Electric Reliability Oversight Management Approach

Original Language Title: 电力可靠性监督管理办法

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
(April 10, 2007, the State electricity regulatory Commission announced as of May 10, 2007, 24th) first in order to improve the reliability of electric power supervision and management of power system safe and stable operation, in accordance with the Ordinance on electricity regulation, these measures are formulated.
    Article state electricity regulatory Commission (hereinafter referred to as the SERC) is responsible for the supervision and management of the national electric reliability; electric power reliability management center of the Council (hereinafter referred to as Center) is responsible for the supervision and administration of the national electric reliability work and assume power reliability management services industry; electricity regulatory Commission within the agencies responsible for supervision and management of electric reliability.
    Article III power plants, power transmission companies, electricity companies and other enterprises engaged in electricity production (hereinafter referred to as electric power enterprises) electric power reliability management should be in accordance with these measures.
    Fourth article power reliability supervision management including following content: (a) developed power reliability supervision management regulations and power reliability technology standard; (ii) established power reliability supervision management work system; (three) organization established power reliability information management system, statistics analysis power reliability information; (four) Organization power reliability management work check; (five) organization implementation power reliability evaluation, and assessment work; (six) released power reliability index and power reliability regulatory report;
    (VII) to promote electricity reliability theory and application technology; (VIII) Organization of electric reliability training; (IX) carry out international exchange and cooperation of electric reliability. Fifth article power enterprise as power reliability management work of responsibility subject, should according to following requirements carried out this enterprise power reliability management work: (a) implementation about power reliability supervision management of national provides, and technology standard, developed this enterprise power reliability management work specification; (ii) established power reliability management work system, implementation power reliability management post responsibility; (three) established power reliability information management system, collection analysis power reliability information; (four) accurate, and timely, and
    Complete submitted to electric reliability information; (e) application of electric reliability, improve the level of reliability of power systems and power facilities; (f) electric reliability technical training.
    Article sixth power reliability information management unified management, graded responsibility, to establish a unified national electric reliability information management system.
    Seventh article power enterprise should submitted following information: (a) power equipment reliability information, including power host, and power auxiliary equipment basic situation and run situation; (ii) lost variable electric facilities reliability information, including power side, and grid side lost variable electric facilities basic situation and run situation; (three) DC transmission system reliability information, including DC transmission system basic situation and run situation; (four) power reliability information, including power basic situation and run situation;
    (E) the power reliability management and technical analysis reports; (vi) significant unplanned outage, power outage event analysis report. Eighth power reliability information submitted in accordance with the following provisions: (a) the SERC city the authority and supervisory Office (hereinafter referred to as the city electricity regulatory Commission) area sent electricity to urban electricity regulatory Commission in a newspaper city electricity regulatory Commission summary report after verifying the SERC region authority (hereinafter referred to as the regional electricity regulatory Commission). Regional power company, without the city electricity regulatory Commission Office of provinces, autonomous regions and municipalities within the electric power enterprise, submitted directly to the regional office.
    Regional totals reported to the Center after the electricity regulatory Commission. (B) the central electric power enterprises, other asset reliability Center of trans-regional power companies to submit.
    Among them, China Southern power grid Corporation shall submit simultaneously to the Administration in the area. Nineth article power Enterprise submitted power reliability information should meet following term requirements: (a) monthly 10th Qian submitted Shang month power host reliability information; (ii) each quarter of 15th recently submitted Shang a quarter power auxiliary equipment, and lost variable electric facilities, and DC transmission system and power reliability information; (three) annual January 20 Qian submitted Shang a annual power reliability management work report and power reliability technology analysis report; (four) major non-plans stopped shipped, and
    Blackouts submitted within one month after the event analysis report. Tenth city electricity regulatory Commission should be since the date of power enterprise information submission deadline within the 3rd regional electricity regulatory Commission to submit the summary information of the province.
    Regional Bureau of urban electricity regulatory Commission shall submit information within 5th deadline submission to center the summary information of the region. 11th electric level regulator for power system reliability evaluation. Evaluations carried out by the center of electric reliability.
    Power reliability assessment measures for implementation shall be formulated.
    12th electric reliability evaluation should be guided by principles of objectivity, fairness and justice.
    Article 13th reliability evaluation of electric power, electricity can be submitted to the relevant investigation to verify the information.
    14th annual electric reliability evaluation results after examination by the SERC unified publishing.
    15th SERC and their agencies implementation of the supervision and inspection of electric reliability, can take the following measures: (a) into electricity Enterprise check and ask related personnel requiring them to check to spell; (b) inspect, copy and check documents and materials relating to the matter.
    16th electric power enterprises and their staff shall coordinate with, assist the SERC and its agencies make on-site inspections, in accordance with the relevant provision of relevant information and data.
    17th SERC and its staff on the basis of the implementation of the measures related to electricity reliability supervision work, be investigated for responsibility according to law.
    18th electric power enterprises, one of the following acts shall be investigated for criminal responsibility: (a) making false statements on or concealing power reliability information; (b) falsifying or tampering with electricity reliability information; (c) refusing to report or repeatedly delaying power reliability information; (d) refuse or impede the electricity regulatory body and its staff shall conduct inspection and verification. 19th article this way since May 10, 2007.
                                                                                                            Originally issued by the State economic and Trade Commission on October 13, 2000 of the interim measures for the administration of electric reliability (economy and trade electricity [2000]970) repealed simultaneously.