Ministry of housing and urban-rural development on amending housing construction and acceptance of municipal infrastructure project for the record of the interim measures for the administration of the decision

    (October 19, 2009 People's Republic of China housing and urban-rural development announced come into force on the date of promulgation, 2nd) decided on the Department of housing and urban-rural construction of the housing construction and the municipal infrastructure project completion acceptance for filing of interim measures for the Administration (Ministry of construction, the 78th) read as follows:

    One, name changed to "the housing construction and management measures of municipal infrastructure engineering acceptance record."

    Second, fifth subparagraph (c), by deleting "fire".

    Adding a third, fifth, paragraph "(d) the legal requirements should be issued by the Fire Department for large densely populated places and other special proof of acceptance of construction project".

    Four, the fifth paragraph is amended as "housing project residential quality guarantee should be submitted and the housing with the instruction".

    Five, modify the article to "construction project completion acceptance date without completion record in the 15th, for the rectification, fined a maximum of between 500,000 yuan and 200,000 yuan."

    In addition, some appropriate changes in the text of the provision. Purposes from the date of publication of this decision.

    The housing construction and urban infrastructure project completion acceptance of interim measures for the administration of record filing of corresponding amendments shall be made according to this decision, publish it again.

    Report: housing construction and acceptance of municipal infrastructure project management approach (2009 revision)

    (April 4, 2000, the Ministry of construction, the 78th published October 19, 2009, the housing and urban-rural construction on amending housing construction and urban infrastructure project completion acceptance decision on the interim measures for the administration of record filing of amendments)

    First in order to strengthen the management of quality of housing and municipal infrastructure projects, in accordance with the regulations on the management of construction engineering quality, these measures are formulated.

    Article in the People's Republic of China territory of new construction, expansion or reconstruction of various types of housing and municipal infrastructure engineering acceptance record, these measures shall apply.

    Third housing and urban-rural development Department of the State Council in charge of the national housing and urban infrastructure projects (hereinafter referred to as project) completion and acceptance of records management.

    Construction of local people's Governments at or above the county level within the Department responsible for the administration management of the engineering acceptance record.

    Fourth section units shall from the date of project completion acceptance in the 15th, in accordance with this regulation, to the local people's Governments at or above the county level, where the engineering building departments (hereinafter referred to as the record) record.

    Article fifth unit handle engineering acceptance record shall submit the following documents:

    (A) completion inspection record form; (B) the project completion report.

    The completion report shall include the build date of the project, construction permits, construction drawing design document review, survey, design, construction, project management and other units were signed quality documentation and acceptance of signed acceptance of the original file, municipal infrastructures on the quality detection and functional test data and records it deems it necessary to provide relevant information;

    (C) the provisions of laws and administrative regulations should be planned, endorse document issued by the Environmental Protection Department, or permit the use of the file;

    (D) legal requirements should be issued by the Fire Department for large densely populated places and other special proof of acceptance of the construction project;

    (E) signed by the construction unit project repair books;

    (Vi) other documents required by laws and regulations.

    Residential projects should also be submitted to the residential quality guarantee and the housing with the instruction manual.

    Sixth filing authority received the construction unit acceptance of submitted filings, verify that the files are complete, should be on the table in project completion acceptance receipt of signed documents.

    Project completion acceptance application form in duplicate, one retained by the owner, by leaving a copy of the record on file.

    Article seventh engineering quality supervision organization shall, within the completion date of the 5th, project quality supervision report to the filing authority.

    Eighth filing authority found the construction unit in the process of completion and acceptance of acts in violation of the relevant provisions on administration of construction project quality, should be received final acceptance of filings in the 15th, ordered to stop using, reorganizing the acceptance.

    Nineth construction units in engineering acceptance of 15th does not go through the project acceptance from the date of filing, the filing shall be ordered to correct within, fined a maximum of between 500,000 yuan and 200,000 yuan.

    Tenth unit will record authorities decided to reorganize the final acceptance of works, in reorganizing prior to acceptance, unauthorized use of, the filing shall be ordered to stop using, penalty of between engineering contract price 2% 4%.

    11th construction units required for project completion acceptance record of using false documents, project completion acceptance is invalid, the filing shall be ordered to stop using, reorganizing the acceptance, fined a maximum of between 500,000 yuan and 200,000 yuan constitutes a crime, criminal responsibility shall be investigated according to law.

    Filing authority decided to reorganize the final acceptance of the 12th bar and ordered to stop using the engineering unit before the record has been put into use or construction losses caused by continued use without authorization from the employer liable.

    13th final acceptance of filing complete, for the organs and their staff do not handle formalities, by the relevant agency ordered corrective action and to directly responsible shall be given administrative sanctions.

    14th emergency rescue and disaster relief work, temporary housing construction and farmers built low-rise housing projects, these measures are not applicable.

    15th military housing construction acceptance filing, in accordance with the relevant provisions of the Central Military Commission.

    The 16th people's Governments of provinces, autonomous regions and municipalities housing and urban development departments in accordance with this approach to implementing rules. 17th purposes herein from the date of publication.