Guangdong Province Water Conservancy Project Management Approach

Original Language Title:  广东省省管水利枢纽管理办法

Read the untranslated law here: https://www.global-regulation.com/law/china/3028519/%2526nbsp%253b.html

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Get a Day Pass for only USD$19.99.
 Administrative measures of Guangdong Province, provincial water conservancy project (July 15, 2013 Guangdong Province 12th session Government 6th times Executive Conference considered through July 25, 2013 Guangdong Province Government makes 190th, announced since on September 1, 2013 up purposes) first article to strengthening province tube project of protection and management, play province tube project of flood control, and water, and water resources deployment, and shipping and power, integrated function, according to People's Republic of China water, and People's Republic of China flood control method and Guangdong Province water management Ordinance

    And other laws and regulations, combined with the actual situation of Guangdong Province, these measures are formulated.

    Article within the administrative area of Guangdong Province, the provincial water conservancy administrative departments of the people's Government of feilaixia project and Chaozhou water supply junction and lechang Gorge water control project tube protection and management of the project, these measures shall apply. Third provincial water conservancy administrative departments of provincial water conservancy management.

    Provincial water conservancy management unit (hereinafter referred to as hub management unit) is specifically responsible for the protection and management of the provincial water conservancy work.

    Development and reform, the people's Governments above the county level of land and resources, planning, construction, environmental protection and other sectors, according to their respective duties, provincial Water Conservancy's protection and management.

    Fourth provincial project management including project management and region management:

    (A) project management including sluice dam and auxiliary dam, power plant and ancillary facilities, locks, flood and other production facilities has been expropriation procedures, such as land and waters land line;

    (B) outside the scope of area management including the project management for the collection procedures of land and the land below the water.

    Fifth province pipe project including project scope of protection scope of protection and the scope of protection in the reservoir area:

    (A) protect the scope of the project including sluice dams, dikes, power plant, lock the main building and management scope boundary extension 200 meters, other ancillary buildings management extension, within 50 metres of the border lands and waters;

    (B) scope of protection in the reservoir area, including dam upstream dam Crest line above or land line to the first line of the watershed Ridge between land and water.

    Sixth engineering scope of protection and the scope of protection in the reservoir area, the provincial water conservancy administrative departments to seek provincial departments, the local people's Government, and after publication, submitted to the provincial people's Government for approval.

    Works within the scope of protection and the scope of protection in the reservoir area of land and water, land and natural resources, urban and rural planning sector into the General land use planning and protection of urban and rural planning.

    Seventh key water management within the scope of provincial lands, waters, and managed by the Hub unit use and management. No unit or individual is allowed to encroach on provincial lands and waters within the scope of project management.

    Nation-building require the recovery of lands within provincial water conservancy management, should ask the provincial water conservancy Administrative Department.

    Provincial project within the scope of protection of the land, waters, its ownership is not changed, but its development shall comply with the provisions of the relevant laws, rules and regulations.

    Provincial water conservancy management and protect the original locks, pumping stations, water diversion works, breakwaters and other water conservancy projects and other water conservancy facilities, the original management unit is responsible for management.

    Eighth hub management unit shall, together with the land and resources of the people's Governments above the County and other departments, provincial project management scope and boundaries of the scope of protection set up permanent markers.

    Without authorization, no unit or individual is allowed to move, and destruction of permanent markers.

    Nineth hub management unit shall establish and perfect the routine maintenance and safe operation, emergency systems, regularly sluice dam and auxiliary dam, lock engineering facility inspections, strengthening electromechanical equipment repair and maintenance, to detect and remove security risks to ensure engineering safety.

    Works when there is a danger, hub management unit shall, in accordance with the relevant contingency plans to take timely measures, eliminate dangerous case, the provincial water conservancy administrative departments, and to inform the local government and related departments.

    Engineering disasters such as flood damage, hub management units should be repaired in a timely manner.

    Provincial hydro-junction on downstream operation and management should be the hub of water, coordinated operation of navigation facilities. Tenth hub management units shall, according to the provincial water conservancy project planning and design, flood prevention schemes and flood regulation scheme, under the prerequisite of ensuring the safety and flood control in developing flood plans and emergency plans, approved by the provincial water conservancy administrative departments, provincial flood control headquarters file and copy to the project location municipal/County flood control headquarters.

    Tube hydro-junction reservoir, dams and other engineering facilities in operation, should be subject to the provincial flood control headquarters of the dispatch.

    Hub management when preparing operation plans and emergency plan for flood control units, should take fully into account the shipping, power generation and other needs, comprehensive use of water resources.

    Provincial project when you need emergency flood or other emergencies occur, hub management units shall do a safety warning, hub on the lower reaches of the relevant Governments and departments concerned shall in accordance with the relevant emergency plan, organization of security preparedness, flood control and mass resettlement work.

    11th tube project power, shipping, tourism and production activities should be subject to flood, drought, water supplies and emergency requirements, and subject to the provincial flood control headquarters and the provincial River basin authorities dispatch.

    Due to flood control, drought resistance, water supply, emergency, engineering rescue and maintenance of emergency scheduling measures need to be taken, hub management shall promptly inform the local flood control headquarters, maritime and waterway management, power generation, shipping and tourism operators should take appropriate measures in a timely manner.

    No unit or individual may unlawfully interfere with provincial water conservancy project regulation.

    The 12th provincial water control project dam, power plant, locks, and other important work areas be closed management, managed by the Hub unit after the people's Governments above the county level to determine, by the people's Governments above the county level announcements.

    Without the consent of hub management units, are forbidden from entering a closed administrative area that may illegally interfere with terminal management.

    13th provincial water conservancy of shangbalu surface, Crest and Crest Road, traffic bridge belong to the dedicated lanes for terminal management, in addition to carrying out urgent tasks of police cars, fire trucks, ambulances, and other motor vehicle without the consent of hub management units, are not allowed to pass.

    Is really necessary to use shangbalu face, Crest and Crest Road, bridge and highway traffic, should be agreed with the consent of the hub management.

    Banned in shangbalu, dam and dike road traffic bridge, heavy crawler tractors, hard wheel and overweight vehicles may result in damage to vehicles on the roads.

    14th Provincial Water Conservancy project water supply shall be declared to the hub management unit, in accordance with administrative rights after the approval, according to the plan of water, install water metering devices and paid according to regulations of water.

    15th generation plant and ancillary facilities project managed by the Hub unit management, electricity generated by its use in addition to hub control unit production and life outside, the rest enter the grid.

    16th no unit or individual may seize, damage, destruction of project facilities and ancillary facilities and equipment.

    Construction needed a temporary occupation, dismantle its project facilities and ancillary facilities, equipment, the construction unit shall be agreed with the consent of the hub management and restoration or alteration within the period specified; not within the time stipulated in the rehabilitation or reconstruction, the construction unit shall be compensated.

    17th strict control in the province, project management and new construction, expansion, renovation works within the scope of protection facilities and buildings; needed construction, according to the Guangdong provincial water management Ordinance and other provisions of the relevant procedures.

    18th in the province within the scope of project management and protection, shall abide by the People's Republic of China water pollution prevention law, administrative regulations of Guangdong Province water conservancy projects and other prohibitive provisions of laws and regulations. 19th in the province shall not operate food and beverage activities within project management.

    Engaged in tourism, production and business activities such as planting, breeding, shall go through the procedures of environmental impact assessment and approval by the provincial water conservancy administrative departments, signed an agreement with hub management unit.

    Hub management unit signed an agreement with producers to charge fees paid in full finance, implementation of "two lines of income and expenditure" management.

    Engaged in the production and operation of these activities should be to ensure that safety, maintaining and area functions, no water pollution or damage to the ecological environment.

    20th hub management unit found that water quality in the reservoir area when an exception occurs, it should be to the local administrative Department of environmental protection and water conservancy administrative departments to report; environmental protection administration departments shall organize, coordinate relevant administrative departments of investigation and treatment.

    21st hub management units should step up inspections found violating these rules of behavior should be stopped, and to report to the local people's Governments above the county level authorities, competent authorities should investigate and punish.

    22nd article violates these rules, any of the following acts, the Department of water administration, project management as well as other relevant departments are directly responsible for the person in charge and other direct liable persons shall be given disciplinary action constitutes a crime, criminal responsibility shall be investigated in accordance with law:

    (A) fails to perform security maintenance responsibilities, affecting the safe operation of facilities;

    (B) failed to carry out flood control responsibility, resulting in significant loss of flood;

    (C) failure to fulfil management responsibilities, resulting in damage to project or the pollution of water;

    (D) unlawful interference with provincial water conservancy project regulation;

    (E) has not been turned over to the financial income related to production and management activities in accordance with the provisions;

    (F) no abnormality of water quality reports in a timely manner;

    (G) failed to carry out inspection responsibilities;

    (VIII) other acts of abuse of authority, dereliction of duty or engages in.

    23rd article violation this approach 12th article provides, unauthorized into province tube project closed management regional or illegal interference province tube project management work of, by County above Government water administrative competent sector ordered corrected, give warning; refused to corrected of, on citizens can sentenced 100 Yuan above 500 Yuan following fine, on corporate and other organization can sentenced 2000 Yuan above 10000 Yuan following fine; caused damage or other serious loss of, should for repair or compensation.

    24th article violates this way to the 16th, 17th, 18th article, in accordance with the relevant provisions of the administrative regulations of Guangdong Province water conservancy project, will be punished. 25th article of the rules take effect on September 1, 2013. On July 2, 1997, feilaixia in Guangdong Province published in provincial regulation repealed simultaneously.