Interim Measures For The Urban Architectural Color And Material Management In Xuzhou City

Original Language Title: 徐州市城市建筑色彩及材质管理暂行办法

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Interim measures for the urban architectural color and material management in Xuzhou city

    (October 6, 2008, Xuzhou city people's Government Executive meeting of the 10th review on December 23, 2008, 120th, Xuzhou city people's Government promulgated as of February 1, 2009) first in order to strengthen the urban architectural color and material management, beautify the urban environment, according to the relevant laws and regulations, combined with the city's actual, these measures are formulated.

    Article in Xuzhou urban area within the primary and secondary roads on either side, building colors and materials used in important areas and their supervisory activities, these measures shall apply.

    Color in these measures refers to buildings, structures and facilities of colors. Third municipal construction Bureau is responsible for urban architectural color and the supervision and control of material used.

    Decoration of its governing body responsible for the day-to-day supervision and management.

    Planning, city departments shall, in accordance with their respective responsibilities to urban construction supervision and management work related to color.

    Fourth city planning administrative departments should develop urban color planning and urban architectural color control technology guidelines.

    Article fifth urban primary and secondary roads within built-up areas on both sides and vital areas of color, shall conform to the urban color planning and urban architectural color control technology guidelines.

    Sixth new construction, expansion, renovation construction projects building design or construction drawings, architectural color and material content should be included.

    Article seventh exterior of buildings, structures and installations should be drawing detail drawing and dimensioning and process in detail.

    Color and material of the outer façade of the building site approval is required should be indicated in the drawings and construction permits. Eighth construction units shall not alter the building's appearance, color and material.

    Alteration, shall be submitted to the original examination and approval Department for approval.

    The construction unit shall, in accordance with the approved design and construction drawings for construction. Nineth encourages and supports the outer façade of the building uses energy-saving, environmental protection and new materials.

    Prohibited to use national disabled or out of the building, decoration materials and construction techniques.

    Article tenth facade decoration of existing buildings, shall comply with the urban color planning and urban architectural color control technology guidelines.

    11th construction design scheme of decoration and fitment engineering of existing buildings should be reported to the examination and approval of City Council; without approval, the decoration shall not commence.

    The approved design, the construction unit shall not be changed without authorization; alteration, shall be submitted to City Council.

    12th of municipal construction Bureau of decoration and fitment engineering of existing buildings should be received within 7 working days from the date of the programme review has been completed, eligible, be approved; do not meet the conditions, and shall state the reasons in writing.

    13th facade decoration of existing buildings from the date of acceptance in the 15th, the construction unit shall be the completion inspection reports and other relevant documents submitted to the municipal construction Bureau.

    Article 14th existing building facade of serious damage, or a faded original design color clear, repair or redo the decoration should be carried out.

    15th the outdoor advertising facilities attached to buildings, its color and material shall be coordinated with the color and texture of the building, its supervision and management by the city administration according to law.

    16th in violation of the provisions of article 11th, decoration and renovation activities shall be ordered to stop by the municipal construction Bureau, more than 5000 Yuan and fined a maximum of 30000 Yuan.

    17th in violation of the provisions of article 13th, by the municipal construction Bureau of correction is more than 2000 Yuan and fined a maximum of 10000 Yuan.

    Article 18th violation of the regulation, from related departments such as planning, city punished according to law, and by the plans, amenities, and other relevant departments shall punish. 19th article this way come into force February 1, 2009.