(August 23, 2004, the Ministry of construction released as of the date of promulgation, 134th) first in order to strengthen the housing construction engineering, construction drawing design document review of municipal infrastructure project management, construction engineering quality management under the Ordinance and the regulations on the management of survey and design of construction projects, these measures are formulated.
    Article in the People's Republic of China engaged in housing construction, municipal infrastructure engineering, construction drawing design document to review and implement supervision and administration, must comply with these measures.
    Third State of construction drawing design documents (including surveying documents, hereinafter referred to as working drawings) censorship.
    Review of construction drawings in these measures refers to building construction identified by the competent review bodies (hereinafter referred to as review bodies) in accordance with the relevant laws and regulations, construction plans relate to public interest, public safety and engineering construction compulsory standard review of the content.
    Construction plans without examination, shall not be used.
    Fourth State Council Building Department is responsible for the review of institutional conditions, construction drawing review of management approaches and national conduct guidance and supervision of the construction drawing review.
    The province, autonomous region, municipality building authorities are responsible for recognition within their respective administrative areas of the review body, to supervise construction drawing review, and accept the guidance and supervision of building departments of the State Council.
    City and county building departments are responsible for the administrative conduct day-to-day supervision and management of the construction drawing review, and accept the provinces, autonomous regions and municipalities directly under the guidance and supervision of the construction authority.
    Fifth of provinces, autonomous regions and municipalities build review bodies of the authority shall be determined in accordance with national conditions, and within the administrative area of the scale of construction, finds that the appropriate number of review bodies.
    Review body is a not for profit independent legal entities.
    Sixth Review by business area divided into two categories, which undertake building, municipal infrastructure engineering, construction drawing review unrestricted scope of business; b institutions can undertake secondary and below the housing construction, municipal infrastructure engineering, construction drawing review.
    Seventh class of censors shall meet the following conditions: (a) not less than 1 million RMB registered capital.
    (B) has a sound technical management and quality assurance system.
    (Three) review personnel should has good of ethics, has 15 years above by needed professional survey, and design work experience; presided over had many Yu 5 items level above construction or large municipal public engineering or class a engineering survey project corresponding professional of survey design; has implemented practice industry registered system of professional, review personnel should has a level registered architects, and level registered structure engineers or survey design registered engineers qualification, not implemented practice industry registered system of, review personnel should has engineer above titles.
    (Four) engaged in housing construction construction figure review of, structure professional review personnel not less than 6 people, building, and electrical, and warm pass, and to drainage, and survey, professional review personnel the not less than 2 people; engaged in municipal based facilities engineering construction figure review of, by needed professional of review personnel not less than 6 people, other must supporting of professional review personnel the not less than 2 people; specifically engaged in survey file review of, survey professional review personnel not less than 6 people.
    (E) review officers shall not be over the age of 65, in principle, over the age of 60 inspectors 1/2 of not exceeding the professional review of staffing requirements.
    The super high-rise building project documentation review of, in addition to the above requirements, should also have hosted super high-rise building project or 100 meters or above building structure design of Examiners of not less than 3 persons.
    Eighth section II review body shall meet the following conditions: (a) the registered capital of no less than 500,000 yuan, (ii) has a sound technical management and quality assurance system.
    (Three) review personnel should has good of ethics, has 10 years above by needed professional survey, and design work experience; presided over had many Yu 5 items II level above construction or medium above municipal public engineering or serie b above engineering survey project corresponding professional of survey design; has implemented practice industry registered system of professional, review personnel should has a level registered architects, and level registered structure engineers or survey design registered engineers qualification, not implemented practice industry registered system of, review personnel should has engineers above titles.
    (D) engaged in housing construction plan review, professional examiners of not less than 2, municipal infrastructure engineering, construction drawing review, and professional reviewers needed no less than 4 people, other professional review staff must be not less than 2, specializing in survey and document review, investigation professional examiners of not less than 4 people.
    (E) review officers shall not be over the age of 65, in principle, over the age of 60 inspectors 1/2 of not exceeding the professional review of staffing requirements.
    Nineth construction units should be sent for review bodies review of construction drawing.
    Units will be free to select the review bodies, the review body shall not be reviewed by the project's construction, survey and design Enterprise Association or other interested parties.
    Tenth owner shall provide the review bodies with the following information: (a) as a basis for investigation, design approval documents and annexes of the relevant departments of the Government; (b) a full set of working drawings.
    11th article review institutions should on construction figure review following content: (a) whether meet engineering construction mandatory standard; (ii) Foundation based and subject structure of security; (three) survey design enterprise and registered practice industry personnel and related personnel whether by provides in construction figure Shang stamped corresponding of stamp and signed; (four) other legal, and regulations, and regulations provides must review of content.
    12th construction drawing review in principle no more than the following time limits: (a) level above building, large municipal projects for 15 working days, secondary and under construction, medium and following public work for 10 working days.
    (B) engineering investigations files, class-a project for 7 working days, grade b and the following projects for 5 business days. After the 13th review authority to review construction drawings shall be made according to the following circumstances: (a) the examination, examination books issued by the review body shall be filed with the employer, and will return the review body stamped complete set construction drawing units. Review of book review should have professional staff eligible for signing, signed by the legal representative and stamped with the seal of the review bodies.
    Review body shall, within 5 working days to review the situation reported to the engineering construction of local people's Governments at and above the County departments. (B) failed to pass the examination, review bodies should be drawing back the construction unit and the unqualified reason of refusal in writing.
    Meanwhile, reviews should be found in construction and in investigation and design enterprises and registered personnel in violation of the law, regulation and engineering construction compulsory standard issue, reported to the competent Department of engineering construction of local people's Governments at and above the County.
    After drawing back the construction unit, the construction unit shall require the Modify survey and design enterprise and modified construction to repay the original review body for review.
    14th no units or individuals are not allowed to modify the examination of construction drawing.
    Necessitates modification, all 11th set out these measures, the construction unit shall review revised construction plans to the original review bodies.
    15th review body responsible for construction drawing review, and review responsibilities.
    After examination, the construction plans, there are still violations of law, regulation and engineering construction compulsory standard issue, causes losses to the construction unit, review body shall assume corresponding liability; building departments for review, review bodies of legal representatives and review dealt with according to law or sanctions. 16th review body shall establish and perfect internal control system.
    Review of construction drawings shall be signed by professional inspectors review records, reviewing records, examination books, and other relevant information should be on file.
    17th is not registered to use the practice review system personnel, should participate in the construction departments of provinces, autonomous regions and municipalities related laws, regulations and technical standards for training, annual training period of not less than 40 hours.
    18th building departments above the county level people's Governments shall promptly accepted the review construction drawings in the illegal or irregular spotting, accusation and complaint.
    19th construction plans under review should be carried out according to stipulations, without examination, building departments may not be issued construction permits.
    20th article County above government construction competent sector should strengthening on review institutions of supervision check, main check following content: (a) whether meet provides of conditions; (ii) whether beyond finds of range engaged in construction figure review; (three) whether using not meet conditions of review personnel; (four) whether by provides reported review process in the found of illegal violations behavior; (five) whether by provides in review qualified book and construction figure Shang signed sealed; (six) construction figure review quality; (seven) review personnel of training situation.
    Building departments when conducting supervision and inspection, the review bodies entitled to be examined relevant documentation review of documents and data.
    21st building departments of the people's Governments above the county level shall review body reports units, investigation and design enterprises, registered practitioners of illegal acts shall be punished according to law.
    22nd article review institutions violation this approach provides, has following behavior one of of, County above place Government construction competent sector ordered corrected, at 10,000 yuan above 30,000 yuan following of fine; plot serious of, province, and autonomous regions, and municipalities Government construction competent sector revoked on review institutions of finds: (a) beyond finds of range engaged in construction figure review of; (ii) using not meet conditions review personnel of; (three) not by provides reported review process in the found of illegal violations behavior of;
    (D) in accordance with stipulations in the examination book and signed and sealed on the construction of (v) review of review content that is not in accordance with the regulations.
    23rd false examination book issued by the review bodies, construction of local people's Governments at or above the county level authorities of 30,000 yuan fine, provinces, autonomous regions and municipality building authorities to withdraw the review body found; illegal income shall be confiscated.
    24th in accordance with these regulations, grant review bodies fined, institutional legal representative and other persons body fines fines of 5% more than 10% below.
    25th of provinces, autonomous regions and municipality building departments in accordance with the provisions of these measures review bodies, building departments under the State Council shall order correction.
    26th State personnel in the construction drawing review regulatory dereliction of duty, abuse of power, favoritism and constitutes a crime, criminal responsibility shall be investigated according to law; do not constitute a crime, administrative sanctions according to law.