Wuxi Civilization Construction Engineering Construction Management

Original Language Title: 无锡市建设工程文明施工管理办法

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.

Modalities for the construction of civilization in the construction of works in the city without cascause

(Adopted by the 33th ordinary meeting of the Government of the Community of the Turkmen Republic of 9 February 2011, No. 120 of 17 February 2011, issued since 1 May 2011)

Chapter I General

Article 1 improves the management of the construction of civilization works, improves the level of construction management of civilization, preserves urban environmental integrity, and develops this approach in line with the relevant provisions of the Department of State Regulation on Construction of Engineering Safety Production, the Regulations on the Safety and Production of Engineering in the Freetown.

Article II states that civilization construction is meant to be carried out in construction works and construction (construction) demolitions, such as house buildings, municipal bridge works, urban orbital transport, as prescribed by the measures to guarantee the physical health of construction on-site sanitation and the maintenance of construction personnel and to effectively improve construction activities in the urban environment.

Article 3 activities such as construction works and construction (construction) demolitions and their oversight management within this city's administration should be subject to this approach.

Article IV. The establishment of administrative authorities is responsible for the supervision of the construction of civilization works throughout the city.

Urban (zone) and district-building administrative authorities are responsible for the management of the construction oversight of civilization works.

Sectors and units such as municipal parks, urban pipelines, environmental protection, tenure, public safety, transport, water, communications, electricity, water supply, heating, etc. should work in the construction of civilization works in accordance with their respective responsibilities.

Article 5. Construction of administrative authorities may entrust the construction market administration, in accordance with the authority of management, with specific responsibility for the construction of the day-to-day work of the management of the construction of civilization.

The municipal construction market administration is responsible for the day-to-day management of the construction of civilization works in urban areas, the organization of construction oversight inspections for the construction of civilization works and guidance on the operation of the city (zone) and the regional construction market administration.

Article 6 encourages scientific construction techniques in construction work, the use of advanced civilization construction facilities, the promotion of the standardization, normativeization, science-policy management of construction on-site, and the improvement of the level of construction management of civilization.

Units and individuals that make significant achievements in the construction of civilization works should be recognized and rewarded.

Chapter II

Article 7. Construction shall be subject to a construction licence by law; a construction licence shall be granted under the same construction work sub-item.

The construction site was determined to be based on the scope approved by the relevant sectors.

Article 8. The construction units shall, when construction works, construction (construction) is removed from tenders or directly issued kits, expressly design, construction, treasury, etc. units relating to civilization construction construction.

Article 9. The cost of security civilization construction measures is non-competitive, and the construction units should determine the cost of security civilized construction measures in accordance with the relevant provisions of the State, the province and the city, as well as in the solicitation documents and the contract for the construction of the security civilization.

The cost of security civilization construction measures consists of basic fees, assessment fees and incentives.

Article 10 Construction units should provide information on the cost of security civilized construction measures, which are presented separately in the delivery package contract, when carrying out construction safety oversight procedures.

The construction units should pay for security civilization construction measures not less than 60 per cent of the basic cost prior to the start-up of the construction work and, in accordance with the contract agreement, pay the cost of security civilization construction measures to the construction units in a timely manner.

Prior to the completion of the preliminary design document for construction, construction units should organize design units and related line units to conduct on-site investigations into construction (construction) and various lines, facilities and to propose specific technical measures and requirements for civilization construction.

The construction units should submit specific technical measures and requirements for civilization construction in writing to design, custodial and construction units.

The design cell, prior to the completion of the construction map design document, shall, in accordance with the written opinion of the construction of the engineering survey and the civilization construction work provided by the construction units, provide protection requirements for construction (construction) and various pipelines, facilities and select, as a matter of priority, construction techniques, processes and construction materials that are conducive to the construction of civilization.

Article 13 states that civilized construction should be integrated into the scope of the institution and that the use of construction measures for the security of civilization in the construction units, and the implementation of civilization construction measures, should be followed up.

In the course of the implementation of the institution, it was found that the construction unit was in violation of civilized construction and should be required to restructure the construction unit; in serious circumstances, the construction unit should be required to suspend the construction and report to the construction unit. The construction unit refused to change or not stop construction, and the institution should report on a timely basis to the construction of administrative authorities or the construction market administration.

The construction of administrative authorities or the construction market administrations should be checked on the construction site in a timely manner, following the receipt of the report of the supervisory units.

Article 14. Construction units, engineering price counselling units shall be based on the rates established in the Field Safety Civilized Construction Measures Modalities, based on the market, the municipality (the district) engineering establishments, and the calculation of the cost of construction measures for the safety of civilization.

Article 15. Construction works shall be carried out by units such as construction, construction, treasury, etc. in accordance with their respective responsibilities, and the management of civilization during the suspension period.

Chapter III Civilization of construction units

Article 16 should be carried out by the construction unit, in accordance with the written opinion on the construction of civilization units, following the approval of the construction units and the custodial units.

The construction units and project heads should carefully implement and implement the objectives, systems and plans, measures for civilization construction at all stages of the work.

Article 17 builds more than 20,000 square meters of homes and construction units with a sizeable municipal bridge, urban orbital traffic etc., which should be established at the main entrance and at the main level involved in the management of the workplace, with real-time video surveillance and networking with the construction of administrative authorities or the construction market administration.

Article 18 The construction unit should have a reliable and fixed door at the construction field entrance, with the opening of the business mark, the opening of the door-to-door shop, with a clear marking of the evening lighting; and the construction of the gateway at the urban gateway should be equipped with a warning, a decimation, a reduction of speed, a reduction of speed, and anti-rays.

The walls on the two sides of the gateway should be directed to the community to demonstrate the construction licence and the establishment of social oversight cards.

The wise place on the construction site should focus on the following brands and maps:

(i) Overview of the work;

(ii) List of managers and supervision of telephones;

(iii) Safety production brands;

(iv) Fire and integrated governance brands;

(v) Civilized construction and sanitation measures;

(vi) The construction site in general;

(vii) Highly high-risk sub-offices and project sheets;

(viii) Profile of emergency relief for construction production;

(ix) Other should be indicative.

The main manager of the construction site should be screened at the construction site for the identification card.

The construction units should be equipped with markers at the top of the construction site and discourage the entry of vehicles and personnel without construction.

Article 20 The construction unit shall establish a continuing and closed block within four weeks of the construction site and shall meet the following requirements:

(i) The perimeter should be set aside for four weeks, excluding the entrance, without remaining gaps and specialized designs, based on geological, climate, material, etc., to ensure stability, integrity, security and the maintenance and integrity of the day;

(ii) Structural materials, such as bars, metals and pyrethroids, shall not be used in such a way as a bar, or a safety net, and in the cross-roads, in which the vehicle is not affected by the distance and, if necessary, through the use of the utering material;

(iii) The main road blocks of the urban area shall not be much lower than 2.5 metres; the perimeter of the general road block shall not be less than 2 metres, with a high degree of basic consistency;

(iv) No distributive material, such as cement, sand, and routing, templates, etc. shall be blocked by the wall.

The construction sites, such as linear works and closed urban road works, are adjusted in due course, in accordance with the operation of the construction site.

Article 21 encourages the establishment of public goods, public interest advertisements, on the side of the construction of the workplace.

The construction field footprint should be accompanied by a clean green bibliographic safety net. Constraints and the floor should be closed and protective measures should be taken at all stages. The trajectory should be painted by the slogan.

The construction works should be hard-clocked in each construction site, in the area of operation and in the mainland areas of life. The entrance should put in place water blocks, vehicle laundering and sewerage ponds and be equipped with vehicle-washing facilities to ensure net vehicle outdoors.

Structural construction should be carried out within the area of the city's rapid landscape, in the context of the new town of Port-au-Prince, as well as in urban poles, poles.

Article 23, construction materials, components, paints, should be constructed on the basis of the balancing of the basement, classification and releasing of the wholesale, orderly, solid, and becated on the wall name, type, specifications, etc.

Article 24

The gate of the engineering transport vehicle to the construction site should have a security mark and carry a duty command with a person with night-time anti-ray functions.

Article 25. The construction site should establish drains and sediments to ensure drainage, and the construction of wastewater should be closed and, after the relevant approval process, the urban drainage network could not be placed directly into urban drainage networks, rivers or outdoor environments.

Article 26 Buildings generated on the construction site shall not be placed in urban drainage networks, rivers or outdoor environments. The construction saving shall not be dumped. The transport, disposal and disposal of the building puls, residues should be transported to specified disposal sites in accordance with the relevant procedures established.

In addition to the laws, regulations and regulations governing the control of noise and dust, the construction unit should comply with the following provisions:

(i) Removable operating equipment should be put in place away from the local side of the residential area and operate in temporary accommodation (cillage) with separate audio functions;

(ii) The construction site shall not be open to blend or prefabricane operations;

(iii) The city area is not allowed to dispel the operation on the construction ground.

The construction (construction) dismantled operations by the construction unit should comply with the following provisions:

(i) Develop specific construction programmes to dismantle (constrain) construction;

(ii) The establishment of the removal of the floor fence and the removal of dangerous areas or dangerous sites should be subject to exclusive supervision;

(iii) To dismantle more than three layers of construction (construction) by using mechanical or fragmented methods to dismantle, and to dismantle the explosion in compliance with the State's regulations on the management of explosive operations;

(iv) When weather forecasts reach more than five levels, the demolition of houses or the dismantling of homes;

(v) The construction (construction) of a humidated operation in the construction process and the dismantling of the operation for the construction of (construction) destroyed water or spraying.

Article 29 should take precautionary measures, such as garbage, spraying water, for building materials that are likely to produce dust on the construction site.

The construction site slots should be downgraded at a high altitude and should not affect the safety of the surrounding construction (construction) and various pipelines, facilities.

Article 33 Urban road works or pipeline works require exhumation, concreteness, etc.

The construction unit should cover the steel floor on the road and should keep the steel floor in a way that will not be completed and will be required as a road. A number of dangerous ministries should establish security alert signs and protective facilities that meet national standards.

In addition to the construction of works such as hijacking, hijacking, the construction unit shall proceed with the approval of night construction, in accordance with the relevant provisions, due to the need for construction of the construction process to be constructed at night from 22 to 6 p.m.

Article 32 builds on the outside side of the construction project or on the road, the construction unit should set up solid safety protection days on the road and set the necessary warning and guidance signs.

As a result of construction work requirements, all closed, partially closed or reduced road blocks were imposed on the roads, affecting the safety of the buoys, and the construction units should establish safe corridors; roads or premises outside the temporary occupation of construction sites should be closed.

The temporary facilities within the construction site and the streets should be maintained.

The construction unit shall not be able to establish a staff accommodation room in buildings that have not yet been completed.

Article 34 establishes a living area on the construction site and shall be in compliance with the following provisions:

(i) The living area is strictly separate from the area of operation;

(ii) The establishment of drinking water facilities in living areas;

(iii) The installation of beds and showers;

(iv) The establishment of water blocked toilets, with exclusive responsibility for cleaning and sterilization, and the construction of high-level buildings after more than 8 levels, have temporary toilets at all four levels;

(v) The establishment of closed-circuit garbage containers and the placement of garbage within the garbage container and the day-to-day inventory;

(vi) The procedures for hygienic licences in the living area and compliance with the relevant provisions of the food health management;

(vii) The installation of open windows at the residence of the living area to ensure the necessary living space;

(viii) The living area is equipped with firefighters and maintains good conditions.

The sewerage in the living area shall be subject to the required emissions; it encourages the use of clean energy in the living area.

The construction unit should establish the remaining schools of the private industry in accordance with the provisions of the construction site to strengthen knowledge education such as professional ethics, social justice, civilization, security technology operation protocols.

The construction unit should, in accordance with the provisions of article 36, dismantle construction ground blocks and other construction temporary facilities in a timely manner, complete the construction site and clear the clearance of construction garbage, sland and other wastes.

Chapter IV Oversight management

Following the completion of the work, the construction market administration should conduct an integrated assessment of the security civilization management of the construction unit throughout the construction project, and evaluate the congestion of opinions to the city, city (zone) engineering establishment authority.

Any unit and individual found that construction activities were in violation of this approach, and complaints could be made to the construction of administrative authorities or the construction market administration. The regulatory authorities should be processed in a timely manner and inform the complainant of the results.

The construction of administrative authorities or the construction market administration should enhance the day-to-day inspection of the construction site, finding that construction activities are in violation of this approach and should be stopped and inspected in a timely manner.

Article 40, city, city (zone), sector construction market management should establish and improve the construction of a management system for the supervision of the construction of civilization works, with corresponding civilized construction supervisors.

Article 40 provides for the construction of a civilized construction inspector to be conducted by more than two supervisors, and the inspection should present effective law enforcement documents.

Chapter V Legal responsibility

Article 42 violates this approach, and the provisions of the laws, regulations and regulations have been punished.

Article 43, in violation of article 10 of this approach, provides that the construction unit pays less than 60 per cent of the cost of the construction measures for the safety of civilization on-site prior to the start-up of the operation and is fined by the construction of administrative authorities for the period of time.

Article 44, in violation of article 13, paragraph 1, and paragraph 2, of the scheme, provides that the institution does not incorporate the construction of civilization into the scope of the institution or that the construction unit violates the construction of civilization and rejects the conversion of the construction of the administrative authority, is subject to the construction of an administrative authority to the time limit and imposes a fine of up to $50 million.

In violation of article 14 of this approach, construction units, engineering price counselling units are not charged with the calculation of the cost of safety civilization measures at the rate approved by the municipal, municipal and district engineering price management, which is due to the construction of administrative authorities for a period of time and fine of up to $20,000.

Article 46, in violation of this approach, provides that the construction unit consists of one of the following acts and is responsible for the construction of administrative authorities and fines of more than one million dollars:

(i) There are no blocks of closure on the workplace four weeks;

(ii) More than 20,000 square metimetres of homes and major entrances with a sizeable municipal bridge, urban orbital traffic, as well as the absence of real-time video surveillance in key ministries involved in working land management;

(iii) The doors of the work area, as well as the awakening of the location, have not been established with respect to the work sheets, maps;

(iv) The slack of pyrethroids, the insecure gap, the safety net damage;

(v) The construction (constitution) of the operation without the application of the wet-moval law;

(vi) Absolidal measures such as garbage, spraying water, etc. for construction sites that can easily generate dust;

(vii) The construction of the engineering project's outdoor neighbourhoods or road blocks, the construction unit has not been able to build safe days on the road and to set the necessary warning signs and guidance signs.

In violation of this approach, the construction unit consists of one of the following acts, which are to be converted by the construction of administrative authorities and fines of up to 3,000 dollars.

(i) Inadequate access to hard-lawed or no washing facilities and washings;

(ii) In the area of rapid indoors, in the context of the new town of Port-au-Prince and in the area of urban ownership, poles and poles, no hard law enforcement law has been applied;

(iii) The duty command of the engineering transport vehicle to enter the construction site;

(iv) The construction of fervents to urban drainage networks, rivers or outdoor environments;

(v) The construction of ground-breaking operations in the urban area and in key areas.

Article 48 of the construction unit violates one of the provisions of article 34, paragraph 1, of this approach, by creating administrative authorities responsible for the period of time and imposing a fine of up to 3,000 dollars.

Article 49 builds the staff of the administrative authorities and the construction market administration, and does not perform oversight duties or abuse of authority, play negligence, provocative fraud, by the unit of the institution or the parent department responsible for the change of the duration of the period; in the event of serious circumstances, the administrative disposition of the competent person and the directly responsible person is governed by the law; and constitutes an offence punishable by law.

Annex VI

Article 50 Professional works, such as transport, water, disaster risk response and other sudden-on-scale construction works, legislation, regulations provide for their provisions, and does not provide for the implementation of this approach.

Article 50 is implemented effective 1 May 2011.