Removal of the city's residential building range and day-to-day management provisions

(Summit of 10 December 2010 at the 24th ordinary meeting of the Government of the city to consider the adoption of the Decree No. 155 of 23 December 2010 on the date of publication)

Chapter I General

In order to secure the day-to-day health environment of residence construction, the scientific use of urban land and space is based on the People's Republic of China Rural Planning Act, the Modalities for the implementation of the People's Republic of China Rural and Rural Planning Act and the relevant laws, regulations and regulations, in line with the actual provisions of this city.

Article 2 units or individuals involved in planning, construction design and construction activities in the city's urban planning area shall be subject to this provision.

Article 3 refers to residential buildings as described in this provision (hereinafter referred to as home, boarding for students) and public service facilities with special requirements, accommodation for kindergartens, secondary school pedagogical buildings, hospitals' wards, garage buildings, garage buildings, garage buildings, garage buildings, etc.).

Article IV Living buildings should meet the day-to-day standards set by States.

Article 5 shall be in line with this provision and shall be in compliance with the provisions of firefighting, vegetation.

Article 6 Governments and relevant departments should be jointly managed in accordance with their responsibilities.

Chapter II

Article 7 refers to the minimum distance between the two walls.

Article 8. The construction interval factor, calculated at a high degree of intrusion of buildings, is a high margin for the construction between the building and the barracks and the construction of the interfabrication factor, calculated by the breadth of the building blocks, is the comparative value of the vertical dispersion of the building between the building and the barracks of the building blocks.

Article 9. Absecure construction is highly defined as a vertical distance from the design of the veterans outside the barracks or from the wall of the daughter. The construction of abundance is not taken into account at a high distance of 200 mm from the design of the area outside the house.

At the time of the slope of the house, the garbage factor should be calculated separately, depending on the high level of impact, and the reckless buildings are calculated at a high level of impact.

Article 10 shows changes in the wall outside the building (e.g., the establishment of a positive unit) and highlights the sizeable length of the general length of 1/2 or the length of the outside wall, which is calculated at the minimum distance between the garbage and the garbage walls.

Article 11 is divided into multi-scale buildings and high-level buildings, with a high altitude of 24 metres, with a high altitude of over 24 metres.

Article 12. The multi-scale building blocks neighbouring homes, when the two buildings are in parallel or interlocked below 30 degrees, the construction break factor shall not be limited to 1.7, and the building blocks shall not be less than 18 m.

When the two buildings are vertically or interlocked in more than 90 times, and in the shortest direction of the homes of the east, the west and the north, the building is not 1.3 times the length of the building block and cannot be less than 13 metres.

When the two buildings are loaded at more than 60 times, the interconnection factor shall not be less than 1.5 and the building is not less than 18 metres.

Under article 13, a high-level building blocked a neighbouring home, when the building was highly lenient than 1.2, the construction break factor would not be limited to 1.7 in accordance with a high degree of construction calculation.

When the building is highly lenient than 1.2 per cent, the construction break factor is not limited to 1.3 and the building is not less than 30 metres, according to the breadth of the building block.

Article XIV is relatively short of two buildings, one of which is inhabited by the following criteria:

(i) A relatively small number of buildings shall not be less than 6 metres;

(ii) High-level buildings are not less than 9 metres compared to the short-range buildings;

(iii) The relatively high-level buildings are not less than 13 metres.

The construction highlights shall not be used as a building block.

Article 15. The construction interval between the construction and the long-range construction is carried out in accordance with the following criteria:

(i) In the light of the large-scale building blocks, the building blocks may not be smaller than 2.0 in accordance with a high degree of construction calculations, as determined by the building blocks; and when the two buildings are actually installed, the building blocks are not less than 1.5.

(ii) The garbage of the high-level building blocks, when the garbage is much larger than 1.2 hours, the building blocks are determined at a high rate of 2.0 per day, and the construction break factor shall not be less than 2.0; and the construction of the building at a high level of breadth and length. More than 1.2 hours, the building blocks were determined by the breadth of the building blocks, and the building blocks were not less than 1.6.

Article 16 provides for non-residential buildings in the north, west and east of the residence building, which are carried out in accordance with the following criteria:

(i) Buildings between multiple buildings, multiple buildings and high-level construction subjects cannot be small at 18 metres;

(ii) Buildings between the high-level construction subject cannot be less than 24 metres.

Article 17, when the bottom of the housed construction is not a residential building, the construction of abundance shall be highly calculated to lessen the level of non-residential buildings that are blocked by the occupancy of the occupancy of the occupants and that the building is not less than 18 metres.

Article 18, when the residential construction is high below 40 metres, is less extensive than 80 metres; the residential construction is at a high rate of over 40 metres.

Article 19 is open to high-level buildings in cities like the river, large greenfields and squares, with the exclusive building blocks not exceeding 2/3 of the breadth of their territorial boundaries, and between the top-down buildings and neighbouring buildings that are not less than 2/3 of the average building blocks of the new building and cannot be smaller than 20 metres.

Article 20 builds between the main urban gateway side and the high-level buildings that are in place are not less than 20 metres unless the requirement is met for the interconnect between the buildings that are relatively appropriate for this provision.

Article 21 shows the interconnection between the main roads of more than 40 metres in the urban area, as well as the exceptional circumstances that are not covered in this provision, and the inter-constructability of the construction.

Chapter III

Article 2, paragraph 2, refers to the number of hours of residence of the homeowners on the basis of the prevailing order of the building, east and west.

Article 23. The residential day care rate shall not be less than 2 hours on the typhical day, and the new residential day care rate in the old area's alteration project should not be lower than the standard of one hour on the typhical day.

Article 24 provides that the long-range construction day care must be in accordance with the relevant provisions of the Urban Residence Planning Guidelines.

Article 25

Article 26 Construction units apply to the urban and rural planning authorities for the processing of planning clearance procedures, one of the following cases must be made available to the construction project's Impact Analysis Report:

(i) Inhabited buildings around the construction of new buildings;

(ii) A high-level house or a high-level and multi-tier hybrid house, which has been installed;

(iii) Construction of complex parking buildings in the construction factory;

(iv) Other circumstances requested by the Executive Department for Rural and Rural Planning.

Article 27 Impact analysis should be carried out by the planning design units with corresponding qualifications; the impact analysis software must be used in the form of a sound software validated by national administrative authorities; and the impact analysis report should be reviewed by urban and rural planning administrative authorities.

Article 28 build-up units and units that have assumed daily impact analyses are responsible for the authenticity of the reports and related materials, which are not materially or concealing the consequences of the information, and should have their respective responsibilities.

Article 29, which is subject to conditions of use, has blocked the original residence of the new building blocked the day-to-day system set by the State, and the construction units must obtain written consent by the owner on the basis of voluntary consultations in the form of purchase, property transfer and economic compensation.

Chapter IV

Article 33 below contains figures.

Article 31 provides for intervals and daily management of towns outside urban planning areas.

Article III provides for implementation effective 1 March 2011. The management of inter-market buildings (No. 73 of the Order of the People's Government) was released on 7 November 2000.

Prior to the date of implementation of this provision, the land-use rights and the detailed planning of projects approved by the Urban Planning Committee are still being implemented in accordance with the original methodology.

Part of the provision of the Rehabitation and Resistance Management Provisions in the City