Administrative Measures On Urban Road In Xi ' An Overhead Cable Landing

Original Language Title: 西安市城市道路架空线缆落地管理办法

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.

Long-term urban road cable management approach

(Act No. 88 of 26 July 2010 of the People's Government Order No. 88 of 24 August 2010)

In order to strengthen urban road trajectory management, expedite the land of the city's roads, make full use of the city's space resources, the United States of America's environment, create international urbanization, and develop this approach in accordance with the relevant laws, regulations and regulations, such as the People's Republic of China Rural Planning Act, the Urban Road Management Regulations, the Regulation of the Urban Engineering Facilities Management Regulations of the West An Indian city.

Article 2 of this approach refers to the garbage of the urban road, which is located over the urban road, including high (low) pressure on the transmission line (a line of 110KV), information transmission lines, electrical feeds, and its subsidiary facilities.

Article 3.

Article IV provides for the implementation and management of urban road cables, consistent planning, harmonization, maintenance and uniform management, in accordance with the principles of government ownership, market operation.

Article 5 The municipal administration sector is the administrative authority for the work of the urban road cable.

Relevant sectors such as urban planning, industrial information, development reform, finance, construction, urban parking forests, prices, public safety, electricity and electricity should be managed in line with their respective responsibilities.

The Government of the people of the region concerned and the Committee for the Development of the District shall, in accordance with their respective responsibilities, be able to work on the ground.

The cable units, such as electricity, communications, transport signals, should be actively aligned and supportive of the work of the air cables. The municipal government has granted support and preference to the cable unit that works in the area of the initiative. Specific enabling and preferential policies have been developed by the Municipal Government.

Article 7. The municipal administration sector should organize special planning for the construction of air cables in line with the overall planning, construction and management sectors of the city.

In the course of the urban diametery, the establishment of transformative power facilities and communications exchange equipment along the lines of electricity, transport, communications and communications should be harmonized. The competent units should be established in accordance with the location of the planning point and the relevant units and individuals should be actively aligned.

Article 9. The municipal administration has led the development of the annual Urban Road Terminal project construction plan and integrated into the integrated management of the annual urban construction plan. The cigarette unit should develop a programme that is in line with the urban road trajectory construction plan.

Article 10 provides for the construction of new urban roads, in line with the overall planning requirement for urban planning and the construction of a diametery, to be constructed in parallel to the planning of new pipelines.

In other cities, the garbage that has been built should enter the planning new pipeline in accordance with the annual Urban Road Terminal project construction plan, which should be constructed in accordance with the norms.

Article 12 There is a need for new air cables, subject to approval by the municipal administration sector and the municipal planning administration sector, which can be implemented; the temporary unsettered urban air cables are maintained on a daily basis by a cable unit to ensure a good and overall picture of the technical condition of the cable.

Article 13 should be dismantled in a timely manner with respect to the abandoned air cables, the floor cables and their subsidiary facilities.

Article 14. The construction of a diametery should promote the application of technologies such as non-exploitation of construction processes and avoid the excavation of urban roads.

Article 15. The construction units of the cable engineering unit shall be governed by the relevant provisions for the planning of the licence process, the procedure for the construction of municipal works. In parallel with road construction, construction units can entrust road construction units to work with road works.

In the course of the construction of cables, the construction units should be organized with the consent of the original approval department, for reasons such as the location conditions.

Following the completion of the cable construction work, the construction unit should transfer the engineering file to the urban Archives Authority, as required.

Article 17 may be subject to the use of pipelines in the form of leases and purchase orders, as required.

Article 18, the custodial units should strengthen the trajectory and inspection, and manage the tactics.

Article 19 Facilities such as well-line and counter-attacks on urban roads should be in line with urban profiling standards and facilitate urban road conservation. In the event of a lack of damage or an impact on the safety of transport, the rights-holders should be filled in a timely manner or rehabilitated.

Article 20 violates the provisions of this approach that do not require the implementation of a garbage by an annual plan, with the application of a cable area organized by the municipal administration sector, and the costs incurred by a cable authority unit.

Article 21, in violation of this approach, stipulates that unmet air cable maintenance obligations and affect urban landscapes, shall be converted by the municipal administration and fines of €200 to the unit of 1000, with the proceeds of the violation, with a fine of over 5,000 dollars.

In violation of this approach, the construction of a new air conditioning line was removed by the municipal administration for the period of time and was not dismantled by the law of the municipal administration, which was charged by a cable unit with a fine of €200 for the individual's office, a fine of 1000 for the unit, with the proceeds of the violation, and a fine of up to $300,000.

Article 23 imposes fines on other violations of the provisions of this approach, in accordance with the relevant laws, regulations.

Article 24 imposes an administrative disposition by its units or superior authorities, which constitutes a crime and is criminally criminalized by law.

Article 25