I-----------------------------I-----------------------I----------------------I

I 1. Designation of parts of the device and 2. Energy audit and 3. Reference to annex I,

I-----------------------------I-----------------------I----------------------I

I I I I

I-----------------------------I-----------------------I----------------------I



If the operator of a current energy audit in accordance with the legal

editing in the field of energy management at the facility or part/parts,

This audit shall be attached to the application and the attachments in this chapter refers to it.



Point 1. -Indicate that the device was part of the energy audit

processed.



Point 2. -Indicate the identifying information to the energy audit (number

unique identification of the reference or other document, the author of the audit date

processing of audit) and a brief description.



8.2. fuel and energy Inputs

I-----------------I-----------------------------I--------I---------I---------I

And I Figure I year I year I year I

I-----------------I-----------------------------I--------I---------I---------I

I 1. The purchase of el. I la. Quantity (MWh) I I I I

I energie I-----------------------------I--------I---------I---------I

I I lb. Conversion to the GJ I I I I

I-----------------I-----------------------------I--------I---------I---------I

And lc. Source and use of purchased electricity and

I----------------------------------------------------------------------------I

I I

I-----------------I-----------------------------I--------I---------I---------I

2. Purchases of heat and 2a. Quantity (GJ) I I I I

I-----------------I-----------------------------I--------I---------I---------I

And 2b. Source and use of purchased heat and

I----------------------------------------------------------------------------I

I I

I-----------------I-----------------------------I--------I---------I---------I

3. Natural gas and 3a. Quantity (thousand m3) I I I I

I I-----------------------------I--------I---------I---------I

And 3b. Calorific value (GJ/000 m3) I I I I


I I-----------------------------I--------I---------I---------I

I I 3 c. Conversion to the GJ I I I I

I-----------------I-----------------------------I--------I---------I---------I

And 3d. The source, characteristics, use and method of loading and

I----------------------------------------------------------------------------I

I I

I-----------------I-----------------------------I--------I---------I---------I

4. Brown coal and 4a. Quantity (t) I I I I

I I-----------------------------I--------I---------I---------I

I I b. Calorific value (GJ/t) I I I I

I I-----------------------------I--------I---------I---------I

I I 4 c. Conversion to the GJ I I I I

I-----------------I-----------------------------I--------I---------I---------I

And 4 d. The source, characteristics, use and method of loading and

I----------------------------------------------------------------------------I

I I

I-----------------I-----------------------------I--------I---------I---------I

(I) 5. Black coal and 5a. Quantity (t) I I I I

I I-----------------------------I--------I---------I---------I

(I) 5b. Calorific value (GJ/t) I I I I

I I-----------------------------I--------I---------I---------I

(I) 5 c. Conversion to the GJ I I I I

I-----------------I-----------------------------I--------I---------I---------I

And 5 d. The source, characteristics, use and method of loading and

I----------------------------------------------------------------------------I

I I

I-----------------I-----------------------------I--------I---------I---------I

6. Coke and 6a. Quantity (t) I I I I

I I-----------------------------I--------I---------I---------I

Even I 6b. Calorific value (GJ/t) I I I I

I I-----------------------------I--------I---------I---------I

I I 6 c. Conversion to the GJ I I I I

I-----------------I-----------------------------I--------I---------I---------I

And 6 d. The source, characteristics, use and method of loading and

I----------------------------------------------------------------------------I

I I

I-----------------I-----------------------------I--------I---------I---------I

7. Other solid and 7a. Quantity (t) I I I I

I paliva I-----------------------------I--------I---------I---------I

I I 7b. Calorific value (GJ/t) I I I I

I I-----------------------------I--------I---------I---------I

And even 7 c. Conversion to the GJ I I I I

I-----------------I-----------------------------I--------I---------I---------I

Even the 7 d. The source, characteristics, use and method of loading and

I----------------------------------------------------------------------------I

I I

I-----------------I-----------------------------I--------I---------I---------I

8. TTO and 8a. Quantity (t) I I I I

I I-----------------------------I--------I---------I---------I

(I) 8b. Calorific value (GJ/t) I I I I

I I-----------------------------I--------I---------I---------I

I I 8 c. Conversion to the GJ I I I I

I-----------------I-----------------------------I--------I---------I---------I

And 8 d. The source, characteristics, use and method of loading and

I----------------------------------------------------------------------------I

I I

I-----------------I-----------------------------I--------I---------I---------I

I 9. LTO and 9a. Quantity (t) I I I I

I I-----------------------------I--------I---------I---------I

I even 9b. Calorific value (GJ/t) I I I I

I I-----------------------------I--------I---------I---------I

I I 9 c. Conversion to the GJ I I I I

I-----------------I-----------------------------I--------I---------I---------I

And 9 d. The source, characteristics, use and method of loading and

I----------------------------------------------------------------------------I

I I

I-----------------I-----------------------------I--------I---------I---------I

10. NAFTA and 10a. Quantity (t) I I I I

I I-----------------------------I--------I---------I---------I

(I) 10b. Calorific value (GJ/t) I I I I

I I-----------------------------I--------I---------I---------I

(I) 10 c. Conversion to the GJ I I I I

I-----------------I-----------------------------I--------I---------I---------I

And 10 d. The source, characteristics, use and method of loading and

I----------------------------------------------------------------------------I

I I

I-----------------I-----------------------------I--------I---------I---------I

11. Other gases and 11a. Quantity (thousand m3) I I I I

I I-----------------------------I--------I---------I---------I

(I) 11b. Calorific value (GJ/000 m3) I I I I

I I-----------------------------I--------I---------I---------I

(I) 11 c. Conversion to the GJ I I I I

I-----------------I-----------------------------I--------I---------I---------I

And 11 d. The source, characteristics, use and method of loading and

I----------------------------------------------------------------------------I

I I

I-----------------I----------------------------I---------I---------I---------I

12. Secondary and 12a. Quantity (GJ) I I I I

And energy I I I I I

I-----------------I----------------------------I---------I---------I---------I

And 12b. The source and method of use

I----------------------------------------------------------------------------I

I I

I-----------------I----------------------------I---------I---------I---------I

13. Renewable and 13a. Gj (MWh) I I I I

I zdroje I----------------------------I---------I---------I---------I

(I) 13b. Calorific Value (GJ/MWh) I I I I

I I----------------------------I---------I---------I---------I

I I c. Conversion to the GJ I I I I

I-----------------I----------------------------I---------I---------I---------I

And 13d. The source, the method of obtaining and using energy and

I----------------------------------------------------------------------------I

I I

I-----------------I----------------------------I---------I---------I---------I

I 14. Other fuels and 14a. GJ I I I I

I or spalitelná I I I I I

I media I I I I I

I-----------------I----------------------------I---------I---------I---------I

And 14b. The source, characteristics, use and method of loading and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------I---------I---------I---------I

15. Total fuel and energy inputs in the GJ I I I I

I----------------------------------------------I---------I---------I---------I



I----------------------------------------------------------------------------I

Even 16. In the case of compensation of administrative acts in accordance with legislation on the protection and

Even the air in relation to changes in used fuel or to increase the sulphur content and the

In liquid fuels, provide other information required by this and

(I) legislation. (I)

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



Point 1. -To the data on the purchase of electric power source and also give

the use of the.



Point 2. -To the data on the purchase of a heat source and also indicate use.



Point 3. -11., 14. -To information on fuels, respectively. other combustible

the media also noted the source, properties (where relevant, for example.

calorific value, the content of ash, water, sulphur, heavy metals), the use and

the treatment (e.g., transport, handling, storage). To the inputs

fuel the fuel shall not be drawn into the transport

funds from external sources IE. for example. petrol stations outside the

the stage equipment.



Item 12. -In the case of the use of secondary energy (e.g. exhaust heat)

indicate also the source and method of use.



Section 13. -In the case of the use of renewable energy sources (eg.

water, wind, solar, geothermal) noted also the source and

How to obtain and use energy.



Paragraph 16. In the case of compensation of administrative acts in accordance with legislation in the field of

air protection in relation to changes in used fuel or to increase

the sulphur content of liquid fuels, indicate also any other data

required under this legislation. If the model application on another site

calls for putting the same information, which are necessary in the context of a request for

the issue of replacement of an administrative act, the same information is already here

not repeated, the only reference to the relevant chapter of the application (this is

for example. about identification and descriptive data).



8.3. energy production


I----------------------------------------------------------------------------I

I 1. Designation of parts of the device (energy sources) and

I----------------------------------------------------------------------------I

I I

I-------------------------------------------------I--------------------------I

2. Total installed electric power consumption (MW) I I

I-------------------------------------------------I--------------------------I

3. Total installed electrical power (MW) I I

I-------------------------------------------------I--------------------------I

4. The installed heating capacity total (MWtep.) I I

I-------------------------------------------------I--------I--------I--------I

I I year I year I year I

I-------------------------------------------------I--------I--------I--------I

(I) 5. Production of electricity (MWh) I I I I

I-------------------------------------------------I--------I--------I--------I

6. The production of heat (GJ) I I I I

I-------------------------------------------------I--------I--------I--------I

7. Losses in its own source and distribution (GJ) I I I I

I-------------------------------------------------I--------I--------I--------I

8. Energy efficiency resources (%) I I I I

I-------------------------------------------------I--------I--------I--------I



Point 1. -Indicate the name or designation of the source (under devices) in accordance with the

the name or the mark provided for in Chapter 6 of the application.



Point 2. -Indicate the total installed electrical power consumption in milliwatts.



Point 3. -Indicate the total installed electrical power in MW.



Section 4. -Indicate the total installed heat output in MWtep. (MW thermal).



Points 5. -8. -Electricity generation, heat production, losses in its own

the source and distribution and energy efficiency for the last three years.



5.2. Use of energy



The chapter is structured so that the first reported data for

each part of the device that is experiencing significant energy consumption

(items 1 to 5 must be in sufficient number of copy), and then

summarises the whole device (items 6 to 11).

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I-------------------------------------------------------I------I------I------I

I I year I year I year I

I-------------------------------------------------------I------I------I------I

2. Electricity consumption (MWh) I I I I

I-------------------------------------------------------I------I------I------I

3. Heat consumption (GJ) I I I I

I-------------------------------------------------------I------I------I------I

4. Losses in energy use (GJ) I I I I

I-------------------------------------------------------I------I------I------I

(I) 5. The energy efficiency of energy utilization (%) I I I I

I-------------------------------------------------------I------I------I------I



Point 1. -Indicate the name or designation under devices, where

significant energy consumption, in accordance with the name or the mark referred to in

Chapter 6 of the application.



Points 2. -5. -Indicate the power consumption, heat consumption, loss

energy use and energy efficiency energy use over the last three

for years.

I----------------------------------------------------------------------------I

And summary information for the entire device and

I-------------------------------------------------------I------I------I------I

I I year I year I year I

I-------------------------------------------------------I------I------I------I

6. Total fuel and energy consumption on I I I I

Even heating and DOMESTIC HOT WATER (GJ) I I I I

I-------------------------------------------------------I------I------I------I

7. Total fuel and energy consumption on I I I I

And technology and related operations (GJ) I I I I

I-------------------------------------------------------I------I------I------I

8. The total loss on the use of energy (GJ) I I I I

I-------------------------------------------------------I------I------I------I

I 9. The overall energy efficiency of energy utilization (%) I I I I

I-------------------------------------------------------I------I------I------I

10. Total sales of electricity produced (MWh) I I I I

I-------------------------------------------------------I------I------I------I

11. The total sales of the produced heat (GJ) I I I I

I-------------------------------------------------------I------I------I------I



The table provides summary data for the entire facility.



Point 6. -Indicate the total private consumption of fuel and energy on heating and

domestic hot water (DHW) in the GJ for the last three years.



Point 7. -Indicate the total private consumption of fuels and energy

technological and related operations in the GJ for the last three years.



Section 8. -If the Office considers it possible and advisable, the operator

the total loss on the device power usage in the GJ for the last three years.



Point 9. -If the Office considers it possible and advisable, the operator

the overall energy efficiency of the equipment energy usage as a percentage for the

the last three years.



Point 10. -Indicate the total sales of electricity in MWh over the last three

for years.



Point 11. -Indicate the total sales of the produced heat in GJ for the last three

for years.



5.3. specific energy consumption

I-------------------I--------I-----------------------------------------------I

I 1. Product and year 2. Energy consumption and

I I I------------------------I----------------------I

I I I 2a. Electricity and 2b. The Heat And The

I I I--------------I---------I-------------I--------I

I I I kWh/unit MWh/year and GJ/unit and GJ/year and

I-------------------I--------I--------------I---------I-------------I--------I

I I year I I I I I

I I--------I--------------I---------I-------------I--------I

I I year I I I I I

I I--------I--------------I---------I-------------I--------I

I I year I I I I I

I-------------------I--------I--------------I---------I-------------I--------I



Data do for combustion plants for energy production.



Point 1. -Indicate the products or groups of products referred to in chapter

7.3.



Point 2. -Energy consumption, according to the nature of the production of the product, respectively.

lists for example. energy consumption per tonne of product, per tonne of production (for

category 6.6 of Annex No. 1 of the Act), on the m2 of the area for 1000 being edited

pieces of the products.



For the activity category 6.4 c) of the annex No. 1 of the Act indicate the consumption

per unit of raw material received (in this case, item 1.

shall be specified in the header instead of a "1. Product "link" 1. Raw material ").



8.6. The realized and planned measures more efficient use and savings

energy

I----------------------------------------------------------------------------I

I 1. General characteristics of the measures and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. Technical description of the measures and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

3. A brief justification of measures and its benefits in terms of environmental protection and

And the environment and the

I----------------------------------------------------------------------------I

I I

I--------------------------------------I-------------------------------------I

4. Saving fuel (GJ/year) I I

I--------------------------------------I-------------------------------------I

(I) 5. Energy conservation (GJ/year) I I

I--------------------------------------I-------------------------------------I

6. The term and the status of implementation of measures and even

I--------------------------------------I-------------------------------------I



Describe the current measures (for example, recuperation, renewable

power, dual power sources, the use of heat produced when the

heat treatment of waste, etc.) and the planned measures

a more efficient use of energy or energy savings.



Point 2. -Technical description of the measure includes a detailed description (for example,

marking, technical description, parameters, methods, materials and energy,

their consumption, year of production, service life, etc.). If there is a corresponding

technical description of the already listed in Chapter 6 of the application, you can just include a link here

the description of the chapter.



5.4. The use of best available techniques

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I


2. The source of information and

I----------------------------------------------------------------------------I

I I

I---------------------I-----------------I-------------------I----------------I

3. Rated I 4. BAT and 5 parameter. Parameter 6. Justification And

And a pointer to the device as well as differences, and even

I---------------------I-----------------I-------------------I----------------I

I I I I I

I---------------------I-----------------I-------------------I----------------I



Compare the parameters of the device-the relevant part in the consumption

fuels and energy, energy efficiency, etc. with the parameters of the best

available techniques and to justify any derogations.



Point 2. -Indicate the sources of information used and in the case of a source outside the BREF

(or the conclusions of the BAT) and the way of determining the best available techniques.



Section 4. -To specific information from the BREF (BAT conclusions) also indicate

the name and badge number of the chapter. subplots and side

the document to which the information is located.



9. emissions and other effects of the device on the environment



Provide information on emissions and sources of emissions into all elements of the

environment and other effects of the operation on the environment.



9.1. The atmosphere

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device (the source of air emissions) and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. Source code of air pollution under the law on the protection and

Even the air and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

3. Description of the measures to prevent emissions into the air and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

4. A description of how the reduction or removal of emissions to air and

I----------------------------------------------------------------------------I

I I

I--------------------I---------------I---------------------------------------I

(I) 5. Issued by the substance. Reference 7. Information on emissions and

I (Group of substances and conditions I I

I or parameter) I I I

I--------------------I---------------I------------------I------I------I------I

I I I figure I year I year I year I

I I I------------------I------I------I------I

I I I 7a. mg/m3 I I I I

I I I------------------I------I------I------I

I I I I I I I 7b.kg/h

I I I------------------I------I------I------I

I I I 7c. OUER/m3 I I I I

I I I------------------I------I------I------I

I I I 7d. t/a I I I I

I I I------------------I------I------I------I

I I I 7e. kg/t product I I I I

I I I------------------I------I------I------I

I I I 7f. the fugitive I I I I

I I I emissions% or I I I I

I I I t/a I I I I

I--------------------I---------------I------------------I------I------I------I

8. For more information and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



I----------------------------------------------------------------------------I

I 9. Operating schedules and other documents and

I---------------------------------------------------------I------------------I

And 9a. Name 9b. Link to and

I, annex I

I---------------------------------------------------------I------------------I

I I I

I---------------------------------------------------------I------------------I



I----------------------------------------------------------------------------I

10. In the case of compensation of administrative acts in accordance with legislation on the protection and

Even the air here also include any other information required pursuant to this legal and

I edit. (I)

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



For each stationary source emissions data separately. All

emission sources, including all the chimneys and the emission duct must have the links to the exact

graphical representation, in the annex to the application (within Chapter 13.1 request) and

on the attached schemas. In the annex attached to the current protocols of measurement,

emission calculations, balance. description of how to estimate emissions. In

relevant cases include the annual mass balance organic

solvent in accordance with legislation on the protection of the atmosphere.



Point 1. -Indicate the designation (name) part of the device (emission sources-number

the source, number exhaust; If possible, always identical markings in

the documents submitted by the authorizing authority) in accordance with the name or

the mark provided for in Chapter 6 of the application.



Point 2. -Indicate the source code of air pollution under the law on

protection of the atmosphere.



Point 3. -The realized or planned to describe the preventive measures

nature leading to the elimination or reduction of emissions, including technical

the description of these measures. The measures will include a technical description of the parameters,

methods, materials and energy consumption, year of production, the life of

and under.



Section 4. -The realized or planned ending to the technology

the reduction or elimination of emissions. In the description of the method of reducing or

the removal of emissions include at least the information on the technical and technological

a solution about the location and the emission duct and chimney heights, on the type, name, and

technical parameters of the measures for reducing and/or eliminating emissions

air pollutants (filters, separators, skrubrů, fat burners,

catalytic converters, etc.), methods, materials and energy consumption,

year of production, life, etc. If one technology affects

more components of the environment (solved), list all

folders and their influence.



Point 5. -Indicate in particular pollutants that are listed in the annex

No 2 of the Act, if the devices are emitted, and other substances in accordance with the

the law and with the law on protection of the atmosphere (including scent

substances). Fill in all the relevant pollutants need to be

items under sections 5 through 7 to copy in good numbers.



Point 6. -Indicate the terms of reference under which they were obtained data on

emissions.



Point 7. -Specific production emissions include, in appropriate units, for example.

kg/t product, g/m2, painted surfaces; in the cases of developing State also

fugitive emissions (%).



Section 8. -All the data to indicate how their findings (measurement, calculation,

estimate), and a reference to the protocols of measurement, calculation, the balance in the annex

request. In the case that are presented data for more years, to justify

significant annual differences. Emissions of substances which are not common to State

briefly and the properties and effects of these substances, which may be adverse

from the perspective of human health or the environment.



Indicate pollutant emissions in temporary conditions (start-up,

stopping operations) and in emergency situations and accidents.



Point 9. -In the outline and in the annex apply operating regulations and other

documents in accordance with legislation on the protection of the atmosphere (e.g., plan

emissions reductions, the plan of implementation of the principles of good agricultural practice), which

to be in the context of the integrated permit approved by the (proposals, suggestions

changes).



Point 10. -In the case of compensation of administrative acts in accordance with legislation in the field of

protection of the atmosphere (excluding administrative acts that are addressed in chapters 7.1, 7.3 and 8.2

the request) to indicate here also for more details and documents required under this

of the legislation. If the model application on another site requires putting

the same data that are required in the application for the issuance of the replaced

administrative act, these same data are not repeated here, the only

reference to the relevant chapter of the application (typically this is, e.g., the

identification and descriptive data).



9.1.1. The use of best available techniques

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. The source of information and

I----------------------------------------------------------------------------I

I I


I----------------I-------------I-----------------I-----------I---------------I

3. Screened and 4. Unit 5. The level of emissions. Level I, 7. Justification And

Even fabric/group I even associated with the BAT and the emissions of the differences and

(I) substances/pointer I I I I I resources

I----------------I-------------I-----------------I-----------I---------------I

I I I I I I

I----------------I-------------I-----------------I-----------I---------------I



To perform a comparison of the achieved or anticipated sources of emission levels

with the emission levels associated with the BAT for the polluting substances referred to in

section 5 of Chapter 9.1.



Point 2. -Indicate the sources of information used and in the case of a source outside the BREF

or conclusions of the BAT and the way of determining the best available techniques.



Point 5. -To specific information from the BREF (BAT conclusions) also indicate

the name and badge number of the chapter. subplots and side

the document to which the information is located.



9.2. Waste water



In the case of the use of external services in the field of the management of waste

waters include the identification of the supplier of services, the management of permissions

waste water treatment of waters and the reference to the relevant

contracts for the supply of services. In this case, the Office can request a copy of

contracts with service providers.



In the annex attached to the current protocols of measurement, calculations of emissions,

the balance, if necessary. description of how to estimate emissions.



9.2.1. Waste water produced by the machine



For each source of waste water treatment plants provide information separately. Noted also

withholding water if they are treated as waste water. All

sources of waste water, including all the discharges must have references to the precise

graphical representation, in the annex to the application (within Chapter 13.1 request) and

on the attached schemas.

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device (the source of waste water)

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. Characteristics of wastewater and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

3. Description of the measures to prevent pollution and waste water and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

4. Description of the method of cleaning. pre-treatment of wastewater and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------I---------I---------I---------I

(I) 5. Produced by the quantity of wastewater a year I year I year I

I----------------------------------------------I---------I---------I---------I

And 5a. The average value (l/s) I I I I

I----------------------------------------------I---------I---------I---------I

And 5b. Maximum (l/s) I I I I

I----------------------------------------------I---------I---------I---------I

And 5 c. The amount per year (m3/year) I I I I

I----------------------------------------------I---------I---------I---------I

And 5 d. Quantity of measure (l/t product) I I I I

I----------------------------------------------I---------I---------I---------I

6. Further details on the quantity of wastewater and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

7. Indicator of pollution of wastewater prior to cleaning and

I-----------------------I------------------------------I------I-------I------I

And a pointer and I year I year I year I

I I------------------------------I------I-------I------I

And even 7a. Concentration (mg/l) I I I I

I I------------------------------I------I-------I------I

I I 7b. Annual balance sheet amount I I I I

(I) discharges (t) I I I I

I-----------------------I------------------------------I------I-------I------I

And 7 c. For more information on the quality of waste water before cleaning and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

8. Indicator of pollution of wastewater after cleaning or pretreatment and

I--------------------I---------------------------------I------I-------I------I

And a pointer and I year I year I year I

I I---------------------------------I------I-------I------I

(I) 8a. Concentration (mg/l) I I I I

I I---------------------------------I------I-------I------I

(I) 8b. Annual balance sheet amount I I I I

(I) discharges (t) I I I I

I--------------------I------------------I--------------I---I--I-------I------I

I I I I I

I--------------------I------------------I------------------I-----------------I

I I I I I

I--------------------I------------------I------------------I-----------------I

I I I I I

I--------------------I------------------I------------------I-----------------I

And 8 c. For more information on the quality of water discharged

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

I 9. Receiving waters waste water treatment plants and points of discharge and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



I----------------------------------------------------------------------------I

10. Operating schedules and other documents and

I------------------------------------------------I---------------------------I

I 10a. Name and 10b. Reference to annex I,

I------------------------------------------------I---------------------------I



I----------------------------------------------------------------------------I

11. In the case of compensation of administrative acts in accordance with legislation in the field and

And waste water discharge of sewage-related list I

And also any other information required by that legislation. (I)

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

12. In the case of compensation of administrative acts in accordance with legislation in the field of water supply and

I and sewerages noted here also all other information and

(I) required under this legislation. (I)

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



Point 1. -Indicate the name or description of the waste water source (part of the

the device) in accordance with the name or the mark referred to in Chapter 6,

request.



Point 2. -Describe the nature of the waste water treatment plants, their main properties.



Point. 3-the realized or planned to describe preventive measures

nature, which lead to the exclusion or limitation of developing effluents

or to reduce the pollution of waste water including technical description

These measures. The measures will include a technical description of the parameters of the method,

materials and energy consumption, year of production, life, etc.



Section 4. -The realized or planned ending to the technology

the reduction or elimination of emissions into water. In the description of the way

cleaning/pre-cleaning of waste water treatment plants provide information regarding the technical and

technological solutions, about the location of the wastewater treatment plant, type, name, and technical

the parameters of the treatment plant (e.g., biological wastewater treatment plant, demulsification station,

neutralisation station), methods, materials and energy, their

consumption, year of production, service life, etc. If one technology

It affects more components of the environment (solved), indicate the

all of the ingredients and their influence.



Point 5. -Specific quantities of waste water per unit of production

indicate in the appropriate units, for example. l/t of product. For devices in category

6.4 c) it is possible to indicate the consumption per unit of raw material is received.



Point 6. In the case that are presented data for more years, to justify the significant

annual differences. Indicate the way of determining the amount of waste water

(measurement, calculation, estimation), and the place to which the data relate.

Indicate the quantity of wastewater in temporary conditions (start-up,

stopping operations) and random phenomena and emergencies.




Point 7. Data refer to the waste water that goes directly from the technology

(i.e. without cleaning). Indicate in particular pollutants that are listed

in annex 2 of the Act, if the devices are produced, and other substances

and indicators in accordance with the law and with the law on waste

waters. Fill in all the relevant substances and indicators

the entire part of the table under point 7 of the copy in the needed numbers.



Section 7 c. In the case that are presented data for more years, to justify

significant annual differences. Give way to determine the quality of waste water

(measurement, calculation, estimation), and the place to which the data relate.

Provide information about the quality of wastewater in temporary conditions (start-up,

stopping operations) and random phenomena and emergencies. If they are

discharged substances which are not common to state briefly the property and

effects that may be unfavourable for human health or the

of the environment. In the case of the impact of wastewater discharge on water

and the water-bound ecosystems, as well as the possible influence of bodies of water and

the sources noted here for specific information about these factors.



Section 8. -Data refer to the waste water that has undergone as described above

cleaning or after. Indicate in particular pollutants that are

are listed in annex 2 of the Act, if the devices are produced, and

other substances and indicators in accordance with the law and with legislation to

the management of water, IE. the same substance and pointers as in item # 7.

Fill in all the relevant substances and indicators need to be a part of the

the table under the number 8 in the required number of copies of these.



Section 8 c. -In the case that are given the data for multiple years, to justify

significant annual differences. Give way to determine the quality of waste water

(measurement, calculation, estimation), and the place to which the data relate.

Provide information about the quality of wastewater in temporary conditions (start-up,

stopping operations) and random phenomena and emergencies. If they are

discharged substances which are not common to state briefly the property and

effects that may be unfavourable for human health or the

the environment (if not already mentioned under point 7 of this chapter

the request). In the case of the impact of wastewater discharge on water and on water

bound ecosystems, as well as the possible influence of bodies of water and resources,

list out the specific information about these effects (if not already mentioned

under point 7 of this chapter application).



Point 9. -In the case of discharge of waste water to flow to give the name of the water

flow, number of hydrological sequence, mileage water flow (station)

the number of the hydrological circle, Q355 (flow rate that is reached or

exceeded an average of 355 days a year), the status indicator water inlet and its

pollution. In cases where discharges of wastewater for example.

to the public or industrial sewer or into groundwater (also

Chapter 9.4.), give details of this discharge. In graphics

the annexes to the application (within Chapter 13.1) draw situation

each location of the discharge.



Point 10. -In the case where the operator applies

the obligation to process the handling or the rules of operation of the water works in accordance with

legislation in the field of water protection, and in the outline in annex

attach this manipulation or code of conduct.



Point 11. -In the case of compensation of administrative acts in accordance with legislation in the field of

water conservation related to the discharge of waste water noted here also

any other information and documents required under this legislation.

If the model application on another site requires entry of the same data,

that are required in an application for the issue of an administrative act to be replaced,

These same data are not repeated here, the only reference to the

the relevant sections of the application (e.g. identification and descriptive

data).



Item 12. -In the case of compensation of administrative acts in accordance with legislation in the field of

water mains and sewerages noted here also all the

additional information and supporting documents required under this legislation. If the pattern

the application on another site requires entry of the same data that are

necessary in the context of applications for the issue of an administrative act, these being replaced

the same information is not repeated here, the only reference to the relevant

Chapter applications (e.g. identification and descriptive data).



9.2.1.1. The use of best available techniques

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. The source of information and

I----------------------------------------------------------------------------I

I I

I---------------------I-------------I--------------I------------I------------I

3. Screened and 4. Unit 5. Level I 6. Level I, 7. (I)

Even fabric/group I and emissions as well as emissions and Justifications and

(I) substances/pointer I I connected with both the gender and resources

I I I BAT I I I

I---------------------I-------------I--------------I------------I------------I

I I I I I I

I---------------------I-------------I--------------I------------I------------I



To perform a comparison of the achieved or anticipated sources of emission levels

with the emission levels associated with the BAT for the pollutants and indicators

referred to in points 7 and 8 of Chapter 9.2.1 request.



Point 2. -Indicate the sources of information used and in the case of a source outside the BREF

or conclusions of the BAT and the way of determining the best available techniques.



Point 5. -To specific information from the BREF (BAT conclusions) also indicate

the name and badge number of the chapter. subplots and side

the document to which the information is located.



9.2.2. Waste water obtained from other producers

I----------------------------------------------------------------------------I

I 1. The origin of the waste water and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. Characteristics of wastewater and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

3. Description of the measures to prevent pollution and waste water and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

4. Description of the method of cleaning. pre-treatment of wastewater and

I----------------------------------------------------------------------------I

I I

I-----------------------------------I-------------I-------------I------------I

(I) 5. Produced by the amount of I year I year I year I

I-----------------------------------I-------------I-------------I------------I

And 5a. The average value (l/s) I I I I

I-----------------------------------I-------------I-------------I------------I

And 5b. Maximum (l/s) I I I I

I-----------------------------------I-------------I-------------I------------I

And 5 c. The amount per year (m3/year) I I I I

I-----------------------------------I-------------I-------------I------------I

And 5 d. Quantity of measure (l/t product) I I I I

I-----------------------------------I-------------I-------------I------------I

6. Further details on the quantity of wastewater and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

7. Indicator of pollution of wastewater prior to cleaning and

I-----------------------------I-----------------------I-------I-------I------I

I I I year I year I year I

I-----------------------------I-----------------------I-------I-------I------I

Even the pointer and 7a. The Concentration Of I I I I

I I (mg/l) I I I I

I-----------------------------I-----------------------I-------I-------I------I

I I 7b. Annual balance sheet I I I I

(I) discharge of I I I I

(I) pollution (t) I I I I

I-----------------------------I-----------------------I-------I-------I------I

I I

I----------------------------I----------------I---------------I--------------I

I I I I I

I----------------------------I----------------I---------------I--------------I

I I I I I

I----------------------------I----------------I---------------I--------------I

I I I I I

I----------------------------I----------------I---------------I--------------I

And 7 c. For more information on the quality of waste water before cleaning and


I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

8. Indicator of pollution of wastewater after cleaning or pretreatment and

I----------------------------I------------------------I-------I-------I------I

I I I year I year I year I

I----------------------------I------------------------I-------I-------I------I

Even the pointer and 8a. The Concentration Of I I I I

I I (mg/l) I I I I

I----------------------------I------------------------I-------I-------I------I

I I 8b. Annual balance sheet I I I I

(I) discharge of I I I I

(I) pollution (t) I I I I

I----------------------------I---------------I--------I------II-------I------I

I I I I I

I----------------------------I---------------I---------------I---------------I

I I I I I

I----------------------------I---------------I---------------I---------------I

I I I I I

I----------------------------I---------------I---------------I---------------I

And 8 c. For more information on the quality of water discharged

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

I 9. Receiving waters waste water treatment plants and points of discharge and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

10. Operating schedules and other documents and

I-------------------------------------------------------I--------------------I

I 10a. Name and 10b. Link to and

I, annex I

I-------------------------------------------------------I--------------------I

I I I

I-------------------------------------------------------I--------------------I



For an external waste water of a different character of the data separately.

All inlets and outlets must have references to the accurate representation of the

a graphical annex requests (within Chapter 13.1 of the request) and on the attached

the schemas.



For the preparation of this chapter use the guidelines to Chapter 9.2.1.



9.2.2.1. The use of best available techniques

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. The source of information and

I----------------------------------------------------------------------------I

I I

I-------------------I-------------I--------------I-------------I-------------I

3. Screened and 4. Unit 5. Level I 6. Level I, 7. (I)

Even fabric/group I and emissions as well as emissions and Justifications and

(I) substances/pointer I I connected with both the gender and resources

I I I BAT I I I

I-------------------I-------------I--------------I-------------I-------------I

I I I I I I

I-------------------I-------------I--------------I-------------I-------------I



To perform a comparison of the achieved or anticipated sources of emission levels

with the emission levels associated with the BAT for the pollutants and indicators

referred to in points 7 and 8 of Chapter 9.2.2. request.



Point 2. -Indicate the sources of information used and in the case of a source outside the BREF

or conclusions of the BAT and the way of determining the best available techniques.



Point 5. -To specific information from the BREF (BAT conclusions) also indicate

the name and badge number of the chapter. subplots and side

the document to which the information is located.



9.3. The underground water

I----------------------------------------------------------------------------I

I 1. Designation of parts of the equipment (sources of discharges into groundwater)

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. Characteristics of discharges into groundwater and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

3. A description of existing measures to prevent and reduce possible emissions and

And groundwater and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

4. A description of the measures envisaged to prevent and reduce possible emissions and

And groundwater and

I----------------------------------------------------------------------------I

I I

I-------------------------------------I--------------------------------------I

(I) 5. Emitted substance (Group of substances 7. Information on emissions and

I or parameter) I I

I-------------------------------------I-----------I--------I--------I--------I

And I figure I year I year I year I

I I-----------I--------I--------I--------I

I I 7a. mg/l I I I I

I I-----------I--------I--------I--------I

I I 7b. t/a I I I I

I-------------------------------------I-----------I--------I----I---I--------I

8. For more important information on the status of groundwater pollution and 8a. Link And

And quality of groundwater and to annex I to

I---------------------------------------------------------------I------------I

I I I

I---------------------------------------------------------------I------------I



Include information related to the source of the discharge of waste water into the

groundwater in accordance with legislation in the field of water protection, if

such a device.



Point 1. -Indicate the name or description of the source of discharge of waste water into the

groundwater.



Point 2. -Describe the character of emissions into groundwater (main features,

the emergence of, impact on the environment).



Point. 3-the realized or planned to describe preventive measures

nature, which lead to the exclusion or limitation of developing emissions into the

groundwater, including the technical description of these measures.



Section 4. -The realized or planned ending to the technology

the reduction or elimination of emissions into groundwater. If one end

technology affects more components of the environment (addressed by

areas), list all the folders and their influence.



Point 5. -Indicate in particular pollutants that are listed in the annex

No 2 of the Act, if the devices are produced, and possibly other substances and

indicators in accordance with the law and with legislation to the environmental harm.

Fill in all the relevant substances and parameters need to be a part of the

table 5-7 under the body copy in good numbers.



Section 8. -If discharged substances that are not common, give a brief

properties and effects that can be unfavourable in terms of health

humans or the environment. Describe the possible effects.



9.3.1. The use of best available techniques

bI----------------------------------------------------------------------------I

I 1. Designation of parts of the equipment (sources of discharges into groundwater)

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. The source of information and

I----------------------------------------------------------------------------I

I I

I-----------------I-------------I----------------I--------------I------------I

3. Screened and 4. Unit 5. Level I 6. Level I, 7. (I)

Even fabric/group I and associated emissions and the emission source and the rationale and

(I) substances/pointer even with the BAT and also the differences and

I-----------------I-------------I----------------I--------------I------------I

I I I I I I

I-----------------I-------------I----------------I--------------I------------I



To perform a comparison of the achieved or anticipated emissions sources with

emission obtained by using best available techniques for

pollutants and indicators referred to in point 5 of Chapter 9.3.

request.



Point 2. -Indicate the sources of information used and in the case of a source outside the BREF

(or the conclusions of the BAT) and the way of determining the best available techniques.



Point 5. -To specific information from the BREF (BAT conclusions) also indicate

the name and badge number of the chapter. subplots and side

the document to which the information is located.



5.8. the land



I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the


I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. Characteristics of the potential emissions into soil and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

3. A description of existing measures to prevent and reduce possible emissions and

I půdy I

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

4. A description of the measures envisaged to prevent and limit the emissions to soil and

I----------------------------------------------------------------------------I

I I

I-----------------------------------------------------I----------------------I

(I) 5. Other important data on the State of soil pollution and 5a. Reference to annex I,

And soil quality as well as I

I-----------------------------------------------------I----------------------I

I I I

I-----------------------------------------------------I----------------------I



Point 1. -Indicate the name or designation of equipment parts which may be

relevant in relation to possible emissions into soil.



Point 2. -Describe the nature of the potential emissions into soil (the main characteristics,

the emergence of, impact on the environment).



Point. 3-Describe the preventive nature of the measures that

lead to the elimination or reduction of the occurrence of possible emissions into soil, including

the technical description of these measures.



Section 4. -Indicate the measures planned preventive nature in relation to the

reducing the possible emissions into soil.



Point 5. -Enter important data on the State of soil pollution and soil quality

for pollutants that are produced by the device, and, where appropriate,

other substances and indicators in accordance with the law and with legislation to

organic injury. Fill in all the relevant substances and parameters is

to be a part of the table under point 5 copy in good numbers.

If the land could be contaminated by substances that are not common,

indicate briefly the properties and effects that may be negative from the

for human health or the environment. Describe the possible additional

influences. Important input to attach to the annexes to the application.



9.4.1. The use of best available techniques

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. The source of information and

I----------------------------------------------------------------------------I

I I

I--------------------I-----------------I------------------I------------------I

3. Rated I 4. BAT and 5 parameter. Parameter 6. Justification And

And a pointer to the device as well as differences, and even

I--------------------I-----------------I------------------I------------------I

I I I I I

I--------------------I-----------------I------------------I------------------I



To perform the comparison of measures to prevent or reduce possible emissions into the

the soil when applying best available techniques.



Point 2. -Indicate the sources of information used and in the case of a source outside the BREF

(or the conclusions of the BAT) and the way of determining the best available techniques.



Point 5. -To specific information from the BREF (BAT conclusions) also indicate

the name and badge number of the chapter. subplots and side

the document to which the information is located.



5.9. Other effects of the device on the environment

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device (the source) and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. Description of the parts of the device (the source) and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

3. Description of preventive measures and to protect the environment and

Even on the source and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

4. Description of the emissions and other environmental effects of both resources and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

(I) 5. The results of measurements or calculations described emissions and other environmental effects of both resources and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



Provide additional resources related to the environment, operated within the

the device, if they are present. Resources represented in a graphical annex

request (within Chapter 13.1). In the annex attached to the current

protocols of measurement, calculations or other documents.



In the case of devices covered by the obligation to carry out reviews

the risks of individual operating activities under the rules to

Prevention of environmental harm and its remedy, can be used for the purposes of this chapter,

the application to take advantage of current and relevant data from this evaluation,

If it is available, or apply this rating or its

the relevant parts of the annexes to the application.



Point 1. -The name (mark) part of the device (the source).



Point 2. -To describe the sources noted in particular a technical description, resource type-

stationary, mobile, nature of emissions or other influences, the period of operation

source.



Point 3. -Describe the realized or planned measures for the protection of the

environment (e.g. to prevent the formation of emission or emission control, including

technical description of the measures). Description of the measures will include technical

parameters, methods, materials and energy consumption, year

production, service life, etc.).



Section 4. -In the device before starting construction or under construction, or in

changes device designed or guaranteed value

parameter/parameters describing/describing the issue, or other effects,

operated device realistically achieved values. If they are

emissions or other influences from the source to a variable or different when different

Working settings, specify the source of values including achieved

the maximum values.



Point 5. -The results of measurements or calculations of emissions or other environmental effects

caused by traffic source. At the device before starting the construction or

construction or changes the device is to be calculated (modeled).



For existing installations to present the results of measurements at the time of the operation.



In the case that is attached in the annex the relevant studies, noted here

also a link to the attachment.



9.5.1. The use of best available techniques

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. The source of information and

I----------------------------------------------------------------------------I

I I

I-----------------I-------------I---------------I------------I---------------I

3. Screened and 4. Unit 5. Level I 6. Level I, 7. Justification And

Even fabric/group I and associated emissions and emissions as well as the differences and

(I) substances/pointer even with the BAT and source I I

I-----------------I-------------I---------------I------------I---------------I

I I I I I I

I-----------------I-------------I---------------I------------I---------------I



To perform a comparison of the achieved or anticipated effects of resources with

the parameters obtained by using best available techniques, if

such parameters are available.



Point 2. -Indicate the sources of information used and in the case of a source outside the BREF

(or the conclusions of the BAT) and the way of determining the best available techniques.



Point 5. -To specific information from the BREF (BAT conclusions) also indicate

the name and badge number of the chapter. subplots and side

the document to which the information is located.



10. Noise, vibrations, non-ionising radiation



Include all the relevant data about noise, vibration and on non-ionizing

radiation from the operation of the device.



10.1. The noise

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device (the source of the noise) I

I----------------------------------------------------------------------------I


I I

I----------------------------------------------------------------------------I

2. A description of the source of the noise and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

3. Description of the measures to prevent noise and the spread of noise and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

4. Sound power level I resources

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

(I) 5. Equivalent sound level LAeq, T and in protected outdoor and

And space and in protected outdoor area buildings and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

6. For more information and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



I----------------------------------------------------------------------------I

7. In the case of compensation of administrative acts in accordance with legislation on the protection and

And public health indicate also any other data required under (I)

I of this law. (I)

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



Identify the source of the noise affecting environment outside the boundaries of the device

or zone of sanitary protection of equipment and demonstrate compliance with hygiene

limits (measurement, calculation). Sources of noise include noise from

internal transport. Noise sources represented in a graphical annex

request (within Chapter 13.1). In the annex attached to the current

logs of measurements and calculations.



Point 1. -The name (identification) of a specific source of the noise.



Point 2. -To describe the sources of noise include, in particular, technical description, type

-stationary, mobile sources, the character of the noise-continuous,

intermittent, steady, variable pulse, tonal content folders, etc.

the period of operation.



Point 3. Describe the realized or planned measures for the prevention of

the noise and the spread of noise including their technical description. Description

the measures will include technical parameters, methods, materials and energy,

their consumption, year of production, service life, etc.



Section 4. -In the device before starting construction or under construction, or in

changes device designed or guaranteed sound power data

performance resources operated device realistically achieved

sound power source. If the sound power source variable or

different in different work settings, specify the source of the noise

the achieved values including the maximum sound power level.



Point 5. -In the device before starting construction or under construction, or in

changes to the device, you should post to the surface of the acoustic load

the environment calculated (modeled).



At present, the noise measurement devices operated in protected outdoor

space and in protected outdoor space of the buildings at the time of operation (i.e..

According to the character of traffic in daytime and night time), these protected

areas in the graphics indicate the annex of the application (within Chapter 13.1

the request).



In the case that is attached in the annex the noise study, noted here also

a reference to this annex.



Point 6. Include information as to whether the correction was applied to noise

the background.



Point 7. In the case of compensation of administrative acts in accordance with legislation of the protection

public health relating to the operation of the noise sources noted here also

additional information and supporting documents required under this legislation. If the pattern

the application on another site requires entry of the same data that are

necessary in the context of applications for the issue of an administrative act, these being replaced

the same information is not repeated here, the only reference to the relevant

Chapter applications (typically this is, e.g., the identification and descriptive

data).



10.1.1. The use of best available techniques

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. The source of information and

I----------------------------------------------------------------------------I

I I

I-----------------I-------------I--------------I-------------I---------------I

3. Rated I 4. Unit 5. Level I 6. Level I, 7. Justification And

I even associated with pointer and resources as well as the differences and

I I I BAT I I I

I-----------------I-------------I--------------I-------------I---------------I

I I I I I I

I-----------------I-------------I--------------I-------------I---------------I



To perform a comparison of the achieved or anticipated effects on source

acoustic situation with parameters obtained by using the best

available techniques, where these parameters available. To justify the

any derogations.



Point 2. -Indicate the sources of information used and in the case of a source outside the BREF

(or the conclusions of the BAT) and the way of determining the best available techniques.



Point 5. -To specific information from the BREF (BAT conclusions) also indicate

the name and badge number of the chapter. subplots and side

the document to which the information is located.



10.2. the Vibration

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device (the source of vibration)

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. Description of the vibration source and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

3. Description of the measures to prevent the spread of and measures against vibration and

Even, even

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

4. The vibration acceleration value (aew) in m/s2 and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

(I) 5. The effective value of vibration acceleration for protected objects and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

6. For more information and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



I----------------------------------------------------------------------------I

7. In the case of compensation of administrative acts in accordance with legislation on the protection and

And public health indicate also any other data required under (I)

I of this law. (I)

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



Identify sources of vibrations affecting the environment outside the boundaries

zone of sanitary protection device or devices, and provide the results of the

measurements or calculations. Vibration sources represented in the graphic

the annex to the application (within Chapter 13.1). The annex attached

the current protocols of measurements and calculations.



Point 1. -The name (identification) of a specific source of vibration.



Point 2. -To describe the source of the vibration noted in particular a technical description, type

-stationary, mobile sources, the character of vibration-continuous,

intermittent etc., during use, the source of vibration.



Point 3. -Describe the realized or planned measures for the prevention of

vibration and measures against vibration propagation including their technical

the description. Description of the measures shall include the technical parameters, methods, used

substances and energy consumption, year of production, service life, etc.



Section 4. -In the device before starting construction or under construction, or in

changes to the device or a guaranteed value of acceleration

vibration, operating device, in terms of real value.

If the vibration emission variable or different in different working


resource settings, specify the values achieved including the maximum values.



Point 5. -Indicate the effective value of vibration acceleration for protected objects

affected by vibrations from the operation of the device. At the device before you start

construction or under construction or on the device, you must change the value of

calculated (modeled). Submit measurements for operated systems

vibration in the protected object in operation. In the case that is to

the annex is accompanied by a relevant study, noted here also a reference to this

an attachment.



Point 7. -In the case of compensation of administrative acts in accordance with legislation of the protection

of public health concerning the operation of vibration sources noted here also

additional information and supporting documents required under this legislation. If the pattern

the application on another site requires entry of the same data that are

necessary in the context of applications for the issue of an administrative act, these being replaced

the same information is not repeated here, the only reference to the relevant

Chapter applications (typically this is, e.g., the identification and descriptive

data).



10.2.1. The use of best available techniques

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. The source of information and

I----------------------------------------------------------------------------I

I I

I---------------I-------------I----------------I-------------I---------------I

3. Rated I 4. Unit 5. Level I 6. Level I, 7. Justification And

Even the pointer and I connected with the BAT as well as resources and differences and

I---------------I-------------I----------------I-------------I---------------I

I I I I I I

I---------------I-------------I----------------I-------------I---------------I



To perform a comparison of the achieved or anticipated effects on source

propagation of vibration parameters obtained by using the best

available techniques, where these parameters available.



Point 2. -Indicate the sources of information used and in the case of a source outside the BREF

(or the conclusions of the BAT) and the way of determining the best available techniques.



Point 5. -To specific information from the BREF (BAT conclusions) also indicate

the name and badge number of the chapter. subplots and side

the document to which the information is located.



10.3. the non-ionising radiation

I----------------------------------------------------------------------------I

I 1. Non-ionizing radiation source and designation

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. Non-ionizing radiation source and description

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

3. Description of the measures to prevent the formation of non-ionizing radiation and against the spread and

(I) non-ionizing radiation and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

4. Parameters and values for these parameters to describe the source of non-ionizing and

I záření I

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

(I) 5. The results of measurements or calculations of non-ionizing radiation emitted by the operation and

I equipment I

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



Non-ionising radiation to identify resources (electric and magnetic

field, electromagnetic radiation at a frequency of up to 1, 7.1015 Hz) affecting

outside the boundaries of the zone of sanitary protection device or devices

(for example, light pollution) and to bring the results of measurements

or calculations. Non-ionising radiation sources represented in a graphical annex

request (within Chapter 13.1). In the annex attached to the current

logs of measurements and calculations.



For additions to indicate whether the device is in the source of ionizing radiation, and in

to what extent this radiation is produced.



Point 1. -Indicate the name or description of a specific source of non-ionizing

radiation.



Point 2. -Non-ionising radiation sources to describe a particularly technical

Description, resource type-stationary, mobile, the nature of non-ionizing

radiation-continuous, intermittent, frequency, wavelength, period, etc.

operation of non-ionizing radiation sources.



Point 3. -Describe the realized or planned measures for the prevention of

non-ionizing radiation and non-ionizing radiation, including against the spread

their technical description. Description of the measures shall include the technical parameters

methods, materials and energy consumption, year of production, the life of

etc.



Section 4. -In the device before starting construction or under construction, or in

changes device designed or guaranteed value

parameter/parameters describing the source describing non-ionizing/

radiation, operated device realistically achieved values. If

the spread of non-ionizing radiation is a variable or different when different

Working settings, specify the source of values including achieved

the maximum values.



Point 5. -The results of measurements or calculations of non-ionizing radiation

caused by traffic source (device). At the device before you start

construction or under construction or on the device, you must change the value of

calculated (modeled).



For existing installations to present the results of measurements at the time of the operation.



In the case that is attached in the annex the relevant studies, noted here

also a link to the attachment.



10.3.1. The use of best available techniques

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. The source of information and

I----------------------------------------------------------------------------I

I I

I--------------I-------------I----------------I--------------I---------------I

3. Rated I 4. Unit 5. Level I 6. Level I, 7. Justification And

Even the pointer and I connected with the BAT as well as resources and differences and

I--------------I-------------I----------------I--------------I---------------I

I I I I I I

I--------------I-------------I----------------I--------------I---------------I



To perform a comparison of the achieved or anticipated effects from source

in terms of non-ionizing radiation with parameters obtained by using

the best available techniques, where these parameters available. To

specific information from the BREF mention also the name and badge number

Chapter, or. subplots and side of the document to which the information

is located.



Point 2. -Indicate the sources of information used and in the case of a source outside the BREF

(or the conclusions of the BAT) and the way of determining the best available techniques.



Point 5. -To specific information from the BREF (BAT conclusions) also indicate

the name and badge number of the chapter. subplots and side

the document to which the information is located.



11. Waste Management



In the case of waste management to connect to the annex a copy of the permissions

the operator of the device to the waste management.



In the case of the use of the external services include the treatment of wastes,

the identification of the supplier of the service, a copy of his permission to use

waste and a reference to the contract for the supply of services. The Office in this

the case may request a copy of contracts with service providers.



In the descriptive parts of the State waste codes.



11.1. the source and the amount of waste produced

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device (the source of the waste) and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. Description of the resource waste and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

3. Description of the measures to prevent or limit the amount of waste and

I----------------------------------------------------------------------------I

I I

I----------------I---------------I--------------I----------------------------I

4. Category I 5. Catalogue and 6. The name of the (I) 7. Produced quantities and


And waste and the number and type of waste (in tonnes)

I I I I---------I---------I--------I

I I I I year I year I year I

I----------------I---------------I--------------I---------I---------I--------I

I I I I I I I

I----------------I---------------I--------------I---------I---------I--------I

8. Hazardous waste identification sheets and 8a. Reference to annex I,

I-----------------------------------------------I----------------------------I

I I I

I-----------------------------------------------I----------------------------I

I 9. For more information and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



Identify and describe the sources of waste, these sources represented in the graphics

the annex to the application (within Chapter 13.1), make reference to

schemas to describe collectively waste management. It should be

identified all the places of production where the waste is produced.



Point 1. -The name (identification) of a specific source of waste.



Point 2. -To describe the sources of waste, particularly as waste arises.



Point 3. -Describe the realized or planned measures for the prevention of

waste and to limit the amount of waste, including their technical description.

Technical description of the measures include marking, parameters, methods, used

substances and energy consumption, year of production, service life, etc. Indicate whether or not

the share of the reduction in the annual amount of waste by category and catalog

numbers of waste, whose emergence is a measure prevented or whose amount

is the measure limited, or that is due to the measures used.



Section 4. -The category of the waste according to the applicable legislation in the field of waste.



Points 5. -6. -Catalog number and the name of the type of waste according to valid

the catalogue of waste.



Point 7. -In the case that are given the data for multiple years, to justify

significant annual differences.



Section 8. -Indicate the specific references to the identification data sheets for dangerous

the waste, which will be attached to the application, if available. Indicate the

valid certificates on the exclusion of hazardous properties of the waste according to the

legislation in the field of waste and apply them in the annex to the application.



11.2. wastes obtained from other producers

I----------------------------------------------------------------------------I

I 1. The origin (the originator) and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. General characteristics of waste and resources

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

I I

I----------------I----------------I---------------I--------------------------I

3. Category I 4. Cataloguing I 5. The name of the (I) 6. Quantity (in the I

And waste and the number and type of waste as well as tonnes) and

I I I I--------I--------I--------I

I I I I year I year I year I

I----------------I----------------I---------------I--------I--------I--------I

I I I I I I I

I--------------I-----------------I----------------I--------I--------I--------I

7. Hazardous waste identification sheets and 7a. Reference to annex I,

I-------------------------------------------------I--------------------------I

I I I

I----------------------------------------------------------------------------I

8. For more information and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



To prepare the chapters use guidelines apply mutatis mutandis to Chapter 11.1 the request.



11.3. The collection, concentration and storage of waste

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device (the place of collection or concentration)

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. Description of the method of collecting or gathering and

I----------------------------------------------------------------------------I

I I

I--------------I-----------------I----------------I--------------------------I

3. Category I 4. Cataloguing I 5. Name of the species, and 6. The quantity (in tonnes)

(I) waste and scrap and waste number I--------I--------I--------I

I I I I year I year I year I

I--------------I-----------------I----------------I--------I--------I--------I

I I I I I I I

I--------------I-----------------I----------------I--------I--------I--------I



I----------------------------------------------------------------------------I

7. Identification of warehouse and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

8. Description of the method of storage and warehouse and security

I----------------------------------------------------------------------------I

I I

I--------------I-----------------I----------------I--------------------------I

I 9. Category I 10. Catalogue and 11. The name of I 12. The quantity stored, and

(I) waste and scrap and the number and type of waste (in tonnes)

I I I I--------I--------I--------I

I I I I year I year I year I

I--------------I-----------------I----------------I--------I--------I--------I

I I I I I I I

I--------------I-----------------I----------------I--------I--------I--------I



Describe the receiving, collecting, or waste in a merger,

If it occurs on the device.



Describe the method of storage of individual types of waste according to the catalog.



The receive location, places of gathering, gathering waste, warehouses

and of the buffer locations, handling areas represented in a graphical annex requests

(within Chapter 13.1), refer also to the relevant schemes.



Points 2. and 8. -Describe the technical solution, ensuring the protection of

the environment and human health, and the disposal of waste gases and

waters from waste stacks, if they arise. In the case of a joint

collect or concentrate the waste give details including

the justification and the final classification.



Section 12-indicate the quantity stored waste in tonnes.



11.3.1. The use of best available techniques

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. The source of information and

I----------------------------------------------------------------------------I

I I

I-------------------I-----------------I------------------I-------------------I

3. Rated I 4. BAT and 5 parameter. Parameter 6. Justification And

And a pointer to the device as well as differences, and even

I-------------------I-----------------I------------------I-------------------I

I I I I I

I-------------------I-----------------I------------------I-------------------I

I I I I I

I-------------------I-----------------I------------------I-------------------I



Compare the parameters of the device and the chosen solution in the field of waste

wastes with the best available techniques in this area and to justify the

any deviations.



Point 2. -Indicate the specification of sources of information on the best available

techniques used for the assessment of the use of BAT.



Section 4. -To specific information from the BREF (BAT conclusions) also indicate

the name and badge number of the chapter. subplots and side

the document to which the information is located.



11.4. Sorting, mixing and editing of the waste

I----------------------------------------------------------------------------I

I 1. Description of the waste sorting and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. Description of the waste and the mixing of the

I----------------------------------------------------------------------------I

I I

I--------------I--------------------I----------------I-----------------------I

3. Category I 4. Cataloguing I 5. Name of the species, and 6. Sorted by both quantity and

(I) waste and scrap and waste and number (in tonnes)


I I I I-------I-------I-------I

I I I I year I year I year I

I--------------I--------------------I----------------I-------I-------I-------I

I I I I I I I

I--------------I--------------------I----------------I-------I-------I-------I



I----------------------------------------------------------------------------I

7. Description of the treatment of waste and

I----------------------------------------------------------------------------I

I I

I-----------------I-------------------I--------------I-----------------------I

8. Category I 9. Catalogue 10. The name of the (I) 11. The adjusted quantity and

(I) waste and scrap and the number and type of waste (in tonnes)

I I I I-------I-------I-------I

I I I I year I year I year I

I-----------------I-------------------I--------------I-------I-------I-------I

I I I I I I I

I-----------------I-------------------I--------------I-------I-------I-------I



Describe the classification systems, the mixing of (State the reasons netřídění waste) and editing

waste. The location of the handling and sorting of the areas represented in the graphics

the annex to the application (within Chapter 13.1), refer also to the

the relevant schemes. Sorting, blending, and waste treatment facility to perform according to the

legislation in the field of waste management.



Point 1. -Describe the grading system of the waste, technical solutions, securing of

for the protection of the environment and human health.



Point 2. -Give details of the mixing of the waste and, if it occurs, including

justification for the netřídění waste.



Point 6. -Indicate the screened the quantity in tonnes. If there are significant

annual differences provide justification.



Point 7. -Describe the specific modifications to the waste, technical solutions, securing of

for the protection of the environment and human health.



11.4.1. The use of best available techniques

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. The source of information and

I----------------------------------------------------------------------------I

I I

I------------------I-----------------I------------------I--------------------I

3. Rated I 4. BAT and 5 parameter. Parameter 6. Justification And

And a pointer to the device as well as differences, and even

I------------------I-----------------I------------------I--------------------I

I I I I I

I------------------I-----------------I------------------I--------------------I



Compare the parameters of the device and the chosen solution in the field of waste

wastes with the best available techniques in this area and to justify the

any deviations.



Point 2. -Indicate the specification of sources of information on the best available

techniques used for the assessment of the use of BAT.



Section 4. -To specific information from the BREF (BAT conclusions) also indicate

the name and badge number of the chapter. subplots and side

the document to which the information is located.



11.5. The reuse

I----------------------------------------------------------------------------I

I 1. Description of the reuse and preparing for re-use and

I----------------------------------------------------------------------------I

I I

I-------------------I------------------I-------------I-----------------------I

2. Category I 3. Catalogue and 4. Name 5. Reused and

(I) waste and scrap and the type of number and quantity (in tonnes)

I I I I-waste------I-------I-------I

I I I I year I year I year I

I-------------------I------------------I-------------I-------I-------I-------I

I I I I I I I

I-------------------I------------------I-------------I-------I-------I-------I



Fill in the event that device to prepare for the recovery

use or re-use within the meaning of the legislation in the field of

the waste. The relevant technical unit represented in a graphical annex

request (within Chapter 13.1) and refer also to the appropriate

schemas describe the waste management on the device.



Point 1. -Description of the re-use and re-use

includes a detailed technical description of the technological process, the share again

used product or part of the total amount as follows

the processed product, produced by residual waste or pollution and

dealing with him.



11.5.1. The use of best available techniques

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. The source of information and

I----------------------------------------------------------------------------I

I I

I-------------------I-----------------I-----------------I--------------------I

3. Reference 4. BAT and 5 parameter. Parameter 6. Justification And

And a pointer to the device as well as differences, and even

I-------------------I-----------------I-----------------I--------------------I

I I I I I

I-------------------I-----------------I-----------------I--------------------I



Compare the parameters of the device and the chosen solution in this area, dealing with

wastes with the best available techniques in this area and to justify the

any deviations.



Point 2. -Indicate the specification of sources of information on the best available

techniques used for the assessment of the use of BAT.



Section 4. -To specific information from the BREF (BAT conclusions) also indicate

the name and badge number of the chapter. subplots and side

the document to which the information is located.



11.6. Recovery of waste (including material recovery)

I----------------------------------------------------------------------------I

I 1. Description of the use of waste as well as

I----------------------------------------------------------------------------I

I I

I-----------------I-----------------I---------------I------------------------I

2. Category I 3. Catalogue and 4. Name 5. The used quantity (in the I

(I) waste and scrap and the number and type of waste tonnes) and

I I I I-------I--------I-------I

I I I I year I year I year I

I-----------------I-----------------I---------------I-------I--------I-------I

I I I I I I I

I-----------------I-----------------I---------------I-------I--------I-------I



Describe the use of waste in the system including the material recovery. Space

recovery of the waste represented in a graphical annex requests (within the chapter

17.1 applications) and to refer also to the appropriate schemas to describe the

waste management.



Point 1. -Description of the recovery of the waste shall include a description of the method of recovery of the waste,

technical solutions, technologies or techniques, technical parameters (name,

the type, design, security, materials, the date of commissioning,

life, the conditions of use of waste, abnormal operating conditions;

produced by residual waste or pollution and waste management). If there is a

the corresponding technical description already listed in Chapter 6 in the application, just

here a link to a description of that chapter.



11.6.1. The use of best available techniques

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. The source of information and

I----------------------------------------------------------------------------I

I I

I------------------I-----------------I------------------I--------------------I

3. Rated I 4. BAT and 5 parameter. Parameter 6. Justification And

And a pointer to the device as well as differences, and even

I------------------I-----------------I------------------I--------------------I

I I I I I

I------------------I-----------------I------------------I--------------------I



Compare the parameters of the device and the chosen solution in this area, dealing with

wastes with the best available techniques in this area and to justify the

any deviations.



Point 2. -Indicate the specification of sources of information on the best available

techniques used for the assessment of the use of BAT.



Section 4. -To specific information from the BREF (BAT conclusions) also indicate

the name and badge number of the chapter. subplots and side

the document to which the information is located.



11.7. Waste disposal

I----------------------------------------------------------------------------I

I 1. Description of the waste disposal and


I----------------------------------------------------------------------------I

I I

I----------------I------------------I----------------I-----------------------I

2. Category I 3. Catalogue and 4. Name of the species and 5. Deleted And

The number of waste disposal and waste and the quantity in tonnes and

I I I I-------I-------I-------I

I I I I year I year I year I

I----------------I------------------I----------------I-------I-------I-------I

I I I I I I I

I----------------I------------------I----------------I-------I-------I-------I



Describe the disposal of waste in the facility. Space disposal

represented in a graphical annex requests (within Chapter 13.1 request) and

refer also to the relevant diagrams describing the waste management in

device.



Point 1. -Description of the disposal of waste includes waste disposal method

technical solutions, technology or technical parameters of landfill (name,

the type, design, security, materials, the date of commissioning,

life, the conditions of disposal, abnormal operating conditions,

the effectiveness of waste disposal; produced by residual waste or pollution

and dealing with them). If there is a corresponding technical description already listed in

Chapter 6 in the application, you can just include a link to the corresponding description in the

that chapter.



11.7.1. The use of best available techniques

I----------------------------------------------------------------------------I

I 1. Designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. The source of information and

I----------------------------------------------------------------------------I

I I

I-------------------I-----------------I------------------I-------------------I

3. Rated I 4. BAT and 5 parameter. Parameter 6. Justification And

And a pointer to the device as well as differences, and even

I-------------------I-----------------I------------------I-------------------I

I I I I I

I-------------------I-----------------I------------------I-------------------I



Compare the parameters of the device and the chosen solution in this area, dealing with

wastes with the best available techniques in this area and to justify the

any deviations.



Point 2. -Indicate the specification of sources of information on the best available

techniques used for the assessment of the use of BAT.



Section 4. -To specific information from the BREF (BAT conclusions) also indicate

the name and badge number of the chapter. subplots and side

the document to which the information is located.



7.3. Additional documents

I----------------------------------------------I-----------------------------I

I 1. Operating systems I la. Reference to annex I,

I----------------------------------------------I-----------------------------I

I I I

I----------------------------------------------I-----------------------------I

2. Additional documents for approval and 2a. Reference to annex I,

I----------------------------------------------I-----------------------------I

I I I

I----------------------------------------------I-----------------------------I



I----------------------------------------------I-----------------------------I

3. Waste Treasurer and 4a. Reference to annex I,

I----------------------------------------------I-----------------------------I

I I I

I----------------------------------------------I-----------------------------I



I----------------------------------------------------------------------------I

4. In the case of compensation of administrative acts in accordance with legislation in the field of waste and

I give here any other information required by that legislation. (I)

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



Point 1. -The operator of equipment to use, the removal, collection or

purchase of waste connects to the annex to the application design rules

device. If there are other places in the application requested data

referred to in the attached documents, the request can be only briefly

summarize and refer to a specific section in a document.



Point 2. -Operator of the plant, which is intended for the use of,

delete, collection or purchase of waste and landfill operator in brief

describe and plan to annex the request shall be accompanied by vocational training

workers of the device according to the legislation in the field of waste. Connect

also other documents according to legislation in the field of waste

the integrated permit be approved.



Point 3. -The name, respectively. name and surname of the waste Manager and to the

the annexes include evidence of his professional competence by legal

editing in the field of waste, if the operator (applicant) in accordance with

This legislation the obligation to determine the waste Manager.



Section 4. -In the case of compensation of administrative acts in accordance with legislation in the field of

waste, indicate here any other information and documents required

under this legislation. If the model application on another site requests

putting the same information that is required in an application for the issue of

that of the administrative act, these same data are not repeated here,

enter only the reference to the relevant chapter of the request (for instance.

identification and descriptive data).



12. Environmental Monitoring equipment on the environment (Monitoring)

I----------------------------------------------------------------------------I

I 1. The environment/monitoring area I

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. Tracked through the discharge ducts or discharges and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

3. Monitored quantities and units as well as

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

4. The location of sampling sites (places) and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

(I) 5. Method of sampling, sampling and measurement method and conditions and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

6. The sampling frequency (measuring)

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

7. The method of recording, processing and storage of data and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

8. Other ways of monitoring and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

I 9. The status of the implementation of the monitoring and planned changes and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



Point 1. -A description of the system for monitoring the effects on the environment include

individually for the elements of the environment or tracked

area (i.e. in the range of chapters 7-11 of the request). the desired table

You must copy the necessary number according to monitored folders

of the environment.



Section 4. -Withdrawal (places) represented in a graphical annex

request (within Chapter 13.1).



Section 8. -Describe other ways of monitoring the effects on the operation of the equipment

the solved folder of the environment or the monitored area (eg.

Visual inspection, checking the level in capturing the sump, check

tightness).



Point 9. -Indicate the planned changes in the area of monitoring and any time

plan for these changes.



12.1. The use of best available techniques

I----------------------------------------------------------------------------I

I 1. The source of information and

I----------------------------------------------------------------------------I

I I

I-------------------I-----------------I------------------I-------------------I

2. I rated 3. Parameter of the BAT I 4. Parameter 5. Justification And


I I I the device pointer and the difference I

I-------------------I-----------------I------------------I-------------------I

I I I I I

I-------------------I-----------------I------------------I-------------------I



Compare the monitoring system with the best available techniques in this

area and to justify any derogations.



Point 1. -Indicate the specification of sources of information on the best available

techniques used for the assessment of the use of BAT.



Point 3. -To specific information from the BREF (BAT conclusions) also indicate

the name and badge number of the chapter. subplots and side

the document to which the information is located.



13. Preventive measures



13.1. The prevention of accidents and the limitation of their consequences

I--------------------------------------------------I-------------------------I

I 1. The classification of the object (the device) to A group or even la. Reference to annex I,

And (B) the Protocol on non-inclusion or even

I--------------------------------------------------I-------------------------I

I I I

I--------------------------------------------------I-------------------------I

2. Measures to prevent the occurrence of accidents and limitation of their consequences and

I----------------------------------------------------------------------------I

I I

I--------------------------------------------------I-------------------------I

3. Emergency plans and 3a. Reference to annex I,

I--------------------------------------------------I-------------------------I

I I I

I--------------------------------------------------I-------------------------I

4. Security program or the safety report and 4a. Reference to annex I,

I--------------------------------------------------I-------------------------I

I I I

I--------------------------------------------------I-------------------------I



Point 1. -Indicate whether the device is, or some object on the device included

in Group A or B according to the legislation in the field of the prevention of major

accidents. In the annex apply the relevant decision on the classification of the object

or a device to a group or to the Group B, where appropriate, attach to the

the annex to the Protocol on non-inclusion.



Point 2. -Describe the measures to prevent accidents and to dispose of or

any limitation of their consequences, and, in the cases referred to in the relevant

legislation in the field of accident prevention, through

item 6 of this chapter to connect into the annex of the application design

the security program or the security of a message or the following documents

approved and the attachment, refer to.



Point 3. -Where relevant, connected to the annex to the proposal for emergency

the plan, according to the legislation in the field of waste waters.



Section 4. -The identification of the decision on the approval of the safety

program or safety messages (if they have been processed), or

information that the approval of documents in progress. At the request of the Office of the

It may be a decision on the approval of the security program and security

the message shown in the annex.



Graphic annexes of the application (within Chapter 13.1 request) to indicate

objects, where dangerous substances are located and also the surrounding objects

(factories, warehouses, etc., outside of your own device), if they

dangerous substances placed under the law on the prevention of

major accidents and in this chapter to refer to them by a description.



13.2. Other preventive measures

I----------------------------------------------------------------------------I

I 1. Description of the measures and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



Point 1. -Indicate the possible subsequent measures the precautionary nature of the

used in the device.

I----------------------------------------------------------------------------I

2. For more information on the categories of activities 6.4, 6.5, 6.6 and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



Point 2. -In the cases category activities 6.4, 6.5, 6.6 indicate potential

the sources of diseases, epidemiological measures, etc. For 6.6 indicate

The contingency plan for the case of a dangerous animal diseases,

legislation in the area of processed animal health care.



13.3. The environmental management system

I----------------------------------------------------------------------------I

I 1. Information about the environmental management system and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



Point 1. -State whether the environmental management system is introduced

(certification according to ISO 14000, EMAS registration, the system

environmental management without certification), annex, include a copy of

the relevant certificate or registration. If there is no system

environmental management according to ISO 14000 or EMAS, briefly describe the

How to control the device in relation to the environment.



14. characteristics of the status and influence of the territory

I----------------------------------------------------------------------------I

I 1. Climate and air quality as well as

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. Quantitative and qualitative indicators of water, protection of water

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

3. The quality of the soil and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

4. Geological environment and natural resources as well as

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

(I) 5. Hydrogeological and engineering-geological and geotechnical conditions and description

And the site I

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

6. An old ecological burden, realized and planned corrective actions and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

7. Protection and concerned

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

8. Ostatní I

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



Provide information about the territory which is, or will be without prejudice to the operation of the equipment or

the implementation of changes in the operation of the device (this territory may

cases vary, for example, emissions to air can strike a more extensive

the territory than the noise emission) and these data represented in a graphical annex

request (within Chapter 13.1).



In the case of devices covered by the obligation of environmental impact assessment

the environment according to the legislation in the field of environmental impact assessment

the environment, for the purposes of this chapter, applications use data from

According to the documentation of the Act, if at the time of submission of the application

the current.



In the case of devices covered by the obligation to carry out reviews

the risks of individual operating activities under the rules to

Prevention of environmental harm and its remedy, can be used for the purposes of this chapter,

the application to take advantage of current and relevant data from this evaluation,

If it is available, or apply this rating or its

the relevant parts of the annexes to the application.



You need to fill in only the part on the elements of the

environment and indicate the source of the data. Used the current measurement results

related with the status of the territory can be attached to the application and attachments

at appropriate places in the following sub-sections, refer to them.



To describe the characteristics of the territory of the State to focus on the area of

(environmental) for which compliance with the standard is at risk

the quality of the environment or is this standard even

has been exceeded. Describe the influence of the territory of operation of the device or

a change in the operation of the equipment.



Point 1. -Describe the climatic conditions of the territory (rainfall, altitude


etc.). Indicate the current status of air quality (air pollution), its

affecting devices, other major sources of air pollution that

affect the air quality in the territory, the area is impaired

air quality and the zone for the protection of ecosystems and vegetation.



Point 2. -Indicate the current status of the water quality (flow rates, pollution,

acidification, eutrophication, performed significant flows, sensitive and

vulnerable areas in accordance with legislation in the field of waste waters,

the location in the protected areas of Headwater, the protection

zone of water source, etc.) and its effect on the device. Noted also

other significant sources of pollution that affect water quality in the

the affected territory.



Point 3. -Indicate the current status (BPEJ, soil pollution, etc.) and its

affecting the device. Include also other sources of pollution of the soil, which

affect the quality of the soil in the territory.



Section 4. -Indicate the current status and its effect on the device. Noted also

other sources that affect the geological environment and natural resources in the

the affected territory.



Point 5. -In the annex to the application, the operator shall submit to the landfill.



Point 6. -Describe the State of contamination of rocks, soil and groundwater and their

the solution. Indicate the results of the analyses and monitoring. In the annex include technical

assessment, risk analysis, environmental impact assessment, if

There are. As a reference you can use the basic message, if it has

the operator is obliged to submit, at the time of processing of the application to the

available, and contains the relevant information (can be on the basic message

refer to).



Point 7. -Indicate the protection water mains, sewage drains,

railways, natural medicinal resources, resources, natural mineral waters,

biokoridory, etc.



Section 8. -Include the nearest housing, the presence of

major features of the landscape territorial systems of ecological stability,

the occurrence of protected species of animals and plants, habitats, and other

protected nature and landscape interest including specially protected

the territory of bird areas and European major sites where they may be

operation of the devices affected and describe this effect.



15. Closure of the

I----------------------------------------------------------------------------I

I 1. Description of the procedure and the closure of the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

2. The planned measures associated with closure device and

I-----------------------------I----------------------------------------------I

And 2a. Dangerous substances and

I-----------------------------I----------------------------------------------I

And 2b. Hazardous waste (I)

I-----------------------------I----------------------------------------------I

And 2 c. Other waste I I

I-----------------------------I----------------------------------------------I

2d. Surface water and

I-----------------------------I----------------------------------------------I

And 2e. Ground water and even

I-----------------------------I----------------------------------------------I

And 2f. Půda I I

I-----------------------------I----------------------------------------------I

Even 2 g. For more measures and even

I-----------------------------I----------------------------------------------I

3. Action to bring the site to a satisfactory state and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

4. The planned monitoring after the closure and

I-----------------------------I----------------------------------------------I

And 4a. Půda I I

I-----------------------------I----------------------------------------------I

(I) 4b. Ground water and even

I-----------------------------I----------------------------------------------I

And 4 c. Surface water and

I-----------------------------I----------------------------------------------I

And 4 d. Additional monitoring and

I-----------------------------I-----------------------I----------------------I

(I) 5. Documents related to the termination of operation I I

And I I

I----------------------------------I------------------I----------------------I

And 5a. The name of the (I) 5b. Description and 5 c. Reference to annex I,

I----------------------------------I------------------I----------------------I

I I I I

I----------------------------------I------------------I----------------------I



Point 1. -Describe how their operation, even in the case that

There is no planned (e.g. disposal of raw materials, materials, waste,

sale or disposal of machinery, demolition equipment, other

the use of equipment, disposal of the residual consequences of the operation of the equipment,

aftercare, monitoring). Specify the individual phase of their

operation and marketing of the site to a satisfactory state.



Points 2. -Indicate in more detail the planned measures associated with the termination of

operation of the equipment (in particular with regard to the issue of hazardous substances,

hazardous and other waste, the State of the soil and groundwater) and to

the exclusion of possible pollution risks and threats

a person's health from the device after the cessation of its activities.



Point 3. -Indicate the measures necessary to bring the site to a satisfactory state, that

due to the present or future approved usage

the place of operation of the equipment does not pose any significant risk to human

health or the environment.



Section 4. -A description of the system for monitoring the effects on the environment after

closure device for the elements of the individually

environment or the monitored area including an indication of the duration of monitoring.



Point 5. -In particular, the plan of reclamation, closure plan

etc. The operator of a landfill shall be attached in the annex to the proposed plan for closure

landfills and aftercare of landfill in accordance with the legislation in the field of waste.

If the documents attached in the annex to the application contain the information

required in items 1-4 of this chapter, you can request these

briefly summarize the information and refer to the attached documents.



As a basis for some of the points you can use the underlying message, if it has

the operator is obliged to submit, at the time of processing of the application to the

available, and contains the relevant information (can be on the basic message

refer to).



16. the proposal of mandatory safety equipment

I---------------------------------------------------------------------------------------------------I

I 1. The emission limits (air, water, soil, and more)

I----------I----------I----------------------I--------I----------I------------I---------------------I

(I) the designation and Marking and Substance/substances/I Emission and IPoznámka and Reference Unit and

Terms and conditions I resources I also limit Indicator and the terms and conditions and (I)

I----------I----------I----------------------I--------I----------I------------I---------------------I

I I I I I I to IVB, BAT, BF, YOU of 1) and

I----------I----------I----------------------I--------I----------I------------I---------------------I

2. The limits for noise, vibration, radiation and non-ionizing

I----------I----------I----------------------I--------I----------I------------I---------------------I

(I) The Designation And Marking And Pointer And Limit And Unit I Reference IPoznámka And

Terms and conditions I resources I I I I I I terms and conditions

I----------I----------I----------------------I--------I----------I------------I---------------------I

I I I I I I TO IVB, BAT, BF, YOU ALSO

I----------I----------I----------------------I--------I----------I------------I---------------------I

3. Measures to avoid the risk of possible pollution of the environment and risks to health and

And a man coming from the device after cessation of its activities and the conditions for ensuring the full and

And the closure of the return of the space operation into a State of nepředstavujícího no I

As well as a significant risk to human health or the environment and

I---------------I-----------------------------------------------------------------------------------I

Even the designation as well as the Text of the conditions and

Terms and conditions I I

I---------------I-----------------------------------------------------------------------------------I

I I I

I---------------I-----------------------------------------------------------------------------------I

4. Conditions to ensure the protection of human health and of the environment when waste management and

(I) measures to monitor the waste in the system causes even

I---------------I-----------------------------------------------------------------------------------I

Even the designation as well as the Text of the conditions and

Terms and conditions I I


I---------------I-----------------------------------------------------------------------------------I

I I I

I---------------I-----------------------------------------------------------------------------------I

(I) 5. Conditions to ensure the protection of human health and the environment, in particular the protection and

Even the air, soil, groundwater and surface water and

I---------------I-----------------------------------------------------------------------------------I

Even the designation as well as the Text of the conditions and

Terms and conditions I I

I---------------I-----------------------------------------------------------------------------------I

I I I

I---------------I-----------------------------------------------------------------------------------I

6. Other special conditions for the protection of human health and environmental protection, necessary even

And, depending on local environmental conditions and the technical characteristics of the device and the

I---------------I-----------------------------------------------------------------------------------I

Even the designation as well as the Text of the conditions and

Terms and conditions I I

I---------------I-----------------------------------------------------------------------------------I

I I I

I---------------I-----------------------------------------------------------------------------------I

7. Measures for the rational use of raw materials and energy and

I---------------I-----------------------------------------------------------------------------------I

Even the designation as well as the Text of the conditions and

Terms and conditions I I

I---------------I-----------------------------------------------------------------------------------I

I I I

I---------------I-----------------------------------------------------------------------------------I

8. The conditions and measures for the prevention of accidents and limitation of their případnýchnásledků and

I---------------I-----------------------------------------------------------------------------------I

Even the designation as well as the Text of the conditions and

Terms and conditions I I

I---------------I-----------------------------------------------------------------------------------I

I I I

I---------------I-----------------------------------------------------------------------------------I

I 9. Procedures or measures for the operation relating to situations different from the podmínekběžného and

I (for example, commissioning, trial operation, equipment failures, tions and I

And definitive closure)

I---------------I-----------------------------------------------------------------------------------I

Even the designation as well as the Text of the conditions and

Terms and conditions I I

I---------------I-----------------------------------------------------------------------------------I

I I I

I---------------I-----------------------------------------------------------------------------------I

10. The method of emission monitoring (technical measures for the monitoring of emissions, including the specification and

And measurement methodologies, its frequency, the keeping of records on monitoring) and

I---------------I-----------------------------------------------------------------------------------I

Even the designation as well as the Text of the conditions and

Terms and conditions I I

I---------------I-----------------------------------------------------------------------------------I

I I I

I---------------I-----------------------------------------------------------------------------------I

I 10a. The conditions for the assessment of compliance with emission limits and

I----------I-----------------------I-----------------------I------------I-----------I---------------I

(I) the designation and the conditions for and the list of emission and placement and Frequency and Methodology 2) I

The terms and conditions and the assessment of compliance with even the limits to which I also subscribe and sampling

(I) emission limitation and condition applies. And places (places and samples I I

I I I I) I (measurement) I I

I----------I-----------------------I-----------------------I------------I-----------I---------------I

I I I I I I I

I----------I-----------------------I-----------------------I------------I-----------I---------------I

And 10b. Conditions for the monitoring of emissions, not covered by the emission limit and

I----------I------------I----------I----------I------------I------------I-----------I---------------I

(I) the designation and the name of the Substance, or even Drive and reference and Location as well as the frequency and methodology of 3) and

The conditions and the designations and the Group I and the conditions of the sampling and the sampling I I

I I resources and I I I sites (sites and samples I I

I I I I I I a measurement indicator) and (measurement) I I

I----------I------------I----------I----------I------------I------------I-----------I---------------I

I I I I I I I I I

I----------I------------I----------I----------I------------I------------I-----------I---------------I

11. Measures to minimise the movement of pollution or pollution remote crossing I

Even national borders, and to ensure a high level of environmental protection as a whole and

I----------I----------------------------------------------------------------------------------------I

Even the designation as well as the Text of the conditions and

Terms and conditions I I

I----------I----------------------------------------------------------------------------------------I

I I I

I----------I----------------------------------------------------------------------------------------I

12. The procedure for the evaluation of the fulfilment of the conditions of the integrated permit and

I----------I----------------------------------------------------------------------------------------I

Even the designation as well as the Text of the conditions and

Terms and conditions I I

I----------I----------------------------------------------------------------------------------------I

I I I

I----------I----------------------------------------------------------------------------------------I

13. The procedures and requirements for the regular maintenance of equipment and procedures to prevent emissions into soil and even

And groundwater and ways of monitoring of soil and groundwater in the context of the relevant and

And hazardous substances that may be present on the site and in the light pollution as well as update option

(I) soil and groundwater at the site of the device and

I----------I----------------------------------------------------------------------------------------I

Even the designation as well as the Text of the conditions and

Terms and conditions I I

I----------I----------------------------------------------------------------------------------------I

I I I

I----------I----------------------------------------------------------------------------------------I



1) an explanation of the abbreviations: VB = based on BAT (according to the original

the directive on integrated prevention 2008/1/EC or are not conclusions on the BAT).

Bat = limit is in accordance with the conclusions of the BAT, BF = actual values in the

accordance with the conclusions of the BAT, YOU = exception to the BAT.



2) sampling Method, conditions and method of measurement, sampling method

recording, processing and storing data-you can provide a link for example. on

methodology of the MINISTRY of the ENVIRONMENT or of another Department, CSN, etc.



3) sampling Method, conditions and method of measurement, sampling method

recording, processing and storing data-you can provide a link for example. on

methodology of the MINISTRY of the ENVIRONMENT or of another Department, CSN, etc.



In this section, request the operator proposes conditions for operation of the device in the

the scope of the integrated permit conditions, including a proposal for their time

implementation, if necessary. changes in the conditions of a valid of the integrated permit.

The proposed conditions of use must be based on the best available techniques

and be in accordance with the legislation in the field of the environment. A proposal from the

binding conditions of operation of the device is based on the information referred to in

request and presented according to environmental and other

landscaped areas. Individual conditions, it is appropriate to clearly

refer to.



It is recommended that, where appropriate, the proposed conditions justify and

to refer to the data in the application or a graphical representation of the circumstances

decisive to the determination of specific conditions.



Point 1. -Propose emission limits for all through the discharge ducts and discharge of

device. Emission ceiling is also considered to be a form of the emission limit.

Indicate also the legal framework (in the "Note")-conclusions on the BAT,

constituent legislation, the exemption from the levels of the BAT.



Point 2. -To propose limits for noise, vibration, non-ionising radiation.



Point 3. -Indicate in particular the list of hazardous wastes, the conditions of loading,

recovery or disposal of waste.



Section 4. -Include in particular measures for the disposal of raw materials, materials,

filling, waste, destruction of machinery, demolition equipment, other

device usage, determine the status of affected soil and groundwater,

disposal of the residual consequences of the operation of the installation, subsequent care

monitoring.



Point 5. -Indicate the conditions of preventive nature and conditions restricting

the influence of the health of humans, animals and the environment.



Point 6. -Indicate the conditions for ensuring compliance with the standards of the

environment, taking into account the technical characteristics of the device, you may

discuss the conditions above and beyond best available techniques.




Point 7. -In particular, the determination of the energy efficiency of conversion

energy and the associated savings in fuel, energy recovery

landfill gas, implementation of measures arising from the energy audit

and more.



Section 8. -Indicate the measures to prevent accidents and to limit their

possible consequences of emergency plans.



Point 9. -Indicate the conditions for the trial operation, the period of downtime, start-up

or disorders.



Point 10. -The conditions to provide for monitoring of all environmental pollution

substances for which emission limit is fixed and at least to the extent

the requirements of the legislation in the field of the environment to provide for

monitoring of other substances emanating from the device. Also provide for

the terms of the monitoring of soil and groundwater (can be used as a basis

the basic message, if the operator is required to submit, in

the processing time of applications available, and contains the relevant information).

For facilities in which waste is handled to provide for both input and

output monitoring. Further specify monitoring with regard to the operational

safety devices, etc. Conditions must also contain procedures to verify

compliance with the limits. Specify the sampling method, the conditions

sampling and measurement method, the method of recording, processing and storage

(you can also give a link to the specific methodology-CSN, etc.). Should

be determined and the conditions of monitoring emissions, which do not have a set

specific emission limits.



Point 11. -Indicate the conditions for the operation of the device, which can significantly

adversely affect the environment of another State, then the conditions

for high-emitting source, which can be expected to move in the

large distances (e.g., beyond the territory of one of the County). Can be here

apply additional conditions to achieve the purpose of the Act, i.e. to ensure a high

the level of protection of the environment as a whole.



Item 12. -Indicate the procedure to review the conditions of the integrated permit.

In particular, the annual transmission of reports on the results of monitoring

and the fulfilment of the binding conditions, determining the structure of the integrated permit

and forms of transmission of this message, the Office, the immediate information of the Office in the

emission limit with your own design of corrective measures, etc.



Section 13. -Lay down the conditions and procedures for the regular maintenance

the appliance and its individual parts (preventive measures, the frequency of

implementation, etc.) to prevent the emission of dangerous substances into the soil, and

groundwater.



17. other documents

I----------------I----------------------------I----------------I-------------I

I 1. I replaced 2. The name of the substrate and 3. The date I 4. Link to and

(I) an administrative act I I which I annex I

I I I I I apply information

I I I I I

I I I I I

I----------------I----------------------------I----------------I-------------I

I I I I I

I----------------I----------------------------I----------------I-------------I



Provide a list of and to annex to attach additional documents required for the issue of

the integrated permit superseded administrative acts under other

the legislation, if not already included in the previous chapters

request. The operator is required to accompany the application as part of any

the supporting documents required by the specific legislation for the issue

administrative acts under this legislation, which are replaced by the

the integrated permit.



Annex nature of maps, plans, schemes, and attach to the representation

the graphics of the annex to the application within the chapter 13.1 request.



Overview of all administrative acts under other legislation

replaced the integrated permit, including supporting documents necessary for their

Edition, is published on the portal of the public administration and in the

Ministry of the environment.



18. the list of documents for the evaluation of the best available techniques

I----------------------------------------------------------------------------I

I 1. Název I

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



Complete list of supporting documents that were used to evaluate the best

available techniques (including release dates and publishers).



19. the list of abbreviations

I--------------I-------------------------------------------------------------I

I 1. The abbreviation I 2. The Importance And

I--------------I-------------------------------------------------------------I

I I I

I--------------I-------------------------------------------------------------I



Include all the abbreviations used in the request and their importance.



20. conclusion

I----------------------------------------------------------------------------I

I 1. The final summary of the application and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



The final brief summary should contain a description of the subject of the request and

the main facts that relate to the subject of the request.



21. Annex



21.1. A graphical annex

I------------------I--------------------------I------------------------------I

I 1. Annex I, no. 2. The name and 3. Chapter I applications

I------------------I--------------------------I------------------------------I

I I I I

I------------------I--------------------------I------------------------------I



Graphic annexes are the block diagrams, site plans, maps, and

additional video outputs.



In this chapter, create a graphic overview of the annexes to the application and in the context of

These annexes present the:



Block diagrams



-Schemas that are needed to describe the function of the device, i.e.. in particular, the

block diagrams of the various technological processes (structured in

conformity with the relevant chapters of the request). The handling of raw materials,

energy, water, waste water disposal, emissions into the

air, waste management system, internal transport and is

appropriate to describe as separate systems. For a schematic representation can be

also use Senkeyův diagram, for example. for the presentation of input and

output material flow in the device.



-In the schema facilities for breeding and fattening of the animals indicate the distance (in the

metres) between the ustájovacími objects occupied by species with the same

epidemiological susceptibility (i.e. the types of animals that can

the taint of infectious diseases). Mark the location of each object

for breeding animals, including ventilation, odklizu feces and urine, hygienic

the loop, the loop control, veterinary disinfectant entrances and other

location of rendering plant entrances, boxing, warehouses, stores livestock manure

feed stores, veterinary medicines and other auxiliary parts

device.



Plans, maps, and other graphic attachments



-A valid copy of the cadastral maps according to the instructions in Chapter 3 of the application.



-Maps or plans of a suitable scale, on which will be indicated by the definition of

the device, its boundaries and its individual components, the solution

in-house transport including entrances and exits, parking areas, etc.; in

to use the devices, the removal, collection or purchase of waste,

the access route to the device in relation to individual modes of transport

waste into the device, and the other information referred to in Chapter 6 of the application.



-A map or plan a suitable scale, on which will be marked by industrial

and each had a set of technical units and activities

accordance with the data in Chapter 6 of the application.



-Maps or plans of an appropriate scale on which are marked the source

water (sampling points), warehouses and intermediate storage and source of the confiscated material

of animal origin and other data referred to in Chapter 7 of the request.



-Maps or plans of a suitable scale, on which will be in accordance with the

Chapter 9 of the application indicated, in particular, all emission sources and other

the effects of the device, the end of technology, through the discharge ducts, receiving waters and effluents

For more information. Map showing the sources of emissions to air will be equipped with a

wind rose.



-Maps or plans of an appropriate scale on which are marked the source

waste, waste places and other details required in Chapter 11

request.



-Maps or plans of an appropriate scale on which are marked the place

sampling (location of measuring points) according to the information in Chapter 12

request.



-Maps or plans of an appropriate scale on which are marked objects

where dangerous substances are located, according to the information in chapter 13 of the application.



-Maps or plans of a suitable scale, on which will be in accordance with the

Chapter 14 of the application indicated the territory of operation of the device in question (may

vary with regard to the various components of the environment being affected) and

additional information required in the cited chapter application.



-Other graphic attachments.



The above information can be organized given together on the

a smaller number of maps, for example. According to the thematic groups. Such

the implementation must not lead to a restriction of the scope, chaotic or


the graphic unreadable data and phenomena. Required components

graphic annexes are the scale and orientation of the map legend.



Point 2. -Where relevant, especially in block diagrams, indicate the

the verbal description of the graphics of the annex.



Links to the accompanying graphic attachments can be used as needed throughout the

the text of the request.



13.2. other attachments

I------------------I--------------------------I------------------------------I

I 1. Annex I, no. 2. The name and 3. Chapter I applications

I------------------I--------------------------I------------------------------I

I I I I

I------------------I--------------------------I------------------------------I



The other annexes of the application attach documents that are

specified in the model request, or in the guidelines to individual

chapters of the application, and to the extent the corresponding character devices

or the changes you want.



Economic evaluation of the achievement of the emission levels associated with the best

available techniques (annex of the application No. 60) by the operator

devices based on the latest relevant aggregate or

sectoral data, estimates or actual project data.

In the event that the operator does not have certain data, or

in the case where the data are burdened by uncertainty, for example, with regard to the

their dynamic development (e.g., proceeds from the sale of allowances, income from

sales of electricity), the operator of such data, estimates

that and the marks.



Points 1-3.



An overview of the anticipated (potential) the annexes to the application in addition to the graphical

attachments (graphics of the annex are subject to chapter 13.1):

I----------I------------I----------------------------------------------------I

Even the serial link and the title of annex I of

The number of chapter I I

I I I I request

I----------I------------I----------------------------------------------------I

I 1 I cover and the power of attorney or other document about permissions contact and

Even leaf, 2 persons/authorised representative and operator

I----------I------------I----------------------------------------------------I

And 2 and 3 and dump the land where it is (or will be) located

I I I the device and

I----------I------------I----------------------------------------------------I

And 3 and 4 and the final decisions in accordance with the legislation in the field and

I I I planning and building law. (I)

I I I the confirmation of submission of the application for the issue of the construction and

I I I the authorisation and

I----------I------------I----------------------------------------------------I

And 4 and 4 and Conclusion of the fact-finding procedures or even the opinion referred to in

I I I the Act on environmental impact assessment and

I----------I------------I----------------------------------------------------I

(I) 5 and 4 and Issued administrative acts under other legal or regulatory

I I I the provisions which will be the integrated permit and

I I I replaced and cancelled and

I----------I------------I----------------------------------------------------I

6 and 4 and project documentation and

I----------I------------I----------------------------------------------------I

And 7 and 6.1 as well as a detailed technical and technological description I

I I I technical units with activities in annex No. 1

I I I Act I

I----------I------------I----------------------------------------------------I

8 and 6.2 as well as a detailed technical and technological description I

I I I technical units to the activities of non-Annex # 1

I I I Act I

I----------I------------I----------------------------------------------------I

I 9 I Plan and the fertilisation and 6.4.

I----------I------------I----------------------------------------------------I

10 and 7.1 and safety data sheets (raw material)

I----------I------------I----------------------------------------------------I

And 11 and 7.1 identification sheets WELL (here as a raw material)

I----------I------------I----------------------------------------------------I

I 12 I Annual mass balance and 7.1 of the processes where I

I I I organic solvents and

I----------I------------I----------------------------------------------------I

13 and other 7.1 information required under the legislation on the

I I I the section of air protection in the case of a refund of the administrative and

I I I the Act in relation to changes in raw materials or waste and

I----------I------------I----------------------------------------------------I

I 14 and 7.1, and other data required by the legislation in the field and

I I I the management of waters in the case of a refund of the administrative and

I I I the acts associated with the collection of water and

I----------I------------I----------------------------------------------------I

15 and 7.2; 7.3 I material safety data sheets (here, intermediates, products)

I----------I------------I----------------------------------------------------I

And 16 and 7.2; 7.3 the annual mass balance as well as of the processes where I

I I I organic solvents and

I----------I------------I----------------------------------------------------I

I 17 and 7.3 other information required under the legislation on the

I I I the section of air protection in the case of a refund of the administrative and

I I I the acts in relation to the manufacture of equipment, materials and even

I I I the products that pollute or pollute even

I I I the air, or to the production of new technologies, products and

I I I and the equipment used to protect the climate and

I----------I------------I----------------------------------------------------I

And even 18 7.4 and copies of contracts for the transmission and excrements and VPŽP

I----------I------------I----------------------------------------------------I

And 19 and 7.4 other information required by the legislation and

I I I the section of veterinary services in the case of a refund of the administrative and

I I I the acts-a binding opinion for the construction and equipment to even

I I I the treatment of animal by-products and

I I I (if it is on by-products and

I I I origin) or to store, collect, collection, destruction and

I I I the removal and processing of the miscellaneous I

I I I products of animal origin. (I)

I----------I------------I----------------------------------------------------I

20 and 8.1 and energy audit and

I----------I------------I----------------------------------------------------I

And 21 other 8.2 and the information required under the legislation on the

I I I the section of air protection in the case of a refund of the administrative and

I I I the acts in relation to changes in used fuel or to even

I I I the increase in content of sulphur in liquid fuels and

I----------I------------I----------------------------------------------------I

And even the 22 9.1 as well as current protocols of measurement, calculations of emissions, and

I I I the balance. description of how the emission estimation, annual and

I I I the process of with the mass balance and

I I I organic solvents and

I----------I------------I----------------------------------------------------I

Even 23 9.1 operating systems and Proposals and other documents referred to in (I)

I I I the legislation to protect the climate and

I----------I------------I----------------------------------------------------I

24 and 9.1 as well as other information required by the legislation and

I I I the section of air protection in the case of a refund of the administrative and

I I I the acts referred to in that rule out previously and

I I I referred to and

I----------I------------I----------------------------------------------------I

And 25 copies of the contracts and 9.2 with external suppliers of services (waste and

I I I vody) I

I----------I------------I----------------------------------------------------I

And 26 and 9.2 as well as current protocols of measurement, calculations of emissions, and

I I I the balance. a description of how the estimate of emissions and

I----------I------------I----------------------------------------------------I

And 27 5.7 and Handling or the rules of operation of the water works and

I----------I------------I----------------------------------------------------I

And the other 28 9.2 information required under the legislation on the

I I I the section dealing with waters in the case of a refund and

I I I the administrative acts relating to discharges and

I I I the waste water and

I----------I------------I----------------------------------------------------I

29 and 5.7, and other information required by the legislation and

I I I the section of water supply and drainage for public use in the I

I I I the case of compensation of administrative acts in accordance with this law and in

I I I I adjustment

I----------I------------I----------------------------------------------------I

30 and 5.9 and risk assessment of the individual operating and


I I I the activities or its relevant part I

I----------I------------I----------------------------------------------------I

And 31 and 10.1 and Noise studies I

I----------I------------I----------------------------------------------------I

And also other 32 10.1 information required under the legislation on the

I I I the field of protection of public health in the case of a refund and

I I I the administrative acts under this legislation (noise)

I----------I------------I----------------------------------------------------I

And 33 and 10.1 as well as current protocols of measurements and calculations and

I----------I------------I----------------------------------------------------I

And 34 and 10.2 and Study to the spread, even

I----------I------------I----------------------------------------------------I

Even 35 even 10.2 as well as other information required by the legislation and

I I I the field of protection of public health in the case of a refund and

I I I the administrative acts under this legislation (vibration) and

I----------I------------I----------------------------------------------------I

And 36 and 10.2 as well as current protocols of measurements and calculations and

I----------I------------I----------------------------------------------------I

And 37 and 10.3 and neionizujícímu and to Study radiation

I----------I------------I----------------------------------------------------I

And 38 and 6.4 and the current protocols of measurements and calculations and

I----------I------------I----------------------------------------------------I

And 39 and 10.6 I study other effects of the device and the

I----------I------------I----------------------------------------------------I

40 and 11 as well as a copy of the operator's device for loading and

I I I the waste and

I----------I------------I----------------------------------------------------I

And 41 and 11 copies of the external vendor permission to waste and

I I I waste as well as

I----------I------------I----------------------------------------------------I

And 42 and 11 copies of contracts with external suppliers of services (waste)

I----------I------------I----------------------------------------------------I

And 43 and 11 as well as valid certificates on the exclusion of hazardous and

I I I the properties of waste and

I----------I------------I----------------------------------------------------I

And 44 and 11 vocational training plan for workers and

I----------I------------I----------------------------------------------------I

And 45 and 11 draft operating procedure and device for the introduction and

I I I the production journal

I----------I------------I----------------------------------------------------I

And 46 and 11 as well as evidence of professional competence, waste management and

I I I the householder and

I----------I------------I----------------------------------------------------I

And 47 11 as well as other information required by the legislation and

I I I the section of waste in the case of a refund of administrative acts and

I I I in accordance with this law and the

I----------I------------I----------------------------------------------------I

And 48 and 13.1 (I) decision on the classification of the object or the equipment into and

I I I the group or to the Group and (B) of the Protocol and, where applicable,

I I and non-I

I----------I------------I----------------------------------------------------I

And 49 and 13.1 (I) decision on the approval of the safety report, or even

I I I the security program as well as

I----------I------------I----------------------------------------------------I

50 and 13.1 (I) emergency plan and Proposal

I----------I------------I----------------------------------------------------I

And 51 and 13.2, (15) and the proposed plan for the closure and aftercare of the I

I I I the dump I

I----------I------------I----------------------------------------------------I

And 52 and 13.2 and contingency plan for the case of a dangerous and

I I I the disease of animals, processed according to the law on the

I I I field of veterinary care

I----------I------------I----------------------------------------------------I

And 53 and 13.3 and copy of the certificate or registration of EMS (EMAS, ISO and

I I I 14000, etc.) (I)

I----------I------------I----------------------------------------------------I

And 54 and 14 as well as Hydrogeological and engineering-geological description and

I I I the geotechnical conditions of the site and

I----------I------------I----------------------------------------------------I

And 55 and 14 as well as expert opinion or assessment, risk analysis and

I I I the impact on the environment by the old environmental and

I I I the burden and

I----------I------------I----------------------------------------------------I

And 56 and 14 and the basic message I

I----------I------------I----------------------------------------------------I

And 57 and 15 as well as the documents for the closure and

I----------I------------I----------------------------------------------------I

And 58 and 15 basic message (according to point 56)

I----------I------------I----------------------------------------------------I

And 59 and 16 as well as expertise to grant exemptions from the emission levels and the

I I I associated with best available techniques and

I----------I------------I----------------------------------------------------I

Even 60 and 16 and economic evaluation of the achievement of the emission levels and the

I I I associated with best available techniques and

I----------I------------I----------------------------------------------------I

And 61 and 17 other documents and

I----------I------------I----------------------------------------------------I



Annex 2



THE BASIC MESSAGE



Title page of the base message

I--------------------------------I-------------------------------------------I

I 1. The name of the document and

I--------------------------------I-------------------------------------------I

2. The name of the device and I

I--------------------------------I-------------------------------------------I

3. Address of the device (I)

I--------------------------------I-------------------------------------------I

4. The competent authority and

I--------------------------------I-------------------------------------------I



I----------------------------------------------------------------------------I

(I) 5. Processor core messages and

I--------------------------------I-------------------------------------------I

And 5a. Business name or I I

Even the name/title, name, or. I I

And the names, first and last name and also

I--------------------------------I-------------------------------------------I

And 5b. Address of the registered office or place of I I

And business and even

I--------------------------------I-------------------------------------------I

And 5 c. COMPANY REGISTRATION NUMBER (if assigned) I I

I--------------------------------I-------------------------------------------I

And 5 d. Telephone (or fax) I I

I--------------------------------I-------------------------------------------I

And 5e. E-mail I I

I--------------------------------I-------------------------------------------I

And 5f. The competence according to the I I

And the law on geological works and I

I (and the identification of the area) I I

I--------------------------------I-------------------------------------------I

And 5 g. Date of processing of the base I I

I zprávy I I

I--------------------------------I-------------------------------------------I

And 5 h. Stamp and signature I I

I--------------------------------I-------------------------------------------I



Explanatory notes



Home (cover) page contains basic data: name of the document, the name of the

the device address of the device (the place where the device is, or will be

be located), the designation of the competent authority, which locally is the basic

shall identify the processor core messages (professionally

eligible persons under the law on geological works).



Section 5-to identify the processor's underlying message is to be noted

business name, business name or name. name and last name, address, identification number

(if allocated), phone, email address, identification of professional competence

processor core messages (No., expiry date, area vocational

eligibility), the date of processing of the basic reports, stamp (called a round)

and the signature.



1. the content of the basic reports



2. identification of the operator and the owner of the device



2.1. The operator of a

I------------------------------I---------------------------------------------I

(I) the trade name or name/I I

Even the title, name, or. the names, and I I

And the surname I I

I------------------------------I---------------------------------------------I


And the registered address or the place I I

(I) permanent residence business/I I

I------------------------------I---------------------------------------------I

(I) the address for service and I

And documents (if different from (I)

Even addresses, location or place of I I

Even business/residence) I I

I------------------------------I---------------------------------------------I

And identification number, if assigned to I I

I------------------------------I---------------------------------------------I

And the VAT REGISTRATION NUMBER, if it has been assigned a I I

I------------------------------I---------------------------------------------I



I------------------------------I---------------------------------------------I

(I) trade name or I I

Even the name/title, name, or. I I

And the names, first and last name and also

I------------------------------I---------------------------------------------I

And the registered address or the place I I

And business and even

I------------------------------I---------------------------------------------I

(I) the address for service and I

And documents (if different from (I)

Even addresses, location or place of I I

And business) I I

I------------------------------I---------------------------------------------I

And IDENTIFICATION NUMBER (if assigned) I I

I------------------------------I---------------------------------------------I

And VAT NUMBER (if assigned) I I

I------------------------------I---------------------------------------------I



3. identification of the device

I----------------------------------------------------------------------------I

Even the name of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

And the address of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

And Identification device (PID) in the information system of integrated prevention MINISTRY of the ENVIRONMENT and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

Even the category of activity/activities referred to in annex No. 1 of the Act and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

And the integrated permit and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



Explanatory notes



. Device identification (PID) in the information system of the integrated

Prevention of the Ministry of the environment-indicate that

Displays each document on the device in the

"device identifier" Umístného format code from the capitalization and

numbers.



. The integrated permission-indicate the reference number and the date of acquisition of legal power

the integrated permit and the decision to change it. If the underlying

message submitted with applications for the issue of the integrated permit,

so, this fact shall be indicated.



4. spatial definition of the basic reports

I----------------------------------------------------------------------------I

I 1. Location (region, municipality, district, number of parcels, respectively. (I)

(I) the designation of the building) and

I---------------------I------------------------------------------------------I

I Kraj I I

I---------------------I------------------------------------------------------I

I Obec I I

I---------------------I------------------------------------------------------I

Even the cadastral area and I

I---------------------I------------------------------------------------------I

Even the numbers of the parcels I I

I---------------------I------------------------------------------------------I

I I I

I---------------------I------------------------------------------------------I

2. Geographical coordinates of the borders device (S-JTSK)

I--------------------------------------I------------------I------------------I

And point number I X: Y: I

I--------------------------------------I------------------I------------------I

I I I I

I--------------------------------------I------------------I------------------I

I I I I

I--------------------------------------I------------------I------------------I

I I I I

I--------------------------------------I------------------I------------------I

3. Relevance of the data and

I---------------------------------------------------------------I------------I

The definition of a basic message corresponds exactly to the area made up of and yes/no * I

(I) land and buildings, referred to in point 1 of the table, geographical and even

Even the coordinates in the point 2 of the table correspond to the border of this outdoor I I

Even the desktop. The basic message defined by points 1 and 2 of the table. I I

I---------------------------------------------------------------I------------I

The definition of a basic message corresponds to point 1 of the table, however, and yes/no * I

And it only takes part of the abovementioned land and buildings. I I

The basic message defined by points (2) of the table. I I

I---------------------------------------------------------------I------------I



* Delete where inapplicable



Explanatory notes



The spatial definition of the basic message specifies a territory subject to the

obligations of the operator after the closure. The definition must

correspond to the information indicated in the integrated permit.



Point 1. -It is reported and the number of land and buildings on which the device interferes with

only in part. The number of rows is adjusted according to the actual needs. When

a larger number of plots you can list them in an annex attached to the request.

In the graphics of the annex accompanied by a valid copy of the cadastral maps with

an indication of the parcels on which the device is installed or will be installed.



Point 2. -Geographical coordinates of border devices (coordinate system

S-JTSK) apply to each of the points that define the space

device. It is stated in the order. The number of rows is adjusted according to the

the real needs. When a larger number of points can be attached to a list of them

the annex to the application.



Point 3. -Determination of the relevance of the data referred to in point 1 and 2 of the table. If

the device occupies only part of the land/building, for example. If it is a few

technological units with different operators in a large hall or on the

one of the land corresponds to the spatial definition of the basic messages only point

2 table. In this case it is recommended to attach to a graphical annex

a valid copy of the cadastral map showing the definition of the device,

corresponding to the geographical coordinates of the point 2.



5. the definition of hazardous substances, mixtures and hazardous waste

can cause contamination of soil and groundwater



5.1. the raw materials, intermediates, products and hazardous waste

I-----------------I-----------------I---------------------I------------------I

I 1. Identification and 2. Total and 3. Description, chemical and 4. Use and I

(I) the quantity and composition of, and a description of the management and

Even I (t/year) as well as properties in the binding and the binding and

I I---------and-I-----and on soil pollution and pollution of soil and

I I year I year I year I and groundwater and surface water and groundwater as well as

I-----------------I-----I-----I-----I---------------------I------------------I

I I I I I I I

I-----------------I-----I-----I-----I---------------------I------------------I



Explanatory notes



In General, the



Each row of the table shows only the dangerous substances or

mixtures and dangerous wastes which may due to its characteristics and

the amount that is treated, cause pollution of soil and groundwater

waters.



Hazardous substances and mixtures must at least satisfy all three

the following criteria:



-substances or mixtures dangerous to the environment according to

legislation in the field of chemical management,



-are on the list of dangerous and especially dangerous of harmful substances

According to the legislation in the field of water protection



-meet the requirement for treatment on a larger scale, or an increased risk of

for surface water or groundwater under the law on the protection of

waters,



These are mainly hazardous substance or mixture contained in the raw materials,

auxiliary materials and other substances, including fuels, intermediates

or similar groups intermediates and products or groups

of the like product.



Hazardous waste must at least show the dangerous properties of


related to the cause of pollution of soil and groundwater, as

is the ability to release hazardous substances into the environment when

dealing with them.



These are mainly hazardous waste which are in the technological

the procedure used as a raw material and dangerous waste from the production activities,

which they are collected and temporarily stored on the premises of the operator

before passing them to an authorized person.



Point 1. -Enter the identification of the hazardous substance or mixture for example. According to the

the safety data sheet.



For hazardous waste then waste categories according to the legislation in the field of

waste management, the nature and the catalogue number of the waste.



As intermediates isolated intermediates is given only by legal

editing in the field of chemical management.



Point 2. -Enter the total amount of individual substances or mixtures

the last 3 calendar years. In the case of the planned device shall indicate

estimation of consumption. The text of the "year" is replaced by the appropriate year.



Point 3.



Description-enter any alternative name; If different from

identification in point 1. If the hazardous substance or mixture contained

in the raw materials, intermediates, and products, so the name of the relevant

raw materials, intermediate or product.



Chemical composition-basic chemical characteristics of hazardous substances

or mixture. In the case that this information is in the security

the sheet can be attached in the annex, and only refer to it. U

hazardous waste can be by analogy to refer to the identification sheets

hazardous waste. Properties in relation to the pollution of the soil and

groundwater-information about the properties, is based on data as defined

in the field of chemical management. In the case that this

the information located in the safety data sheet, it can be attached in the annex, and

only refer to it. For hazardous waste, can be analogous to refer

hazardous waste identification sheets.



Section 4.



The use of the use of the hazardous substance or mixture. It is from the

data as defined in the management of chemicals. In the case that

This information is located in the safety data sheet, it can be in the annex

apply and only to it refer to.



Description of the waste-describe the measures that are being implemented for the protection of

of the environment, such as preventing intrusion into groundwater and

the soil, according to the legislation in the field of chemical management,

water conservation and integrated prevention. Identifies the location in the

the facility where the waste occurs and it is recommended to add this information

coordinates (coordinate system S-JTSK). At the device before the construction

or under construction, or in the case of relevant changes in the operation of the equipment

indicate the expected data.



5.2. Emissions to soil

I------------------I-----------------I----------------------I----------------I

I 1. Fabric/group I 2. Total and 3. Description, chemical and 4. The Name And

And the substances and quantities and composition and properties and (mark) and

Even I (t/year) and in detention and the place of emission of the I

I I---------and-I-----and the pollution of soil and soil and

I I year I year I year I I I

I------------------I-----I-----I-----I----------------------I----------------I

I I I I I I I

I------------------I-----I-----I-----I----------------------I----------------I



Explanatory notes



This is not about the incorporation of fertilizers (including manure), Assistant

substances, modified sludge and sediments into the soil for the purpose of their use in

Agriculture, does not mention the emergency as a result of emissions or emissions

breach of legal obligations.



It is reported the removal of wastes containing pollutants according to the

legislation in the field of waste management, in the case of incorporation of

of waste that arise on the device, into the soil at the site of the device.

The operator must have an appropriate method of disposal of waste

allowed in the integrated permit.



Point 1. -Place the substance or group of substances that may be released into

land of zapravovaného waste and can cause pollution of the soil.



Point 2. -Indicate the total quantity of waste zapravených for the last 3

calendar years.



Point 3. -Describe the character of emissions into soil (the main properties of the substances and

zapravovaného waste, including waste categories according to the legislation on

Department of waste management, creation, effect on the environment).



Section 4. -Place of incorporation, it is recommended to add this

data point coordinates (coordinate system S-JTSK) or number of the

a plot of land.



6. The underlying message in accordance with legislation in the field of geology



Explanatory notes



-The underlying message is handled appropriately in accordance with legislation on

Department of geology, relevant for this type of document.



-The underlying message must be handled appropriately within the scope as defined in the

Chapter 4 and 5 as to hazardous substances and mixtures, and the investigation of the space

that was sufficient for the determination of the indicators in Chapter 7.



-Alternatively, the underlying message for a wider area and more

quantities of substances than specified in Chapter 4 and 5, however, must always be

clear information is weighing in on the information required in chapters 4, 5 and

7. in addition to the underlying message could not be any other part of the base messages

in this way.



-Part of the underlying message is the information on the actual use and

or about past uses of space, as defined in Chapter 4.



-When handling the underlying message as far as possible make use of the

the existing documents, relating to the place of operation, including information from the

the risk assessment in accordance with the legislation in the field of ecological harm.

The usability of documents must always be evaluated in relation to

a particular device and a specific-rated site. The relevance of the

handouts, which means the timeliness and usefulness of the date processing

the underlying message, technically competent person pursuant to § 3 of the law on

geological works, as amended. List of existing

the supporting documents shall be entered in the underlying message, at a larger scale in the annex.



-Processor core messages based on existing materials and

any additional survey to determine whether pollution as defined in

Chapter 4, located in the locality of the relevance of the hazardous

substances and mixtures of hazardous wastes as defined in Chapter 5. Then

based on the same definition of progresses in relation to possible future

contamination-IE. identify and quantify the indicators that can be

hazardous substances, and mixtures of hazardous wastes as defined in

Chapter 5 in the future. The purpose is to lay down the relevant

indicators to quantify and describe the related uncertainties.



7. Determine the State of contamination of soil and groundwater



7.1. Binding parameters of relevant indicators

I-------------------------------------I--------------------------------------I

I 1. Indicator 2. The current status and

I-------------------------------------I--------------------------------------I

I I I

I-------------------------------------I--------------------------------------I



Explanatory notes



Point 1. -In the definition of indicators is based on the laws and

methodological guidelines on the protection of the soil and rock environment and

the protection of water. Lists only those indicators that may be affected by

the operation of the device.



Point 2. -The existing situation; quantified on the basis of previous surveys

and in case of necessity of the survey, carried out in the framework of processing

the underlying messages. Lists the numeric parameter and additional information

(units, etc.).



7.2. Description of the procedure parameter validation

I-----------I----------------------------------------------------------------I

(I) a description of the procedure, the Indicator parameter validation and

I-----------I----------------------------------------------------------------I

I I I

I-----------I----------------------------------------------------------------I



Explanatory notes



. Indicators shall conform to table 7.1.



. Description of the procedure parameter validation must ensure the comparability of values

listed in the table of binding relevant indicators.



8. List of abbreviations

I----------------------------------I-----------------------------------------I

Even The Abbreviation And Meaning

I----------------------------------I-----------------------------------------I

I I I

I----------------------------------I-----------------------------------------I



9. conclusion

I----------------------------------I-----------------------------------------I

I 1. Datum I I

I----------------------------------I-----------------------------------------I

2. Business name or the name of the (I) I

And or name. the names, and I I

And the surname of the operator and equipment

I----------------------------------I-----------------------------------------I

3. Business name or the name of the (I) I

And or name. the names, and I I

And the last name of the authorized representative (I)

Even operators of I I

I----------------------------------I-----------------------------------------I


4. The signature of the operator I I

I or the authorized representative of I I

Even operators of I I

I----------------------------------I-----------------------------------------I



Explanatory notes



Point 1. -The date is the date of filling in the data, i.e. the information provided is correct

and valid as of this date.



Point 2. -Fill Legibly trade name or name or name.

name, and last name of the operator of the device. If the operator is

the device is a legal person and does not have an authorised representative, to indicate whether or not

title, name, or. name and surname of the natural person authorized to sign

the basic message in the operator's facility.



Point 3. An authorized representative of operator means the person

who is entitled to submit a basic report on the basis of power of Attorney

granted by the operator of the device. If it is an agent of the operator

a legal entity, indicate the device whether or not title, name, or. the names and

surname of the natural person authorized to sign the base report for the agent.



Section 4. -Attach the signature operator's device, or a representative of the

the operator of the device authorized to submit a basic message on

the basis of power of attorney. If the operator or authorized

the representative of the operator is a legal person, this is the signature of the

natural persons authorized to sign the basic message in the operator

device respectively authorized representative of operator.



10. annexes



10.1. A graphical annex

I----------------I-----------------I--------------I--------------------------I

And the serial number as well as the name and description of the chapter the basic message I

I----------------I-----------------I--------------I--------------------------I

I I I I I

I----------------I-----------------I--------------I--------------------------I



10.2. other attachments



I----------------I-----------------I--------------I--------------------------I

And the serial number as well as the name and description of the chapter the basic message I

I----------------I-----------------I--------------I--------------------------I

I I I I I

I----------------I-----------------I--------------I--------------------------I



Explanatory notes



-Include the annex according to the requirements of the underlying report in accordance with

legislation in the field of geology in accordance with Chapter 6.



Annex 3



PROFESSIONAL ASSESSMENT FOR EXEMPTION FROM EMISSION LEVELS ASSOCIATED WITH THE

BEST AVAILABLE TECHNIQUES



Title page of vocational assessment

I--------------------------------I-------------------------------------------I

Even the name of the document and

I--------------------------------I-------------------------------------------I

Even the name of the device and I

I--------------------------------I-------------------------------------------I

And the address of the device (I)

I--------------------------------I-------------------------------------------I

I I I the competent authority

I--------------------------------I-------------------------------------------I



I----------------------------------------------------------------------------I

Even the processor expert (if different from your device) and

I--------------------------------I-------------------------------------------I

(I) trade name or I I

Even the name/title, name, or. I I

And the names, first and last name and also

I--------------------------------I-------------------------------------------I

And the registered address or the place I I

And business and even

I--------------------------------I-------------------------------------------I

I phone (or fax) I I

I--------------------------------I-------------------------------------------I

I E-mail I I

I--------------------------------I-------------------------------------------I



I--------------------------------I-------------------------------------------I

I Datum I I

I--------------------------------I-------------------------------------------I



1. content of the vocational assessment



2. identification of the operator

I--------------------------------I-------------------------------------------I

(I) the trade name or name/I I

Even the title, name, or. the names, and I I

And the surname I I

I--------------------------------I-------------------------------------------I

And the registered address or the place I I

(I) permanent residence business/I I

I--------------------------------I-------------------------------------------I

(I) the address for service and I

And documents (if different from (I)

Even addresses, location or place of I I

Even business/residence) I I

I--------------------------------I-------------------------------------------I

And contact person (name and I I

And last name) and I

I--------------------------------I-------------------------------------------I

I phone (or fax) I I

I--------------------------------I-------------------------------------------I

I E-mail I I

I--------------------------------I-------------------------------------------I

And identification number, if assigned to I I

I--------------------------------I-------------------------------------------I

And the VAT REGISTRATION NUMBER, if it has been assigned a I I

I--------------------------------I-------------------------------------------I



Explanatory notes



-As contact person provide the operator of the device, it is a natural

a person or business is a natural person or a natural person authorized

in the context of the procedure for granting exemptions from the emission levels associated with the best

available techniques do acts on behalf of the operator, that

is a legal person, a natural person or a natural person-entrepreneur

representing the operator in control device based on power of Attorney,

or natural person, who is entitled, in the procedure do acts

on behalf of an agent of the operator of the device, which is a legal person.



3. identification of the device

I----------------------------------------------------------------------------I

Even the name of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

And the address of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

And Identification device (PID) in the information system of integrated prevention MINISTRY of the ENVIRONMENT and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

Even the category of activity/activities referred to in annex No. 1 of the Act and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

And the integrated permit and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



Explanatory notes



-Identification of the device (PID) in the information system of the integrated

Prevention of the Ministry of the environment-indicate that

Displays each document on the device in the

"device identifier" Umístného format code from the capitalization and

numbers.



-Integrated permission-indicate the reference number of the original integrated

to enable, with legal force and the appropriate changes to the integrated permit.



4. Emission limits



4.1. Emission levels associated with best available techniques and design

the emission limit

I----------------------------------------------------------------------------I

And the designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

As well as the conclusions on best available techniques and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

Even compared with the emission levels associated with best available techniques and

I-------------I------------I------------I------------I------------I----------I

And Substance/I Level I Proposed And The Issue And Reference And Note I

And the Group I and the emission and emission limit according to the terms and conditions and (I)

(I) substances/I associated with and even limit the request I I I

And even the best Indicator I I I I I special

I I I I legal available I I I

Even the techniques as well as and I I I


I-------------I------------I------------I------------I------------I----------I

I I I I I I I

I-------------I------------I------------I------------I------------I----------I



Explanatory notes



. In the case of exemptions from the emission levels associated with best available

techniques for multiple substances (substances, indicators) must be section

repeatedly copied.



. Designation of parts of the facility-indicate the precise identification of the parts of the equipment

(the exhaust/discharges, etc.), to which the data relate.

Used the designation must correspond to the indications in the integrated permit.



. Conclusions on best available techniques-labelling

the relevant implementing decision of the European Commission (e.g. 2012/134/EC),

laying down the relevant conclusions on best available techniques,

designation of parts and the party/parties, where is the value listed.



. Compared with the emission levels associated with best available

the techniques of



-The substance/substance Group/pointer-to indicate what the substance/group

substances/indicators are the following values apply.



-Emission levels associated with best available techniques-

the value of the emission levels associated with best available techniques

(including units).



-The proposed emission limit-state the proposed value of the emission limit.

The value must be placed under the same reference conditions as level

emissions associated with best available techniques, so that could be

made comparison by the relevant authorising authority. The value of the

must not exceed the minimum requirements for the emission limits in accordance with special

legislation (e.g. in the protection of the atmosphere).



-Emission limit as required by the specific legislation-it is

the value of the emission limit for that substance (Group of substances/pointer)

laid down in a separate legal Act (for example, for the area of the air,

water, etc.).



-Terms of reference-the specification of reference conditions that

bind to a given level of emissions associated with best available

techniques.



-Note-to indicate text that will accompany the emission level associated with the best

available techniques, if it is relevant to the issue of exceptions.

Indicate what environmental values. It is appropriate to

Enter important accompanying information (such as whether the application is made for a limited

an exception, when after that date assumes the transition to the emission limit

According to emission levels associated with best available techniques).



4.2. Description of the technical solution

I----------------------------------------------------------------------------I

And the Scenario of the BAT: the description of the technical solutions needed to achieve emission levels and

Also associated with best available techniques and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

As well as justification for the failure to achieve the values of the emission levels associated with the best available and

And techniques and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

Even the design scenario: description of the technical solution to achieve by the applicant and

Even the proposed emission limit and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I



Explanatory notes



Description of the technical solution needed to achieve emission levels associated with the

best available techniques (hereinafter referred to as "scenario of the BAT").



-A description of the technical solution, possibly a variant of this solution, it must be

sufficiently detailed so that it can be derived on the basis of the investment

and operating costs.



-If relevant conclusions on best available techniques

shows the range of emission levels, described the technique must comply with the

less stringent value.



-Of the possible technical solutions, the operator is required to describe the solution

that would, if approved, would not be the exception.



Justification for the failure to achieve the values of the emission levels associated with the best

available techniques



-The reasons arising from the geographical location of the device (the disposition of the equipment,

land resource availability).



-The reasons arising from the environmental relevance of the device in relation to the

local environmental conditions, eg. value limits or other

environmental quality standards.



-The reasons arising from the technical characteristics of the equipment (e.g. range

the necessary adaptations of the device)



Description of the technical solution to the achievement of the proposed emission limit (hereinafter

"the design scenario")



-In the event that the operator will not make any adjustments to the

the existing technology, it shall state this fact here.



-If the operator of a proposed implementation of a more stringent emission

than the existing limit, however, issuing a more lenient than the limit according to

conclusions on best available techniques, describe the applicant technical

the solution to achieve this emission limit. The description must be sufficiently

detailed to be derived on the basis of capital and operational

costs.



-In the case that the operator undertakes to implement the measures on

another source/device, which leads to emission reductions with a similar impact

on the quality of the environment (the so-called compensatory measures), enter here

This fact (e.g., emission reduction measures made on another

a source within the device or another device in the same

location). They take into account only the measures on other devices that

the operator is able to fully guarantee.



5. In relation to the environment



5.1. basic information on the environment

I-------------------------------------------I--------------------------------I

And Substance/substances/pointer (I) emission data and

I-------------------------------------------I----------I----------I----------I

I I year I year I year I

I I----------I----------I----------I

I I I I I

I-------------------------------------------I----------I----------I----------I

And Emission relevance I I

I-------------------------------------------I--------------------------------I

And Values the significance of I I

I-------------------------------------------I--------------------------------I



Explanatory notes



-Table fill in separately for each substance (Group of substances/pointer)

where application is made for the exception.



-Emission relevance derives from obligations exhaustively defined in

the relevant specific legislation (the so-called. constituent

regulations). For example, when the discharges into the air to indicate whether a resource is

listed in the enumeration of major resources "Program to improve the quality

the atmosphere "and whether it is an vyjmenovaný source according to the law on the protection of

Air (in the case of listed sources noted, what is the scope of the stored

the obligations referred to in annex No. 2).



-Values significance derives in particular from the information listed

laid down in the relevant specific legislation (the so-called.

constituent legislation)-for example, whether the source is listed in the enumeration

significant sources of "air quality improvement program" and is listed in the

enumeration imisně relevant sources and has therefore laid down special conditions

operation for the episode. In the case that the lenses is available

study for the area of air and the pollutant, can be used

(in the annex shall be to vocational assessment).



-Indicate the amount of relevant information available from the emission of polluting

substance (Group of substances/indicators) for the last three calendar years.



5.2. share the significance of exceptions

I-------------------------------------I------------I----------I--------------I

Both parameter and Scenario Design and even BAT the difference between (I)

I I I the scenario and scenario of the BAT and

I I I I and the design and

I I I I I scenario

I-------------------------------------I------------I----------I--------------I

(I) Emission limit I I I I

I-------------------------------------I------------I----------I--------------I

As well as total emissions for the year I I I I

I-------------------------------------I------------I----------I--------------I

As well as total emissions for the anticipated I I I I

(I) the duration of the exceptions I I I I

I-------------------------------------I------------I----------I--------------I



Explanatory notes



-The evaluation of parameters technique achieved in normal

operation. Emergency and emergency conditions are not taken into account.



-Emission limit Values and total emission is indicated including units.



-In the case of the use of the so-called. the compensatory measures described in chapter

4.2 the following table column that describes the parameters using the

compensation (i.e.. design scenario započtenými compensation

measures) and the evaluation of the difference between this scenario and the scenario with the BAT.




5.3. Assessment of environmental pollution and the level of protection

the environment in the case of approval of the proposed emission limit

I--------------------------------------I-------------------------------------I

And the characteristics of the State and affect I I

And of the territory-air quality I I

I (or other elements of the environment) I I

In relation to the relevant emissions. I I

I--------------------------------------I-------------------------------------I

And the expected impact on the pollution level I I

Even after implementation of the scenarios of the BAT. I I

I--------------------------------------I-------------------------------------I

And the expected impact on the pollution level I I

Even after the approval of the design of the scenario I I

Even including the implementation of any measures and even

And other resources/devices (when I I

Both are suggested). I I

I--------------------------------------I-------------------------------------I



6. Evaluate the cost



Evaluating the cost of the device, the operator performs on the basis of

the latest relevant aggregated or sectoral information, professional

estimates or actual project data.



In the event that the operator does not have certain data, or

in the case where the data are burdened by uncertainty, for example, with regard to the

their dynamic development (e.g., proceeds from the sale of allowances, income from

sales of electricity), the operator of such data, estimates

that and the marks.



6.1. Comparison of the costs

I---------------------------------I------------------I-----------------------I

And the costs to achieve the level I CZK/year as well as the evaluation and

Emissions associated with the best I I I

Also available techniques or I I I

And the cost of reducing emissions with a I I I

I like the effect on the I I I

I ment I I I

I---------------------------------I------------------I-----------------------I

Even the cost-revenue technology I I I

(BAT) and I I I

I---------------------------------I------------------I-----------------------I

Even the cost of another site I I I

I---------------------------------I------------------I-----------------------I

Costs in the field I I I

I---------------------------------I------------------I-----------------------I

Even the cost of the other devices I I I

I---------------------------------I------------------I-----------------------I

Even the reference cost I I I

I---------------------------------I------------------I-----------------------I



Explanatory notes



The basis for comparing the cost is the economic evaluation of the achievement of the levels of

emissions associated with best available techniques, processed

the operator of the device according to the methodological guideline issued by the

the Ministry. The operator is obliged to submit the economic

evaluation of the achievement of the emission levels associated with best available

techniques as a separate part of the application that is not part of the

vocational assessment. If the operator of an installation in the economic

evaluation of the achievement of the emission levels associated with best available

the techniques of information protected by special legislation,

can these reviews mark it as a document that contains protected information.



-Expenses-revenues (BAT) technology, i.e.. The cost of site

discharges are the costs of achieving emission levels associated with the best

available techniques on the relevant discharge or other exhaust/

the point where the emissions leave the establishment (instead of directly corresponds to the appropriate BAT

According to the text of the conclusions on best available techniques).



-The cost of another place in the device are taken into account only in the case that

proven to be the same or will be achieved very similar effect as if

has been made in the transition of the point of discharge of emissions to a level

best available techniques-related emissions.



-In the field-for the Costs of the costs in the field of sustainable

the costs of achieving emission levels associated with best available

techniques on technically comparable devices.



-The cost of other establishments: the case that the applicant

undertakes to implement the measures on other devices, which lead to a reduction

emissions with a similar impact on the quality of the environment (e.g. measures

reducing the emissions that you made on another device in the same site).

They take into account only the measures on other devices, that is

the operator can fully guarantee. A specific proposal for a guaranteed

the measures are to be given in the annex to scientific assessment. The use of the

for devices with more assumed impact on the quality of the

environment requesting significant exception.



-Reference costs: the costs of emission reductions, which are to be considered

for acceptable. You can use the appropriate reference documents processed

The European Commission, or other information from verifiable sources (sources of information

must be documented).



6.2. Summary evaluation costs

I------------------------------------------I---------------------------------I

And summarizing the evaluation costs to achieve even

And emission levels associated with the best and

And the available techniques. I I

I------------------------------------------I---------------------------------I



7. the supporting documents

I---------I------------------------------------------------------------------I

And The Name And Number

I---------I------------------------------------------------------------------I

I I I

I---------I------------------------------------------------------------------I



Explanatory notes



-To provide a list of the supporting documents used for processing (other than

integrated permit).



-Number-indicate the number.



-Name-key accordingly.



-Each basis to indicate on a separate line.



8. annexes

I---------I------------------------------------------------------------------I

(I) the number and the title of annex I

I---------I------------------------------------------------------------------I

I I I

I---------I------------------------------------------------------------------I



Explanatory notes



-Indicate the complete list of the attachments.



-Number-indicate the number.



-Name-annex accordingly.



-Each attachment to indicate on a separate line.



9. List of abbreviations

I-----------I----------------------------------------------------------------I

Even The Abbreviation And Meaning

I-----------I----------------------------------------------------------------I

I I I

I-----------I------------------------I---------------------------------------I

(I) the signature of the operator, or even

(I) a duly authorized representative of the operator I I

And I I

I------------------------------------I---------------------------------------I



Explanatory notes



-Authorized representative of operator means the person who is

authorised to submit expert assessment on the basis of the power of attorney granted by the

the operator of the device.



-Attach the signature device, the operator or the representative of the

operator authorised to submit expert assessment on the

the basis of power of attorney. If the operator or authorized

the representative of the operator is a legal person, this is the signature of the

physical person authorised to sign for the operator or

authorized representative of the operator.



Annex 4



PATTERN-REPORT ON THE IMPLEMENTATION OF THE INTEGRATED PERMIT CONDITIONS



PART AND



THE IDENTIFICATION OF THE OPERATOR OF THE DEVICE, DEVICE IDENTIFICATION AND

RELATED DATA

I-----------------I------------------------------------I

I Rok I I

I-----------------I------------------------------------I



Explanatory notes



-Year-indicate the year for which the report on fulfilment of the conditions

the integrated permit (IP) is given.



1. identification of the operator

I-------------------------------------I--------------------------------------I

(I) the trade name or name/title I

Even the name, respectively. name, and last name (I)

I-------------------------------------I--------------------------------------I

And the registered address or the place I I

(I) permanent residence business/I I

I-------------------------------------I--------------------------------------I

(I) the address for service of documents I I

I (if different from the address of the registered office or I I

(I) the place of business/domicile) I I

I-------------------------------------I--------------------------------------I

And identification number, if assigned to I I

I-------------------------------------I--------------------------------------I


And the VAT REGISTRATION NUMBER, if it has been assigned a I I

I-------------------------------------I--------------------------------------I



2. identification of the device

I----------------------------------------------------------------------------I

Even the name of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

And the address of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

And Identification device (PID) in the information system of integrated prevention MINISTRY of the ENVIRONMENT and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

Even the category of activity/activities referred to in annex No. 1 of the Act and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

And the integrated permit and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

And changes or extensions to the device (for the corresponding year)

I-------------------------------I--------------------------------------------I

(I) the designation and description of changes and changes

I-------------------------------I--------------------------------------------I

I I I

I-------------------------------I--------------------------------------------I



Explanatory notes



-Identification of the device (PID) in the information system of the integrated

Prevention of the Ministry of the environment-indicate that

Displays each document on the device in the

"device ID" in the format of a 12 seater it code of uppercase letters

and numbers.



-Integrated permission-indicate the reference number of the integrated permit,

acquisition of legal power and changes to the year for which the report is made.



-Changes or extensions to the device-it is reported a list of all the changes that

took place in the year for which the report is made on implementation of the

the terms IP.



-Indication of the changes-give the name and identify the changes (IE. reference number

changes and legal force of the change)



-A description of the changes-include a description of each of these changes.



3. processors shall report

I----------------------------------I-----------------------------------------I

(I) the trade name or name/title I

Even the name, respectively. name, and last name (I)

I----------------------------------I-----------------------------------------I

I phone (or fax) I I

I----------------------------------I-----------------------------------------I

I E-mail I I

I----------------------------------I-----------------------------------------I

I Datum I I

I----------------------------------I-----------------------------------------I



I----------------------------------I-----------------------------------------I

(I) the signature of the operator I I

I or the authorized representative of I I

Even operators of I I

I----------------------------------I-----------------------------------------I



Explanatory notes



-Indicate the business name or the name or title, first name, last name, and

contact details of the processor of the message, if it differs from your

device.



-Processing date-state the date when the message was processed.



-Authorized representative of operator means the person who is

entitled to submit a report on the basis of the power of attorney granted by the operator

device.



-Attach the signature device, the operator or the representative of the

the operator of the device authorized to submit a report on the basis of

power. If the operator or authorised representative

operators of a legal person, this is a signature of the physical

the person authorized to sign the message for the operator or

authorized representative of the operator.



PART (B)



DATA ON COMPLIANCE WITH THE CONDITIONS OF THE INTEGRATED PERMIT



The conditions of the integrated permit



The limits (limits, other limits, limit values)

I------------------------------------------------------------------------------------------------------I

And the designation of the portion of the IP and

I------------------------------------------------------------------------------------------------------I

I I

I-------------------I-------------------I----------------I---------I-----------I----------I------------I

And the designation of the conditions indicated by the other part I of the Substance/the measured value and the Group I/I and the performance of and justification for the

Even in the IP (emission and the device (the source) and substances/pointer and stored and calculated and the conditions I I

I limit, limit) I I I in both IP and IP value and I I

I-------------------I-------------------I----------------I---------I-----------I----------I------------I

I I I I I I I I

I-------------------I-------------------I----------------I---------I-----------I----------I------------I

And conditions as well as the Text of the terms of the Designation IP and

I v IP (ostatní I----------------------------------------------------------------------------------I

The terms and conditions) I I

I-------------------I-------------------------------I---------------------------------------I----------I

And even the performance of IP terms and Rationale and link to and

I I I I to annex I

I I-------------------------------I---------------------------------------I----------I

I I I I I

I-------------------I-------------------------------I---------------------------------------I----------I



Explanatory notes



-Indication of the portion of the IP-indicate the name and number of the relevant part of the integrated

authorisation (e.g.. Measures for the rational use of raw materials and energy).



-Indication of the conditions in the IP (emission limit, limit)-indicate the name (eg.

a serial number or other designation) conditions under the integrated

the authorization.



-The designation of parts of the device (the source)-indicate the designation of equipment parts

(including the above spirit/discharge) to which the constraint applies.



-The substance/substance Group/pointer-labelling of the substance, the Group of substances

or a pointer (including e.g. the abstraction of groundwater/surface water) to which

the condition applies.



The value stored in the IP-value limit that is specified in the valid

the text of the integrated permit (including units).



The measured/calculated value-indicate the observed value for the

substance/substance or a pointer to the following the procedure, which shows the valid built-in

authorisation (including units).



The fulfilment of the conditions of the IP-specify the status of the fulfilment of the conditions-Yes (bottled), not

(neplněno).



Justification the justification for the status-indicate the fulfilment of the conditions. A reference to the

an attachment with the finer details. If the performance of the conditions

an exhaustive, or at least part-way to certify data reported

for the same reporting period through the integrated system

the fulfilment of reporting obligations in the field of the environment (ISPOP)

According to law No. 25/2008 Coll., as amended, can here the operator

device identification data, and link to these same details

in a report submitted through ISPOP.



Indication of conditions in the IP (other terms)-indicate the number or other

the identification of the conditions set out in the integrated permit.



The text of the terms of the IP-include text according to the conditions as set out in

the integrated permit. Fulfilment of the conditions-specify the status of the performance of the

terms and conditions-Yes (bottled), no (neplněno), partially filled. Justification-

provide justification for the performance of the health conditions and other potential

details. Reference to the annex-annex, where appropriate, be brought to a more detailed

data for the fulfilment of the conditions. If the performance of the terms of a comprehensive

or at least a part prove data reported for the same

reporting period through an integrated system of performance

reporting obligations in the field of the environment (ISPOP) by

Act No. 25/2008 Coll., as amended, can here operator

include a link to the same information in reports filed through the

ISPOP.



You must copy the table for each condition listed in the integrated

the authorization.



Table rows for each of the integrated permit conditions need to be

copy in the appropriate number of times.



PART (C)



TO PERFORM THE COMPARISON DEVICE EMISSION LEVELS WITH EMISSION LEVELS

ASSOCIATED WITH BEST AVAILABLE TECHNIQUES



The explanatory notes



-This part of the message is filled in only in the case that are in the

the integrated permit established emission limits according to § 14 para.

4 (b). (b)) of the Act.



Compared with the emission levels associated with best available techniques

(BAT)


I----------------------------------------------------------------------------I

And the designation of parts of the device and the

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

And conclusions on the BAT and

I----------------------------------------------------------------------------I

I I

I----------------------------------------------------------------------------I

Even compared with the emission levels associated with BAT and

I-----------------I---------------I----------I------------I------------------I

Even fabric/group I level of emissions and level I Reference and note I

(I) substances/pointer and associated with the BAT as well as the terms and conditions and emissions

The device I I I I I I

I-----------------I---------------I----------I------------I------------------I

I I I I I I

I-----------------I---------------I----------I------------I------------------I

(I) assessment of the reference to annex I

I---------------------------------------------------------I------------------I

I I I

I---------------------------------------------------------I------------------I



Explanatory notes



-The designation of parts of the facility-indicate the precise identification of the parts of the equipment

[the above spirit/discharges, etc.), to which the data relate.

Used the designation must correspond to the indications in the IP.



-Conclusions on the BAT-indicate the implementing decision

The European Commission (e.g. 2012/134/EC) laying down the relevant

conclusions on the BAT, chapter and page/side, where is the value of

listed.



-The substance/substance Group/pointer-to indicate what the substance/group

substances/indicators are the following values apply.



-Level of emissions associated with BAT-indicate the value of the emission levels associated with BAT

(including units).



-Terms of reference-the specification of reference conditions that

bind to the value of emissions associated with BAT



-Note-indicate the accompanying text in the relevant conclusions on the BAT. Indicate the

also what environmental values.



-The level of emissions of installations-indicate the detected (measured, calculated)

the level of emissions from installations. The value must be placed under the same

reference conditions such as the level of the emissions associated with the BAT so that it

relevant comparisons to be made by the authorising Office.



-Assessment-state how the figure was reached

"The level of emissions of installations". It is possible to include a link to a standard, or the like

the document. Detailed reasons for any differences.



-In the case of the need to compare multiple substances (substances, indicators) must

to be repeatedly copied section.



Used documents

I---------I------------------------------------------------------------------I

And The Name And Number

I---------I------------------------------------------------------------------I

I I I

I---------I------------------------------------------------------------------I



Explanatory notes



-To provide a list of the supporting documents used in the preparation of the report, other than

the integrated permit, its amendments and the relevant conclusions on the BAT.



-Number-indicate the number.



-Name-key accordingly.



-Each basis to indicate on a separate line.



Annex

I---------I------------------------------------------------------------------I

(I) the number and the title of annex I

I---------I------------------------------------------------------------------I

I I I

I---------I------------------------------------------------------------------I



Explanatory notes



-A complete list of annexes to the report be noted.



-Number-indicate the number.



-Name-annex accordingly.



-Each attachment to indicate on a separate line.



List of abbreviations

I-----------I----------------------------------------------------------------I

Even The Abbreviation And Meaning

I-----------I----------------------------------------------------------------I

I I I

I-----------I----------------------------------------------------------------



Explanatory notes



-To provide a list of abbreviations.



Shortcuts



-BAT-best available technology



-VAT NUMBER-the tax identification number



-EU-European Union



-COMPANY ID-the identification number of organization



-IP-integrated authorization



-IPPC – integrated pollution prevention and control



-ISPOP-an integrated system for the fulfilment of reporting obligations under

Act No. 25/2008 Coll., as amended



-MOE-Ministry of the environment



-PID-the installation identification code referred to in the information system

integrated prevention



1) European Parliament and Council Directive 2010/75/EU of 24 October.

November 2010 on industrial emissions (integrated pollution prevention and control

pollution).