Advanced Search

Fushun City Development And Application Of New Type Of Wall Material And Building Energy-Saving Management Regulations

Original Language Title: 抚顺市新型墙体材料开发应用和建筑节能管理规定

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.

(Adopted by the 33th ordinary meeting of the Government of the city on 30 March 2006 in response to Order No. 118 of 10 April 2006 of the People's Government of the city, which was published as effective 20 May 2006)

Article 1 enhances the management of buildings in order to promote the development of new wall materials, in accordance with the relevant laws, regulations and regulations, such as the People's Republic of China Energy Act, to develop this provision in the light of the actual practice of this city.
Article II units and individuals involved in the development, production and use of materials in the present administration, as well as construction planning, design, construction, construction, treasury, etc., shall be subject to this provision.
Article III refers to the new type of material referred to in this Article, which means the construction of wall materials that meet the requirements of national or industry-related technical standards, in addition to bricks.
This provision refers to activities aimed at reducing the depletion of civilian buildings.
Article IV reproduces urban and rural construction committees as administrative authorities for the development of new wall materials in the city and for the construction of buildings. The Office of the New Type of Wall Materials in the City (hereinafter referred to as the commune wall conversion) is responsible for the development of applications for new types of wall materials in the city and the day-to-day management of the construction.
In line with their respective responsibilities, the relevant sectors of the city are working in conjunction with the development of applications and buildings for new types of wall materials.
Article 5 provides recognition and incentives to units and individuals that have contributed to the development of new wall materials and to the performance of buildings.
Article 6 prohibits new construction, the expansion of bakery production and production lines. The existing brick production enterprise and production lines should be limited or technically adapted, and the conversion of new types of wall materials such as bricks, diabebs, could not continue to produce bricks that could not be easily sustained after the drying of the source.
The production, use of bricks is prohibited in the context of new zones, prefabricated zones, East Africa region, city-and-urban areas, economic development zones; construction works for construction, expansion or alteration, and new types of wall materials should not be used in addition to the requirements of the engineering ± 0.00 line and the design of the Department.
In line with the construction of more than 0.00 ax lines in the areas of the district, the identification of the former and the towns of the new guest, the use of bricks should be used for new types of wall materials.
Article 7 encourages the development and extension of the following new types of materials:
(i) The burning of bricks and empty bricks, such as coales, coales, page rocks, end-of-going mines and stoves (30 per cent of the quality compared to ≥ 30 per cent);
(ii) General steadfast, polybricks and lights for small-scale aircrews;
(iii) Buildings that meet national standards or industry standards for the construction of walls inside and outside buildings;
(iv) Prefabricated and existing concrete walls;
(v) Other new types of wall materials encouraged by States, provinces.
Article 8 encourages research and extension applications for technology and products in the following construction sections:
(i) Be able to enhance the design of energy efficiency in the construction section and to increase new materials, new products and new processes for the sympathetic power of the building block structures;
(ii) Saving materials, supporting materials and building windows that have a marked, long-lasting and high-quality wall;
(iii) Integrated use of technologies and products for renewable energy, such as solar, geothermal;
(iv) Sections can light technology and products;
(v) High efficiency, low heating, air regulation and wind equipment;
(vi) The control, regulation and measurement of heating technologies and equipment;
(vii) Design, technology and products suitable for the self-building of farmers;
(viii) Improvement of technology and products in both buildings;
(ix) Improve the heat efficiency of the heat system and technologies for reducing heat losses, including for thermal energy management techniques, and products.
The new construction, expansion or alteration of civilian buildings under article 9, should be designed in strict compliance with the mandatory standards of national, provincial buildings and related protocols.
Article 10. The construction units shall be designed to entrust the project with the design of the project in accordance with the requirements of the Section and in accordance with the mandatory standards of the construction section, without any unauthorized modification of the design document.
Article 11. The design cell should be designed in accordance with the mandate of the construction unit and the mandatory standards and norms of the construction section to ensure the quality of the construction section.
The construction map review body, when carrying out the construction map review, should design the construction section as an essential element of the construction map review and non-reviewed projects that violate the mandatory standards of construction.
The construction map was reviewed in line with the project that did not meet the mandatory standards of construction, and the construction of administrative authorities would not grant construction permits; the review of qualified projects should be accompanied by the Civil Construction Section's design of the registration schedule for the review process within 10 working days.
Article 13. The construction units shall be strictly constructed in accordance with construction maps that meet the mandatory standards of the construction section and shall guarantee the quality of construction work.
Article 14.
Article 15. The construction quality monitoring body should monitor the design of documents and related provisions in accordance with the construction section, prohibiting the use of technical, material and other projects that do not meet the standards of construction and design documents, and should be recorded in the case.
Article 16 provides for the certification and phase-out of new wall materials and construction products.
The production of enterprises is in line with the new type of wall material provided by the State and is subject to preferential policies for tax relief under national provisions.
The material of the wall shall not be used by the industrial solid waste that endangers human health and to produce new types of materials of the wall.
New types of material and construction energy products that are not subject to product standards or are not certified are prohibited. Untested or unqualified products are not allowed to go.
The municipal walls change section is responsible for the accreditation of new types of wall materials and construction items throughout the city. The certified products are regularly published by the municipal authorities through the media.
Article 17 builds new, expanded or modified construction works, and construction units and individuals shall pay special funds (hereinafter referred to as special funds) in accordance with the relevant criteria prior to the start of the operation and receive payment for registration of the municipal wall.
Section 18 provides for the establishment of the identification system. It was determined that the work was carried out by the municipal walls.
Construction works should be subject to inspection supervision of the use of materials and the construction of buildings.
Within 30 days after the completion of construction works, the construction unit filed an application for the use of new wall materials and the related supporting materials available in the construction section, which was returned to the financial sector in accordance with the specified funds.
In 60 days from the date of receipt of the application, the municipal walls will be inspected for the use of new types of wall materials and other buildings that meet the standards of energy-efficient buildings and for the use of new wall materials, to return to the appropriate special funds in accordance with the proportion and the effectiveness of the use of new wall materials.
The following Article 19 construction work is free of the dedicated funds:
(i) Non-profit social welfare construction works;
(ii) Roads, bridges, navigations, construction of drainage facilities;
(iii) Construction of work on farmland;
(iv) Environmental pollution governance and waste residues, wastewater and integrated use construction works;
(v) The inclusion of the archipelag of maintenance works in the area of the protection of property;
(vi) The provincial Government has approved other construction projects that are free of payment.
Article 20, in violation of article 6, paragraph 1, of the present provision, provides for the construction, expansion of the artimeter production enterprise and production line, and for the production of bricks by the local source after the exhaustion of the bricks, which is converted by the municipal administrative authorities and fines of up to 3,000 dollars.
In violation of article 6, paragraph 2, the construction of a ± 0.00 line within the urban area is used for the burning of bricks, which is being restructured by the municipal authorities and fines for each single engineering unit of 3,000 dollars.
In violation of article 10 of this provision, construction units expressly or imply that design units violate the mandatory standards of the construction section, reduce the quality of construction work, be converted by the urban construction administrative authorities and fines of over 500,000 dollars.
In violation of article 11 of the present article, the design cell was not designed in accordance with the mandatory standard of construction, which was redirected by the municipal executive authority, with a fine of up to 300,000 dollars.
Article 23, in violation of article 12 of the present article, the construction map review body has not reviewed the construction map in accordance with the requirements, and the construction of the administrative authority in the city is changing the order of the parties and their units and pays a fine of up to 3,000 dollars dollars; in serious circumstances, the removal of the eligibility to review.
Article 24, in violation of article 13 of the present provision, the construction unit has not been constructed in accordance with the construction map consistent with the mandatory standards of construction in the construction section, which is restructured by the urban construction administrative authority and is fined by more than 4 per cent of the engineering contract price.
Article 25, in violation of article 17 of the present article, construction units and individuals do not pay the earmarked funds prior to the start of the operation, shall be charged by the city's administrative authorities to supplement the earmarked funds and receive a lapse from the start of the work day.
Article 26 builds administrative authorities and their staff, in violation of this provision, toys negligence, abuse of authority, provocative fraud, and to administratively dispose of them by their units or superior organs; and to hold criminal responsibility under the law.
Article 27 is inconsistency with administrative penalties and may apply for review to the superior administrative organ or the Government of the people at the highest level, within 60 days of the date of receipt of the sanctions decision, or to the People's Court in accordance with the law.
Article 28 of this provision is implemented effective 20 May 2006.