(July 31, 2006 Huainan municipal people's Government at the 28th Executive meeting on August 9, 2006, Huainan municipal people's Government announced come into force on the date of promulgation, 106th) road, Huainan municipal people's Government for decision of the regulations read as follows: first, the article is revised as follows: "city and County traffic Administration Department is an administrative area of the Highway Department, their respective Highway administrative departments are responsible for road management work. The relevant administrative departments shall, in accordance with their respective responsibilities, with the traffic Administrative Department and highway administrative departments are responsible for road management work. "Second, sixth paragraph is amended as:" the road management institutions shall delineate control areas on both sides of the highway set the stakes, and boundary markers. "After the third, the amendments add a 20th:" engaged in mining operations on both sides of the road, should maintain a safe distance from Highway should not endanger the security of its facilities and endanger the safety of roads and facilities, protective measures should be taken and reported to the management body. "Four, increased a revised 21st:" overload the site approved by the provincial people's Government, transport vehicles have been inspected and over-limit and should uninstall overrun parts cannot be unloaded, it shall provide for effective protective measures. "Five, 20th is amended as:" the violation of the first paragraph of this article seventh, or buried in the road construction within the controlled area without authorization pipelines, cables and other facilities, managed by the Highways Agency ordered dismantled, and to a fine of up to 50,000 yuan; fails to dismantle, managed by the Highways Agency removed, the costs are borne by the builders, building. "Six, and 21st article modified for:" has following behavior one of of, by highway management institutions ordered stop violations, and can at 30,000 yuan following of fine: (a) unauthorized occupied, and mining highway of; (ii) across Highway built bridge, and aqueduct or in highway with to range within erection, and laid pipeline, and cable, facilities, without agreed or not according to highway engineering technology standard requirements of; (three) engaged in endanger Highway security job of; (four) vehicles in highway Shang unauthorized super limited driving of; (five) iron round car, and Tracked vehicles and other machines that may damage the pavement at highway speeds without authorization; (vi) damage, or move or alter ancillary facilities of roads damaged, moved the building controlling stakes, boundary markers, which may endanger road safety. "Seven, 22nd is amended as:" the violation of the provisions of article 15th, managed by the Highways Agency ordered dismantled, and to a fine of up to 20,000 yuan; fails to dismantle, managed by the Highways Agency removed, the costs borne by the setter. "Eight, 23rd is amended as:" the violation of the provisions of this article 14th, by road authorities be ordered to desist from the illegal act and to a fine of up to 5000 Yuan. "Nine, 24th is amended as:" the violation of the provisions of the first paragraph of this article 19th, managed by the Highways Agency to a fine of less than 1000 Yuan. "Ten, 25th is amended as:" violation of the relevant provisions of this approach, of damage to highways, shall bear civil liability should be given administrative penalties for public security, in accordance with the People's Republic of China public security management punishment law provides for penalties constitutes a crime, criminal responsibility shall be investigated according to law.
    "Regulatory provisions in order to make the appropriate adjustments.
    This decision shall come into force as of the date of.
    Of the Huainan city road management measures be revised according to this decision, republished. Annex: Huainan Highway highways management approach (2006 amendment this) attached: Huainan Highway highways management approach (2006 amendment this) (November 2, 1998 Huainan Government makes 72nd, released according to August 9, 2006 Huainan Government on modified straddling Huainan Highway highways management approach of decided Amendment) first chapter General first article for strengthening Highway Highways Management, guarantees Highway intact, and smooth, according to People's Republic of China Highway method, about legal, and regulations,
    This municipality actually, these measures are formulated.
    Article of the present regulation is applicable within the administrative area of the city of state highways and provincial roads, county roads and township roads road management.
    Article city and County traffic Administration Department is an administrative area of the Highway Department, their respective Highway administrative departments are responsible for road management work.
    The relevant administrative departments shall, in accordance with their respective responsibilities, with the traffic Administrative Department and highway administrative departments are responsible for road management work. Article people's Governments at various levels shall strengthen the leadership of road management work.
    Road management institutions should endeavour to adopt scientific management methods and advanced technical means to improve highway management level, improve road service facilities, ensuring good and smooth.
    Fifth article of any units and individuals have the obligation to protect highways and ancillary facilities, may not be damaged or illegally occupied roads and ancillary facilities.
    Chapter II highways managed sixth in the roadside from roadside ditches or Swales, toe berm outside origin, according to the National Highway not less than 20 metres, the DART is not less than 15 m and county roads is not less than 10 m and township roads designated control areas not less than 5 m.
    Road management institutions shall delineate control areas on both sides of the highway set the stakes, and boundary markers.
    Seventh in road construction within the control area, except for Highway protection, maintenance, and prohibited the construction of buildings and structures on the ground.
    Close to the inside of the curve or level crossing of highway construction of buildings and structures on the ground, shall conform to the requirements of highway planning. Article eighth plan and the new towns, development, markets should avoid road; really necessary along the highway, should be carried out on the road side, and set the drainage system.
    The drainage should be at the bottom outer edge of the shoulder height 50 cm.
    Nineth addition of the level crossing on the highway, should be approved by the highway authorities and public security traffic management authority, in accordance with the State standard.
    Tenth Planning Administration and land administration examination and approval on both sides of highway construction projects and construction of land involving the control areas, shall solicit the views of road management agencies. 11th no unit or individual is allowed to occupy or dig the roads without authorization. Absolutely necessary to occupy or dig or the highway relocation, shall in the construction a month ago, carrying the relevant documents of ratification, to apply to the highway authority, approved and paid the fee, to be mining in the specified scope, time or occupied.
    Affecting the safety of traffic, you should also ask the public security traffic management authorities for permission.
    12th water, gas, telecommunications, cables and other underground pipelines due to sudden failure to repair, mining, mining unit or individual shall, within 48 hours go through examination and approval procedures.
    13th article after approved mining highway of, in construction Shi should comply with following provides: (a) construction site set obviously of security logo and protection facilities, night hanging red; in traffic busy sections, construction site ends was command traffic; (ii) half site construction, stay recovery Hou again construction addition half site; (three) met has underground pipeline should immediately stop construction, and units contact, properly solution rear can continues to construction; (four) construction material stacked neatly.
    After the project is completed, according to no less than the original technical standards of Highway repairs, alterations or appropriate financial compensation.
    14th article in highway, and highway with to range within ban following behavior: (a) set hut, and stalls, and maintenance field and he temporary facilities; (ii) set poles, and transformer and the along Highway laid underground pipeline, permanent facilities; (three) stacked garbage, and material; (four) take soil, and diversion irrigation, and emissions sewage, and planting crop, and burn kiln, and business billet, and composting, and play Sun grain, and pulled steel, and mixing cement mortar and the other similar job; (five) for Bazaar; (six) using bridge added set gate, and du bad, and pipeline;
    (VII) blocked gutters, culverts, and other damage, pollution, roads and affected traffic behaviour.
    15th no units and individuals are not allowed to use the highway within the billboards, store brand, other than publicity, placards and other road signs signs really necessary to set, after regulatory approval should be reported to the highway, made in accordance with uniform standards, at specified locations. 16th article over highway of limited contains, and limited high, and limited wide, and limited long standard of vehicles, shall not in highway Shang driving; over Highway limited contains standard, does needed driving of, should comply with following provides: (a) ahead of 10 days to Highway management institutions application, and provides about data and information; (ii) Highway management institutions on by to passage of highway, and highway bridge for field exploration, determine actual hosted capacity; (three) by highway management institutions and police traffic management organ approved, and law paid about costs Hou, according to specified of time
    , Course, speed and (iv) vehicle traffic should be hanging sign, and take effective protective measures as required.
    17th no unit or individual is allowed to damage or move or alter ancillary facilities of roads must not steal stored along the road management and maintenance unit in the highway of sand, stone, clay and other materials. 18th post and telecommunication, radio and television, power supply units, such as highways street trees need to be pruned, should be approved by the highway authority.
    Highways street trees need to be pruned due to sudden failure can be trimmed, but should be within 48 hours of completing the formalities. 19th big damage caused by vehicles on the road, it should be immediately suspended.
    Owners should protect the scene and timely report the authority, by the highway authority's investigation.
    Public security organs in dealing with traffic accidents, involves damaged roads, shall promptly notify the road authority inspection damage.
    20th on the highway on both sides engaged in the mining operation, should maintain a safe distance from Highway should not endanger the security of its facilities and endanger the safety of roads and facilities, protective measures should be taken and reported to the management body.
    Article 21st overload the site approved by the provincial people's Government, transport vehicles have been inspected and over-limit and should uninstall overrun parts cannot be unloaded, it shall provide for effective protective measures. Chapter III liability

    22nd article violates this article seventh paragraph, or buried in the road construction within the controlled area without authorization pipelines, cables and other facilities, managed by the Highways Agency ordered dismantled, and to a fine of up to 50,000 yuan; fails to dismantle, managed by the Highways Agency removed, the costs are borne by the builders, building. 23rd article has following behavior one of of, by highway management institutions ordered stop violations, and can at 30,000 yuan following of fine: (a) unauthorized occupied, and mining highway of; (ii) across Highway built bridge, and aqueduct or in highway with to range within erection, and laid pipeline, and cable, facilities, without agreed or not according to highway engineering technology standard requirements of; (three) engaged in endanger Highway security job of; (four) vehicles in highway Shang unauthorized super limited driving of; (five) iron round car, and
    Tracked vehicles and other machines that may damage the pavement at highway speeds without authorization; (vi) damage, or move or alter ancillary facilities of roads damaged, moved the building controlling stakes, boundary markers, which may endanger road safety.
    24th in violation of the provisions of article 15th, managed by the Highways Agency ordered dismantled, and to a fine of up to 20,000 yuan; fails to dismantle, managed by the Highways Agency removed, the costs borne by the setter.
    25th in violation of the provisions of article 14th, by road authorities be ordered to desist from the illegal act and to a fine of up to 5000 Yuan.
    26th article violates provisions of the first paragraph of this article 19th, managed by the Highways Agency to a fine of less than 1000 Yuan.
    27th in violation of relevant provisions of this approach, of damage to highways, shall bear civil liability should be given administrative penalties for public security, in accordance with the People's Republic of China public security management punishment law provides for penalties constitutes a crime, criminal responsibility shall be investigated according to law.
    28th transportation administration, highway authorities of dereliction of duty, favoritism, abuse of power, shall be given administrative sanctions constitutes a crime, criminal responsibility shall be investigated according to law.
    The fourth chapter by-laws article 29th of this approach the following terms mean: a "road" refers to the designated by the traffic Administrative Department of the city, urban and rural, country vehicle on public roads, including roads and bridges, tunnels and highway crossings.
    "Road" refers to the local people's Governments at or above the county level shall determine roadside ditches or Swales, toe berm outside the origin land of not less than 1 m.
    "Road installations" refers to the protection, conservation road and ensuring safe setting of drainage, conservation, protection, management, traffic safety, ferrying, monitoring, communication, charges, facilities, equipment, and special-purpose buildings, structures, and so on.
    Article 30th special roads road management may refer to these measures.
    Highway after consultation from municipal facilities administration management and conservation, these procedures do not apply.
    31st to specific problems in the application of these measures by the municipal traffic Administration Department is responsible for the interpretation.
                                                                  32nd article this way come into force on the date of promulgation.