Installation Of Sichuan Province (Repairing, Testing) And Electric Utilities Permits Pilot Scheme

Original Language Title: 四川省承装(修、试)电力设施许可试行办法

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
(May 17, 2006 Sichuan Province Government 89th times Executive Conference considered through October 16, 2006 Sichuan Province Government makes No. 204, announced since October 16, 2006 up purposes) first article for strengthening bearing loaded (repair, and try) power facilities license of management, convenient enterprise on bearing loaded (repair, and try) power facilities license of application and handle, specification bearing loaded (repair, and try) power facilities license behavior, according to national about provides, combined I province actual, developed this approach.
    The second installation (repairing, testing) power facility permit application, acceptance, examination, issuance, management and supervision, these measures shall apply.
    Article Chengdu office, the State electricity regulatory Commission in central China Bureau (hereinafter "Chengdu electricity regulatory Commission") in accordance with the relevant provisions of the State, is responsible for the contractors within the scope of its regulatory, Sichuan province (repairing, testing) and electric utilities the acceptance, examination, issuance of permits and daily supervision and management.
    Province, city (State) Economic Commission (hereinafter "Commission") in accordance with these regulations, take the corresponding installation (repairing, testing) permits administration of electric power facilities. Article fourth installation (repairing, testing) and electric utilities business, shall be in accordance with these measures require installation (repairing, testing) license of electric power facilities.
    No unit or individual without a license, shall not be engaged in installation (repairing, testing) and electric utilities business.
    Article fifth under the relevant national installation (repairing, testing) and electric utilities license class, grade and condition, considered themselves qualified and meet the grade standard units, are available to contractors (test) power facility permit application.
    Article sixth installation (repairing, testing) and electric utilities business unit, with the installation (repairing, testing) power facility licence, may apply to the Administration for industry and commerce business license or change of business scope.
    Article seventh installation (repairing, testing) power facilities business unit through the provincial Government Center Chengdu electricity regulatory Commission, as well as an electronic network to the Office installation (repairing, testing) power facility permit applications can also be submitted to the municipal (State) Commission proposed installation (repairing, testing) power facility permit application.
    City (State) Commission entrusted by the Chengdu Jian ban accepted installation (repairing, testing) power facility permit application.
    Eighth article has following case one of of, engaged in bearing loaded (repair, and try) power facilities business of units should application corresponding of license business: (a) holds of license has expired, needed again made license; (ii) holds of license validity will expires, needed continued license validity; (three) license of license matters occurred change, needed change license category or license grade; (four) units name, and residence or statutory representative people, license registration matters occurred changes, needed change license registration matters;
    (E) holding the original license issued by the competent authorities, to record but not valid, period to issue a permit.
    Nineth of municipal (State) Commission accepted installation (repairing, testing) power facility permit application, application materials should be first instance, trial observations made, Chengdu electricity regulatory Commission, report in a timely manner and reported to the Commission.
    Tenth Article Chengdu electric prison do should since accepted application or received city (State) Commission turned reported of application of day up 20th within with province Commission, units, and experts common composition experts Review Committee completed on application material of review (containing site verification), and according to following provides made whether license of decided: (a) by review, applicants of conditions meet statutory conditions, and standard of, should law made granted license of written decided and since made decided of day up 10th within to applicants issued, and served license;
    (B) upon examination, the applicant's condition did not meet the legal conditions and standards, it shall make a disapproval decision, notify the applicant in writing, the notice shall state the reasons for disapproval.
    Chengdu electricity regulatory Commission for issuing installation (repairing, testing) power facilities permit, it shall seek the views of provincial commissions, provincial commissions should reply in writing.
    11th Chengdu electricity regulatory Commission from the date of receiving notice in the 20th did not take a decision, approved by the electricity regulatory Commission Office official in Chengdu, you can extend the 10th and will inform the applicant of the reasons for such further period.
    12th electricity regulatory Commission Office in Chengdu in Sichuan Provincial Government Affairs Service Center set up a special window, in accordance with the requirements of open Government, scientific reviews, standardized operation, according to installation (repairing, testing) administrative licensing items of power facilities. 13th the licensee shall properly keep the installation (repairing, testing) license of electric power facilities.
    Once lost, the Chengdu electricity regulatory Commission in a timely manner, or (State) Commission report, applications for a replacement.
    A licensee shall not alter, resell, lease, lend installation (repairing, testing) license of electric power facilities.
    14th the licensee shall, in accordance with installation (repairing, testing) power facilities and limits of durability, security, Organization for the safety of power facilities contractors, contractors, trial construction.
    15th licensee shall strengthen the electricity facilities of contractors, contractors, trial construction quality and safety of daily supervision and inspection, establish appropriate annual self test system and will post the results of Chengdu power monitoring, and (State) Commission.
    16th Chengdu electricity regulatory Commission and the provincial, city (State) Commission shall strengthen the licensee is engaged in installation (repairing, testing) operations of the supervision and inspection of electric power facilities, special rectification activities carried out jointly by the Chengdu power Regulatory Commission, in conjunction with the province, city (State) consolidation efforts within the Commission responsible for the administration of organizations.
    Article 17th Chengdu electricity regulatory Commission and the provincial, city (State) Commission licensee engaged in the installation (repairing, testing) operations of the supervision and inspection of electric power facilities can be written or field inspections carried out in two ways, while accepting the illegal installation (repairing, testing) the business report acts of power facilities.
    Article 18th, Chengdu electricity regulatory Commission and the provincial, city (State) Commission licensee engaged in the installation (repairing, testing) power facility operations after conducting supervision and inspection, and make a decision according to the following provisions: (a) inspected the licensee's register, signature, license remain in force. (B) failed to pass the inspection of the licensee give notice of the rectification, to order rectification, rectification shall be carried out during production and business activities. Rectification qualified for registration, signature, license remain in force.
    Has not qualified the rectification shall be determined according to its actual conditions of approved licenses. 19th article has following case one of of, considered this approach 18th article provides of not qualified: (a) unauthorized Division or merged, not handle related procedures of; (ii) application license procedures Shi hide real situation, fraud of; (three) not established corresponding annual since check system of; (four) unauthorized engaged in and bearing loaded (repair, and try) power facilities license grade not match of business activities of; (five) enterprise assets, and professionals, and facilities equipment, situation occurred major changes, has not meet license provides,
    Not timely to Chengdu electric prison do and province, and city (State) Commission report of; (six) unauthorized altered, and reselling, and rental, and lending license; (seven) in bearing loaded (repair, and try) power facilities contract provides of shelf life within appeared major quality accident of; (eight) appeared major security accident of; (nine) violation national legal, and regulations of other case.
    20th article has following case one of of, Chengdu electric prison do should law handle bearing loaded (repair, and try) power facilities license of cancellation procedures: (a) license effective expires not application continued of or not was granted continued of; (ii) was license people for dissolved, and bankruptcy, and failed, and closed, reasons and law terminated of; (three) license law was revoked of; (four) for force majeure led to was license people not has engaged in license matters of capacity of; (five) according to national legal, and regulations and about provides should cancellation of other case.
    21st article was license people violation this approach provides, has following case one of of, by Chengdu electric prison do law give administrative punishment: (a) hide about situation or provides false application material, and provides false application material application license matters change of; (ii) take cheat, and bribery, not due means made license of; (three) take cheat, and bribery, not due means change license matters of; (four) altered, and reselling, and rental, and lending or to other form illegal transfer license of;
    (Five) beyond license range engaged in bearing loaded (repair, and try) power facilities business of; (six) engaged in bearing loaded (repair, and try) power facilities business process in the appeared major security accident or major quality accident of; (seven) not by provides handle registration change procedures of; not by provides provides reflect its activities situation of material or hide about situation, provides false material of.
    (H) violations of State laws and regulations in other circumstances.
    22nd on an administrative punishment is dissatisfied, he may apply for administrative reconsideration or bring an administrative suit.
    Article 23rd Chengdu electricity regulatory Commission and the provincial, city (State) Commission of dereliction of duty, abuse of power, favoritism, and managers directly responsible and other persons directly responsible shall be given administrative sanctions constitute a crime, criminal responsibility shall be investigated according to law; damages are caused to the parties, shall be subject to compensation.
                                                                                                                  24th article this way since October 16, 2006.