Hunan Provincial Water Management Approach

Original Language Title: 湖南省水文管理办法

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Get a Day Pass for only USD$19.99.
(June 2, 2003, Hunan provincial people's Government 9th Executive session on June 24, 2003, Hunan provincial people's Government, the 174th published) first in order to strengthen the management of hydrological, accurately and in a timely manner well hydrologic and rational development and utilization of water resources, according to the relevant regulations of the State, combined with the facts of the province, these measures are formulated.
    Article in within the administrative area of the province engaged in hydrological network construction and management, hydrology and water resources monitoring, hydrologic information and forecasting of water resources, water resources investigation and assessment activities shall abide by these measures.
    Third provincial water conservancy administrative departments provincial hydrology authorities.
    City, State, County and city water conservancy administrative departments of the people's Government implementation guidance of hydrologic work within their respective administrative areas.
    Provincial hydrological institutions to implement specific management of hydrologic work in the province.
    Fourth hydrological cause in people's Governments above the county level shall be incorporated into the national economic and social development plan.
    Governments and the competent authorities shall, in accordance with relevant regulations of the State, costs relating to special funding arrangements in a certain percentage of water conservancy for hydrologic undertakings.
    Fifth provincial water conservancy administrative departments organize provincial hydrological institutions hydrological planning, submitted to the provincial people's Government for approval.
    Hydrological planning shall solicit opinions related to municipal people's Government, in line with the comprehensive River basin planning and integrated regional planning. Sixth national basic hydrological station network, the provincial governments for construction of water conservancy administrative departments under the unified State Planning Organization, the provincial hydrological management.
    Local hydrological station network, the provincial water conservancy administrative departments of unified planning and hydrology Agency Organization and management.
    Hydrometric station the establishment, transfer, modification, cancellation, in accordance with the procedures prescribed by the State.
    Article seventh reservoir water, medium and large hydropower project management unit, must have a hydrological hydrological station in, flood facilities or the establishment of a dedicated, hydrological institutions upon the acceptance by the province put into use.
    Hydrological automatic measuring and reporting system of water project management unit to build, should be set up to have the right to dispatch the people's Government of flood control and drought relief command and hydrological hydrological information transmitted channel.
    Article eighth hydrological institutions, hydrometric station and hydrological functioning of water management units should be based on national technical standards, accurate and timely for hydrological monitoring, ensure the quality of monitoring results. Hydrological agencies set up water levels, rainfall, groundwater observation points, escrow entity or individual may be entrusted.
    Clients should comply with the relevant provisions of hydrological management. Water Administrative Department of the people's Governments above the county level shall organize and hydrological agencies, hydro-station monitoring of water function areas of the water quality.
    Found total emissions of key pollutants over control of, or waters water quality does not meet performance requirements, shall promptly report to the relevant people's Government to take measures, and to inform the Administrative Department of environmental protection.
    Nineth, hydrological institutions should establish the province's hydrological database, and is responsible for the province's hydrological data collecting, processing and review, compilation. Hydrologic station and hydrologic observing water project management unit of the business shall, in accordance with national standards, the integration of data of hydrology and water resources, submitted to the provincial hydrological institutions compiled on an annual basis.
    Without the provincial hydrological agencies compiled data of hydrology and water resources may not be available to other units or individuals to use.
    Article tenth hydrological institutions, hydrometric station and hydrological functioning of water project management unit, must according to the provincial flood control and drought relief command structure and water administration authority requirements, submit timely and accurate collection, transfer, hydrological information and forecasting.
    Hydrological agencies participate in the flood control and drought relief commanding institutions under the same level of flood control and drought relief work.
    11th Hydrographic Office, radio management and communications departments should closely cooperate with, ensure that hydrologic communication networks open, accurate and timely transmission of hydrological information and forecast. 12th hydrological condition of institutions and other eligible units engaged in hydrology and water resources survey and evaluation activity, corresponding qualifications shall be obtained in accordance with relevant regulations of the State.
    Valley City State or regional hydrology and water resources survey and evaluation, commissioned by the provincial Department of water administration hydrological institution with a grade a qualification certificate.
    13th relevant departments of the people's Governments above the county level and the organizational review Ford engineering planning and design, it shall notify the triage of hydrological institutions Wade engineering hydrology section.
    14th hydrological institutions should be in accordance with national technical standards ongoing hydrological analysis and calculation work, and ensure the quality of hydrological calculation results.
    Province-or basin-wide hydrologic calculation tasks assumed by the provincial hydrological agencies, its hydrologic calculation results reported to the provincial Department of water administration in accordance with the administrative rights organizations audited. 15th article hydrological test River, and test facilities, and meteorological observation field of protection range, by hydrological institutions according to following standard and actual need proposed programme, sought about sector of views Hou, reported County above Government review approved be announcement, and established logo: (a) test river protection range: from test River Shang than precipitation feet section of upstream 20 meters up, to Xia than precipitation feet section downstream river width 1 time times check of River on both sides of history highest flood following of regional; not set than precipitation feet section of,
    Mapping from float 20 meters upstream of the flow cross section, between buoys width transport in the metering section 1 time history highest flood water level in the following areas on both sides of the channel.
    (B) testing facilities and meteorological observation protection range: testing facilities around the 10 m; meteorological observation around 15 meters.
    16th article hydrological test River, and test facilities, and meteorological observation field protection range within, ban effect hydrological test of following behavior: (a) planting trees, and high Rod crop; (ii) built built (frame) built real, and stacked material; (three) take soil, dug sand, quarrying, gold rush, dumping garbage waste, emissions sewage; (four) docked ship, and rafts; (five) erection line. Article 17th hydrological institutions should strengthen the hydrological facilities construction, maintenance, protection, and management.
    Any units and individuals have the obligation to protect hydro facilities. Prohibit the appropriation or destruction of hydrological instruments, flags, cable, channel, ships, docks, logging site, communication facilities.
    Crowding or interference hydrological wireless channel, channel is prohibited. 18th in the hydrological station may be built within the scope of upstream and downstream to determine impact on hydrologic engineering.
    Due to national or local key projects need to be built, construction units shall in the construction (construction) before the provincial hydrological institutions or their programmes of agencies affiliated with the specified consultation no consultation programme, relevant departments shall not approve design needs demolition or hydrological station hydrometric station to take remedial measures, the costs borne by the construction unit.
    19th hydrometry in the navigable river operations, shall comply with the marine traffic management rules, hang warning signs, past boats, rafts shall give way.
    20th hydrological institutions, hydrological station in accordance with relevant provisions of national and provincial, can engage in hydrological professional paid services. 21st in violation of these rules, any of the following acts, commissioned by the provincial Department of water administration of hydrological institutions give a warning, rectification or take remedial measures may be fined a maximum of 200 Yuan more than 1000 Yuan.
    Which belongs to business activities of, can and at 1000 Yuan above 10000 Yuan following fine: (a) unauthorized established, and migration, and modified level, and revoked hydrological measuring station of, or not according to provides built hydrological test reported flood facilities, and established dedicated hydrometric station of; (ii) not integration or refused to submitted hydrological water resources monitoring information of; (three) in hydrological test River, and test facilities, and meteorological observation field protection range within, engaged in effect hydrological test behavior of; (four) design without approved, forced built engineering effect hydrological test of.
    22nd appropriation or destruction of hydrological instruments, flags, cable, channel, boats, docks, logging site, communication facilities, in accordance with the People's Republic of China water and the People's Republic of China Law on flood control provisions.
    Article 23rd water conservancy administrative departments, hydrological hydrological management of institutions for children in dereliction of duty, abuse of power, favoritism, corruption and misappropriation of hydrological resources, shall be subject to administrative sanctions constitutes a crime, criminal responsibility shall be investigated according to law.
                                                      24th article this way come into force August 1, 2003.

Related Laws