Chapter I General

In order to strengthen the movement control management of the Eastern River in the province's administrative region, the integrated benefits of water resources in the Eastern River basin are guaranteed, the protection of the ecological environment, and the development of this approach in line with laws, regulations, such as the Water Act of the People's Republic of China and the Water Resources Management Regulations of the North-East Province.

The second approach applies to the movement control management of water in the Oriental Region of the province. The law, legislation and regulations provide otherwise, from their provisions.

Article 3. The movement of water in the east should be guided by the principles of significant intermodal traffic control, overall water control and sub-sector management, and the principle of sub-ordination.

The movement of water in the east should first meet the water needs of rural and urban residents and rationalize water demand such as agriculture, industry, shipping and ecological environments.

Water banks, water hubs, hydroelectric plants and their movement control operation should be subject to flood demand and water supply needs.

Article IV Water distribution programmes for the Eastern River Basin, emergency movement control and water movement control plans are the basis for the implementation of the Eastern Ji.

Article 5 is responsible for organizing, coordinating, monitoring and guiding the movement of water in the province.

The Oriental River Basin Authority is specifically responsible for the distribution of water resources across the basin, the distribution of water to water and the new Fondang, the destruction of trees, the White Basin jewell (hereinafter referred to as three hydrates), the Eastern Jong River hub, gate dams, hydroelectric stations and other water access works for the approval of water licenses by the territorial Government's water administration authorities.

The Water Administration authorities of the Eastern River Basin are responsible for the movement of water in the east, in accordance with the established competencies.

The Eastern River Basin concerned hydrological institutions responsible for hydrological monitoring and hydrological information forecasts for the movement of water in the east.

Article 6. The three major hydro and the eastern driha dry stream, gate dams, hydropower stations, engineering management units for water engineering and facilities, as well as the electricity movement control sector, are the water control movement control enforcement units.

The main leadership of the water administration authorities of the Eastern River Basin, the city concerned, the district (zone) and the main heads of the water movement control enforcement units are the responsibilities of the Eastern Riverwater movement control movement movement movement movement movement movement movement movement movement. The list of responsible persons is published by the Provincial Government Water Administration by 1 April each year.

Article 7

The water movement control enforcement units should be aligned with the construction of water-control facilities.

Chapter II

Article 8

The annual water movement control programme is divided into the cascause movement control plan (1 April-30 September) and the dry water control programme (1 October to 31 March). The Google water movement control programme was issued by 31 March each year, and the dry water movement control plan was issued by 30 September each year.

Article 9. The water movement control enforcement units shall be structured in accordance with the extended Annual Water Control Programme for the Oriental Region, with reasonable arrangements for the movement of water, electricity and engineering.

The movement of water in the three water banks should be fully effective in the discharge of water pools, and joint optimization of movement in accordance with the approved water-transmission programme.

The power movement control sector should be carried out in accordance with the Oriental Water Control Plan, the Emergency Movement Control Presiding and Movement Control Directives. In the event of the need to adjust the three arsenal flows, it will be possible to implement the agreement of the territorial Government's water administration authorities; in exceptional circumstances, the temporary adjustment of the three garage flows should be reported on time to the territorial Government's water administration authorities.

Article 10 is an important control control over the movement of water in the east, and the flow in the south-east should meet the requirements for controlling the flow control indicators.

The establishment and flow control indicators of the important control of the traints in the east are determined and published by the provincial authorities of the Government's water administration.

Important controls over the flow of trajectory flows are based on the hydrological monitoring data from the relevant hydrological institutions in the Eastern River.

Article 11 provides for the adaptation of the water movement control plan, with the advice of the Water Administration Authority of the People's Government of the Eastern River Basin, the three major water treasury engineering units, and the approval of the territorial Government water administration authorities.

Article 12 provides for major public activities such as celebrity and sports, with the consent of the territorial Government's water administration authorities, an interim movement control operation may be carried out by the Water Administration authorities of the Eastern River Basin and watershed-related municipalities.

Chapter III

Article 13. Significant control over the eastern River basin is likely to endanger the safety of water supply and vital engineering facilities, and should be implemented in accordance with the mandated competence.

Article 14.

Article 15. In the implementation of the emergency response movement control, the Water Administration of the Eastern River Basin and the Watershed-related municipalities, districts (zones) Governmental water administrations can take measures to adapt to the control requirements of the three hydrates, the shores, drainage of hydroelectric power stations and access to water works, to secure water supply security, to ensure that the significant control over watershed flow is in line with the required control indicators, and that the authorities and units must be subject to compliance.

Article 16, when implementing the emergency response movement control, the relevant hydrological institutions should strengthen hydrological monitoring and forecasting and send relevant hydrological monitoring information to the Oriental Basin Authority on a daily basis. The Water Administration authorities of the Eastern River Basin Authority and the watershed-related municipalities, districts (zones) Government shall be informed on a daily basis of water access and water storage, leading water, etc., and report to the provincial Government's water administration authorities.

Chapter IV Oversight management

Article 17 The Oriental Basin Authority should establish a water control information platform to achieve information-sharing and online monitoring.

Relevant hydrological institutions, water control enforcement units should send information on the movement of water in the east to the Orang River Basin Authority in a timely manner.

The Oriental River Basin Authority should regularly communicate to the relevant municipal, district (zone) people's government water administration authorities, hydrological institutions and water movement control enforcement units to the east of the country's water control movement, which should be reported in a timely manner to the provincial government water administration authorities and provincial environmental protection authorities.

Article 18 of the provincial Government's water administration authorities and watershed-related municipalities, districts (zones) government water administration authorities should conduct monitoring inspections of the implementation of the Eastern Riverwater movement control units, in accordance with the water movement control authority; and, when implementing the emergency response movement control campaign, the inspection of the mission should be carried out or the monitoring inspection.

Article 19 requires the authorities to conduct monitoring inspections of the management of the water movement control enforcement units of their management, the implementation of the Eastern Giang Water Movement Control Programme, the Movement Control Premier and the Movement Control Directive, and to correct in a timely manner violations of movement control management.

Article 20 allows the following measures to be taken when the territorial Government's water administration authorities and watershed-related urban, district and territorial Government water administrative authorities monitor the water movement control implementation units:

(i) To request information, such as data, documentation, or reproduction;

(ii) To request clarifications on issues such as the implementation of the movement control measures in the east;

(iii) On-site inspection and investigation into places of production;

(iv) On-site monitoring of water or water quality;

(v) To compel it to cease violations of the provisions of the relevant laws, regulations and methods and to fulfil its statutory obligations.

Article 21 shall accept and cooperate with the supervision of the territorial Government's water administrative authorities and the watershed-related authorities of the Government of the Provincial People's Government, and shall not refuse or impede the enforcement of official duties by the relevant supervisors.

Chapter V Legal responsibility

Article 2

Article 23, the authorities of the water movement control enforcement units and their staff members do not perform the management responsibilities of the Eastern Province's control over the control of the movement of water and their staff are converted to the law by their superior authorities or by the supervisory authority.

Article 24

Annex VI