Tibet Autonomous Region, Lightning Protection And Disaster Reduction Management

Original Language Title: 西藏自治区防雷减灾管理办法

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$20 per month, or Get a Day Pass for only USD$4.99.
(The people's Government of Tibet Autonomous Region, on October 14, 2003 the 21st Executive meeting on January 30, 2004 the people's Government of Tibet Autonomous Region promulgated as of March 1, 2004, 60th) first in order to defend and mitigating lightning hazards, protect people's lives and property safety, guaranteeing economic construction smoothly, according to the People's Republic of China Meteorological law and the regulations of the Tibet Autonomous Region meteorological and other provisions of the relevant laws and regulations, combined with State practice, these measures are formulated.
    Article autonomous region within the administrative area of the lightning protection and disaster reduction activities units and individuals shall abide by these measures.
    Lightning protection and disaster reduction in these measures refers to defence and lightning hazard mitigation activities, including defense, research, monitoring, early warning of lightning.
    Third mine disaster prevention, combining prevention with treatment guidelines, adhere to the principle of unified planning, unified deployment, centralized management.
    Fourth autonomous region Governments at all levels should strengthen leadership of the lightning protection and disaster reduction work, organize the relevant departments to take effective measures to increase input into the lightning protection and disaster reduction, improving the lightning protection and disaster reduction capabilities. Fifth article autonomous regions meteorological competent institutions unified is responsible for organization management and guide full district anti-mine mitigation work, perform following duties: (a) developed full district anti-mine mitigation work development planning; (ii) Guide and coordination around (City) anti-mine mitigation work; (three) Organization lightning protection technology research, and promotion, and training and anti-mine knowledge of publicity work, improve universal anti-mine mitigation consciousness; (four) organization full district lightning disaster survey, and major lightning accident identification work; (five) is responsible for on anti-mine products of supervision, and management; (six) legal, and
    Other duties stipulated by law.
    Sixth local (municipal) and County meteorological departments according to the Division of responsibilities, in charge of the lightning protection and disaster reduction work in the administrative area. The seventh autonomous region set up a leading group for lightning protection and disaster reduction to coordinate the lightning protection and disaster reduction work in the autonomous region.
    Office of the leading group under the lightning protection and disaster reduction management, responsible for daily work, with offices located in the municipal meteorological authorities.
    (City) establishment of the lightning protection and disaster reduction management office, meteorological departments in the people's Governments at the corresponding level and peer leadership, responsible for the administration of the lightning protection and disaster reduction work, and accept the lightning protection and disaster reduction management office of the autonomous region's operational guidance.
    Eighth levels of fire, quality and technical supervision, construction and urban planning, administrative departments of labor security in accordance with their respective responsibilities, in collaboration with local meteorological departments do the lightning protection and disaster reduction work. Nineth article following places and facilities, should installation lightning protection device: (a) buildings anti-mine design specification provides of a, and two or three class anti-mine built (frame) built real; (ii) Depot, and liquefied petroleum gas station, and gas station, and dangerous goods warehouse, flammable easy burst facilities; (three) communications facilities, and computer network and control system; (four) power high pressure line, and power plant, and substation, power facilities; (five) national, and autonomous regions level focus heritage protection units in the of ancient building, and Museum and ancient tree name wood; (six) legal, and regulations, and
    Other facilities and sites specified in regulations and technical standards.
    Lightning protective device mentioned in these measures refers to the Flash device, wire, grounding equipment, surge protectors and other bonding conductors, lightning and the facilities in General. Article tenth professional mine engineering design or construction of the unit in accordance with the provisions of law and rules and regulations to implement quality management.
    Lightning protection activities of professional and technical personnel engaged in the implementation of qualification management system.
    Outside professional mine engineering design, construction quality units in the district professional mine engineering design and construction, you should ask the municipal meteorological authorities for permission, and after the construction Administration Department of the autonomous region registered, may engage in professional mine engineering design and construction.
    11th specialized in mine engineering design, construction units, shall, within the scope allowed by their corresponding level of qualification, in strict accordance with national and industry standard specification for Lightning engaged in mine engineering design and construction.
    12th mine engineering design practice system. New construction, expansion, renovation of the building (structure) of mine engineering, should be incorporated into the construction plan. Construction professional mine engineering design drawings should be submitted to the local meteorological authorities above the county level audit, of which the State key construction projects and State-level professional mine engineering design drawings shall be submitted to the competent meteorological departments of the autonomous region for review.
    Without approval, no delivery and construction.
    13th meteorological departments at various levels shall, when receiving a professional mine engineering design drawings for construction within 5 working days from the date the audit opinion. 14th construction unit should be carried out in accordance with approved lightning protection design of construction and related meteorological departments should track the quality test.
    After completion, the meteorological departments or its authorized acceptance of units before they can put to use.
    15th autonomous region, Prefecture (City) meteorological departments established lightning detection Center, is responsible for the various types of lightning protection device for detection and research of lightning protection technology, introduction and promotion, gradually carry out lightning hazard forecasting.
    Lightning testing center should establish and improve the detection system, strict implementation of the relevant standards and norms of the State, guarantee the authenticity of mine inspection reports, scientific, impartial. 16th lightning protection device implementation of the periodic inspection system.
    Inflammable and explosive place, key cultural relics protection units, lightning protection devices for telecommunication, electronic equipment, testing once every six months; other lightning protection devices testing once a year.
    Industry standard special provisions from its provisions. 17th lightning detection unit after the detection of lightning protection device, it shall issue a test report, and take responsibility for results.
    After passing the test projects are all issued certificates, test failure rectification. The 18th unit shall, within 2 working days of Thunder disasters will damage local meteorological authorities.
    Meteorological departments at various levels year lightning disaster should be a summary report of the people's Government meteorological departments and parent.
    Lightning protection engineering drawings 19th audits and detection of lightning protection device fees in accordance with the standards approved by the price Department of the autonomous region.
    20th article violation this approach provides, has following behavior one of of units, by about meteorological competent institutions according to duties permission, ordered deadline corrected; late not corrected of, at 5000 Yuan above 50,000 yuan following of fine; has illegal proceeds of, confiscated illegal proceeds; caused loss of, law bear compensation responsibility; constitute crime of, law held criminal: (a) not has qualification or beyond corresponding qualification license range engaged in professional anti-mine design, and construction of;
    (Ii) without audit approved or without acceptance qualified of anti-mine engineering delivered construction or input using of; (three) not by provides installation lightning protection device or refused to accept detection of; (four) District outside has professional anti-mine design, and construction qualification of units to district within engaged in professional anti-mine design, and construction, and not registration record of; (five) installation, and using not meet requirements of lightning protection device of; (six) construction and construction units in construction process in the refused to meteorological competent institutions for quality track detection of;
    (VII) causing significant damage detection units did not carry out their duties.
    21st article violates these rules, without the corresponding qualification certificate without professional mine engineering design, construction of the individual, the local meteorological authority to order the suspension of the design, construction, and a fine of less than 2000 Yuan and 20,000 Yuan; has illegally obtained, confiscation of illicit proceeds.
    22nd national staff in violation of these measures in the lightning protection and disaster reduction work, abuse their powers, neglect their duties, by the competent authorities, impose administrative sanctions constitutes a crime, criminal responsibility shall be investigated according to law.
    23rd party refuses to accept the decision on administrative penalty may apply for administrative reconsideration or bring an administrative lawsuit in accordance with law.
    Article 24th of this approach by the municipal meteorological authorities are responsible for interpretation.
                                                                                                25th article of the rules take effect on March 1, 2004.