Tangshan Mine Disaster Reduction Management

Original Language Title: 唐山市防雷减灾管理办法

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
(July 27, 2004, considered and passed by the 19th meeting of the people's Government of Tangshan City on July 29, 2004, Tangshan City, the people's Government [2004] the 4th release come into force on September 1, 2004) first to strengthen the management of lightning disaster prevention, protection of national interests and people's lives and property safety, according to the People's Republic of China Meteorological law Hebei province, and the implementation of People's Republic of China Meteorological law measures, combined with the city's actual, these measures are formulated.
    Second approach applies within the administrative area of the city need to install lightning protection facilities and units and individuals engaged in lightning disaster prevention activities.
    Article lightning defense in these measures refers to defenses all the acts and mitigating lightning hazards, including the lightning protection and disaster reduction research, lightning detection lightning, monitoring, early warning and protection.
    Fourth article of the municipal level government organs, social organizations, enterprises and institutions shall formulate the lightning disaster prevention plans, establish and improve the safety management of lightning, personnel, funding, mine disaster report, mine safety performance testing, emergency rescue system, accept the supervision and inspection of lightning protection security. The fifth municipal meteorological authorities are responsible for the lightning protection and disaster reduction, organization, coordination, direction and management.
    In each County (City) area meteorological authorities are responsible for the administrative area of the lightning protection and disaster reduction management; there is no meteorological departments, the lightning protection and disaster reduction work by the municipal Meteorological Administration authorities are responsible for.
    City, County (City) public safety Committee responsible for supervising the lightning protection and disaster reduction work in the local guide.
    Development, planning and reform, public security, supervision, construction, property management and other administrative departments according to their respective duties, in collaboration with meteorological departments do the lightning protection and disaster reduction work.
    Sixth meteorological departments at various levels shall strengthen the lightning protection and disaster reduction science and lightning disaster prevention research, new technologies, new measures to promote the lightning protection and disaster reduction, ensuring the public accurate and timely weather forecasts and severe weather alerts, disaster monitoring, early warning of lightning, safety testing and evaluation.
    Meteorological departments at various levels shall organize seven lightning detection work within their respective administrative areas. Article eighth of lightning protection and antistatic grounding protection facilities and the testing system on a regular basis. General lightning protection device test once a year, lightning protection device for explosion hazardous environment inspection once every six months.
    Lightning protection devices failed to pass the test, the owner or the holder shall timely rectification. Lightning protection devices using units shall do the routine maintenance work, specify the person in charge, ensure stable and reliable lightning protection devices.
    Technical maintenance is required, and shall promptly report to the detection unit to deal with it.
    Nineth article following places or facilities must installation lightning disaster protection device: (a) buildings anti-mine design specification provides of a, and two or three class buildings; (ii) oil, and chemical, and gas, flammable easy burst items of production, and transportation, and conveying, and sales, places and facilities and large entertainment and amusement facilities; (three) power production facilities and lost distribution system; (four) communications facilities, and broadcast TV system, and computer information system, and control and monitoring facilities;
    (E) countries and require the installation of lightning protection device in the province's other venues and facilities.
    Tenth lightning protection design of the implementation system.
    New construction, expansion, renovation of buildings, structures and ancillary facilities need to install lightning protection device, organization design meteorological departments shall participate in drawing units. Lightning protection designs do not conform to the standards, specifications, organized triage unit shall issue a written notice.
    Design units should be modified in accordance with the notice, and in accordance with the procedure for approval.
    11th new construction, expansion, renovation of buildings, structures and ancillary facilities need to install lightning protection devices, lightning protection engineering design has not been approved, construction works shall not be delivered.
    Approved lightning protection design, construction units must be carried out in strict accordance with the design and construction, construction process needs to be changed and modified in mine engineering design shall be in accordance with the procedure for approval.
    12th meteorological departments should be according to the lightning protection project in terms of progress, organizational phase detection in a timely manner, inform the contractor in writing and testing results, the construction unit when it is completed, should refer to the test results. Lightning protection facilities construction project is completed, the construction unit should apply to local meteorological departments lightning protection engineering.
    Qualified, to lightning protection facility certification; failed and issue rectification notice, units and construction units should be in accordance with the notice of completion and timely review.
    Lightning-free facilities construction certificate shall not be put into use.
    13th article in which are within the city limits in lightning protection design and installation of the units and individuals shall obtain the relevant qualification and level of qualification within the lightning design and installation activities.
    Outside of the entity or individual engaged in lightning protection device in the administrative area of the city design or installation activities, shall hold a valid certificate to the local people's Governments above the county-level meteorological departments for the record.
    14th administrative area of the city within all organizations or individuals using lightning products, shall be subject to supervision and inspection of the municipal meteorological authorities.
    Lightning protection prohibited the use of substandard products. 15th meteorological departments at various levels are responsible for the organization within the administrative area of the city of lightning disaster investigation, statistics, evaluation and reporting.
    Safe production supervision and administration institutions at all levels, and shall cooperate with the local meteorological departments to do survey work, and accident investigation, identification of the citizens, legal persons or other organizations should extend support and cooperation.
    Each County (municipality) regional lightning disaster investigations should be timely submitted to the competent meteorological archive record.
    16th suffered lightning damage to the units and individuals, should be in local meteorological departments within 3rd report after the disaster, and assist the competent meteorological departments in the investigation and identification of the lightning.
    Public facility damage due to lightning, public facility owners or the victim can apply for municipal meteorological authorities on the identification of hazards.
    17th article units or personal has following behavior one of of, by meteorological competent institutions at 1000 Yuan above 10,000 yuan following fine; plot serious of, at 10,000 yuan above 50,000 yuan following fine: (a) should installation lightning disaster protection device no installation, and by meteorological competent institutions ordered installation Hou still refused to installation of; (ii) new, and expansion, and alterations of lightning disaster protection device without detection, unauthorized input using of; (three) installation of lightning disaster protection device not meet requirements, and not according to requirements rectification of;
    (D) the lack of lightning protection engineering design or construction qualification or qualifications, arbitrarily engaged in mine engineering design or construction.
    18th units or individuals engaged in lightning protection device without authorization testing activities, by the municipal meteorological authorities to be warned and fined a maximum of 1000 Yuan.
    19th Lightning Safety supervisory and management personnel for neglect, resulting in heavy lightning accidents, should be given an administrative sanction; heavy losses to the States interests or people's lives and property, crime, transferred to judicial organs for criminal prosecution.
    Lightning due to human factors, resulting in fire, explosion, injury, or other significant losses, given by an organization or higher authority directly responsible for sanctions; suspect, transferred to judicial organs for criminal prosecution. Article 20th meteorological departments for specific administrative acts, may apply for administrative reconsideration or bring an administrative suit.
    Within the statutory time limit does not apply for reconsideration or sue or carry out a specific administrative act, meteorological departments by making a specific administrative act apply to a people's Court for compulsory execution.
                  21st article this way come into force on September 1, 2004.